Loading...
HomeMy WebLinkAboutSW8110715_HISTORICAL FILE_20210525STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2U2\ 05 25 YYYYMMDD Burd, Tina J From: Burd, Tina J Sent: Tuesday, May 25, 2021 12:59 PM To: Barraco CIV Talia M; heather.blackwell@usmc.mil Subject: SW8 110715 - USMCB Camp Lejeune, Electric Supply Substation The Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (Stormwater Section) accepted the Stormwater Permit Renewal Application and $505.00 fee for the subject project on May 17, 2021. The project has been assigned to Ashley Smith and you will be notified if additional information is needed. Best Regards, Tina Burd Administrative Associate II Wilmington Regional Office Division of Environmental Assistance & Customer Service Phone 910-796-7215 NCDEQ Wilmington Regional Office 127 Cardinal Drive Ext. Wilmington, NC 28405 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may he disclosed to third parties. Website: http://deg.nc.gov/about/divisions/energy-mineral-land-resources/starmwater Based on the current guidance to minimize the spread of COVID-tq, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQoffice locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Non -Transfer Application Completeness Review Checklist - Short Version c. Project Name: (�,Srv'LC� CLA:Croso�PPC'l SUd�TAi//oN Date Del ivered to WI RO: Jr /O 20'Z Project County/Location: _ 0A L5 LLLa�MGL� RIMS Received/Accepted Date: g 1 -� ^ RIMS Acknowledged Date': 9 oN' Permit Action: New Not located in the ETJ of the following deligated and New Permit 7!': functioning programs: NHC: Carolina Beach / Kure Beach / Wilmington / Wrightsville Beach Bruns: Leland / Navassa (?) / Oak Island Cart: Emerald Isle Onsl: Jacksonville Pend: Surf City Major Mod / Minor Mo newa Permit Type: �/ LD / LD Overall / HD &LD Combo ®Existing Permit k: 5S36 0 O %( c6J Expriation Date3: B/ ) 7 20 Z General Permit/ Offsite/ Exempt FlOffsite to SW8: Development Type: Commercial / Residential / Other Nt l uTA P4 I.SVSG 1-1I5 Lot IYed in Master Permit? Subdivided?: Subdivision o mg a Lot Rule(s): F-12017 Coastal �2008 Coastal El1995 Coastal Phase II Universal F-11988 Coastal Permittee Type & Documents Needed: Property Owner(s) MPurchaser Lessee =HOA =Developer =Viable? =Viable? =Viable? =Viable? Viable? =Deed =Purchase Aamt =Not Subdivided: Deed =Subdivision: Common Area Deed Paperwork ®Application =Fee: F--1$505 (within 6mo) CheckN(s): Supplement' (1 new form or for older forms: 1 original per SCM) �O&M2 Soils Report (Infil or PP) Calculations (signed/sealed) Deed Restrictions, if subdivided Project Narrative FTSGS Map (or on file?) Subject to SA?: Y / N Subject to ORW?: Plans (2 Sets) �PE Certification Electronic Copies Easements, Recorded (2017 Rules) NOTES: 'Enter BIMS Acknowledged Date on this Sheet 'For New Projects -Enter New Permit tf on Supplements & Deed Restiction Templates. 3If w/in 6 months and they are requesting a mod, STOP. Needs a renewal first EMAILED ENGINEER DATE: Comments: REVIEWER NAME: ,'Sal,Exl 71No Fee Y/N Minutes G:WQ\\\Reference Libra ry\Procedures\Checklists\Completeness Review Checklist 20200131 69Z-dMS `8SZ-dMS