Loading...
HomeMy WebLinkAboutSW8121119_CURRENT PERMIT_20210710STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 t jc1 DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2021 0 11D YYYYMMDD f '1� ROY COOPER Governor DIONNE DELL -GAT 1 sernrtmy BRIAN WRENN Director July 10, 2021 Par 5 Development Group, LLC Attn: Brian Clodfelter, Managing Member 2075 Juniper Lake Road West End, NC 27376 NORTH CAROLINA Fmironmentd QudBy Subject: Permit Renewal State Stormwater Management Permit No. SW8 121119 Dollar General- Long Ridge Drive New Hanover County Dear Mr. Clodfelter: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on July 8, 2021. The Division is hereby notifying you that permit SW8 121119 has been renewed on July 10, 2021, and shall be effective until February 21, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application_ Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit The plans originally approved on February 21, 2013 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdem.gov. Sincerely, C'� Brian Wrenn, Director Division of Energy, Mineral and Land Resources lK North Caroliw Department of Environmental Qualhy I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilnungton. North Carolina 2a405 °+��•��'� 910.796.7215 State Stormwater Permit No. SW8 121119 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2012\121119 HD\2021 07 permit 121119 cc: Wilmington Regional Office Stormwater File ®w, �Z� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 .omv rxin�w. State Stormwater Management Systems Permit No SW8 121119 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Par 5 Development Group, LLC Dollar General — Long Ridge Drive 93 Long Ridge Drive, Wilmington, New Hanover County FOR THE construction, operation and maintenance of one (1) infiltration basin in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter collectively and separately referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until February 21, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater control has been designed to handle the runoff from 30,000 square feet of impervious area. 3. The infiltration basin is designed in accordance with Option 3 of Section 16.3.9 of the BMP Manual, therefore, no offline bypass and no vegetated filter strip are required. This alternative design meets the requirements of Section .1008 (h) of the stormwater rules. The basin provides active storage volume for 2.5 times the regulated 1.5" design storm and infiltrates that volume within 5 days using a soils infiltration rate of one-half the infiltration rate reported in the soils report. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 of this permit, and as shown on the approved plans. The built -upon area for the future development is limited to 1,740 square feet. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. Page 1 of 7 State Stormwater Management Systems Permit No. SW8 121119 The project shall provide a 50' wide vegetated buffer adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers, and the mean high water line of tidal waters. 8. The following design criteria have been permitted for the alternative design infiltration basin and must be provided and maintained at design condition: a. Drainage Area, acres: 1.056 Onsite, ft2: 46,000 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 30,000 Buildings, ftZ: 9,100 Parking, ft2: 16,775 Sidewalks, ft2: 2,385 Future, ft2: 1,740 c. Design Storm, inches: 3.75" (2.5 x 1.5") d. Basin Storage Depth, feet: 1.36 e. Bottom Elevation, FMSL: 31.25 f. Bottom Surface Area, ft2: 5,629 g. Emergency Overflow Elevation, FMSL: 32.61 h. Top Elevation, FMSL: 33.5 h. Provided Storage Volume, ft3: 9,244 i. Type of Soil: Group A j. Expected Infiltration Rate, in/hr: 3.0 k. Seasonal High Water Table, FMSL: 29.25 I. Time to Draw Down, hours: 13.2 m. Receiving Stream/River Basin: UT of Smith Creek n. Stream Index Number: CPF17 18-74-63 o. Classification of Water Body: 'C; Sw" II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 4. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 5. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 6. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 121119 Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 11. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the Page 3 of 7 State Stormwater Management Systems Permit No. SW8 121119 construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 4. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08. C. Bankruptcy, d. Foreclosure, subject to the requirements of Session Law 2013-121, 5. Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Page 4 of 7 State Stormwater Management Systems Permit No. SW8 121119 Permit renewed, updated and reissued this the 10th day of July 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION C.,K1Aa o /Q .�,, nan Wrenn, Uirector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 7 State Stormwater Management Systems Permit No. SW8 121119 Dollar General — Long Ridge Drive Stormwater Permit No. SW8 121119 New Hanover County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Certification Requirements: Page 6 of 7 State Stormwater Management Systems Permit No. SW8 121119 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built - upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 7 of 7 Attachment C - Permitting History Dollar General- Long Ridge Drive Permit No. SW8 121119 Approval Date Permit Action BIMS Version- 'Descriptionofthe 'Changes 2/21/2013 Original Approval I.0 7/10/2021 Renewal 2.0 Permit Number. (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement IV -f /a063 1 will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate the problem:. The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. E(CF9V . NOV 15 2012 Br: Form SW40I-Infiltration Basin O&M-Rev.3 Page I of 3 Sws 12 r ►►J BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. The embankment Shrubs or trees have started -spray). Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose oI the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- ou tlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 EE(CDo--U VIF NOV 15 2012 13Y: Page 2 of 3 Permit Number: Sag 1 21 11 ` (to be provided by DR/Q) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Dollar General - Long Ridge Drive BMP drainage area number: Print name:B Title:Manaae Address:2860-B NC Flwy 5, Aberdeen, NC 28315 Phone Signat �16117t�ri_ • . Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I a Notary Public for the State of County of %] 0 lip, do hereby certify that personally appeared before me this I� rj day of a(j,�} and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, 9O�PH T SCyF?''. O NotCVY Public Moore County MY Co OWx Ires= /rnninnwa SE -AL My commission expires Form SW40 I -Infiltration Basin O&M-Rev.3 riIf IN %I NOV 15 2012 bY:—Page 3-of-3 DEMLH USE ONLY Date ec ived Fee Paid Permit Number 510 G hJ191111 NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60. (c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: c5W a 0 110l 2. Project name: 3. Project street a City: Mm 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: httl)s://deg.nc.gov/about/divisions/energy- m i neral-land-resources/energv-m i neral-la nd-rules/stormwater-prog ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/abouUdivisions/energv-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: �R 15 De_GIROUPi LLG 2. Signing Official's Name: L3121Qn C1od�el+ex 3. Signing Official's Title: 4. Mailing Address: Zp5 Jim= 1..t�-m F�l'`Dti)I city: We -St End� State: WC zip: 2jal(D 5. Street Address: City: 6. Phone: BI—G) Email: ZIP: JUL 0 8 2021 1 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: ��/(JC.� 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: I have a copy of the current reserded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been nspected, and that they have been built and maintained in accordance with the permit. i7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httos://www.sosnc.gov/online services/search/by title/ Business Registration I JUL 082021 BY:_ Stormwater Permit Renewal Application Form Page 2 of 3 , May 11, 2018 D. PERMITTEE'S CERTIFICATION I, Bpnon CI Zip. -ki+ek , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All informatio provided on this permit renewal application is, to the best of my knowledge, correct a comple Signature: Date: Lb - Z8" 2021 NOTARIZATION: __(f��,, I, ltnni4m Vyinc h&-el; a Notary Public for the State of ,IORAY) CA9101 160L County of MooRe , do hereby certify that BRIUn _ Cwo e_l+ell personally appeared before me this the Z a}h day of execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) Notary Signature: My commission expires O 20 2-1 , and acknowledge the due JENNIFER VM CKLH NOTARY FER PUBLIC Moore County North Carolina I My Cammbelon Fjores April2f, 2028 [C6o�0 w JUL 0 8 2021 I Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 u .. A'd �i'fi-'�tit ;-xD(�sz gRs(S ^ui� 5d�t . � � L1�:U (;'PLC[ Ur No:v,e�. %r�sr�c R�9R!�tlk�-F1 h4:�CKfkQfEK �,. - ,'� • , ��• Permit No. Sks o (Z 1 (( 9 t Ito be provided by DWQ) or�p W / TEq�G 'AA STORMWATER MANAGEMENT PERMIT APPLICATION FORM p�<" NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT �V % /�0& 3 This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. Contact Person Phone Number Date Drainage Area Number Dollar General - Long Ridge Drive J. Phillip Noms, P.E./ Norris & Tunstall Consulting Engineers, P.C. 910-287-5900 02-05-13 II. "DESIGN INFORMATION Site Characteristics Drainage area 46,000.00 f2 Impervious area 30,000.00 h' Percent impervious 65.22 % Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr discharge Post -development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak Sow control Storage Volume: Non -SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area 3.80 in: 0.16 in/hr 0.31 ft'Isec 2.92 ft3/sec 2.61 Ns/sec 9,235.00 it' — 2.510< ".s,g•v i«L 8-(P4sS " 51911" 9,244.00 it' OK for non -SA waters Sand 1.50 inmr tl2 t.0114E vo)jn" t.+FV' 9A.1d 29.25 fmsl 0.55 days OK TIA0 1201- 10 M4WDct"1 A 4.00 :1 OK 31.25 imsl OK 32.61 fmsl 8,000.00 ftz 33.50 fmsl 169.19 it F �IFIVF- 5,629.00 33.27 fe FEB 0 9 2013 Form SW401-Infttration Basin-Rev.5 11Ap2011 Paris I. & II. Design Summary, Page 1 of 2 Permit No. SW 9 1 'Z 1 1 1 g • (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? 0.43 ac-in OK Length of vegetative filter for overflow NIA It OK—1161r�i' E} 104Nf— VF5 c"196 Distance to structure 15.00 It OK 0 Distance from surface waters 50+ ft OK Distance from water supply well(s) 50+ fit OK Separation from impervious soil layer 2+ It OK Naturally occuring soil above shwt 3.75 It OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? NIA (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Sheet Flow to drop inlets �{;FOVoF_ FEB 0 7 2013 Form SW401-Infiltration Basin-Rev.5 11Ap2011 Pans I. & 11. Design Summary, Page 2 of 2