HomeMy WebLinkAboutSW8110715_HISTORICAL FILE_20210525STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW8
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
2U2\ 05 25
YYYYMMDD
Burd, Tina J
From: Burd, Tina J
Sent: Tuesday, May 25, 2021 12:59 PM
To: Barraco CIV Talia M; heather.blackwell@usmc.mil
Subject: SW8 110715 - USMCB Camp Lejeune, Electric Supply Substation
The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted
the Stormwater Permit Renewal Application and $505.00 fee for the subject project on May 17, 2021. The project has
been assigned to Ashley Smith and you will be notified if additional information is needed.
Best Regards,
Tina Burd
Administrative Associate II
Wilmington Regional Office
Division of Environmental Assistance & Customer Service
Phone 910-796-7215
NCDEQ
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may he disclosed to third parties.
Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/starmwater
Based on the current guidance to minimize the spread of COVID-tq, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered
shifts. To accommodate these staffing changes, all DEQoffice locations are limiting public access to appointments only. Please
check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We
appreciate your patience as we continue to serve the public during this challenging time.
Non -Transfer Application Completeness Review Checklist - Short Version
c.
Project Name: (�,Srv'LC� CLA:Croso�PPC'l SUd�TAi//oN Date Del ivered to WI RO: Jr /O 20'Z
Project County/Location: _ 0A L5 LLLa�MGL� RIMS Received/Accepted Date: g 1
-� ^
RIMS Acknowledged Date': 9 oN'
Permit Action: New Not located in the ETJ of the following deligated and New Permit 7!':
functioning programs:
NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach
Bruns: Leland / Navassa (?) / Oak Island
Cart: Emerald Isle Onsl: Jacksonville
Pend: Surf City
Major Mod / Minor Mo newa
Permit Type: �/ LD / LD Overall / HD &LD Combo
®Existing Permit k: 5S36 0 O %( c6J
Expriation Date3: B/ ) 7 20 Z
General Permit/ Offsite/ Exempt FlOffsite to SW8:
Development Type: Commercial / Residential / Other Nt l uTA P4 I.SVSG 1-1I5 Lot IYed in Master Permit?
Subdivided?: Subdivision o mg a Lot
Rule(s): F-12017 Coastal �2008 Coastal El1995 Coastal
Phase II Universal F-11988 Coastal
Permittee Type & Documents Needed:
Property Owner(s) MPurchaser Lessee =HOA =Developer
=Viable? =Viable? =Viable? =Viable? Viable?
=Deed =Purchase Aamt
=Not Subdivided: Deed
=Subdivision: Common Area Deed
Paperwork
®Application
=Fee: F--1$505 (within 6mo) CheckN(s):
Supplement' (1 new form or for older forms: 1 original per SCM)
�O&M2
Soils Report (Infil or PP)
Calculations (signed/sealed)
Deed Restrictions, if subdivided
Project Narrative
FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?:
Plans (2 Sets)
�PE Certification
Electronic Copies
Easements, Recorded (2017 Rules)
NOTES:
'Enter BIMS Acknowledged Date on this Sheet
'For New Projects -Enter New Permit tf on Supplements & Deed Restiction Templates.
3If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first
EMAILED ENGINEER DATE: Comments:
REVIEWER NAME: ,'Sal,Exl
71No Fee
Y/N
Minutes
G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist 20200131
69Z-dMS `8SZ-dMS