Loading...
HomeMy WebLinkAboutSW8090632_CURRENT PERMIT_20210607STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 Oq U53 _ DOC TYPE ® CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE � f�� Oq 0­1 YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI seaeeary BRIAN WRENN Duecror June 7,2021 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 NORTH CAROLINA Em6onmenral Quadty Subject: Permit Renewal State Stormwater Management Permit No. SW8 090632 Motorcycle Training Course Onslows County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 090632 has been renewed on June 7, 2021, and shall be effective until December 30, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on July 2, 2009 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, C4 2ko Brian Wrenn, Director Division of Energy, Mineral and Land Resources If ®yn Aft^�} North Carolina Department of Environmental Quality J Division of Energy. Mineral and Land Resources Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 rom wo State Stormwater Permit No. SW8 090632 Page 2 of 2 Enclosures: DES/ams: cc: Attachment C — Permitting History Renewal Application Documents \\\Stormwater\Permits & Projects\2009\090632 HD\2021 06 permit 090632 NCDEQ-DEMLR Wilmington Regional Office ®VR �, North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington. North Carolina 28405 rvwmcvaum..® ®� �� 9I0.7%.7215 State Stormwater Management Systems Permit No. SW8 090632 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Motorcycle Training Course Virginia Dare Drive, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 and Session Law 2008-211 (hereafter collectively referred to as the "stormwater rules') the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until December 30, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 2 of this permit. The stormwater control has been designed to handle the runoff from 52,490 square feet of impervious area. 3. A 50' wide vegetative buffer must be provided adjacent impounded structures, streams, rivers and tidal waters. 4. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 090632 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2: C. Design Storm, inches: d. Average Pond Design Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ft2: h. Permitted Storage Volume, ft3: i. Temporary Storage Elevation, FMSL: j. Pre-dev. 1 yr-24 hr. peak flowrate, cfs: k. Controlling Orifice: I. Orifice flowrate, cfs: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower o. Receiving Stream/River Basin: p. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1.77 77,041 None 52,490 52,490 None 1.5 3.5 90% 18.5 5,808 6,678 19.4 0.21 1.25"0 pipe 0.03 2,958 N/A Beaverdam Creek / White Oak 19-20-2 "SB;NSW' 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 2 of 5 State Stormwater Management Systems Permit No. SW8 090632 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the stormwater facilities for inspection and maintenance shall be maintained via appropriate recorded easements at all times. 9. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 11. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. Page 3 of 5 State Stormwater Management Systems Permit No. SW8 090632 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 4. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121, 5. Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H. 1 045(3). Page 4 of 5 State Stormwater Management Systems Permit No. SW8 090632 Permit renewed, updated and reissued this the 7th day of June 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Sri 'Ann Wrenn, Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History Motorcycle Training Course Building 58 Permit No. SW8 090632 Approval Date Permit Action BUMS Version Description of the Changes 7/2/2009 Original Approval 1.0 6/7/2021 Renewal 2.0 JUN 2 ^ 2009 Wet Detention Basin IPermit Number: SU) nln ()lp S�)_ (to be provided by DWQ) Drainage Area Number: and Maintenance Agreement 1 will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW40I-Wet Detention Basin O&M-Rev.4 Page I of 1 ,JUN 2 2009 BY: �j Permit Number: v�t,t_$�i] O (� -� -?— (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the Swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion 2roblems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 2 RECEl[V1ED JUN 2 ^ 2009, BY:_�_ Permit Number:{,� �U i V (c� Z (to be provided by DWQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 55:5 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 55:5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Sediment Removal EI, 13.0 Pe manenl Volume Bottom Elevatio 12.0 -ft Min. Sediment Storage Permanent Pool Elevation 18.5 Sediment Removal Elevation 13.0 Volurm ---------------------------------------- ------ Bottom Elevation 12.0 j 1-f1 Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 3 JUN 2 Perm it Number: �zXN OQ )C>(p32— (to be provided by DWQ) BY:_-- -- I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Construct Motorcycle Training Course Building 58 BMP drainage area number: Print name: Carl Baker, P.E. Title:Deputy Public Works Officer Address:MCB Camp Leieune, 1005 Michael Road, Camp Lejeune, NC 28547 Date: b —OV -d5 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, )f//iu // fJt��R a Notary Public for the State of / '�///r `c ..• ,.z, County of r 11V40 , do hereby certify that personally appeared before me this-4..?.'L day of ZJg , and acknowledge the due execution of the forgoing/wet detention basin maintenance requirements. Witness my hand and official seal, AUCE A SOMMM Not" ftwk Ondow County State of Notdtt Carolina 2010 SEAL My commission expires .4"?- Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 VGA CCwwlzzlou ExtWOt Oct 39' 5010 mole 01 Nwry Coloviuo outiom Conu►A KMCM enauc vtICE v BoNYlf"t State Stormwater Management Systems Permit No. SW8 090632 Motorcycle Training Course Stormwater Permit No. SW8 090632 Onslow County Designer's Certification I, Kleti Lfcas a duly registered rr>¢tssloRd/ro$/ge6'� in the State of North Car lina, having been authorized to observe (period icallyi-wookiyl-faN-- the construction of the project, for /Pint 6or /JxjC ,wn /e/Ctn `e (Project Owner) hereby state that, to the best of my abilit es, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specifications: A)D/J-C Signature SEAL 1',433 Registration Number D 3 ar7 5�1r, Date MAY 17 2021 Page 6 of 7 i State Stormwater Management Systems Permit No. SW8 090632 Certification Requirements: The drainage area to the system contains approximately the permitted acreage. 02. The drainage area to the system contains no more than the permitted // amount of built -upon area. /t3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. �5. The outlet structure elevations are per the approved plan. LOk6. The outlet structure is located per the approved plans. ab. Trash rack is provided on the outlet structure. A�L& All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. �10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized and located per the approved plans. 3. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. &15. The required system dimensions are provided per the approved plans. 416. All components of the stormwater BMP are located in either recorded common areas, or recorded easements. cc: NCDENR-DWQ Regional Office MAY 17 2021 13V._ Page 7 of 7 Permit No.� -(y %L� fto be pmvitled by DWQ) RECEIVED AYA JUN 2 2005 o�oFWATFgoG �A BY: NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT Project name Contact person Phone number Date Drainage area number This form must be filled out, printed and submitted. The Required Items Checklist (Pad III) must be printed, (fled out and submitted along with all of the required information. Joseph C. Avolis, P.E. II. DESIGN INFORMATION Site Characteristics Drainage area 77,041 i Impervious area, post -development 52.490 ft2 % impervious 68.13 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the prelpost control of the 1yr 24hr stone peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, post -development Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanoul, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 6,357 ft3 Insufficient required volume. 6,678 ft3 OK, volume pmvided is equal to or in excess of volume required. ft3 ff3 ff3 0 fts ft3 �YmJ; 3.8 in 0.15 (unitless) 0.70 limitless) 0.19 inlhr OK 0.81 ff'IseC 4.00 ft3fsec 3.19 ft3lsec 19.40 fmsl 18.50 fmsl 18.50 fmsl 19.00 fmsl 18.00 fmsl 13.00 fmsl 12.00 frnsl 1.00 ft N (Y or N) 19.4 fmsl OK Form SW401-Wel Deureon Basin-Rev.6-MG139 Paris 1. a 11. Design Summary, Page 1 of 2 Permit No3 ro be P.1ided by DWQ) Surface Areas Area, temporary pool Area REQUIRED, permanent pool SA/DA ratio Area PROVIDED, permanent pool, A, o Area, bottom of 1 Oft vegetated shelf, Abe, a Area, sediment cleanouL top elevation (bottom of pond), Ab . Volumes Volume, temporary pool Volume, permanent pool, Vp,, . Volume, forebay (sum of forebays if more than one forebay) Forebay %of permanent pool volume SA/DA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, V.,�, n„� Area provided, permanent pool, A,,,p, Average depth calculated Average depth used in SA/DA, Q„, (Round to nearest 0.51t) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, A,_. Area, bottom of 10ft vegetated shelf, A._, Area, sediment cleanouL top elevation (bottom of pond), Ab�m„4 'Depth' (distance blw bottom of 10ft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, dam, (Round to nearest 0.511) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if -non -circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak Flow Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of Bowpath to width ratio Length to width ratio Trash rack for overflow 8 orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build -out? Drain mechanism for maintenance or emergencies Form S W401-Wet Detention Basin-Rev.6 2/20109 8,152 1 5,246 ft 6.81 (unitless) 5,808 ft° OK 4,046 1 9114 ft2 6,678 ft' OK 14,704 ft' 2,958 ft' 20.1% % OK 90 % Y (Y or N) N (Y or N) 6.81 (unifiess) N (Y or N) ft' ft' ft it Y (Y or N) 5,808 it, OK 4,046 ft' OK 994 111 OK 5.00 It OK 3,53 It OK 3.5If OK JUN 2 ^ 2000 Y (Y or N) 1.25 in in 0.60 (unit ess) 0.30 It N (Y or N) (unifless) (unitless) If it 081 ft'/sec OK 0.69 ft/sec Insufficient post -development peak flow. 0.02 ft'Isec 3.44 days OK, draws down in 2-5 days. OK, drawdown time is correct. 3:1 OK 10 :1 OK 10.0 If OK 3:1 OK 3.0 :1 OK Y (Y or N) OK 1.2ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Df=MLH U5t ONLY Date R ceiv d Fee Paid I Permit Number 5 o al i-wEU)C2 2s, C 5o I 51t)8 o&3;�2 NC DEQ Division of Energy, Mineral and Land Resources EC+EIVIE4� STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM BY• In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 090632 2. Project name: Motorcycle Training Course High Density Commercial Wet Detention Pond Project 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 fora Major Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/about/divisions/energy- mi ne ral-land-resou rces/ene rgy-m ine ral-land-rules/stormwater-pros ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https:Hdeg.nc.gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil MAY 17 2021 Stormwater PermitRenewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEO. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity— a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor, or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration MAY 17 2021 Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'Sn/CIERTII_FICATIION I, M' &'r A • &)&d 14- the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, o wnership. rmation provided on this permit renewal application is, to the best of my knowledge, cor ec d comp ete.II i / Signature: L Date: 7 ,L NOTARIZATION: qq� nl.V LVI I VW JOr 1 , a Notary Public for the State of IV O�-�'h l .CVbl tr'1 A- , County of DnS16W/ , do hereby certify that lA • Lo w&k_,r personally appeared before me this the daY of k LL) 202-1 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) NOTARY ' Notary Signature: _ —•� v p �k 2 ob =oy Pus1�G : �; M commission expires MAY 171011 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 r t