HomeMy WebLinkAboutNCC220066_ESC Approval Submitted_20220105ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality December 15, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Armstrong Timber Management Attn: Brian Armstrong, Manager 2709 Thorngrove Court, Suite 2 Fayetteville, NC 28303 RE: Project Name: Legacy Lakes, Phase 4, Section 1-3 Acres Approved: 16.65 Project ID: MOORE-2022-023 County: Moore, City: Aberdeen Address: US Hwy 15-501 River Basin: Lumber Stream Classification: Other Submitted By: Double D Engineering, PLLC Date Received by LQS: November 22, 2021 Plan Type: New Dear Mr. Armstrong: This office has reviewed the subjecterosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO 10000 Construction General Pcrmit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.l?ov/NCG0L Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office, If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: I. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received, 3. Records of inspections made during the previous 12 months. North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301 na+�+a� rua 910.433.3300 Armstrong Timber Management December 15, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: LEGACY LAKES, PHASE 4, SECTION 1-3 Project Number: MOORE-2022-023 County: MOORE This plan is for streets, utilities and townhorne construction. Land disturbing activity on individual lots is not approved with this plan review. Before house construction begins on the Iots, a plan showing individual lot measures is required. Provide two full size copies each of revised plan sheets, showing all the Modifications required for approval, prior to beginning any land -disturbing activity. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through I5A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities