Loading...
HomeMy WebLinkAboutSW8091111_APPROVED PLANS_20110317STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 69 I DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2_011 0 311 YYYYMMDD V 91 C I N 1 1 2 3 11 GE BASIN DRAINAGE AREA (IB) 7B SF (5.00 AC) COASTAL SITE DESIGN,PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.D. Box 4041 Wilmington, NC 28406 (910) 791-4441 11Calibre 3libre Engineering, Inc. V Southpark Lane, Unit 200 ttleton, CO 80120 (303) 730-0434 uvw.calibre-engineering.com Construction Management Civil Engineering Surveying 5 C z 0 rc U 0 L DES I DEW OHK FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH Q��z z g 0 Z s J C Q J a zgo� Q z B- v, Ozz W w Z W l In J Q> w LL C\I J Q V J Z Q >> T U E- aV Q Z z ¢� zO UQ� O (n C7 z 0 � m O o C5, J W — Z z U) W m W } Wcr 0 z o Z O2 m C3 W w U co 0 o �w wmV O LO cn U- D 0 < 0 0 J O W � Q o a U } Q z d Z U o O CODE ID. NO SIZE D SCALE. AS INDICATED = NA%IMO No. — -D JOB ORDER NO. — 0 O WORK ORDER N0. — U CONSTR. CONTR. NO O N40085-09—R-32-15 0 NAVFAC DRAWING No. sHEEr of - O SHEET No. Q DA N 1 I 2 I 3 I 4 I 5 I C 0 N NOTES 1. ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM OR INTO THE STREET/PARKINC LOT 2. PORTABLE PUMP TO BE USED TO DRAIN POND IN CASE OF EMERGENCY. PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO HOSE INLET AND COVERED WITH STONE HOSE OUTLET TO DRAIN ACROSS STABLE UPLAND AREA SUFFICIENT TO RESTRAIN EROSION. 3. POND SIDESLOPES TO BE PERMANENTLY VEGETA➢VELY STABILIZED NTH CENTIPEDE SOD. - - U�.. 1 - --7' - 4 - ...... . \ BY-PASS JUNCTION BOX \ RADIUS = 115 FT 28 LF 30" CL 19 RCP 9 111 LENGTH = 22 FT RADIUS = 582 FT WITH F.ES LENGTH = 4 7 RADIUS = 32.2 FT LENGTH =31.2 FT 5 250 FT 22.4 FT12.4 FT IE = 4. -. ._. _.. \ 1.5 CY CL II RIP RAP _ RADIUS = 437 FT 1 , 28 LF 18" CL III R P RADIUS = 26.3 FT iP ADIUS = 4.2 FT µITT{ FES_ LENGTH =326 FT LENGTH = 25.5 FT SEDIMENT CLEANGUT ELEV. = 5.0 \ / LENGTH = 8.7 FT " MPCRARY POOL ELEVATION = 73 SURFACE AREA 0 ELEV. 73 = IZ327 SF 455 FT STORAGE 0 ELEV. 7.3 = 32,828 OF NCDENR BORING 12 SITE VISIT 9118109 5 ND = 5.0 BASIN BOTTOM = 4.0 EXISITNG GROUIE = 5.3 I SNWT - 36" 6 SHWT ELEV.-- ,_ 5 15 ft RADIUS = 169 FT / gP gERM S LENGTH .5 FT VEGETATIVE FILTEREE TOP 20 FT EMERGENCY SPILLWAY SEE DETAIL THIS SHEET IE = 75 ,SEE_QETAIL THIS SHEET RADIUS = 47.0 FT LENGTH =50 FT TEMPORARY OUTLET STRUCTURE SEE DETAIL THIS SHEET / ADIUS = 74. FT =35.4 FT - � , 36 LF 4" PVC P , I1. = 4.5 , 1.5 FT DEEP / o Io zo ao -- -l--inch = 20 ft. Horizonte / , INFIL TRA TION BASIN 1 DETAIL FRAME & COVER TOP OF GRA TE = 8.5 MANHOLE FRAME & COVER BOX IE = 2.2 BOTTOM OF BOX = 0.7 MANHOLE FRAME & COVER 18" RCP PIPE TO VEG. FILTER INV= 5.5 =BASE \ SECTION VIEW /\\ (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX \ JUNCTION BOX BYPASS STRUCTURE 1 NOT TO SCALE I 4 FT 4 FT WEIR ELEV. = 7.3 CIE4) 1 2 FT SUMP FOR CLEANOUT 1 2 FT SUMP + FOR CLEANOUT 12" CONC. 12" CONC. , 1 ' 2 TOP OF EMBANKMENT ELEVATION - 8.0 ELEV - 4.0 INFIL TRA TION BASIN CROSS SECTION NOT TO SCALE CALCULATION SUMMARY FOR DWQ: IMPERVIOUS AREA PERCENTAGE. TOTAL AREA DRAINING TO BASIN = 372,256 SF (8.55 ACRES) TOTAL IMPERVIOUS = 262,492 SF (6.03 ACRES) PERCENT IMPERVIOUS = 70.5% 1.5 INCH VOLUME: I=70.5 Rv = 0.05 + 0.009 x I = 0.05 + (0.009)(70.5) = 0.68 IN/IN MINIMUM VOLUME = DESIGN STORM x Rv x DRAINAGE AREA _ (1.5/12)(0.68)(8.55) = 31,857 CF 1.5 INCH STORAGE VOLUME AT ELEVATION 7.3 = 32,828 CF DRAWDOWN TIME INFILTRATION RATE = 6.7 IN/HR DRAW DOWN = 0.3 DAYS 3 23 FT TOP OF EMBANKMENT 20 FT ELEVATION = 8.0 /w/ AAi A�, AAA ELEV. 75 . j/v%Avj INFIL TRA TION BASIN EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE TOP OF BERM = 8 SKIMMER = 4.0" SKIMMER WITH 2.9" ORIFICE DIAMETER SEDIMENT BASIN 1 TEMPORARY OUTLET STRUCTURE DETAILS NOT TO SCALE d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6'. OP LEVATION OF STRIP ON SAME ELEVATION AND DIRECTLY ABUTS LEVEL SPREADER r J w W �`C -` O%�� 5v v ✓ W v W v GRASSED FILTER STRIP j� _7 v r,7r STONE -FILLED TRENCH-"'�`�y� LEVEL SPREADER �-40.0 Fl --I 50.0 FT VEGETATED FILTER DETAIL NOT TO SCALE 13 FT 1, 5-F,T ����� 70P OF EMBANKMENT ELEVAT]ON = 8.0 EMERGENCY SPILLWAY ELEVATION = 7.5 STATE STORAGE ELEVATION = 7.3 �7 \ � STATE STORAGE VOLUME = 32,828 CF- \. BASIN BOTTOM ELEV. = 4.0 NATURAL GROUND INFIL TRA TION BASIN 1 EMBANKMENT SECTION NOT TO SCALE 0 LICENSE # C-2710 COASTAL SITE DESIGN,PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 2B406 (910) 791-4441 WETLANDS VEGETATION NOTE: THE FOLLOWING SPECIES OF WETLANDS VEGETATION ARE SUITABLE FOR PLANTING ALONG THE 10.1 VEGETATED SHELF.. - SAGITTARIA LA77FOLIA (COMMON ARROWHEAD) - SAGITTARIA LANCIFOLIA (DUCK POTATO) - SAURURUS CERNUUS (LIZARDTAIL) - PELTANDRA NRONICA (ARROW ARUM) IF ONE OR MORE OF THE SUGGESTED SPECIES IS UNAVAILABLE, APPROPRIATE WETLANDS VEGETATION COMMON TO THE COASTAL NORTH CAROLINA REGION MAY BE SUBSTITUTED. - 111Calibre Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 Littleton, CO 80120 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying 5 a 0 11 0 a DES I DRw CHK FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH a� z ozs00 U J B �g � Q W Q z S- � LLJ w CD > w g o z w Z F w (� ��Q N Q Q Z Q V pQ Z w S- Q� i YQ D- O z QLU} Z 0 U F- Q 00 o z Z Cn J_ a' LL W ir O OJ = z zo z ' U W a w� U= Q M z o a Q U Lu a W I zm U w ZUj Fwrn Ui-C I� z o LQL LJ Q o U aQZm U LAD 0 CODE ID. No. slr o SCALE AS INDICATED = MAXIMO N0. JOB ORDER N0. - WORK ORDER NO. - U CONSTR. CONTR. NO. N40085-09-R-3245 0 NAVFAC DRAWING NO. SHEET OF - _ c� SHEET NO, C- 5 0 4 j APR 1 4 2010 I 1 1 2 I 3 4 1 5 ❑I El I M NOTES 1, ALL BUILDING ROOF DRAINS MUST BE DIRECTED INTO THE STORM DRAINAGE COLLECTION SYSTEM OR INTO THE STREET/PARKING LOT. 2. PORTABLE PUMP TO BE USED TO DRAIN POND IN CASE OF EMERGENCY. PUMP TO BE PLACED ON TOP OF BERM WITH SCREEN ATTACHED TO HOSE INLET AND COVERED WITH STONE. HOSE OUTLET TO DRAIN ACROSS STABLE UPLAND AREA SUFFICIENT TO RESTRAIN EROSION. J. POND SIDESLOPES TO BE PERMANENTLY VEGETATIVELY STABILIZED WITH CENTIPEDE SO% 1 1 ` 1 ' 1.5 CY CL II RIP RAPj� � ••`t , 30 LF 18" CL III RCP ,\'. X` A % �� WITH F.ES" �, \ ----.� �i" _ \� p,\ F 1� VEGETATIVE FILTER SEE DETAIL C-504 5L i J SURFACE AREA OOL ELEV. 7A 11 - t - Lot TEMP ARY P 2I3-SF��- \ A } STORAGE 0 ELEV. ZO = 19,951 CF \ - - i 10 v \ABASIN BOTTOM = 4.0 ? It / , SEDIMENT CLEANOUT ELEVATION = 5.75 �\ / / j /; j 20 F7 EMERGENCY SPILLWAY IE = Z5 SEE DETAIL THIS SHEET it 16/ A T i �'36 LF 4" PVC PIPE.-._.. � TEMPORARY OUTLET STRUCTURE_�a. � " SEE DETAIL THIS SHEET 1.5 FT DEEP i a/ / ' v. I i �� _ ✓ 5 CY CL II I AP--- ' �c5ll 1 iZeK = 20,ft. Horizontal STORAGE BASIN DETAIL WETLANDS GET FOLLOWING VEGETATIONNOTE: AT7AnDNE SUITABLE FOR M PLANTING ALONG ME 10: 1 VEGETATED SHELF: - SAGITTARIA LA77FOLIA (COMMON ARROWHEAD) - SAGITTARIA LANCIFOLIA (DUCK POTATO) - SAURURUS CERNUUS (LIZARDTAIL) - PELTANDRA l4RGINICA (ARROW ARUM) IF ONE OR MORE OF THE SUGGESTED SPECIES IS UNAVAILABLE APPROPRIATE WETLANDS VEGETATION COMMON TO THE COASTAL NORTH CAROLINA REGION MAY BE SUBSTITUTED. 30 TO BAST/ �63 PLAN VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX TOP OF GRATE = 10.5 15 LF 30"9III NTH�F 1, 0 F,7 � �--�� TOP OF EMBANKMENT ELEVATION = 8.0 EMERGENCY SPILLWAY ELEVATION = 7.5 STATE STORAGE ELEVATION = 7.0 \7 STATE STORAGE VOLUME = 19,951 CF SAX BASIN BOTTOM ELEV. = 4.0 \\/\ NA TURAL GROUND STORAGE BASIN 1 EMBANKMENT SECTION NOT TO SCALE STORMWATER PUMP LOCATED IN THIS BOX (SEE DETAIL THIS SHEET FOR PUMP/8OX CONFIG.) MANHOLE FRAME & COVER II, 30" RCP 4 FT 4 FT WEIR TO BASIN ^CcfS ScoN-R IE = 6.3 30" 18" RCP PIPE RCP TO VEG. FILTER E = 5.0 ^ccfss ; + INV= 5.2 T O FEG F27ER 2 FT SUMP 2 FT SUMP RF� Sp BOX IE= 3.0 +_OR CLEANOUT -+ FOR CLEANOUT o 12" CONC. 12" CONC. , _ BOTTOM OF BOX = 1.5 =ASE / SECTION VIEW (2) - 4 FT x 4 FT PRECAST CONCRETE BOX NC PRODUCTS 4848 OR EQUIVALENT MANHOLE FRAME & COVER JUNCTION BOX 2 BYPASS STRUCTURE NOT TO SCALE 1 ' 2 3' MIN TOP OF EMBANKMENT ELEVATION = 8.0 TOP OF LINER = 7.0' 3' TUCK 36 36 /� - 40 �\ ELEV j\\\ 1 4" CLEAN SIFTED SAND 1. RECOMMENDED LINER - 40 MIL ELOPE LINER 2. OVER EXCAVATE BOTTOM OF POND 4" AND FILL WITH CLEAN SIFTED SAND. 3. CALL MANUFACTURE REPRESENTATIVE TO INSPECT SITE ONCE EXCAVATION OF BASIN IS COMPLETE. 4. CALL MANUFACTURE REPRESENTATIVE TO INSPEC' SITE WHEN FABRIC IS BEING PLACED. 5. CLEAN SCREENED MATERIAL TO BE USED FOR 3ACKELL. STORAGE BASIN CROSS SECTION NOT TO SCALE CALCULATION SUMMARY FOR DWQ: IMPERVIOUS AREA PERCENTAGE: TOTAL AREA DRAINING TO BASIN = 217,678 SF (5.00 ACRES) TOTAL IMPERVIOUS = 158,033 SF (3.63 ACRES) PERCENT IMPERVIOUS = 72.6% 1.5 INCH VOLUME: I = 72.6 Rv = 0.05 + 0.009 x I = 0,05 + (0.009)(72.6) = 0.70 IN/IN MINIMUM VOLUME = DESIGN STORM x Rv x DRAINAGE AREA _ (1.5/12)(0.70)(5.0) = 19,139 CF 1.5 INCH STORAGE VOLUME AT ELEVATION 7.0 = 19,951 CF DRAWDOWN TIME PUMP RATE = 0.23 CFS DRAW DOWN = 1.0 DAYS 3 TOP OF BERM = 8 SKIMMER = 3.0" SKIMMER WITH 2.4" ORIFICE DIAMETER SEDIMENT BASIN 2 TEMPORARY OUTLET STRUCTURE DETAILS NOT TO SCALE PUMP MODEL: TSURUMI NK2-SERIES SEMI -VORTEX DEWATERING PUMP SEE SPECIFICATIONS FOR ADDITIONAL DETAIL LOCKING EL= 10.5 FT HATCH COVER _ o o STEPS II DEPTH OF WELL 16 7.5 FT DISCHARGE ELEVATION -EL.= 7.5 FT TO INFILTRATION BASIN 1 \ 1 NOTE 1/4" CHAIN WITH 1/4" SHACKELS 4 LIFTOUT CHAIN 1/4" (STAINLESS STEEL) 4 C.I. FLANGE SWING CHECK Q VALVE IN LINE GROUND EL.- 10.5 NOTE 2" PVC ELECTRICAL PIPE GOING :ROM CONTROL PANEL TO WET WELL. -hT(- MUST SEAL BOTH ENDS OF PIPE W11H ELECTRICAL PUTTY. d II- 2"CONDUIT REQUIRED ELECTRIC POWER CABLE 0 / \ - PUMP ON EL .= 5.5 FT PUMP OFF EL.- 5.0 FT 4 PREFABRICATED RENFORCED CONCRETE PIPE OF MH O BASE ELEVATION E_.= 3.0 FT of o 0 0 0 a ANCHOR BOLT (2" PROJECTIG�I) J 4 FT X 4 FT PRECAST BOX WITH STEPS SECTION VIEW NTS STORMWA TER PUMP STATION / OFFLINE 13 FT TOP OF EMBANKMENT ELEVA710H = d0 20 FT /, STORAGE \BASIN EMERGENCY SPILL WA Y FRONT VIEW NOT TO SCALE NTS LICENSE # C-2710 COASTAL SITE DESIGN,PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 � 1 1/4" rn SIDE ELEVATION 1/2" GRADE 60 STEEL REINFORCEMENT I '�1 COPOLYMER POLYPROPYLENE PLASTI C ELEVATION SECTION A -A MANHOLE STEP DETAIL N TS 0 a 0 9 DES I DRW ICHK FIRE PROTECTION BRANCH MANAGER CHIEF ENC/ARCH O A �_� " Q H 0 Z � �, B o Z s 00 O Q J Q Z U w Z W LU L�J C) I W�a �Cr zw Z > � F w t H JM N I Q `� a Z Z � w Q V �: Z/-3 T' OV r CIDaV Z w Q Y Q li O Z o aw} a H z U 00 Z Z C/) m Fr LLI 0 _ _J L1 w w Ir O� Z Z o LU w U� m CD O U Lli LU Ld CO w W�I�o Zm o N LLo�E 0Lza LL _ F- x o !EJa w � � U Q U Q = m 0 w Z j� U N CODE ID. NO. SIZE D O = SCALE. AS INDICATED Of MAXIMO NO. - 11,Calibre Z O O JOB ORDER NO. - WORK ORDER NO. CONSTR. CONTR. NO. N40085-09-R-3245 0 N NAVFAC DRAWING NO. Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 SHEET OF - Littleton, CO 80120 (303) 730-0434 www.Galibre-engineering.com a SHEET No. C - 5 0 5 Construction Management Civil Engineering Surveying �0 N 5 1 1 2 1 3 1 4 1 5 I I 0 /I1 SCHEDULE 40 PVC END PVC VENT PVC PIPE CAP \ PVC ELBOW PIPE WATER SURFACE PVC END 0 CAP /� • R SCHEDULE 40 ORIFICE / \ PVC PIPE PVC TEE FLEXIBLE PLATE PVC PIPE Yp" HOLES IN HOSE PVC TEE UNDERSIDE OBOTTOM SURFACE END VIEW FRONT VIEW SKIMMER SEDIMENT BASINS ARE NEEDED WHERE DRAINAGE AREAS ARE TOO LARGE FOR TEMPORARY TRAPS. DO NOT LOCATE THE SKIMMER SEDIMENT BASIN IN INTERMITTENT OR PERENNIAL STREAMS. OVERFILL 6" FOR SETTLEMENT 4'MININJV EMERGENCY BYPASS 6' BELOW / X\2; 1 SETTLED TOP OF DAM // < \\i NATURAL \� GROUND SECTION VIEW r- 3'MINIVJM WASHSTONE I' NOTE: THICK ON FACE SEE NARRATIVE FOR FROM TOE OF DAM 5'MINIMUM MORE DETAIL. TO WEIR. \ 3,600 CF / ACRE 'n 2:1 SIDE SLOPE MAX. CROSS SECTION ST TEMPORARY SEDIMENT TRAP Practice 6.60 NOT TO SCALE 2:1 SIDE SLOPE MAX. SK SKIMMER DETAIL Practice 6.64 NOT TO SCALE NCDOT #5 OR WASHED S "C" ENCLOSURE WATER ENTRY UNIT SEE DENR STANDARDS & SPECS. FOR COMPLETE DESIGN CRITERIA & MAINTENANCE -�-4' MAX — NCDOT #5 OR #57 HASHED STONE JOE HARDWARE CLOTH =Si OPENINGS) 2' HARDWARE CL 0 TH & GRAVEL r� DROP INLET PROTECTION r PRACTICE 6.51 NOT TO SCALE 2' 14.0 3 1 F-- iTi—ITT—I i I—i I — 1 8" I— 1 TD I— s' —I SEE EROSION CONTROL CALCULATIONS FOR VELOCITY CALCULATIONS. TEMPORARY DIVERSION DETAIL Practice 6.20 NOT TO SCALE M= 3 VARIES n= 0.03 LINED WITH REINFORCING MATTING AND SEED PER SPECIFICATIONS OR SOD. 3: 1 GRASSED CHANNEL COMPACTED FILL OR GRAVEL, EXTENSION OF FABRIC AND WIRE INTO THE TRENCH FILTER FABRIC BACKFILL MINIMUM 8" THICK LAYER OF GRAVEL 8"MINIMUM V- TRENCH N.TS 6 FT. ON CENTER NOTE: ', -\1, SEE NARRATIVE FOR MORE DETAIL. ISOMETRIC VIEW EXTENSION OF FABRIC AND WIRE / NTO THE TRENCH COMPACTED FILL 8"MINIMUM FILTER FABRIC STEEL POST 14 "MINIMUM 4 "MINIMUM SECTION SECTION sF SEDIMENT FENCE ( SILT FENCE Practice 6.62 NTS • LICENSE # C-2710 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL COASTAL SITE DESIGN,PC P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 PUBLIC ROAD 6" MINIMUM 5G THICKNESS �" � 2"-3" COARSE �_ AGGREGATE NOTE: SEE NARRATIVE GRAVEL CONSTRUCTION FOR MORE DETAIL ENTRANCE, WIDTH 12'MINlMUM AS REQUIRED TEMPORARY GRAVEL CONSTRUCTION EE ENTRANCE/EXIT DETAIL Practice 6.06 NTS La 4' ° 000°° C. ° 0 `0 ° o REFERENCE EROSION CONTROL 000°°°° CALCULATIONS FOR SPECIFIC "°"°" (11 DIMENSIONS. OUTLET PIPE DIAMETER °0° (Do) 1 d50 = REFERENCE EROSION CONTROL CALCULATIONS dMAX = REFERENCE EROSION CONTROL CALCULATIONS Lo = REFERENCE EROSION CONTROL CALCULATIONS MIN. APRON THICKNESS = 4.5'• NOTE: CEOTEX NONWOVEN FILTER FABRIC TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. CULVERT RIP RAP DIMENSIONS L X W X D CLASS QUANITY HW-3 8' X 5' X 1' I1 I'S CY STORAGE BASIN OU7FALL 13, X 11' X 1' 11 5.5 CY INFILTRATION BASIN OUTFAU. 9 X 8' X P ll 3.0 CY OUTLET PROTECTION DETAIL NOT TO SCALE III Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 Littleton, CO 80120 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying a 0 I DES I DRW CHK FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH Lz U)_ J BoZo) Q U� (D wz WH,z pl�(r J > z o W O W w 2 t �o�� Jcc N -jQ F- Z Q Z iZVoC'JT O a�vYOCL U Z Zp ��Q 0 Z U U)m Z J Z U 0 - m F W W \ W 0LLJ z 0 Z OH m o LU U= U O a—�zmU O L Z I-- O =) 0 _ F-- 1-U JU O LLLLz d CD O z wag0 < O U Qa=m aZ�LJ O CODE ID. NO. SIZE D SCALe. AS INDICATED = MAXIMO NO. — ~ JOB ORDER NO. — Z 0 WORK ORDER NO. — U CD CONSTR. CONTR. NO. N40085-09-R-32-15 0 N NAVFAC DRAWING N0. SHEET 17 OF - U SHEET NO. C - 5 0 6 N 1 1 2 3 Ell 5 C 0 1= 1 S!T N07 70 SCALE LICENSE # C-2710 COASTAL SITE DESIGN,PC ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 LIMITS OF DISTURBANCE 16.39 AC LLULNU C E CONSTRUCTION ENTRANCE ❑ INLET PROTECTION ® SED. TRAP PROJECT LIMITS WETLANDS LINE LIMITS OF DIST. SILT FENCE CULVERT RIP RAP - e CONTOUR STABALIZE NOTE WELL: AREAS ON SITE WITHOUT ACTIVITY WITHIN 21 \ CALANDER DAYS SHALL BE TEMPORARILY STABILIZED AS PER PER THE SPECIFICATIONS FOLLOWING ANY PHASE OF GRADING. 2. THIS PLAN TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION WITH THE WRITTEN NARRATIVE, WHICH IS AN INTEGRAL PART OF THIS EROSION AND SEDIMENT CONTROL PLAN. 3. ALL SLOPES SHALL BE 3.1 OR FLATTER. 4. ALL ROOF DRAINS TO BE DIRECTED TO STORM DRAINAGE SYSTEM. 5. NO WETLANDS EXIST ON SITE. 6. SITE IS LOCATED ON OFF MARINE ROAD. 7 ANY BORROW MATERIAL REQUIRED WILL BE TAKEN FROM ANOTHER APPROVED SITE ON USMC BASE CAMP LEJEUNE. ANY SURPLUS CUT MATERIAL WILL BE DISPOSED OF AT AN APPROVED SITE ON THE USMC BASE, CAMP LEJEUNE. 2 DISTURBANCE IN THIS AREA FROM ELECTRIC LINE INSTALLATION CONTRACTOR TO SOD DISTURBED AREAS DAILY �i SEDIMENT BASIN SUMMARY: MIN. TRAP VOL. = 1,800 CF/ACRE DISTURBED AREA (10 YEAR STORM) Q = (0.2)(9.7)(A) (SEDIMENT MUST BE REMOVED AT MINIMUM TWICE A YEAR) 10 YR SEDIMENT DISTURBED MINIMUM BASIN VOLUME FLOW MIN. SURFACE SURFACE AREA BASIN AREA (ACRES) VOLUME (CF) PROVIDED (CF) ICES) AREA (SF) PROVIDED (SF) 1 3.55 12,780 31,603 6.89 3,001 12,176 2 5.00 18,000 18,830 9.7 4,225 11.141 1 ' 2 3 1 4 1 5 CONSTRUCTION SCHEDULE - 1. Obtain approval of Plan and any necessary permits, and hold a pre -construction conference prior to commencing any work. 2. Flag work limits and stake -out roads and storm drainage structures for preliminary grading. 3. Install Gravel Construction Entrances. 4. Install sediment basin, sediment traps,skimmer and silt fencing as shown on plan prior to clearing and grubbing site. 5. Construct grass lined channels, and any other sediment control practices shown, prior to rough grading roadways, site and stockpiling topsoil as necessary. 5. Install utilities in roadway/parking lot, establish final grades and stabilize road/parking lot with stone base course. 7. Final grade, install non -municipal utilities as needed, and vegetatively stabilize areas where building construction is not imminent. 8. All erosion and sediment control Practices are to be inspected weekly and after any rainfall, and repaired as necessary. 9. Upon completion of construction, the roadway/parking lot is to be paved, and all areas permanently vegetatively stabilized with centipede sod. After site stabilization, temporary measures are to be removed. ACRES OF DISTURBANCE N UTILITY LINE MAINTENANCE PLAN - 1. All measures to be inspected weekly and after any rainfall event and needed repairs made immediately. 2. Sediment Basin to be cleaned out when the level of sediment accumulates to elevations listed on pond detail sheets. 3. Sediment to be removed from swales when they are approximately 50X filled or sediment level is with 1' of top of ditch bank. 4. Sediment to be removed from behind any Silt Fence and inlet protection devices when it becomes 0.5' deep. Fencing and inlet protection to be repaired as needed to maintain a 5. All sodded areas to be watered as needed to establish growth. Dead sod should be removed and new sod installed as needed. 6. Construction entrance to be maintained in such a manner as to prevent mud or sediment from leaving the construction site. Periodic topdressing with 2-inch stone may be required. Inspect after each rainfall and immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. IN THIS AREA FROM ELECTRIC LINE INSTALLATION TO SOD DISTURBED AREAS DAILY el TEMPORARY SEDIMENT TRAP SUMMARY: MIN. TRAP VOL. = 3,600 CF/ACRE DISTURBED AREA (10 YEAR STORM) Q = (0.2)(9.7)(A) (SEDIMENT MUST BE REMOVED TWICE A YEAR) 1F0LOW SEDIMENT DISTURBED MINIMUM TRAP VOLUME WEIR DEPTH MIN. SURFACE SF AREA LENGTH WIDTH TRAP AREA (ACRES) VOLUME (CF) PROVIDED LENGTH (FT) (M (CFS) AREA (SF) PROVIDED 4M 1 0.45 1,620 1,950 6 5 0.87 379 390 26 15 2 3.08 11,088 13,160 6 5 5.98 2,604 2,632 56 47 3 N 7. Inspect t temporary sediment trap s after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to 1/2 the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. VEGETATIVE PLAN - 1. Permanent vegetation to be established in accordance with North Carolina Erosion and Sediment Control Planning and Design Manual", Section 6.11, latest version. See Sheet C-507. PLANNED EROSION AND SEDIMENT CONTROL PRACTICES - CE 1. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE Practice 6.06 Shall be installed at the entrances to the project from an existing roadway. Drainage should be away from the road and erosion will be controlled with downstream practices. During wet weather it may be necessary to wash truck tires at these locations. 2. LAND GRADING Practice 6.02 Grading should be limited to areas as shown on the Plans. Cut and fill slopes shall be 3.1 or flatter except where specifically indicated. Care shall be taken during land grading activities not to damage existing trees that are identified as "to be preserved". !SF 3. SEDIMENT FENCE Practice 6.62 Sediment fencing should be installed as shown on the Plan, to delineate and protect wetlands and specified areas, and around any temporary stockpile areas as necessary to prevent any graded interior areas from eroding onto adjacent lands or roadway, or into inlets, or as directed by Engineer or NCDENR/LQS personnel. GC 4. GRASS -LINED CHANNELS Practice 6.30 All overflow swales to be graded to design configuration, lined with centepede sod, to collect and convey site water as shown on Plan. After final project stabilization, swales to be re -graded, cleaned of siltation and lined with centipede sod to establish original design contours for stormwater conveyance. OP 5. OUTLET STABILIZATION Practice 6.41 Rpprop aprons will be located at the downstream end of all discharge pipes to prevent scour. 6. CONSTRUCTION ROAD STABILIZATION Proctic, 6.80 Upon reaching final grade and after utilities have been installed, roadwaylparking areas are to be stabilized by placing sub -base course of approved 4" marl stone or 6" ABC, as shown in the typical street cross-section detail on the Plan, to reduce erosion and dust during the remainder of building construction. $B 7. SEDIMENT BASIN Practice 6.61 The Sediment Basin is to be constructed first (see Construction Schedule) and is the primary Practice to prevent sediment from leaving the site. Detailed design and spillway configurations are specified in the detail sheet. SK B. SKIMMER Practice 6.64 A sedimentation basin dewatering control device that withdraws water from the basins water surface, thus removing the highest quality water for delivery to the uncontrolled environment. P 9. INLET PROTECTION Practice 6.51 A temporary measure of wire -mesh hardware cloth around steel posts supporting washed stone placed around the opening of a drop inlet. TD 10. TEMPORARY DIVERSIONS Practice 6.20 A temporary ridge or excavated channel or combination ridge and channel constructed across sloping land on a pre- determined grade to protect work areas from upslope runoff and to divert sediment -laden water to appropriate traps or stable outlets. 0 11. TEMPORARY SEDIMENT TRAP Practice 6.60 'Q - Sediment traps are to be installed as indicated an�p7�ak: A�f at the downstream end of swales as shown. 0 rc 0 I C DES I DRW ICHK FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH � z Z J g S 0ZLu Z � o zpZ its CD > Z c-c W G F W L� f w l I- W J- N < Z a LQZZ z '- - g w Q V O Y0CL Z Z - Z O < O Z J co o 0 Z Lu Z W m Cr_ W O } Er 02 00 Z CD Z L11 ♦- W o Z Cr U C)w� �wZwmV Z=o 1- W J � O �O � n ~LL U JL x O< z LL W d 0 C) CD _J aQ� v 0 Z LJ Cnn O ODE ID. N0. SIZE D = ~ � O SCALE AS INDICATED MAXIMO NO. ORDER N0. _JOB \J WORK ORDER NO. U IIICONSTR. CONTR. NO. CDbN40085-09-R-3215 0 o ao aD zoo Ca'' re Calibre Engineering, Inc. NAVFAC DRAWING NO. 8201 Southpark Lane, Unit 200 SHEET OF - v Littleton, CO 80120 (303) 730-0434 SHEET NO. a 1 inch = 100 ft. Horizontal www.calibre-engineering.com Construction Management Civil Engineering Surveying C - 1 05 4 AV NORTH GAhtail; C "17AL MANAGEMENT C,-`, ,N DIVISION OF 1'%'A I A I — I e� . ..... ..... .... ...... . . ... ... X . . . . . . . . . . . . . . . . . . . . . . . ............................... ................... ....................... . ....... ........ . . v ....... ... . ...... ... 13 - r 12 < ------------ ik� 1A . .................................. ................... .......... ........... . ............. ........... .. La IPN iN REDEVELOPMENT AREA O Ll (SEE SHEET REDEV IN RIGINALLY PERMITTED 7 PLAN SET FOR DETAIL S ... ........... ...... ... ...... . 'N\j d 7 17♦ FF . . . . . . . . . . J -4 11 10— % It .............. ................ - . ............. kQ ......s'w - - - - - - - - - - - TT7 77 .......... OD 1p" j Z .............. if ............ ............... ......... . T .... .......... INFILTRATION BASIN #JA .............. DA= 154,578 SF (3.55 AC) IMP= 105,333 SF (2.42 AC) ............. % IMP= 68.14X .......... .......... - . . ........... ........... --k ............ . ......... .......... ..... ......... .......... -o .......... ........... .... .. . .... . ....... ........ .................. ............. It .......... ............ 4— ............. � .............. ... ... 77tt "I . . . .. . . . . ......... . .......... . ..... ............... �p \ All NOTE: DRAINAGE AREAS 1 A & 1 B TOTALS bA= 372,796 SF (8.56 AC) IMP= 267,686 SF (6.15 AC) X IMP = 71.8OX NOTE: PER NCDENR DWQ GUIDANCE, SOLAR CANOPY DESIGN IS CONSIDERED PERVIOUS A OUTLINE SOLAR In r L tit 7-11 . ......... .. . .... ........ ......-n ..... 4. .......... it it STORAGE BASIN #JB DA= 218,218 SF (5.01 AC) it IMP= 162.353 SF (3.73 AC) X IMP= 74.40% .......... ........... L .... ...... Li .......... ............. 1--T .......... 2, . ......... ......... T I'll 10 INHLTRATION BASIN J1A ............. ......... .... ...... . ....... ............................... . . . ........ .. . . ....... IX tit .. ......... 10— ............ ............ 'z' STORAGE BASIN 013 ........ ... / bzvt" ............ CP > \V iie is 11 -4 --- ..... ..... . .. .... - ...... �v in —7 A fi" 777 60 0 60 120 1 INCH = 60 FEET CAPE FEAR Engineering, Inc. 151 Poole Rd, Suite 100 Belville, NC 28451 TEL (910) 383-1044 FAX (910) 383-1046 www.capefearengineering.com NC LICENSE NO. C-1621 I I DES — IMt/— ICHK FIRE PROTECTION BRANCH MANAGER CHIEF ENGARCH I Z so [L- 0 I.- z < Lh W V) z _j 91-- 5 >- >0< < z UJ Uj (n < z Lj Z 0 < _5 Z =) 0 < a, > X 0 0 0 0 - Z r- --wo Of r- E z LU Cj) ZX tn LU Q 0 < CO z Cf) LL W L-L1 R (9 OZO V) =:) I.- z w :) z W 0 a w LJ -113 Z w LU oU a. 0 C-) Cq 'U < Cq 8 ♦m CL M (n tr LLJ F. 3i: m wo CODE 10. NO. SIZE D SCALE: AS INDICATED MAXIMO NO. JOB ORDER NO. FM WORK ORDER NO. 863M CONSTR. CONTR. NO. N62470-06-D-6002-X023 NAVFAC DRAWING NO. rn (n En SHEET SHEET NCB—DA w a: 0. X w 4 a I I C ,ME Is LEGEND PROJECT LIMITS ATOB 8.83' S09'54'15"E 20.40' S76'27'43"W 19.75' S1110'48"E 24.58' S36'16'32"W 21.94' S19'23'52"W 84.84' S87'53'50"W 17.03' S54'46'25"W 20.17' S18'19'40"W 56.29' S29'19'55"E 39.94' S22'52'07"E 28.60' S1116'26"W 32.53' S18'40'09"E 9.92' S43'02'30"E 116.03' S20'22'17"E 26.17' S51'53'44"E 30.54' S19'54'25"E 112.62' S73'35'58"E 28.51' N 72'16'13"E 61.63' S23'10'08"E ETOF 41.00' N18'01'05"W 52.46' S70'33'31 "W 17.51' S09'40'44"E 23.85' S1514'59"E 33.53' S54'15'27"W 99.91, S18'34'33"E 53.13' S70'09'32"W 32.01' N 20'23' 07"W 10.00' S69'36'53"W 31.92' S20'23'07"E 98.87' S70'09'32"W 6.02' N20'O0'14"W 37.99' N65'00'42"E 38.19' S66'41'13"W 27.56' N28'10'51'W G TO H 55.25' N19'36'34"W 26.96' S70'44'15"W 43.59' S20'06'33"E 189.26' S70'23'26"W 4.27' N14'10'05"W 36.71' S83'51'52"W 27.53' N63'49'24"W 50.81' N32'01'10"W I I I�I 20 FT l o I I ' 1222 FT I y� ll \ �7 I co I o a' {' J IO N m 2 a I T J w♦` � J _. .03,09' E m \ 2• �, ` rr0� N68'45'09' E C n 8143s , 9 /Vs p. 66 ?8.?p.. 47 76.6 16 0 50 100 200 1 inch = 100 ft. Horizontal RECEIVED APR 14 2010 I I 111Calibre Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 Littleton, CO 80120 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering DES I DRW CHK FIRE PROTECTION BRANCH MANACER CHIEF ENC/ARCH C) s a z 0 Z s 0 �g 6 cn ZH Z ftf Zo= B-cn O w W U) f- Z w 2 C) L-j J Q N W 5 L_ ¢ IaL Z V o d *- Y 0 d u) Z0 �m O\\ / J Z Z_y LL U) W W d w W IX 0 0 = Z W ~ Q w cr UD 100a O LU aw U) J = w O w LLJ O B- Q 0 LL J L zL,j Q J a Q U aQwM O w Z CODE ID. NO. SIZE D SCALE AS INDICATED MAXIMO No. - JOB ORDER NO. - WORK ORDER NO. - CONSTR_ CONTR. NC. N40085-09-R-32-15 NAVFAC DRAWING NO SHEETOF - SHEET No I M P Surveying a uQ z FL w 0 p I C w Z O W z O w w X O O IM W cn O S B- O O 0 N S U Q I 7 f r./•, ...._Ll ..... 0 h f� NEW IMPERVIOUS` pL 1. PER NCDENR DWQ GUIDANCE, SOLAR CANOPY DESIGN IS CONSIDERED PERVIOUS. (SOLAR CANOPIES NOT SHOWN FOR CLARITY) 2.IMPERVIOUS AREA ADDED TO ACCOMMODATE PLACEMENT OF SOLAR CANOPIES. SEE SHEET C-102 TO C-104 PREPARED BY CALIBRET ENGINEERING INC. RECEIVED BY DWQ APRIL 16, 2010 FOR GRADING & STORMDRAIN LAYOUT. SEE SHEETS CS-201 THRU CS-204 BY CAPE FEAR ENGINEERING FOR SOLAR CANOPY LAYOUT & REVISED PARKING LOT CONFIGURATIONS. 3. ORIGINALLY PERMITTED DIMENSIONS SHOWN ABOVE PROPOSED IMPERVIOUS DIMENSION FOR REFERENCE. 100 0 100 200 1 INCH = 100 FEET 4wCAPE FEAR Engineering, Inc. 151 Poole Rd, Suite 100 BeWile, NC 28451 TEL (910) 383-1044 FAX (910) 383.1045 www.capejearengineering.com NC LICENSE NO. C-1621 I 3 DES — I DRW---_ ICHK FIRE PROTECTION BRANCH A4WER CHIEF ENC ARCH o aZ 8v Z� I�O0 =z ira aUj a¢ � Q S2 F-Zof m UJ ti z F- UJ wj LLJ ZJ O F � o (qz Of U W 0 Z Y z 0 Fe w WUU Q w z a�� Ir u i o m O Z w cn Z U=) Z $LU UAW J O w� _Z LU �J w 0- U =O Q U w oU o r a.0 s CODE ID. NO. I SIZE D SCALE: AS INDICATED w00N0 N0. — JOB ORDER NO. FXXX WORK ORDER NO. 6 CONSTR. CONTR. NO. N62470-06-D-6002-X023 NAVFAC DRAWING NO. — SHEET — OF — SHEET NQ CB -IMP C B s , 4F o LIMITS OF REDEVELOPMENT 1 e. I C LIMITS OF REDEVELOPMENT 00 w� IN 0 r", s Yi'ii � I I I I I I I I I I I fnarar/�x — +---- -ram ----r--- ----� ---� � ----r--- 71 I _t I _L_ bl i I I l I I I I. II T l 41VN r ,b 4'p11� E --1T------�'--- �1 it WI W Iw W d fl r 9 •„ I I SS N 3 EXISTING IMPERVOUS WITHING REDEVELOPMENT AREA PARKING/ROADS = 119,620 SF (2.74 AC: 1 ' 2 r_ \ I 3 4 j 5 LIMITS OF REDEVELOPMENT LINI TS OF REDEVELOPMENT PROPOSED IMPERVOUS IN REDEVELOPMENT AREA BUILDINGS = 39,434 SF (0.91 AC) FIRE ROAD = 35,676 SF (0.82 AC) SIDEWALKS = 9,756 SF (0.22 AC) REC COURTS = 11,907 SF (0.22 AC) TOTAL = 96,773 SF (2.22 AC) PROPOSED IMPERVIOUS TO BE TREATED IN REDEVLOPMENT AREA BUILDINGS = 16,073 SF (0.37 AC) FIRE ROAD = 15,448 SF (0.35 AC) SIDEWALKS = Z338 SF (0.05 AC) TOTAL = 33,859 SF (0.78 AC) REDUCTION IN IMPERVIOUS FROM EXISTING TO PROPOSED 119,620 SF - 96, 773 SF = 22,847 SF N 0 30 60 120 1 inch = BO ft. Horizontal IN 0 U a 9 II kJaMNSIN91MI11= DES I DRW jChK FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH ,C Z B Zz • 0 o:: C3 w C/) p w Z�' Z zW COASTAL W t `C> WIZ Z SITE Eo�JQ� ° z Z <VjZ U w �QV(DO Z Z DESIGN,PC =o ° z cn m O o ENGINEERING C7 J Ll! Of— LAND PLANNING Z Z En (n LLJ LLI COMMERCIAL / RESIDENTIAL LU cc0 } /z P.O. Box 4641 LU O = m Wilmington, NC 28406 z ��4�0 Ld (910) 791-4441 Z = Cr u 0 a w (� w� z m 2 w CDoQ & a O o g U s w Q 0 4 � � Q o U e w_ m +• i� W Z W cn 7 0 CODE ID. N0. SIZE D O SCALE AS INDICATED = MAXIMO NO. — ~ Cr JOB ORDER NO. — 0 O Calibre WORK ORDER NO. — U CONSTR. CONTR. NO. CDN40085-09-R-32-15 0 N Calibre Engineering, Inc. NAVFAC DRAWING NO, 8201 Southpark Lane, Unit 200 SHEET of - Littleton, CO 80120 (303) 730-0434 SHEET N0. Q www.r,alibre-engineering.com R E D E V Construction Management Civil Engineering Surveying �0 N 5 A J `R ETA I I N G WALL i �`� t I � f ( � 3 57ORr bWA` &X V / ` ✓ f/ BW 2.59 3.83 1, (� 0� li (l \s 992ss r Bw Bw I 4.45 ° 7��� e I ! 1 AROJECT IMI �I . - 13 - -t _,' #VO BW 1 3.68 r - - / TW d g \ ,7 i C ST I 71-* -13 e' . sw, - E f 8 £ WETLANfSS �3W7'_ 9oDl�� ` 1. O� _ - 5 SS -S' S - --5S- .. -�__- / EP TW�e� I- r ICJ I W wsuur ' , �' �- TW-it4j-r-----�s -$�o - VV " n . GRASS - - - -- -' -�5 a E' �,�12.31 FS a FS. cRA33 - f2 it r EP I r rz o ��,. W. 1 �'o° 1 P�OJ C LIMITS I N, ^e r tie tM 04 --W' W- - W -W-- W 10 40/'F F F 1 2.0% e 7 hD - Q U f� �h a 0' 0 a _ \ FG FG oFo Co Co =aF� �F� AINN,� CB-1 0 2.8% I I� CB-1 '1 1.37- I� / t ! Q' I� TG 152.62' L C i I 10 QC O� P OF 15 RCP t 1 C-102 C-501 ROFILE 'J O J o j i 1 -Jul X ATCH A B.58 \ (TYP.) / o� E STORM DRAIN TG E CAT ASIN I v ! o�rn I l I 1 F' tie ( 1 BTU ° yor� ok_� yo�o b v C� O / I► (t o o ���o ��� Z C-102 C-50 9.95 r CB-1 6 C-e2C-501 )`I° e EG o o Q) h� 4 in o o ! f 1 J 0-/,12 (TYP. t ��� 1.9v% U H03YV ( 10.25 \ O L % t ti i f / A f � Cb 01�. �1�. �� O A 5i q� o� �� / \ Cb COW o ty o FS S--- .............- FS - -- FS--- 10.25 sa✓6 ! 3- 1 i �5� _ e CB-11 C-102 C-501 EPA -- i WW05 �° �° PAD !r i f / of-9.50 t ^ 3 6� o TY x III p �2 >� - Q CB-18 ti t i d r f / / ?) -TG i r0 ,o > .G O ! I ! PoSl(2J m {"^ p /' � o CB FF=13.00 �° s - � �P J - W n o� N , - i C J , R i.,_ �. F..,,..� 10.01 co I I POST(j) i t �d h dQ BUILDING A o �e ? - \OF, 1 C-30� 3.5%10 `e �- EP W. ! Posr(3� II J WFfLANDS - _- S \ % �59.2 \ - W --W Pasr(1l ® m W f _ a `ec �• In \ PROF\� �; oa a �� o o I \ \ W C I f 0T GB-1G 11.46 °�e ��e- ��e i PoST ��fg I -- FS s7 ! l 10.53 >TG �� 11 W p <h o m r _� Al �� �o C-102 C-501 o° >> \ W L OP �° C-102 C-502 s (� o_' w �e rn o I� F- ° I 5� (TY v " w �I II 5� !� m Z 12.30 ! y of 2.0% ) J m I EP CB-14 �I oo FF=11.5D o� ��e 11 BUILDING �� C-102 C-501 1 ) 1 z t! `�e `�e �e 5 C-102 C-501 j �I t_ I U r I� 00 .5''- ` CB-9 1 �] 9.69- (TY .) y E ' \ I Q / og - - a ❑ (TYP.) o TG CB-8 E E E 41 - �i �N�e Eo 1.0% w 1.3%E1.0%e f f� FE - I' �: ---- >> Ge 9.88 ^° 10.50 0 T ~ _ 1 EP o.° T �� i iO to Fe- N �e o • - 1 js m ti G 10.70 p 1 q\ 12 % �F EP ��� ° Q ^�� cave -- _ ^��-� 2.78 _ W - - W--S� W --W 11-wiI �� sw� 4 D 5 w�� -W -W----------W ��u- 1 _ - t -., C-102 C-501 MH-3 1 13j6p OF y8„ R (��, Q�(3 T11 N S - �� C-102 C-502 _.. _ -_� 1�� Sm Cslllliilillii�ps 10 "? (TYP. o '-- - - - (TYP.) 11.19 �' t ✓ 12 I1 J \ \ EP W GW \ B.20 8.90 EP 0 LNG j Cs o - _ - A.eB e �9 �o �q a�� i co . (� (� °e °e CB-13�C-102 C-501 8.81 �e \ �_14 > EP >p .., \ '` .� s l (TYP.) WCUT LINE BP B� 1 \ B �` 9.51 I �v -- EP EX. STORM D < I l L 8.93- -EX CATCH BAST FL 0 EP EP EXISTING f N SOFTBALL \ I ( 00 00 L V G� FIELD \ ( Y ;� �z ' 1 \ b x w D ! o I 1� A N J_ C \ V ( Q m \ ( v o f II ~\\ C I I \ s ~ ! ! a'E 0 \ � I SS_ Li Fr" _. Map F rrot9tR� \ PROJECT LI<TS BI f TORM }, 9 51 GO t MATCHLINE SEE SHEET C-103 LEGEND- Ex. CONTOUR (MAJOR) ) - - EX. CONTOUR (MINOR) 20 PR. CONTOUR (MAJOR) PR. CONTOUR (MINOR) 0.6% _ FINISH GRADE SLOPE X 20.15 FINISH GRADE ELEVATION EX. STORM PIPE PR. STORM PIPE OD PR. STORM MANHOLE ❑❑ PR. CATCH BASIN SB SPLASH BLOCK FL FLOWLINE SL SPILL LINE TG TOP OF GRATE SW SIDEWALK FIG FINISHED GRADE EP EDGE OF PAVEMENT HW-1 CONCRETE HEADWALL NO. CB-1 CATCH BASIN NO. (dS-D FLARED END SECTION NO. MH-1 STORM MANHOLE NO. CI-1 CURB INLET NO. NOTES: 1. SEE SHEET C-105 FOR EROSION CONTROL MEASURES, 2. GRADING IN LANDSCAPE AREAS AT BUILDING TO BEGIN 0.5' BELOW FINISHED FLOOR. 3. REFER TO ARCHITECTURAL PLANS TO VERIFY DOWNSPOUT AND SPLASHBLOCK LOCATIONS. 2010 o zo ao ao A BLDG A PROPOSED GRADE FF=13.00 FLOWLINE SWALE o EDGE OF EMERGENCY ACCESS SECTION CONCRETE PAVEMENT EDGE OF PAVEMENT o EDGE OF PAVEMENT 1 inch = 40 ft. Horizontal 10.00' 6' WALK ------------ ____-------- -�--- PROPOSED GRADE EXISTING GROUND FLOWLINE _ _ _ _ _ _ _ EXISTING GROUND EXISTING GROUND EXISTING PAVEMENT EXISTING PAVEMENT „ Ca''b PROPOSED G e SECTION A SECTION B SECTION C Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 Littleton, CC 80120 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying 1 2 3 4 5 a 5 rd N CARO< I C DES I DRw ICHK FIRE PROTECTION BRANCH MANAGER CHEF LNG/ARCH a"sZ J 5 OZ> CD 00� Z Lu I Z w W a w 0- o� w > w o z F- � F w 1LLJ rtN Z Q J 0 40Q Q Of L a v Q T H Yid CL 0 z Qw 2 z C3 J w O Z Z Cl)m w CrO C Z OJ Z:Z Q a 0 w� o w� U0 Z_ Zp ::DO LLJ = J w o� z d w 0 O z J a ¢ ~ Q z Cc Ld vW D CODE D NO. SIZE 0 SCAEe. AS INDICATED MAXIMC No - .,07 OFFER NO - 0 WORK ORDER NO. - U CONS -If . CONTR- NO 0 N40085-09-R-3215 0 N NAVFAC DRAWING N0. - SHEEr C-102 ofOff sHEFT NO Q C-102 N 2 f SOFTBALL FIELD RO I RE N C-102 C-501z (TYP. ) r \� � I , 1 l \ x \ A. I\ PROJECT LIM TS x ,1'-- 00 \� \ \10. WETLANDS tI, MATCHLINE SEE SHEET C-102 �s _. 1 , PROJECT LIMITS �1\ ) r - _ r' r / t 1w f10 � I l r'. y l LIMIT hi TL e/�- --_ — - D i _. r / . 6 r // �JCo r 6 ti l RR // OR p 20 40 80 1 inch = 40 ft. Horizontal LEGEND 20 EX. CONTOUR (MAJOR) - -- - EX. CONTOUR (MINOR) 20 PR. CONTOUR (MAJOR) PR. CONTOUR (MINOR) _0.6% _ FINISH GRADE SLOPE x 20.15 FINISH GRADE ELEVATION EX. STORM PIPE PR. STORM PIPE OD PR. STORM MANHOLE ❑❑ PR. CATCH BASIN SB SPLASH BLOCK FL FLOWLINE SL SPILL LINE TO TOP OF GRATE o SW SIDEWALK U FG FINISHED GRADE EP EDGE OF PAVEMENT W W HW-1 CONCRETE HEADWALL NO. CB-1 CATCH BASIN N0. W W FES-1 FLARED END SECTION NO. Z MH-1 STORM MANHOLE NO. J CI-1 CURB INLET NO. U NOTES: 1. SEE SHEET C-105 FOR EROSION CONTROL MEASURES. 2. GRADING IN LANDSCAPE AREAS AT BUILDING TO BEGIN 0.5' BELOW FINISHED FLOOR. 3. REFER TO ARCHITECTURAL PLANS TO VERIFY DOWNSPOUT AND SPLASHBLOCK LOCATIONS. 5.00' EDGE OF PAVEMENT �.� `-PROPOSED GRADE EXISTING GROUND — — — — — — — — — — —r — — — — — — — SECTION D 5.00' EDGE OF PAVEMENT �N PROPOSED GRADE --- 'EXISTING GROUND — — - SECTION E Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 Littleton, CO 80120 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying 5 545E i 'I c -30 10 Y'V. 0 DES I DRW CrK FIRE PROTECTON BRANCH MANAGER CC CHIEF LNG/ARCH QUs Z M Z R J L� o Z -> Z� 0 Z C gZ LLJ Q o a w oir W C�C Ld G F ZLU w ? J< N JQ Z Q 0 4 Z LQiZ Q v Q IJT- ¢� Y0a z z Q W >- z �-:j 0 W 0 Z Z (/) I- m Cr W Z) w 0 0 o W 02 Z z a ] /rt Z W LU U 0 Z Cl)a U 4 w BILL!m w Z�oZD(3) LLJO cn =Jc ~U� LAB! � d W CDLL AD z J i Q ~ F- Q 0- Z U L11 o CODE ID. NO SIFF D scaLL AS INDICATED MAXIMO NO JOB ORDER N0. - O WORK ORDER N0. - U CONSTR. CONTR_ NO- N40085-09-R-3215 0 cV NAVFAC DRAWING NO SHEET C-103 of - z U SHEET No. Q C-103 Lo c.0 2 3 E 5 I IG1 1 06 SA o_a �_cj -7 cP J 1 MATCHLINE SEE SHEET C-102 O)� 'o, m 1 .0 d -11 C-102 C-501 ES CD � T 0 .-_tom; ,30 10, °ee 1 W 3.5% Ix w A bxI 7 1 .6q 10.2 POST aos7f2> 10.01 o j P07(3) i l U J EP I A2sr{3)z (LI � I I -W--- - NJ I I Pos7(2) ® o //14 PROJECT LIMITScp ? �'Q �50 (� Q �A C-102 C-502 0 I­-A (TYR) w q' wu ��11 j 1 FF=11.50 S � 1 BUILDING �j C-102 C-501 I - a 102 C-501 1 e r -j (TY .) I (TYP.) CB-9 i o-9.s� CB-8 1.0% 1.01 w 1.3%_ �Q E 107 " 9.88 Ge G �° �10.50 T EP Oda TO G �10.E0 -'V%, ...........-W 4� 9'`-W W 0 -_C-102 C-50.2-- �_U mow- 10 (TYP. o r- 8.90 EP r �a 9 o'cy� CB-1 ,C-102 C-501- 8E81 Qe / (TYP) WCUT LINE 8.581, 1 1 � EP \ EX. STORM D < EX CATCH\ BA M C r U W /r w = t (n W LU CO LU Z J U 1 � SC-103 C-501 Q-I t a � o O { � � I T / x TORM DRAIN` 1 I � i / 1 0"� R AVE I a �� • 14.59- 1 �. ' SQ00. 77 /_13.73 EP� ��Q ®. W 5�� I\✓ m/ / EP /3,89 13.39 eeQ EP EP 10.93 FIL 11.92 E -i9 EP EP EP 1 T -o fi,----_ _ �� � ' � � �' MH-2 C-104 C-501 cave 1z-78 ��' ;5 - I i •_ w it 1 � ! � 1 ' ti ' � W 6 � w � t W J � T W � t2 � � � i i � �-W "t �FG � � ,'C-104 C, 5 o �\�W .� �� j` (TYPE � � / t I I � col V mOF 10.14 � 1 ' TO CB-7 C-104 C-5 �"AC, , � / ``' / o 5 3 11.15J11.15 A9 EP � � ,}i } II vVee��Q I � i eQ��ee l e l , � p P� I 11.14 11.14 \ I EP EP Q I o j /-1 t t � 1z.1st 1z.3z °I EP \ EP y _ � ��sru ti Gov Fra=�= � �No � � l / / / � � � � PROJECT LIMITS � � t` � rt f � o f 1 5 11 1 12 - l / /� //Y / jt HW-3C-104 C-501 / f/ 11 C-104 C-502 ( o f f /� tl G r 'F� (TYP.) I I / TYP. aco Ily 1 ( I 7 J � � � �Q { (NO �1 �FLf co 70 1 CUT LIN I I i 6, 2 - C-103 C-5 4 �__\ /%FL INLET C-104 C-50� _9.00`,1 51 \ / o° y CI TO r C \ 3y� 10.01 7Gffl CB-6 C-104 C-50k 3: 1 5 ROF/�F q 24„ S9 � \ \i 9 �� a�� cave uc a�y> �h ,lea 107.89' OF 24" RCP EP t0.01 / 1 t C RCA - o- 1 A �--- �9 9 oQ� oQ 9 PROFILE 'D' C-301 rEP �s \\ 3C� �° \ A 10 _ 9 00� IIOI CB-4 C-103 C-50� \ 7w Pau -UP. • • 19,71' OF 15" RCP �e� 1 10 1 F s �' 67.10' OF 36" RCP r EP Q� 1 ���o �° �3s a o PROFILE 'E' C-301 _S CB-1 �0�% FL68 0.7%1 T PROFILE/'C C-301ig,' 2 , . h C-103 C-502 e e _ C-103 C-5 I e Q 4 ° -t ' -� oho\1 / CB-5 SHEET - 9.3s -- Z Sew - 10.22 G 7p I e C-104 C-502 e \\ f SEE EET C 505 (TYP.) ti Z EL (TYP.) e e � �_ C-103 C-502L - 0.34' �o 10.45>1 �F-1 Fnn. \_11.z9 } v 10.34' OF 18" RCP 4" FORCE MAIN 9.55 QR` 0 4 ,EP p �= o i 517.68' OF 42" RCP EP \ S FL a4 ` 7 �FG PROFILE 'C' C-301-34.21' OF 12" RCP 1 \ - PRbF1LE 'A' C-302 ( o o 9.03 TYP) �6 �oF 1 e . �' l i 5- 11 - e MH-1 C-103 C �� oQo� 8.12 PROFILE 'F' C-301 1 j EP FM =����p o -_ o� -103 C-5, E 1 II �C-104 C-501 ES- \A EG Hw-2� 04 C-501 /> 05� 0b �°FL EP,/(TYP.) (i ) wi 5 -� ._ I 4" FORC MAIN / 1 9.32 �_ �e �I �M9 �e FM_11.3o e FM �I 1 T PROFILE C-302 ( i �- 8 EP t / /STORAGE BASIN �r� 5 5 67-Q \ p5EE SHEET 505 / f E \ A T LIMIT I QG 0 1fl' S oQti-5 .8-t2� �rl� '/ ♦ �\ �V % EP 21 8�9 �vJ ' 1 i �u oos� I 5 / FG si // /i ♦ \ ~ \ 5 \ / o I 1 \ D � � �-' �� / �►__ _--�_ - ---�r=� ��.- _ � �5 %%- /%,%ter'' ,�, . ., y v , _� .._-- f ii N. 4 PROJECT LIMITS ♦/ r __ _ ^1,} 4yD _ if rC �/ fwrocs v 5 ♦ - , �// ,�i= / � v " ~. ? �i� Irl�i'�, � I�� a �`^�!/ ...fir/� � t OF 77 1 12 5 4 EDGE OF PAVEMENTS PARKING BUMPER LEGEND ----20 EX. CONTOUR (MAJOR) - -- - EX. CONTOUR (MINOR) 20 PR. CONTOUR (MAJOR) PR. CONTOUR (MINOR) 0.6% FINISH GRADE SLOPE x 20.15 FINISH GRADE ELEVATION EX. STORM PIPE PR. STORM PIPE OD PR. STORM MANHOLE ❑❑ PR. CATCH BASIN SB SPLASH BLOCK FL FLOWLINE SL SPILL LINE TG TOP OF GRATE SW SIDEWALK FG FINISHED GRADE EP EDGE OF PAVEMENT HW-1 CONCRETE HEADWALL NO. CB-1 CATCH BASIN NO. FES-1 FLARED END SECTION NO. MH-1 STORM MANHOLE NO. CURB INLET N0. 1. SEE SHEET C-105 FOR EROSION CONTROL MEASURES. 2 GRADING IN LANDSCAPE AREAS AT CAiR i 03 V 3 1 BUILDING TO BEGIN 0.5' BELOW FINISHED FLOOR. �pF' .NCT(NEE 3. REFER TO ARCHITECTURAL PLANS TO VERIFY DOWNSPOUT AND SPLASHBLOCK LOCATIONS. DES F)Rw OWN FIRE PROTECTION BRANCH MANAGER o CNIE ENG/ARCH 0 EDGE OF PAVEMENT U A z oZ> � Z Q ---- FLOWLINE- Q o = J ---__ w z P-00 a w ---_-_-- forr W z o Z LU w l JN Z Q SECTION F a Z 3 o T a2 YpCL 0 Z� aW>_ z O �U)m cl� o PROPOSED GRADE Z Z W O m LD -EDGE EX. PARKING Fr W Z) Cl) 3' --- w Z o Z J a ------------- y.�U, -FLOWLINE SWALE LU a U 0 Z o EXISTING GROUND � w w rn U < - Z w - - - z 20 40 80 t inch = 40 ft. Horizontal ION G � _�8gio 00-1 U�_ ~w '6 90 ZLL Q CD CA J m `\ o Z V) -`\- (D CODE IN N0. SIZE D IV s sCALF AS INDICATED ~ MAXIMO NO. - JOB DEDFR NO - WORK ORDER N0 _ Callba O CONSTR. CON`R. NO. N40085-09-R-3215 0 N NAVEac DRAWING NO Calibre Engineering, Inc. _ SHTT C-104 c- - 8201 Southpark Lane, Unit 200 Littleton, CO 80120 (303) 730-0434 Q SHEET NO. www.calibre-engineering.com C-104 Construction Management Civil Engineering Surveying n N 5 5 I I I w STORMWATER AND GRADING NOTES: 1. UNLESS NOTED OTHER WISE, CONTRACTOR SHALL ENSURE THAT EXISTING DRAINAGE PATTERNS ARE MAINTAINED. lit 2 3 4 GENERAL NOTES / LEGEND: SEE SHEET CI-001 SITE NOTES t. Ot TYPE 'T' PV CANOPY. Lxg 72 SEE STRUCTURAL PLANS "` TYPE 00 PV CANOPY. SEE STRUCTURAL PLANS._ O300 DIAMETER CONCRETE CAISSON. SEE STRUCTURAL PLANS INSTALL NEW SIDEWALK. SEE PAVING AND STRIPING PLAN AND DETAIL 3/SHEET CS-107/CS-207 INSTALL NEW ASPHALT JOGGING TRAIL VV SEE PAVING AND STRIPING PLAN AND DETAIL 4/SHEET CS-107/CS-207 OCONCRETE WHEEL BLOCK SEE DETAIL 5/SHEET CS-107/CS-207 OADJUST RIM TO MATCH FINISHED GRADE ONEW DRAINAGE PATTERN. CONTRACTOR _ SHALL ASSURE POSITIVE DRAINAGE FROM INTERFACE OF EXISTING PAVEMENT AND NEW PAVEMENT OVERLAY TO RIM OF EXISTING STORM DRAIN BOX. OPROVIDE SHADE TOLERANT PERMANENT GRASS COVER AS NECESSARY IN PARKING LOT ISLANDS AND ALONG PARKING LOT PERIMETER. ELECTRICAL SITE WORK NOTES, 1. REFER TO ELECTRICAL PLANS FOR ELECTRICAL SITE WORK ALIGNMENTS, NOTES, AND DETAILS 2. SITE AND ELECTRICAL CONTRACTORS SHALL COORDINATE TO MINIMIZE PAVEMENT DEMOLITION/DISTURBANCE. 3 STE FEATURES DISTURSED/REMOVED DURING ELECTRICAL INSTALL SHALL BE REPLACED IN LIKE KIND. 40 0 40 80 1 INCH = 40 FEET CAPE FEAR Engineering, Inc. 151 Poole Rd, SUNS 100 Beh3le, NO 28451 TEL (910) 383-1044 FAX (910) 383-1045 www.capefearengineering.com NO LICENSE NO. C-1621 5 11 a i b 2i-c3 DES - FDRW - 1CHK FIRE PROTECTION BRANCH MANAGER CHIEF ENGARCH 0 C u Q aJ g 8v ZO pi C1 z I Ir Lu � Q zg U a= I3❑ >Lu �a �Zm >a ZJ O �O �z g D w Z Co/5 WU ° z w as Z Oz o z �W W� 10) UU Z N W J ¢a \ J cV 2 m 04 N LaL OU A r mmj `S1 0 (L 3 m m N CODE ID. N0. SIZE D SCALE: AS INDICATED MAXIMO NO. - JOB ORDER NO. F)D% WORK ORDER NO. 8W46 Q CONSTR. CONTR. NO. N62470-06-D-6002-X023 0 NAVFAC DRAWING NO. - H H SHEET - OF - SHEET 02 � TC W 1 2 3 4 5 LEGEND e (/ \5�oy� - 20- - EX. CONTOUR (MAJOR) EX. CONTOUR (MINOR) i v v\ l I I i I - �� I t, x \ 20 PR. CONTOUR MAJOR' ' CONTOURMIN I r -12- EX. STORM PIPE BASIN LINE - - . 1} 6l E \ I ! - - Il t E 1 Q DESIGN POINT _ o.47 / D j \ o.ao0.8 1 I I ( PR. BASIN LABEL S I 1.04 �Sq Q RUNOFF COEFF. 10-YR BASIN AREA(AC.) 14.6 FLOW (CFS) rr ll I / o _ 1 1 I I 3 F t T 0.49 1 I / 'H�3Y1 \ - - I L S1 / n - 0.683.2 ' i a � i )� � � ' � �\ Ir f � r1J.1 U t 0.49 0.77 W f i W R1 �4 \ P A I 14 0.150.9 -- { - _---� 0.9 .i -- -- --- I os H I � � ,� _ � � \ � OS-1 . o.2s o.ao I I r o �' l i o.aa o.3s l 9 "✓ 3 I I A 1.7 7� A (� k❑ / 8 / 0.72 % / �� �i/ 1 C - - 1 I I ? I \ \ ` 1 I ost oss i ❑ 0.38 2.3 V � 0.55 3.1 ❑ I I R-- t 12 o j 1 v rod - \ .33 0.2200.7 - r r- -\� / I IS T ����1n►CARp����iii� Aj A I I o.3s 3.2 3.a I % ✓ v / V DES DRw CNK V I I I ll FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH F- ::3 B o 0.44 4.0 ' A, vx I I� t I\ I /� t t/�i�(n w v I / p OC > Ao.33 - 1 I I/ // I IgZW � Z ( t.o9 / t j i3 2 � � a a Y I 0.54 j v v L Ili I t o.45 o.7a I o.42 22 o o CL 7RECEIVED �p GHQ o _ -- - 7 �/ - B r i r I I ^ APR 14 2010 t.o9 I/il \ BY:----- z V m _ � W z Ir Ud O o ( / / / a l r/ vv vv z � I a O Uj F- o BB 1 t z Z =D 0.53 0.22 - l A\ \\V I W Q � LAJ A Z w g 10 M 1 t �- _ w} v) ULL A � A j - E Q a o - 11-- / 1 NQ LLQ fop Q� 035 �o - \ _- lg7 FM / l / h t I 1t o zs so Sao Q U %♦ ?. `' - 0.93 0.86 \ / 4 soh _ I I� 1t z N ♦ _ ` tV t ZD CODE ID. NO, SIZE D O rp SCALE: AS INDICATED - �' r \ \ ILI 1 inch = 50 ft Horizontal MAXIMO NO. \ Tj/!Ile Joe ORDER No. ' 1 �` \ v / - o ri ! _ t - \. � �,,, A _ �. � %r�� � \ �` \ � � `ti- � WORK ORDER No. - U / --lam \---.._- = _ //�/ \ a ���� •� f. �_ ►�_.. -� ... .-'" �/ld �l� r '�, V ..\. / CONSTR. CONTR. NO. O r "rf i \ - CIa' 1 b N40085-09-R-3215 0 � / I Calibre Engineering,Inc. NAVFAC DRAWING No. - 2 y 8201 So uthpark Lane, Unit 200 SHEET of v Littleton, CO 80120 (303) 730-0434 sNFEr No. of ✓ l / < - ��t,tt / www.calibre-engineering.com � Construction Management Civil Engineering Surveying cV 1 2 3 4 5 1 2 i 3 4 5 C I 0+00 1+00 2+00 3+00 3+85 STORM PROFILE ON m = U cc ^ Ln Ln No 20 20 LO 20 In In ^ Q - O v z o O M o O N 7 N 1< OMN GOON _D m 00 P z C' z o 2C a +¢ j +- PROPOSED GROUND C) _0z Z @ PIPE CL 10 10 a EXISTING ROUND C -- �@ PIPE C Fy 1C RCA - _ 1 EXISTING - _ \ GROUND L=19,71' _ \ @ PIPE CL 0 S=4.01 % EX. _ 18" RCP _ 0 15" RCP L=10.34'J S=1.54% 18" RCP -5 -5 C Ln I Rn LO U I ^ .m U ^ N CD t- r] I N O O _ ] OHO Ln Z O� ^ ] O O On h- (n 000 CV owz o m -0 En H- _ � W Q + oz J O Q Ln NO o ED w +> = oZ �; PRO OSED GRO ND 554.2j @ PI DE CL Rip 0 N Q N m U ^ m U ^. O N . O, 0 W 3: J r O Z O O M N OCc 0 Q O� I- R- m r�) of O Z - Z O U r0 E6B- oZ j OF _ tnQ C +By > Q �Q +n_ > J J O � J OU Z z U CD Z- N N < O 0 �. -. Q W 00 + > = oz EXISTING GROUND _ PROPOSED @ PIPE CL GROUND L=30.31' @ PIPE CL S=0.50% 0 12" RCP 0 0+00 1+00 1+44 STORM PROFILE 'B' 0+00 1+00 2+00 3+00 4+00 4+50 STORM PROFILE 'C' U W N ^ ^ LC) L w In Eli ZT) v (0Q Q 00 M CD O ro (D U Lr) W = o o in M 00 0c ~ U oN F- N�Z ::DQ p—Z .� O U _ oLij no o > > .+ > In CN Z Z w oU? EX. 15" RCP 0+50 1+00 2+00 2+70 0+00 1+0U+14 0+40 STORM PROFILE 'E' STORM PROFILE 'F' N m U m U I 1 w 20 Li o 00 LnN N I 0 Z I z n� Q PROPOSED GROUND m o 00 - NQ CO) PIPE CL Cc BE) 00 o+0 z EXISTING GROUND 0 �� @ PIPE CL < w oz z z p x + Bf » Z Z Z Z 10 W .0 �1�-6" FIRE SERVICE \_8" WATER MAIN L=152.62' - -- A 5= 7. 609 -- 15 RCP 0 0+15 1+00 10 2+00 2+282+50 0+00 STORM PROFILE 'J' /-EXISTING GROUND @ PIPE CL PROPOSED GROUND (9 PIPE CL L=255.72--- — — _� 5=0.99% 15" RCP 1+00 2+00 3+00 4+00 STORM PROFILE 'G' 1+00 2+00 3+00 4+00 5+00 STORM PROFILE 'K' 2 1 3 6+00 I � U U ^ X 10 W _ _ ^^ ^ In = 20 20 2( z z Cn mor,r)ro oz Q0 J O m 0) 0 = O OD M Q1 � Q M o� = W O -� zo O00 NQ Q+D'> Q �wz z w +> U OU? EXISTING GROUND x +<> > > _ 4 z @ PIPE CL W= 0 z z Z PROPOSED GROUND @ PIPE CL 10 10 1C �8" DIP SANITARY L=136.46' S=0,25% 15" RCP 0 D 8" WATER MAIN 0 1+00 2+00 5+00 0+15 STORM PROFILE 'H' Q U - m U N ^ 20 COD 0 LiM N. w r v J Z_ p. In O. Z 00 N 0* 0) J O CD FAO N Er) W � . O Oj O 0] � Qv DO LO . � U n. Z +U> S LnW Z Z O EC) Z U 4 F- +<> > > U— U Z Z Z PROPOSED GROUND 10 @ PIPE CL C L=107.89` S=0.25%` \\ 24" RCP \ J EXISTING GROUND 0 @ PIPE CL 0 0+00 1+00 2+00+14 STORM PROFILE 'D' O - - i M LO In w U ^ O BCD N O� o EXISTING ? o� _D GROUND V NQ o; PIPE CL �l oo CO +� > it ocD z PROPOSED Q 0E0 0 m 00 GROUND rooj = N`JJ z o @ PIPE CL -� Q+�>> 1--8 DIP SANITARY caz z I " �8WATER MAIN - '•'03 30,4-110 �::.. R�IIIII1111\\1� L=159.28' 5=1.50.1 15" RCP [FIRE 7ENG/ANCh CHK G G 0+15 1+00 2+00 2+25 STORM PROFILE 'I' B � I m I U ^ m � U G ^Ln 00 DO �. 20 I �Z, zCD .� Z Q CD 00..00 O (DO CD N O C) � AD m `]�.� Q -0 M Op d. En I- _ (D W 0 O Z U LO = WZ_Z_ O a� ,Q PROPOSED z a +w > > > GROUND 0 0 0 z z z @ PIPE CL 08" DIP SANITARY - 0 -- - �EXISTI G GROUND — — - - (P PIPE CL L=105.63' S=0.25% lx__8" 15" RCP WATER MAIN 0 0 7+00 7+707+90 0+35 1+00 1+81+97 STORM PROFILE 'L' M0~ J oZ>o g Q Zoo LLI U) LLJ L' p > m m BIB LU � "' 20 w U Ln 20 F p Q W z ^ Go U< O U' T LL z N No Z Y Q a O <� UW zn w.n � zo "' Z� F_ z Q Y D) On 0� 0 U � lii Q_ 0 Qi — m 0LO 17, m �� � Z Z w _Z m F_ o� � o!NF-O (r W a 0LET z Z ~ 6 Q> W tz Q z 10 wocCDZzz-- 10 W� o Z U 0 T �EX STING co = _ GROUND ¢ W. z Ca U w @ IPE CL = J w }O Cn w lL PRO OSED o Q o J 0 L=67.3% GRO NO LL z a o ,52'SP @ PIPE CL w Q IX v COaQh[3, 0 w 0 o Z Cn 0+00 1 +09 +117+30 ZD CODF IF N0. SIZE D O STORMPROFILE 'M' SEA AS INDICATED MAxIMo N0. - EI, Jag ORDER N0. CD Calibre W CHRK ORGE4 _ U �� CONSTR. CONf4. NC:)0. o zs so \oo N40085-09-R-3215 0 Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 1 inch = 50 ft. Horizontal Littleton, CO 80120 (303) 73( www.calibre-engineering.com Construction Management Civil 1 4 5 N NN,=AC DRAWING No. S su-ET 301 0E - v CEVED1 BH,_ET NO. c I \gine"Rgl pt fring C=301 Q0 N 1 1 2 1 3 1 4 1 5 , I m n SAWCUT EXISTING7 7 REQUIRED • ACCEPT PAVEMENT SU --UMIOF 7 0NT RECONSTRUCTION MATCHGRADE • aTO MIN ai 120 NEWOF EXISTING PAVEMENT PAVEMENT TO REMAIN - TO REMAIN (DEP7H VARIES) JACK COAT NEW 10ASPHALT ////.�' OVERLAY y 1 NG 1'► A'W (SEE DETAIL 7 THIS SHEET) EXISTING BASE Tj I MA7ER AL TACK C�� 11A I=NEW SUBMADE TACK YI EXISTING NOTE: 7'i • PLACED CONCURENT NTH BITUMINOUSOVERLAY NEW 1"ASPHALT OVERLAY AVM N X SI N �2 PAVEMENT MILL AND OVERLAY (NTS) (NTS) C ) 6' 24 BARS MIN N I r- 7DIA nN000S- HO -"-I---�/'- FILE 712L3/4- TO 6.1• MIN TOP OF REINFORCING BAR FLUSH WITH TOP OF CONCRETE -7 r _ DIA. REINFORCI I..0 FRONT VIEW 5" MIN SIDE VIEW 5 ONCRETE WHE (NTS) r r;. m, -! PARKING SPACE O HANDICAPPED SYMBOL IF CURB ;E OF :NT io N �s TYPICAL INTERIOR PARKING STALL DETAIL (NTS) 12' PARKING ADDITIONAL SIGN/ TO INDICATE A 'VAN ACCESSIBLE" HANDICAP SPACE O HANDICAP SIGN (NTS) 2 1/4' R SEE PLAN FOR WIDTH s SLOPE TO DRAIN SPILL CURB OR CURB AND GUTTER L------ — I WM EXTERIOR PARKING SPACES TO BE 9'X18' rtnnnmmmnn .; y�m • m 6'-0' EXPANSION p JOINT T 4_V SLOPE 12.1. MAX. .......... C COMPACTED SUBGRADE EXPANSION JOINT MATERIAL SLOPE: 1/4' : 1'-0' O CONCRETE SIDEWALK (NTS) HEAVY-DUTY BITUMINOUS BITUMINOUS CONCRETE CONCRETE PAVEMENT PAVEMENT SEAL 20663 A 191 FOR REPLACEMENT AND REPAIR OPERATIONS, CONTRACTOR SHALL REINSTALL PAVEMENT SECTION OF THAT ENCOUNTERED IN FIELD 4d41n1 !I ` DURING DEMO OPERATIONS. DES _ D ICHK _ FOR NEW PAVEMENT EXPANSIONS, BITUMINOUS CONCRETE PAVEMENT CONTRACTOR SHALL INSTALL SECTION. FlRE PROTECno &VA04 M41AGER CHIEF ENC/FRCH I� z B PAVEMENT O (NTS) SECTIONS OZ 9 0 W Q ?U H 0 F=H -EXTERIOR PARKING SPACES TO BE WX18' Z 0 cry -ALL HANDICAP SPACES SHALL MEET CURRENT ADAAG AND UFC } Z TIE TO EXISTING NEW PAVEMENT EXISTING PAVEMENT Q CD Llj PROVIDE GRASS COVER $ W J Z > MATCH Ui EXISTING V O I SLOPE XISTIN 00" a } SI.OPEG F?T11I:CT/,R 1 A PLAN I 10 HANDICAPPED RAMP (NTS) 3 T1Z/jj1T1Zj- Fr 0C W o Z_ Z W cc z � p a Z NOTE: CONTRACTOR SHALL PROVIDE POSITIVE DRAINAGE AND SHALL W - U o ASSURE THAT ALL NEW IMPERVIOUS SURFACES DRAIN TO PERMITTED c STORMWATER BMPS. `' F Cl)W w d a aQ c z O11 PAVEMENT EXPANSION AND GRADING DETAIL �� oA (NTS) o H CODE ID. NO. SIZE D Z SCALE: AS INDICATED a f/f WXWO NO. — W 4WCAPE FEAR M DRNR NO, Enineerin Inc" WORK ORDER NO. I 9 9� CONSTR. CONTR. NO. 151 Poole Salle f00 eewlll•. NC 23451 N62470-06-D-6002-X023 N TEL (910) 363.1044 FAX (910) 363-1045 NAVFAC DRAWING NO. 12589047 _ www.capefearengineering.com SHEET 13 OF 78 NC LICENSE NO. C-1621 SHEETC ` _ 1 O 4 5 • 2 3 4 1 5 COMPACTED FILL OR GRAVEL, EXTENSION OF FABRIC AND WIRE INTO THE TRENCH FILTER D FABRIC BACKFILL MINIMUM 8" THICK LAYER OF GRAVEL BOMINIMUM 17 V—TRENCH C IN w films-- CENTER STEEL POST NOTE SEE NARRATIVE RIM FOR MORE DETAIL. ISOMETRIC VIEW EXTENSION OF FABRIC AND WIRE / INTO THE TRENCH COMPACTED FILL 8"MINIMUM 14"MINIMUM SECTION 1�1 an FILTER FABRIC 4"MINIMUM SECTION SILT FENCE (NTS) 4 La o 1 ou'oo' REFERENCE EROSION CONTROL 000000i CALCULA710NS FOR SPECIFIC o�000 DIMENSIONS. OUTLET PIPE DIAMETER (Do) d50 = REFERENCE EROSION CONTROL CALCULATIONS dMAX = REFERENCE EROSION CONTROL CALCULA7101VS La = REFERENCE EROSION CONTROL CALCULA7IONS MIN. APRON THICKNESS = 4.5" NOTE' GE07EX NONWOVEN FILTER FABRIC TO BE PLACED UNDER ALL STONE OUTLET PROTECTION. 01 CDLI171T W RAP DIVAM L X X D CUSS 00AIV1Y HW-J 8' X 5' X 1' f 1.5 Cy SiZIRAGE BASH OffALL 13' X if,X 1' f 55 CY MI MARW BASW OffAu IVx e• x r r so cY 5�5 OUTLET PROTECTION (NTS) PUBLIC ROAD 8" MINIMUM THICKNESS 2"-3' COARSE AGGREGATE NOTE SEE NARRATIVE FOR MORE DETAIL. #W91 gum 0001111 GRAVEL CONSTRUCTION ENTRANCE, WIDTH AS REQUIRED TEMP GRAVEL CONSTRUCTION (NTS) ENTRANCE f EXIT NCDOT #5 OR WASHED S' I I I I Ir II u u NCDOT #5 OR #57 WASHED STONE OVERFILL 6" FOR SETTLEMENT BYPASSN6Y BELOW \/ '2 � DE�� SETTLED TOP OF DAM ��i a i SLoP AAAX. NATURAL GROUND 4'MINIMUM SECTION VIEW �� SMINIMUM WASHSTONE 1' NOTE: THICK ON FACE HARDWARE CLOTH SEE NARRATIVE FOR FROM TOE OF DAM 5'MINIMUM OPENINGS) MORE DETAIL. TO WEIR. 3,600 CF / ACRE a r�i 2:1 SIDE SLOPE MAX. CROSS SECTION 0 HARDWIRE CLOTH & GRAVEL 7 DROP INLET PROTECTION (NTS) I M= 3 f VARIES n= 0.03 3 'l TEMPORARY DIVERSION (NTS) LINED W/7H REINFORCING MAT77NG AND SEED PER SPECIFICA77ONS OR SOD. 3:1 GRASSED CHANNEL (NTS) X m 2:1 SIDE 7n SLOPE MAX. TEMPORARY SEDIMENT TRAP (NTS) CAPE FEAR Engineering, Inc. 151 Poole Rd, SuHe 100 SOM11e, NC 28451 TEL (910) 303-1044 FAX (910) 383-1045 ., www.capefearengineering.com NC LICENSE NO. C•1821 a I E 'T:oVe U G� �.u•e DES — jb4 — CHK — FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH I C J Z B 0 LL O z Z 0L Q g 11= bQ WF-} I3� >CCQ J QZ W Q 0 < ZJO O Z O O F-- wO= F Z ZR C H WU0 wU) a oo Z 0 pz V o �. w W W J Of W mW ZW J N ca. V �< O V I o � m V a ail a 1I= m :D fN w CODE ID. NO. SIZE D SCALE. AS INDICATED INXMO NO. — JOB ORDER NO. FW Loi F 3 0 N H WORK ORDER NO. CONSTR. CONTR. NO. N62470-06—D-6002—X023 NAVFAC DRAWING NO. — SHEET — OF — SHEET yQ S — 108 (v- !C W , • 1 2 3 4 5 U C I 0 uG� p� �y,� ANE q^, yy. Ye py;g� y�EfA� ,,.,��p RY i Ayiryb, e�! AVI'ssG :ryiW DNIN\ �i{ S7 p�T/ftDYXCU ii'FO FYfi°.. Vra i/+AA',. Call 7CW ICE Z tI'TAW PUP T9 =- UZD TO ?,)'WiN rOND IN 01,6 OF EURXNC,'. AV TO 5 P-A.Mi ON RF a fi€RA1 CH SMEN ATTACW1 ,J H0ff;NLET AW- i:fi'ORED wiH S!(s%'<': HOSE tWILET TO RAW AC-OZ STs'<8LE U, �AV AREA 9+TT tE.Nr TO RES}RNIV r7 OCN. 3. POND SO;"l,�;x•ES Tu BE PERUANENRY ➢ OUA7frEi Y STAMIM Mr. t"ardTvKM a{Y3. l r 'k\l t �"` off �� ••• .i 1 i i _ ✓ / e } _. _ 8Y PASS wk+'!r`OON RADIUS ?I: FT 28 L? 30" O 19 0 \ StNGT?t .. -: 12 � Rtp7US - SFi2 / _ ~ \, u t, 4.t1...._._._� + , its ;� 7.5 C:Y CL 9 P,P RAR Rs iS - 2C.S iT' \ F.RifkUS 4v7 FF ,�'" N ITN ri.S + x / r j UNG?H 25,5 t! �I)Iklfhli 'Lifi£fuwFl Ev = a(t ^- Y✓ Y3SeNJkP,C di r" - t3YT PWP0RA?t7 P0(A. RE`J�UIM - F..i E% / aitiffr'I.•<. AEA f� x.€? " . _.. h zh'+ r• ."'-•'` "` r yr''r d RAULtC r rY' f _ i�„ ur x _ .."✓"`•r..- . ^.:✓ I F3iv!N Ni:lh:�qj 8x`�`,NG P. 3 i t f E ANs"�27T•.'ATON RAW4 ,r,A % ...s '""....•:...; � / / - _._ � C�af „f€3�.1 ta 5:0. �� i } `t 8di%.kl B(i?.+"s�,fA - nC+ f „ ..•.'`� ..^ ✓ %.,. ^' � � / � / .'jt€"".__1 '{E .�1..<:l �� ��,,.,,..^. t , 1 7\ / / l ,i ``yfy r •,,, ; - _• " � •^ �f„ „ ^ .... f .1 t i i t ,i i �,,,,,,s'' i ;� it R \ t, l i i� f. „✓r 'K'`,• RAiT€US tE4 t_71 - •-- " ,... �" _...-' { i ' t' v A.M., fd. "f.4' rar .-605 FT: tSEEi 7R1L Yifif3 L 1 i'aU'G \�\ �.� \ 2G'"7 L:tiC7X;�A�ry VIUWAY /� P ✓f� � } 3. 1. i ? �-""M ti `� \ tf f..`3 \ ./ fr ' / % !` ,r .✓.'. ( ' Ft f F t j ::Lf.. LTf: ti:L Ds:,; :.'q i'; � ; -/ r r' i r, ✓ ,.r' `.`. -Y t i \L,\ \ \� \ �. � •-., h .. .% t ! / ✓ /. ``' .., ".r' .r r ,,• Y, € - .�S t t`. ; t= � tl .,,,..-`�'G'„F V \\ ARRTAvS 47,0 \ _ RA;US 74A t"T + s. /' �r •✓ i 'h- • \ i[.NG!N -3:xd i r -42 it 4x Rom: ixi+G. .^'". '•y r' r' d ,,.. •/ \ '`" '\ ,,. ".. h moolow a I J NO NEW WORK PROPOSED INFILTRATION BASIN 1A DETAIL MANHOLE FRAME f COVER j 'TOF' 0,Ft'✓"ATc- H. UAP1H'1i..F Fufih#E & C,'OLE'r? _.a 4 f I— //j" 07 Fr j i ...... ft 4 1r ir{f.0 VtaLm € ' &" RCP t't6'i RC? 3 i i TO Vf;G. I-.L 7? R I!4.36 i i i , F \\ ^+ (' r F t :_ < f' ,i ...t_<. u, a, it ' .A: +7 FOR n OJTI ' N G4L 'X �s} �;a.�✓'' \ ,1� dam/ � f �Frx!�:��..� F�A��' � ca�>� .�u max.�. �a -� d'r �. (7r.-'t.,A, ✓'t,.,.. ` f E yx;r�F;.i2` Ct"Jr1'Cf ! 3 t jq} L tr' ( -,`i .l if:' K' a' ! 3 f Fi liASx. �x L.v „ ✓ � 2 e.,4 T X 4 FT F i1i:.:,4 a r C; )hC('if:-TE. :`i% PF IX)LiC"TS 4848 OR EQUIVALENT NT 4r'�.-,-'/. (2) 4 FT x fPI`F i�E"1c:f.'AS'r" C/Fhrt.";?E_.ir.Roy L, l v ry C.� .J Ott E r (.... `1 ....) �...� ,...J r lt°i :J .... f ...i ...r. ............- _ NO NEW WORK PROPOSED _ WA UVnR tN Ti r PIK, Well CA C.AY 94Nt A,$ NA74fSAN} r At t f L`ji tXk+..�'f. 'r.... :X Y TER . 40 FIX CLL (AW l Ey VA IiyVCLiDETAIL S NP5 NO NEW WORK PROPOSED — iisU. BO it.( TO RE Lv A!f u 2 F! tif_G'W WWI 80MX ELEV. 1115 F7' Y Y— oaf 7.EVkT,§Yt :.. j.,_�.�,� r ll /VI L__Il .t�-��._: 4J)it../ f ./.�.%)f-ic_L_."Y>-t f I� r�'O Y f _ .__..._.... _.................... ... ..... _. _........................_.._...._.... NOT TO SCALE NO NEW WORK PROPOSED = 1,5 TiYES 17HE MAXIMUM STONE G'AVETER &Lt' NOT LESS THI AN W, TOP rAiTCN C)"€' STRIP V "GN iL .. A.iCJN � ,✓ W d� W � v Jr "i7I)NI '-T�ii.t..EO Ti':.'?ti..F."f: -, C w v ,}, y' W .y d• ! E:'✓EL SPREADER ...... TO1' O!-` ENf fuK#� N T r "'VA',,ON ;::: 3.0 10 YR STORM ELEV = Z10 'MAR c STATE" STORAGE Et.E:S•`ATION .- 7.3 SIAIE S'T:)RAGF VOLUME - 32,826 Cf, BASIN' 60 T T OM t;_E Y. _= 4,0 NATURAL GROUND A fi (J N BASIN IA it 7 1 i` t✓ILL ! l i SECTION 1401' TO SCALE m NO7' TO Sf:A:..r NO NEW WORK PROPOSED , l I , ...# '^.r r. .. U. ) z) � 11 L/Al NOT 10 SCALE NO NEW WORK PROPOSED AVETL. N Q,C...j-/JTA-I: 0:IN% TIFF: \ — 01C • ...F::... ... �. t!r?: Ptk1CJ>zr:AL SPt,.rCS A` tS3�rTAHuS' >I#:::�±:triatGrR' nT': SUi!R?sxt. PLAPdi?r¢R(va}mRYi.t2j4/:� i}tc 4/F2vG<:7A(�r#:J__((:,,���r3:.''f,,��app'; pf:t.< yy//�� .. .Yrl'W i fAAIA x A.sf FI V4lA �L WAV ARPOKI„f5tf/ n r _. �kOTTiR?n .,AhrCYFirv'ri (,�f/Y( #"x7 AFO) SAUf iIHUS ^SOWS "VARDIA.10 _ x'l7.iRUCf?R WR; VICA (ATtI? W kfTIM) iP S f}f.' - u'RE OF iHE' SiYGaSTEO �xCOES TS UNAYk?iA?f.£ APPitiC,PPIATF M-RANDS Wfi'EFf',XIN (Yki(,V(N TC 7XFGC)RSTAL £.NTH CARMNr`. 11tE0,0p NO NEW WORK PROPOSED CAPE FEAR Engineering, Inc. 151 soofe Rd, Suffe 100 BaWls, NC 28451 ML (910) 383.1044 FAX (810) 383-1045 www.capefearengineerin-q.com NC LICENSE NO, C-1621 5 I I I Iol C DES — NTJ — ICHK FIRE PROTECTION BRANCH MANAGER CHIEF ENG/ARCH cl v z B Z o LU mg >< 0 z0 z z z 9 0 ui > � UJ z wZ o 0 cc a� rZ z i OV cuj c W } Z_ Z LU z 0 Q: 0 0 �W m� z wC C-J o W 0 Q � C.) T C Z 8U �0 o 1<5 mLU ZA CODE ID. NO. SIZE D Cn SCALE AS INDICATED O MAXIMO NO. - JOB ORDER NO. Lil WORK ORDER NO. 86Mi CONSTR. CONTR. NO. N62470-06—D—M—X023 0 NAVFAC DRAWING NO. 12W000 C4 SHEET 15 OF 78 mo: SHEEP yQ, ^ _ 109 of of a 4 ! 0 1 2 3 4 5 a CI I uG 1. ALL 9UiT :1G^ RGOF UZAINS MUST BE MUM f W-70 rW STMU WAWA3r ;YSiry (R Pam wr s"Rf.':i/FA.'{Kmx'o'l .� 2 P'}n7fW ?`L+E, P TO W U 1`0 )PAIN PC40 W CA9 OrikRGENCY Pr1#fi' TO BE MACkli CN MP O> H,ERY NTH SCREM ATIAff0 Ili NOaT: &LE:T AND COkF. ED WTH SKME: HOSE (YME.T .TO `PAW AO"WSS SMBLE JOLAID AREA SUFf7MT M 4ESTRA,4 MSM' J. PG'1C% S SLOPES Tr SE PEP.A MENTLY ; TAV LY ST46420' Miff CzMIR&E SM. \\ k 'ARRix. ROE -t�y; d1,Yx7TtT6,E€bb?` ' •.�f f/r/-� •,,. - „- �,.�!, .� l j r f.,..• "`` ' - ' " �.••-" ' ,fir ,✓ {' �� � •`� r jt f .• r � j 719 E, f/"J at t t. 1 1 s f t✓ � 't WE AS$ STRUCTURE 2 4' l ✓ r - r - - r 1 1 (. J 1 / JEyNL� TFjIS .1i1EET - t•^ a 'I'i - "• c a I 1 I / j J 1 1 7 _ . 1EIWCRARY POOL EIEVA71011 - 825 f i / I 1 ! 1 l ✓ _. .'�', , � R� ? `Y; .•-• ,,,,. ,..-' "' 'r'"' • SWAGE AREA O HEV. 8Z a 1ZO05 SF ,x r (1 { t .... ✓ „ -.. �:` rr (' sH�..... SRRAGE O QEV AM - 343M CF --z fr YHA` ..,,..,,.•-. ^..-„ 1-0 sr,i......... , E RAISE 0BERIA•-TO EUVATION 8.75 ��✓ '' L 17 \', (f f 1 ! fR SO �, NT:W DISTURBED AR f P F } f � �'"� Alt _.. ✓`� ;• i�� \ ; t� i tt i f�f f t r / /� ; it � (f �T- ! 1 ff f �` t f / - ,._ _ _ _ - / ✓V (! f f ( a t z �A� ,� ,,�rT't i� l \ \ > \,, • �t SAGN #?O7?(A1 = �.a j ' / // J f l ) /,f 1 1 t 1 f f k�'` J ,r a° i ,1' y t \ : ,`l t ,1 '1t �a:7A�E.�ti G?..T'A,�i:%}Trr..CYh;?Ctf - nO / J / / / > I j/' ( �/ €\•% RAISE EIERGSICY S 11MY TD FlEVARLW 8?S SE DETAL IM SLEET '�r,.;za� t ��' \ \ i `a � 1`•, :�,'•'`"��''" „ "� s / "�"% � /ti/ . I ! J/`f,% � / f fi t 1 _.T., a t _,.,." ./' \ t i i ' ,�;,,";.-",.,,•••• •, .•�' ",,. �•- .,, - / i / IsY t / fit tf /i `? M,t 1 et \r' � : \ ,� at = ; y, ,, K :,,,,. �,.,,� r ... ,,,, " • "' � � / i t f,' j f ff �,,lt'3• f�, ,dU ,.. _ ` �'a a ,r. t ` �-'�''� �� ,1 t �` � ✓� \ ? t t L, `\><7 ` =; Y,s ,- ..- -- .� / / t r f /! nl,/I r`i /t� � T � ,.:. J•�yz,,,, ,' '. -t \ \ l �\ } ` `\ ..•• 1.• ...= ,,../ / / / J / f / /it If%f�f . i tt J I � � ..\ sf� �tatl� ti,iti\\\ \\��\�,�//�Tr / i��/i� err--' f_.~. •,./�r,,�tfi� �/jlfi / „_._.M __ _- \ ..... ? i.�i tx'3't \ \ �$.�' / .d • ' ` Y., y�, r...-...,� J'" ,�- ti` fill ,%%I ! f ',. t,ticCa.:,i r\\\\ // i�!�.�'•f'r ✓tnY.flett%I r!%�l /t ti fr --', • l A/�' {v t ._ ___ a ....... � ' �',., `/Y r• • -- ._..._.._ .. 1 / � '>' 4 1 rlLtrh• = 20 r ,r / t STORAGE BASIN 1B DETAIL \ „ t r f Jgy a } r j'�(� { r , p NO �- "' E # -pr f-� it L1 )✓ L L r+ 'i f 1 Li!ti i,.f f 1:,:..4_ t..c . vilaWtrG ,„ CCi_S .%i i4E?LAN„a Viu:r,0:Fti ARE SU€7Awir. FLT,. +'LfoN ING'AWiG Pf. ; G;1. 1,T'.91 Air.71 SWEZ F: -- SAaTTAMA. LATY'00A (CGIR1YM ARROWLAj fxA&flr 4iA tAh`DFWA !DUCK P07ATC; \ SAURURUS CE-MVS (LiZARDrAIL) I Yn ' f: , - f'z�. TANUXA tARf;,,RK,A ;nffh'..Y1 ATiLAfj :F Ovi: OR Afro: (X* ''M SUY.IGESTED .%VE:C;FS iS UrNAVA A01X:, APP;{Mj ,A7E #ic7TANDc VrEGGLTAVON COMMON TO rr,'E COASTAL teRYi CAROUNA Rook MAY dE SUSSP,luIED. i NO NEW WORK PROPOSED i PLAN - W �o N (2) 4 FT x 4 FT PRECAST CCNCRETE 00)1, . 5, fi .._.__.._ ....- Itl BRICK BOTH SIDES OF WEIR TO TOP OF BOX. REDUCE EXISTING WEIR J TO 2 FT WIDE _ & t." VER Z jg ✓ax. wa. BOXi1_. 3.0 TTOT?rm -'X' L1ox - 1.: YANKMEIVT ELEVATION = U.75 1M ELEV. = 8.59 SPILLWAY ELEVATION - &25 GE ELEVA71ON = &25 lu VOLUME = 39r335 CF'i-7 wASir$1 B07 tv`4 .1fn 11J:1 fi?. :J.(n".f,�a/(1r1 `^,�:/ AS/ t 3 f Y-' F is r r` � : r t f r L ,z f.. if , , 7 �t . { I L.._ f V ; ..7:.._. � .I.. V ,'tf r'S LiA.C r f L.r , a.. .y..<_ f S ORMWAMR PUMP LCI A?*.D W fl!{" BOX (SEE DETAii. TF{{S s"ar %Gr'a Pum fBOX 4,:NH0JE- FRAME x& COVER 1.75 FT �.�._' .. fi 2 FT WIDE WEIR ELEV. _ &25 \ i / RCP j i I BRICK UP WEIR TO G (z• FLT R ELEVATION 8.25' 2 F i SUMP ! 2 "i SUMP SECTION VfEW ;2) - 4 i7 x 4 F7 FIREG'AS7' f;Ch Cftt:'77' 0OX NC Y140DUCTS 4848 0,R EQUIVALENT i;..i 1 ` Ut ; :..1; 'it BOX ,...'A,._{r �c �. ,A10T T,0 SCALE TUT•' 0: OYER .W 3 4' "MAIN SftWD' 2. OK..W EXCAVAIe DOI?;'A? (X' PWD 4' AND "AlWH GT1:AN !WHI D SAND. , ,.. , a Ce.rx APAMgA..ritR£' 7Tt:i•reESEN'iR7iYE. 70 rNS�'E:t,`7 . k ,k „�iG% el`CAVR7FLYS frASiti IS C°,A1fYE:f>- 4. CALL MANUFACTURE REPRMNTA117W TO !A'Sff,-^T Siff MEN tADF;:. IS En'."rNG MACA}. 5. (Yl.*tN 9XI-49 UA7EWAIL TO RE. USPi) >C1f VAI`,<R11. 1 i f IS4 S''-1 '£ f A J 1NOT TO S SUTM IG LE. [�7�, 5�11�v' ,._ . r f".� ..'. A f-a f..` r'; j j i ' F f `# mf F, QN7' ;t,J711.. W NOT TO .SCA1..€. 1 ' 2 ' 3 LINER d 1.5 TIMES -!PE AdAMMUM STC1'F DTAMEMR BUT 5� NOT LESS?7-.AN 15'. Imo' t7EVA77GIN OF SHIP ON SAME ELf!1 A'--7iW A?Jf.T t?tkE'.::77. X APU I S LEM.-L SPREADER .... .. ....... .......... W _.......... . 41 _....................._.. ..........._.._ W w it.YtL: it'HL.Ar:,r.rS' .F"y �^•:,. ` w W �• W w W .... _........ .......__................._............:..................._..__...__._...._ -"'-- 'SC'.G 'Y G,'E TA ; 0 _Lf. ?,. I ime7DF 7/a,I'._ NM SCALE: NO NEW WORK PROPOSED t. r'k,10D ,L: I SURUMI N'*K2—SER::E W U v`�' Sr 11-'vf0gTEX DEWA TE RING PUMP SEE ZW.CI?'iCAWAN't FOR ADD.T`.GNAL. DFTAEi. NUTE: 2' PVC PIPE GOING MOM CONCROL PANEL rO a$:.: *ELL A9i;5T SCAT, ODTH FRCS OF P;P;: Wim oxciWCAL FW 1Y. LOCKING GROUND I L. 10.5 PT HA `.;H COVER t0.5 l 1 3 gSTE.?S � i # r . I 10 31»" '--A .._. __ .........._ _._.... _ .. 0 t•ti177: s/2. CRADE F[:..i2l•,iit Ci Cf30LY&4!- 0t'r��i, ._...._........................._..._....._........_. i.....1 FLA>i#C 'l 5z _A-ri c 4 SEAL p r 20553 Al --..........._._..__....._....._..... .......... .............. ......._.._...._.............._._................ _........ _..... _. NiS P`s n DES — ID — CHK FADRIiCRTEG SHELL i� [� FIRE PROTECTION >a:;t) <? BRANCH MANAGER „�•""" rr� Ir:k�Dt€A[_ CHEF ENG/ARCH 1 " O2 U_ J u ° LLJ t) "BOX ; z :IFr:x.I i:FiAEN 1/4" _.-'-.- ... _..... _... ........ �i -'-I- � � F— a tSTAiN2,ESs slut \\ i � ..3 S r.i. _ Q Z (� W. FLANGE?�lyG G L: r i {L J i Z �......,. ...aof • #'.. FCK , vAt.� W 8GT°'04A ;:P PDX m Q c' ,J I W PUMP OFF EL 4.5 FT # II.1 ...._ ..... ..... .... . .. ......_ S 3 t t 1 L f .rti E :, t.i1rJ W E .- _.. .... _ ._ .._............ .._..._ _ .. __ . .. .._._.. E 7 ° 0 f U i t r e F eFn� #c<;?E o n #raFf)ac o i Z a: Y Rj r S _ 00 _:.. E ................. t... _........ ...................... ._.... _......... .._...._..... _....... _... ...._..._ } i A ......t_v_. r .,.,.U E .v i :m W LLJ Z W W Z U) % 'Y ANIC)HOR BOLT (2" PROJECTION) � R Z n a W 2 -3 O 4 F 7� X 4 P" PRECAST E#t)X� .� �W d (L - -_oJv0F) ��r i � til%� v r�?�� �i f��f��?fV20 N' W _ �¢ m zA U o LAJ CODE ID. NO. SIZE D V) I t 1 scALE: AS INDICATED 0 MAXIMO ND. - d to ,RB ORDER NO. LtJ CA P c EAR WORK ORDER IR �rr, c r CONSTR. CONfR, N0. � Engineering, Inca N 247o-os-o-6=-)M 151 Poole Rd, Suits 100 NAVFAC DRAWING NO. 1 2589U5D N BOM118, NC 28451 sHEtT i B OF 78 = TEL (910) 383-1044 U FAX (910) 383-100Ce www.capefearengincerin_q.com Q SHEET' t)G� ^ _ 110 NC LICENSE NO. G�`J fe21 (v- 4 5 ELEVAMN E#.= %.8 F t TC7 iNNI THA710N BAS["'f . i €:L_ECIIRIC Pf)YdER "'ABLE: • IIIIIIIIIIJ A r • 2 3 0 5 C OP i Structure Outlet Stabilizat on Specification J/ 5.41 - Construction Specifications 1. Ensure that the subgrade for the filter and riprap follows the required lines and grades shown in the plan. Compact any fill required in the subgrade to the density of the surrounding undisturbed material. Low areas in the subgrade on undisturbed soil may also be filled by increasing the riprap thickness. 2. The riprap and gravel filter must conform to the specified grading limits shown on the plans. J. Filter cloth, when used, must meet design requirements and be properly protected from punching or tearing during installation. Repair any damage by removing the riprap and placing another piece of filter cloth over the damaged area. All connecting pints should overlap a minimum of I ft. If the damage is extensive, replace the entire filter cloth. 4. Riprap may be placed by equipment, but take care to avoid damaging the fit ter. 5. The minimum thickness of the riprap should be 1.5 times the maximum stone diameter. 6. Riprap may be field stone or rough quarry stone. It should be hard, angular, highly weather -resistant and well graded. 6. Construct the apron on zero grade with no overfall at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly below it. am and d all ned with the receiving stream apron is roe 8. Ensure that the ap o properly y g 9 preferably straight throughout its length. If a curve is needed to fit site conditions, place it in the upper section of the apron. 9. Immediately after construction, stabilize all disturbed areas with vegetation (Practice 6.10, Temporary Seeding, and 6.11, Permanent Seeding). Maintenance Inspect riprap outlet structures after heavy rains to see if any erosion around or below the riprap has taken place or if stones have been dislodged. Immediately make oil needed repairs to prevent further damage. SF Sediment Fence (Silt Fence) Specification 6.62 - Construction Specifications MATERIALS 1.Use a synthetic filter fabric or a pervious sheet of polypropylene, nylon, polyester, or polyethyfene yarn, which is certified by the manufacturer or supplier as conforming to the requirements shown in Table 6.62b. Synthetic filter fabric should contain ultraviolet ray inhibitors and stabilizers to provide a minimum of 6 months of expected usable construction life at a temperature range of 0 to 120 F. 2.Ensure that posts for sediment fences are 1.33 Ib/lineor ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening the fabric. 3.For reinforcement of standard strength filter fabric, use wire fence with a minimum 14 gauge and a maximum mesh spacing of 6 inches Table 6.62b Specifications For Sediment Fence Fabric Physical Property Requirements Filtering Efficiency - 85% (mm) Tensile Strength at Standard Strength- 30 Ib/lin in (min) Extra Strength- 50 Ib/lin in (mm) Slurry Flow Rate - 0.3 gal/sq ft/min (min) CONSTRUCTION 1.Construct the sediment barrier of standard strength or extra strength synthetic filter fabrics. 2.Ensure that the height of the sediment fence does not exceed 18 inches above the ground surface. (Higher fences may impound volumes of water sufficient to cause failure of the structure.) 3.Construct the filter fabric from a continuous roll cut to the length of the barrier to avoid pints. When pints are necessary, securely fasten the filter cloth only at a support post with overlap to the next post. 4.Support standard strength filter fabric by wire mesh fastened securely to the up slope side of the posts using heavy duty wire staples at least 1 inch long, or tie wires. Extend the wire mesh support to the bottom of the trench. 5.Men a wire mesh support fence is used, space posts a maximum of 8 ft apart. Support posts should be driven securely into the ground to a minimum of 18 inches. 6.Extra strength filter fabric with Eft post spacing -does not require wire mesh support fence. Staple or wire the filter fabric directly to posts. ]Excavate a trench approximately 4 inches wide and 8 inches deep along the proposed line of posts and upslope from the barrier (figure 6.62a). B.Backfill the trench with compacted soil or gravel placed over the filter fabric. 9.0o not attach filter fabric to existing trees. Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose or become I e burls ever 60 days. ineffective, replace if promptly. Replace p y ys Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence duringcleonout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been properly GC Gross -Lined Chonnels Specification J 6.30 - Construction Specifications 1. Remove all trees, brush, stumps, and other objectionable material from the foundation area and dispose of properly. 2. Excavate the channel and shape it to neat lines and dimensions shown on the Plans plus a 0.2 ft overcut around the channel perimeter to allow for bulking during seedbed preparations and sod buildup. 3. Remove and properly dispose of all excess soil so that surface water may enter the channel freely. 4. The procedure used to establish grass in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendix 8.05). Maintenance During the establishment period, check grass -lined channels after every rainfall. After gross is established, periodically check the channel; check it after every heavy rainfall event. Immediately make repairs. It is particularly important to check the channel outlet and all road crossings for bank stability and evidence of piping or scour holes. Remove all significant sediment accumulations to maintain the designed carrying capacity. Keep the gross in 0 health, vigorous condition at all times, since it is the primary erosion protection for the channel (Practice 6.11, Permanent Seeding). / N_s Sediment Basin Specifications 16.61 - Construction Specifications 1.Site preparations -Clear, grub and strip topsoil from areas under the embankment to remove trees, vegetation, roots and other objectionable material. Delay clearing the pool area until the dam is complete and then remove brush, trees and other objectionable materials to facilitate sediment cleonout. Stockpile oil topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative establishment. Place temporary sediment control measures below the basin as needed. 2.Cut-off trench -Excavate a cut-off trench along the centerline of the earth fill embankment. Cut the trench to stable soil material, but in no case make it less than 2 ft. deep. The cut-off trench must extend into both abutments to at least the elevation of the riser crest. Make the minimum bottom width wide enough to permit operation of excavation and compaction equipment but in no case less than 2 ft. Make side slopes of the trench no steeper than 1:1. Compaction requirements are the some as those for the embankment. Keep the trench dry during backfilling and compaction operations. 3.Embankment-Take fill material from the approved areas shown on the plans. It should be clean mineral soil, free of roots, woody vegetation, rocks and other ' ctionoble material. Scarify areas on which nil is be laced before placing orb P P 9 le Y fill. The fill material must contain sufficient moisture so it can be formed by hand into a ball without crumbling. If water can be squeezed out of the boll, it is too wet for proper compaction. Place fill material in 6 to 8-inch continuous layers over the entire length of the fill area and then compact it. Compaction may be obtained by routing the construction hauling equipment over the fill so that the entire surface of each toyer is traversed by of least one wheel or tread track of the heavy equipment, or c compactor may be used. Construct the embankment to an elevation 10%higher than the design height to allow for settling. 4.Conduit spillways -Securely attach the riser to the barrel or barrel stub to make a watertight structural connection. Secure all connections between barrel sections by approved watertight assemblies. Place the barrel and riser on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe or anti -seep collors. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2ft. of hand -compacted backfill over the pipe spillway before crossing it with construction equipment. Anchor the riser in place by concrete or other satisfactory means to prevent flotation. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5.Emergency spillway -Install the emergency spillway in undisturbed soil. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of emergency spillway. 6.Inlets-Discharge water into the basin in a manner to prevent erosion. Use diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency (References Runoff Control Measures and Outlet Protection). ]Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction (References: Surface Stabilization). S.Sofety-Sediment basins may attract children and can be dangerous. Avoid steep side slopes, and fence and mark basins with waming signs if trespassing fs likely. Follow all state and local requirements. Maintenance Check sediment basins after periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one- half the design depth. Check the embankment, spillways, and outlet far erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area. Land Grading Specification 16.02 - Construction Specifications 1.Construct and maintain all erosion and sedimentation control practices and measures in accordance with the approved sedimentation control plan and construction schedule. 2.Remove good topsoil from areas to be graded and filled, and preserve it for use in finishing the grading of all critical areas. 3.Scarify areas to be topsolled to a minimum depth of 2 inches before placing topsoil (Practice 6.04, Topsoiling). 4.Clear and grub areas to be filled to remove trees, vegetation, roots, or other objectionable material that would affect the planned stability of the fill. 5.Ensure that fill material is free of brush, rubbish, rocks, logs, stumps, building debris, and other materials inappropriate (or constructing stable fills. 6.Place all fill in layers not to exceed 9 inches in thickness, and compact the layers as required to reduce erosion, slippage, settlement, or other related problems. 7.Do not incorporate frozen material or soft, mucky, or highly compressible materials into fill slopes. 8.Do not place fill on a frozen foundation, due to Possible subsidence and slippage. 9.Keep diversions and other water conveyance meosures free of sediment during all phases of development. 10.Handle seeps or springs encountered during construction in accordance with approved methods (Practice 6,81, Subsurface Drain). 11.Permanently stabilize all graded areas immediately after final grading is Apply completed on each area in the grading pIan pp y temporary stabilization measures on all graded areas when work is to be interrupted or delayed for 30 working days or longer. 12Ensure that topsoil stockpiles, borrow areas, and spoil areas are adequately protected from erosion with temporary and final stabilization measures, including sediment fencing and temporary seeding as necessary. Main lenience Periodically check all graded areas and the supportirg erosion and sedimentation control practices, especially after heavy rainfalls. Promptly remove all sediment from diversions and other water -disposal practices. If washouts or breaks occur, repair them immediately. Prompt maintenance of small eroded areas before they become significant gullies is an essential part of an effective erosion and sedimentation control plan. Construction Road Stabilization Specification 16.80 - Construction Specifications 1. Clear roadbed and parking areas of all vegetation, roots and other objectionable material. 2. Ensure that road construction follows the natural contours of the terrain if it is possible. J. Locate parking areas on naturally not areas if they are available. Keep grades sufficient for drainage but generally not more than 2 to 3% 4. Provide surface drainage, and divert excess runoff to stable areas by using water bars or turnouts (References. Runoff Control Measures). 5. Keep cuts and fills at 21 or flatter for safety and stability and to facilitate establishment of vegetation and maintenance. 6. Spread a 6-inch course of 'ABC* crushed stone evenly over the full width of the road and smooth to avoid depressions. 7. Where seepage areas or seasonally wet areas must be crossed, install subsurface drains or geotextile fabric cloth before placing the crushed stone (Practice 6.81, Subsurface Drain). 8. Vegetate all roadside ditches, cuts, fills and other disturbed areas or otherwise appropriately stabilize as soon as grading is complete (References: Surface Stabilization). 9. Provide appropriate sediment control measures to prevent off -site sedimentation. Maintenance Inspect construction roads and parking areas periodically for condition of surface. Top cress with new gravel as needed. Check road ditches and other seeded areas for erosion and sedimentation after runoff -producing rains. Maintain all vegetation in a healthy, vigorous condition. Sediment -producing areas should be treated immediately. Permanent Seeding Centipede Sod to be used as permanent vegetation stabilization. Temporary Seeding Fertilizer shall be the some analysis as specified for "Seeding and Mulching" and applied at the rate of 400 Ibs (450 kg) and seeded at a rote of 50 pouds (55 kg) per hectare. Sweet Sudan Grease, German Millet or Browntop Millet shall be used in summer months and Rye Grain during the remainder of the year. The Engineer will determine the exact dates for using each kind o1 seed. Fertilizer Toodressin Fertilizer used for topdressing on all roadway areas except slopes 2.1 and steeper shall be 10-20-10 written approval of the Engineer, a different analysis of fertilizer may be used provided grade and shall be applied at the rate of 500 Ibs per acre (560 kg per hectare). Fertlizer used for topdressing on slopes 2.1 and steeper and waste and borrow areas shall be 16-8-8 grade and shall be applied at the rate of 500 Ibs per acre (560 kg per hectare) Upon written approval of the Engineer, a different analysis of fertilizer may be used provided the 2-1-1 ratio is maintained and the rate of application adjusted to provide the same amount of plant food as 16-8-8 analysis. Supplemental Seeding The kinds of seed and proportions shall be the same as specified for "Seeding and Mulching ; with the execption that no centipede seed will be used in the seed mix for supplemental seeding. The rate of application for supplemental seeding may vary from 251 to 751 per acre (28 kg to 85 kg per hectare). The actual rate per acre (hectare) will be determined by the Engineer prior to the time of topdressing and the Contractor will be notified in writing of the rate per acre (hectare), total quantity needed, and areas on which to apply the supplemental seed. Minimum tillage equipment, consisting of a sood seeder shall be used for incorporating seed into the soil as to prevent disturbance of existing vegetation. A clodbuster (ball and chain) may be used where degree of slope prevents the use of a sod seeder. Mowing The minimum mowing height on this project shall be 4 inches (100 man). Crimping Straw Mulch Crimping will be required on this project adjacent to any section of roadway where traffic is to be maintained or allowed during construction. In areas within 6 ft (2 meter) of the edge of pavement, straw is to be crimped and then immediately tacked with asphalt tack Crimping of straw in lieu of asphalt tack will be allowed on this project subject to the following conditions., All areas seeded and mulched shall be crimped and/or tacked with asphalt as directed by the Engineer. Crimping will be limited to slopes 4:1 or flatter unles the Contractor can demonstrate to the Engineer that steeper slopes can be negotiated without altering the typical section. Straw mulch to be of sufficient length and quality to withstand the crimping operation and provide adequate ground cover. Crimping equipment incluing power source shall be subject to the approval of the Engineer ( providing that maximum spacing of crimper blades shall not exceed 8 inches (200 mm). 0 Temporary Gravel Construction Entrance/Exit Specification 16.06 - Construction Specifications 1. Clear the entrance and exit area of all vegetation, roots and other objectionable material and properly grade it. 2 Place the gravel to the specific grade and dimensions shown on the plans and smooth if. 3. Provide drainage to carry water to a sediment trap or other suitable outlet. 4. Use geotextile fabrics because they improve stability of the foundation in locations subject to seepage or high water table. Maintenance Maintain the gravel pad in a condition to prevent mud or sediment from leaving the construction site. This may require periodic topdressing with 2-inch stone. After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways. 0SK Skimmer Sediment Basin Specification 6.64.7 - Construction Specifications .MATERIALS 1. Clear, grub, and strip the area under the embankment of ail vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed. 2 Ensure that fill material for the embankment is free of roots, woody vegetotion, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Over nil the embankment 6 inches to allow for settlement. J. Shape the basin to the specified dimensions. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or timber. 4. Place the barrel (typically 4-inch Schedule 40 PVC pipe) on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, gravel, or crushed stone as backfill around the pipe. Place the lilt material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the some density as the adjacent embankment. Care must be taken not to raise the pipe from the firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with construction equipment. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Assemble the skimmer following the manufacturers instructions, or as designed. 6. Lay the assembled skimmer on the bottom of the basin with the flexible pint at the inlet of the barrel pipe. Attach the flexible pint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 7 Earthen spillways -Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be lined with laminated plastic or impermeable geotextile fabric. The ,'abric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-inch staples or pins The fabric must be ]on enough to extend down the slope and exit onto stable ground. The width of the fabric must be one piece, not pined or spliced; otherwise water can get under the fabric. If the length of the fabric is insufficient for the entire length of the spillway, multiat sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so that water cannot flow under the fabric. Secure the upper edge and sides o1 the fabric in a trench with staples or pins. (Adapted from A Manual for Designing, Installing and Maintaining Skimmer Sediment Basins." February, 1999. J. W. Faircloth & Son.). 8. Inlets -Discharge water into the basin in a .manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment - laden water to the upper end of the pool area to improve basin trap efficiency 9. Erosion control -Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction References: Surface Stabilization), P Y Y ( onJ• 10. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly (References: Surface Stabilization). Inspect skimmer sediment basins at least weekly and after each significant (one-half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate th e sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. If the skimmer is clogged with trash and there is water in the basin, usually jerking on the rope will make the skimmer bob up and down and dislodge the debris and restore flow. If this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged; if so remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather can result in ice fanning in the basin. Some special precautions should be taken in the Water to prevent the skimmer from plugging with ice. r. P HARDWARE CLOTH & GRAVEL INLET PROTECTION Specification 16.51 - Construction Specifications 1. Uniformly grade a shallow depression approaching the inlet. 2 Drive 5 FT steel post 2 FT into the ground surronding the inlet.. Space post evenly around the perimeter of the inlet, a maximum of 4 FT apart. J. Surrond the posts wit wire mesh hardware cloth. Secure the wire mest to steel posts at the top, middle, and bottom. Placing a 2 FT flap of the wire mesh. under the gravel for anchoring is recommended. 4. Place clean gravel (NC DOT 15 or 157 stone) on a 2:1 slope with a height of 16 inches around the wire, and smooth to an even grade. 5. Once the contributing drainage area has been stabilized , remove accumulated sediment, and establish final grading elevations. 6. Compact the area properly and stabilized it with ground cover. Maintenance Inspect inlets at least weekly and after each significant (0.5 in or greater) rainfall event. Clear the mesh wire of any debris or other objects to provide adequate flow for subsequent rains. Take care not to damage or undercut the wire mesh during sediment removal. Replace stone as needed. KLiCENSE # C-2710,%4 ENGINEERING LAND PLANNING COMMERCIAL / RESIDENTIAL COASTAL SITE DESIGN, PC P.O. Box 4041 Wilmington, NC 28406 (910) 791-4441 Temporary Sediment Trog - continued Protection from piping - Place filter cloth on the foundation below the riprap to prevent piping. An alternative would be to excavate a keyway trench across the riprap foundation and up the sides to the height of the dam. Weir length and depth - Keep the spillway weir at least 4 ft long and sized to pass the peak discharge of the 10-yr storm. A maximum flow depth of 1 ft, a minimum freeboard of 0.5 ft, and maximum side slopes of 2A ore recommended. Weir length may be selected from Table 6.60a shown for most site locations in North Carolina. Table 6.60a Design of Spillways Drainage Area Weir Length(1) (acres) (ft) 1 4.0 2 6.0 3 8.0 4 10.0 5 120 () 1 Dimensions shown are minimum Construction Specifications I. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches and machine compact it. Over fill the embankment 6 inches to allow for settlement. J. Construct the outlet section in the embankment. Protect the connection between the riprap and the soil from piping by using filter fabric or a keyway cutoff trench between the riprap structure and the soil. (Place the fitter fabric between the riprap and soil. Extend the fabric across the spillway foundation and sides to the top of the dam; or (Excavate a keyway trench along the centerline of the spillway foundation extending up the sides to the height of the dam. The trench should be at least 2 ft deep and 1 ft wide with 1:1 side slopes. 4. Clear the pond area below the elevation of the crest of the spillway to facilitate sediment cleonout 5. All cut and fill slopes should be 2A or flatter. 6. Ensure that the stone (drainage) section of the embankment has a minimum bottom width of 3 ft and maximum side slopes of 1:1 that extend to the bottom of the spillway section. 7. Construct the minimum finished stone spillway bottom width, as shown on the plans, with 2:1 side slopes extending to the top of the over filled embankment Keep the thickness of the sides of the spillway outlet structure at a minimum of 21 inches. The weir must be level and constructed to grade to assure design capacity. & Material used in the stone section should be a well -graded mixture of stone with a d50 size of 9 inches (class B erosion control stone is recommended) and a maximum stone size of 14 inches. The stone may be machine placed and the smaller stones worked into the voids of the larger stones. The stone should be hard, angular, and highly weather -resistant. 9. Ensure that the stone spillway outlet section extends downstream past the toe of the embankment until stable conditions are reached and outlet velocity is acceptable for the receiving stream. Keep the edges of the stone outlet section flush with the surrounding ground and shape the center to confine the outflow stream (References: Outlet Protection). 10. Direct emergency bypass to natural, stable areas. Locate bypass outlets so that flow will not damage the embankment. 11. Stabilize the embankment and all disturbed areas above the sediment pool and downstream from the trap immediately after construction (References. Surface Stabilization). 12. Show the distance from the top of the spillway to the sediment cleonout level (one-half the design depth) on the plans and mark it in the field. Maintenance Inspect temporary rysediment traps after each period of significant rainfall. Remove sediment and restore the trap to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the gravel facing. Check the structure for damage from erosion or piping. Periodically check the depth of the spillway to ensure it is a minimum of 1.5 ft below the low point of the embankment. Immediately fill any settlement of the embankment to slightly above design grade. Any riprap displaced from the spillway must be replaced immediately. After all sediment -producing areas have been permanently stabilized, remove the structure and all unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly (References: Surface Stabilization). 11,Calibre Calibre Engineering, Inc. 8201 Southpark Lane, Unit 200 Littleton, CO 80120 (303) 730-0434 www.calibre-engineedng.com Construction Management Civil Engineering Surveying 9k DES IORW ICHK FIRE PROTECTION BRANCH MANAGER CHIEF LNG/ARCH 0 A z 5 CO o Z 1 S o J 0 sS Q Q or WQzH(n W z Q i o W J w o F J_ w 2 J= N Q J Q > LLZzo0T Q v Z 0 a� N YQ0 U zO �C/)m 0 Z Z (n to W � Ir 0 w W � Z } W Z 7- m Q 0 L1 z�==�U D w0 0 4iJ ~0i=�L 2 0 LL z d w J MaacC.) Q 0 Co Q z m U a oZ� CODE ID. NO. SIZE D SCALE: AS INDICATED MAXIMO NO. - JOB ORDER NO. - WORK ORDER NO. - CONSTR. CONTR. NO. N40085-09-R-3i15 NAVFAC DRAWING NO. SHEET - OF - I SHEET N0. C- 5 O 7 `-J C C w m z 0 < Q 0 z O w w CD 0 w O 2 O U O O N U Q N 2 1 i 2 , S 4 u C 0 II II II II II II I,I II II II II II II II II 11 II II II II II II II II II II II II II II II II II II II II II II II II II II II 11 II II II II r' II 11 II II II II II it II II II II II II II II II I � � �I II II II II II -------) �--� �----_� �_------ --�------- -------� L it II II II II I� � �I II II II II II A ,,; II II II II II II II II II II II II II II II II II II II II II II II II S-002 II II II II II II II II II II II II II II II II II II it Il II II II II II II II II I( II II II II II II II II II II II 11 II it II II II II II II II II II II 11 II II II II II II II II II II II II II II II II II II I II II II II I I II I I II II II II II II II Il II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II it it I L------1 L-= 1 �1 l =_� 1� k==) -_=====1 L=-j 1=======1 L__- II If II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II 11 II II II II II it II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II II rk TYPICAL SOLAR MODULE ATTACHEMENT PLOCATION S- II II II II II II II II II II II I II II II II II II II I II II II II II II II I� II II II I II II II II II II II II it II II II II II II II II II II II II II II II II II II II II II II II II II I I I I V II r II �I IA II II Ir- -�I II II 11 II II II 11 II II II 11 II II II II II II II Il II II II II II II II II II II II 11 II 11 II II II I II II II it II II it II II II II II II II II I� II II II II II Il 65.94' L Xn TYP• 10'x14GA CEE END CHANNEL TYP, SOLAR WORLD MODULE WITH lhw FLANGE WITH SW 240 mono HILTI KWIK-PRO S-MD 12-24x1Y- HWH #5 KWIKCOTE SELF DRILLING SCREW TOP & BOTTOM TO EACH PASSING ZEE PLAN VIEW 3/8 = Tv 1 2 N X N �J • o 10x12GA ^ N %- ZEE, TYP. z J m 0 CA i br N o � N GENERAL NOTES: 1. DEAD LOAD: PHOTOVOLTAIC MODULES = 4&5 LB. EACH = 2.69 psf, SUPPORT STRUCTURE = 5.31 psf; BASIC WIND SPEED 130 MPH, WIND EXPOSURE 'C°; LIVE LOAD 300 LBS. SNOW LOAD 10 PSF. SDS = 0.220, S1 = 0.077, R = 2, V= 0.11 W 2. SOLAR PANELS: SOLAR WORLD SUNMODULE SW 240 mono & ALL PERTINENT DIMENSIONS SHAD_ BE FIELD VERIFIED BY CONTRACTOR PRIOR TO FABRICATION AND INSTALLATION. 4. CHANGES FROM THE CONTRACT DRAWINGS SHALL BE MADE ONLY WITH THE APPROVAL OF THE ENGINEER. CONCRETE NOTES: w 1. CONSTRUCTION SHALL CONFORM TO 2009 I.B.C. AND LOCAL REQUIREMENTS. 2. ALL CONCRETE WORK SHALL COMPLY WITH ACI 301 & 318 LATEST EDITION. 3. CONCRETE SHALL BE: 3,000 psi 028 DAY COMPRESSIVE STRENGTH 4. AGGREGATE GRADATION AND QUALITY SHALL BE IN ACCORDANCE WITH ACI 302-IR. 5. REINFORCEMENT SHALL BE ASTM A615 GR60. 6. MINIMUM CONCRETE COVER SHALL BE 3" TO EARTH, 2- TO SKY. tr 7. GROUT BELOW BASE PLATES SHALL BE MASTERFLOW 713. MIXING AND PLACEMENT w PER MANUFACTURER'S RECOMMENDATIONS. a w STEEL NOTES: `n 1. PLATES (UNLESS NOTED OTHERWISE) AND ANGLES: ASTM A36 2. PLATE (WHERE NOTED): ASTM A57Z GRADE 50 3. STRUCTURAL TUBING (HSS): ASTM A500 GRADE B 4. ANCHOR BOLTS. ASTM F15K GRADE 105 - USE HEAVY HEX NUTS (ASTM A563 DH) AND ROUND HARDENED STEEL WASHERS (ASTM F436). ANCHOR BOLTS, NUTS AND WASHERS ON SHALL BE HOT DIP GALVANIZED. 5. ALL STEEL FABRICATION SHALL COMPLY WITH LATEST AISC SPECIFICATIONS ®® 6. ALL WELDING SHALL COMPLY WITH LATEST AWS D1.1. USE E70XX ELECTRODES 7. HSS BEAM AND COLUMN ASSEMBLIES SHALL BE HOT DIP GALVANIZED ASTM A123. & ZEE PURUNS, BENT 10 GA. PLATE, CEE BLOCKING AND END CHANNEL.• ASTM A653/A653M-95, GRADE 50 HOT DIP GALVANIZED G90. 9. SELF DRILLING SCREWS SHALL BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS UTILIZJNG A DEPTH SENSITIVE OR TORQUE LIMITING NOSE PIECE. 10. A325 BOLTS: USE LOAD INDICATOR WASHERS OR TC BOLTS. USE ROUND HARDENED STEEL WASHERS (ASTM F436) UNDER THE NUT (ASTM A563 DH). BOLT, NUT, AND WASHER /.' SHALL BE HOT DIP GALVANIZED. /Aw 11. WO BOLT SHALL BE ASTM A307. BOLT, NUT AND WASHER SHALL BE HOT DIP GALVANIZED. B LY M Y E R 12. REPAIR DAMAGE TO GALVANIZED COATINGS USING ASTM A780 ZINC -RICH PAINT FOR E N G I N E E R S GALVANIZING DAMAGE BY HANDLING, TRANSPORTING, CUTTING, OR WELDING. ZINC -RICH 1101MAMA VLLAGEPARKWAY #100 COMPOUND SHALL BE 95% METALLIC ZINC BY WEIGHT IN DRIED FILM. PROVIDE TWO COATS 1111A.CA846o1 '10.521.3773 WITH 2 MIL THICKNESS PER COAT FOR A TOTAL OF 4 MILS. SPECIAL INSPECTIONS: 1. DRILLED PIERS INSPECTION BY GEOTECHNICAL ENGINEER 2. CONCRETE PLACEMENT Q��JGoOg F� 1' 0 1' 2' 3' 4' 5' 6' 7' 8' 9' 10' i'-0'-'` i '1 4 L•\Acad\2011dwq\211002 Buld Group Camp L ns PV\,piar daetgn\211002S-00l.dwq February 15 2011 - 10:33AM LWIttstoak Z Q J I z LU < >- ig g aC.)= Q Lug' a I3o >0 U g QZ JW �Q ~J >p g Z_ 000 O (},!Z ix 0 LU 0 LW OC Z wU �3 w a 3 0w Z a:LJ 0 Lg OZ F-0 LU LU � a - rn Z L LI 2 LLI J F J Q a_ 022 i LaL q U CL r m a. CODE a No. I sax D scmL- AS INDICATED VAM Na - AS OM M FXXX WORK ORM NO, 8611M CONSM CONRL N0. N62470-06-D-6002-X023 NAWAC DROM NO. S w OF SHM NO. S-001 0 I al w C I 9 C L I_ 1 1-1; 3 9