LETTER OF APPROVAL WITH MODIFICATIONS
Armstrong Timber Management
Attn: Brian Armstrong, Manager
2709 Thorngrove Court, Suite 2
Fayetteville, NC 28303
RE: Project Name: Legacy Lakes, Phase 4, Section 1-3
Acres Approved: 16.65
Project ID: MOORE-2022-023
County: Moore, City: Aberdeen Address: US Hwy 15-501
River Basin: Lumber
Stream Classification: Other
Submitted By: Double D Engineering, PLLC
Date Received by LQS: November 22, 2021
Plan Type: New
Dear Mr. Armstrong:
This office has reviewed the subjecterosion and sedimentation control plan and hereby issues this Letter of
Approval with Modifications. A list of the modifications and reservations is attached. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken,
as is required by Title 15A NCAC 4B .0129, Should the plan not perform adequately, a revised plan will
be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000
Construction General Pcrmit. After the form is reviewed and found to be complete, you will receive a
link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive
the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this
project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.l?ov/NCG0L Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office, If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
I. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received,
3. Records of inspections made during the previous 12 months.
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
na+�+a� rua
910.433.3300
Armstrong Timber Management
December 15, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: LEGACY LAKES, PHASE 4, SECTION 1-3
Project Number: MOORE-2022-023
County: MOORE
This plan is for streets, utilities and townhorne construction. Land disturbing activity on individual lots is
not approved with this plan review. Before house construction begins on the Iots, a plan showing
individual lot measures is required.
Provide two full size copies each of revised plan sheets, showing all the Modifications required for
approval, prior to beginning any land -disturbing activity.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through I5A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities