Loading...
HomeMy WebLinkAboutSW8080813_HISTORICAL FILE_20130227STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 U k 0 81 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ® HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD MC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director February 27, 2013 Commanding Officer USMCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28542 Subject: State Stormwater Management Permit No. SW8 080813 Camp Devil Dog SOI Overall Low Density Project with Areas of High Density Onslow County Dear Mr. Paul: John E. Skvarla, III Secretary The Wilmington Regional Office received a complete, modified State Stormwater Management Permit Application for Camp Devil Dog SOI on February 26, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211, Session Law 2006-246, and Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 080813 dated February 27, 2013, for the construction, operation and maintenance of the built -upon areas and BMP's associated with the subject project. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 2010-177 which grants an extra year for a total of four (4) years extension. Accordingly, this permit, which was set to expire on September 25, 2018, shall now be effective from the date of issuance until March 20, 2019, which includes all available extensions. This permit shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, and transferring the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, or to transfer the permit, will result in future compliance problems. The modifications covered by this permit include: 1. Expanding the project area to include the entire Camp Devil Dog area and to create an overall low density project with areas of high density. 2. Removing three (3) previously permitted sand filters (2, 3, and 4). The runoff associated with sand filters 2 and 3 are will now be directed to wet detention pond DA 3. The runoff associated with sand filter 4 will now be directed to wet detention pond DA 1: The remaining two previously permitted sand filters (DA 5 and 6) are still covered by this permit. 3. Modifying and expanding the wet detention pond associated with drainage area 1 (DA 1) in order to handle the increase in runoff from the additional drainage area and impervious area. 4. Adding a new wet detention pond associated with drainage area 3 (DA 3) in order to handle the runoff associated with the previously approved sand filters 2 and 3 that will bE removed. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 one Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: "77-623-6748 NorthCarolina Internet: v .nmalerquality.org i��n {�Nn//'/ An Fri al Onnndanilv l Affirmative Action Emolover (/ ►'Kb rail' / State Stormwater Management Systems Permit No. SW8 080813 If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Christine Nelson at (910) 796-7215. Sincerely, c� 9m Charles Wakild, P.E., Director Division of Water Quality GDS/arl: S:\WQS\Stormwater\Permits & Projects\2008\080813 HD\2013 02 permit 080813 cc: Melissa Pritchard, Parsons Brinckerhoff Wilmington Regional Office Stormwater File Page 2 of 11 State Stormwater Management Systems Permit No. SW8 080813 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT WITH AREAS OF HIGH DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Camp Devil Dog Perimeter Road, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of a 24% low density development as well as three (3) wet detention ponds and two (2) sand filters in compliance with the provisions of Session Law 2008-211, Session Law 2006-246, and 15A NCAC 2H .1000 (hereafter referred to singly and collectively as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 20, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. The overall tract built -upon area percentage for the project must be maintained at no more than 24%, as required by the stormwater rules. This permit covers the construction of a total of 1,473,500 square feet of built - upon area, which includes 615,216 square feet of proposed BUA, 784,066 square feet of future BUA allocation and 74,218 square feet of existing BUA. 4. Within the approved areas of high density, the stormwater systems have been approved for the management of stormwater runoff as described in Sections 1.14 and 1.15 of this permit. The wet detention pond stormwater controls labeled DA1, DA 2, and DA 3 have been designed to handle the runoff from 133,781, 170,860, and 36,924 square feet of impervious area, respectively. The sand filter stormwater controls labeled DA 5 and DA 6, have been designed to handle the runoff from 6,600 and 6,600 square feet of impervious area, respectively. Page 3 of 11 State Stormwater Management Systems Permit No. SW8 080813 5. The amount of built -upon area available for the future development within the high density drainage areas DA 1 and DA 2 are limited to 30,000 and 21,000 square feet, respectively. The amount of built -upon area available future for future development within the remaining low density area is 733,066 square feet. 6. Within the low density portion of his project, the only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and approved by the Division. 7. No piping is allowed within the low density portion of this project except that minimum amount necessary to direct runoff beneath an impervious surface such as a road or to provide access. The sand filters have been approved to operate with a 30' level spreader and vegetated filter strip. A level spreader and vegetated filter strip system are not needed for wet detention ponds as they have been designed to remove 90% of the total suspended solids (TSS). The runoff from all built -upon area within the permitted drainage areas of the BMPs for this project must be directed into the appropriate permitted stormwater control system. 10. A 50' wide vegetative buffer must be provided adjacent surface waters, measured horizontally from and perpendicular to the normal pool of impounded structures, the top of bank of both sides of streams and rivers and the mean high water line of tidal waters. 11. All runoff directed into and through the vegetative buffer must flow through the buffer in a diffuse manner. 12. All runoff directed into wetlands shall flow into and through the wetlands at a non -erosive velocity of 2 feet per second or less. 13. Roof drains must terminate at the outer edge of the buffer. Page 4 of 11 State Stormwater Management Systems Permit No. SW8 080813 14. The following design criteria have been provided in the wet detention ponds to meet SL 2008-211, and must be maintained at design condition: Design Criteria DA9 DA2 DA 3 a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: 10.15 442,038 0 7.63 332,363 0 2.55 111,115 0 b.Total Impervious Surfaces, ft : Onsite, ft2: Offsite, ft2: 133,781 133,781 0 170,860 170,860 0 36,924 36,924 0 d. Design Storm, in: 1.5 1.5 1.5 e. Average Design Depth, ft: 3.0 4.0 3.0 f. TSS removal efficiency: 90% 90% 90% g. Permanent Pool Elev., FMSL: 18.5 20.5 19.5 h. Perm. Pool Surface Area, ft2: 15,505 19,041 9,024 i. Permitted Storage Volume, ft : 18,015 21,562 10,260 . Temporary Storage Elev., FMSL: 19.5 21.5 20.5 k. Pre-dev. Discharge rate, cfs: 0.63 8.5 0.16 I. Controlling Orifice , 0 Inches: 2.5 2.5 1.0 m. Orifice flow rate, cfs: 0.09 0.09 0.02 n. Permitted Forebay Volume, ft3: 7,509 12,784 4,998 o. Max. Fountain HP: 1/8 1/6 N/A . Receiving Stream/River Basin Southwest Creek / White Oak q. Stream Index Number 19-17- 0.5 r. Classification of Water Body C NSW 15. The following design criteria have been provided in the sand filters to meet SL 2006-246, and must be maintained at design condition: Design Criteria DA5 DA6 a. Drainage Area, acres: Onsite, ft: Offsite, ft2: 0.15 6,600 0 0.15 6,600 0 b. Total Impervious Surfaces, ft : Onsite, ftZ: Offsite, ft2: 6,600 6,600 0 6,600 6,600 0 C. Design Storm, in. 1.5 1 1.5 d. Sediment Chamber Surface Area: 70 70 e. Sand Chamber Surface area: 70 70 f. Media Depth, ft: 1.5 1.5 . Maximum Head, ft: 4.5 4.5 h. Permitted Storage Volume, ft3: 630 630 i. Drawdown orifice, inches: 4 4 '. Draw Down Time, hrs: 31 31 k. Receiving Stream / River Basin: Southwest Creek / White Oak I. Stream Index Number: 19-17- 0.5 m. Classification of the Water Body: C, NSW II. SCHEDULE OF COMPLIANCE The permittee shall not allow any person, including the permittee, to alter any part of the approved stormwater management system or fill in, alter, or pipe any of the vegetated conveyances shown on the approved plans, except for minimum driveway crossings, unless and until the permittee shall have submitted a modification to the permit and received approval from the Division of Water Quality. Page 5 of 11 State Stormwater Management Systems Permit No. SW8 080813 2. The permittee is responsible for monitoring the project on a routine basis and verifying that the proposed built -upon area does not exceed the allowable built - upon area. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 5. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc, regardless of size. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. d. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. e. Construction of any designated future development areas. 7. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of wet detention pond slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of the inlet/outlet/bypass structures, sand filter media, level spreader, catch basins, piping and vegetated filter. g. A clear access path to the outlet/bypass structure must be available at all times. 8. Records of maintenance activities must be kept for each permitted BMP and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. Page 6 of 11 State Stormwater Management Systems Permit No. SW8 080813 9. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 10. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the wet detention pond. c. The falling water from the fountain must be centered in the wet detention pond, away from the shoreline. d. The maximum horsepower for a fountain in wet detention pond DA 1 and DA 2 is 1/8 and 1/6 horsepower, respectively. A fountain is not permitted in wet detention pond DA 3 as the permanent pool volume is too small. 11. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 12. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 13. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 14. Access to the stormwater facilities shall be available at all times. 15. Prior to the construction of any permitted future areas shown on the approved plans, the permittee shall submit final site layout and grading plans to the Division for approval. 16. A copy of this permit and the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. At least 30 days prior to an ownership change, or a name change of the permittee or of the project, or a mailing address change, the permittee shall submit a completed and signed Name/Ownership Change form to the Division of Water Quality accompanied by appropriate documentation as listed on the form. The approval of this request will be considered on its merits, and may or may not be approved. Page 7 of 11 State Stormwater Management Systems Permit No. SW8 080813 The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. Neither the sale of the project area in whole or in part, nor the conveyance of common area to a third party shall be considered an approved permit transfer request. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with and obtaining any and all permits or approvals as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site prior to receipt of the necessary permits or approvals to do so is considered a violation of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. Any individual or entity found to be in noncompliance with the provisions of this stormwater permit or the requirements of the stormwater rules under 15A NCAC 02H.1000 as amended under Session Law 2008-211, is subject to enforcement procedures as set forth in N.C.G.S. 143, Article 21. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 8. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 9. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 10. Approved plans, application, supplements, and specifications for the project covered by this permit are incorporated by reference and are enforceable parts of the permit. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. Page 8 of 11 State Stormwater Management Systems Permit No. SW8 080813 12. The permittee shall submit a permit renewal application at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit modified and reissued this the 27th day of February 2013. ANO CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION W kild, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission Page 9 of 11 State Stormwater Management Systems Permit No. SW8 080813 Camp Devil Dog Stormwater Permit No. SW8 080813 Onslow Countv Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 10 of 11 State Stormwater Management Systems Permit No. SW8 080813 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet/bypass structure is located per the approved plans. 7. The orifice for the wet detention pond is correctly sized and is at the proper elevation. , 8. A Trash Rack is provided on the outlet/bypass structure. 9. All slopes are grassed with permanent vegetation. 10. Vegetated slopes are no steeper than 3:1. 11. The inlets are located per the approved plans and do not cause short- circuiting of the system. 12. The permitted amounts of surface area and/or volume have been provided. 13. All required design depths are provided. 14. All required parts of the system are provided such as a forebay, vegetated shelf, etc. 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Page 11 of 11 ' DWQUSE ONLY ' Date Received Fee Paid P rmit Number Applicable Rules: (select all that apply) ❑ Coastal SW - 1995 'Coastal SW - 2008 ❑ Ph II - Post Construction ❑ Non -Coastal SW- HQW/O W Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): P1269 Camp Devil Dog SC[ 2. Location of Project (street address): City:CAMPLEIEUNE County:ONSLOW Zip:28547-2539 3. Directions to project (from nearest major intersection): . Approximately 5.3 miles south of the intersection of US 17 and NC 24 if traveling north on US 17, right onto Verona Loop Rd. Travel 0.2 miles turn left onto Town Point Rd. Travel 1.3 miles turn left onto Perimeter Rd..' Site located 0.15 miles up on both sides of the road. 4. Latitude:34° 4"1' i6" N Longitude:77° 27' 28" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): []New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 080813 , its issue date (if known)luly 8, 2011 , and the status of construction: Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): ®Low Density AHigh Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, N/A 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ❑ Sedimentation/ Erosion Control: ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts ac of Disturbed Area b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-101 Version 07Jun2010 Pagel of JAN 3 12013 BY: III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the oroiect): Applicant/ Organization: M CB CAMP LEIEUNE Signing Official & Tltle:NEAL PAUL - DEPUTY PUBLIC WORKS OFFICER b.Contact information for person listed in item la above Street Address:BLDG 1005 MICHAEL ROAD City:MCB CAMP LEIEUNE State:NC Zip:28542 Mailing Address (if applicable): City: State: Zip: Phone: (910 ) 451-2213 Fax: (910 ) 451-2927 Email:neal.12aul@usmc.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the "property that the project is located on): Property Owner/i Signing Official & b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State, Phone: ( 1 Fax: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b.Contact information for person listed in item 3a above: Mailing Address: City: State: Zip: Phone: 4. Local jurisdiction for building permits: Point of Contact: Fax: Phone #: Form SWU-101 Version 071un2010 Page 2 of 7 --CEIVE JAN 3 12013 L'Y: IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. High density pocket areas will be treated by existing and proposed BMPs. Density controls will be used on the low desity areas of Camp Devil Dog 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ® Other: EX. SW PERMIT Date: 7-8-2011 b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph I I - Post Construction 3. ' Stormwater runoff from this project drains to the White Oak River basin. 4. Total Property Area: 140.95 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:140.95 acres ' Total project area shall be calculated to exclude the followingg the normal pool of impounded structures, the area between the area of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHIA9 line, and coastal wetlands landward front the NHW (or MH➢) line. The resultant project area is used to calculate overall percent built upon area (BLIA). Non -coastal wetlands landward of the NHW (or MHW) lute ntay be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 24 % 9. How many drainage areas does the project have?l (For high density, count 1 for each proposed engineered stormwater BMP. For low densihj and other projects, use 1 for the whole properhj area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area Drainage Area Drainage Area Drainage Area Receiving Stream Name Stream Class * Stream Index Number Total Drainage Area (sf) SEE NEXT PAGE On -site Drainage Area (sf) Off -site Drainage Area (so Proposed Impervious Area s °6 Impervious Area** total Impervious- Surface Area Drainage Area _ Drainage Area _ Drainage Area _. Drainage Area _ On -site Buildings/Lots (so On -site Streets (so On -site Parking (sf) On -site Sidewalks (so Other on -site (so SEE NEXT PAGE . Future (so Off -site (so Existing BUA*** (so Total (so: Stream Class and Index Number can be determined at: htto:*ortal.ncdenr.oWzvebhuq[ps/csu7classifications Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. �_ E U � s E Form SWU-101 Version 07Jun2010 Page 3 of 7 JAN 3 12013 BY:_---_- Drainage Area 1 Drainage Area 2 Drainage Area 3. .Drainage Area 5 Drainage Area 6 Basin Information Low Density (P1269) (P1269) (P1269) (TECOM) (TECOM) Receiving Stream Name Southwest Creek Southwest Creek Southwest Creek Southwest Creek Southwest Creek Southwest Creek Stream Class & Index Number C; NSW 19-17-(0.5) C; NSW 19-17-(0.5) C; NSW 19-17-(0.5) C; NSW 19-17-(0.5) C; NSW 19-17-(0.5) C; NSW 19-17-(0.5) Total Drainage Area 6139856 442038 332363 111115 6600 6600 On -site Drainage Area 6139856 442038 332363 111115 6600 6600 Off -site Drainage Area 0 0 0 0 0 0 Total Impervious Area 1473500 133781 170860 36924 6600 6600 Total %Impervious Area 24% 30% 51% 33% 100% 100% Drainage Area 1 Drainage Area 2 Drainage Area 3 Drainage Area 5 Drainage Area 6 Impervious Surface Area Low Density (P3269) (133269) (P1269) (TECOM) (TECOM) On -site Buildings/Lots 126198 26910 25331 19147 6600 6600 On -site Streets 237820 15934 0 5731 0 0 On -site Parking 100215 50060 0 2016 0 0 On -site Sidewalks 42049 4037 38012 0 0 0 Other on -site 108934 6840 12299 10030 0 0 Future 784066 30000 21000 0 0 0 Off -site 0 0 0 0 0 0 Existing BUA 74218 0 74218 0 0 0 TotalImpervious Area 1473500 133781 170860 36924 6600 6600 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11: How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWO Central Office staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and'maintemnce (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at httl2://12ortal.ncdenr.org/web/wq/ws/su/mal2s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from httl?://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initial 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to htto://wsvw.envhelp.org/12ages/onestolexl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for n additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the _ receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 ^ mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5 x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend.. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. ECEIVE Form SWU-101 Version 07Jun2010 Page 4 of 7 JAN 3 12013 BY:� m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the detern-nation on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit far DWQ to verify the SHWT prior to submittal, e m t current 10: A copy of the most current property deed. Deed book: Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC _ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http://www.secretarv.state.nc.us/Corl2orations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http:////12ortal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:MELISSA PRITCHARD Consulting Firm: PARSONS BRINCKERHOFF Mailing Address:999 THIRD AVENUE SUITE 3200 City:SEATTLE State:WA Zip:98104 Phone: (206 1 382-6325 Fax: ( ) Email: PRITC HARDM I®PB WORLD.COM w ECEIVE Form SWU-101 Version 071un2010 Pane 5 of )AN 3 12013 BY: IX. PROPERTY OWNER AUTHORIZATION (if Contact Inforniah'on, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Inforniation, item 2a) certify that I own the property identified in this permit application, and thus give permission to (print or hjpe name of person listed in Contact Information, item la) with (print or hjpe name of organization listed in Contact Infornmtion, item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid perm t is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My comnussion Form SWU-101 Version 07Jun2010 Page 6 of 7 ECEIVE JAN 3 12013 BY; X. APPLICANT'S CERTIFICATION I, (print or hjpe name of person listed in Contact Information, item la) NEAL PAUL certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable storrpvater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph. 11-Post Construction) or SL 2008-211. Signature: �Daatee: 73(A I) I, t i �i a Ntary, Public for the State of tires VI �l jCounty of do hereby certf y that^�n�`^tyr ��y U personally appeared before me this day of ( uA W�� and ac wle e due execr a stormwater permit. Witness my hand and official se , KELLEY VANDECOEVERIN NOTARY PUBLIC ONSLOW COUNTY STATE OF NORTH CAROLINA commission expires `ECEIVE JAN 3 1 20B Form SWU-101 Version 071un2010 Page 7 of 7 BY: i-J Nelson, Christine From: Pritchard, Melissa J. [pritchardmj@pbworld.com] Sent: Tuesday, February 26, 2013 2:32 PM To: Nelson, Christine Subject: RE: Camp Devil Dog request for additional info Christine — I'm fine with leaving it the way it is. Thanks — Melissa Melissa J. Pritchard, PE Senior Water Resources Engineer Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 Desk 206.382.6325 Cell 586.855.8647 www.pbworld.com From: Nelson, Christine (mailto:christine.nelson@ncdenr.gov] Sent: Tuesday, February 26, 2013 8:08 AM To: Pritchard, Melissa J. Subject: RE: Camp Devil Dog request for additional info Melissa, Technically, the intermittent stream is the point that the stormwater group is most interested in as that is the extent to which the 50' buffer can be applied. There appeared to be a second point on the wetland map that listed the intermittent strip. I can run with what you have sent as it is more conservative, but if you wish to change it to the intermittent point, that is fine too. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Pritchard, Melissa J.(mailto:pritchardmj@pbworld.com] Sent: Monday, February 25, 2013 8:22 PM To: Nelson, Christine Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Christine — I've changed intermittent to ephemeral. The request for additional information stated intermittent and I assumed that's what it was. No change was made from 2009. I've also fixed the scale on CS 101 and the depth on page 3 of Pond 3 O&M. I've attached both of those and CS 100 which also showed intermittent stream. Also, it was brought to my attention by NAVFAC the riser elevation in the table on sheet CS 131 didn't match the cross section's elevation. I've attached that updated sheet as well. Thank you — Nelson, Christine From: Pritchard, Melissa J. [pritchardmj@pbworld.com] Sent: Monday, February 25, 2013 8:22 PM To: Nelson, Christine Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Attachments: BMPMan-OMA-WetDetention-BMP3 Page 3.pdf, P1269 CS 100.pdf; P1269 CS 101.pdf; P1269 CS-131.pdf Christine — I've changed intermittent to ephemeral. The request for additional information stated intermittent and I assumed that's what it was. No change was made from 2009. I've also fixed the scale on CS 101 and the depth on page 3 of Pond 3 O&M. I've attached both of those and CS 100 which also showed intermittent stream. Also, it was brought to my attention by NAVFAC the riser elevation in the table on sheet CS 131 didn't match the cross section's elevation. I've attached that updated sheet as well. Thank you — Mclissa Melissa J. Pritchard, PE Senior Water Resources Engineer Parsons Brinkerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 Desk 206.382.6325 Cell 586.855.8647 www.pbworld.com From: Nelson, Christine [mailto:christine.nelson(o)ncdenr.gov] Sent: Monday, February 25, 2013 9:38 AM To: Pritchard, Melissa J. Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Melissa, I have reviewed the additional items received on February 191h. I had a few questions / comments: Where did the intermittent stream call come from? The wetland map (dated 6/16/2009) and provided with the submittal is blurry but seems to indicate this spot is the start of the ephemeral stream. Has a more recent call been made? • The scale on CS101 appears to be off. Can you please double check the scale is correct? • Page 3 of the updated O&M form doesn't seem to have the depth listed correctly. (19.5-15 = 4.5) If changes are necessary, feel free to e-mail them. Since the latest sets of plans are 11 x 17, 1 can print off the updated sheets. Thanks, Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Pritchard, Melissa J. rmailto:oritchardmi(a i)bworld.com] Sent: Monday, February 18, 2013 7:26 PM To: Nelson, Christine; Bradshaw CIV Thomas C Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Christine — I have sent the updated plan set and supplemental documents out Priority FEDEX and you should received them no later than loam Wednesday February 20, 2013. 1 have attached the letter with my responses and also included one in the package. I've also attached page 4 of the application because I'm not sure if it was in the package. Thank you — Mclissa Melissa J. Pritchard, PE Senior Water Resources Engineer Parsons Brinkerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 Desk 206.382.6325 Cell 586.855.8647 www.pbworld.com From: Nelson, Christine rmailto:christine.nelson(la ncdenr.gov] Sent: Wednesday, February 13, 2013 2:06 PM To: Pritchard, Melissa J.; Bradshaw CIV Thomas C Cc: Russell, Janet Subject: Camp Devil Dog request for additional info Melissa, A pdf of the request for additional information on the modification to Camp Devil Dog, SW8 080813, is attached. Copies of this letter will also be sent in the mail. Please let me know if you have any questions. Thanks, Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. NOTICE: This communication and any attachments ("this message") may contain confidential information for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on this message is strictly prohibited. If you have received this message in error, or you are not an authorized recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. NOTICE: This communication and any attachments ('this message") may contain confidential information for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on this message is strictly prohibited. If you have received this message in error, or you are not an authorized recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. Nelson, Christine From: Nelson, Christine Sent: Tuesday, February 26, 2013 11:08 AM To: 'Pritchard, Melissa J.' Subject: RE: Camp Devil Dog request for additional info Melissa, Technically, the intermittent stream is the point that the stormwater group is most interested in as that is the extent to which the 50' buffer can be applied. There appeared to be a second point on the wetland map that listed the intermittent strip. I can run with what you have sent as it is more conservative, but if you wish to change it to the intermittent point, that is fine too. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Pritchard, Melissa J. [mailto:pritchardmj@pbworld.com] Sent: Monday, February 25, 2013 8:22 PM To: Nelson, Christine Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Christine — I've changed intermittent to ephemeral. The request for additional information stated intermittent and I assumed that's what it was. No change was made from 2009. I've also fixed the scale on CS 101 and the depth on page 3 of Pond 3 O&M. I've attached both of those and CS 100 which also showed intermittent stream. Also, it was brought to my attention by NAVFAC the riser elevation in the table on sheet CS 131 didn't match the cross section's elevation. I've attached that updated sheet as well. Thank you - Mclissa Melissa J. Pritchard, PE Senior Water Resources Engineer Parsons Brinckerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 Desk 206.382.6325 Cell 586.855.8647 www.obworld.com From: Nelson, Christine rmailto:christine.nelson(alncdenr.aov] Sent: Monday, February 25, 2013 9:38 AM To: Pritchard, Melissa J. Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Melissa, I have reviewed the additional items received on February 191". I had a few questions / comments: Nelson, Christine From: Nelson, Christine Sent: Tuesday, February 19, 2013 8:15 AM To: 'Pritchard, Melissa J.' Subject: RE: Camp Devil Dog request for additional info Thanks for the heads up. I will keep an eye out for it and if necessary, add the updated page of the application. Christine Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. From: Pritchard, Melissa J. fmailto:pritchardmiCa)pbworld.com] Sent: Monday, February 18, 2013 7:26 PM To: Nelson, Christine; Bradshaw CIV Thomas C Cc: Russell, Janet; Hallinan, Tyler; Smith, Charles (Norfolk); White, Lewis Subject: RE: Camp Devil Dog request for additional info Christine — I have sent the updated plan set and supplemental documents out Priority FEDEX and you should received them no later than loam Wednesday February 20, 2013. 1 have attached the letter with my responses and also included one in the package. I've also attached page 4 of the application because I'm not sure if it was in the package. Thank you — Mclissa Melissa J. Pritchard, PE Senior Water Resources Engineer Parsons Brinkerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 Desk 206.382.6325 Cell 586.855.8647 www.pbworld.com From: Nelson, Christine fmailto:christine.nelsonCabncdenr.aov] Sent: Wednesday, February 13, 2013 2:06 PM To: Pritchard, Melissa I.; Bradshaw CIV Thomas C Cc: Russell, Janet Subject: Camp Devil Dog request for additional info Melissa, A pdf of the request for additional information on the modification to Camp Devil Dog, SW8 080813, is attached. Copies of this letter will also be sent in the mail. Please let me know if you have any questions. Thanks, Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. NOTICE: This communication and any attachments ("this message") may contain confidential information for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on this message is strictly prohibited. If you have received this message in error, or you are not an authorized recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. February 18, 2013 North Carolina Department of Natural Resources Wilmington Regional Office Attn: Christine Nelson, Environmental Engineer 127 Cardinal Drive Extension Wilmington, NC 28405 Subject: Request for Additional Information Stormwater Project No. SW8080813 Camp Devil Dog S01 Onslow County Ms. Nelson — PARSONS y= BRINCKERHOFF �u Parsons Brinckerhoff has updated the enclosed plans and supporting documents for the Camp Devil Dog SOI stormwater permit modification per your request for additional information on February 13, 2013. The following responses coordinate with your request: 1. The amount of future impervious has been reduced so that the percent impervious is 24.0%. This change is reflected in the basin breakdown (page 4 of application) and sheet CS-100. 2. a. Bottom elevation of BMP 3 has been updated to 15' with a sediment cleanout bottom of 14'. This change is reflected on sheets CS-111, CS-121 and CS-131 as well as in the supplemental spreadsheet and stage -storage table. b. Surface areas and volumes were checked and updated accordingly. c. Orifice changed to 1" to achieve an adequate drawdown time of 2-5 days. .3. Identified the intermittent stream starting point and stormwater buffer area on sheets CS-100 and CS-101. 4. BUA remaining removed. BUA future and other updated in tables on sheet CS-100 and page 4 of application. 5. Planting density has been added to sheets CS-130 and CS-131 under the wetland vegetation notes. Please let me know if you require any additional information. Thank you — Melissa Pritchard, PE ECEIVE FEB 19 2013 BY: _^-.-�' MC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. Governor Director February 13, 2013 Commanding Officer MCB Camp Lejeune c/o Neal Paul, Deputy Public Works Officer Building 1005 Michael Road Camp Lejeune, NC 28542 Subject: Request for Additional Information Stormwater Project No. SW8 080813 Camp Devil Dog SOI Onslow County Dear Mr. Paul: John E. Skvarla, III Secretary The Wilmington Regional Office received a modified Express Stormwater Management Permit Application for Camp Devil Dog on January 31, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The percent of impervious area to drainage area appears to be 24.3%, which is greater than the low density development limits. Please reduce the amount of future impervious area allocated to the project such that the impervious area for the total project is 24.0% or less. 2. For Pond 3, please confirm the following: a. That the elevation for the bottom of the pond (at the top of the sediment storage) is consistently presented. For instance, the calculations appear to use a bottom elevation of 15 for the main pool however the cross section of the pond on the plans and other documents appear to indicate the bottom elevation is set an elevation of 16. Also, please double check the depths presented on page 3 of the operation and maintenance agreement are correct. b. That the surface areas and volumes of the pond presented in the supplement, calculations, and plans are consistent and accurate. c. Based on the provided design parameters, it appears that pond 3 will drawdown faster than 2 days. Please double check the drawdown calculations for the pond. Please remember that the required storage volume and the provided head are used to determine the drawdown time. 3. According to the provided wetland map, it appears that the interment stream starts within the low density boundary. Please identify the starting point of the intermittent stream on plan sheet CS100, the approximate top of bank, and delineate the required stormwater buffer. 4. On plan sheet CS100, please clarify that the "BUA remaining" is the amount of future BUA available. Also, in table summarizing the BUA of the various BMPs and low density portions of this project, you should consider separating the future BUA from the other BUA. These are two very different categories and it is helpful to separate the two for future file reviews. 5. Please include the planting density proposed for the vegetated shelf. The top of page 10-17 of the NC BMP manual lists the recommenced planting density. Wilmington Regional Office One 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 NorthCarolina Phone: 910-796-72151 FAX: 910-350-20041 DENR Assistance: 1-877-623-6748 Internet mws.ncwateryuality.org Naturally lly Neal Paul February 13, 2013 Stormwater Application No. SW8 080813 6. Due to the potentially minor nature of these comments, the express additional information fee has been waived for this request for additional information Please keep in mind that changing one number may change other numbers and require the calculations, supplements, and other supporting documentation to be updated. Verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to February 21, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. Please note that a second significant request for additional information may result in the return of the project. If the project is returned, you will need to reschedule the project through the Express coordinator for the next available review date, and resubmit all of the required items, including the application fee. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please label all packages and cover letters as "Express" and reference the project name and State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (910) 796-7323 or email me at christine.nelson@ncdenr.gov. Sincerely, Christine Nelson Environmental Engineer GDS/can: S:\WQS\StormWater\Permits & Projects\2008\080813 HD\2013 02 addinfo 080813 cc: Melissa Pritchard, Parsons Brinckerhoff Wilmington Regional Office Page 2 of 2 Nelson, Christine From: Nelson, Christine Sent: Wednesday, February 13, 2013 5:06 PM To: 'Pritchard, Melissa J.'; Bradshaw CIV Thomas C Cc: Subject: Russell,.Janet—,,,_ Camp_Qevil.Dog.request.for_additional in o� Attachments: 2013 02 addinfo 080813:pdf Melissa, A pdf of the request for additional information on the modification to Camp Devil Dog, SW8 080813, is attache57-Copies of'this leette� will also be sent in°the mail. Please let me know if you have any questions. Thanks, Christine Christine Nelson Environmental Engineer State Stormwater Program NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 Phone:910-796-7323 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. IE PARSONS BRINCKERHOFF February 11, 2013 6161 Kempsville Circle Suite 110 Norfolk, VA 23502 Main: 757-466-1732 Fax:757-466-1493 North Carolina Department of Environment and Natural Resources 127 Cardinal Drive Extension Wilmington, NC 28405 ATTN: Janet Russell RE: P1269 — Camp Devil Dog Stormwater Permit No. SW8 08813 Onslow County Transmitted herewith is the certification for Pond 1 for the Camp Devil Dog SOI Interim Facilities and Field Training Facility. If you have any questions regarding this certification please contact Ms Melissa Pritchard at 1-206-382-6325 or me at 757-466- 9603. Sincerely, Parsons Brinckerhoff Lewls R. White, P. E. Project Manager Enclosure V(cf-lve FEB 14 2013 Over a Century of Engineering Excellence Y25 YEARS Stormwater Management Narrative and. Calculations P1269 Devil Dog SOI Stormwater Enhancements Camp Lejeune, North Carolina January 18, 2013 Prepared by: Parsons Brinckerhoff 6151 Kempsville Circle, Suite 110 Norfolk, Virginia 23502 ECEIVF- JAN 3 12013 Table of Contents I. Introduction.............................................................................................................. ProjectDescription................................................................................................... Existing Site Conditions............................................................................................ II. Hydrology................................................................................................................................ III. Pre- and Post Development Conditions................................................................... IV. Water Quality Analysis............................................................................................ BM P-1...................................................................................................................... BM P-3...................................................................................................................... V. Drainage Design....................................................................................................... AppendixA Mapping.................................................................................................... Appendix B BMP Analysis............................................................................................. p� .co �)JN3 ................................................................... Appendix D Culvert Calculations................................................................................... Appendix E Ditch Calculations...................................................................................... ............3 ............3 ............3 ............3 ............4 ............4 ............4 ............4 ............5 ............6 ............8 ..........65 ..........70 ..........79 _----- ----------- ---- 1 g 2 P a e j; �,s I. Introduction Project Description Camp Devil Dog is an approximately 141 acre site located within Camp Lejeune on the west side of New River. The main drive, Perimeter Road, can be accessed from U.S. Route 17 and Verona Loop Road. The Camp Devil Dog Stormwater Enhancement Alternatives Study was completed March 29, 2012. The study evaluated the existing stormwater management and flooding problems routinely occurring within the Camp Devil Dog watershed. The purpose of this project is to alleviate the identified flood areas and also provide stormwater management for current and future development. This report presents the stormwater management and drainage design of the project area necessary to comply with North Carolina Department of Natural Resources (NCDENR) requirements to modify the existing state stormwater management permit SW8 080813. Existing stormwater permit SW8 080813 covers five sand filters and two wet detention ponds. Two sand filters located on the Thunderdome and the wet retention pond (BMP-2) located near the AIF building is to remain in place. This permit modification includes removing three sand filters, modifying one existing wet retention pond (BMP-1) and adding one new wet retention and (BMP-3). Existing Site Conditions Camp Devil Dog is one of many training sites located within MCB Camp Lejeune. The majority of the 141 acre site is forested land with low density development. There is a pocket of high density development within the site that consists of academic, administrative, storage, and other miscellaneous support buildings, barracks, latrines, outdoor training course, paved roadways, detention ponds, and a large parking lot. The terrain for the site is relatively flat with slopes not exceeding 2%. The existing site has problems with erosion control, sustaining vegetation and flooding or standing water. The project site drains to the Non -SA waters of Mill Run and then eventually to Southwest Creek. Southwest Creek is located in the White Oak river basin, its Index number is 19-17-(6.5) and its class is C; HOW; NSW. Mill Run is class C; NSW. II. Hydrology In accordance with NCDOT criteria, the hydrological analysis for the proposed site was completed using the Rational Method for culverts and ditches and the Modified Rational equation for storm water management. The rainfall intensity values were found using the NOAA rainfall data for Snead's Ferry rain gauge and the time of concentration determined using Seelye and Kirpich methods. The pre -development and post -development conditions for this project are divided into three primary drainage areas. ....... ECEIVPE 31pa.ge JAN 3 1 2M S. BY: III. Pre- and Post Development Conditions This project includes construction of ditches, culverts, -and stormwater management facilities to alleviate existing flooding conditions onsite. The overall permit boundary has 8% built upon area (BUA) with 160,952 square feet of impervious land cover. An overall site map showing existing impervious areas is located in Appendix A. A new wet detention pond and a modified existing wet detention pond are proposed for the project site to provide stormwater treatment and reduce runoff from development. Table 1 below gives the 10- and 100-year pre- and post development flows, for both stormwater management facilities, found using the Modified Rational Method and NOAA Atlas 14 rainfall intensities from Sneads Ferry rain gauge located approximately 3 miles from Camp Lejeune. Table 1— Summary of Pre and Post Development Conditions Predevelopment Flow (cfs) Post development Flow (cfs) 2-yr 10-yr 100-yr 2-yr 10-yr 100-yr BMP-1 25.13 30.01 39.55 1.24 4.73 8.77 BMP-3 5.60 7.35 9.09 0.05 0.06 1.79 IV. Water Quality Analysis ;.. BMP-1 has been modified to provide storage and treatment of stormwater runoff from a contributing drainage area of 442,038 square feet. The average depth of the basin is 3.0 feet and the design total suspended solids removal is 90%. A 10-foot wide vegetated shelf is provided with 6 inches below the permanent pool elevation and the outside edge is 6 inches above the permanent pool elevation. The forebay volume is 19.0% of the total permanent pool volume. Total nitrogen removal is 25% and total phosphorus removal is 40%. BMP-3 BMP-3 provides storage and treatment of stormwater runoff from all 332,533 square feet of drainage area 2.The average depth of the basin is 4.0 feet and the design total suspended solids removal is 90%. A 10-foot wide vegetated shelf is provided with 6 inches below the permanent pool elevation and the outside edge is 6 inches above the permanent pool elevation. The forebay volume is 21.4% of the total permanent pool volume. Total nitrogen removal is 25% and total phosphorus removal is 40%. Stage storage tables and routing models for both wet detention basins are located in Appendix B. NCDENR Supplemental Forms are located in Appendix C. 4 1 P a g e V. Drainage Design Culverts have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Culverts have been designed for the 10 year storm occurrence for the area. Culvert calculation spreadsheets are located in Appendix D. Ditches have been designed according to NCDOT criteria using the Rational Method and rainfall intensities provided by NOAA for Sneads Ferry rain gauge. Ditches have been designed for the 10 year storm occurrence for the area. ECEWE Page JAN 3 12013 i Appendix A Mapping 6Page LINE TABLE LINE LENGTH BEARING Ll 1117.83 N79e56'41"E L2 909.79 N62e27'43"E L3 1706.51 N89e48'35"E L4 761.48 S57e38'24"E LS 689.17 S24e17'01"W L6 1192.65 529e10'29"W L7 373.92 561°09'37"W L8 1150.66 S8Se38'20"W L9 988.63 587e31'47"W L10 706.20 586e16'12"W L11 557.14 N17e07'12"W L12 912.55 1\130e36'49"E L13 517.47 N51e41'39"E Project Phases Permit Type Stormwater Permit Approval Date TECOM High Density SW8080313 9252008 Camp D"I Dog SOI-Pl269 High Density SW8080313 Mod 7 011 CampDeulDog SOI-P1269 Overall Low Density w/Pockets ofHighDensity SW8080313Mod BMP BUILDINGS STREETS PARKING SIDEWALKS OTHER EX. BUA TOTAL BUA PER BMP BMP 1 26.910 15,934 50,060 4,037 36,840 0 133,781 BMP 2 25.331 0 0 38,012 33.299 74,218 170,860 BMP3 19.147 5,731 2,016 0 10,030 0 36,924 BMP 5 6.600 0 0 0 0 0 6,600 BMP6 6,600 0 0 0 0 0 6,600 LowDenso 41,610 216.155 48.139 0 79.765 0 385,669 Total 126,198 237,820 100,215 42,049 159,934 74,218 740,434 •• I\1 III\\ \\\ — I I I / •I Aft 1 _ / / I _ _------- / / I 1 I LEGEND mmmmmmmm �nlK LN1YI.,Q .A ECEIVE 1AN 3 12013 BY: 200 IM 0 300 400 de lee\ N V Yr C m J E U� Qm LLL UW Z_2 Z N a¢a E F o W_ N LL 0) ((0 O N L 0 aZ J a I v1 W G Appendix B BMP Analysis ECEIVE JAN 3 12013 M3 -- WET DETENTION BASIN STAGE -STORAGE TABLE: Bottom Shelf PP Top Shelf State Storage ELEVATION (FT) AREA (SF) 14.5 6180 15 7359 16 8901 17 10563 18 12341 1 5 15505 19 18475 19.5 19655 INCREMENTAL STORAGE VOLUME (CF) (CF) 0 3380 8118 9720 11440 6946 8484 8484 9531 18015 volume at ermanent pool (elev. 18.5) = 39605 cf 1.5" storage volu a provided (elev. 19. = 18015 cf t I volume o asin = 57620 cf surface area at bottom f 10:1 shelf = 15505 sf volume at tom of 1 . shelf = 39605 cf surfac area at top of 10:1 sh If = 18475 sf volume at top of 10:1 shelf - 57620 cf minimum forebay volume = 7509 cf BMP 1 - Forebay evation (FT) Area (SF) Incremental Volume (CF) Accumula ' e Volume (CF 15 1140 0 0 16 1675 1399 1399 17 2273 1966 3365 18 2928 2594 5959 18.5 3277 1550 7509 BMP 1 WET DETENTION BASIN STAGE -STORAGE TABLE: ELEVATION (FT) AREA (SF) 14.5 6180 15 7359 16 8901 17 10563 Bottom Shelf 18 12341 PP 18.5 15505 Top Shelf 19 1847S State Storage 19.5 19655 INCREMENTAL STORAGE VOLUME (CF) (CF) 0 3380 8118 9720 11440 6946 8484 9531 volume at permanent pool (elev. 18.5) = 39605 cf 1.5" storage volume provided (elev. 19.5) = 18015 cf total volume of basin = 57620 cf surface area at bottom of 10:1 shelf = 15505 sf volume at bottom of 10:1 shelf = 32659 cf surface area at top of 10:1 shelf = 18475 sf volume at top of 10:1 shelf = 57620 cf minimum forebay volume = 7509 cf BMP 1 - Forebay Elevation (FT) Area (SF) Incremental Volume (CF) Accumulative Volume (CF) 15 1140 0 0 16' 1675 1399 1399 17 2273 1966 3365 18 2928 2594 5959 18.5 3277 1550 7509 8484 18015 19.0% j FEB 19 2013 BMP 3 WET DETENTION BASIN STAGE -STORAGE TABLE: ELEVATION (FT) AREA (SF) 15 2628 16 3549 17 4419 18 5933 Bottom Shelf 19 7700 PP 19.5 9024 Top Shelf 20 10,490 State Storage 20.5 11,058 volume at permanent pool (elev. 19.5) = 1.5" storage volume provided (elev. 20.5) = total volume of basin = surface area at bottom of 10:1 shelf = volume at bottom of 10:1 shelf = surface area at top of 10:1 shelf = volume at top of 10:1 shelf = minimum forebay volume = INCREMENTAL STORAGE VOLUME (CF) (CF) 0 3077 3976 5157 6797 4177 4874 5386 23184 10260 33445 9024 19008 10490 33445 4998 BMP 3 - Forebay Elevation (FT) Area (SF) Incremental Volume (CF) Accumulative, Volume (CF) 15 551 0 0 16 854 697 697 17 1212 1028 1725 18 1623 1413 3137 19 2110 1861 4998 4874 10260 cf cf cf sf cf sf cf cf 21.6% ` FEB 19 2013 F Fly Project Summary Camp Lejeune - Title Devil Dog SOI Stormwater Enhancements Engineer M3 Pritchard Company Parsons Brinckerhoff Date 1/18/2013 Notes BMP-1 Modified Rational Method Bentley Systems, Inc. Haestad Methods Solution BMP t.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 V•t It -.e ... Bentley PondPack V8i 108.11.01.541 Page 1 of 27 P 3 WET DETENTION BASIN STAGE -STORAGE TABLE: ELEVATION (FT) AREA (SF) 15 0 16 3549 17 4908 18 6108 Bottom Shelf 7700 PP 19.5 9024 Top Shelf 20 10,490 State Storage 20.5 11,058 volume at pe anent pool (elev. 19.5) = 1.5" storage volume p vided (elev. 20.5) = total vo me of basin = surface area at bottom of 1 . sh = volume at bottom of 10• sh - surface area at top f 10:1 shelf = volume a op of 10:1 shelf = mini um forebay volume = INCREMENTAL STORAGE 'VOLUME (CF) (CF) 0 1183 4210 5497 6889 4177 4874 5386 21956 32216 9024 21956 10490 4 BMP 3 - Forebay Elevation (FTV Area (SF) Incremental Volume (CF) Accumulative Volume (CF) 16 946 0 0 17 1343 1139 1139 8 1798 1565 2704 19 2309 2048 4752 e cf cf cf sf cf sf cf cf JAN 3 12013 By: BMP 1 BMP 1 Outlet 1 BMP 1 BMP 1 (IN) DA 1 Table of Contents Modified Rational Grand 2 Summary Master Network Summary 3 Devil Dog 2 Year Time vs. Volume 4 Time vs. Volume 8 Time vs. Volume 12 Elevation -Area Volume 16 Curve Outlet Input Data 17 Devil Dog - 100 Year Elevation -Volume -Flow 21 Table (Pond) Devil Dog - 2 Year Level Pool Pond Routing 22 Summary Level Pool Pond Routing 23 Summary Level Pool Pond Routing 24 Summary Devil Dog - 2 Year C and Area (Pre- 25 Development) C and Area (Post- 26 Development) JAN 3 12013 BY- Subsection: Modified Rational Grand Summary Modified Rational Method Q = CiA * Units Conversion; Where conversion = 43560 / (12 * 3600) __ __.__-.----------__._ _.__--- _..; Frequency Area Adjusted C Duration ..Intensity- Flow (Peak) Flow Volume I (years) (ft2) Coefficient (hours) .. (in/h) (ft3/s) (Allowable) (inflow) .t (ft3/s) (ft3) 2 442,038.000 0.522 0.250 4.710 25.13 22.67 22,620.051 30 442,038.000 0.522 0.333 5.623 30.01 29.61 36,008.518 100 442,038.000 0.522 0.350 7.412 39.55 39.13 49,835.191 Volume .(Storage) (ft3) 2,218.119 4,921.588 7,579.231 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack Val BMP 1.ppc Center [08.11.01.54[ 1/17/2013 27 Siemon Company Drive Suite 200 W Page 2 of 27 Watertown, CT 06795 USA r1-203-755-1666 Subsection: Master Network Summary Catchments Summary Scenario 'Return - Hydro —graph.- Time to Peak :Peak Flow � Event Volume (hours) (ft3/S) (years) (ft3) - DA 1 Devil Dog 2 yr 2 22,121) 00 0.250 25.13 DA 1 Devil Dog 10 yr 10 36,009.000 0.250 30.01 DA 1 Devil Dog 100 yr 100 49,835.000 0.250 39.55 Node Summary Label - Scenario : Return Hydrograph Time to Peak 'Peak Flow I - Event Volume (hours) (ft3/s) ... (Years) (ft3) - ; CG-6 Devil Dog 2 yr 2 17,165.000 0.500 1.24 CG-6 Devil Dog 10 yr 10 30,252.000 0.550 4.73 CG-6 Devil Dog 100 yr 1001 43,970.000 0.550 8.77 Pond Summary - - -- - - - -. Label Scenario 'Return Hydrograph Time to Peak Peak Flow Maximum :Maximum Event Volume, (hours) (ft3/s) Water. Pond Storage !, ,(years) (ft3) i.. Surface. (R3) Elevation i (ft) BMP 1 (IN) Devil Dog 2 yr 2 22,620.000 0.250 25.13 (N/A) (N/A) BMP 1 (OUT) Devil Dog 2 yr 2 17,165.000 0.500 1.24 19.69 61,430.000 BMP 1 (IN) Devil Dog 10 10 36,009.000 0.250 30.01 (N/A) (N/A) yr BMP 1 (OUT) Devil Dog 10 10 30,252.000 0.550 4.73 20.18 72,143.000 yr BMP 1 (IN) Devil Dog 100 100 49,835.000 0.250 39.55 (N/A) (N/A) yr BMP 1 (OUT) Devil Dog 100 100 43,970.000 0.550 8.77 20.61 82,508.000 yr Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack Val BMP 1.ppc Center 108.11.01.541 1/17/2013 27 Siemon Company Drive Suile 200 W Page 3 of 27 Watertown, CT 06795 USA +1-203-755-1666 ECEIVE JAN 3 12013 BY: Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 2 years Storm Event: Devil Dog - 2 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume ^ Volume Volume Volume Volume (hours) (ft3) (ft3) (ft3) (ft3),,. (ft3) 0.000 39,555.000 39,973.000 41,248.000 43,446.000 46,678.000 0.250 50,761,000 54,807.000 57,979.000 60,052.000 61,199,000 0.500 61,430.000 61,215.000 61,011.000 60,817.000 60,633.000 0.750 60,458.000 60,292.000 60,134.000 59,984.000 59,842.000 1.000 59,707.000 59,578.000 59,456.000 59,340.000 59,230.000 1.250 59,125.000 59,025.000 58,931.000 58,841.000 58,755.000 1.500 58,674.000 58,596.000 58,523.000 58,453.000 58,387.000 1.750 58,323.000 58,263.000 58,206,000 58,152.000 58,100.000 2.000 58,051.000 58,004.000 57,960.000 57,918.000 57,877.000 2.250 57,839.000 57,803.000 57,768.000 57,735.000 57,704.000 2.500 57,674.000 57,646.000 57,616.000 57,587.000 57,557.000 2.750 57,527.000 57,497,000 57,468.000 57,438.000 57,409.000 3.000 57,379.000 57,350.000 57,320.000 57,291.000 57,261.000 3.250 57,232.000 57,203.000 57,173.000 57,144.000 57,115.000 3.500 57,086.000 57,056.000 57,027.000 56,998.000 56,969.000 3.750 56,940.000 56,911.000 56,882.000 56,853.000 56,824.000 4.000 56,795.000 56,767.000 56,738.000 56,709.000 56,680.000 4.250 56,652.000 56,623.000 56,594.000 56,566.000 56,537.000 4.500 56,509.000 56,480.000 56,452.000 56,423.000 56,395.000 4.750 56,367.000 56,338.000 56,310.000 56,282.000 56,253.000 5.000 56,225.000 56,197.000 56,169.000 56,141.000 56,113.000 5.250 56,085.000 56,057.000 56,029.000 56,001.000 55,973.000 5.500 55,945.000 55,917.000 55,889.000 55,862.000 55,834.000 5.750 55,806.000 55,779.000 55,751.000 55,723.000 55,696.000 6.000 55,668.000 55,641.000 55,613.000 55,586.000 55,558.000 6.250 55,531.000 55,504.000 55,476.000 55,449.000 55,422.000 6.500 55,395.000 55,367.000 55,340.000 55,313.000 55,286.000 6.750 55,259.000 55,232.000 55,205.000 55,178.000 55,151.000 7.000 55,124.000 55,097.000 55,070.000 55,044.000 55,017.000 7.250 54,990.000 54,963.000 54,937.000 54,910.000 54,883.000 7.500 54,857.000 54,830.000 54,804.000 54,777.000 54,751.000 7.750 54,724.000 54,698.000 54,671.000 54,645.000 54,619.000 8.000 54,592.000 54,566.000 54,540.000 54,514.000 54,488.000 8.250 54,461.000 54,435.000 54,409.000 54,383.000 54,357.000 8.500 54,331.000 54,305.000 54,279.000 54,253.000 54,228.000 8.750 54,202.000 54,176,000 54,150.000 54,124.000 54,099.000 9.000 54,073.000 54,047.000 54,022.000 53,996.000 53,971.000 9.250 53,945.000 53,919.000 53,894.000 53,869.000 53,843.000 9.500 53,818.000 53,792.000 53,767.000 53,742.000 53,716.000 9.750 53,691.000 53,666.000 53,641.000 53,616.000 53,591.000 10.000 53,565.000 53,590.000 53,515.000 53,490.000 53,465.000 10.250 53,440.000 53,415.000 53,391.000 53,366.000 53,341.000 10.500 53,316.000 53,291.000 53,266.000 53,242.000 53,217.000 BMP 1.ppc 1/17/2013 J. t Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203.755-1666 Bentley Pond Pack V8i 108.11.01,w Page 4 of 27 Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 2 years Storm Event: Devil Dog - 2 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume , Volume Volume, (hours) (ft3) (ft3).� i, (ft3) _ (k3) (ft3) 10.750 53,192.000 53,168.000 53,143.000 53,119.000 53,094.000 11.000 53,069.000 53,045.000 53,020.000 52,996.000 52,972.000 11.250 52,947.000 52,923.000 52,899.000 52,874.000 52,850.000 11.500 52,826.000 52,801.000 52,777.000 52,753.000 52,729.000 11.750 52,705.000 52,681.000 52,657.000 52,633.000 52,609.000 12.000 52,585.000 52,561.000 52,537.000 52,513.000 52,489.000 12.250 52,465.000 52,441.000 52,418.000 52,394.000 52,370.000 12.500 52,346.000 52,323.000 52,299.000 52,276.000 52,252.000 12.750 52,228.000 52,205.000 52,181.000 52,158.000 52,134.000 13.000 52,111.000 52,088.000 52,064.000 52,041.000 52,018.000 13.250 51,994.000 51,971.000 51,948.000 51,925.000 51,901.000 13.500 51,878.000 51,855.000 51,832.000 51,809.000 51,786.000 13.750 51,763.000 51,740.000 51,717.000 51,694.000 51,671.000 14.000 51,648.000 51,625.000 51,602.000 51,579.000 51,557.000 14.250 51,534.000 51,511.000 51,488.000 51,466.000 51,413.000 14.500 51,420.000 51,398.000 51,375.000 51,353.000 51,330.000 14.750 51,308.000 51,285.000 51,263.000 51,240.000 51,218.000 15.000 51,195.000 51,173.000 51,151.000 51,128.000 51,106.000 15.250 51,084.000 51,062.000 51,040.000 51,017.000 50,995.000 15.500 50,973.000 50,951.000 50,929.000 50,907.000 50,885.000 15.750 50,863.000 50,841.000 50,819.000 50,797.000 50,775.000 16.000 50,753.000 50,731.000 50,709.000 50,688.000 50,666.000 16.250 50,644.000 50,622.000 50,601.000 50,579.000 50,557.000 16.500 50,536.000 50,514.000 50,493.000 50,471.000 50,449.000 16.750 50,428.000 50,406.000 50,385.000 50,364.000 50,342.000 17.000 50,321.000 50,299.000 50,278.000 50,257.000 50,235.000 _ 17.250 50,214.000 50,193.000 50,172.000 50,151.000 50,129.000 17.500 50,108.000 50,087.000 50,066.000 50,045.000 50,024.000 17.750 50,003.000 49,982.000 49,961.000 49,940.000 49,919.000 16.000 49,898.000 49,877.000 49,856.000 49,835.000 49,815.000 18.250 49,794.000 49,773.000 49,752.000 49,732.000 49,711.000 18.50o 49,690.000 49,670.000 49,649.000 49,628.000 49,608.000 18.750 49,587.000 49,567.000 49,546.000 49,526.000 49,505.000 19.000 49,485.000 49,464.000 49,444.000 49,424.000 49,403.000 19.250 49,383.000 49,363.000 49,342.000 49,322.000 49,302.000 19.500 49,282.000 49,261.000 49,241.000 49,221.000 49,201.000 19.750 49,181.000 49,161.000 49,141.000 49,121.000 49,101.000 20.000 49,081.000 49,061.000 49,041.000 49,021.000 49,001.000 20.250 48,981.000 48,961.000 48,942.000 48,922.000 48,902.000 20.500 48,882.000 48,862.000 48,843,000 48,823.000 48,803.000 20.750 48,784.000 48,764.000 48,744.000 48,725.000 48,705.000 21.000 48,686.000 48,666.000 48,647,000 48,627.000 48,608.000 21.250 48,588.000 48,569.000 48,550.000 48,530.000 48,511.000 Bentley Systems, Inc. Haestad Methods Solution BMP 1.ppc Center 1/172013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.541 Page 5 of 27 ECEIVE `. JAN 3 1 20t RV. Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 2 years Storm Event: Devil Dog - 2 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. ` Time Volume Volume .. Volume Volume Volume (hours). (ft3) (ft3) (ft3) (ft3).:... ;(ft3) , 21.500 48,492.000 48,472.000 48,453.000 48,434.000 48,415.000 21,750 48,395.000 48,376.000 48,357.000 48,338.000 48,319.000 22.000 48,300.000 48,280.000 48,261.000 48,242.000 48,223.000 22.250 48,204.000 48,185.000 48,166.000 48,147.000 48,129.000 22.500 48,109.000 48,089.000 48,068.000 48,047.000 48,026.000 22.750 48,005.000 47,985.000 47,964.000 47,943.000 47,923.000 23.000 47,902.000 47,882.000 47,861.000 47,841.000 47,820.000 23.250 47,800.000 47,780.000 47,760.000 47,740.000 47,719.000 23.500 47,699.000 47,679.000 47,660.000 47,640:000 47,620.000 23.750 47,600.000 47,580.000 47,561.000 47,541.000 47,521.000 24.000 47,502.000 47,482.000 47,463.000 47,444.000 47,424.000 24.250 47,405.000 47,386.000 47,366.000 47,347.000 47,328.000 24.500 47,309.000 47,290.000 17,271.000 47,252.000 47,233.000 24.750 47,215.000 47,196.000 47,177.000 47,158.000 47,140.000 25.000 47,121.000 47,103.000 47,084.000 47,066.000 47,047.000 25.250 47,029.000 47,011.000 46,993.000 46,974.000 46,956.000 25.500 46,938.000 46,920.000 46,902.000 46,884.000 46,866.000 25.750 46,848.000 46,830.000 46,812.000 46,795.000 46,777,000 26.000 46,759.000 46,742.000 46,724.000 46,706.000 46,689.000 26.250 46,672.000 46,654.000 46,637.000 46,619.000 46,602.000 26.500 46,585.000 46,568.000 46,551.000 46,533.000 46,516.000 26.750 46,499.000 46,482.000 46,465.000 46,448.000 46,432.000 27.000 46,415.000 46,398.000 46,381.000 46,365.000 46,348.000 27.250 46,331.000 46,315.000 46,298.000 46,282.000 46,265.000 27.500 46,249.000 46,232.000 46,216.000 46,200.000 46,184.000 27.750 46,167.000 46,151.000 46,135.000 46,119.000 46,103.000 28.000 46,087.000 46,071.000 46,055.000 46,039.000 46,023.000 28.250 46,007.000 45,992.000 45,976.000 45,960.000 45,945.000 28.500 45,929.000 45,913.000 45,898.000 45,882.000 45,867.000 28.750 45,851.000 45,836.000 45,821.000 45,805.000 45,790.000 29.000 45,775.000 45,760.000 45,745.000 45,729.000 45,714.000 29.250 45,699.000 45,684.000 45,669.000 45,654.000 45,639.000 29.500 45,624.000 45,610.000 45,595.000 45,580.000 45,565.000 29.750 45,551.000 45,536.000 45,521.000 45,507.000 45,492.000 30.000 45,478.000 45,463.000 45,449.000 45,434.000 45,420.000 30.250 45,406.000 45,391.000 45,377.000 45,363.000 45,349.000 30,500 45,335.000 45,320.000 45,306.000 45,292.000 45,278.000 30.750 45,264.000 45,250.000 45,236.000 45,222.000 45,209.000 31.000 45,195.000 45,181.000 45,167.000 45,153.000 45,140.000 31.250 45,126.000 45,112.000 45,099.000 45,085.000 45,072.000 31.500 45,058.000 45,045.000 45,031.000 45,018.000 45,005.000 31.750 44,991.600 44,978.000 44,965.000 44,952.000 44,938.000 32.000 44,925.000 44,912.000 44,899.000 44,886.000 44,873.000 Bentley Systems, Inc. Haestad Methods Solution BMP 1.ppc Center 1/17/2013 27 Sidman Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V81 [08.11.01.541 Page 6 of 27 Subsection: Time vs. Volume Return Event: 2 years Label: BMP 1 Storm Event: Devil Dog - 2 Year Time vs. Volume (ft3) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time :- Volume Volume Volume Volume Volume (hours) (ft3), (k3) (ft3) _. _(K3)...(k3)_._ ...... a _.._._.._.., ._. 32.250 44,860.000 44,847.000 44,834,000 44,821.000 44,808.000 32.500 44,795.000 44,782.000 44,770.000 44,757.000 44,744.000 32.750 44,731.000 44,719.000 44,706.000 44,693.000 44,681.000 33.000 44,668.000 44,656.000 44,643.000 44,631.000 44,618.000 33.250 44,606.000 44,594.000 44,581.000 44,569.000 44,557.000 33.500 44,544.000 44,532.000 44,520.000 44,508.000 44,496.000 33.750 44,484.000 44,472.000 44,460.000 44,448.000 44,436.000 34.000 44,424.000 44,412.000 '44,400.000 44,388.000 44,376.000 34.250 44,364.000 44,352.000 44,341.000 44,329.000 44,317.000 34.500 44,306.000 44,294.000 44,282.000 44,271.000 44,259.000 34.750 44,248.000 44,236.000 44,225.000 44,213.000 44,202.000 35.000 44,190.000 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BMP 1.ppc Center [08.11.01,541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 7 of 27 Watertown, CT 06795 USA +1-203-755-1666 ECEI 4Y E JAN 3 12013 BY: Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 10 years Storm Event: Devil Dog - 10 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume 'Volume Volume Volume 0.000 39,555.000 40,054.000 41,584.000 44,236.000 48,166.000 0.250 52,933.000 58,326.000 63,249.000 67,450.000 70,193.000 0.500 71,728.000 72,143.000 71,676.000 70,904.000 70,191.000 0.750 69,533.000 68,924.000 68,362.000 67,814.000 67,266.000 1.000 66,747.000 66,255.000 65,790.000 65,349.000 64,931.000 1.250 64,536.000 64,161.000 63,806.000 63,469.000 63,149.000 1.500 62,846.000 62,559.000 62,286.000 62,027.000 61,782.000 1.750 61,549.000 61,328.000 61,118.000 60,919.000 60,729.000 2.000 60,550.000 60,379.000 60,217.000 60,063.000 59,917.000 2.250 59,778.000 59,646.000 59,520.000 59,401.000 59,288.000 2.500 59,180.000 59,078.000 58,980.000 58,888.000 58,800.000 2.750 58,717.000 58,637.000 58,562.000 58,490.000 58,422.000 3.000 58,357.000 58,295.000 58,236.000 58,180.000 58,127.000 3,250 58,077.000 58,029.000 57,983,000 57,940.000 57,899,000 3.500 57,859.000 57,822.000 57,786.000 57,753,000 57,720,000 3.750 57,690.000 57,661.000 57,632.000 57,602.000 57,573.000 4.000 57,543.000 57,513.000 57,484.000 57,454.000 57,424.000 4.250 57,395.000 57,365.000 57,336.000 57,306.000 57,277.000 4.500 57,247.000 57,218.000 57,189.000 57,160.000 57,130.000 4.750 57,101.000 57,072.000 57,043.000 57,014.000 56,985.000 5.000 56,955.000 56,926.000 56,897.000 56,869.000 56,840.000 5.250 56,811.000 56,782.000 56,753.000 56,724.000 56,696.000 5,500 56,667.000 56,638.000 56,610.000 56,581.000 56,552.000 5.750 56,524.000 56,495.000 56,467.000 56,438.000 56,410.000 6.000 56,382.000 56,353.000 56,325.000 56,297.000 56,268.000 6.250 56,240.000 56,212.000 56,184.000 56,156.000 56,128.000 6.500 56,100.000 56,072.000 56,044.000 56,016.000 55,988.000 6.750 55,960.000 55,932.000 55,904.000 55,876.000 55,849.000 7.000 55,821.000 55,793.000 55,766.000 55,738.000 55,710.000 7.250 55,683.000 55,655.000 55,628.000 55,600.000 55,573.000 7.500 55,546.000 55,518.000 55,491.000 55,464.000 55,436.000 7.750 55,409.000 55,382.000 55,355.000 55,328.000 55,300.000 8.000 55,273.000 55,246.000 55,219.000 55,192.000 55,165.000 8.250 55,138.000 55,112.000 55,085.000 55,058.000 55,031.000 8.500 55,004.000 54,978.000 54,951.000 54,924.000 54,897.000 8.750 54,871.000 54,844.000 54,818.000 54,791.000 54,765.000 9.000 54,738.000 54,712.000 54,685.000 54,659.000 54,633.000 9.250 54,606.000 54,580.000 54,554.000 54,528.000 54,502.000 9.500 54,475.000 54,449.000 54,423.000 54,397.000 54,371.000 9.750 54,345.000 54,319.000 54,293.000 54,267.000 54,241.000 10.000 54,215,000 54,190.000 54,164.000 54,138.000 54,112.000 10.250 54,087.000 54,061.000 54,035.000 54,010.000 53,984.000 10.500 53,959.000 53,933.000 53,908.000 53,882.000 53,857.000 BMP t.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack V8i [08.11.01,541 Page 8 of 27 Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 10 years Storm Event: Devil Dog - 10 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume. Volume Volume Volume (hours)_- (ft).. _ (ft3) (ft3) ._ _ (ft3) 10.750 53,831.000 53,806.000 53,781.000 53,755.000 11.000 53,705.000 53,679.000 53,654.000 53,629.000 11.250 53,579.000 53,554.000 53,529.000 53,504.000 11.500 53,454.000 53,429.000 53,404.000 53,379.000 11.750 53,329.000 53,304.000 53,280.000 53,255.000 12.000 53,205.000 53,181.000 53,156.000 53,132.000 12.250 53,082.000 53,058.000 53,033.000 53,009.000 12.500 52,960.000 52,936.000 52,911.000 52,887.000 12.750 52,839.000 52,814.000 52,790.000 52,766.000 13.000 52,718.000 52,694.000 52,669.000 52,645.000 13.250 52,597.000 52,573.000 52,550.000 52,526.000 13.500 52,478.000 52,454.000 52,430.000 52,407.000 13.750 52,359.000 52,335.000 52,312.000 52,288.000 14.000 52,241.000 52,217.000 52,194.000 52,170.000 14.250 52,123.000 52,100.000 52,077.000 52,053.000 14.500 52,007.000 51,983.000 51,960.000 51,937.000 14.750 51,890.000 51,867.000 51,844.000 51,821.000 15.000 51,775.000 51,752.000 51,729.000 51,706.000 15.250 51,660.000 51,637.000 51,614.000 51,592.000 15.500 51,546.000 51,523.000 51,501.000 51,478.000 15.750 51,432.000 51,410.000 51,387.000 51,365.000 16.000 51,320.000 51,297.000 51,275.000 51,252.000 16.250 51,207.000 51,185.000 51,163.000 51,140.000 16.500 51,096.000 51,074.000 51,051.000 51,029.000 16.750 50,985.000 50,963.000 50,941.000 50,919.000 17.000 50,874.000 50,852.000 50,831.000 50,809.000 17.250 50,765.000 50,743.000 50,721.000 50,699.000 17.500 50,656.000 50,634.000 50,612.000 50,591.000 17.750 50,547.000 50,526.000 50,504.000 50,482.000 18.000 50,439.000 50,418.000 50,396.000 50,375.000 18.250 50,332.000 50,311.000 50,289.000 50,268.000 18.500 50,225.000 50,204.000 50,183.000 50,162.000 18.750 50,119.000 50,098.000 50,077.000 50,056.000 19.000 50,014.000 49,993.000 49,972.000 49,951.000 19.250 49,909.000 49,888.000 49,867.000 49,847.000 19.500 49,805.000 49,784.000 49,763.000 49,743.000 19.750 49,701.000 49,681.000 49,660.000 49,639.000 20.000 49,598.000 49,578.000 49,557.000 49,537.000 20.250 49,496.000 49,475.000 49,455.000 49,434.000 20.500 49,394.000 49,373.000 49,353.000 49,333.000 20.750 49,292.000 49,272.000 49,252.000 49,232.000 21.000 49,192.000 49,172,000 49,151.000 49,131.000 21.250 49,091.000 49,071.000 49,051.000 49,032.000 Bentley Systems, Inc. Haestad Methods Solution BMP 1.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Volume (ft3) 53,730.000 53,604.000 53,479.000 53,354.000 53,230.000 53,107.000 52,985.000 52,863.000 52,742.000 52,621.000 52,502.000 52,383,000 52,265.000 52,147.000 52,030.000 51,914.000 51,798.000 51,683.000 51,569.000 51,455.000 51,342.000 51,230.000 51,118.000 51,007.000 50,896.000 50,787.000 50,677.000 50,569.000 50,461.000 50,354.000 50,247.000 50,141.000 50,035.000 49,930,000 49,826.000 49,722.000 49,619.000 49,516.000 49,414.000 49,313.000 49,212.000 49,111.000 49,012.000 Bentley Pond Pack V8i [08.11.01.541 Page 9 of 27 E C E I v E JAN 3 12013 BY:----_ Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 10 years Storm Event: Devil Dog - 10 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume. Volume (hours) (0) W) (ft3) (ff'). (ft3) 21.500 48,992.000 48,972.000 48,952.000 48,932.000 48,912,000 21.750 48,893.000 48,873.000 48,853.000 48,833.000 48,814.000 22.000 48,794.000 48,775.000 48,755.000 48,735.000 48,716.000 22.250 48,696.000 48,677.000 48,657.000 48,638.000 48,618.000 22.500 48,599.000 48,579.000 48,560.000 48,541.000 48,521.000 22.750 48,502.000 48,483.000 48,463.000 48,444.000 48,425.000 23,000 48,406.000 48,386.000 48,367.000 48,348.000 48,329.000 23.250 48,310.000 48,291.000 48,272.000 48,252.000 48,233.000 23.500 48,214.000 48,195.000 48,176.000 48,158.000 48,139.000 23.750 48,120.000 48,100.000 48,079.000 48,058.000 48,037.000 24.000 48,016.000 47,996.000 47,975.000 47,954.000 47,934.000 24.250 47,913.000 47,892.000 47,872.000 47,852.000 47,831.000 24.500 47,811.000 47,791.000 47,770.000 47,750.000 47,730.000 24.750 47,710.000 47,690.000 47,670.000 47,650.000 47,630.000 25.000 47,611.000 47,591.000 47,571.000 47,551.000 47,532.000 25.250 47,512.000 47,493.000 47,473.000 47,454.000 47,434.000 25.500 47,415.000 47,396.000 47,377.000 47,357.000 47,338.000 25.750 47,319.000 47,300.000 47,281.000 47,262.000 47,243.000 26.000 47,225.000 47,206.000 47,187.000 47,168.000 47,150.000 26.250 47,131.000 47,113.000 47,094.000 47,076.000 47,057.000 26.500 47,039.000 47,020.000 47,002.000 46,984.000 46,966.000 26.750 46,948.000 46,930.000 46,911.000 46,893.000 46,876.000 27.000 46,858.000 46,840.000 46,822.000 46,804.000 46,786.000 27.250 46,769.000 46,751.000 46,733.000 46,716.000 46,698.000 27.500 46,681.000 46,663.000 46,646.000 46,629.000 46,611.000 27.750 46,594.000 46,577.000 46,560.000 46,543.000 46,525.000 28.000 46,508.000 46,491.000 46,474.000 46,457.000 46,441.000 28.250 46,424.000 46,407.000 46,390.000 46,373.000 46,357.000 28.500 46,340.000 46,324.000 46,307.000 46,290.000 46,274.000 28.750 46,258.000 46,241.000 46,225.000 46,209.000 46,192.000 29.000 46,176.000 46,160.000 46,144.000 46,128,000 46,111.000 29.250 46,095.000 46,079.000 46,064.000 46,048.000 46,032.000 29.500 46,016.000 46,000.000 45,984.000 45,969.000 45,953.000 29.750 45,937.000 45,922.000 45,906.000 45,891.000 45,875.000 30.000 45,860.000 45,844.000 45,829.000 45,814.000 45,798.000 30.250 45,783.000 45,768.000 45,753.000 45,737.000 45,722.000 30.500 45,707.000 45,692.000 45,677.000 45,662.000 45,647.000 30.750 45,632.000 45,618.000 45,603.000 45,588.000 45,573.000 31.000 45,558.000 45,544.000 45,529.000 45,515.000 45,500.000 31.250 45,485.000 45,471.000 45,456.000 45,442.000 45,428.000 31.500 45,413.000 45,399.000 45,385.000 45,370.000 45,356.000 31.750 45,342.000 45,328.000 45,314.000 45,300.000 45,286.000 32.000 45,272.000 45,258.000 45,244.000 45,230.000 45,216.000 Bentley Systems, Inc. Haestad Methods Solution BMP 1.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA t1-203-755-1666 Bentley PondPack VBi (08.11.01.541 Page 10 of 27 Subsection: Time vs. Volume Return Event: 10 years Label: BMP 1 Storm Event: Devil Dog - 10 Year Time vs. Volume (W) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) (ft3):'..' (ft3) (ft3) (ft3) ((t3) 32.250 45,202.000 45,188.000 45,174.000 45,161.000 45,147.000 32.500 45,133.000 45,120.000 45,106.000 45,093.000 45,079.000 32.750 45,065.000 45,052.000 45,039.000 45,025.000 45,012.000 33.000 44,998.000 44,985.000 44,972.000 44,959.000 44,945.000 33.250 44,932.000 44,919.000 44,906.000 44,893.000 44,880.000 33.500 44,867.000 44,854.000 44,841.000 44,828.000 44,815.000 33.750 44,802.000 44,789.000 44,776.000 44,764.000 44,751.000 34.000 44,738.000 44,725.000 44,713.000 44,700.000 44,688.000 34.250 44,675.000 44,662.000 44,650.000 44,637.000 44,625.000 34.500 44,613.000 44,600.000 44,588.000 44,576.000 44,563.000 34.750 44,551.000 44,539.000 44,527.000 44,514.000 44,502.000 35.000 44.490.000 MA1 (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BMP I.ppc Center 108.11.01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 11 of 27 Watertown, CT 06795 USA at-203-755-1666 ECEIVE JAN 3 12013 Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 100 years Storm Event: Devil Dog - 100 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time __-- -lume _ Volume _. Volume _ _-- yolurne ____ Vo_ � .Volume r (hours) 'W) (h3) (ft3)_. (ft3) ,. (ft3) 0.000 39,555.000 40,214.000 42,247.000 45,817.000 50,849.000 0.250 57,282.000 64,082.000 70,677.000 76,124.000 79,949.000 0.500 81,950.000 82,508.000 81,694.000 80,276.000 78,886.000 0.750 77,545.000 76,313.000 75,179.000 74,134.000 73,172.000 1.000 72,294.000 71,466.000 70,710.000 70,012.000 69,367.000 1.250 68,771.000 68,220.000 67,666.000 67,126.000 66,614.000 1.500 66,130.000 65,671.000 65,236.000 64,825.000 64,435.000 1.750 64,065.000 63,715.000 63,383.000 63,068.000 62,769.000 2.000 62,485.000 62,216.000 61,961.000 61,719.000 61,489.000 2.250 61,271.000 61,064.000 60,868.000 60,681.000 60,504.000 2.500 60,335.000 60,175.000 60,023.000 59,879.000 59,742.000 2.750 59,612.000 59,488.000 59,370.000 59,259.000 59,152.000 3.000 59,051.000 58,956.000 58,864.000 58,778.000 58,695.000 3.250 58,617.000 58,542.000 58,471.000 58,404.000 58,340.000 3.500 58,279.000 58,221.000 58,166.000 58,114.000 58,064.000 3.750 58,017.000 57,972.000 57,929.000 57,888.000 57,849.000 4.000 57,812.000 57,777.000 57,744.000 57,712.000 57,682.000 4.250 57,653.000 57,624.000 57,595,000 57,565.000 57,535.000 4.500 57,505.000 57,476.000 57,446.000 57,416.000 57,387.000 4.750 57,357.000 57,328.000 57,298.000 57,269.000 57,240.000 5.000 57,210.000 57,181.000 57,152.000 57,122.000 57,093.000 5.250 57,064.000 57,035.000 57,006.000 56,977.000 56,948.000 5.500 56,919.000 56,890.000 56,861.000 56,832.000 56,803.000 5.750 56,774.000 56,745.000 56,717.000 56,688.000 56,659.000 6.000 56,631.000 56,602.000 56,573.000 56,545.000 56,516.000 6.250 56,488.000 56,459.000 56,431.000 56,402.000 56,374.000 6.500 56,346.000 56,317.000 56,289.000 56,261.000 56,233.000 6.750 56,205.000 56,176.000 56,148.000 56,120.000 56,092.000 7.000 56,064.000 56,036.000, 56,008.000 55,980.000 55,953.000 7.250 55,925.000 55,897.000 55,869.000 55,841.000 55,814.000 7.500 55,786.000 55,758.000 55,731.000 55,703.000 55,676.000 7.750 55,648.000 55,621.000 55,593.000 55,566.000 55,538.000 8.000 55,511.000 55,484.000 55,456.000 55,429.000 55,402.000 8.250 55,375.000 55,347.000 55,320.000 55,293.600 55,266.000 8.500 55,239.000 55,212.000 55,185.000 55,158.000 55,131.000 8.750 55,104.000 55,078.000 55,051.000 55,024.000 54,997.000 9.000 54,970.000 54,944.000 54,917.000 54,890.000 54,864.000 9.250 54,837.000 54,811.000 54,784.000 54,758.000 54,731.000 9.500 54,705.000 54,678.000 54,652.000 54,626.000 54,599.000 9.750 54,573.000 54,547.000 54,521.000 54,495.000 54,468.000 10.000 54,442.000 54,416.000 54,390.000 54,364.000 54,338.000 li 10.250 54,312.000 54,286.000 54,260.000 54,234.000 54,209.000 10.500 54,183.000 54,157.000 54,131.000 54,106.000 54,080.000 BMP Lppc 1/17/2013 G Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack VBi 108.11.01,541 Page 12 of 27 Subsection: Time vs. Volume Label: BMP 1 Time vs. Volume (ft3) Return Event: 100 years Storm Event: Devil Dog - 100 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) ,(ft3) (k3). W) (ft3) (ft3). 10.750 54,054.000 54,029.000 54 003.000 53,977.000 53,952.000 11.000 53,926.000 53,901.000 53,875.000. 53,850.000 53,824.000 11.250 53,799.000 53,774.000 53,748.000 53,723.000 53,698.000 11.500 53,673.000 53,647.000 53,622.000 53,597.000 53,572.000 11.750 53,547.000 53,522.000 53,497.000 53,472.000 53,447.000 12.000 53,422.000 53,397.000 53,372.000 53,347.000 53,323.000 12.250 53,298.000 53,273.000 53,248.000 53,224.000 53,199.000 12.500 53,174.000 53,150.000 53,125.000 53,100.000 53,076.000 12.750 53,051.000 53,02T000 53,002.000 52,978.000 52,954.000 13.000 52,929.000 52,905.000 52,881.000 52,856.000 52,832.000 13.250 52,808.000 52,784,000 52,760.000 52,735.000 52,711.000 13.500 52,687.000 52,663.000 52,639.000 52,615.000 52,591.000 13.750 52,567.000 52,543.000 52,519.000 52,495.000 52,472.000 14.000 52,448.000 52,424.000 52,400.000 52,376.000 52,353.000 14.250 52,329.000 52,305.000 52,282.000 52,258.000 52,235.000 14.500 52,211.000 52,168.000 52,164.000 52,141.000 52,117,000 14.750 52,094.000 52,070.000 52,047.000 52,024.000 52,000.000 15.000 51,977,000 51,954.000 51,931.000 51,907.000 51,884.000 15.250 51,861.000 51,838.000 51,815.000 51,792.000 51,769.000 15.500 51,746.000 51,723.000 51,700.000 51,677.000 51,654.000 15.750 51,631.000 51,608.000 51,586.000 51,563.000 51,540.000 16.000 51,517.000 51,494.000 51,472.000 51,449.000 51,426.000 16.250 51,404.000 51,381.000 51,359.000 51,336.000 51,314.000 16.500 51,291.000 51,269.000 51,246.000 51,224.000 51,201.000 . 16.750 51,179.000 51,157.000 51,134.000 51,112.000 51,090.000 17.000 51,068.000 51,045.000 51,023.000 51,001.000 50,979.000 17.250 50,957.000 50,935.000 50,913.000 50,891.000 50,869.000 17.500 50,847.000 50,825.000 50,803.000 50,781.000 50,759.000 17.750 50,737.000 50,715.000 50,693.000 50,672.000 50,650.600 18.000 50,628.000 50,606.000 50,585.000 50,563.000 50,541.000 18,250 50,520.000 50,498.000 50,477.000 50,455.000 50,434.000 18.500 50,412.000 50,391.000 50,369.000 50,348.000 50,326.000 18,750 50,305.000 50,284.000 50,262.000 50,241.000 50,220.000 19.000 50,199.000 50,177.000 50,156.000 50,135.000 50,114.000 19.250 50,093.000 50,072.000 50,050.000 50,029.000 50,008.000 19.500 49,987.000 49,966.000 49,945.000 49,925.000 49,904,000 19.750 49,883.000 49,862.000 49,841.000 49,820.000 49,799.000 20.000 49,779.000 49,758.000 49,737.000 49,716.000 49,696.000 20.250 49,675.000 49,654.000 49,634.000 49,613.000 49,593.000 20.500 49,572.000 49,552.000 49,531.000 49,511.000 49,490.000 20.750 49,470.000 49,449.000 49,429.000 49,409.000 49,388.000 21.000 49,368.000 49,348.000 49,327.000 49,307.000 49,287.000 21.250 49,267.000 49,247.000 49,227.000 49,206.000 49,186.000 Bentley Systems, Inc. Haestad Methods Solution SNIP t.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.1 t01.541 Page 13 of 27 ECEI E JAN 3 12013 BY: Subsection: Time vs. Volume Label: BMP 1 Outpu Time on left rel Time Volume (hours). (ft3)' 21.500 49,166.000 21.750 49,066.000 22.000 48,967.000 22.250 48,868.000 22.500 48,769.000 22.750 48,671.000 23.000 48,574.000 23.5 23.7 24.0 24.2 24.5 24.7 25.0 25.2 25.5 25.7 26.0 26.2 26.5 26.7 27.0 27.2 27.5 27.7 28.0 28.2 28.5 28.7 29.0 29.2 29.5 29.7 30.0 30.2 30.5 30.7 31.0 31.2 31.5 31.7 32.0 BMP 1.ppc 1/17/2013 50. 48,477.000 00 48,381.000 50 48,286.000 00 48,190.000 50 48,094.000 00 47,990.000 50 47,887.000 00 47,785.000 50 47,685.000 00 47,586.000 50 47,488.000 00 47,391.000 50 47,295.000 00 47,201.000 50 47,108.000 00 47,016.000 50 46,925.000 00 46,835.000 50 46,746.000 00 46,659.000 50 46,572.000 00 46,487.000 50 46,402.000 00 46,319.000 50 46,237.000 00 46,156.000 so 46,075.000 00 45,996.000 50 45,918.000 00 45,840.000 50 45,764.000 00 45,688.000 50 45,614.000 00 45,540.000 50 45,467.000 00 45,395.000 Time vs. Volume (ft3) t Time incref )resents tim Volume ..._ „ft3) 49,146,000 49,046.000 48,947.000 48,848.000 48,750.000 48,652.000 48,555.000 48,458.000 48,362.000 48,266.000 48,171.000 48,073.000 47,969.000 47,867.000 47,765.000 47,665.000 47,566.000 47,468.000 47,372.000 47,276.000 47,182.000 47,089.000 46,997.000 46,907.000 46,817.000 46,729.000 46,641.000 46,555.000 46,470.000 46,386.000 46,303.000 46,220.000 46,139.000 46,059.000 45,980.000 45,902.000 45,825.000 45,749.000 45,673.000 45,599.000 45,525.000 45,453.000 45,381.000 nent = 0.05C e for first val Volume 49,126.000 49,026.000 48,927.000 48,828.000 48,730.000 48,632.000 48,535.000 48,439.000 48,343.000 48,247.000 48,153.000 48,052.000 47,949.000 47,846.000' 47,745.000 47,645.000 47,546.000 47,449.000 47,352.000 47,257.000 47,163.000 47,071.000 46,979.000 46,889.000 46,799.000 46,711.000 46,624.000 46,538.000 46,453.000 46,369.000 46,286.000 46,204.000 46,123.000 46,043.000 95,964.000 45,886.000 45,809.000 45,733.000 45,658.000 45,584,000 45,511.000 45,433.000 45,367.000 Return Event: 100 years Storm Event: Devil Dog - 100 Year hours je in each row. Volume Volume (ft3) .(ft3) .. 49,106.000 49,086.000 49,006.000 48,986.000 48,907.000 48,887.000 48,809.000 48,789.000 48,711.000 48,691.000 48,613.000 48,594.000 48,516.000 48,497.000 48,420.000 48,400.000 48,324.000 48,305.000 48,228.000 48,209.000 48,134.000 48,115.000 48,032.000 48,011.000 47,928.000 47,907.000 47,826.000 47,805.000 47,725.000 47,705.000 47,625.000 47,605.000 47,527.000 47,507.000 47,429.000 47,410.000 47,333.000 47,314.000 47,238.000 47,220.000 47,145.000 47,126.000 47,052.000 47,034.000 46,961.000 46,943.000 46,871.000 46,853.000 46,782.000 46,764.000 46,694.000 46,676.000 46,607.000 46,589.000 46,521.000 46,504.000 46,436.000 46,419.000 46,352.000 46,336.000 46,270.000 46,253.000 46,188.000 46,172.000 46,107.000 46,091.000 46,028.000 46,012.000 45,949.000 45,933.000 45,871.000 45,856,000 45,794.000 45,779.000 45,718.000 45,703.000 45,643.000 45,628.000 45,569.000 45,555.000 45,496.000 45,482.000 45,424.000 45,409.000 45,352.000 45,338.000 Bentley Systems, Inc. Haestod Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA t1-203-755-1666 Bentley Pondleack V8i 10B.11.01.541 Page 14 of 27 Subsection: Time vs. Volume Label: BMP 1 1 Time BMP 1.ppc 1/17/2013 Time vs. Volume (ft3) Return Event: 100 years Storm Event: Devil Dog - 100 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Volume .Volume .Volume Volume Volume (ft3) (ft3) (ft3) ..(ft3) (ft3) 32.250 45,324.000 45,310.000 45,296.000 45,282.000 45,268.000 32.500 45,254.000 45,240.000 45,226.000 45,212.000 45,198.000 32.750 45,185.000 45,171.000 45,157.000 45,143.000 45,130.000 33.000 45,116.000 45,103.000 45,089.000 45,075.000 45,062.000 33.250 45,048.000 45,035.000 45,022.000 45,008.000 44,995.000 33.500 44,982.000 44,968.000 44,955.000 44,942.000 44,929.000 33.750 44,916.000 44,902.000 44,889.000 44,876.000 44,863.000 34.000 44,850.000 44,837.000 44,824.000 44,811.000 44,799.000 34.250 44,786.000 44,773.000 44,760.000 44,747.000 44,735.000 34.500 44,722.000 44,709.000 44,697.000 44,684.000 44,672.000 34.750 44,659.000 44,647.000 44,634.000 44,622.000 44,609.000 35.000 44,597.000 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack Val (08.11,01.541 Page 15 of 27 ECEITA 9 V � 1AN 3 12013 BY: Subsection: Elevation -Area Volume Curve Return Event: 100 years Label: BMP 1 Storm Event: Devil Dog - 100 Year Elevation ,'Planimeter Area _ AI+AZ+sgr(Al*A Volume ,. Volume (Total) (ft) ,-(ftz). (ft2) 2) .. (.fta) (ha) (ft2) 14.50 0.0 5,737.000 0.000 0.000 0.000 15.00 0.0 7,359.000 19,593.583 3,266.000 3,266.000 16.00 0.0 8,901.000 24,353.359 8,118.000 11,383.000 17.00 0.0 10,563.000 29,160.456 9,720.000 21,104.000 18.00 0.0 12,341.000 34,321.442 11,410.000 32,544.000 18.50 0.0 15,774.000 42,067.309 7,011.000 39,555.000 19.00 0.0 18,475.000 51,320.164 8,553.000 48,109.000 19.50 0.0 19,655.000 57,185.869 9,531.000 57,640.000 20.00 0.0 22,019.000 62,477.448 10,413.000 68,052.000 21.00 0.0 27,134.000 73,596.067 24,532.000 92,585.000 22.00 0.0 30,689.000 86,679.807 28,893.000 121,478.000 Bentley Systems, Inc. Haestad Methods Solution - Bentley PondPack Val BMP 1.ppc Center I06.11.01.54I 1/17/2013 27 Siemon Company Drive Suite 200 W Page 16 of 27 Watertown, CT 06795 USA +1.203-755-1666 Subsection: Outlet Input Data Label: Outlet 1 BMP 1.ppc 1/17/2013 Return Event: 100 years Storm Event: Devil Dog - 100 Year Requested Pond Water Surface Elevations Minimum (Headwater) 14.50 R Increment (Headwater) 0.50 ft Maximum (Headwater) 22.00 ft Outlet Connectivity ...._. . YP._ . s_.tl Y._- _. __..... . _ ... _ ...__ Structure T e Outlet ID Direction Outfall El E2 (ft) (R) i Rectangular Weir WO Forward co 19.50 22.00 Inlet Box RO Forward CO 21.50 22.00 Orifice -Circular 00 Forward CO 18.50 22.00 Culvert -Circular CO Forward TW 18.25 22.00 Tailwater Settings Tailwater (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.541 Page 17 of 27 JAN 3 12013 BY:�_ Subsection: Outlet Input Data Label: Outlet 1 Return Event: 100 years Storm Event: Devil Dog - 100 Year Structure ID: CO Structure Type: Culvert -Circular Number of Barrels 1 Diameter 24.0 in Length 50.00 It Length (Computed Barrel) 50.00 ft Slope (Computed) 0.005 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.200 Kb 0.012 Kr 0.000 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio (HW/D) 1.093 T2 ratio (HW/D) 1.195 Slope Correction Factor -0.500 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... TI Elevation 20.44 ft Tl Flow 15.55 ft3/s T2 Elevation 20.64 ft T2 Flow 17.77 ft3/s BMP 1.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack VN [08.11.01.54] Page 18 of 27 Subsection: Outlet Input Data Label: Outlet 1 Return Event: 100 years Storm Event: Devil Dog - 100 Year Structure ID: 00 Structure Type: Orifice -Circular Number of Openings 1 Elevation 18.50 ft Orifice Diameter 2.5 in Orifice Coefficient 0.600 Structure ID: RO Structure Type: Inlet Box Number of Openings 1 Elevation 21.50 ft Orifice Area 8.2 ft' Orifice Coefficient 0.600 Weir Length 12.80 ft Weir Coefficient 2.80 (ftA0.5)/s K Reverse 1.000 Manning's n 0.000 Key, Charged Riser 0.000 Weir Submergence False Orifice H to crest False Structure ID: WO ' Structure Type: Rectangular Weir Number of Openings 1 Elevation 19.50 ft Weir Length 3.00 ft Weir Coefficient 2.80 (ftAO.S)/s Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Downstream Channel Catalog Conduit 24 inch Channel Slope 0.005 ft/ft Channel Invert Elevation 18.00 ft Convergence Tolerances Maximum Iterations 40 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 ft (Maximum) Headwater Tolerance 0.01 ft (Minimum) Bentley Systems, Inc. Haestad Methods Solution BMP 1.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA a1-203-755-1666 Bentley Pond Pack V8i [08.11.01.541 Page 19 of 27 E C E I Y/ E 1 JAN 3 12013 BY: Subsection: Outlet Input Data Label: Outlet 1 BMP 1.ppc 1/17/2013 Return Event: 100 years Storm Event: Devil Dog - 100 Year Convergence Tolerances Headwater Tolerance 0.50 ft (Maximum) - Flow Tolerance (Minimum) 0.001 R3/s Flow Tolerance (Maximum) 10.000 R3/s Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack VBi 108.11.01.541 Page 20 of 27 Subsection: Elevation -Volume -Flow Table (Pond) Label: BMP 1 Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 18.50 It Initial) Volume (Initial) 39,555.000 ft3 Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Return Event: 100 years Storm Event: Devil Dog - 100 Year Elevation - Outflow. Storage Area. , - � Infiltration Flow (Total) 25/t + O (ft) (ft3/s). (ft3) (ft2). (ft3/s) MYS) (ft3/s) 14.50 0.00 0.000 5,737.000 0.00 0.00 0.00 15.00 0.00 3,265.597 7,359.000 0.00 0.00 36.29 15.50 0.00 7,131.740 8,111.679 0.00 0.00 79.24 16.00 0.00 11,383.383 8,901.000 0.00 0.00 126.48 16.50 0.00 16,035.709 9,714.228 0.00 0.00 178.18 17.00 0.00 21,103.536 10,563.000 0.00 0.00 234.49 17.50 0.00 26,601.526 11,434.721 0.00 0.00 295.58 18.00 0.00 32,544.016 12,341.000 0.00 0.00 361.60 18.25 0.00 35,835.063 14,004.905 0.00 0.00 398.17 18.50 0.00 39,555.234 15,774.000 0.00 0.00 439.51 19.00 0.10 48,108.595 18,475.000 0.01 0.11 534.65 19.50 0.16 57,639.573 19,655.000 0.01 0.16 640.60 20.00 3.02 68,052.481 22,019.000 0.01 3.03 759.17 20.50 7.71 79,679.117 24,509.784 0.01 7.72 893.04 21.00 12.33 92,584.504 27,134.000 0.01 12.34 1,041.06 21.50 16.84 106,586.763 28,884.154 0.01 16.85 1,201.15 22.00 25.44 1 121,477.773 30,689.000 0.01 25.45 1,375.20 BMP 1.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack vet [08.11.01.541 Page 21 of 27 E(CEOVE JAN 3 12013 BY:�_ Subsection: Level Pool Pond Routing Summary Label: BMP 1 (IN) Return Event: 2 years Storm Event: Devil Dog - 2 Year Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 18.50 ft Initial) Volume (Initial) 39,555.000 ft3 Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Flow (Peak In) 25.13 ft3/5 Time to Peak (Flow, In) 0.250 hours Infiltration (Peak) 0.01 ft3/5 Time to Peak (Infiltration) 0.500 hours Flow (Peak Outlet) 1.24 ft3/s Time to Peak (Flow, Outlet) 0.500 hours Elevation (Water Surface, 19.69 ft Peak) Volume (Peak) 61,429.969 ft3 Mass Balance (W) Volume (Initial) 39,555.000 ft3 Volume (Total Inflow) 22,620.000 ft3 Volume (Total Infiltration) 653.000 ft3 Volume (Total Outlet 17,165.000 ft3 Outflow) Volume (Retained) 44,179.000 R3 Volume (Unrouted) -177.000 ft3 Error (Mass Balance) 0.8 % BMP 1.ppc 111712013 � y ' �r Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA a1-203-755-1666 Bentley PondPack Val [08.11.01,541 Page 22 of 27 Subsection: Level Pool Pond Routing Summary Return Event: 10 years Label: BMP 1 (IN) Storm Event: Devil Dog - 10 Year Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 18.50 ft Initial) Volume (Initial) 39,555.000 ft3 Flow (Initial Outlet) 0.00 ft3/5 Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Flow (Peak In) 30.01 ft3/s Time to Peak (Flow, In) 0.250 hours Infiltration (Peak) 0.01 ft3/s Time to Peak (Infiltration) 0.550 hours Flow (Peak Outlet) 4.73 ft3/s Time to Peak (Flow, Outlet) - 0.550 hours Elevation (Water Surface, 20.18 ft Peak) Volume (Peak) 72,143.227 ft3 Mass Balance (ft3) Volume (Initial) 39,555.000 ft3 Volume (Total Inflow) 36,009.000 ft3 Volume (Total Infiltration) 659.000 ft3 Volume (Total Outlet 30,252.000 ft3 Outflow) Volume (Retained) 44,478.000 ft3 Volume (Unrouted) -175.000 ft3 Error (Mass Balance) 0.5 % Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V6i BMP 1.ppc Center [08.11.01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 23 of 27 Watertown, CT 06795 USA +1-203-755-1666 F-CEIVE JAN 3 12013 E'tY: Subsection: Level Pool Pond Routing Summary Return Event: 100 years Label: BMP 1 (IN) Storm Event: Devil Dog - 100 Year Infiltration Infiltration Method Average (Computed) Infiltradon Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 18.50 ft Initial) Volume (Initial) 39,555.000 ft3 Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s _ Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Flow (Peak In) 39.55 ft3/s Time to Peak (Flow, In) 0.250 hours Infiltration (Peak) 0.01 ft3/s Time to Peak (Infiltration) 0.550 hours Flow (Peak Outlet) 8.77 ft3/s Time to Peak (Flow, Outlet) 0.550 hours Elevation (Water Surface, 20.61 ft Peak) Volume (Peak) 82,508.277 fts Mass Balance (ft3) Volume (Initial) 39,555.000 ft3 Volume (Total Inflow) 49,835.000 ft3 Volume (Total Infiltration) 663.000 ft3 Volume (Total Outlet 43,970.000 ft3 Outflow) Volume (Retained) 44,585.000 ft3 Volume (Unrouted) -173.000 ft3 Error (Mass Balance) 0.3 % Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BMP I.ppc Center [08.11.01.54] 1/17/2013 27 Siemon Company Dore Suite 200 W Page 24 of 27 Watertown, CT 06795 USA +1-203-755-1666 �� i I Subsection: C and Area (Pre -Development) Return Event: 2 years Label: DA 1 Storm Event: Devil Dog - 2 Year C and Area Results (Pre -Development) __. _____- ._.. ._.,__..__ ---- Soil/Surface Description C Coefficient Area Area (Adjusted) Impervious 0.950 32,545.000 (N/A) Unimproved 0.350 409,493.000 (N/A) Weighted C & Total Area ---> 0.394 442,038.000 174,240.300 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack Val BMP 1.ppc Center [08.11.01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 25 of 27 Watertown, CT 06795 USA +1-203-755-1666 M,t ..Fr,FIVE " F + {I r JAN 3 1200 iY:-- Subsection: C and Area (Post -Development) Label: DA 1 __ Su _ Soil/rface Description Impervious Grass Gravel Roof Weighted C & Total Area ---> BMP 1.ppc 1/17/2013 Return Event: 2 years Storm Event: Devil Dog - 2 Year C and Area Results C Coefficient Area Area (Adjusted) i (ft2) 0.950 89,308.000 (N/A) 0.350 308,257.000 (N/A) 0.850 17,563.000 (N/A) 0.850 26,910.000 (N/A) 0.522 442,038.000 230,534.600 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA t1.203-755-1666 Bentley PondPack V8i [08.11.01.541 Page 26 of 27 Index B BMP 1 (Elevation -Area Volume Curve, 100 years)... 16 BMP 1 (Elevation -Volume -flow Table (Pond), 100 years) ... 21 BMP 1 (IN) (Level Pool Pond Routing Summary, 10 years) ... 23 BMP 1 (IN) (Level Pool Pond Routing Summary, 100 years) ... 24 BMP 1 (IN) (Level Pool Pond Routing Summary, 2 years) ... 22 BMP 1 (Time vs. Volume, 10 years) ... 8, 9, 10,11 BMP 1 (Time vs. Volume, 100 years)... 12, 13, 14, 15 BMP 1 (Time vs. Volume, 2 years) ... 4, 5, 6,7 D DA 1 (C and Area (Post -Development), 2 years) ... 26 DA 1 (C and Area (Pre -Development), 2 years) ... 25 Iu Master Network Summary ... 3 Modified Rational Grand Summary ... 2 O Outlet 1 (Outlet Input Data, 100 years)... 17, 18, 19, 20 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BMP 1.ppc Center [08.11.01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 27 of 27 Watertown, CT 06795 USA +1-203-755-1666 C EIV� H JAN 3 12013 BY: Project Summary Camp Lejeune - Title Devil Dog SOI Stormwater Enhancements Engineer Ml Pritchard Company Parsons Brinckerhoff Date 1/18/2013 Notes BMP-3 Modified Rational Method BMP 3.ppc 1/17MI3 i Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Dme Suite 200 W Watertown, CT 06795 USA a1-203-755-1666 Bentley PondPack V8i [08.11.01.541 Page 1 of 27 a Table of Contents Modified Rational Grand 2 Summary Master Network Summary 3 BMP 3 Devil Dog - 2 Year Time vs. Volume 4 Time vs. Volume 8 Time vs. Volume 12 BMP 3 Elevation -Area Volume 16 Curve Outlet 1 Outlet Input Data 17 BMP 3 Devil Dog - 100 Year Elevation -Volume -Flow 21 Table (Pond) BMP 3 (IN) Devil Dog - 2 Year Level Pool Pond Routing 22 Summary Level Pool Pond Routing 23 Summary Level Pool Pond Routing 24 Summary DA 3 Devil Dog - 2 Year C and Area (Pre- 25 Development) C and Area (Post- 26 Development) !' g7FWE JAN 2013 Subsection: Modified Rational Grand Summary Modified Rational Method Q = CiA * Units Conversion; Where conversion = 43560 / (12 * 3600) Fr_. _ ii ._ - -_--- m-... equency ;. Area AdjustedL — Duration; Intensity Flow" (-Peak)- � Flow Volume ° (years) (ft2) Coefficient (hours) (in/h) (ft3/s) (Allowable) (inflow) (ft3/s) (ft3) 2 ,111,115.000 0.541 0.367 4.029 5.60 5.15 7,397.090 10 111,115.000 0.541 0.383 5.283 7.35 7.19 10,141.746 100 111,115.000 0.532 0.450 6.644 9.09 8.91 14,733.586 Volume (Storage) (ft3) 2,142.527 2,591.080 4,307.528 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BMP 3.ppc Center [08.11,01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 2 of 27 Watertown, CT 06795 USA 41-203-755-1666 Subsection: Master Network Summary Catchments Summary i Label'. Scenario . Return . Hydrograph Time to Peak Peak Flow 1 Event Volume (hours) {ft3/s) (years) (ft3) DA 3 Devil Dog 2 yr 2 7,397.000 0.200 5.60 DA 3 Devil Dog 10 yr 10 10,142.000 0.200 7.35 DA 3 Devil Dog 100 yr 100 14,734.000 0.200 9.09 Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (hours) - (ft3/5) (years) ((ti) CG-14 Devil Dog 2 yr 2 4:453.000 0.600 0.05 cc Devil Dog 10 yr 10 5,706.000 0.600 0.06 CG-14 Devil Dog 100 yr 100 9,914.000 0.600 1.79 Pond Summary Label ' Scenario ° Return .. Hydrograph Time to Peak Peak Flow Maximum, Maximum Event - Volume (hours) (ft3/s). Water Pond Storage, - .. (years) (ft3) -. Surface., (ft3) , - Elevation - - (ft) BMP 3 (IN) Devil Dog 2 yr 2 7,397.000 0.200 5.60 (N/A) (N/A) BMP 3 (OUT) Devil Dog 2 yr 2 4,453.000 0.600 0.05 20.23 28,068.000 BMP 3 (IN) Devil Dog 10 10 10,142.000 0.200 7.35 (N/A) (N/A) yr BMP 3 (OUT) Devil Dog 10 10 5,706.000 0.600 0.06 20.48 30,831.000 yr BMP 3 (IN) Devil Dog 100 100 14,734.000 - 0.200 9.09 (N/A) (N/A) yr BMP 3 (OUT) Devil Dog 100 100 9,914.000 0.600 1.79 20.80 34,425.000 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BMP 3.ppc Center [08.11.01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 3 of 27 Watertown, CT 06795 USA +1-203-755-1666 ECEIVE JAN 3 12013 Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Return Event: 2 years Storm Event: Devil Dog - 2 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Tme Volume Volume Volume -� t (hours) (ft3) W) (ft3) - (ft') .. (ft3) 0.000 20,773.000 20,889.000 21,242.000 21,839.000 22,695.000 0.250 23,702.000 24,738.000 25,789.000 26,687.000 27,384.000 0.500 27,835.000 28,035.000 28,068.000 28,059.000 28,050.000 0.750 28,041.000 28,032.000 28,023.000 28,014.000 28,005.000 1.000 27,996.000 27,987.000 27,978.000 27,969.000 27,960.000 1.250 27,951.000 27,942.000 27,933.000 27,924.000 27,915.000 1.500 27,906.000 27,898.000 27,889.000 27,880.000 27,871.000 1.750 27,862.000 27,853.000 27,844.000 27,835.000 27,826.000 2.000 27,817.000 27,809.000 27,800,000 27,791.000 27,782.000 2.250 27,773.000 27,764.000 27,755.000 27,747.000 27,738.000 2.500 27,729.000 27,720.000 27,711.000 27,703.000 27,694.000 2.750 27,685.000 27,676.000 27,667.000 27,659.000 27,650.000 3.000 27,641.000 27,632.000 27,624.000 27,615.000 27,606.000 3.250 27,597.000 27,589.000 27,580.000 27,571.000 27,563.000 3.500 27,554.000 27,545.000 27,536.000 27,528.000 27,519.000 3.750 27,510.000 27,502.000 27,493.000 27,484.000 27,476.000 4.000 27,467.000 27,458.000 27,450.000 27,441.000 27,433.000 4.250 27,424.000 27,415.000 27,407.000 27,398.000 27,389.000 4.500 27,381.000 27,372.000 27,364.000 27,355.000 27,347.000 4.750 27,338.000 27,329.000 27,321.000 27,312.000 27,304.000 5.000 27,295.000 27,287.000 27,278.000 27,270.000 27,261.000 5.250 27,253.000 27,244.000 27,236.000 27,227.000 27,219.000 5.500 27,210.000 27,202.000 27,193.000 27,185.000 27,176.000 5.750 27,168.000 27,159.000 27,151.000 27,142.000 27,134.000 6.000 27,126.000 27,117.000 27,109.000 27,100.000 27,092.000 6.250 27,084.000 27,075.000 27,067.000 27,058.000 27,050.000 6.500 27,042.000 27,033.000 27,025.000 27,017.000 27,008.000 6.750 27,000.000 26,991.000 26,983.000 26,975.000 26,966.000 7.000 26,958.000 26,950.000 26,9142.000 26,933.000 26,925.000 7.250 26,917.000 26,908.000 26,900.000 26,892.000 26,883.000 7.500 26,875.000 26,867.000 26,859.000 26,850.000 26,842.000 7.750 26,834.000 26,826.000 26,817.000 26,809.000 26,801.000 8.000 26,793.000 26,785.000 26,776.000 26,768.000 26,760.000 8.250 26,752.000 26,744.000 26,735.000 26,727.000 26,719.000 8.500 26,711.000 26,703.000 26,695.000 26,686.000 26,678.000 8.750 26,670.000 26,662.000 26,654.000 26,646.000 26,638.000 9.000 26,630.000 26,621.000 26,613.000 26,605.000 26,597.000 9.250 26,589.000 26,581.000 26,573.000 26,565.000 26,557.000 • 9.500 26,549.000 26,541.000 26,533.000 26,525.000 26,517.000 9.750 26,509.000 26,501.000 26,492.000 26,484.000 26,476.000 10.000 26,468.000 26,460.000 26,452.000 26,444.000 26,436.000 10.250 26,428.000 26,421.000 26,413.000 26,405.000 26,397.000 10.500 26,389.000 26,381.000 26,373.000 26,365.000 26,357.000 BMP 3.ppc 1/1V2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack V8i 108.11.01,541 Page 4 of 27 Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Return Event: 2 years Storm Event: Devil Dog - 2 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Tlme Volume Volume Volume Volume Volume , (hours) (ft3) (ft3) (ft3).. (ft3) (ft3) 10.750 26,349.000 26,341.000 26 333.000 26,325.000 26,317.000 11.000 26,309.000 26,301.000 26,294.000 26,286.000 26,278.000 11.250 26,270.000 26,262.000 26,254.000 26,246.000 26,238.000 11.500 26,231:000 26,223.000 26,215.000 26,207.000 26,199.000 11.750 26,191.000 26,184.000 26,176.000 26,168.000 26,160.000 12.000 26,152.000 26,144.000 26,137.000 26,129.000 26,121.000 12.250 26,113.000 26,106.000 26,098.000 26,090.000 26,082.000 12.500 26,075.000 26,067.000 26,059.000 26,051.000 26,044.000 12.750 26,036.000 26,028.000 26,020.000 26,013.000 26,005.000 13.000 25,997.000 25,990.000 25,982.000 25,974.000 25,966.000 13.250 25,959.000 25,951.000 25,943.000 25,936.000 25,928.000 13.500 25,920.000 25,913.000 25,905.000 25,897.000 25,890.000 13.750 25,882.000 25,875.000 25,867.000 25,859.000 25,852.000 14.000 25,844.000 25,836.000 25,829.000 25,821.000 25,814.000 14.250 25,806.000 25,799.000 25,791.000 25,783.000 25,776.000 14.500 25,768.000 25,761.000 25,753.000 25,746.000 25,738.000 14.750 25,731.000 25,723.000 25,715.000 25,708.000 25,700.000 15.000 25,693.000 25,685.000 25,678.000 25,670.000 25,663.000 15.250 25,655.000 25,648.000 25,640.000 25,632.000 25,623.000 15.500 25,615.000 25,607.000 25,599.000 25,591.000 25,582.000 15.750 25,574.000 25,566.000 25,558.000 25,550.000 25,542.000 16.000 25,534.000 25,526.000 25,518.000 25,510.000 25,501.000 16.250 25,493.000 25,485.000 25,477.000 25,470.000 25,462.000 16.500 25,454.000 25,446.000 25,438.000 25,430.000 25,422.000 16.750 25,414.000 25,406.000 25,398.000 25,391.000 25,383.000 17.000 25,375.000 25,367.000 25,359.000 25,352.000 25,344.000 17.250 25,336.000 25,328.000 25,321.000 25,313.000 25,305.000 17.500 25,298.000 25,290.000 25,282.000 25,275.000 25,267.000 17.750 25,259.000 25,252.000 25,244.000 25,237.000 25,229.000 18.000 25,221.000 25,214.000 25,206.000 25,199.000 25,191.000 18.250 25,184.000 25,176.000 25,169.000 25,162.000 25,154.000 18.500 25,147.000 25,139.000 25,132.000 25,124.000 25,117.000 18.750 25,110.000 25,102.000 25,095.000 25,088.000 25,080.000 19.000 25,073.000 25,066.000 25,059.000 25,051.000 25,044.000 19.250 25,037.000 25,030.000 25,022.000 25,015.000 , 25,008.000 19.500 25,001.000 24,994.000 24,986.000 24,979.000 24,972,000 19.750 24,965.000 24,958.000 24,951.000 24,944.000 24,937.000 20.000 24,930.000 24,923.000 24,916.000 24,909.000 24,902.000 20.250 24,895.000 24,888.000 24,881.000 24,874.000 24,867.000 20.500 24,860.000 24,853.000 24,846.000 24,839.000 24,832.000 20.750 24,825.000 24,818.000 24,812.000 24,805.000 24,798.000 21.000 24,791.000 24,784.000 24,777.000 24,771.000 24,764.000 21.250 24,757.000 24,750.000 24,744.000 24,737.000 24,730.000 Bentley Systems, Inc. Haestad Methods Solution BMP 3.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11.01.541 Page 5 of 27 FICEI Q/ E JAN 3 12013 BY: Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Return Event: 2 years Storm Event: Devil Dog - 2 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. -- - - --- --Volume-- -- --- - - Time Volume- - Volume Volume Volume Volume --_.(hours)_ (ft3),:.___ �fta>., _'.,,.,.. (fta.).:.,. _.,. .. ,(fta)..:.. (ft3) 21.500 24,723.000 24,717.000 24,710.000 24,703.000 24,697.00( 21.750 24,690.000 24,683.000 24,677.000 24,670.000 24,664.00( 22.000 24,657.000 24,650.000 24,644.000 24,637.000 24,631.00( 22.250 24,624.000 24,618.000 24,611.000 24,605.000 24,598.00( 22.500 24,592.000 24,585.000 24,579.000 24,572.000 24,566.000 22.750 24,559.000 24,553.000 24,546.000 24,540.000 24,534.000 23.000 24,527.000 24,521.000 24,515.000 24,508.000 24,502.000 23,250 24,496.000 24,489.000 24,483.000 24,477.000 24,470.000 23.500 24,464.000 24,458.000 24,452.000 24,445.000 24,439.000 23.750 24,433.000 24,427.000 24,420.000 24,414.000 24,408.000 24.000 24,402.000 24,396.000 24,390.000 24,383.000 24,377.00( 24.250 24,371.000 24,365.000 24,359.000 24,353.000 24,347.000 24.500 24,341.000 24,335.000 24,329.000 24,323.000 24,317.00( 24.750 24,311.000 24,305.000 24,299.000 24,293.000 24,287.000 25.000 24,281.000 24,275.000 24,269.000 24,263.000 24,257.00( 25.250 24,251.000 24,245.000 24,239.000 24,233.000 24,227.000 25.500 24,221.000 24,216.000 24,210.000 24,204.000 24,198.000 25.750 24,192.000 24,186.000 24,181.000 24,175.000 24,169.000 26.000 24,163.000 24,157.000 24,152.000 24,146.000 24,140.000 26.250 24,135.000 24,129.000 24,123.000 24,117.000 24,112.000 26.500 24,106.000 24,100.000 24,095.000 24,089.000 24,083.000 26.750 24,078.000 24,072.000 24,067.000 24,061.000 24,055.000 27.000 24,050.000 24,044.000 24,039.000 24,033,000 24,027.000 27.250 24,022.000 24,016.000 24,011.000 24,005.000 24,000.000 27.500 23,9194.000 23,989.000 23,983.000 23,978.000 23,972.000 27.750 23,967.000 23,962.000 23,956.000 23,951.000 23,945.000 28.000 23,940.000 23,934.000 23,929.000 23,924.000 23,918.000 28.250 23,913.000 23,908.000 23,902.000 23,897.000 23,892.000 28.500 23,886.000 23,881.000 23,876.000 23,870.000 23,865.000 28.750 23,860.000 23,855.000 23,849.000 23,844.000 23,839.000 29.000 23,834.000 23,828.000 23,823.000 23,818.000 23,813.000 29.250 23,808.000 23,802.000 23,797.000 23,792.000 23,787,000 29.500 23,782.000 23,777.000 23,771.000 23,766.000 23,761.000 29.750 23,756.000 23,751.000 23,746.000 23,741.000 23,736.000 30.000 23,731.000 23,726.000 23,721.000 23,716.000 23,711.000 30.250 23,706.000 23,701.000 23,696.000 23,691.000 23,686.000 30.500 23,681.000 23,676.000 23,671.000 23,666.000 23,661.000 30,750 23,656.000 23,651.000 23,646.000 23,641.000 23,636o00 31.000 23,631.000 23,626.000 23,621.000 23,617.000 23,612.000 31.250 23,607.000 23,602.000 23,597.000 23,592.000 23,587.000 31.500 23,583.000 23,578.000 23,573.000 23,568.000 23,563.000 31.750 23,559.000 23,554.000 23,549.000 23,544.000 23,540.000 32.000 23,535.000 23,530.000 23,525.000 23,521.000 23,516.000 Bentley Systems, Inc. Hassled Methods Solution BMP 3.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack V8i [08,11.01.541 Page 6 of 27 Subsection: Time vs. Volume Return Event: 2 years Label: BMP 3 Storm Event: Devil Dog - 2 Year Time vs. Volume (ft3) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time '- Volume Volume Volume Volume Volume (hours) (ft3) (ft3) (ft3) (ft3) (ft3) . 32.250 23,511.000 23,507.000 23,502.000 23,497.000 23,492.000 32.500 23,488.000 23,483.000 23,478.000 23,474.000 23,469.000 32.750 23,465.000 23,460.000 23,455.000 23,451.000 23,446.000 33.000 23,442.000 23,437.000 23,432.000 23,428.000 23,423.000 33.250 23,419.000 23,414.000 23,410.000 23,405.000 23,401.000 33.500 23,396.000 23,392.000 23,387.000 23,383.000 23,378.000 33.750 23,374.000 23,369.000 23,365.000 23,360.000 23,356.000 34.000 23,351.000 23,347.000 23,342.000 23,338.000 23,334.000 34.250 23,329.000 23,325.000 23,320.000 23,316.000 23,312.000 34.500 23,307.000 23,303.000 23,298.000 23,294.000 23,290.000 34.750 23,285.000 23,281.000 23,277.000 23,272.000 23,268.000 35.000 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BMP 3.ppc Center [08.11.01,541 1/172013 27 Siemon Company Drive Suite 200 W Page 7 of 27 Watertown, CT 06795 USA +1-203-755-1666 ECEIVE JAN 3 12013 By: Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Return Event: 10 years Storm Event: Devil Dog - 10 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. __.... n.,-,..__. ..._.----... _. __..._.._....r,..,.,__._._____......._.,.-., Time Volume Volume Volume Volume Volume (hours) - (ft') (ft3) (fta) (ft3) (ft3) 0.000 20,773.000 20,925.000 21,390.000 22,180.000 23,320.000 0.250 24,672.000 26,034.000 27,328.000 28,582.000 29,628.000 0.500 30,346.000 30,729.000 30,831.000 30,821.000 30,810.000 0.750 30,799.000 30,788.000 30,777.000 30,766.000 30,756.000 1.000 30,745.000 30,734.000 30,723.000 30,713.000 30,702.000 1.250 30,691.000 30,680.000 30,670.000 30,659.000 30,648.000 1.500 30,637.000 30,627.000 30,616.000 30,605.000 30,595.000 1.750 30,584.000 30,573.000 30,563,000 30,552.000 30,541.000 2.000 30,531.000 30,520.000 30,509.000 30,499.000 30,488.000 2.250 30,477.000 30,467.000 30,456.000 30,446.000 30,435.000 2.500 30,424.000 30,414.000 30,403.000 30,393.000 30,382.000 2.750 30,372.000 30,361.000 30,351.000 30,340.000 30,330.000 - 3.000 30,319.000 30,309.000 30,298.000 30,288.000 30,277.000 3.250 30,267.000 30,256.000 30,246.000 30,235.000 30,225.000 3.500 30,214.000 30,204.000 30,193.000 30,183.000 30,173.000 3.750 30,162.000 30,152.000 30,141.000 30,131.000 30,121.000 4.000 30,110.000 30,100.000 30,090.000 30,079,000 30,069.000 4.250 30,059.000 30,048.000 30,038.000 30,028.000 30,017.000 4.500 30,007.000 29,997.000 29,986.000 29,976.000 29,966.000 4.750 29,956.000 29,945.000 29,935.000 29,925.000 29,915.000 5.000 29,904.000 29,894.000 29,884.000 29,874.000 29,863.000 5.250 29,853.000 29,843.000 29,833.000 29,823.000 29,812.000 5.500 29,802.000 29,792.000 29,782.000 29,772.000 29,762.000 5.750 29,752.000 29,741.000 29,731.000 29,721.000 29,711.000 6.000 29,701.000 29,691.000 29,681.000 29,671.000 29,661.000 6.250 29,651.000 29,641.000 29,630.000 29,620.000 29,610.000 6.500 29,600.000 29,590.000 29,580.000 29,570.000 29,560.000 6.750 29,550.000 29,540.000 29,530.000 29,520.000 29,510.000 7.000 29,500.000 29,490.000 29,480.000 29,470.000 29,460.000 7.250 29,451.000 29,441.000 29,431.000 29,421.000 29,411.000 7.500 29,401.000 29,391.000 29,381.000 29,371.000 29,361.000 7.750 29,352.000 29,342.000 29,332.000 29,322.000 29,312.000 8.000 29,302.000 29,292.000 29,283.000 29,273.000 29,263.000 8.250 29,253.000 29,243.000 29,234.000 29,224.000 29,214.000 8.500 29,204.000 29,194.000 29,185.000 29,175.000 29,165.000 8.750 29,155.000 29,146.000 29,136.000 29,126.000 29,116.000 9.000 29,107.000 29,097.000 29,087.000 29,078.000 29,068.000 9.250 29,058.000 29,049.000 29,039.000 29,029.000 29,020.000 9.500 29,010.000 29,000.000 28,991.000 28,981.000 28,971.000 9.750 28,962.000 28,952.000 28,943.000 28,933.000 28,923.000 10.000 28,914.000 28,904.000 28,895.000 28,885.000 28,876.000 10.250 28,866.000 28,856.000 28,847.000 28,837.000 28,828.000 10.500 28,818.000 28,809.000 28,799.000 28,790.000 28,780.000 BMP 3.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack V8i [08.11.01.541 Page 8 of 27 1 Subsection: Time vs. Volume Label: BMP 3 Time -(-(hours) 10.7 11.0 11.2 11.5 11.7 12. 12.2 12.5 12. 13.0 13.2 13.5 13.7 14.0 14.2 14.5 14. 15. 15.2 15.5 15. 16.0 16.2 16.5 16.7 17.0 17.2 17.5 17.7 18.0 18.2 18.5 18.7 19.0 19.2 19.5 19.7 20.0 20.2 20.5 20.7 21.0 21.2 BMP 3.ppc V172013 Time vs. Volume (ft3) Return Event: 10 years Storm Event: Devil Dog - 10 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Volume Volume Volume Volume Volume (f[3).. "(ft3) (ft3) (ft3) C (ft3) 50 28,771.000 28,761.000 28,752.000 28,742.000 28,733.000 00 28,723.000 28,714.000 28,704.000 28,695.000 28,686.000 50 28,676.000 28,667.000 28,657.000 28,648.000 28,638.000 00 28,629.000 28,620.000 28,610.000 28,601.000 28,592.000 50 28,582.000 28,573.000 28,563.000 28,554,000 28,545.000 000 28,535.000 28,526.000 28,517.000 28,507.000 28,498.000 50 28,489.000 28,479.000 28,470.000 28,461.000 28,452.000 00 28,442.000 28,433.000 28,424.000 28,414.000 28,405.00087 7so 28,396.000 28,3.000 28,377.000 28,368.000 28,359.000 00 28,350.000 28,341.000 28,331.000 28,322.000 28,313.000 50 28,304.000 28,295.000 28,285.000 28,276.000 28,267.000 00 28,258.000 28,249.000 28,240.000 28,230.000 28,221.000 50 28,212.000 28,203.000 28,194.000 28,185.000 28,176.000 00 28,167.000 28,158.000 28,148.000 28,139.000 28,130.000 50 28,121.000 28,112.000 28,103.000 28,094.000 28,085.000 00 28,076.000 28,067.000 28,058.000 28,049.000 28,040.000 7so 28,031.000 28,022.000 28,013.000 28,004.000 27,995.000 000 27,986.000 27,977.000 27,968.000 27,959.000 27,950.000 50 27,941.000 27,932.000 27,923.000 27,914.000 27,905.000 00 27,896.000 27,887.000 27,878.000 27,870.000 27,861.000 750 27,852.000 27,843.000 27,834.000 27,825.000 27,816.000 00 27,807.000 27,798.000 27,790.000 27,781.000 27,772.000 50 27,763.000 27,754.000 27,745.000 27,737.000. 27,728.000 00 27,719.000 27,710.000 27,701.000 27,693.000 27,684.000 50 27,675.000 27,666.000 27,657.000 27,649.000 27,640.000 00 27,631.000 27,622.000 27,614.000 27,605.000 27,596.000 50 27,587.000 27,579.000 27,570.000 27,561.000 27,553.000 00 27,544.000 27,535.000 27,527.000 27,518.000 27,509.000 50 27,501.000 27,492.000 27,483.000 27,475.000 27,466.000 00 27,457.000 27,449.000 27,440.000 27,431.000 27,423.000 50 27,414.000 27,405.000 27,397.000 27,398.000 27,380.000 00 27,371.000 27,363.000 27,354.000 27,345.000 27,337.000 50 27,328.000 27,320.000 27,311.000 27,303.000 27,294.000 00 27,286.000 27,277.000 27,268.000 27,260.000 27,251.000 50 27,243.000 27,234.000 27,226.000 27,217.000 27,209.000 00 27,201.000 27,192.000 27,184.000 27,175.000 27,167.000 50 27,158.000 27,150.000 27,141.000 27,133.000 27,124.000 00 27,116.000 27,108.000 27,099.000 27,091.000 27,082.000 50 27,074.000 27,066.000 27,057.000 27,049.000 27,040.000 00 27,032.000 27,024.000 27,015.000 27,007.000 26,999.000 50 26,990.000 26,982.000 26,974.000 26,965,000 26,957.000 00 26,949.000 26,940.000 26,932.000 26,924.000 26,915.000 50 26,907.000 26,899.000 26,891.000 26,882.000 26,874.000 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack V8i [08.11.01.541 Page 9 of 27 FICEIVE 1AN 3 12013 Y. Subsection: Time vs. Volume Label: BMP 3 Return Event: 10 years Storm Event: Devil Dog - 10 Year Time vs. Volume (ft3) Output Time increment = 0.050 hours Time on left represents time for first value in each row. -- - Time --- , Volume-� .. -.. -- Volume - -- Volume _ Volume Volume f (hours) (ft3) '. ,(ft3) (ft3) (fta) (ft3) 21.500 26,866.000 26,858.000 26,849.000 26,841.000 26,833.000 21.750 26,825.000 26,816.000 26,808.000 26,800.000 26,792.000 22.000 26,783.000 26,775.000 26,767.000 26,759.000 26,751.000 22.250 26,743.000 26,734.000 26,726.000 26,718.000 26,710.000 22.500 26,702.000 26,694.000 26,685.000 26,677.000 26,669.000 22.750 26,661.000 26,653.000 26,645.000 26,637.000 26,628.000 23.000 26,620.000 26,612.000 26,604.000 26,596.000 26,588.000 23.250 26,580.000 26,572.000 26,564.000 26,556.000 26,548.000 23.500 26,540.000 26,532.000 26,524.000 26,515.000 26,507.000 23.750 26,499.000 26,491.000 26,483.000 26,475.000 26,467.000 24.000 26,459.000 26,451.000 26,443.000 26,435.000 26,427.000 24.250 26,419.000 26,411.000 26,403.000 26,396.000 26,388.000 24.500 26,380.000 26,372.000 26,364.000 26,356.000 26,348.000 24.750 26,340.000 26,332.000 26,324.000 26,316.000 26,308.000 25.000 26,300.000 26,292.000 26,285.000 26,277.000 26,269.000 25.250 26,261.000 26,253.000 26,245.000 26,237.000 26,230.000 25.500 26,222.000 26,214.000 26,206.006 26,198.000 26,190.000 25.750 26,182.000 26,175.000 26,167.000 26,159.000 26,151.000 26.000 26,143.000 26,136.000 26,128.000 26,120.000 26,112.000 26.250 26,105.000 26,097.000 26,089.000 26,081.000 26,073.000 26.500 26,066.000 26,058.000 26,050.000 26,042.000 26,035.000 26.750 26,027.000 26,019.000 26,012.000 26,004.000 25,996.000 27.000 25,988.000 25,981.000 25,973.000 25,965.000 25,958.000 27.250 25,950.000 25,942.000 25,935.000 25,927.000 25,919.000 27.500 25,912.000 25,904.000 25,896.000 25,889.000 25,881.000 27.750 25,874.000 25,866.000 25,858.000 25,851.000 25,843.000 28.000 25,835.000 25,828.000 25,820.000 25,813.000 25,805.000 28.250 25,798.000 25,790.000 25,782.000 25,775.000 25,767.000 28.500 25,760.000 25,752.000 25,745.000 25,737.000 25,730.000 28.750 25,722.000 25,714.000 25,707.000 25,699.000 25,692.000 29.000 25,684.000 25,677.000 25,669.000 25,662.000 25,654.000 29.250 25,646.000 25,639.000 25,630.000 25,622.000 25,614.000 29.500 25,606.000 25,598.000 25,589.000 25,581.000 25,573.000 29.750 25,S65.000 25,557.000 25,549.000 25,541.000 25,533.000 30.000 25,525.000 25,516.000 25,508.000 25,500000 25,492.000 30.250 25,484.000 25,476.000 25,468.000 25,460.000 25,453.000 30.500 25,445.000 25,437.000 25,429.000 25,421.000 25,413.000 30.750 25,405.000 25,397.000 25,389,000 25,382.000 25,374.000 31.000 25,366.000 25,358.000 25,351.000 25,343.000 25,335.000 31.250 25,327.000 25,320.000 25,312.000 25,304.000 25,296.000 31.500 25,289.000 25,281.000 25,274.000 25,266.000 25,258.000 31.750 25,251.000 25,243.000 25,236.000 25,228.000 25,220.000 32.000 25,213.000 25,205.000 25,198.000 25,190.000 25,183.000 Bentley Systems, Inc. Haestad Methods Solution BMP 3.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1.203-755-1666 t n.. Bentley PondPack V8i 108.11of1 541 Page 10 of 27 Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Output Time increment = 0.050 hours Time on left represents time for first value in each re Time Volume Volume Volume Volume (hours) (ft3) (ft3) (ft3) (ft3) 32.250 25,175.000 25,168.000 25,161.000 25,153.000 32.500 25,138.000 25,131.000 25,123.000 25,116.000 32.750 25,101.000 25,094.000 25,087.000 25,079.000 33.000 25,065.000 25,058.000 25,050.000 25,043.000 33.250 25,029.000 25,021.000 25,014.000 25,007.000 33.500 24,993.000 24,986.000 24,978.000 24,971.000 33.750 24,957.000 24,950.000 24,943.000 24,936.000 34.000 24,922.000 24,915.000 24,908.000 24,901.000 34.250 24,887.000 24,880.000 24,873.000 24,866.000 34.500 24,852.000 24,845.000 24,838.000 24,831.000 34.750 24,817.000 24,811.000 24,804.000 24,797.000 35.000 24,783.000 (N/A) (N/A) (N/A) BMP 3.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-75Si666 Return Event: 10 years Storm Event: Devil Dog - 10 Year W. Volume (ft3) 25,146.000 25,109.000 25,072.000 25,036.000 25,000.000 24,964.000 24,929.000 24,894.000 24,859.000 24,824.000 24,790.000 (N/A) Bentley PondPack V8i [08,11.01,541 Page 11 of 27 31 EI@0E R JAN 3 12013 Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Return Event: 100 years Storm Event: Devil Dog - 100 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume .. Volume (hours) (ft3) (ft3) (ft3).(ft3) (ft3)- 0.000 20,773.000 20,962.000 21,538.000 22,524.000 23,957.000 0.250 25,668.000 27,267.000 28,892.000 30,541.000 32,106,000 0.500 33,358.000 34,119.000 34,425.000 34,311.000 34,011.000 0.750 33,737.000 33,488.000 33,262.000 33,055.000 32,867,000 1.000 32,696.000 32,539.000 32,397.000 32,267.000 32,149.000 1.250 32,041.000 31,942.000 31,853.000 31,771.000 31,696.000 1.500 31,628.000 31,566.000 31,509.000 31,457.000 31,410.000 1.750 31,367.000 31,328.000 31,292.000 31,259.000 31,230.000 2.000 31,202.000 31,178.000 31,155.000 31,134.000 31,115.000 2.250 31,098.000 31,082.000 31,068.000 31,055.000 31,043.000 2.500 31,032.000 31,021.000 31,010.000 30,999.000 30,988.000 2.750 30,977.000 30,966.000 30,955.000 30,945.000 30,934.000 3.000 30,923.000 30,912.000 30,901.000 30,890.000 30,879.000 3.250 30,868.000 30,857.000 30,847.000 30,836.000 30,825.000 3.500 30,814.000 30,803.000 30,792.000 30,782.000 30,771.000 3.750 30,760,000 30,749.000 30,738.000 30,728.000 30,717.000 4.000 30,706.000 30,695.000 30,685.000 30,674.000 30,663.000 4.250 30,652.000 30,642.000 30,631.000 30,620.000 30,610.000 4.500 30,599.000 30,588.000 30,577.000 30,567.000 30,556.000 4.750 30,545.000 30,535.000 30,524.000 30,514.000 30,503.000 5.000 30,492.000 30,482.000 30,471.000 30,460.000 30,450.000 5.250 30,439.000 30,429.000 30,418.000 30,408.000 30,397.000 5.500 30,386.000 30,376.000 30,365.000 30,355.000 30,344.000 5.750 30,334.000 30,323.000 30,313.000 30,302.000 30,292.000 6.000 30,281.000 30,271.000 30,260.000 30,250.000 30,239.000 6.250 30,229.000 30,219.000 30,208.000 30,198.000 30,187.000 6.500 30,177.000 30,166.000 30,156.000 30,146.000 30,135.000 6.750 30,125.000 30,114.000 30,104.000 30,094.000 30,083.000 7.000 30,073.000 30,063.000 30,052.000 30,042.000 30,032.000 7.250 30,021.000 30,011.000 30,001.000 29,990.000 29,980.000 7.500 29,970.000 29,960.000 29,949.000 29,939.000 29,929.000 7.750 29,919.000 29,908.000 29,898.000 29,888.000 29,878.000 8.000 29,867.000 29,857.000 29,847.000 29,837.000 29,827.000 8.250 29,817.000 29,806.000 29,796.000 29,786.000 29,776.000 8.500 29,766,000 29,756.000 29,745.000 29,735.000 29,725.000 8.750 29,715.000 29,705.000 29,695.000 29,685.000 29,675.000 9.000 29,665.000 29,655.000 29,645.000 29,634.000 29,624.000 9.250 29,614.000 29,604.000 29,594.000 29,584.000 29,574.000 9.500 29,564.000 29,554.000 29,544.000 29,534.000 29,524.000 9.750 29,514.000 29,504.000 29,494.000 29,484.000 29,474.000 10.000 29,464.000 29,455.000 29,445.000 29,435.000 29,425.000 10.250 29,415.000 29,405.000 29,395.000 29,385.000 29,375.000 10.500 29,365.000 29,355.000 29,346.000 29,336.000 29,326.000 BMP 3.ppc 1117Y2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley Pond Pack V8i [08.11.01.541 Page 12 of 27 Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Output Time increment = 0.050 hours Return Event: 100 years Storm Event: Devil Dog - 100 Year Time on left represents time for first value in each row. � Time Volume Volume. Volume volume Volume (hours) (ft3) (ft3) (ft3) .' ,. (ha), (ft3) 10.750 29,316.000 29,306.000 29,296.000 29,286.000 29,277.000 11.000 29,267.000 29,257.000 29,247.000 29,237.000 29,228.000 11.250 29,218.000 29,208.000 29,198.000 29,189.000 29,179.000 11.500 29,169.000 29,159.000 29,150,000 29,140.000 29,130.000 11.750 29,120.000 29,111.000 29,101.000 29,091.000 29,082.000 12.000 29,072.000 29,062.000 29,052.000 29,043.000 29,033.000 12.250 29,023.000 29,014.000 29,004.000 28,995.000 28,985.000 12.500 28,975.000 28,966.000 28,956.000 28,946.000 28,937.000 12.750 28,927.000 28,918.000 28,908.000 28,898.000 28,889.000 13.000 28,879.000 28,870.000 28,860.000 28,851.000 28,841.000 13.250 28,832.000 28,822.000 28,813.000 28,803.000 28,794.000 13.500 28,781.000 28,775.000 28,765.000 28,756.000 28,746.000 13.750 28,737.000 28,727.000 28,718.000 28,708.000 28,699.000 14.000 28,689.000 28,680.000 28,670.000 28,661.000 28,652.000 11.250 28,642.000 28,633.000 28,623.000 28,614.000 28,605.000 14.500 28,595.000 28,586.000 28,576,000 28,567.000 28,558.000 14.750 28,548.000 28,539.000 28,530.000 28,520.000 28,511.000 15.000 28,502.000 28,492.000 28,483.000 28,474.000 28,465.000 15.250 28,455.000 28,446.000 28,437.000 28,427.000 28,418.000 15.500 28,409.000 28,400.000 28,390.000 28,381.000 28,372.000 15.750 28,363.000 28,353.000 28,344.000 28,335.000 28,326.000 16.000 28,317.000 28,307.000 28,298.000 28,289.000 28,280.000 16.250 28,271.000 28,262.000 28,252.000 28,243.000 28,234.000 16.500 28,225.000 28,216.000 28,207.000 28,198.000 28,188.000 16.750 28,179.000 28,170.000 28,161.000 28,152.000 28,143.000 17.000 28,134.000 28,125.000 28,116.000 28,107.000 28,098.000 17,250 28,089.000 28,080.000 28,070.000 28,061.000 28,052.000 17.500 28,043.000 28,034.000 28,025.000 28,016.000 28,007.000 17.750 27,998.000 27,989.000 27,980.000 27,971.000 27,962.000 18.000 27,954.000 27,945.000 27,936.000 27,927.000 27,918.000 18.250 27,909.000 27,900.000 27,891.000 27,882,000 27,873.000 18.500 27,864.000 27,855.000 27,816.000 27,838.000 27,829.000 18.750 27,820.000 27,811.000 27,802.000 27,793.000 27,784.000 19.000 27,775.000 27,767.000 27,758.000 27,749.000 27,740.000 19.250 27,731.000 27,722.000 27,714.000 27,705,000 27,696.000 19.500 27,687.000 27,678.000 27,670.000 27,661.000 27,652.000 19.750 27,643.000 27,635.000 27,626.000 27,617.000 27,608.000 20.000 27,600.000 27,591.000 27,582.000 27,573.000 27,565.000 20.250 27,556.000 27,547.000 27,539.000 27,530.000 27,521.000 20.500 27,513.000 27,504.000 27,495.000 27,487.000 27,478.000 20.750 27,469.000 27,461.000 27,452.000 27,443.000 27,435.000 21.000 27,426.000 27,418.000 27,409.000 27,400.000 27,392.000 21.250 27,383.000 27,375.000 27,366.000 27,357.000 27,349.000 Bentley Systems, Inc. Haestad Methods Solution BMP 3.ppc Center 1/17/2013 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08A 1.01.541 Page 13 of 27 ECEIVE JAN 3 12013 by:__ Subsection: Time vs. Volume Label: BMP 3 Time vs. Volume (ft3) Return Event: 100 years Storm Event: Devil Dog - 100 Year Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume - Volume Volume- _ 1 (hours) ,(fta) :_- - (ft') _.. (ha).. d_ (lr:3 (83) 21.500 27,340.000 27,332.000 27,323.000 27,315.000 27,306.000 21.750 27,297.000 27,289.000 27,280.000 27,272.000 27,263.000 22.000 27,255.000 27,246.000 27,238,000 27,229.000 27,221.000 22.250 27,212.000 27,204.000 27,195.000 27,187.000 27,178.000 22.500 27,170.000 27,162.000 27,153.000 27,145.000 27,136.000 22.750 27,128.000 27,119.000 27,111.000 27,103.000 27,094.000 23.000 27,086.000 27,077.000 27,069.000 27,061.000 27,052.000 23.250 27,049.000 27,035.000 27,027.000 27,019.000 27,010.000 23.500 27,002.000 26,994.000 26,985.000 26,977.000 26,969.000 23.750 26,960.000 26,952.000 26,944.000 26,935.000 26,927.000 24.000 26,919.000 26,910.000 26,902.000 26,894.000 26,886.000 24.250 26,877.000 26,869.000 26,861.000 26,853.000 26,844.000 24.500 26,836.000 26,828.000 26,820.000 26,811.000 26,803.000 24.750 26,795.000 26,787.000 26,779.000 26,770.000 26,762.000 25.000 26,754.000 26,746.000 26,738.000 26,729.000 26,721.000 25.250 26,713.000 26,705.000 26,697.000 26,689.000 26,680.000 25.500 26,672.000 26,664.000 26,656.000 26,648.000 26,640.000 25.750 26,632.000 26,624.000 26,616.000 26,607.000 26,599.000 26.000 26,591.000 26,583.000 26,575.000 26,567.000 26,559.000 26.250 26,551.000 26,543.000 26,535.000 26,527.000 26,519.000 26.500 26,511.000 26,503.000 26,495.000 26,487.000 26,479.000 26.750 26,471.000 26,463.000 26,455.000 26,447.000 26,439.000 27.000 26,431.000 26,423.000 26,415.000 26,407.000 26,399.000 27.250 26,391.000 26,383.000 26,375.000 26,367.000 26,359.000 27.500 26,351.000 26,343.000 26,335.000 26,327.000 26,319.000 27.750 26,311.000 26,304.000 26,296.000 26,298.000 26,280.000 28.000 26,272.000 26,264.000 26,256.000 26,248,000 26,240.000 28.250 26,233.000 26,225.000 26,217.000 26,209.000 26,201.000 28.500 26,193.000 26,186.000 26,178.000 26,170.000 26,162.000 28.750 26,154.000 26,147.000 26,139.000 26,131.000 26,123.000 29.000 26,115.000 26,108,000 26,100.000 26,092.000 26,084.000 29.250 26,077.000 26,069.000 26,061.000 26,053.000 26,046.000 29.500 26,038,000 26,030.000 26,022.000 26,015.000 26,007.000. 29,750 25,999.000 25,992.000 25,984.000 25,976.000 25,968.000 30.000 25,961.000 25,953.000 25,945.000 25,938.000 25,930.000 30.250 25,922.000 25,915.000 25,907.000 25,899.000 25,892,000 30.500 25,884.000 25,877.000 25,869.000 25,861.000 25,854.000 30.750 25,846.000 25,838.000 25,831.000 25,823.000 25,816.000 31.000 25,808.000 25,801.000 25,793.000 25,785.000 25,778.000 31.250 25,770.000 25,763.000 25,755.000 25,748.000 25,740.000 31.500 25,732.000 25,725.000 25,717.000 25,710.000 25,702.000 31.750 25,695.000 25,687.000 25,680.000 25,672.000 25,665.000 32.000 25,657.000 25,650.000 25,642.000 25,634.000 25,625.000 Bentley Systems, Inc. Haestad Methods Solution BMP 3.ppc Center 1/17/2013 27 Semen Company Drive Suite 200 W Watertown, CT 06795 USA i1-203-755-1666 Bentley PondPack V8i [08.11.01, 541 Page 14 of 27 Subsection: Time vs. Volume Return Event: 100 years Label: BMP 3 1 Storm Event: Devil Dog - 100 Year Time vs. Volume (ft3) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume.- Volume Volume - Volume I ':`(hours). r. (h3).,, :....(ft3) (ft3) (ft3) (ft3) 32.250 25,617.000 25,609.000 25,601.000 25,593.000 25,585.000 32.500 25,576.000 25,568.000 25,560.000 25,552.000 25,544.000 32.750 25,536.000 25,528.000 25,520.000 25,512.000 25,504.000 33.000 25,496.000 25,488.000 25,480.000 25,472.000 25,464.000 33.250 25,456.000 25,448.000 25,440.000 25,432.000 25,424.000 33.500 25,416.000 25,408.000 25,400.000 25,393.000 25,385.000 33.750 25,377.000 25,369.000 25,361.000 25,354.000 25,346.000 34.000 25,338.000 25,330.000 25,323.000 25,315.000 25,307.000 34.250 25,300.000 25,292.000 25,284.000 25,277.000 25,269.000 34.500 25,261.000 25,254.000 25,246.000 25,239.000 25,231.000 34.750 25,223.000 25,216.000 25,208.000 25,201.000 25,193.000 35.000 25.186.000 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BMP 3.ppc Center [08.11.01.541 1/1712013 27 Siemon Company Drive Suite 200 W Page 15 of 27 Watertown, CT 06795 USA t1-203-755-1666 F VE Subsection: Elevation -Area Volume Curve Return Event: 100 years Label: BMP 3 Storm Event: Devil Dog - 100 Year v_, . _ _ r ... ,__,__.. _-e ._ .._ Elevation' Planimeter � Area' Al+A2+5gr(Al*A Volume Volume (Total) I (ft) (ft') (h2) 2) (fta). (fta) 16.00 0.0 3,549.000 0.000 0.000 0.000 17.00 - 0.0 4,908.000 12,630.547 4,210.000 4,210.000 18.00 0.0 6,108.000 16,491.223 5,497.000 9,707.000 19.00 0.0 7,700.000 20,665.959 6,889.000 16,596.000 19.50 0.0 9,024.000 25,059.754 4,177.000 20,773.000 20.00 0.0 10,490.000 29,243.428 4,874.000 25,646.000 21.00 0.0 11,637.000 33,175.626 11,059.000 36,705,000 22.00 0.0 12,830.000 36,685.949 12,229.000 48,934,000 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BMP 3.ppc Center [08.11.01 S l] 1/17/2013 27 Siemon Company Drive Suite 200 W Page 16 of 27 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Outlet Input Data Label: Outlet 1 BMP 3.ppc 1/17/2013 Requested Pond Water Surface Elevations Return Event: 100 years Storm Event: Devil Dog - 100 Year Minimum (Headwater) 16.00 ft Increment (Headwater) 0.50 ft Maximum (Headwater) 22.00 ft Outlet Connectivity I Structure Type Outlet ID Direction Outfall El E2 (ft) (ft). Rectangular Weir WO Forward CO 20.50 22.00 Inlet Box RO Forward CO 21.50 22.00 Orifice -Circular 00 Forward CO 19.50 22.00 Culvert -Circular CO Forward TW 19.00 22.00 Tailwater Settings Tailwater (N/A) (N/A) Bentley Systems, Inc. Haested Methods Solution Center 27 Siemon Company Olive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08.11,01,541 Page 17 of 27 E C E I Y E JAN 3 12013 BY: Subsection: Outlet Input Data Label: Outlet 1 Return Event: 100 years Storm Event: Devil Dog - 100 Year Structure ID: CO Structure Type: Culvert -Circular Number of Barrels 1 Diameter 15.0 in Length 50.00 ft Length (Computed Barrel) 50.00 ft Slope (Computed) 0.005 ft/ft Outlet Control Data Manning's n 0.013 Ke 0.200 Kb 0.023 Kr 0.000 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio (HW/D) 1.093 T2 ratio (HW/D) 1.195 Slope Correction Factor -0.500 Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... TI Elevation 20.37 ft TS Flow 4.80 ft3/s T2 Elevation 20.49 ft T2 Flow 5.49 ft3/S BMP 3.ppc 1117,2013 s Bentley Systems, Inc. Haestad Methods Solution Center 27 Sidman Company Drive Suite 200 W Watertown, CT 06795 USA +1.203.755-1666 Bentley Pond Pack Val 108.11.01.541 Page 18 of 27 Bentley Systems, Inc. Haestad Methods Solution Center 27 Sidman Company Drive Suite 200 W Watertown, CT 06795 USA +1.203.755-1666 Bentley Pond Pack Val 108.11.01.541 Page 18 of 27 Subsection: Outlet Input Data Label: Outlet 1 BMP 3.ppc 1/17/2013 Return Event: 100 years Storm Event: Devil Dog - 100 Year Structure ID: 00 Structure Type: Orifice -Circular Number of Openings 1 Elevation 19.50 ft Orifice Diameter 1�5-io` —)�, D;�� Orifice Coefficient 0.600 Structure ID: RO Structure Type: Inlet Box Number of Openings 1 Elevation 21.50 ft Orifice Area 8.2 ft' Orifice Coefficient 0.600 Weir Length 12.80 ft Weir Coefficient 2.80 (ft^0.5)/s K Reverse 1.000 Manning's n 0.000 Key, Charged Riser 0.000 Weir Submergence False Orifice H to crest False Structure ID: WO Structure Type: Rectangular Weir Number of Openings 1 Elevation 20.50 ft Weir Length 3.00 ft Weir Coefficient 2.80 (ft^0.5)/s Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Downstream Channel Catalog Conduit Swale Channel Slope 0.005 ft/ft Channel Invert Elevation 18.00 ft Convergence Tolerances Maximum Iterations 40 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 It (Maximum) Headwater Tolerance 0.01 ft (Minimum) Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W. Watertown, CT 06795 USA a1-203-755-1666 Bentley PondPack V8i [08.11.01.541 Page 19 of 27 Fr3EIVE JAN 3 12013 BY: Subsection: Outlet Input Data Label: Outlet 1 BMP 3.ppc 1/17/2013 Return Event: 100 years Storm Event: Devil Dog - 100 Year Convergence Tolerances Headwater Tolerance 0.50 k (Maximum) Flow Tolerance (Minimum) 0.001 k3/s Flow Tolerance (Maximum) 10.000 k3/s Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA t1-203-755-1666 Bentley PondPack Val [08.11.01, 541 Page 20 of 27 Subsection: Elevation -Volume -Flow Table (Pond) Label: BMP 3 Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 19.50 fit Initial) Volume (Initial) 20,773.000 ft3 Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Return Event: 100 years Storm Event: Devil Dog - 100 Year Elevation Outflow Storage Aiea. Infiltration Flow (Total) - - 25/D+ O (ft) ' (ft3/5);, (ft3) : (ft2) .,.(ft3/5) (11:3/5) (ft3/5).. 1 16.00 0.00 0.000 3,549.000 0.00 0.00 0.00 16.50 0.00 1,935.216 4,201.023 0.00 0.00 21.50 17.00 0.00 4,210.182 4,908.000 0.00 0.00 46.78 17.50 0.00 6,808.719 5,491.611 0.00 0.00 75.65 18.00 0.00 9,707.256 6,108.000 0.00 0.00 107.86 18.50 0.00 12,952.583 6,880.979 0.00 0.00 143.92 19.00 0.00 16,595.909 7,700.000 0.00 0.00 184.40 19.50 0.00 20,772.535 9,024.000 0.00 0.00 230.81 20.00 0.09 25,646.440 10,490.000 0.00 0.04 285.00 20.50 0.06 31,032.336 11,056.063 0.00 0.06 344.86 21.00 2.93 36,704.982 11,637.000 0.00 2.93 410.77 21.50 6.70 42,670.181 12,226.224 0.00 6.71 480.82 22.00 9.14 48,933,631 12,830.000 0.00 9.14 552.85 BMP 3.ppc 1/1V2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA a1-203-755-1666 Bentley PondPack V8i 108.11.01.541 Page 21 of 27 ECFR'%f JAN 3 12013 BY: Subsection: Level Pool Pond Routing Summary Return Event: 2 years Label: BMP 3 (IN) Storm Event: Devil Dog - 2 Year Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 19.50 ft Initial) Volume (Initial) 20,773.000 ft3 Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/5 Flow (Initial, Total) 0.00 ft3/s Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Flow (Peak In) 5.60 ft3/s Time to Peak (Flow, In) 0.200 hours Infiltration (Peak) 0.00 ft3/s Time to Peak (Infiltration) 0.600 hours Flow (Peak Outlet) 0.05 ft3/s Time to Peak (Flow, Outlet) 0.600 hours Elevation (Water Surface, 20.23 ft Peak) Volume (Peak) 28,068.136 ft3 Mass Balance (ft3) Volume (Initial) 20,773.000 R3 Volume (Total Inflow) 7,397.000 ft3 Volume (Total Infiltration) 362.000 ft3 Volume (Total Outlet 4,453.000 ft3 Outflow) Volume (Retained) 23,260.000 ft3 Volume (Unrouted) -95.000 ft3 Error (Mass Balance) 1.3 % Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BMP 3.ppc Center 106.11.01.54I 1/17/2013 27 Siemon Company Drive Suite 200 W Page 22 of 27 Watertown, CT 06795 USA + 1 -203-755-1666 i Subsection: Level Pool Pond Routing Summary Label: BMP 3 (IN) Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions . Elevation (Water Surface, 19.50 ft Initial) Volume (Initial) 20,773.000 fta Flow (Initial Outlet) 0.00 fta/s Flow (Initial Infiltration) 0.00 fta/s Flow (Initial, Total) 0.00 fta/s Time Increment 0.050 hours Return Event: 10 years Storm Event: Devil Dog - 10 Year Inflow/Outflow Hydrograph Summary Flow (Peak In) 7.35 fta/s Time to Peak (Flow, In) 0.200 hours Infiltration (Peak) 0.00 fta/s Time to Peak (Infiltration) 0.600 hours Flow (Peak Outlet) 0.06 fta/s Time to Peak (Flow, Outlet) 0.600 hours Elevation (Water Surface, 20.48 It Peak) Volume (Peak) 30,831.429 fta Mass Balance (W) ' Volume (Initial) 20,773.000 fta Volume (Total Inflow) 10,142.000 fta Volume (Total Infiltration) 374.000 fta Volume (Total Outlet 5,706.000 fta Outflow) Volume (Retained) 24,777.000 fta Volume (Unrouted) -58.000 fta Error (Mass Balance) 0.6 % BMP 3.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA i1-203-755-1666 Bentley PondPack Vai [08.11.01.541 Page 23 of 27 F C E I V E JAM 3 12013 BY: Subsection: Level Pool Pond Routing Summary Label: BMP 3 (IN) Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 0.0120 in/h Initial Conditions Elevation (Water Surface, 19.50 ft Initial) Volume (Initial) 20,773.000 ft3 Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/S Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Return Event: 100 years Storm Event: Devil Dog - 100 Year Flow (Peak In) 9.09 ft3/s Time to Peak (Flow, In) 0.200 hours Infiltration (Peak) 0.00 ft3/s Time to Peak (Infiltration) 0.600 hours Flow (Peak Outlet) 1.79 ft3/5 Time to Peak (Flow, Outlet) 0.600 hours Elevation (Water Surface, 20.80 ft Peak) Volume (Peak) 34,424.991 ft3 Mass Balance (ft3) Volume (Initial) 20,773.000 ft3 Volume (Total Inflow) 14,734.000 ft3 Volume (Total Infiltration) 377.000 ft3 Volume (Total Outlet 9,914.000 ft3 Outflow) Volume (Retained) 25,178.000 ft3 Volume (Unrouted) -37.000 ft3 Error (Mass Balance) 0.3 % BMP 3.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Bentley PondPack V8i [08A 1.01.541 Page 24 of 27 Subsection: C and Area (Pre -Development) Label: DA 3 Return Event: 2 years Storm Event: Devil Dog - 2 Year C and Area Results (Pre -Development) - _. __- ( Soil/Surface Description CCoeffioent � Area (ft2) _- Impervious _ 0.950 5,731.000 Unimproved 0.350 105,384.000 Weighted C & Total Area ---> 0.381 111,115.000 BMP 3.ppc 1/1712G13 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drys Suite 200 W Watertown, CT 06795 USA .1-203-755-1666 Area (Adjusted) i _— (ft2) -- -- [ (N/A) (N/A) 42,328.850 Bentley PondPack V8i [08.11.01.541 Page 25 of 27 111 JAN392013 BY:_�_ Subsection: C and Area (Post -Development) Return Event: 2 years Label: DA 3 Storm Event: Devil Dog - 2 Year C and Area Results Soil Surface Description -C Coefficient Area Area (Adjusted) r Impervious 0.950 17,777.000 (N/A) Grass 0.350 74,191.000 (N/A) Roof 0.900 19,147.000 (N/A) Weighted C & Total Area ---> 0.541 111,115.000 60,087.300 BMP 3.ppc 1/17/2013 Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT o6795 USA +1-203-755-1666 Bentley Pond Pack V8i [08A1.01.541 Page 26 of 27 Index B BMP 3 (Elevation -Area Volume Curve, 100 years) ... 16 BMP 3 (Elevation -Volume -Flow Table (Pond), 100 years) ... 21 BMP 3 (IN) (Level Pool Pond Routing Summary, 10 years) ... 23 BMP 3 (IN) (Level Pool Pond Routing Summary, 100 years) ... 24 BMP 3 (IN) (Level Pool Pond Routing Summary, 2 years) ... 22 BMP 3 (Time vs. Volume, 10 years) ... 8, 9, 10, 11 BMP 3 (Time vs. Volume, 100 years)... 12, 13, 14, 15 BMP 3 (Time vs. Volume, 2 years) ... 4, 5, 6, 7 D DA 3 (C and Area (Post -Development), 2 years) ... 26 DA 3 (C and Area (Pre -Development), 2 years) ... 25 M Master Network Summary ... 3 Modifed Rational Grand Summary ... 2 O Outlet 1 (Outlet Input Data, 100 years)... 17, 18, 19, 20 Bentley Systems, Inc. Haested Methods Solution Bentley PondPack V84 BMP 3.ppc Center [08.11.01.541 1/17/2013 27 Siemon Company Drive Suite 200 W Page 27 of 27 Watertown, CT 06795 USA +1-203-755-1666 11.: C-Eit'tJE pp JAN 3 12013 BY:— Ap x C NCDENR S lem ntal Forms a/313 CAJ 671Page Appendix D Culvert Calculations :CEOViE 72' Pa-g_-e JAN Q 1 2'019 FRO JF:C1' Camp Devil Dog Stnrinwn tar EnlmneRments SHEET UNITS OF FNGLISH CULVERT DESIGNER: REVIEWED: DESIGN MOP LRW FORM LD-269 DATE: DATE: UM41013 1/15Q013 ROAD Drlvawvy entrance COUNTY Onslow CULVERT CG-I/CG--2 NC HYDROLOGICAL DATA MRIRRI RATIONAL Dlaint, Area: 3.31 Acrts Time of Conccmati.n 12,042 Minutes DESIGN FLOWS - ShW Flff Eli- L^ 5- SKEW- LRv. LI. 23007,E ELIIWJ. ??.?] 2074 II ?op0 A 36 A a.] a Roadway B A _ Width 26 R ROADWAY &____________________________________________________ xwi '-- -------- -_ _ DEPRESSION Girt "n"Bed 0.013 ELEVATION vmmn _ ' 23.00 R __________ _"------ -------------_-_ Ele- Road LngM 800 FRrNvnrd, Shldr. LT.,. Rr[., ___ H T W DEPTH TW TW VGL Chl.]lnv.E1.. _ NEW ❑ Suface Type 068 23,00, ,. 120 226 2040 GRAVEL 0 A A it n R.L(ycars) FLOW(cB) 10 DasiR n _. 9.54 2 Clmck ].2] 10 Mnx. 9.61 CULVERT DESCRIPTION: TYPE: Single/Melliple Cooperating . Intel Edge D,WnpB011: 0re.vc Fnd PmjcclinS FOIAL PLOW Q 'r, FLOW PER BARREL QN c6 HEADW'A I ER CALCULAI IONS CONTROL HEADWATER ELEV It OUTLEF VEL on, MINIMUM SHOULDER ELEV. It COMMENTS INLET CONTROL OUI'LETCONtROL Sin le/Muhl Ie Confnmtin /Rmkd.Btwk Culvert IIW✓D IIWi B FAL L It ELIIWi It TW It do R (det DF2 It In 11 Iv 11 11 ELIw. R 'SMATERIAL SHAPE Siu(in) N Manninys &ln,ol. e CinvUr IS _ 0!01 9.54 4.9 1.14 1.3] (LOD 22,27 1.20 0.90 1.08 1.20 0.20 0.52 22.32 22.32 525 ]1] 16 0.84 0.9Y D00 21.84 1.07 0.]] 1.01 1.07 0,20 0.29 21,95 21.95 495 984 4.9 LN Ll] 0.00 22.27 L20 0.90 1.08 1,20 0.20 0.52 22.32 22.32 5,25 Ikroken Back C.H'eft TAH.WATER DATA: TAILWATER RESULTS: ROADWAY DATA: ROADWAY OVERTUPP1iG: LENGTH Ells. SEEN° annRl SNP Triangular 0.035 Deytar, t,G F4+a1im R FW dqM R Vittiry T, Slaw fare NSF and aY WidJFfl 26 Dix'brBe vIs TO appm6 DiklurBe C(S DtclTPing Ell-ai. 0 xOBom WidO.R Side Slope D:(H:IV) Side Sbpe R[ (HAV) Channel Slope, half 0.00 SnrWt,I W GRAVEL 3.D0 DeV, ?1411 120 2,26 045 Top of Road Elevation. It 23 kn.' 0 0.tt0 3.00 k 21AX 1.07 2.10 040 Length of Road, It gm hek 0 O.W 0.0060 Mu, 21.60 110 2,26 0,45 Mug. 0 11.Iq Dialewe Elavmion TECHNICAL FOOTNOTES: (1) USE Q/NB FOR BOX CULVERTS (4)ELhi-HWi+ELi(INVERI' OF INLET' CONTROL SECTION) (6)he-IWOT (dc+ D12)(WHICHEVER IS GREATER) (2)HWi/D=HW/D OR HWi/D FROM DESIGN CHARTS (5) TW BASED ON DOWNSTREAM CONTROL OR FLOW (])H-H+kc+(29ti LVR`"If2g (3) FALL = DWI - O:LH Wd - ELSO; FALL IS ZERO FOR CULVERTS ON GRADE DEPTH IN CHANNEL SUBSCRIPT DEFINITIONS: COMMENTS / DISCUSSION: CULVERT BARREL SELECTED HWd DESIGN HEADWATER I INLET SIZE: n. IIWi IIW IN NLIa'C'ON'I ROL o OUI LEI' SHAPE: MA'I TRIAL: HIV. HW IN OUT' LET CONTROL of SlrtambNENTRANCE: Co+cuh dO Gcc PROJECT Camp Devil Dog St.'an" lef Enhancememe SHEET UNITS OF ERGLISH CULVERT DESIGNER: REVIEWER: DESIGN MIP LRW FORM LD-269 DATE: DATE: 1/142013 - I/152013 ROAD Perimeter Road COUNTY O.aI.W - - -- NC CULVERT CO-31064 HY DROLOGICLL DATA Mclhod: INPUT Drainage Area: 0.3 Tim, of Conccnlration 5 DESIGN FLOW'S Shldr.Eln'.LL- EkPm lili- L- S- SKEW- _..22.W ELHWJ• 21w .. - 0.00 It 21.2n 0 054% a° Road.n, Width 26 6 ROADWAY R It ____________________________________________________ -/ x.i - -- -- DEPRESSION 11in, en" Bed .0D F.LEVA'DON SamnnN 24.0U It __________ ------------------- F1, Read Length 400 Fhm esrd• Shldn Elw.Rv' ___ H 1 W DEPfII TW TW VEL. Clumd I -EL. 21W a SaLux type am 22.60 -{R . 0.19 1,11 20.80 GRAVEL It It p It R.L(ycan) FLOW(cfi) 10 2 10 Design Chmk M.. 1.69 13] 1,69 CULVERT DESCRI PI' ION: TYPE: Single/.Multiple C.onfornaing Inlet Edge Description: Groove End Projecting TAM, FLOW Q Its FLOW PER BARREL ON cfs HEADWATER CALCULAT IONS CONTROL HRAUWAFER ELEV It OIR'LEF VEL fpe MINIMUM SHOULDER ELEV. 11 COMMENTS INLGr CONTROL OWLEI 'CONI ROL Single IMultile Conforaning I Broken Back Culverts HW✓D HW1 R FALL R ELHWi R TW It de It (WDV2 11 M It kn 11 a EI.Hwo 11 MATERIAL SHAPE SicI(in) N Meanings C..IN,e Circular 15 1 0.01 169 1.7 0.59 0.55 0.00 21.75 0.19 0.52 0.89 0.88 0.20 0.06 21.94 21.94 3.54 1.27 13 0.54 046 0.00 21.66 0.16 0A5 0,85 OF5 020 003 21,89 21.88 321 1.69 1.7 0.59 0.55 000 21.75 0.19 0.52 0.89 0.88 0.20 0.06 2Lw 21.94 3.54 Brake. hack C.Ivert I'AILWA'FER DATA: I'AILWA'I'ER RESULTS: -40.J2 ADWAY DATA: ROADWAYOVER'1'OPPINC: LENGTH El- SKEW. 'Mnncl.St., TnPvmdal 0.035 Iisoles, rr E0. lion It Fbx' depth a Vionty fps da., Width,It 26 Oisclurpe a, ononaring Discharge CIS (Nmgtpmg Elewlim 0 Rdtmnwiam,n Side Slope LI: (H:I V) See Slope RC (H:IV) Channel Slope, NR 6.00 face Tvpc GRAVEL 3.00 i, 20.99 a19 L33 of Road Elevation, It 34 i, 0 000 3.00 hak 21IM; 0.In 1,20 gth of Road It 400 honk 0 000 0.0100 Mu. 20.99 0.19 1.33 Has, 0 0.00 Iilae TECI IS I CAL FOO fN'OTF.S: (O USE QMB FOR BOX CULVERTS tat ELhi-I1Wi+ELi(INVER'I' OF I NLEI' CONI7ROL5EC 1ON) (6)ho-I WOF(d,+ D2)(WHICHEVER IS GREATER) (2)HWUD-HW/D OR HWUD FROM DESIGN CHARTS (5) TW RASED ON DOWNSTREAM CONTROL OR FLOW (])H-(I+ke+(29n'LYRI'"(a`/2g (3) FAI.I,- H WI. (IiLHWd- I!LeO; FALI.IS ZIIRO FGR Cl1LVElt'FS ON GRADE DEPf11 IN CHANNEL SURSCRI PI' DF.FINI'HONS: COMMENTS / DISCUSSION: CULVERT' BA RRF.L SELECTED HWd DESIGN HEADWATER i INLET SIZE: n. IIWi I IW IN I,NLE I' CON'IAOI, OU I'LEf SI TAPE: MATERIAL: HW. HW IN DO I LET CONTROL of Slteambcd ENTRANCE: (9 oulvcrt face ECEIVE - JAN 3 12013 BY:_ J. PROJECI Camp Des' it Dog Stormwnter Enhancements - SHEIEi UNITS OF F.N(. hISH CULVERT DESIGNER. REVIEWER: MAP LAW DESIGN FORM DATE: DAIR: 1/142013 1/IS2011 t ROAD. sS s, COMMAND POST ROAD COUNTY ONSLOW CULVERT C(i4/CG-8 NC BYDROLOGICAL DATA Meshed: INPUT' Drame, Arta: 10,15 Tim, ofCraccltruint 20 DESIGSFLOVIS Si F.Is1- LI L- S- SKEW- Ek-L, ,2080_ 1 ELIIWd. R124 Von a 17,10 fl 38 0 095: 0° Roadway 0 0 _ Width Is OF ROADWAY ___----- _----------- Hw1 ----------------- - - - ___-„ EXPRESSION em. "n"Bed 0.01) ELEVATION _------------------------------- Simim Rd 2I.00 R __________ ______ "�--(.Tvmel plo„ good Lmph 200 F.bxurd- SNJr. EIe', R1^ ___ H TW DEPrfI TW T\V VEL. lnv Fl. 16.N0 0 SOR.Tyd 2Sn 2080 ' 0,56 2,'0 I6 N0 s GRAVEL 9 fl ❑ it fl R.1. Ods") FLOW (cfs) 10 Design 4,$2 2 Check 191 100 Max, $.35 C ULVE RT DESCRI PTION: TYPE: Singlc/Mulliple Conforndng Inlel EdKe Description: Square edgaw/Leadwall TOTAL FLOW O tlY FLOW PER BARREL ON is If EADW'A"fEII CALCULATION S C(]NfROL IIEADWVFER ELEV R ODUT VEL Fps MINIMUM SHOULDER ELEV, It COMMEMS INLCTCONTROL OUTLET CONTROL Single / MultiIe Contomsin / Bsnken Back Culver,' HWLD flwi fl FALL II ELIIW, tl TW p do p (du DF2 tt M II to If X ELIIWo It MATERIAL SHAPE Sizc (in) N Manning, Cncrt¢ CI¢Wer 24 I 0.01 4.52 4.5 0.57 0.79 000 17.89 0.56 0.75 138 1.37 0.50 0.06 18.24 H(24 5.16 191 19 0,49 OA8 RIM 17.59 0.36 0.48 1.24 1.24 0.50 001 18.05 18.05 4.02 8,35 8A 0.72 120 000 18.30 0.76 1.03 1.52 152 0.50 0.22 I$.53 18.53 6.10 Broken [lack Culvert TAHAVAIER DATA: ITILWA'TER RESULTS: ROADWAY DATA: ROADWAY OVERUPPING: LENGTH Ell SKEW.'hannel Slope Tnpaddsl "" D035 Oiwe"" eB F"4 lion n Flex' aNU n Viociry fps SM1ur lm.< PSI oWxay WiSltX 19 Dissiu. ifs O,encppinN Dirdir¢• GIs O"sol Ell IF Ronan Widl6. It Side Slope lBLIV) Side Sbpe Rt(H:1 V) cannot Slaps, AIR 2.00 sinfic.1,x GRAVEL 3.00 {ln 17.36 0.56 2.20 035 Top of Road Elevation, R 21 krlp' 0 0.00 3D0 hak 17A6 0.31i 1.73 022 Length of Road, fl 200 -hack 0 ILW 0.0100 17.51, 076 2,59 U.J] 0 pro loalirm TECHNICAL FOOTNOTES- (H USE QNB FOR BOX CULVERTS (4)ELhi-HWe+ELi(INVERT OF INLET CONTROL SECTION) (6)ho-I W or Ric +D12 (WHICH EVER IS GREATER) 12) H W i/D- H W/D OR li W i/D FROM DESIGN CHARTS (5) TW BASED ON DOWNSTREAM CONTROL OR FLO W (7) H - I I +kc+(29n'LyR"Idag (3) FALL - LOW[ [ - (Ii ,HW,J - EL,T; FALL IS ZFR0 FOR CULVERTS ONGRADE DEPTH IN CHANNEL SUBSCRI P I' DEFIN'I'I IONS: COMMENTS / DISCUSSION: CULV f;NT' BAILRF.I. Sk:1.EC1'Y:D Hwd DESIGN HEADWATER i INLET IZE: 24' re 0.013 BW'i HOWIN INLETCON'EROL o OU11I117 SHAPE: MATERIAL: RCP H. HW IN OUILEI"CONTROL sf Sod,nol d E_IEANCE: HEADWALL © culvert face PROJECT Camp Devil D.R Striranander Enhancements SHEET UNITS OF ERGLISH - - CULVERT DESIGNER: REVIEWER: M.IP LRW' DESIGN FORM - DATE: - DATE: 1/M013 1/15iQ013 ROAD Entrance COUNTY ONSLOW CULVERT CG-9/C(5-10 NC - HYDROLOGICAL DATA Method: INPUT Umloege Arch 0.86 Tfmv of Conrea.ron 6 DESIGN FLOW'S - SMN. Elel'- Oi- L- S. SKEW- Wev. L, i W77 ELIIWd• 2341 am R '_2.W R A R O.SJK 0° Roadway R R Width 31 H ROADWAY g_____________________________________________________ xwi DEPRESSION a- "n"Bed 00I3 Ei.RVAU0N mmm W 24,00 R __________ ----' El - R¢W Leni 50 Frcezerd .Sold, Lli Rr+ ___ x TW DEPTH Tw Tw "EL ('luimd lnv.Fl. Sell 055 24D0.` IR 0.69 1.73 GRAVEL. R A R R-1. (years) FLOW co) IO 2 IO Design Check163 Mac. 4.$$ 4.82 CULVERT DESCRIPTION: TYPE: SingIcAlultiple Conforming INrt EdFe Desripti0n: Squwa edge wllmudwnl TOTAL FLOW Q efi FLOW BARREL QN cG HEAUWA'fED CALCULAIIO,NS ('01UR01. HEAOWA'I'ER ELEV R OtTLEF VEL fpr MINIMUM SHOULDER ELEV. H CUMMEN'fS WItUr CONTROL OUfLEF CONTROL Sin He/Multi leConfnmtin /Urokat Back Culverts IIWBD IIWI R FALL It FLHwi 11 TW H do R NcIDV2 tl he 11 ke II if EUIWc It MATERIAL SHAPE Size (in) IN Ma0ni0ys Conerem Chalar IS I 0AI 4.82 4.8 1.16 145 0.00 23.45 0.69 0,89 1.07 1.07 0.50 0.65 2342 23,45 4.51 3.63 3.6 0.86 0.99 OW 22.99 0.60 0.77 I'M Iof SM 0.3] 23DS 23.OR 434 4.92 4.8 IA6 1,45 0 0 2345 0.69 0.89 1.07 1.0] 0.50 0.65 2342 23.45 451 Broken Hark Culvert TAILWA'TER DATA: AILWATER RESULTS: ROAD\Y,YY DATA: ROADWAY OVERTOPPING: LENGTH Ell SKEW ° Tm idal 0.035 Diialia" cfa- Elrvaxam R Few deal, R Vclociry IF, Soevforc, wduny Wi4N,H 31 Dirrlurge cfs (h�'^oPPer DixMrg Cf5 (lrmegpieg Elcvvtiun ❑ ll t:NAV) T.(H'.1 VI e, Ntt LI 2.00 'urI'el" GRAVEL 3.00 !n'I 22.44 0.69 I.73 op of Road Elevation, h Y4 ni 0 000 3.00 oak 22J5 0.HI I'll Length of Road, 11 50 bak 0 one 0.0050 2244 0.69 I.A d2' Mae. 0 am TECHNICAL F(10 FNOTES: (1)USE QNB FOR BOX CULVERTS (4)El-IM+EU(INVERI OF INLET' CONTROL SECTION) (6)he^1'W or(do + DP)(WHICHEVER IS GREATER) (2)HWI/D= HWOD OR HW✓D FROM DESIGN CHARTS (5) TW BASED ON DOWNSTREAM CONTROL OR FLOW (7)H=[I+ke+(29n LpR'")'li (3) FALL- IIWI- (ELHWd- lfl f; FALL IS ZERO FOR CULVERTS ON GRADE DEPTH IN CHANNEL, SUBSCRIPT DEFIN 'PIONS: COMMENTS / DISCUSSION: CULVERT BARREL SELECTED HWd DESIGN I IEADWATER I INLET' SIZE: IS" a 0.013 IIWI I I W I N I NLHT LON'I'RO L o oil ILEr SHAPE MATERIAL RCP Hw. HWIN'OU'ILEI' CONTROL sf Sucenlbcd ENTRANCE: GROOVE END PROJECTING C calve. face CULVERTSOFT by ENSOFTEC, INC. VE R=CEI JAN 3 12013 BY: it��; ; i Si1i3 Camp Devil Dog Stormwater Enhancements PERIMETER ROAD s _ - It 'It 1-'COUNTY ONSLOW CO11/CGI2 NC CULVERT DESIGN FORM SHEET OE DESIGNER: M1P DATE: UNITS ERGIJSH REVIEWER: LRW DATE. HYDROLOGICAL DATA :Ihod: RAI'IDEAL Roadway Width 24 R ROADWAY F.1.11VAFION 23.50 It Rand Lm6A 500 Sofew Ty GRAVEL airs, Arrp: 1.29 A.v Fredsnard- 054 11 ne of cwe, nh ralion ] Minutes ShIJ. Lkv. Id - ` 234655i 0 Said, Li R C2J:40; '�fl [SIGN FLOWS ELIIWJ= 22.8e 0 _ �____________________________________________________ __________ --- i _. R I (,pE) FLOW EEO F.bH am d Hwi H 10 IAsign 6.38 Eli- 21.65 11 T'W DLPTtt 033 B 2 Check 4.79 L- IU A ___ ______ '� ____ ______ Suvm [ial _ TW TW VEL. I]9 0 10 Max. 6,38 S- 3.U% DEPRESSION 0it. ----------. ________ _ _ C.Iurncun..F1. Igoe n 1LVERT DESCRIPTION: SKEW- a° Red 0.013 Flo- _ _ I9.00 6 'PE: Single/Mulliple Conforming el Edge Dewripdnn: TOTAL FLOW PER HEADWATER CALCULATIONS CON IROL MINIMUM vc End Prujeniny FLOW BARREL INLETMNIROL 0Un LLr C,ONIROl- HEADWATER (1IrrLEr SHOULDER COMMENTS t Ic/Multi le Cnnfomlin•/Hmkrn [1nek Culverts 0 QN 11plim IIWi FALL EL11Wl TW do (JnDI^_ hn ke 11 EI.IIW9 ELEV VET. EIEV, MATERIAL SLIMS Siu(in) N Marmings ch c8 R I It It It 0 B It A fl 0 rps 0 ncmm Chancier is I But 6.38 6.4 091 1.21 0.00 22.86 0.33 0.98 124 1.24 020 066 19.90 22.86 264 4.79 4.8 0.64 096 Bull 22.61 0.28 0,84 1.17 1.17 020 039 19.54 22.61 R.90 6.38 6A 0.81 121 full 22,86 0.33 0.98 1,24 1.24 020 066 19,90 22.86 9.64 own [lack Culver[ TAI LWA FER DATA: FAILWATER RESULTS: ROADWAY DATA: ROADWAY OVERTOPPING: LENGTH El- SK,, a 'M1amd Ste, Tnpomdd Dina Pe Elenlion r� V dmity Sler fins r ssy WiJh, a Die,led" [TasOppas fTva41PIN Jmth 24 Dndurg Elenlimt mama w.dd,.it 10.00 0.035 crs R n fps PSF 'mGce Type ORAVEL crs CIS B Side Slope LII(RIV) 3.00 R,h, 18,33 0,3: 1.79 0,18 op of Road Elevaflon,❑ 235 N'iF 0 000 Side Slope RL(HAV) 3.00 heck IN20. 0.2X 1.61 0.15 Length of Road. it 500 .heck 0 0W Channel Slope, test 0.0090 Mu, 1833 033 1.79 0.18 Mus. 0 one TECHNICAL, FOOTNOTES: (1) USE ONB FOR BOX CULVERTS (4)ELAi-HWi+ELI(INVER F OF INLET CONTROL SECTION) (6)he- TW.1 Ble+ Dn)(WHICHEVER IS GREATER) (2)HWi/D=HW/B OR HW✓D FROM DESIGN CHARTS (5) TW BASED ON DOWNSTREAM CONTROL OR FLOW (7)H=(I+ke+(2%1)fR' uls)Ry (3) FALL = H W I - (EI,11 W d - IiLs); FALL IS ZERO FOR CULVERTS ON GRADE, DEPTH IN CHANNEL SUBSCRI PT DEFIN I IONS: COMMENTS / DISCUSSION: CULV ERT BARREL SELECTED HWd DESIGN HEADWATER I INLET SIZE: IS" n. 0,013 HWi IIW IN HILL LCON'I'ROL. n OUTLEr SHAPE: MAIT:RIAL: RCP HWo HW IN DO I LETCONTROL sf She ambcd ENTRANCE: GROOVE END PROJECLINO @ cuNv rf fecc CULVERTSOFT by ENSOFTEC, INC. PROTECT Camp Devil Dog Stnrmwater Enhancements -" SHEET - uNrrs- OF encllsu - �" CULVERT DESIGNER: REVIEWER MJP , TRW DESIGN FORM DATE: DATE: Ul44013 U15Q013 _ ROAD PERIMETER ROAD COUNTY ONSLOW - - - - � _ � - CULVERT cr,ls/cT;le NC III DROLOGICAL DATA Method: INPUT Dminogc A.: 0.s Timcof Conccnlm0on 5 DESIGN FLOWS Shko. ELaM1 E- C- S- SKEW- Ell Le= 15A0 7.. ELfIWJ• 2451 Ono 0 2.3.75 fl 54 R 0.5 It Roadway R ❑ Width 13 11 ROADWAY vy____________________________________________________ Hwi ___________ DEPRESSION II i. "n'Bed 0013 ELEVATION Summ lkA 26.00 R --- - -------------- __________ Flo- Road Lm h Rae F.Namd- SWdr. 0,1. Rt-) --- H Tw DEPTH TW TW VEL. Clow[ln¢F:L. _ 2348 R Suface Typ lit 2680 1R 029 I21 2348 GRAVEL It R R R R.I. ('c"d FLOW trot 10 2 10 Design Check Me, 2.24 1.69 2.24 CULVERT DESCRIPTION': TYPE: Single/.\Multiple Cunforning lolct Edge Description: Groove lend PrujcOing TOTAL FLOW Q cts FLOW PIA 13ARRLL QN cli R EADWA'PER CALCU[.ATIONS CONTROL IRADWXTER ELEV R 0UrLItr VEL fin MINIMUM SHOULDER ELEV. R CODIMENIS INLET CONTROL OUTLET CONTROL Sin le/Mul' le Conepain / Broken [lack Culvena Hwm Hw'1 R FALL. R F.L11Wi 11 Toe R do R (bes Y2 11 1n R 1, II It ELI1Wo If MATERIAL SHAPF. Site, (in) N Mappings Cuneroc Cinvlar 15 I 0.01 2.24 2.2 0.62 0.66 0.00 24.41 0]9 060 0.93 0.92 0.20 0.13 24,53 24.51 3J0 1.69 1] 055 0.55 0.W 24.30 091 0.52 0.89 0.88 0.20 0,09 24A4 24.44 3A4 2.24 2.2 0,62 0.66 0.00 24.41 0.29 Oho 093 0.92 020 0.13 24.53 24.53 370 Broken Rack Culver, I'AIL\VATER DATA: I' All I' ER RESULTS: ROADWAY DATA: ROADWAYOVERTOPPING: LENGTH F.Iev. SKEWo 'Iunrcl Slope Trunguler a..0.035 Disels�rge of EMnlim It FYm deed R Velma, fps Slbr fora PSP mMaY Width, 33 Dialurge ON Ovnopl Deelurge Df5 Ovmgrping Elcaukan It Ron -Width. ll Safe Slope Ltt(H:1V) Sell Slope RL(HAV) Channel Slope, Wft 0.00 Sorfacelypc GRAVEL 3,00 Design 24.17 0.79 L21 0.15 Top of Road Elevation, It 26 ha 0 0.w 3.00 chak 2419 0J1 1.12 0.13 LeWth of Road, 1t I00 xk 0 O.W 0.0030 24,27 099 1121 0,15 Has, 0 out Dnl Ro-vino TECIINICAL FOOTNOTES: ID USE GME TO It 130X CU LVER IS (4) ELhi-Ii Wi-ELI(INVER'I' OF INLET CON ROL SECT ION) (6)h0-1'W or(dc1 D/2) DYNC'IEEVER IS GREATER) (2)HW✓D-IDV/D OR HWUD FROM DESIGN CHARTS (5) TW BASED ON DOWNSTREAM CONTROL OR FLOW (9)H-(I Ikc+(29n'LyR1.1,1'Rg (3) FALL = H W I - (ELH Wd - ELsO; FALL IS ZER01'OR CULVERTS ON GRADE DEPTH IN Cl IANNEI, SUBSCRIPT DEFINI'I IONS: COMMY:B'fS / DISCl1.4510N: CULV ER'I' BARRlil, SE:LEC7ED HWd DESIGN HEADWATER i INLET SIZE: 15" n.0013 DWI I IW ININLGTCONTROL o out LET SHAPIi: MATERIAL: RCP HWO HW IN OUTLET CONTROL of Sncaebcd ENTRANCE: GROOVE END PROTECTING U culvw face CULVERTSOFT by ENSOFTEC, INC. " E G E I V E Iitl } JAN 3 12013 BY: Ei PROJECT Camp Devil Dog Starmwaler Enhancements - SHEET UNITS OF BNGLISp CULVERT DESIGNER: REVIEWER MJP LRW DESIGN' FIRM DATE: DA'IT: 1114CO13 1/15ROU ROAD PERIMETER ROAD - COUNTY ONSLOW ^rc r' e . NC CULVERT (7017/CG 18 - HYDROLOGICAL DATA McRmul RATIONAL Drainage Arco 0,86 Acres Time of C.meemmen 5 Mmu4 DESIGN FI.OYY'S Shldr. FIaF EIi- L- 5- SKEW- El'. LL- 27 * ELIIW& 2441 OJA 11 D.JS a lg 0 d.{lya 00 Roadway 0 R - Width 22 ❑ ROADWAY __________________________________ Hwi - ------___-„-_ " DEPRESSION Pin. a" Red 0.013 RLEVA Amm Od HON 26.00 a __________ ___ _ Fh' Read Len h land Fneeb-nd- Sh]&. Ek-Rr-'.s ___ H 1W DIiP Of Tw TV VEL (lumdlnv.El.. 23.15 a Sell-T>'Pc I.59 26.00 0.95 1.36 23.I5 PAVED it In a 0 a R.I. (years) FLOW (efO 10 Dceign 3.b6 2 Check 2.76 10 Max. 3(6 CULVERT DESCRIPTION: TYPE: Single/.Multiple Conforming Inlet Edge Description: Square edge w/Imudwull TOTAL FLOW O in FLOW PER BARREL OM c6 H EADWA'I ER CALCU LAI"IONS c,)NrRUI. IIEADWA'rER ELEV 0 OUFLIO VEL to MINIMUM SHOULDER ELEV. it COMMENTS INLET CONIROL OUI'LM CONIROL Sin le/Multi le'mr,hrmine Book. pock Culrcne IIWPD HWi h I FALL R FLUWi 11 TV 0 de 0 pk4DE3 tl In H ke 11 a 6LIIWo 0 MATERIAL SHAPE St. (in) N Marine, Concrcm Circular IS 1 0!01 1.66 7.7 0,]I 0.84 0.00 24.10 095 O.D 1.12 LL' 0.50 0.15 24.41 24.41 4�7 2.7b 0.69 O.W 24.04 0.85 0,63 1.07 1.07 0,50 0.08 24.10 24.30 3.96 3.66 123�7 L17 0.80 000 24.19 0.95 0.73 1.12 1.12 0.50 0.15 24.41 24.41 4.27 Broken Rack Culver, IAILWAEF.R DATA: TAILWATER RESULTS: ROADWAY DATA: ROADWAY OVERTOPPING: LENGTH Elev. SKE. Cmcf she, Tmm,pa 0,035 Diu w efs El-cion n F" dqu6 0 Vd-, IT, Shearon. PST .' Widm. ft 22 Divehi, a c0 IkvtgPping Mule,, MS OWAePpinp Elevated ❑ Fmi. Width. ll Side Slaps LE(H:1V) Side Slope RI: (H:1 V) barrel Slope. WE 0.00 bfaalypc PAVED 3.00 fasi, 24.I0 0.95 136 0,19 Top of Road Elevator. It 2E e'ied 0 0.00 3.00 Cluck 24M 095 1.27 0A6 Length of Road, It 1000 cMk 0 am 0.0030 24,10 0.93 I'M 0,18 0 am Din '.Inn TF.CI IN CAL FOOrN OTES: (1) USE Q/NB FOR BOX CULVERTS (4)ELhi-HWi+ELI(INVER'F OF INLET CONTROL SEC I' ION) (6)an-l'W or ldc+ DO)(WHICHEVER IS GRYA'IER) 12)IIWUD=HW/D OR HW'VD FROM DESIGN CHARTS (5) TW BASED ON DOWNSTREAM CONTROL OR FLOW (7)H-(1+kc+(29n2LVR'"p'Rg LH FALL = H W I - (ELHWd - ELsO; FALL IS ZERO FOR CULVERTS ON GRADE DEPTH IN CHANNEL. SUBSCRIPT DF.PINI'I IONS: COMMENTS / DISCUSSION: CULVERT" BARREL SELECTED HWd DESIGN HEADWATER 1 INLET SIZE: 18" n. 0,013 DWI HW IN INLF:TCONTROL o OUTLET SHAPE: MATERIAL RCP HWo HW IN OU'ILEI'CONrROL sf" Secarebed ENTRANCE: GROOVE END PROTECTING (j eelvcttf e CULVERTSOFT by ENSOFTEC, INC. CAPACITY OF POND OUTFALL PIPES STORM SEWER DESIGN COMPUTATIONS STORM FREQUENCY 100 PROJECT: Dam Dog Sot SLolmwater Management Plan LOCATIONCamp Lejauna COUNTY - OnMmy .._ Dma,nea by. M. Pmear0 Checka0 by L Mile UNITS ENGLISH PIPE NO, FROM POINT TO POINT DRAIN, AREA 'A' 3 RUNOFFr.CE COEFF.ACCUM '17 4 G ULATEOTIME 8 TOTAL INLET ] RNN FALL;CFS INHr B RUNOFF INVERT ELEVATIONS LENGTH of Pyq FL 13 SLOPE Flhl. 10 SIZE (D., Or SpadR ) In. 14 SHAPE NumCer Capanty CFS 15 Frlctian NORMAL FLOW FLOW 9ec, IT RLNA965Mlnulm (IPI l Tgv1OOWER CFS 9 END 10 ENO 11 , En Fbx,M SGFI FL FUSec 16 Fl. REFERENCE STA. REFERENCE STA. CG-StCG-6 CG-5 CG-6 Fbxln Ilmm Puga}mMN 6]] 1325 law SO.W O RJO 34 Circular 1 1 IS 4F,�,Ft 1.59 0.50 5,11 IAI 979 CGIWCG14 CGl] CG-14 Fbwb ham Pma meEel 1.]9 19.00 1BT5 50.00 000500 15 C4wle 1 4.9 53 043 047 341 010 1CM Appendix E Ditch Calculations 811 Page ,t s �NI Section Report Date: 1/12/2013 Project: Camp Devil Dog SOI Ditch No: 1 Section No: 1A Section Data Discharge (2-Year):, 2.26 cfs Discharge (10-Year): 3.12 cfs Section Elev. U/S: 23.00 ft Section Elev. D/S: 20.80 ft Slope: 0.0055 ft/ft Bottom Width: ft Left Side Slope: 3.00 HA V Right Side Slope: 3.00 HIV Mannings: 0.03 Section Analysis Results 2-Year 10-Year Depth of Flow: 0.666 ft 0.751 ft Top Width of Flow: 3.08 ft 4.51 ft Flow Velocity: 1.698 ft/sec 1.844 ft/sec Shear: 0.229 lb/ft 0.258 lb/ft Lining Recommended: Bare earth !Ditch No 1 10-YEAR FLOW;SEGTION 'Section No 1A V:R Scale 1.000 DitchSoftVA byEnsoftec, Inc.---p ECEI �/ JAN 3 12013 BY:� Section Report Date: 1/12/2013 Project: Camp Devil Dog SO1 Ditch No: 1 Section No 1B Section Data Discharge (2-Year): 8.510 cfs Discharge (10-Year): 11.740 cfs Section`Elev. U/S: 20.60 ft Section Elev. D/S: 18.00 ft Slope: 0.0068 ft/ft Bottom Width: 8.00 ft Left Side Slope: 3.00 HAV Right Side Slope: 3.00 HAV Mannings: 0.05 Section Analysis Results 2-Year 10-Year Depth of Flow: 0.579 ft 0.695 ft Top Width.of Flow: 9.73 ft 12.17 ft Flow Velocity: 1.509 fUsec 1.675 ft/sec Shear: 0.246 lb/ft 0.295 lb/ft Lining Recommended: Sid. EC-2 Ditch No 1 10-YEAR FLOW. SECTION Sec n.No 16 1� 0.695jil--' .9 V:HScele 1.000: 8.00R DitchSoftVA by Ensoftec, Inc. L ' Section Report Date: 1/12/2013 Project: Camp Devil Dog SOI Ditch No: 2 Section No: 1 Section Data Discharge (2-Year): 0.62 cfs Discharge (10-Year): 0.81 cfs Section Elev. U/S: 22.00 ft Section Elev. D/S: 21.20 ft Slope: 0.0057 ft/ft Bottom Width: ft Left Side Slope: 3.00 HAV Right Side Slope: 3.00 HAV Mannings: 0.03 Section Analysis Results 2-Year 10-Year Depth of Flow: 0.407 ft 0.450 ft Top Width of Flow: 1.88 It 2.70 ft Flow Velocity: 1.248 ft/sec 1.333 ft/sec Shear: 0.145 lb/ft 0.160 lb/ft Lining Recommended, Bare earth [Mch No 2 10-YEAR FLOW SECTION Section No 1 2"70� 0.450R= ��--� .3 •3 V:H Scale 1.000 'DitchSoftVAby Ensoftec; Inc. - `- ECEIV Ef 4 JAN 3 12013 k Section Report Date: 1/12/2013 Project: Camp Devil Dog SOI Ditch No: 3 Section No: 1 Section Data Discharge (2-Year): 2.260 cfs Discharge (10-Year): 3.120 cfs Section Elev. U/S: 22.00 ft Section Elev. D/S: 20.80 ft Slope: 0.0043 ft/ft Bottom Width: ft Left Side Slope: 3.00 H:1V Right Side Slope: 3.00 H:1V Mannings: 0.03 Section Analysis Results 2-Year 10-Year Depth of Flow: 0.697 ft 0.787 ft Top Width of Flow: 3.23 ft 4.72 It Flow Velocity: 1.551 ft/sec 1.679 ft/sec Shear: 0.187 lb/ft 0.211 lb/ft Lining Recommended: Bare earth Ditch No 3 .. 10-YI:ARFLOW .SECTION Section No 1 V:HScale 1.000' DitcfiSoftVA by Ensoftec, Inc. ' Section Report Date: 1/12/2013 Project: Camp Devil Dog SOI Ditch No: 4 Section No: 1 Section Data Discharge (2-Year): 1.16 cfs Discharge (10-Year): 4.52 cfs Section Elev. U/S: 18.00 ft Section Elev. D/S: 17.10 ft Slope: 0.0047 ft/ft Bottom Width: ft Left Side Slope: 3.00 HIV Right Side Slope: 3.00 HIV Mannings: 0.03 Section Analysis Results 2-Year 10-Year Depth of Flow: 0.534 ft 0.889 ft Top Width of Flow: 2.47 ft 5.33ft Flow Velocity: 1.356 ft/sec 1.906 ft/sec Shear: 0.157 lb/ft 0.261 Ib/ft Lining Recommended: Bare earth DBch No 4 10-YEAR FLOW SEctioN Section No 1 .. _. .. . I I. 0.889 •3 V:H:Scale!1.000i DitciSoftVA by Ensoftec,'1nc. EGEIVE .. JAN 3 12013 Section Report Date: 1/12/2013 Project: Camp Devil Dog SOI Ditch No: 5 Section No: 1 Section Data Discharge (2-Year): 0.830 cfs Discharge (10-Year): 1.140 cfs Section Elev. U/S: 23.96 ft Section Elev. D/S: 22.00 ft Slope: 0.0123 ft/ft Bottom Width: ft Left Side Slope: 3.00 HAV Right Side Slope: 3.00 H:1V Mannings: 0.03 Section Analysis Results 2-Year 10-Year Depth of Flow: 0.393 ft 0.443 ft Top Width of Flow. 1.82 ft 2.66 It Flow Velocity: 1,791 ft/sec 1.936 ft/sec Shear: 0.302 lb/ft 0.340 lb/ft Lining Recommended:, Bare earth Ditch No 5 10-YEAR FLOW SECTION Section No 1 17 0.44391= V:H Scale 1.000 DitchSoftVAbyEnsoftec, Inc. Section Report. Date: 1/12/2013 Project: Camp Devil Dog SOI Ditch No: 6 Section No: 1 Section Data Discharge (2-Year): 2.620 cis Discharge (10-Year): 3.610 cfs Section Elev. U/S: 23.15 ft Section Elev. D/S: 21.50 ft Slope: 0.0055 ft/ft Bottom Width: ft Left Side Slope: 3.00 H:1V Right Side Slope: 3.00 HAV Mannings: 0:03 Section Analysis Results 2-Year 10-Year Depth of Flow 0.704 ft 0.793 ft Top Width of Flaw: 3.26 ft 4.76 ft Flow Velocity: 1.762 ft/sec 1.914 ft/sec Shear: 0.242 Ib/ft 0.272 lb/ft Lining Recommended: Bare earth Desch No 6 10-YEAR RAW sEcmn Section Mo 1 0:793W— -3 3 V:H-Scale 1.000 DitchSoftVA by Ensoftec, Inc. ECE6VE JAN 3 12013 ##11 BY. �_ __.6H E' Solution's, Inc. Geotechnical . Environmental • Testing REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES P-1269 Devil Dog SOI, Field Training Facility MCB Camp Lejeune, North Carolina G E T PROJECT NO: JX10-114G March 8, 2011 Prepared for Archer Western Contractors, LTD 333 Technology Drive, Suite 205 Cannonsburg, PA 15317 ATTN: Mr. Mark P. Hallinan Prepared by GET Solutions, Inc. ECEBVE JAN 3 12013 BY: 415 A Western Boulevard, Jacksonville, NC 28546 ♦ Phone 910-478-9915 ♦ Fax 910-418-9917 info@getsolutionsinc.com March S, 2011 TO: Archer Western Contractors, LTD 333 Technology Drive, Suite 205 Cannonsburg, PA 15317 Attn: Mr. Mark P. Hallinan RE: Report of Subsurface Investigation and Geotechnical Engineering P-1269 Devil Dog SOI - Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Dear Mr. Hallinan: In compliance with your instructions, we have completed our Subsurface Investigation and Geotechnical Engineering Services for the above referenced project. The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. Thank you for the opportunity to work with you on this project. We trust that the information contained herein meets your immediate need, and should you have any questions or if we could be of further assistance, please do not hesitate to contact us. Respectfully Submitted, z,{owl— CAR % G E T Solutions, Inc.�OQFEssia npy`, Q PE No. t OW529 � Glenn W. Hohmeier, P.E. Senior Project Engineer. ����FNGINE�P K, H���' NC Reg. # 033529 '1µ.....N.NM �1 ........... �N .'. Ei '•. �ESS�pCARp ti'••. 1" -. Camille A. Kaftan, P.E. :-ate 9 SEAL - Principal Engineer 014103 NC Reg, # 014.103 1 �`• ; ;_ Copies:' F(1) Client is 415-A Western Boulevard - Jacksonville, NC 28546 - Phone: (910) 478-9915 - Fax: (910) 478-9917 info@gelsolutionsinc.com TABLE OF CONTENTS - EXECUTIVE SUMMARY.............................................................................................i 1.0 PROJECT INFORMATION..............................................................................1 1.1 Project Authorization..............................................................................1 1.2 Project Description ............. ........ ........................ .................. ............ """ 1 1.3 Purpose and Scope of Services.............................................................2 2.0 FIELD AND LABORATORY PROCEDURES..................................................3 2.1 Field Exploration.................................................................................... 3 2.2 Laboratory Testing.......'..........................................................................5 3.0 SITE AND SUBSURFACE CONDITIONS........................................................6 3.1 Site Location and Description ................................................. :.............. 6 3.2 Subsurface Soil Conditions....................................................................6 3.3 Groundwater Information....................................................................... 7 4.0 EVALUATION AND RECOMMENDATIONS...................................................8 4.1 Clearing and Grading.............................................................................8 4.2 Subgrade Preparation .......................... :................................................. 9 4.3 Structural Fill and Placement.................................................................9 4.4 Shallow Foundation Design Recommendations - Buildings.................10 4.5 Shallow Foundation Settlements - Building..........................................11 4.6 Mat Foundation Design Recommendations — Water Storage Tank ..... 11 4.7 Mat Foundation Settlements — Water Storage Tank ............................11 4.8 Foundation Excavations.......................................................................12 4.9 Floor Slabs.........................................................................:..................13 4.10 Pavement Design................................................................................13 4.11 Seismic Design Recommendations.....................................................15 4.12 Soil Permeability..................................................................................15 5.0 CONSTRUCTION CONSIDERATIONS.........................................................16 5.1 Drainage and Groundwater Concerns.................................................16 5.2 Site Utility Installation...........................................................................16 5.3 Excavations.........................................................................................16 6.0 REPORT LIMITATIONS.................................................................................16 APPENDIX I BORING LOCATION PLAN APPENDIX II BORING LOGS APPENDIX III GENERALIZED SOIL PROFILE APPENDIX IV DCP TEST DATA APPENDIX V HYDRAULIC CONDUCTIVITY WORKSHEETS APPENDIX VI PREVIOUSLY COMPLETED BORINGS ASSOCIATED WITH THE FEASABILITY STUDY DATED AUGUST 10, 2009 ALONG WITH THE BORING LOCATION SKETCHES AND DCP TEST DATA APPENDIX VII CLASSIFICATION SYSTEM FOR SOIL EXPLORATION E C E 8 VE JAN 3 12013 BY: Report of Subsurface Investigation and Geotechnical Engineering Services March 8, 2011 P-1269 Devil Dog SOI Field Training Facility MCB, Camp Lejeune, North Carolina GET Project No: JX10-114G EXECUTIVE SUMMARY The construction at this site is planned to consist of building a total of four (4) new single story structures which will consist of the Applied Instruction Facility, Battalion Aid Station, Laundry Facility, and a Water Storage Tank. These project sites are located east of Wilmington Highway (U.S. 17) off of Verona Loop Road within the Camp Devil Dog portion of the Camp Lejeune military installation in North Carolina. It is expected that the building structures will be of steel frame and/or CMU wall design supported by shallow foundations. The proposed 80,000 gallon water storage tank is expected to be a steel tank 24.5 feet in diameter and 24 feet in height. The maximum wall and/or column foundation loads associated with the structures as well as the mat foundation loads associated with the proposed water tank were not known at the time of this report. However, based on our experience with similar projects, the maximum wall loads associated with the buildings are not expected to exceed 3 kips per linear foot, the column loads are not expected to exceed 75 kips, and the tank mat foundation loads are not expected to exceed about 1500 psf. The ground floors are anticipated to be of slab -on -grade design with the distributed loads estimated at 150 pounds per square foot. The structures' first floor elevation(s) are expected to be located slightly above existing site grade elevations. Accordingly, cut and/or fill operations are not anticipated to exceed about 2 feet. The construction at this site is also planned to include the construction of paved roadways and parking areas, infiltration/bioretention basins and installation of associated infrastructure components. Our field exploration program included: • Eight (8) 25 to 70-foot deep SPT borings drilled within the footprint of the proposed structures (designated as B-1 through B-8). • Two (2) 10-foot deep SPT borings (designated as P-1 and P-2) were drilled within the proposed parking area. • Six (6) 10-foot deep SPT borings (designated as BMP-1 through BMP-6) were drilled and six (6) saturated hydraulic conductivity tests (in -situ) were completed within the proposed stormwater management areas located throughout the project site. • Seven (7) 20 to 75-foot deep SPT building borings identified as B-1 through B-7 and four (4) 5-foot deep parking area hand auger borings performed during our initial feasibility study for the proposed project, are included herein in Appendix VI and in our evaluations and recommendations for this project. :... , GET. Report of Subsurface Investigation and Geotechnical Engineering Services P-1269 Devil Dog SOI Field Training. Facility MCB, Camp Lejeune, North Carolina GET Project No: JX10-114G March 8, 2011 A brief description of the natural subsurface soil conditions is tabulated below: RANGES AVERAGE STRATUM DESCRIPTION SPOF N- D VALUES 1 to 11 inches of Topsoil (Topsoil was not 0 to 0.92 encountered at borings B-1 and P-1) SAND (SP-SM, SM, SC) with varying amounts of 0 to .92 silt and clay; interbedded layers of Clay (CL) Sand to I were encountered at boring locations B-3 (4 to 1 to 58 10 to 70 8 feet), B-6 (2 to 4 feet), BMP-5 (0.58 to 4 clay feet), and BMP-6 1 to 4 feet 5 to 9 Note (1) SPT = Standard Penetration Test, N-Values in Blows -per -foot The groundwater level was recorded at the boring locations as observed through the wetness of the recovered soil samples during the recent drilling operations. The initial "groundwater table encountered at these boring locations was measured to occur at depths ranging from 9 to 13 feet below current grades. The groundwater levels are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The initial groundwater level recorded at the boring locations previously completed as part of the initial feasibility study in August, 2009 was measured to occur at depths ranging from 13 to 18 feet below current grades. The variations in groundwater depths are likely due to seasonal weather patterns and seasonal groundwater table fluctuations. The soils recovered from the boring locations were classified in general accordance with ASTM D 2487 test method. Based on the soil classifications located throughout the site, the shallow subsurface soils appeared to be relatively homogenous consisting predominantly of Clayey SAND (SC) and Sandy CLAY (CL). Observed color changes and texture of the collected soil samples were used to aid in identifying the estimated normal seasonal high water table (SHWT) at the location of boring BMP-1 through BMP-6. It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from orangish brown and/or brow to light gray) were observed within the soil profile of soil samples collected at the location of borings BMP-1 through BMP-6. As such, the normal SHWT depth was estimated to occur at approximately 4 feet below the existing site grade and likely the result of perched water conditions which may occur above encountered restrictive clayey SAND (SC) and sandy CLAY (CL) horizons at these boring locations. ECEIVEA # 1AN 3 12013 ft: Solutions. Inc Report of Subsurface Investigation and Geotechnical Engineering Services March 8, 2011 P-1269 Devil Dog SOI Field Training Facility MCB, Camp Lejeune, North Carolina GET Project No: JX10-114G The following evaluations and recommendations were developed based on our field exploration and laboratory -testing program: • Field testing program during construction to include, subgrade proofrolling, compaction testing, and foundation excavation observations for bearing capacity verification. All other applicable testing, inspections, and evaluations should be performed as indicated in the North Carolina State Building Code (2006 International Building Code with North Carolina Amendments). • A cut of 6,to 12 inches will be required to remove the topsoil material from the construction area. This cut is expected to extend deeper in isolated areas to remove deeper deposits of organic soils, root mat and/or unsuitable soils which become evident during the clearing operation. • Some subgrade improvements (including foundation and parking area subgrade) should be anticipated within the construction areas (undercutting and backfilling as discussed further in the report) as a result of potentially loose/soft subgrade soils containing appreciable amounts of fines (silt and clay). Shallow foundations designed using a net allowable bearing capacity of 2,000 psf (24-inch embedment, 24-inch width). ■ Estimated post -construction total and differential settlements for the buildings up to 1-inch and respectively, as contributed by the foundation bearing soils. ■ Mat foundation associated with the water storage tank can be designed using an allowable bearing capacity of up to 1,500 psf (minimum 18-inch embedment for mat foundations). • Estimated total settlement for the water storage tank on the order, of approximately 2.5-inches with approximately 1 to 1.5-inches consisting of immediate elastic settlement and approximately 0.5 to 1-inch consisting of long- term settlement. Filling of the tanks is recommended to be performed in three equal stages to allow for the estimated elastic settlement. Total differential settlement occurring between the center and the edges of the tank pads will be about 1/3 to 1/2 of the total settlement indicated above • Based on our experience with similar construction in the general area of the project site and in accordance with the NC Building Code; Chapter 16, this site may be classified as a site Class D, based on which seismic designs should be incorporated. This summary briefly discusses some of the major topics mentioned in the attached report. Accordingly, this report should be read in its entirety to thoroughly evaluate the contents. 4 • ;/; GEC Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G 1.0 PROJECT INFORMATION 1.1 Project Authorization G E T Solutions, Inc. has completed our subsurface investigation and geotechnical engineering services for the proposed P-1269 Devil Dog SOI Field Training Facility located within the Camp Lejeune military installation in North Carolina. The Geotechnical Engineering Services were conducted in general accordance with G E T Solutions, Inc. Proposal No. PJX10-110G, dated September 2, 2010. Prior to our preparation of this report, Archer Western Contractors, LTD requested a separate report for the Devil Dog SOI — K-Range Toilet Facility which was provided in January, 2011 (GET Project No. JX10- 114G dated January 21, 2011). The K-Range facility portion of the project is separated by several miles of wooded property and is not contiguous to the Devil Dog Field Training Facility site. Geotechnical investigative field drilling services could not be completed simultaneously due to the potential of unexploded ordnance at the Devil Dog Training Facility site which required further investigation and clearances by others prior to our mobilization. The clearance work was completed and GET Solutions, Inc. mobilized to the field training site in February, 2011 to complete the drilling services. Furthermore, these services were provided in conjunction with our previously completed feasibility study dated August 10, 2009 (GET Project No. EC09-216G). Authorization to proceed with the Geotechnical Engineering Services was received from Mr. Mark Hallinan of Archer Western Contractors, LTD. 1.2 Project Description The construction at this site is planned to consist of building a total of four (4) new single story structures which will consist of the following: ➢ Applied Instruction Facility (20,500 square feet) ➢ Battalion Aid Station (3,000 square feet) ➢ Laundry Facility (1,600 square feet) ➢ Water Storage Tank (80,000 gallons) It is expected that the building structures will be of steel frame and/or CMU wall design supported by shallow foundations. The proposed 80,000 gallon water storage tank is expected to be a steel tank 24.5 feet in diameter and 24 feet in height. The maximum wall and/or column foundation loads associated with the structures as well as the mat foundation loads associated with the proposed water tank were not known at the time of this report. However, based on our experience with similar projects, the maximum wall loads associated with the buildings are not expected to exceed 3 kips per linear foot, the column loads are not expected to exceed 75 kips, and the mat foundation loads are not expected to exceed about 1500 psf. The ground floors are anticipated to be of slab -on - grade design with the distributed loads estimated at 150 pounds per square foot. The structures' ground floor elevation(s) are expected to be loca ghtly aabbovve existing site 1 JA��N.� 113�C1 2013 GET Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G grade elevations. Accordingly, cut and/or fill operations are not anticipated to exceed about 2 feet. The construction at this site is also planned to include the construction of paved roadways and parking areas, infiltration/bioretention basins and installation of associated infrastructure components. If any of the noted information is incorrect or has changed, please inform G E T Solutions, Inc. so that we may amend the recommendations presented in this report, if appropriate. 1.3 Purpose and Scope of Services The purpose of this study was to obtain information on the general subsurface conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: General assessment of the soils revealed by the borings performed at the proposed development. 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or structure performance, including existing fills or surficial/subsurface organics. 3. Soil subgrade preparation, including stripping, grading and compaction. Engineering criteria for placement and compaction of approved structural fill material. 4. Construction considerations for fill placement, subgrade preparation, and foundation excavations. 5. Feasibility of utilizing a shallow foundation system for support of the proposed structures. Design parameters required forthe foundation system, including foundation sizes, allowable bearing pressures, foundation levels and expected total and differential settlements. 6. Feasibility of utilizing a shallow mat foundation system for support of the proposed water storage tank. Design parameters required for the foundation systems, allowable bearing pressures, foundation levels, and expected total and differential settlements. 7. Typical pavement sections recommendations based on the results of our field testing program (Dynamic Cone Penetrometer (DCP) and correlated CBR design values) and our experience with similar soil conditions. Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P4269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G 8. Permeability (infiltration) values are provided based on the results of in -situ Saturated Hydraulic Conductivity Testing conducted within the proposed infiltration/bioretention basins as well as our experience with similar soil conditions. Normal seasonal high groundwater table (SHWT) was also estimated. 9. Seismic site classification provided based on the results of the 25 to 70-foot deep SPT borings, our experience in the project area, and the requirements provided in the North Carolina State Building Code (2006 International Building Code with North Carolina Amendments) Section 1615.1; Table 1615.1.1. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Prior to development of this site, an environmental assessment is advisable. 2.0 FIELD AND LABORATORY PROCEDURES 2.1 Field Exploration In order to explore the general subsurface soil types and to aid in developing associated foundation parameters, eight (8) 25 to 70-foot deep SPT borings (designated as B-1 through B-8) were drilled within the proposed structures' footprints. In order to explore the general subsurface soil types and to aid in developing associated pavement design parameters, two (2)10-foot deep SPT borings (designated as P-1 and P- 2) were drilled within the proposed parking area. To aid in developing associated storm water management parameters, six (6)10-foot deep SPT borings (designated as BMP-1 through BMP-6) were drilled and six (6) saturated hydraulic conductivity tests (in -situ) were completed within the proposed. stormwater management areas located throughout the project site. The SPT borings were performed with the use of rotary wash "mud" drilling procedures in general accordance with ASTM D 1586. The tests were performed continuously from the existing ground surface to a depth of 12-feet, and at 5-foot intervals thereafter. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches, using an automatic hammer. The number of blows required to drive the sampler each 6-inch increment of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value (uncorrected for automatic hammer). A representative portion of each disturbed split -spoon sample was collected with each SPT, placed in a glass jar, sealed, labeled, and returned to our laboratory for review. E .vEI o/ E JAN 3 12013 GET BY: Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Following the exploration procedures, the borings were backfilled with a neat cement grout mix in accordance with NCDENR requirements. The boring schedule noting the SPT boring depths and locations recently completed is presented in the following table (Table I — Boring Schedule of Recently Completed Borings and provided in Appendix II). Table I — Boring Schedule of Recently Completed Borings Boring Number Boring Type • Boring Depth (feet) Boring Location B-1 SPT 25 Battalion Aid Station; Approximate West Center B-2 SPT 25 Laundry Facility; Approximate West Center B-3 SPT 70 Water Storage Tank; Approximate Center Applied Instruction Facility; Approximate Center of East Perimeter B-4 SPT 25 Applied Instruction Facility; Approximate Center of North Perimeter B-5 SPT 25 Applied Instruction Facility; Approximate Center of East ' Perimeter B-6 SPT 25 Applied Instruction Facility; Approximate Center of South Perimeter B-7 SPT 25 Applied Instruction Facility; Approximate Northwest Perimeter Corner B-8 SPT 25 Applied Instruction Facility; Approximate Southwest Perimeter Comer P-1 SPT 10 Parkin Lot; Approximate West Center P-2 SPT 10 Parkin Lot; Approximate East Center BMP-1 SPT 10 Northwest Stormwater Management Area BMP-2 SPT 10 Central Stormwater Management Area BMP-3 SPT 10 Western Stormwater Management Area BMP-4 SPT 10 Western Stormwater Management Area BMP-5 SPT 10 Eastern Stormwater Management Area BMP-6 SPT 10 Southeastern Stormwater Management Area 'SPT = Standard Penetration Test Boring The recently completed borings were performed in conjunction with the previously completed borings associated with the project's feasibility study dated August 10, 2009 (GET Project No. EC09-216G). Accordingly, seven (7) 20 to 75-foot deep SPT building borings identified as B-1 through B-7 and four (4) 5-foot deep parking area hand auger borings performed during our initial feasibility study for the proposed project, are included herein in Appendix VI and in our evaluations and recommendations for this project. The remaining boring (B-8) performed during the initial feasibility study is not included in this report as this boring is located outside the limits of the Devil Dog Field Training facility project area. The boring schedule noting the boring depths and locations performed as part of the August 10, 2009 feasibility study is presented in the table on the following page (Table II —August 10, 2009 Feasibility Study Boring Schedule). Solutions. Inc. Report of Subsurface Investigation and Geotechnical Engineering P-1269 Devil Dog SO[ - Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Table II - August 10, 2009 Feasibility Study Boring Schedule March 8, 2011 Boring Boring Boring Depth Boring Location Number Type (feet) B-1 SPT 75 Applied Instruction Facility; Approximate North Corner B-2 SPT 75 Applied Instruction Facility; Approximate South Comer B-3 SPT 30 Applied Instruction Facility; Approximate Center of East Perimeter B 4 SPT 30 Applied Instruction Facility; Approximate Center of West Perimeter B-5 SPT 20 Battalion Aid Station; Approximate Center B-6 SPT 20 Laundry Facility; Approximate Center B-7 SPT 75 Water Storage Tank; Approximate Center HA-1 HA 5 Parkin Lot; Approximate Southwest Corner HA-2 HA 5 Parkin Lot; Approximate Southeast Corner HA-3 HA 1 5 1 Parkin Lot; Approximate Northeast Corner HA-4 HA 1 5 1 Parkin Lot; Approximate Northwest Comer 'SPT = Standard Penetration Test Boring HA = Hand Auger Boring The boring locations were established and staked in the field by a representative of G E T Solutions, Inc. The approximate boring locations are shown on the attached "Boring Location Plan" (Appendix 1), which was generated based on the conceptual site plan provided by the client. 2.2 Laboratory Testing Representative portions of all soil samples collected during drilling were sealed in glass jars, labeled and transferred to our laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. A total of eleven (11 representative soil samples were selected and subjected to laboratory testing which included Atterberg Limit and/or natural moisture and 4200 sieve wash testing and analysis, in order to corroborate the visual classification. These test results are provided in the table on the following page (Table III - Laboratory Test Results) and are presented on the "Boring Log" sheets (Appendix II), included with this report. RECEIVE" 5 j JAN 3 12013 BY: Solutions, Inc Report of Subsurface Investigation and Geotechnical Engineering P-1269 Devil Dog SOI - Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Table III - Laboratory Test Results March 8, 2011 Boring No. Depth (Feet) Natural Moisture /o % Passing #200 Atterberg Limits LL/PL/PI USCS Classificatio n B-3 4-6 29.6 64.4 Not Tested CL B-3 6-8 24.2 56.2 Not Tested CL B-3 8-10 32.3 46.9 Not Tested Sc B-3 13-15 28.0 38.0 Not Tested SC B-3 18-20 47.4 35.6 Not Tested Sc BMP-1 1.5-2 21.3 49.5 Not Tested Sc BMP-2 1.5-2 18.8 45.7 Not Tested Sc BMP-3 1.5-2 14.3 33.0 Not Tested SM BMP-4 1.5-2 14.4 23.8 Not Tested SM BMP-5 1.5-2 21.0 52.3 Not Tested CL BMP-6 1.5-2 18.4 51.1 Not Tested CL 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Location and Description The proposed Applied Instruction Facility, Battalion Aid Station, Laundry Facility, Water Storage Tank, and Parking Lot project sites are located east of Wilmington Highway (U.S. 17) off of Verona Loop Road within the Camp Devil Dog portion of the Camp Lejeune military installation in North Carolina. The sites consist predominantly of a combination of lightly wooded and open grass covered areas adjacent to existing structures. The existing grades of the project site were not known at the time of this report. However, based on visual observations, the project sites appeared relatively level parcels with elevation variations of less that 1 foot in 50 linear feet. The site is bordered in all directions by heavily wooded areas. 3.2 Subsurface Soil Conditions The results of our field exploration program indicated the presence of 1 to 11 inches of topsoil at the soil boring locations. As an exception, no topsoil was encountered at borings B-1 and P-1. The topsoil thickness could vary between boring locations. Beneath the topsoil and extending to the boring termination depth, the subsurface soils encountered were generally consistent at the boring locations, to their explored depths. These soils were classified as SAND (SP-SM, SM, SC) with varying amounts of silt and clay. As an exception, interbedded layers of Clay (CL) were encountered at boring locations B-3 (4 to 8 feet), B-6 (2 to 4 feet), BMP-5 (0.58 to 4 feet), and BMP-6 (1 to 4 feet) below existing site grades. .The Standard Penetration Test (SPT) results, N-values, recorded within the granular soil layer ranged from 1 to 58 blows -per -foot (BPF) indicating a very loose to very dense relative density. The Standard Penetration Test (SPT) results, N- - 6 GET Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G values, recorded within the cohesive soils ranged from 5 to 9 blows -per -foot (BPF), indicating a medium stiff to stiff consistency. The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration are included on the "Boring Log" sheets (Appendix II) and in the "Generalized Soil Profile" (Appendix III), which should be reviewed for specific information as to the individual borings. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual boring locations. Variations may occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual or occur between sample intervals. It is noted that the topsoil designation references the presence of surficial organic laden soil, and does not represent any particular quality specification. This material is to be tested for approval prior to use. 3.3 Groundwater Information The groundwater level was recorded at the boring locations as observed through the wetness of the recovered soil samples during the recent drilling operations. The initial groundwater table encountered at these boring locations was measured to occur at depths ranging from 9 to 13 feet below current grades. The groundwater levels are anticipated to have been contributed by the variations in existing site grade elevations and the associated distance between boring locations. The initial groundwater level recorded at the boring locations previously completed as part of the initial feasibility study in August, 2009 was measured to occur at depths ranging from 13 to 18 feet below current grades. The variations in groundwater depths are likely due to seasonal weather patterns and seasonal groundwater table fluctuations. The soils recovered from the boring locations were classified in general accordance with ASTM D 2487 test method. Based on the soil classifications located throughout the site, the shallow subsurface soils appeared to be relatively homogenous consisting predominantly of Clayey SAND (SC) and Sandy CLAY (CL). Observed color changes and texture of the collected soil samples were used to aid in identifying the estimated normal seasonal high water table (SHWT) at the location of boring BMP-1 through BMP-6. It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from orangish brown and/or brow to light gray) were observed within the soil profile of soil samples collected at the location of borings BMP-1 through BMP-6. As such, the normal SHWT depth was estimated to occur at approximately 4 feet below the existing site grade and likely the result of perched water conditions which may occur above encountered restrictive clayey SAND (SC) and sandy CLAY (CL) horizons at these boring locations. ECEI E JAN 3 12013 BY:� Solutlons. Inc Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, sidewalks, etc.). Seasonal groundwater fluctuations of t 3 to 4 feet are common in the project's area; however, greater fluctuations have been documented. We recommend that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on the construction procedures. 4.0 EVALUATIONS AND RECOMMENDATIONS Our recommendations are based on the previously discussed project information, our interpretation of the soil test borings and laboratory data, and our observations during our site reconnaissance. If the proposed construction should vary from what was described, we request the opportunity to review our recommendations and make any necessary changes. 4.1 Clearing and Grading The proposed construction areas should be cleared by means of removing the existing structures along with the associated foundations and utilities, and/or topsoil or sand mixed with stone. It is estimated that an average cut depth of about 6 to 12 inches will be required to remove the topsoil and associated root mat from within the proposed construction areas. This cut is expected to extend deeper in isolated areas to remove deeper deposits of organic soils, possible abandoned foundations, or unsuitable soils, which become evident during the clearing. It is recommended that the clearing operations extend laterally at least 5 feet beyond the perimeter of the proposed construction areas. Additionally, an estimated cut depth of about 2 feet will be required to remove the foundations associated with the existing structures. Following the initial clearing, the resulting exposed subgrade will generally be comprised of SAND (SM, SC) or CLAY (CL) containing appreciable amounts of fines (silt and/or clay). Accordingly, combinations of excess surface moisture from precipitation ponding on the site and the construction traffic, including heavy compaction equipment, may create pumping and general deterioration of the bearing capabilities of the surface soils. Therefore, undercutting to remove loose/soft soils in isolated areas should be expected. The extent of the undercut will be determined in the field during construction based on the outcome of the field testing procedures (subgrade proofroll). In this regard, and in order to reduce undercutting, care should be exercised during the grading and construction operations at the site. Furthermore, inherently wet subgrade soils combined with potential poor site drainage make this site particularly susceptible to subgrade deterioration. Thus, grading should be performed during a dry season if at all possible. This should minimize these potential problems, although they may not be eliminated.. The project's budget should include an allowance for subgrade improvements (undercut and backfill with structural fill or aggregate base in the building and pavement areas). Solutions, Inc. Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Control of surface water is very important to the successful completion of the proposed construction. The contractor should plan his grading activities to control surface water and ,minimize erosion of exposed cut or fill material. This may include constructing temporary berms, ditches, flumes and/or slope drains to intercept runoff and discharge it in a controlled fashion, while complying with state and local regulations. 4.2 Subgrade Preparation Following the clearing operation, the exposed subgrade soils should be densified with a large static drum roller. After the subgrade soils have been densified, they should be evaluated by G E T Solutions, Inc. for stability. Accordingly, the subgrade soils should be proofrolled to check for pockets of loose material hidden beneath a crust of better soil. Several passes should be made by a large rubber -tired roller or loaded dump truck over.the construction areas, with the successive passes aligned perpendicularly. The number of passes will be determined in the field by the Geotechnical Engineer depending on the soils conditions. Any pumping and unstable areas observed during proofrolling (beyond the initial cut) should be undercut and/or stabilized at the directions of the Geotechnical Engineer. The prepared subgrade should be sloped to prevent the accumulation and/or ponding of surface water. If the exposed subgrade becomes wet or frozen, the geotechnical engineer should be consulted. Following the proofroll and approval by the engineer, it is recommended that the newly exposed subgrade soils be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557), as tested to a depth of at least 12 inches. The suitability of compacting the natural subgrade soils should be more accurately determined in the field by the G E T Solutions, Inc. representative at the time of construction as the compaction operations could deteriorate the subgrade soil conditions. Accordingly, it is anticipated that this site will require monitoring of the clearing, subgrade preparation, and fill placement procedures by a G E T Solutions, Inc. representative in order to minimize potential deterioration of the natural subgrade soils. The compaction testing of the natural subgrade soils may be waived by the Geotechnical Engineer, where firm and stable bearing conditions are observed during the proofroll. 4.3 Structural Fill and Placement Following the approval of the natural subgrade soils by the Geotechnical Engineer, the placement of the fill required to establish the design grades may begin. Any material to be used for structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20% by weight of fines (SP, SM, SW, GP, GW), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics, clay, debris and other unsuitable material. CEOVE - GET . JAN 31 2013 nv: Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G The subsurface soils encountered at the boring locations and classified to consist of,Silty SAND (SM) and SAND (SP-SM) appear to meet the criteria recommended in this report for reuse as structural fill. Further classification testing (natural moisture content, gradation analysis, and Proctor testing) should be performed in the field during construction to evaluate the suitability of excavated soils for reuse as fill within building and pavement areas. The remaining on -site excavated soils (Topsoil, CLAY (CL) and SAND (SC) are not anticipated to be suitable for re -use as structural fill but may be used as fill within green areas. All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum Ary density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. Backfill material in utility trenches within the construction areas should consist of structural fill (as previously above), and should be compacted to at least 98 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. Care should be used when operating the compactors near existing structures to avoid transmission of the vibrations that could cause settlement damage or disturb occupants. In this regard, it is recommended that the vibratory roller remain at least 25 feet away from existing structures; these areas should be compacted with small, hand -operated compaction equipment. 4.4 Shallow Foundation Design Recommendations - Buildings Provided that the construction procedures are properly performed, the proposed structures can be supported by shallow spread footings bearing upon firm natural soil or well compacted structural fill material. The footings can be designed using a net allowable soil pressure of 2,000 pounds per square foot (psf). In using net pressures, the weight of the footings and backfill over the footings, including the weight of the floor slab, need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the footings. In order to develop the recommended bearing capacity of 2,000 pounds per square foot (psf), the base of the footings should have an embedment of at least 24 inches beneath finished grades and wall footings should have a minimum width of 24 inches. In addition, isolated square column footings are recommended to be a minimum of 3 feet by 3 feet in area for bearing capacity consideration. The recommended 24-inch footing embedment is considered sufficient to provide adequate cover against frost penetration to the bearing soils. t 10 Solutions. Inc 1iY 1 4 " Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog Sol — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G 4.5 Shallow Foundation Settlements - Buildings It is estimated that, with proper site preparation including the subsurface improvements noted above (where required), the maximum resulting post construction total settlement of the proposed building foundations should be up to 1 inch, as contributed by the foundation bearing soils. The maximum differential settlement magnitude is expected to be less than'/2 -inch between adjacent footings (wall footings and column footings of widely varying loading conditions), as contributed by the foundation bearing soils. The settlements were estimated on the basis of the results of the hand auger borings. Careful field control will contribute substantially towards minimizing the settlements. 4.6 Mat Foundation Design Recommendations — Water Storage Tank Provided that the previously recommended earthwork construction procedures are properly performed, the proposed above ground water storage tank can be supported by shallow spread (Mat) footing bearing over firm natural soil or well -compacted structural fill material. The mat foundations can be designed using a net allowable soil pressure of up to 1,500 pounds per square foot (psf). In using net pressures, the weight of the foundation need not be considered. Hence, only loads applied at or above the finished floor need to be used for dimensioning the mat. A licensed structural engineer should design the foundation concrete and reinforcement. However, in order to aid in minimizing the potential effects of the differential foundation settlement, it is recommended that the mat foundation designs provide a structurally rigid member to evenly distribute the loads. In order to develop the recommended bearing capacity, the base of the mat footing for the above ground storage tank should have an embedment of at least 18 inches beneath existing grades. In order to accommodate for the anticipated and estimated elastic (immediate) settlement of approximately 1 to 1.5-inches (center of tank) and 0.5 to 1-inch (edges of tank) as indicated in Section 4.7 of this report, it is recommended to perform the filling procedures within the storage tanks areas in no less than three (3) equal stages (lifts). Each stage (lift) should be allowed to remain in -place for approximately 3-weeks prior to commencing with the subsequent lifts. Monitoring the settlements during stage filling is recommended in order to determine the next stage of filling. 4.7 Mat Foundation Settlements — Water Storage Tank It is estimated that, with proper site preparation, the maximum resulting total settlement of the proposed mat foundation for the water storage tank should up to about 2.5-inches (to the depths explored). The estimated settlement for the storage tank is anticipated to consist of up to 1.0 to 1.5-inches of elastic (immediate) settlement to occur during the staged filling of the storage tanks and approximately 0.5 to 1-inch of long-term settlement. More specifically, the staged filling is recommended to be performed in 3 equal volumes in order to minimize total and differential settlement effects as opposed to a single filling event. Total differential settlement occurring between the center and the edges of the tank ECEIVE¢:. GET JAN 3 12013 Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog Sol — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G pads will be about 1/3 to 1/2 of the total settlement indicated above. The settlement was estimated on the basis of the results of the field penetration tests in combination with the anticipated dimensions of the water storage tank (24.5 feet in diameter and 24-feet in height), which based on the specified 80,000 gallon storage capacity and our experience with similar above ground water storage tanks. Careful field control will contribute substantially towards minimizing the settlements. If these settlements cannot be tolerated by the tank structure or plumbing, then the tank area should be. surcharged (about 15 feet of fill for about 6 weeks), or the tank be supported on piles. 4.8 Foundation Excavations In preparation for shallow foundation support, the footing excavations should extend into firm natural soil or well compacted structural fill. All foundation excavations should be observed by G E T Solutions, Inc. At that time, the Geotechnical Engineer should also explore the extent of excessively loose, soft, or otherwise unsuitable material within the exposed excavations. Also, at the time of footing observations, the Geotechnical Engineer may find it necessary to make hand auger borings or use.a hand penetration device in the bases of the foundation excavations. If pockets of unsuitable soils requiring undercut are encountered in the footing excavations, the proposed footing elevation should be re-established by means of backfilling with "flowable fill", an open graded washed stone (such as No. 57 stone), or a suitable structural fill material compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D 1557), as described in Section 4.3 of this report, prior to concrete placement. Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footings be compacted using hand operated mechanical tampers, to a dry density of at least 98% of the Modified Proctor maximum dry density (ASTM D 1557) as tested to a depth of 12 inches, for bearing capacity considerations. In this manner, any localized areas, which have been loosened by excavation operations, should be adequately recompacted. The compaction testing in the base of the footings may be waived by the Geotechnical Engineer, where firm bearing soils are observed during the footing inspections. Soils exposed in the bases of all satisfactory foundation excavations should be protected against any detrimental change in condition such as from physical disturbance, rain or frost. Surface run-off water should be drained away from the excavations and not be allowed to pond. If possible, all footing concrete should be placed the same day the excavation is made. If this is not possible, the footing excavations should be adequately protected. s _ 12 GET Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SO[ - Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G 4.9 Building Floor Slabs The building floor slabs may be constructed as a slab -on -grade members provided the previously recommended earthwork activities and evaluations are carried out properly. It is recommended that the ground floor slab be directly supported by at least a 4-inch layer of relatively clean, compacted, poorly graded sand (SP) or gravel (GP) with less than 5% passing the No. 200 Sieve (0.074 mm). The purpose of the 4-inch layer is to act as a capillary barrier and equalize moisture conditions beneath the slab. It is recommended that all ground floor slabs be "floating". That is, generally ground supported and not rigidly connected to walls or foundations. This is to minimize the possibility of cracking and displacement of the floor slabs because of differential movements between the slab and the foundation. It is also recommended that the floor slab bearing soils be covered by a vapor barrier or retarder in order to minimize the potential for floor dampness, which can affect the performance of glued tile and carpet. Generally, use a vapor retarder for minimal vapor resistance protection below the slab on grade. When floor finishes, site conditions or other considerations require greater vapor resistance protection; consideration should be given to using a vapor barrier. Selection of a vapor retarder or barrier should be made by the Architect based on project requirements. 4.10 Pavement Design The recent field DCP testing indicated in -place CBR values generally ranging from about 3 to 12, and averaged 7.5, at depths ranging from approximately 6 to 24 inches below the existing site grade elevations at the tested locations. The prior field DCP testing indicated in -place CBR values generally ranging from about 5.5 to 23, and averaged 12, at depths ranging from approximately 6 to 24 inches below the existing site grade elevations at the tested locations. The overall average of both the recent and prior field DCP testing is about 10. The average in -place CBR value was multiplied by a factor of two-thirds to determine the pavement design CBR value. The two-thirds factor provides the necessary safety margins to compensate for some non -uniformity of the soil. Therefore, a CBR value of about 7 should be used in designing the asphalt pavement section thicknesses. A summary of the DCP test results are presented in Appendix IV and VI. The typical minimum pavement sections provided in the following table are based on the results of our DCP testing, field explorations, and experience with similar soils conditions. Furthermore, these typical sections do not represent a completed AASHTO pavement design in accordance with the NCDOT and/or UFC requirements and are considered to be preliminary. ECEIVEi. 13 JAN 3 1202 BY; Solutions. Inc Report of Subsurface Investigation and Geotechnical Engineering P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Table IV — Typical Minimum Pavement Sections March 8, 2011 Hot Mix As halt Section Concrete' Aggregate Subgrade••• Surface Base (SF-9.5A or (1-19 0) Base" S9.513 Standard Duty 2" 8" Firm, Stable and Asphalt Com acted Heavy Duty 2" 3" 8- Firm, Stable and As all Compacted Rigid 8" 8" Firm, Stable and Standard Du Compacted Rigid 10" 6" Firm, Stable and (HeavyDu Compacted Concrete minimal compressive strength of 4000 psi at 28 days. NCDOT Type ABC, compacted to a dry density of at least 100% of the Modified Proctor maximum dry density (ASTM D 1557). Actual pavement section thickness should be provided by the design civil engineer based on traffic loads, volume, and the owners design life requirements. The above sections correspond to thickness representative of typical local construction practices and as such periodic maintenance should be anticipated. All pavement material and construction procedures should conform to North Carolina Department of Transportation (NCDOT) requirements. Following pavement rough grading operations, the exposed subgrade should be observed under proofrolling. This proofrolling should be accomplished with a fully loaded dump truck or 7 to 10 ton drum roller to check for pockets of soft material hidden beneath a thin crust of better soil. Any unsuitable materials thus exposed should be removed and replaced with a well -compacted material. The inspection of these phases should be performed by the Geotechnical Engineer or his representative. The subgrade soils are likely to be unstable at the time of construction and some ground improvements are likely. As such, the project's budget should include a contingency to accommodate the potential ground improvements. Where excessively unstable subgrade soils are observed during proofrolling and/or fill placement, it is expected that these weak areas can be stabilized by means of thickening the base course layer by 2 to 4 inches and/or placing an inter -bedded layer of geotextile biaxial geogrid (such as Tensar BX1100, or equivalent) within the ABC materials. These alternates are to be addressed by the Geotechnical Engineer during construction, if necessary, who will recommend the most economical approach at the time. 14 Solutions. Inc Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G 4.11 Seismic Design Recommendations: It is noted that, in accordance with the NC Building Code; Chapter 16, this site would be classified as a site Class D, based on which seismic designs should be incorporated. This recommendation is based on the data obtained from the 70-foot deep SPT borings, our experience with 100-foot deep CPT soundings and SPT borings performed within the vicinity of the project site, as well as the requirements indicated in the North Carolina State Building Code (2006 International Building Code). 4.12 Soil Permeability Six (6) infiltration tests were performed at boring locations BMP-1 through BMP-6 (one test at each location). The tests were performed at a depth of 2 feet below the existing site grade elevation. The borehole was prepared utilizing an auger to remove soil clippings from the base. Infiltration testing was then conducted within the vadose zone utilizing a Precision Permeameter and the following testing procedures. A support stand was assembled and placed adjacent to the borehole. This stand holds a calibrated reservoir (2000 ml) and a cable used to raise and lower the water control unit (WCU). The WCU establishes a constant water head within the borehole during testing by use of a precision valve and float assembly. The WCU was attached to the flow reservoir with a 2-meter (6.6 foot) braided PVC hose and then lowered by cable into the borehole to the test depth elevation. As required by the Glover solution, the WCU was suspended above the bottom of the borehole at an elevation of approximately 5 times the borehole diameter. The shut-off valve was then opened allowing water to pass through the WCU to fill the borehole to the constant water level elevation. The absorption rate slowed as the soil voids became filled and an equilibrium developed as a wetting bulb developed around the borehole. Water was continuously added until the flow rate stabilized. The reservoir was then re -filled in order to begin testing. During testing, as the water drained into the borehole and surrounding soils, the water level within the calibrated reservoirwas recorded as well as the elapsed time during each interval. The test was continued until relatively consistent flow rates were documented. During testing the quick release connections and shutoff valve were monitored to ensure that no leakage occurred. The flow rate (Q), height of the constant water level (H), and borehole diameter (D) were used to calculate KS utilizing the Glover Solution. Based on the field testing and corroborated with laboratory testing results (published values compared to classification results), the hydraulic conductivity of the shallow soils is tabulated below (Table V) and is presented on the "Hydraulic Conductivity Worksheet" (Appendix V), included with this report. riA. CEIVE 15 31 2013 BY:_ ----- Solutions. Inc Report of Subsurface Investigation and Geotechnical Engineering P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G Table V - Infiltration Test Results March 8, 2011 Boring Boring depth ft Percent Silt and/or Clay Ksat Value cm/sec Ksat Value in/hr Ksat Class BMP-1 2.0 49.5 8.64 x 10 0.012 Low BMP-2 2.0 45.7 2.94 x I V 0.042 Low BMP-3 2.0 33.0 9.88 x 10' 0.140 Moderate BMP-4 2.0 23.8 1.31 x 10 0.185 Moderate BMP-5 2.0 52.3 1.75 x 10 0.002 VeryLow BMP 6 2.0 51.1 3.97 x 10 0.006 VeryLow 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns It is expected that dewatering may be required for excavations that extend near or below the existing groundwater table. Dewatering above the groundwater level could probably be accomplished by pumping from sumps. Dewatering at depths below the groundwater level may require well pointing. It would be advantageous to construct all fills early in the construction. If this is not accomplished, disturbance of the existing site drainage could result in collection of surface water in some areas, thus rendering these areas wet and very loose. Temporary drainage ditches should be employed by the contractor to accentuate drainage during construction. If water collects in foundation excavations, it will be necessary to remove water from the excavations, remove saturated soils, and re -test the adequacy of the bearing surface soils to support the design bearing pressure prior to concrete placement. 5.2 Site Utility Installation The base of the utility trenches should be observed by a qualified inspector prior to the pipe and structure placements to verify the suitability of the bearing soils. If unstable bearing soils are encountered during installation some form of stabilization may be required to provide suitable bedding. This stabilization is typically accomplished by providing additional bedding materials (NCDOT No. 57 stone). In addition, depending on the depth of the utility trench excavation, some means of dewatering may be required to facilitate the utility installation and associated backfilling. All utility excavations should be backfilled with structural fill, as described in Section 4.3 of this report. ''16 GET Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: JX10-114G 5.4 Excavations In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches or excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches,, basement excavation or footing excavations, be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary excavations and should shore, slope, or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or the contractor's activities; such responsibility is not being implied and should not be inferred. 6.0 REPORT LIMITATIONS The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client and their consultants for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc. should be notified immediately to determine if changes in the foundation recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. ECEIVE 17 JAN 3 12013 BY: Report of Subsurface Investigation and Geotechnical Engineering March 8, 2011 P-1269 Devil Dog SOI — Field Training Facility Camp Lejeune, North Carolina GET Project No: Al0-114G After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork and foundation recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations. This report has been prepared for the exclusive use of Archer Western Contractors, LTD and their consultants for the specific application to the proposed P-1269 Devil Dog SOI - Field Training Facility project located within the Camp Lejeune military installation in North Carolina. . 18 GET , 71 - I. APPENDICES BORING LOCATION PLAN II BORING LOGS III GENERALIZED SOIL PROFILE IV DCP TEST DATA V HYDRAULIC CONDUCTIVITY WORKSHEETS VI PREVIOUSLY COMPLETED BORINGS ASSOCIATED WITH THE FEASABILITY STUDY DATED AUGUST 10, 2009 ALONG WITH THE BORING LOCATION SKETCHES AND DCP TEST DATA VII CLASSIFICATION SYSTEM FOR SOIL EXPLORATION CEIVEDa JAN 3 12013 BY: a N BORING LOCATION PLAN PROJECT: P-1269 Devil Dog SOI, Field Training Facility MCB Camp Lejeune, North Carolina PROJECT NO: JX10-114G CLIENT: Archer Western Contractors, LTD SCALE: As Drawn DATE: 3/7/2011 PLOT BY: GH GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Leieune, NC PROJECT NO.: JX10-114G - -- rmfd-r•r..�.,.�r•rmq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2.18-11 B-9 DEPTH TO WATER -INITIAL': a 10 AFTER 24 HOURS: -T CAVING> L c E ii m m � v U n y d a' � a 01 3 m m m o u TEST RESULTS Plastic Limit H Liquid Limit n m o E o Description (7 n Z E V~ m n z v Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 Brown, moist, Silty fine to medium SAND (SM), Loose _ s 1 12 as s 8 :...:...:...:...:...:...:... Tan and brown, moist, Silty fine to medium SAND (SM) with trace Z : _ Clay, Loose .. 2 22 as 3 5 .. _.......... ..........:... . 4 ::::: .... 4 3 s Light gray and brown, moist, Poorly Graded fine to medium SAND ,5? i r 4 - - (SP-SM) with trace Silt, Loose to Medium Dense .... { 3 18 as s 10 - - - - - — �l'[i s : . ......... .......... ....... Y ...... �;rr n:[r 4 20 as s 10 ...:...:...:...:...:...:... YCi 17 ..:...:...:...:... / 5 11 ss a 7 10, 1 i[!10 9 Orangish brown and light gray, wet, Silty fine to medium SAND (SM) 4 2 with little Clay, Loose s 1a as 3 s .--......-.---- 3 4 z 7 16 as 2 6 q is 3 — 18 Light gray, wet, Poorly Graded fine to medium SAND (SP-SM) with ! ��: Z 3 s trace Silt, Loose 8 15 as 3 6 .:...........:...:...:...:... �1[r l }a t ltr Gray, wet, Silty fine to medium SAND (SM) with Shell Fragments, 4 . . _ Loose 4i[i 9 21 as 3 5 i .:..........:...:...:...:... 2s z Boring terminated at 25 ft. 9. ....:...:.. .:. ..:............... 30 10 — JAN 3 1 2013 _:..:..: BY: _:...:...:._...:...:... Notes:: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample I *The initial aroundwater readina may not be indicative of the static oroundwater leveL WOH = W In of Hammer I PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM O 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX10-114G ® r�ir.r .nwe4 BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: qwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-18-11 B-2 DEPTH TO WATER -INITIAL*: 10 AFTER 24 HOURS: _ CAVING> L c ,� .Tn a d a to n m e 0o TEST RESULTS m u Description a� d z a> ry a Plastic Limit t-t Liquid Limit o E o N N y N r a n z v Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 2-inches of Topsoil _ _ 5 0.1F 1 23 as 8 13 ..:...:...:..:._:_.:... Light brown, moist, Silty fine to medium SAND (SM) with little Clay 6 Medium Dense ..:...:...:...:...:...:... 4 iiLi " t • 2 21 ss 5 s 10 .......................:... ' Whitish tan, moist, Poorly Graded fine to medium SAND (SP-SM) with trace Silt, Loose to Medium Dense tl Lr .. rl. 7 1..: � I .:.. :. I :...:...:... 3 18 as 5 5 �C 11 ........... ......:...:... 6 2 ri:ii. 5 ............. 4 19 ss 5 12 ..........:...:. _:...:... Sii .Ttr s : par.... Ytf .. .......... ... ...... 4 1kfi: 5 13 as Z 5 .:...:.......:...:...:...:... 10 J'c f t :... 2 10 _ 2 Light gray, wet, Clayey fine to medium SAND (SC), Very Loose 2 — ...'..'. . . . 6 14 ss 2 4 12 . J Orangish brown and light gray, wet, Poorly Graded fine to medium 1«si: _ SAND (SP-SM) with trace Silt, Loose to Medium Dense ri f ................... . 7 tr.tJ. ztr 7 14 ss 2 6 .............. .___....... 5 -- — .... Jti[f fY.LL' 0 L1 N. J:cti 8 15 ss 8 11 ...:...: ..:...:_ .:...:... fi 20 zti i:f i I IA ;4 Gray, wet, Poorly Graded fine to medium SAND (SP-SM) with trace ..... I"i s Silt, Medium Dense rr.Lv 9 13 ss 12 ..:..:...:...........:... — 25 r:. r j 9 Boring terminated at 25 ft. 30 10 ... .... ... .... ........ .. .. ...... 3 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in geneml accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI - Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Leieune, NC PROJECT NO.: JX10-114G I•r.�„W r� BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: qwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-16-10 ,. B-3 DEPTH TO WATER -INITIAL': 8 13 AFTER 24 HOURS: CAVING> l_ c m m m m$ TEST RESULTS Plastic Limit H Liquid Limit m a d a d Description n 6 z a' a °' 1O m a 'm o E o t7 n m m �~ m$ Z v Moisture Content - • N-Value- 10 20 30 40 50 60 70 0 0 3-inches of Topsoil a 0 0.2 122 ss 48Brown, moist, Silty fine to medium SAND (SM), Loose 4 Orangish brown, moist, Silty fine to medium SAND (SM), Loose ox 3 2 22 ss 3 63 Orangish brown, moist, -Sandy Lean CLAY (CL), Medium Stiff4 — xzz 3 22 ss 3 7 :...:.. r...:...:...:...:... 4 2 Slightly mottled grayorangish brown, moist, Sandy Lean CLAY (CL) e Soft to Medium Stiff, Stiff 4 22 ss 5 9 6 � � ray and orangish brown, moist to wet, Clayey fine to medium SAN 3 _ (SC), Very Loose to Loose ...... 5 21 ss 4 7 6-'' 11 2 . . .ss i . .. ... ... 2 _:...:...I ...:...........:. f .............. .....'. 1 7 18 ss 2 8 — 16._... Gray, wet, Clayey fine to medium SAND (SC), Very Loose ...... WOH woH ... .. ..:....... - .'.r... 8 24 ss 1 1 35.E ...:...:...:...: _L....:...:... s 20 — 23 3 Grayish brown, wet, Silty fine to medium SAND (SM) with Shell 2 Fragments, Very Loose ;; 9 16 ss 1 3 ..:...:...:...:...:...:...:... 25 28 Light gray, wet, Poorly Graded fine to medium SAND (SP-SM) with fi r:� 6: 13* pace Silt and Rock Fragments, Dense to Very Dense '+:e r } to 20 ss 13 23' 30 tr.r1. 20 1{[f rr.ir ...:... c...:...:...:...:...:... Y4t[ 1 3s[r r.[r 11 17 ss 31 58 75 tr� �® EcEI A:yti 33 E! E - JAN 3 12013 4 16 16 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample . BS = Bulk Sample *The initial aroundwater readino may not be indicative of the static aroundwater /evel. WOH f Hammer I PAGE 1 of 2 Standard Penetration Tests were performed in the field in General accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune NC PROJECT NO.: JX10-114G ® f.l•c,J.®.1•mme BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-18-10 B-3 DEPTH TO WATER -INITIAL': 4V� 13 AFTER 24 HOURS: CAVING> .L a r t >? t m m m m o TEST RESULTS Plastic Limit H Liquid Limit m a m n v m D05CflptlOrl n d a m to m c'u m 1 o E o z m n Z Moisture Content - • uWjN-Value rn In a - 10 20 30 40 50 60 70 12 Light gray, wet, Poorly Graded fine to medium SAND (SP-SM) with ... 12 18 ss 22 38 40 trace Silt and Rock Fragments, Dense to Very Dense ; T C C — zs .....:.. :r f [ zff 10 n:Lr ]r(i 13 14 as 10 39-- 45 u: rl. ]:CCf 1 22 :.. .:. ..:...:... 14 IF r f 'I'411 Greenish gray, wet, Poorly Graded fine to medium SAND (SP•SM) Lrii. So with trace Silt, Medium Dense to Dense t1 7 � 14 — e I:rr{... ]1[i t6 n:[r ... .. ......... .... 12 15 20 ss i6 31 ................ 55 i]:[7: 19 t :I:tf :kttY•4Y I S[1 l i:lF 6 to 1>tt 16 24 as y 16 .....:...........:....... 60 ii�i'r' 12 l i'kl .. r . xofiat: .:.. .:.. 04rL 17 24 as a 14:...:._ :...:...:...:... 20 65 •1.1'(r f0 6 i:Ftf — [i: i1., 18 24 as 10 17 :...;._;...;...:... �... 70 a:L i 1 . 12 Boring terminated at 70 ft.--"` 22 75 �. Notes: "' SS = Split Spoon Sample - - - - - - -" ST =Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI - Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX10-114G nmua.fe,t•cae.�..w•tmng BORING LOCATION: See'Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 B-4 DEPTH TO WATER • INITIAL': " 11 AFTER 24 HOURS: CAVING> L m n m a m n ad m 0 m a 3 m m oo u TEST RESULTS Plastic Limit Fi Liquid Limit m o E o= Description N Z N N r m n i Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 6-inches of Topsoil 3 — 0. ...... 1 24 as 3 9 ... _:...:...: ........... Orangish brown and tan to orangish brown and light gray, moist, 4 — Clayey fine to medium SAND (SC), Loose .'. '.' 3"''"' — 2 23 ss 5 9 :...:...:...:...:...:...: s ........................... 5 ..'..".' 5 as 5 9 :...:...:...:...:...:....... s 4 .."..".." ...... 4 24 as 4 6 . 2 Orangish brown and light gray, moist, Silty fine to medium SAND 2 (SM) with trace Clay, Loose 5 18 as 3 5 10 — ::::: ..... 3 :. ... ........ .:...:... :... 2 ..1.. 6 20 as 5 8 : _.:...:...:.. :...:...: 11- Orangish brown and light gray, wet, Poorly Graded fine to medium 1'.+: k i 4 — SAND(SP-SM) with trace Silt, Loose rzn:" _ ....... .. .......... ..... ..... 3 trr 7 11 as 6 .:...:...:...: :...:..." rr. n' u: n. Mtl r�ctr — 18 Orangish brown, wet, Poorly Graded fine to medium SAND (SP-SM) !�i: e s s with trace Silt, Medium Dense i� 8 10 ss s e 18-"'—"-""'—'— 20 ...... it 3;e r I in'f r 23il;.if Gray, wet, Poorly Graded fine to medium SAND (SP-SM) with trace :I.if is Silt and Rock Fragments, Dense rr.tr y;; r F 9 16 ss i6 31 ...:...:...:...:... " 25 36 ...:. Boring terminated at 25 ft. 30 35 E C E I V ... ... ... ... . JAN 3 12013 BY: _.;... : Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial oroundwater readina may not indi .......... cative of the static oroundwatar lavat WOH - Welaht of Hammer I PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI - Field Training Facility Archer Western Contractors. LTD PROJECT LOCATION: MCB Camp Leieune, NC PROJECT NO.: JX10.114G ®CLIENT: - r•c,a.mlw•meq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 B-rJ DEPTH TO WATER - INITIAL*: a 13 AFTER 24 HOURS: T _ CAVING> C c - o TEST RESULTS Plastic Limit H Liquid Limit �p J m. n d o n a) o m Description n a d Z a am 3 to m u E L� n n gEmi Inn z e Moisture Content - • N-Value - 0 a 10 20 30 40 50 60 70 _ 3-inches of Topsoil 3 __ 0.2 Orangish brown, moist, Clayey fine to medium SAND (SC), Loose . ;..:..: " 1 24 ss 4 3 7 :...:...: Light gray and orangish brown, moist, Clayey fine to medium SAND .".'. 3 ..:...:... - a ' (SC), Loose '.....: 2 18 ss 4 7 :. _:...:...:...:...:....... ... s r .". "." 3 24 ss 5 10 ...:...:...:...:... ..... e 5 5 10 ..'.. '..' 3 :.. .:...:.. .:...:...:... 10 Tan and orangish brown, moist to wet, Poorly Graded fine to mediuI x i i a SAND (SP-SM) with trace Silt, Very Loose to Loose t i s r x 4 — 11i7. ......... ........ ..1 ...[... 4 . _ r iral .:...:...:... :...:...:.. .:... 3 ri i! 7 16 ss 4 .:...:...:...: ..:...:...:... 15_ 3 .:.. ............:. _:...:. . tY t! .... e!L 18 Orangish brown, wet, Poorly Graded fine to medium SAND (SP-SM) 410 1 �: — — 5 4 6 with trace Silt, Loose irL 8 t2 ss 5 9'--- 20 5 ttt 3;e r t ': — 23 Gray, wet, Poorly Graded fine to medium SAND (SP-SM) with trace!* i 1 -- 1z 33 Silt and Rock Fragments, Very Dense n:Lr ;,; r F 9 18 ss 33 56 s Boring temtinated at 25 ft. 10 35 r i Notes: - -... - 1 " SS = Split Spoon Sample ST = Shelby Tube Sample . HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Leleune, NC PROJECT NO.: JX10-114G t�aaar.c,d=®w•mq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 B-S DEPTH TO WATER -INITIAL': s 13 AFTER 24 HOURS: v _ CAVING> L r m m m m m o TEST RESULTS Plastic Limit H Liquid Limit m n d n m Description n a d Z �' 3'O m m o E o= C7 r° n 0~ m °a Z v Moisture Content - • a` N-Value - 10 20 30 40 50 60 70 0 0 4-inches of Topsoil 4 --.... 0.3 ..'..'..' 1 23 ss 3 5 .:...:... :...: ............... Orangish brown, moist, Clayey fine to medium SAND (SC), Loose - 2 2 3 Slightly mottled orangish brown -gray, moist, Sandy Lean CLAY (CC), 3 Medium Stiff.: 2 21 ss 6 ...:...:...:...:...:...:... 4 4 6 Oran Ish brown and gray, moist, Clayey fine to medium SAND SC 9 9 Y. Y ( ) Loose 3 17 as y 7 4 ............:...:...:...:... 2 3 ...'... 4 i ... 10 3 Orangish brown, moist to wet, Poorly Graded fine to medium SAND T.t i 3 2 2 - (SP-SM) with trace Silt, Loose ?t V6 6 18 as 6 .....:. i �rt1 5 3 i 7 i'i t'l.tr 7 12 as 3 5 - .:...:...:.... .............. is Ati' 4 >tl trit j re[t :...:.. .:. .:...:.. lxtf a 19 05 10 ...:...:...:...:...:...:... 6 � lT.tt: 6 t,tr lYlf ..:...:...:...:...: i:r• r L ..II 23 Orangish brown and gray, wet, Poorly Graded fine to medium SAND jX r * i 6 6 / (SP-SM) with trace Silt, Medium Dense 25 Boring terminated at 25 ft. 30 10 JAN 3 12013 _.:...: :. Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial oroundwater readina may not be indicative of the static oroundwater lavell WOH = Weicht of Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in .general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX10.114G r .ae�•c�....,ar• BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 B-% DEPTH TO WATER - INITIAL': a 13 AFTER 24 HOURS: CAVING> C c z oo TEST RESULTS Plastic Limit H Liquid Limit i N m m m m Description E 6 E$ E o toa w o E o` rn in y 1- m a i s Moisture Content -• N-Value - 0 0 10 20 30 40 50 60 70 11-inches of Topsoil _ _ 3 ::.:: 1 23 ss e 8 a ...:...:...:...:...:...: 0.92 Tan, moist, Silty fine to medium SAND (SM), Loose 3 f. Light gray and orangish brown, moist, Clayey fine to medium SAND ... a . . . ' . ' ' (SC), Very Loose to Loose .:..: 2 24 ss 4 7 : : : : a : : a :...:...:...:...:... a ... ...:._ s ' ' 3 23 ss 5 10 ...:...... ....:...:...: a z 4 • ....... 4 23 ss 5 9 :. _:...:...:. .:...:. _:... 4 i ` _..'.. 5 22 ss z 4 10 10 ... — — ......... ................. Orangish brown, moist to wet, Silty fine to medium SAND (SM) with [ i - ' trace Clay, Very Loose ?;;;; 6 22 ss i 4 ------ 3 4 1 7 18 ss z 4 .............: 5 4 Gray, wet, Clayey fine to medium SAND (SC), Very Loose 18 .... _. u s 19.5 ...'_'. :.:.. 8 24 ss z 2 ..:...:...:...:...:. Brown, wet, Poorly Graded fine to medium SAND (SP-SM) with tra z0 s e I — — - - - - Silt, Loose "' t kA 11� IYLI 11�t1' irr 4 .. .:...:. ..:.. .....:...:... 9 16 ss 410 ...:...:...:...:...:...:... 25 crt 9 Boring terminated at 25 ft. 30 10 3s Notes: - SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *T17e initial oroundwater readina may not be indicative of the static aroundwater level, WOH = Weiahl of Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog S01 - Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Leleune, NC PROJECT NO.: JX10-114G PMMOEEMMM - - comwL.6.wn.nm. mroy BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 B'H DEPTH TO WATER -INITIAL*: s- 11 AFTER 24 HOURS: CAVING> L Z 1'%h U 4) m 02 m o TEST RESULTS Plastic Limit H Liquid Limit m� o, JOE ntd Description n d Z a m~ 3 ro m m a p o�.? (7 rq m$ n i s Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 3-inches of Topsoil _ 3 0.2" " 1 24 ss 3 6 .: _.:...:. ..:...:...:... :... Brown, moist, Clayey fine to medium SAND (SC), Loose 3 / Gray and orangish brown, moist, Clayey fine to medium SAND (SC), .....' 5 L0058 2 24 ss 5 10 ...:...:. .................. 5 4 5 .'..'..'. 3 24 ss 4 8 :...:...:...:...:...:...:... 5 4 2 " 4 24 ss 5 9 4 :...:...:...:...:...:...:.. Orangish brown and gray, moist, Clayey fine to medium SAND (SC), .." ." 2 _ Very Loose to Loose .:.: .: 5 19 ss 2 4 --------- i 10 .'..'.'. 2 .. _........................ _ 2 .'..'..'. 6 19 as 5 B .. _......... _.... ._...... -- 4 4 ... 4 .'..'..'. 7 17 ss 3 6 15 78 Orangish brown to tan, moist to wet, Poorly Grades fine to medium :....._.. B a — a Silt, Medium Dense ...1 8 19 17SAND(SP-SM)withtrace " ;'r r :. ..:...:...:.. .:. :20 ... tY[r i iitr 23 .. 4 No Recovery — 9 0 ss 12 19 _: _.:...:...:...:... 25 t Boring terminated at 25 ft. 9 ..:._c...:..-: _.:._:...:... to 35 ECERVE - JAN 3 12013 ._ Y. Notes: SS = Split Spoon Sample ST - Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The OiUal aroundwater roadina may not be indicative of the static aroundwater /eye/. WOH - Weiahl of Hammer I PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM 0 1586. GET PROJECT: P-1269 Devil Dog S01-Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, INC PROJECT NO.: JX10.114G ® r•r,.r.®r. mee? BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 BMP-1 DEPTH TO WATER -INITIAL*: s 9 AFTER 24 HOURS: _ CAVING> - o y t r - m m n m m m a m 0 io m e TEST�RESULTS Plastic Limit"iH Liquid Limit f m m a d o n m o= Description a d z > m m a E c� m n n~ a i s Moisture Conte • N-Value - 0 0 10 20 30 40 c50 60 70 4-inches of Topsoil 3 :!:: 1 24 as 2 3 5 g ' 0.3j.:..... Orangish brown and tan, moist, Clayey fine to medium SAND (SC), Loose .:....._:...:_�:...i...i... .... 3 — 2 17 as 2 5 .:...:...:....._ ............ 5 4 Light gray amd orangish brown, moist, Clayey fine to medium SAND ... : : : 3 i : ...... .............. ........ (SC), Loose :.:: 3 19 ss 4 7 :...:...:...:...:...:...:... _ 4 2 Estimated SHWT 4 feet 3 ...... ... 4 23 ss 3 6 :...:...:...:...:...:._:... 8 ...... 3 Orangish brown and light gray, moist to wet, Silry fine to medium 32 SAND (SM), Loose ?;;;! 5 24 ss 3 5—-- — 10 2 Boring terminated at 10 ft. — ............................. 4 t5 e 20 25 g . .:.. .:. ..:. ..:...:...:...:... 30 10 35 Notes: .. __ _ _. _ _... SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were pedprmed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI - Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC •PROJECT NO.: JX10-114G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwti DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-16-11 BMP-Z IDEPTH TO WATER - INITIAL*: a _ AFTER 24 HOURS: T _ CAVING> L c G 'm m� a d o E a d o �, Description U a m Cx d E N Z a' N, m a m M F 3 iO ton m m Z 0 u v TEST RESULTS Plastic Limit N Liquid Limit Moisture Content -• N-Value - 10 20 30 40 50 60 70 0 0 5 8 10 5 2-inches of Topsoil :': ': .-.' . 1 _ 20 _ ss 3 3 .:...:...:. _: ...:...:...:... ............................ ...... ....... — .1 Brown to orangish brown and brown, moist, Clayey fine to medium SAND (SC). Loose :.:.:. ......' 2 22 ss 3 a 5 4 Light gray amd orangish brown to light gray, moist, Silty fine to medium SAND (SM), Loose .. 3 21 as e 6 4 _ ::::: 4 23 as < 5 2 Estimated SHWT Q 4 feet 7 5 21 as 3 3 10 6 Boring terminated at 10 ft.- a ...:...:...:...:...:...... :... 15 20 8 ............ .................. : ........ .. ..... .. ............. • 25 s ' 30 10 ...... ... ....... .. .. .......... `. _ 35 . ECErye,....IVE ...:...:. ..:...:...:...:.. .:... JAN 3 12013 _......:. ... _.... Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial aroundwater readino may not be indicative of the static oroundwater /eye/, WOH = Weiaht of HammeLj PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SO[ - Field Training Facility Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX70-114G ©CLIENT: • r�dd.rm,�,w•mmq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-18-11 BMP-3 DEPTH TO WATER - INITIAL': �,4 9 AFTER 24 HOURS: T _ CAVING> -L c o m oo TEST RESULTS Plastic Limit H Liquid Limit m m m m � m Description n d z �' ; 1D n m c'u o E o 0 m to n~ m Z a Moisture Content- • N-Value - 0 0 10 20 30 40 50 60 70 2-inches of Topsoil _ _ 3 0.1 Dark brown, moist, Silty fine to medium SAND (SM), Loose �:: 1 20 ss ° a 8 1 :...:...:...:...:...:...: " Brown, moist, Silty fine to medium SAND (SM), Loose 3 3 ..... 2 4 a5 3 3 6 5 Light gray and orangish brown to light gray and brown, moist to wet, 33 Silty fine to medium SAND(SM), Loose to Medium Dense [;' 3 24 ss A 7-"--""-""- _ a 2 Estimated SHWT Q 4 feet _ e a 22 ss 7 11 1 a 5 12 ss e 9 10 ..... 2 ' Boring terminated at 10 ft. is 6 20 ...:........ ..............:... 25 e ...:...:. ..:...:.. .:. ..:. ..:... 30 10 35 ... Notes: SS = Split Spoon Sample ST =Shelby Tube Sample HA = an Auger Sample BS =Bulk Sample *The initial aroundwaterreadina may not be indicative of the static oroundwater lavaL WOH - eiaht of Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Leieune, NC PROJECT NO.: JX10-114G rmmaaw•c.d.m�N•nxeq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-18-11 BMP-4 DEPTH TO WATER • INITIAL•: $ _ AFTER 24 HOURS: 3 _ CAVING> L E m m a> m m o'p 'm o u TEST RESULTS Plastic Limit F1 Liquid Limit m O E o m Description ,� z N 8 E N t- m n Z v Moisture Content- • m N-Value - 10 20 30 40 50 60 70 0 0 2-inches of Topsoil 2 0.1 [;; 1 21 ss e 7 :. _t...l._I...: ........... Brown, moist, Silty fine to medium SAND (SM), Loose EiEsi 4 3. :_.:...:...:...:...: _.:... z — 2 19 SS 3 5 ...................:...: : : 3 2 5 Light gray, moist, Silty fine to medium SAND (SM), Loose 3 : 3 3 6 — Estimated SHWT Q 4 feet" 3 .............:._:...:. _:... ... 4 18 ss i 3 2 — 4 — — - - - - Light gray and orangish brown, moist, Clayey fine to medium SAND i . (SC), Very Loose to Loose . . z .�.... ...... 5 16 ss e 7 - 10 ..'..'..' 3 Boring terminated at 10 ft. s 6 20 ............................... : 25 9. ...:. ..................:... :... 30 10 C a , 35 - JAN 3 12013 - BY: Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in General accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune, NC PROJECT NO.: JX10-114G © •c.0 ,w.mmi BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 BMP-5 DEPTH TO WATER - INITIAL*: S _ AFTER 24 HOURS: S _ CAVING> L c,r - y oo TEST RESULTS Plastic Limit H Liquid Limit m u d n m m Description a a o z a °' 3 m m u m o E o U n n 0 n~ m n z v Moisture Content - • 10 N-Value - (� 10 20 30 40 50 60 70 0 0 7-inches of Topsoil 2 0.5 1 23 ss 3 5 .:...:...:...:...:...:... : Brown, moist, Sandy Lean Clay (CL), Medium Stiff to Stiff 2 2 3 2 23 ss e 9 :...:...:...:...:...:...:... 5 q 5 Gray and orangish brown, moist, Clayey fine to medium SAND (SC), .'..'..'. 5 Loose to Medium Dense 3 22 ss 5 10-4— 1--q. s 2 Estimated SHWT @ 4 feet ' e : : . .. ... 4 24 ss a 12 ..:...:...:. .:...:...:.— . .. ... _ 5 5 ........ ............ ..... .'..' . 5 24 ss a — 10 '..'. '. 3 :.. :. :... — .. • Boring terminated at 10 ft. .:. ..:...:...:... .. 4 al a 20 ...:...:...:..:...:. ..:...:... 25 g .. .:...:. ..:...:. .. :.. :.. .:... 30 1 — .. ............. ... .. .... ...... 35 ✓ -. T1 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample 'The initial aroundwater readino may not be indicative of the static oroundwater level. WOH Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Leleune, NC PROJECT NO.: JX10-114G PMKMNNNEIM �.a.ar•�,.r.�„m.n.e� BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: qwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-18-11 BMP-6 DEPTH TO WATER -INITIAL': -?r _ AFTER 24 HOURS: CAVING> L c m 'm a d pm E n -y pm `•' Description g a m n d w z m a i rn $ n m rn I- ; <m m n Z " v TEST RESULTS plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 a 0 5 1 1 4-inches of Topsoil .— 0.3 1 23 as 3 2 .:.. .:...:...:...:...:...: ! Tan, moist, Silty fine to medium SAND (SM) with trace Clay, Loose _ 5 — rzzx" .'..... !!_: 8 9------ .:._.:_.:...:...:...:...:... Tan and orangish brown, moist, Sandy Lean CLAY (CL), Medium LAY Stiff 4 Light gray and orangish brown, moist, Clayey fine to medium SAND (SC), Loose to Medium Dense 2 3 21 24 ss as 3 3 3 5 d s 2 _ Estimated SHWT @ 4 feet 4 24 ss 5 5 11 . . .. . . .. 5 23 as d 3 7 ............... Boring terminated at 10 ft. d ...:...:...:...:............... s............................ . 6 20 ............................... 25 a ..:...:. .. :...:... :...:.. .:... 30 10 - EGEI M E 3s JAN 3 12013 ... . - EY: Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample 'The initial oroundwater readino may not be indicative of the static aroundwatar level. WOH - Weiaht of Hammer I PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM 0 1586. GET PROJECT: P-1269 Devil Dog SOI -Field Training Facility ' CLIENT: Archer Western Contractors, LTD PROJECT LOCATION: MCB Camp Lejeune NC PROJECT NO.: JX10-114G ® m.mr.-==•»� BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 P-1 DEPTH TO WATER -INITIAL*: $ 10 AFTER 24 HOURS: T CAVING> L c L" - oo TEST RESULTS Plastic Limit H Liquid Limit > y n v w m n m m m Description n 12 d E Z o> E n a E 3 m o m m u M 0 E O fj in N m t- m a Z e Moisture Content - • �m N-Value - 0 0 10 20 30 40 50 60 70 Tan, moist, Silty fine to medium SAND (SM), Loose _ _ _ s 1 18 as y 9 :...:...:...:...:...:...:... 3 Brown, moist, Silty fine to medium SAND (SM) with trace Clay, s - Loose 2 3 ss 3 5 .................:...:...:... 4 ....: . 3 . ........ ...... .. ..... 5 A dSii! 3 18 as a 7:...:...............:.. 8 Light gray, moist, Poorly Graded fine to medium SAND (SP-SM) wit 1,. t i 5 - trace Slit, Medium Dense n:R- 4 21 as 10 15 .:...: _.:.. .:...:...:... ,;,;1 ... 14 Orangish brown, moist, Clayey fine to medium SAND (SC), Medium '.":": 1e Dense . .. .. . 5 21 as 5 13 10 5 I Boring terminated at 10 ft. 4. ... ... ......... ....... ..... ..... 1s 20 8 ... :...:. ..: .. :.. .:...:. ..:... 25 8 ...:.. .:. .:...: ..:...:. ..:... 30 10 35 d it j Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample *The initial oroundwater madino may not be indicative of the static aroundwater /eye/. WOH = Weiaht of H PAGE 1 of 1 Standard Penetration Tests were performed in the held in general accordance with ASTM D 1586. GET PROJECT: P-1269 Devil Dog SOI - Field Training Facility CLIENT: Archer Western Contractors, LTD - �211111111111 PROJECT LOCATION: MCB Camp Leleune, NC PROJECT NO.: JX10-114G •c,re.�=r•mn,r BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: BORING LOG DRILLER: GET Solutions, Inc. LOGGED BY: gwh DRILLING METHOD: Rotary Wash Mud Drilling DATE: 2-17-11 P-2 DEPTH TO WATER - INITIAL*: g 10 AFTER 24 HOURS: - _ CAVING> -C m m 'p 03 oo TEST RESULTS Plastic Limit " Liquid Limit n v a'- Description n n d Z n> n 3 # m o E o (J rE d VE�i ~ m a Z v Moisture Content -• LLJ rn N-Value - 10 20 30 40 50 60 70 0 0 3-inches of Topsoil 0 0.2 .. 1 23 as 2 3 ..:...:... : ................... Orangish brown to orangish brown and gray, moist, Clayey fine to 1 medium SAND (SC), Very Loose to Loose... z--" 2 24 as a 5 .:...:...:...:...:...:...:... 4 3 5 ...... 3 18 ss e 8 : 2 s... Gray and orangish brown, moist, Clayey fine to medium SAND (SC), . . e 4 a Medium Dense .., .,. 4 15 ss a 16- - ....-..:... e 5 ...... 5 24 as 6 11 ........................... 10 4 Boring terminated at 10 ft. 4 — ...:... [...:...:...: _.:.. �... 15 f 8 20 25 ECEIVE[ - JAN 3 12013 BY: Notes`. SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. APPENDIX III GENERALIZED SOIL PROFILE 0 Sd 56 34 Bd 36 0 3d d3 43 t:: [ 76 dd Jd 33 22 - 22 45 3] 3d 33 33 34 ;I ;1;(j 57 33 55Z. 45 34 ..I:t ]d j;l: h't' 45 34 Sd .... d5 33 - •• •• 85 •. 66 _ 34 NM=296 .. . .. .... 55 56 dd ...... .'.... 5 .1 :I: L f 5 5 3 d r {. 1{- ) 6 5 5 NM=342 d 5 d 5 d d - jaV}1 62 1;1:[C1 43 23 22 22 12 •111'1 109 2 2 1 5 NMg23 33 2 3 .. 3 3 10 —, 2 = —32 —1"2 —3-] —] :1 :fC 1 —32 t0 33 23 22 — 50 :1'I:(j 5d15 22 •:.h 3d =_ 11 is i, l- 33 1•I.r 1. a' 31 Fd;l: Lf 33 d3 21 12 NM=26.0 63 2d .1:CCl:1:[CI - 23 •- ia.l}1 35 WON -44: H 69 J.1•t 9-1 5d 1;;ry d5 ZO —'17; CJ• 32 'C9,`r-1- 66 WON —1-1L'1; NMd>A '•' I-J. 98 55 56 77S[3. dJ:.Lf_ p - .1XCi I -1-CCt -1:CCi r1•I1• :I •I: 1 :I1; 1 :I1; 1 J:I:[C1 42 55 32 1115 1223 56 32 79 11 1638 3322 67 - t 1310 <� .6 80LLId- 1320 p _ k, a jaa}I 1627 - .1 .1. l f 31 33 - r41i• 7;1:t L1 22 25 do :1016 j;lj r fit•- w •r - - i�ji� 7:If[[1 1020 9u _ - >> - ja:F•l: 195 .lc[Lr �rtiii• t12 8 t - 12 60 ;1;t; C•l A 60 W SI!a� symbols K 'L�' 9i L •' sury Sand , z GET Solutions, Inc. �!! PoodySilt graded Sand N wiSilt c.a GENERALIZED SOIL PROFILE r ® SCALE: DRAWN.aVIAPPROVED BY DATE DRAWN iovfioll sVERT cuE: ]'IVh 3/9/2011 P-1269 Devil Dog SOI - Field Training Facility Clayey Sand M Lean Clay "°'`T' FIGURE NUMBER ® PROJECT NO. JX10-114G a +++ 31 1 S' '� 23 33 33 1 5 BMP-1 32 33 NM=21.] 3 3 BMP 33 23 NM= 180 3 1 . MP-3 BMP< ::: 31 23 a 13 41 3 3 NM•11.3 2 2 NM=11A 11 i 55 23 15 33 33 11 11 23 11 33 23 .. .. - 61 1 .. ... 15 .. .. 11 ::::: 61 ::::: 11 ::::: 33 11 11 33 33 31 12 - 51 i� 12 23- 1�! 22 22 —2-3 4 32 32 : 23 33 : 15 23 — 12 - 13 to —1 2 ..,. Q. .... . 10 23 — 51 Nz = �j 12 13 21 3i 23-20 8> ;1 �I;F1 A�I:C1 6 9 217 d � - 3 Io Ip w 5p ro � Strawsvmpgl ❑ Void Silty Sand GET Solutions, Inc. Poody graded sand with Slll GENERALIZED SOIL PROFILE Ed Topsoil ;SKE: DRAWN EIVAPPROVED BY DATE DRAWN SCALE: r-m h 3/9/2011 Clayey Sand P-1269 Devil Dog SOI - Field Training Facility ® Lean Clay FIGURE NUMBER PROJECT NO. JX10-I 14G 0 MP- amp-6 P-1 P-2 0 23 2 3 NM=21.0 35 J3 3 2 NM-18 < 33 85 6 3 22 33 1 1 22 45 33 34 34 45 35 34 34 _ _. ... .. 58 • •• •• 5 5 •• .. - 8 5 :. 1014 •• ••. 8 8 - . .. .. 5 y ..... 3 3 .. .. .... < 4 3 .. .. .. t3 8 5 5 .. .... 5 8 - .. .. 5 4 0 = — 10 20 20 30 30 _ a <0 40 50 � 60 W 11 /a3YMMIS ❑ Void l M Silly Sand � GET Solutions, Inc. c.a � GENERALIZED SOIL PROFILE withSilg2dedSend /,.j C Howow�DRAWN BY/APPROVED BY DATE DRAWN Topsoil as scue: r=la wh r 3/9/2011 P-1269 Devil Dog SOI - Field Training Facility Clayey Sand Lean Clay FIGURE NU MBER ® PROJECT NO. JX10-114G G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: rof r Project Name.: P-1269 Devil Dog SOI, Field Traing Facility Location.......: MCB Camp Le eune, NC Terminology and Solution Boring No......: BMP-1 Date .............: 2/26/2011 Ksat : Saturated hydraulic conductivity investigators.: B. Cone and M. Guzman File No.........: JX10-114G Q: Steady-state rate of water Flow into the soil Boring Depth.: 2 ft WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Sus . Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Red. r: 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat=Q(sinh-1(H/r)-(r2/H2+1).5+r/Hj/(2pH2) Glover Solubonl VOLUME ml Volume Out ml a TIME hr:min:sec a/ Elapsed Time I Flow Rate O mllmin alb Kest Equivalent Values hr:min:see min b em/min(cm/sec) (cm/day) in/hr ft/da 120 12:45:00 PM 119 1 12:45:34 PM 0:00:34 0.57 1.76 0.001 9.29E-06 0.8 0.013 0.03 118 1 12:46:14 PM 0:00:40 0.67 1.50 0.000 7.90E-06 0.7 0.011 0.02 117 1 12:46:55 PM 0:00:41 0.68 1.46 0.000 7.71E-06 0.7 0.011 0.02 116 1 12:47:29 PM 0:00:34 0.57 1.76 0.001 9.29E-06 0.8 0.013 0.03 115 1 12:48:05 PM 0:00:36 0.60 1.67 0.001 8.78E-06 0.8 0.012 0.02 114 1 12:48:39 PM 0:00:34 0.57 1.76 0.001 9.29E-06 0.8 0.013 0.03 113 1 12:49:06 PM 0:00:27 0.45 2.22 0.001 1.17E-05 1.0 0.017 0.03 112 1 12:49:42 PM 0:00:36 0.60 1.67 0.001 8.78E-06 0.8 0.012 0.02 111 1 12:50:37 PM 0:00:55 0.92 1.09 0.000 5.74E-06 0.5 0.008 0.02 110 1 12:51:17 PM 0:00:40 0.67 1.50 0.000 7.90E-06 0.7 0.011 0.02 Natural Moisture 21.3% % Passing 9200 : 49.5% ESTIMATED FIELD KSAT: 0.001 8.654E-061 0.71 0.0121 0.02 USCS Class.: SC Consistency: Loose Depth to an Impermeable Layer: NA Notes: Ksat Class =Low Structure/Fabric NAJSlo a/Landsc: NA IDepth to Bedrock ...................: NA i= _ Precision Permeameter' JAM 3 1200 RV.- GET Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: P-1269 Devil Dog SOI, Field Training Facility Location.......: MCB Camp Le'eune, NC Terminology and Solution Boring No......: BMP-2 Date .............: 2/26/2011 Ksat: Saturated hydraulic conductivity Investigators.: B. Cone and M. Guzman File No.........: JX10-114G 0: Steady-state rate of water Flow into the soil Boring Depth.: 2 fit WCU Base. HL h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Sus . Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Rad. r : 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = 0[sinh-l(H/r) - (r2/H2+1).5 + r/Hl / (2pH2) . [Glover Solution VOLUME ml Volume Out ml a TIME hr:min:sec al Elapsed Time Flow Rate O ml/min alb Ksat Equivalent Values hr:min:sec min b cm/min cm/sec(cm/day) Inlhr ft/da 120 1:00:00 PM 115 5 1:00:48 PM 0:00:48 0.80 6.25 0.002 3.29E-05 2.8 0.047 0.09 110 5 1:01:36 PM 0:00:48 0.80 6.25 0.002 3.29E-05 2.8 0.047 0.09 105 5 1:02:23 PM 0:00:47 0.78 6.38 0.002 3.36E-05 2.9 0.048 0.10 1001 5 1:03:17 PM 0:00:54 0.90 5.56 0.002 2.93E-05 2.5 0.041 0.08 95 5 1:04:12 PM 0:00:55 0.92 5.45 0.002 2.87E-05 2.5 0.041 0.08 90 5 1:05:06 PM 0:00:54 0.90 5.56 0.002 2.93E-05 2.5 0.041 0.08 85 5 1:06:05 PM 0:00:59 0.98 5.08 0.002 2.68E-05 2.3 0.038 0.08 80 5 1:07:04 PM 0:00:59 0.98 5.08 0.002 2.68E-05 2.3 0.038 0.08 75 5 1:08:03 PM 0:00:59 0.981 5.08 0.002 .2.68E-05 2.3 0.038 0.08 70 5 1:09:02 PM 0:00:59 0.981 5.08 0.002 2.68E-05 2.3 0.038 0.08 Natural Moisture 18.8% %Passing 0200 : 45.7% ESTIMATED FIELD KSAT:j 0.002 2.94E-05 2.51 0.042 0.08 USCS Class.: SC Consistency: Loose 113epth to an Impermeable Layer: NA Notes: Ksat Class = Low Structure/Fabric N Slope/Landsc: NA IDepth to Bedrock ...................: NA Precision Permeameter° G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET sheet No.: 1 of 1 Project Name.: P-1269 Devil Dog SOI, Field Training Facility Location.......: MCB Camp Le'eune, NC - Terminology and Solution Boring No......: BMP-3 Date .............: 2/26/2011 Ksat : Saturated hydraulic conductivity Investigators.: B. Cone and M. Guzman File No.........: JX10-114G Q: Steady-state rate of water flow into the soil Boring Depth.: 2 It WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Sus . HL S: 15.2 cm r: Radius of cylindrical borehole Boring 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat=Q[sinh-1(Wr)-(2/H2+1).S+r/H]/(2pH2) [Glover Solution Volume Out l a hr:min:sec a/ Elapsed Time Flow Rate O ml/min alb Ksat E ulvalent Values hr:min:see min b cm/min emisee em/da inlhrr 2:00:00 PM 10 2:00:28 PM 0:00:28 - 0.47 21.43 0.007 1.13E-04 9.7 0.1 10 2:00:54 PM 0:00:26 0.43 23.08 0.007 1.22E-04 10.5 0.1 10 2:01:22 PM 0:00:28 0.47 21.43 0.007 1.13E-04 9.7 0.1 80 10 2:01:62 PM 0:00:30 0.50 20.00 0.006 1.05E-04 9.1 0.149 0.30 70 10 2:02:26 PM 0:00:34 0.57 17.65 0.006 9.29E-05 8.0 0,132 0.26 60 10 2:02:58 PM 0:00:32 0.53 18.75 0.006 9.87E-05 8.5 0.140 0.28 50 10 2:03:34 PM 0:00:36 0.60 16.67 0.005 8.78E-05 7.6 0.124 0.25 40 10 2:04:10 PM 0:00:36 0.601 16.67 0.005 8.78E-05 7.6 0.1241 0.25 30 10 2:04:47 PM 0:00:37 0.621 16.22 0.005 8.54E-05 7.4 0.121 0.24 20 10 2:05:25 PM 0:00:38 0.63 15.79 0.005 8.31E-05 7.2 0.118 0.24 Natural Moisture 14.3% % Passing #200 : 33.0% ESTIMATED FIELD KSAT: 0.006 9.88E-051 8.51 0.1401 0.28 USCS Class.: SM Consistency: Loose Depth to an Impermeable Layer: NA Notes: Ksal Class =Moderate Structure/Fabric N Slope/Landsc: NA Depth to Bedrock ...................: NA yq T-- q-o Precision Permeameter' JAN 3 12013 EY: GET Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: P-1269 Devil Dog SOI, Field Training Facility Location.......: MCB Camp Le'eune, NC Terminology and Solution Boring No......: BMP4 Date .............: 2/26/2011 Saturated hydraulic conductivity Investigators.: B. Cone and M. Guzman File No.........: JX10-114G -Ksat: O: Steady-state rate of water Flow into the soil Boring Depth.: 2 ft WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dla..... : 8.3 cm WCU Sus . Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Rad. r : 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = l] sink-l(H/r) - (01/ 12+1),5 + r/H] / (2pH2) [Glover Solution] VOLUME ml Volume Out Intl) a hr:min:sec a/ Elapse Time Flow Rate O mVmin a/b Ksat Equivalent Values - hr:min:sec min b cm/min cMsee (cm/day)in/hr ft/da 120 12:30:00 PM 110 10 12:30:20 PM 0:00:20 0.33 30.00 0.009 1.58E-04 13.6 0.224 0.45 100 10 12:30:40 PM 0:00:20 0.33 30.00 0.009 1.58E-04 13.6 0.224 0.45 90 101 12:31:02 PM I 0:00:22 0.37 27.27 0.009 1.44E-04 12.4 0.204 0.41 80 101 12:31:25 PM 0:00:23 0.38 26.09 0.008 1.37E-04 11.9 0.195 0.39 70 10 12:31:50 PM 0:00:25 0.421 24.00 0.008 1.26E-04 10.9 0.179 0.36 60 10 12:32:15 PM 0:00:25 0.42 24.00 0.008 1.26E-04 10.9 0.179 0.36 50 10 12:32:43 PM 0:00:28 0.47 21.43 0.007 1.13E-04 9.7 0.160 0.32 40 10 12:33:13 PM 0:00:30 0,50 20.00 0.006 1.05E-04 9.1 0.149 0.30 30 10 12:33:42 PM 0:00:29 0.48 _ 20.69 0.007 1.09E-04 9.4 0.154 0.31 Natural Moisture 14.4°/. /. Passing #200 : 23.8% -- ESTIMATED FIELD KSAT: 0.008 1.31E-041 11.31 0.185 0.37 USCS Class.: SM Consistency: Loose Depth to an Impermeable Layer: NA ' Notes: Ksat Class = Moderate Structure/Fabric N Slope/Landsc: NA Depth to Bedrock ...................: NA Precision Permeameter" G E T Solutions, Ine. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET- Sheet No.: _1 of 1- Project Name.: P-1269 Devil Dog SOI, Field Training Facility Location.......: ' MCB Camp Le'eune, NC Terminology and Solution Boring No......: BMP-5 Date .............: 2/26/2011 Ksat: Saturated hydraulic conductivity Investigators.: B. Cone and M. Guzman File No.........: JX10-114G O: Steady-state rate of water flow into the soil ` Boring Depth.: 2 It WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Sus . HL S: 15.2 cm r: Radius of cylindrical borehole Boring Red. f : 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = 0[sinh-1(H/r) - (r2/H2+1).5 + r/Hl / (2pH2) [Glover Solution VOLUME ml Volume Out ml a TIME hr:min:see al Elapse Time Flow Rate O mVmin alb - Ksat Equivalent Values--- hr:min:sec min b (cm/min emisee (cm/day) inlhr ft/da 120 1:30:00 PM 119 1 1:32:40 PM 0:02:40 2.67 0.38 0.000 1.97E-06 0.2 0.003 0.01 118 1 1:34:57 PM 0:02:17 2.28 0.44 0.000 2.31E-06 0.2 0.003 0.01 117 1 1:38:24 PM 0:03:27 3.45 0.29 0.000 1.53E-06 0.1 0.002 0.00 116 1 1:41:35 PM 0:03:11 3.18 0.31 0.000 1.65E-06 0.1 0.002 0.00 115 11 1:44:50 PM 0:03:15 3.25 0.31 0.000 1.62E-06 0.1 0.002 0.00 114 1 1:48:12 PM 0:03:22 3.37 0.30 0.000 1.56E-06 0.1 0.002 0.00 113 1 1:51:27 PM 0:03:15 3.25 0.31 0.000 1.62E-06 0.1 0.002 0.00 Natural Moisture 21.0% % Passing #200 : 52.3% ESTIMATED FIELD KSAT: 0.000 1.75E-061 0.21 0.0021 0.00 USCS Class.: CL Consistency: Medium Stiff I Depth to an Impermeable Layer: NA Notes: Ksat Class =Very Low Structure/Fabric N Slope/Landsc: NA Depth to Bedrock ...................: NA Precision Permeameter°n L JAN 3 12013 G E T Solutions, Inc. SATURATED HYDRAULIC CONDUCTIVITY WORKSHEET Sheet No.: 1 of 1 Project Name.: P-1269 Devil Dog SOI, Field Training Facility Location.......: MCB Camp Le'eune, NC Terminology and Solution Boring No......: BMP-6 Date .............: 2/26/2011 Ksat : Saturated hydraulic conductivity Investigators.: B. Cone and M. Guzman File No.........: JX10-114G O: Steady-state rate of water Flow into the soil Boring Depth.: 2 It WCU Base. Ht. h: 15.0 cm H: Constant height of water in borehole Boring Dia..... : 8.3 cm WCU Sus . Ht. S: 15.2 cm r: Radius of cylindrical borehole Boring Red. r : 4.15 cm Const. Wtr. Ht. H: 30.2 cm Ksat = O[sinh-l(H/r) - (2/H2+1).5 + r/H] / (2pH2) [Glover Solubon] VOLUME ml Volume Out ml a TIME hr:m[n:see al Elapsed Time Flow Rate O mi/min a/b(cm/min) Kest Equivalent Values hr:min:see min b (cm/sec) (cm/day) inlhr ft/da 120 1:45:00 PM 119 1 1:46:20 PM 0:01:20 1.33 0.75 0.000 3.95E-06 0.3 0.006 0.01 118 1 1:47:35 PM 0:01:15 1.25 0.80 0.000 4.21E-06 0.4 0.006 0.01 117 1 1:49:24 PM 0:01:49 1.82 0.55 0.000 2.90E-06 0.3 0.004 0.01 116 1 1:50:38 PM 0:01:14 1.23 0.81 0.000 4.27E-06 0.4 0.006 0.01 115 1 1:51:55 PM 0:01:17 1.281 0.78 0.000 4.10E-06 0.4 0.006 0.01 114 1 1:53:12 PM 0:01:17 1.28 0.78 0.000 4.10E-061 0.4 0.006 0.01 113 1 1:54:29 PM 0:01:17 1.28 0.78 0.000 4.10E-06 0.4 0.006 0.01 112 1 1:55:48 PM 0:01:19 1.32 0.76 0.000 4.00E-06 0.3 0+0061 0.01 111 1 1:57:06 PM 0:01:18 1.30 0.77 0.000 4.05E-06 0.3 0.006 0.01 110 1 1:58:25 PM 0:01:19 1.32 0.76 -0.000 4.00E-06 0.3 0.006 0.01 Natural Moisture 18.4% % Passing 0200 : 51.1% ESTIMATED FIELD KSAT:j 0.000 3.97E-061 0.31 0.0061 0.01 USCS Class.: CL Consistency: Medium Stiff Depth to an Impermeable Layer: NA Notes: Ksat Class = Very Low Structure/Fabric N Slo elLandse: NA Depth to Bedrock ...................: NA Precision Permeameter"" APPENDIX VI PREVIOUSLY COMPLETED BORINGS ASSOCIATED WITH THE FEASABILITY STUDY DATED AUGUST 10, 2009 ALONG WITH THE BORING LOCATION SKETCHES AND DCP TEST DATA ;. LCEIVE.. JAN 3 12013 BY:_ Parking NEW w e � � Launtl Applied 7 $. $ e -o - Instruction $-3' h I O ED i e I q �a' n'�' •y�� e _ _ _ _ CAMP eEML DOG WAI R Me,$EIYER PL ('`�`''E� (-'h 1 PriZ 9 GTE I�ICLO TRAINING DEVIL BOG S01 CAMP LEJWNE, NORM CAROLINA Pr.JeL EC09-2M Bruwn By APE r_•�r.rm. Bn lr 8/TO/09 Figure No; 1 BUR1NG LOCATION PLAN SCALD NOT TO SCALE 7 v 1 GET PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G ® fmlNedvl•4v6e,�,W1>d4r BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA BORING LOG DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-24-09 B-1 DEPTH TO WATER -INITIAL*: H 18' AFTER 24 HOURS: a _ CAVING> L ,� fi C 5 .9 m N m m w 0 oo TEST RESULTS m n d o .. n m o m Description n a o> Z I 3 1p m m u Plastic Limit H Liquid Limit u2 E N m m n Z Moisture Content -• N-Value - 0 0 10 20 30 40 50607 4 inches of TOPSOIL .. = 1 24 SS 2 2 a .:...:...: ..:...:...:...: :...:...:... Mottled Gray -Reddish Tan, moist, Lean CLAY (CL) with sand, soft to medium stiff .:...:...:...:.. 2 2 24 SS 3 5 .:. .:. .:...:...:...:..:... 3 5 3 24 SS a 7 :...:...:...:...:...:...:... 4 :. :...:...:... :...:... 2 2 .. .. 4 24 SS 3 4 6 59.1 .:...:.� :...:...:...:...:... ` Mottled Gray -Reddish Tan, moist, Silty fine SAND (SM), very loose :T 2 s t0 loose iliii 5 24 SS 4 .:.'.: ..: _.:...:...:...:... 10 4 2 .:...:...:...:...:...:...:... `. 6 24 SS 3 8 .'. `` a 11.5 Mottled Gray -Reddish Tan, moist, Clayey SAND (SC) with silt, loose 4 Mottled Tan -Reddish Tan, moist, poorly graded fine to medium SAND (SP) to poorly graded fine to medium SAND (SP-SM) with silt, :l � ° ` ipui 7 24 SS s 10 ..........:...:...:. l:r[t :I:[I' .:...:...:...:...:...:...: :.. 18 Reddish Tan, wet, Silty fine SAND ISM), loose ..... 2 3 6 8 24 SS 2 5 .:...:...:...:...:...:...:... 20 a s. ..... ' :...:...:...:.......:...:... 23 Reddish Tan, wet, poorly graded fine to medium SAND (SP), loose '.:'.:' ...... ..... e . .... 9 14 SS 4 8 :...:...:...:...:...:...:. 25 s g .::::. ...:...:...: _.:...:...:. _:... Light Gray -Tan, wet, Silty fine SAND ISM) with marine shell 10 fragments, medium dense 10 24 SS 11 21- 30 3 0 ..... ........ ...... ............ 33 Gray, wet, poorly graded fine to coarse SAND (SP) to poorly graded ': " !�i(i: z3 fine to coarse SAND ( SP-SM) very with sill, dense 1:': t ! I]:t1 11 24 SS 30 58 35 i +: r't: 33 Yeti •- a --.c c/ ......:... " 38 Gray, wet, poorly graded fine to medium SAND (SP-SM) with silt to .. 21 Notes: r i i SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample ' BS = Bulk Sample PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT Inc. ro•amm�r.awuq BORING LOG B-1 PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-24-09 DEPTH TO WATER -INITIAL*: -V 18' AFTER 24 HOURS: aS _ CAVING> L m > n JEE_ o nm o � Description d t� v Z a' m m c m~ 3 m m n m i c e TEST RESULTS Plastic Limit r-I Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 011 .............................. :...:. ..:...:. .:.. 4. ....:... :. ..:. . .:... :...:...:...: .. .:...:...:...:...:... ..:...:. .:...:.—;... ..:... :... :...:...:... i> : C-4 .. ._. ._4M!': lead 4vij y. ... �. .. :......Q. - . ........... ........... 12 40 Silty fine SAND (SM), medium dense to dense Light Gray with marine shell fragments from 43 feet 48 Gray, wet, Silty fine SAND (SM) with cemented sand, medium dense 3 Gray, wet, Silty fine SAND (SM), medium dense ?_ 12 24 SS 26 30 47 23�-�-- 29- 27 24 23 17 20-- td. f [ [ 13 24 SS 7 12 45 ;;... ` [ ' 14 24 SS 7 7 1d 13 18 15 24 SS 6 14 13 17 16 65 iiii ;; 16 60 24 SS in 17 20 17 ::::: 24 SS 7 R 15 65 18 24 SS y 12 2 70 lEEEE 19 24 SS 9 75 Boring terminated at 75 ft. Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample A PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586, GET PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G © �dol.cd m.away BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA BORING LOG DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-24-09 B-2 DEPTH TO WATER - INITIAL-: V 18' AFTER 24 HOURS: & _ CAVING> L o t C m m m H m oo TEST RESULTS i y aai m m m Description E Z E> E o a Plastic Limit Fi Liquid Limit w o E a O N in 8 m l rn c, Z v Moisture Content -• N•Value - 0 0 10 20 30 40 50 60 70 4 inches of TOPSOIL t 1 20 SS i 0 4 .:...:...: _.:...:._: Reddish Tan, moist, Lean Clay (CL), soft to stiff Mottled Gray -Reddish Tan from 2 feet z 2 20 SS 3 5 ............. f._I...I...t. . 3 5 3 A SS s 9 :...:...:...:...:.. :...:... 4 Mottled Gray -Reddish Tan, moist, Silty fine SAND (SM) to Clayey ." .... y 2 SAND (SC) with silt, loose::::: 4 24 SS 4 8- '. '.' 4 :...:...:.......:...:...:... . ... 5 24 SS 2 5 .:...:...:...: 10 4 1 ....'..' 6 22 SS a 7 ....... ........:...:. .:... s Mottled Tan -Reddish Tan, moist, poorly graded fine to medium s SAND (SP) to poorly graded fine to medium SAND (SP-SM) with silt, ',?i�'�.e ! 7 18 SS 5 11 15 medium dense : is a ...:...:.. :...:...:...:... :I:ir l aerl 9:C1' .. .............. 16 Reddish Tan, wet, Silty fine SAND (SM), very loose 5 a 22 SS 3 4 ....................... ..... . 20 4 23 Gray, wet, poorly graded fine to medium SAND (SP) to poorly grade '� r� s fine to medium SAND (SP-SM) with silt, loose ':I l' CpCI 9 18 SS 5 10 — — — 25 ... .. 4 .:.. Fii _.:... :.. .:. ..:. '...:. ' X[ r 28 Light Gray -Tan, wet, Silty fine SAND (SM), medium dense o 10 20 SS 12 26 - 30 6 rI..... 4 ± ..... ... .... ..... ...... f ,• • U. > t 33 Light Gray, wet, poorly graded fine to coarse SAND (SP) to poorly ':.. 14 fiSSP-SM with silt, very d gradedfine to coarse AND(SP-SM) ( ) ryense 11 t ` tf• t l 11 24 SS u 68 j 1 35 3� i af[r 1:C[[ ?];tr 38 Gray, wet, Silty fine SAND ISM), medium dense to very dense : x ze Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET r.r.,.a®m.maq BORING LOG 1 B-2 PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-24-09 DEPTH TO WATER - INITIAL': $ 18' AFTER 24 HOURS: a _ CAVING> L m 0 o E o„ Description n a d y z a> N a N 3 m m a m i o u e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content — • N-Value - 10203040506 ........ .:...:.. :... I [ f :... :. .. :.. :.. .:... . .............. ..... ... ... ... .. .....—....:...:... .:._ :. .. :...:.. .:... '...: ... :... :.. :...:... ...:...:...:...:.. .:... <j.:.::.. : �N.. ...... .:.�...R[.- 12 40 Light Gray with marine shell fragments from 43 feet 46 Gray, wet, Silty fine SAND (SM) with cemented sand, medium dense a a a[ 12 22 SS 26 52 23 27 29 24 21 16 17 14 iiiii iiiii 13 22 SS 6 iu 21 45 i i iiiii i i 14 24 SS 6 ie 14 16 50 Gray, wet, Silty fine SAND ISM), medium dense Ei EEEE; 15 22 SS 1s 14 14 55 1 ?i?iE iiiii 16 23 SS 19 16 60 iiiii 20 17 24 SS 6 1z aw i 18 24 SS y 14. 22 10 iiiii 1 19 24 SS 4P�.. 6 g 12 75 Boring terminated at 75 ft. SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample r Fq PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM 0 1586. GET PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G © rmsatrr.am.rrmy BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA BORING LOG DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-24-09 B-3 DEPTH TO WATER -INITIAL': S 18' AFTER 24 HOURS: g _ CAVING> L m m' N $ a d pm E L .. a m p°' m , Description - L o. m (9 n o m z m a m d rn m a m F rn a 3 'O m n > z op `� v ae TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 0 0 1 4 50 0 70 3 inches of TOPSOIL P - 1 24 SS ➢ s 12 ..I _.I... t... l...l...a .2 Gray -Tan, moist, SILT (ML), stiff Mottled Gray -Reddish Tan, moist, Silty CLAY (CL-ML) to Lean CLA (CL), stiff 2 24 SS y s 10 ...:...:...i...i...:.._i... s s 3 24 SS s a 13 ..: ..:...:...:...:...:... ..:...:...:...:.. :...:... 7 4 24 SS 5 s 2 12 ..:...:.. .:. ..:. ..:.. .:... ..:. .. .:..... :...:... 8 Mottled Gray -Reddish Tan, moist, Silty fine SAND (SM) to Clayey SAND (SC) with silt, loose 5 22 SS s s 4 4 8 .................... ..... ...........:...:...:... 10 . .. .... 6 20 SS 1 3 6 .:...:...:...:.. e ° 13 Mottled Tan -Reddish Tan, moist to wet, poorly graded fine to medium SAND SP to poorly graded fine to medium SAND SP-SM with silt, loose to medium dense qea !a: [ t: '4 ^1! 7 18 SS e r 15 ' 15 I ;etl Reddish Tan from 18 feet 6 Wet from 18 feet 1 .1•�I' ;ri: ii:ii• CFti 6 18 SS 3 2 7 20 l par Tan with fine to coarse Sand from 23 feet r nc{r !'. t,: 1225 :...:...: 9 18 SS 2 6 l2(v .... .. ...... ... . .... l T, tl. 1:C[r XEI:i Lri i' 15 .:...: .. .:...: . .......... .. ...................... 10 24 SS 3 r e 9 JO Boring terminated at 30 ft. .:...:...:...:.. .:. .:.. 10 is 35 I ° Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT Inc. PROJECT LOCATION: Camp LeJeune North Carolina PROJECT NO.: EC09-216G Wimenamom r�add.Js.e..�m•mmf BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA BORING LOG DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-24-09 . B'4 DEPTH TO WATER - INITIAL': S 18' AFTER 24 HOURS: 3 _ CAVING> -C WCID oEo„Description n 6 N z a' N N I 3 mm m n z o n v TEST RESULTS PlasticLimit H LiquidLimit Moisture Content -• N-Value - 1 4 0 0 70 o 0 9 3 inches of TOPSOIL 1 24 SS 2 e 6 :...:...:... [... t...t. _: .2 Gray, moist, SILT (ML), stiff Mottled Tan -Reddish Tan, moist, Lean CLAY (CL), medium stiff to stiff Mottled Gray -Reddish Tan from 4 feet 2 24 SS 3 4 e 7 :...:...:. .:...:...:...:... 4 5 3 24 SS 5 10 ...:...:...:...:.. :...:... r ...:...:...:...:...:...:... 2 4 24 SS 4 6 11 ... :._.:... Mottled Gray -Reddish Tan, moist, Silty fine SAND ISM) to Clayey SAND (SC) with silt, loose .. ... 5 24 SS r 2 7 10 ... ... 4 :...:...: .. .:. ..:... :.. :... 2 . .. ... . . .. ... 6 24 SS 6 8 ........... . . 6 4. 13 Mottled Gray -Reddish Tan, moist, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND (SM), medium dense ..... ' T 24 SS 3 5 11 15 a 1 Mottled Tan -Reddish Tan, wet, poorly graded fine to medium SAND (SP) to poorly graded fine to medium SAND (SP-SM) with silt, loose to medium dense .. rx t': ��[ f .... .iaa r 8 24 SS z 3 3 4 6 .:... t...[,..:...:...[...[... ' 6 20 Gray from 23 feet .itifC �, � ; i ❑: f J. 9 :...:...:... :. _:...:...:... ....:...:...:...:...:...:... .. ..... ... ..... .. .... ..... 9 24 SS 0 y 5 25 e ..... r1:f L' Tan from 28 feat 'I :I: [ i 11:; 4 11 1V7. .. eei ® ' 10 24 SS 6 6 Boring terminated at 30 ft. 10 Hu 7.. W .:;:.gym 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample fHammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET ® r•.+.w.�Wa.mv BORING LOG B-J PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-23-09 DEPTH TO WATER -INITIAL': $ 13' AFTER 24 HOURS: S _ CAVING> C a m 2 w n o EJE-E t -• o- Description L a S' C0 m adm m z ul m m A ti m m H rn m m n m > Z oo v ae TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 1 50 60 7 -- 0 a _ 8 7 10 10 13 4 6 8 0. Gray -Tan, moist, Silty fine SAND ISM); (FILL), loose 1 22 SS 5 4 5 :.,.. _:...:...:.... . .. ' :._:...:...: _.:...:...:... ........................... ...:............:...:... ... :... :...:...:.. :...:... .:...:...:. _:...:...:... .......................... :...:�.:...:...:...:...:... ............................. :...:...:...:...:..'...: p. ......... ... .... .......... ..... .............. .. .. ... .. .. ... .. ..:. _:...:...:._:.. :...:... Tan, moist, Silty fine SAND ISM), loose to medium dense Mottled Light Gray -Reddish Tan from 6 feet i E E f 2 20 SS 3 4 5 2 5 3 24 SS a 5 5 4 24 SS 2 B 8 5 20 SS 5 j 4 Light Gray, moist, Lean CLAY (CL) with sand, soft 13 Reddish Tan, wet, poorly graded fine to medium SAND (SP-SM) wit silt to Silty fine SAND ISM), loose Light Gray from 18 feet :: [[: 6 20 SS 2 2 3 - 22 SS 3 3 3 1s 6 [[ 8 18 SS 0 ° 4 3 20 Boring terminated at 20 ft. k, " I 2s Z30 10 85 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample'Thennitialorm, may not be indicative of the static groundwater level, - 1 Weiahtof Hammer PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586, GET PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT, PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G co�xdd•d.u..m,w.nmq BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA BORING LOG DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) DATE: 7-23-09 „ B-S DEPTH TO WATER - INITIAL': S 14' AFTER 24 HOURS: b _ CAVING> L z lii ° u m qno° fi m 3 m o aMoisture TEST RESULTS lastic Limit H LiquidLimit P Content - • N-Value - 10 20 30 40 50 60 70 a 0 4 3 inches of TOPSOIL 1 24 SS t z 3 .:...:. _:...:...: _.:. .2 Gray -Tan, moist, SILT (ML), soft Tan, moist, Silty fine SAND ISM) to Silty, Clayey SAND (SC-SM), loose to medium dense 2 2a SS 3 4 5 7 :...:...:...:...:...:...:... 6 3 24 SS 4 5 71 ..............: _.:...:... Tan, moist, poorly graded fine to medium SAND (SP-SM) with sill to Silty fine SAND ISM), loose to medium dense Light Gray from 8 feet Light Gray -Tan, moist, Clayey SAND (SC) with silt, loose ::[ 4 24 SS e 5 8 9 12 6 ' - - • - ......t. _[...I...I... I... ;iii': 6 6 1 24 24 1 SS SS s 2 3 4 14 Mottled Gray -Reddish Tan, wet, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND(SM), loose 15 ... 7 24 SS 3 4 5 8 ......... .... I—— ....... , :............ ..:. ..:.. .:... f8 Gray, wet, poorly graded fine to medium SAND (SP) to poorly grades fine to medium SAND (SP-SM) with silt, loose i I !°: E b' :: 8 24 SS 3 3 5 6 20 Boring terminated at 20 ft. 5 x' . .:...: .. ..": .....:. a. 30 m ®. . US ch ...:...:...... ...........:. . Z: s:•-=max,.,-,..+... . Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET PROJECT: P-1269 GTF -Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G r .a�c.+•c.w•raea BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA BORING LOG DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Mud Rotary (Wash) - DATE: 7-23-09 B-% DEPTH TO WATER - INITIAL': V. 18' AFTER 24 HOURS: 6 _ CAVING> -C o m > y W n d m m o E n m m m o '� Description n Lp t7 m a o E Z rn m a' E o N o y a 01 E w 3 `O o m rn a m -au z o a TEST RESULTS Plastic limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 3 inches of TOPSOIL F 1 24 SS 3 3 4 :...:...:...:...:...:...: 8 .2 Dark Gray, moist, SILT (ML), medium stiff Reddish Tan, moist, Lean CLAY (CL), medium stiff to still 2 24 SS 3 3 6 .:...:...:...:. ...... . :... Mottled Gray -Reddish Tan from 4 feet 4 3 5 3 24 SS 3 8 ..:.... .........:...:... 6 3 4 24 SS 511 ...:...:.. :...:...:...:... 6 5 24 SS 1 3 " 5 ............:. :...: _.:... 10 1 Mottled Reddish Tan -Gray, moist to wet, Clayey SAND (SC) with silt, veryloose -.-.-. ...:.::. 6 24 SS 5 1 1 2 3 .:...:...:...:...:...:. .: 3 . . . WON '.."..". 7 24 SS WOH WOH 1 0 4 1.1 1--I .............. \ 15 6 Wet from 18 feet ' ' ' 0 33. .. :4 8 24 SS WOH WOH WOH WOH 20 1 25 Mottled Tart -Reddish Tan, wet, poorly graded fine to medium SAND (SP) to poorly graded. fine to medium SAND (SP-SM) with silt, loose Li:if• �, .,_ e i 9 24 SS 3 3 5 .:...:...:...:._:...: i{ LX 1. .I:,: c i 28 Light Gray, wet, poorly graded fine to medium SAND (SP-SM) with silt to Silty fine SAND ISM), loose to dense :'i ::: ; 10 24 SS 3 3 6 :...:...:...:...: .. - - • 30 1 r 10, B ;+ 11 20 SS 21 25 46 ':...:...:... a.' 35 21 :...:.. ( :L ...:...:...:...:...:...:...:... 4 15 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample WOH - Wei,ht of Hammer PAGE 1 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET BORING LOG B-% PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD! Mud Rotary (Wash) DATE: 7-23-09 DEPTH TO WATER - INITIAL`: V 18' AFTER 24 HOURS: ;f _ CAVING> L cu 020 E o Description n U�' 0 n d n Z n> rm n m~ m n 0 i c s TEST RESULTS Plastic Limit' H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 12 4e 43 Light Gray, wet, Silty fine SAND (SM) with cemented sand and marine shell fragments, dense - 4 Gray, wet, Silty fine SAND (SM), medium dense 12 20 SS 18 2e 33 42 17 19 16 18 20 20 - ............... _:... :.. :...:...:...:...:. . .:...: ....: ...:...:...:... :. _.::..:.—:—•:—._ LU ..:... Iry� C" 1 :: Eliii 13 20 SS 9 23 19 21 14 45 50 : : 14 24 SS J y 14 :::: 15 24 SS 4.:. 10 12 55 tee 16 24 SS 5 y 12 60 2 17 24 SS 5 10 12 as 18 24 SS iu is iFi 19 20 SS 5 5 16 75 Boring terminated at 75 fit. Notes; SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS - Bulk Sample PAGE 2 of 2 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET ® Gmmaa.u.u�m. mmq BORING LOG HA-1 PROJECT: P-1269 GTF -Field Training Devil Dog SO] CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Hand Auger DATE: 7-22-09 DEPTH TO WATER - INITIAL': S _ AFTER 24 HOURS: $S _ CAVING> L o r 'm > y W y B a d v m o E a m m ;_> o Description o o m t7 m d E Z N m n E$ N m E y m 3 m o m m a m m Z\ oo TEST RESULTS Plastic Limit I-1 Liquid Limit Moisture Content.- • N-Value - 10 20 30 40 50 60 a o HA HA Gray, moist, Silty fine SAND (SM) mixed with stone ............ ... :..::...:... ..:...:...:...:...:...:...:... .......... .. :. ..:.. .: .. .:. .. ..:...:...:...:...:...:...:... ... .. _ Mottled Gray -Reddish Tan, moist, Clayey SAND (SC) with silt . 3 Mottled Gray -Reddish Tan, moist, Lean CLAY (CL) ... ... z s i Boring terminated at 5 ft. ._,l f i 10 4 15 8 20 a 25 30 10. r: Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests wereperformed in the field in general accordance with ASTM D 1586. GET G¢udNY•GvbwmnW •aeeq BORING LOG HA-2 PROJECT: P-1269 GTF -Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Hand Auger DATE: 7-22-09 DEPTH TO WATER - INITIAL: V _ AFTER 24 HOURS: 4 _ CAVING> L o ,F 'm > Flir? n d W E n d o Description u n m E o al Z m E' oM of n '03 ~ m 3 `O i°nn m m# z oo a TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 19 0 aQ AQ 50 60 70 o� 0 HA HA Tan -Gray, moist, Silty fine SAND (SM) mixed with stone 22 ..:........................... ..: .....:...:...:.. :...:. . ..:...:...:...:...:...:...:... _..�.I.N ..; m e'!'S .. [...1. .;... ... [... Q cm 1 Mottled Gray -Reddish Tan, moist, Lean CLAY (CL) s Boring terminated at 5 ft. 10 a. 6 20 25 30 to 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM 0 1586. GET •u•m•r BORING LOG HA-3 PROJECT: P-1269 GTF -Field Training Devil Dog SOI CLIENT: JMT, Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Hand Auger DATE: 7-22-09 DEPTH TO WATER -INITIAL': 8 AFTER 24 HOURS: s CAVING> L m 'Np� W n J!i m p� `° Description `` (:1 d m z N N�dJ m F 3`DmuPlastic m n > Z v a TEST RESULTS Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 0 0 HA HA HA 6 inches of TOPSOIL ;. - - - - .. .... ...... -... . .:...:...:...:. .. :...: ... :... ... .. .. ....:... :.. .:.. .:... _:...:...:...:...:...:...:_ ..:...:...:...:...:...:...:... Gray, moist, Silty fine SAND (SM) 2.5 Mottled Tan -Gray, moist, Clayey SAND (SC) with silt 2 3. Mottled Gray -Reddish Tan, moist, Lean CLAY (CL) 5 Boring terminated at 5 ft. 4 t 1 a 15 6 20 25 30 10 35 1 Notes: SS = Split Spoon Sample ST =Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586. GET r�w•o-.+,..s,,,.t•mev BORING LOG I"1A►-4 PROJECT: P-1269 GTF - Field Training Devil Dog SOI CLIENT: JMT.Inc. PROJECT LOCATION: Camp LeJeune, North Carolina PROJECT NO.: EC09-216G BORING LOCATION: See Attached Boring Location Plan SURFACE ELEVATION: INA DRILLER: G E T Solutions, Inc. LOGGED BY: P. Lankford, EIT DRILLING METHOD: Hand Auger DATE: 7-22-09 IDEPTH TO WATER - INITIAL*: $ _ AFTER 24 HOURS: -V _ CAVING> L c > MM n d O E°` n m Description u 17 m E o N Z m E n m E M l— m ; `o o n m m i oo u e TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - 10 20 30 40 50 60 70 a o 1 HA HA HA 3 inches of TOPSOIL iiiii ... _.I.., I... f... [._ [... .I.... [... ..i...i...i...i...i....... .............................. .............................. ..:...:...: ..:...:.. :...:... a. ..:... :... s. �. .N. s® 7 . .2 Tan -Gray, moist, Silty fine SAND (SM) 1 Mottled Gray -Reddish Tan, moist, Lean CLAY (CL) Mottled Gray -Reddish Tan, moist, Clayey SAND SC with silt 3 Y Y ( ) 2 s Boring terminated at 5 ft. 10 i 15 20 25 10 35 Notes: SS = Split Spoon Sample ST = Shelby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 0f 1 Standard Penetration Tests were performed in the field w general accordance with ASTM D 1586. 7' GEC DCP TEST DATA ;rm= Project: P-1269 GTF- Field Training Devil Dog SOI Date: 22Jul-09 Location: Camp LeJeune, North Carolina Soil Type(s): Sea Boring Log (HA-1) GET Project#: EC09.216G Surficial Thickness: 12 Inches of Stone Test Starting Depth: 6Inches (Concrete. Aephalt, Hammy Sol TYDa Stone, Tapwd, etc.) •1o.l ils. Test Identification: Oa O17., ies. HA 1 Oa O B hammers Ua Mother wik No. of Blows Accumulative Penetration mm Type of Hammer 0.1 0 5 10 15 20 C 25 30 a W 0 35 45 50 55 80 0.1 1.0 CBR 10.0 100.0 0 127 254 381 508 635 E 762 F 06 889 LU G 1016 1143 1270 1397 1524 100.0 0 155 2 5 180 2 ---____ - —______ - - - _______ - 5 205 2 5 231 2 5 257 2 --- — - - ----- - - - 5 284 2 4 312 2 4 339 2 - - - 4 392 2 ------____ — — - —______ - ___— — -___ - - 4 420 2 3 447 2 - - 3 1 499 2 4 527 2 4 554 2 — - 3 580 2 3 607 2 - - -- - 3 633 2 1.0 10.0 3 659 2 3 686 2 0 5 10 15 20 .5 25 Q.30 p 35 40 45 50 55 60 0 2000 BEARING 4000 CAPACITY, psf 6000 8000 10000 12000 0 127 254 381 508 635 E 762 F 889 G 1016 1143 — Bawd on approximate Interrelationships 1270 of CBg and Bsedng values (Design of — ConcreteAirport Pavement, Portland 1397 Cement Association, page a, 1955) 1 1524 42 56 69 83 CAPACITY, psi 3 713 2 3 740 2 3 768 2 3 794 2 3 821 2 3 850 2 3 887 2 3 914 2 - t 2 2 2 — — • - 2 2 2 Y> •i 2 2 •- 2 L - - - 2 2 0 14 28 BEARING �t 2 I 2 . GEC DCP TEST DATA Project: P-1269 GTF- Field Training Devil Dog SOf Date: 22Jul-09 Location: Camp LeJeune,North Carolina Soll Type(s): Sae Boring Log (HA-2) GET Project 0: EC09.216G Surficial Thickness: 14 inches of Stone Test Starting Depth: 6Inches (CWn ,Asphalt. Stone. Topsail, eta) IlNmxrier 910.1 Test Identification: 017.cihs. HA-2 OCL =CH Oeammo No. of Blows cumulative Penetration (mm) Type of Hammer 0.1 0 5 t0 15 20 c 25 f- 30 0. C 35 45 53 60 0.1 1.0 CBR 10.0 100.0 0 127 254 381 508 e35 E 762 3 f- 889 m O 1143 1270 1397 1524 0 205 1 2 3 232 2 ---____ --______ - 3 259 2 3 287 2 3 315 2 --____ - - --_____ - - _ - — - - _ - _ -- 3 341 2 3 369 2 3 394 2 - - - - - 3 419 2 3 446 2 _--____ — - - - -- —____ - _----____ - 3 473 2 2 499 2 2 525 2 2 552 2 2 578 2 2 606 2 3 632 2 3 660 2 _ 3 687 2 1.0 10.0 100.0 3 715 2 3 740 2 0 2000 0 5 10 i3 20 25 F 30 a p 35 40 45 $0 55 60 0 BEARING 4000 CAPACITY, psf 6000 8000 10000 12000 0 127 254 Sal 608 35 635 E 762 3 IL 889 WO 1018 1143 1270 1397 1524 83 3 771 2 3 799 2 3 824 2 3 851 2 3 878 2 3 904 2 - 2 2 2 2 - 1-- 2 — 2 2 2 2 Based on approximate interrelationships - of CBR and Bearing values (Design of - Concrete Airport Pavement. Portland - Cement Association, page 8, 7955) 2 2 2 2 14 26 BEARING 42 56 69 CAPACITY, psi 2 2 IL GET DCP TEST DATA Project: P-1269 GTF- Field Training Devil Dog SW Date: 22Jul-09 Location: Camp Woune, North Carolina Soil Type(*): See Boring Log (HA3) GET Project 0: EC09-216G Sur icial Thickness: 6Inches of Topsoil Test Starting Depth: 7 inches (Canmm, Mohan, Bmee, Twwu, etc.) • to lhs. Test Identification: Oa 017.61Ee. HA-3 Oa O BONNo. hammers usM M other mik of a alders wrs Blos Accumulative Penetration (mm) Type of Hammer 0.1 0 5 10 15 20 c 25 F 30 W 0 35 40 45 50 55 60 0.1 1.0 C8R 70.0 100.0 0 127 254 381 S0o 635 E 782 S R 889 m 0 1016 1143 1270 1397 1524 0 185 1 2 3 214 2 ---___-_ — - - - — __ ---__ 4 241 2 4 271 2 4 300 2 ----- — __ -- ---____ — -- —_ - _ 4 332 2 3 360 '2 3 392 2 -------- — — - - ------ - ----- --------- — --- - 3 419 2 3 447 2 3 475 2 3 503 2 3 530 2 — — - - - -- ------- — - ------- - 3 558 2 3 585 2 3 614 2 — - __ — 2 639 2 2 665 1 2 2 691 2 1.0 10.0 100.0 3 718 2 3 1 743 2 0 2000 0 5 10 15 20 25 -- W. 30 O 35 45 50 55 80 0 14 BEARING 4000 CAPACITY, psf 6000 8000 10000 12000 0 127 254 381 508 635 E 762 F $89 w O lots 1143 1270 1397 7524 83 3 1 769 2 3 795 2 3 821 2 3 847 2 3 873 2 2 900 2 2 2 2 2 2 2 2 2 —T— _+ 2 2 - eased on approximate Interrelationships Concrete Airport Pavement, Portland - of Cement and Bea4 Lion. page 8, sign12M o/ Cement Association. pqe 8, 1951) 2 2 2 2 28 BEARING 42 56 69 CAPACITY, psi 2 -. 2 GET' Q DCP TEST DATA Project: P-1269 GTF-Field Training Devil Dog SOI Date: 22Jul-09 Location: Camp LeJeune, North Carolina Soil Type(s): See Boring Log (HA-4) GET Project g: EC09.216G Surficial Thickness: 3 Inches of Topsoil Test Starting Depth: 7 Inches (Canmete, Aaphall, Slane. Twp . ek.) Hammer rTY • t9.t �. Test Identification: O17.6ft. HA-4 aO—" hammeru a other sdk No. of Blown Accumulative Penatratlon mm) Type of Hamm" 0.1 0 5 10 15 20 c 25 F 30 W G 35 45 50 53 60 0.1 1.0 CBR 10.0 100.0 0 127 254 381 508 635 762 889 lots 1143 1270 1391 1524 E H a W G 0 2 4 180 210 240 2— 2 2 ________ — --____ ---___ — 4 272 2 3 300 2 -- - -- ------ — - 3 330 2 3 364 2 — — — - - _ 3 397 2 2 423 2 2 450 2 _—______ - ---___ - - - _ _--____ — - 3 481 2 3 514 2 2 539 2 — - 2 568 2 2 602 2 2 637 2 - - - - - - ---- 2 673 2 2 706 2 2 736 2 1.0 10.0 10).0 2 763 2 2 788 2 0 0 5 10 15 20 5 25 H 30 Q. p 35 40 45 50 55 60 0 2000 — BEARING 4000 CAPACITY, psf 6000 8000 10000 - BaaM on approa1ma41nterrNanonshipa of CBR and Bearing values (Design of Conen a Airport Pavement, Portland Cement Assoc; don, on. 6, 1955) 42 56 69 CAPACITY, psi 12000 0 127 254 381 508 635 762 889 10Is 1143 - 1270 -7 1397 1524' 83 E E X W O a tt F 2 1 813 2 2 840 2 2 865 2 2 891 2 2 J 918 2 2 2 2 2 — 2 2 T 2 2 2 2 2 2 2 2 2 14 28 BEARING - 2 GET GolnFukY • LmironvwY•Ra+NA Virginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757)518-1703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg, Virginia 23185 (757)564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Elizabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252)335-9765 Standard Penettadon Test (SPA' . N-value Standard Penetration Tests (SPT) were performed in the field in general accordance with ASTM D 1586. The soil samples were obtained with a standard 1.4" I.D., 2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of a 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring logs. The sum of the second and third penetration increments is termed the SPT N-value. NON COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) Relative Density Very Loose 4 blows/ft. or less Loose 5 to 10 blows/ft. Medium Dense I I to 30 blows/ft. Dense 31 to 50 blows/ft. Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium '/7 to 1 inch diameter Fine t/s to t/2 inch diameter Sand Coarse 2.00 men tot/t inch (diameter of pencil lead) Medium 0.42 to 2.00 ram (diameter of broom straw) Fine 0.074 to 0.42 ram (diameter of human hair) Silt 0.002 to 0.074 men (cannot see particles) CLASSIFICATION SYMBOLS (ASTM D 2487 and D 2488) COHESIVE SOILS (CLAY, SILT and Combinations) Consistency Very Soft 2 blows/ft. or less Soft 3 to 4 blows/ft. Medium Stiff 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/ft. _ Hard 31 blows/ft. or more Relative Pro_uortions Dgsgrtytive Term Percent Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Mostly 50-100 Coarse Grained Soils Fine -Grained Soils More than 509b retained on No. 200 sieve 50%or more passes the No. 200 sieve GW - Well -graded Gravel CL - Lean Clay GP - Poorly graded Gravel CL-ML - Silty Clay GW-GM - Well -graded Gravel w/Silt ML - Silt • GW-GC - Well -graded Gravel w/Clay OL - Organic Clay/Silt GP -GM - Poorly graded Gravel w/Silt Liquid Limit 50%or greater GP -GC - Poorly graded Gravel w/Clay CH - Fat Clay GM - Silty Gravel MH - Elastic Silt GC -Clayey Gravel OH - Organic Clay/Silt GC -GM - Silty, Clayey Gravel SW - Well -graded Sand H4bly OrPAk Soils SP - Poorly graded Sand PT - Peat SW-SM - Well -graded Sand w/Silt SW -SC- Well-gmded Sand w/Clay SP-SM - Poorly graded Sand w/Silt SP-SC - Poorly graded Sand w/Clay SM - Silty Sand SC - Clayey Sand � 7*,,C E 0 SC-SM - Silty, Clayey Sand v f JAN 3 12013 page 1 of 1 eT Revision 11111107 BY: Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. Groundwater Readings Groundwater conditions will vary with environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdmins and areas of covered soil (paved parking to", side walks, etc.). Depending on percentage of fines (fraction smaller than No. 200 sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW, GP. SW.SP More than 12 percent GM, GC, SM, SC 5 to 12 percent Borderline cases requiring dual symbols 60 Q x 40 W 25 30 ca 20 q10 i 0 Plasticity Chart ■■■■■■■■., LIQUID LIMIT (LL) (%) LIQUID LIMIT (LL) (%) I Il H GeotechnicalF• Environmental PRELIMINARY REPORT OF SUBSURFACE INVESTIGATION AND GEOTECHNICAL ENGINEERING SERVICES Project 1269C Devil Dog Stormwater. Enhancements, MCB Camp Lejeune, North Carolina G E T PROJECT NO: JX11-110G August 16, 2011 Prepared for Cape Fear Engineering, Inc. 151 Poole Road, Suite 100 Belville, North Carolina 28451 ATTN: Mr. Perry Davis, P.E. Prepared by GET Solutions, Inc. ECEIVE JAN 3 12013 415 A Western Boulevard, Jacksonville, NC 28546 ♦ Phone 910-478-9915 ♦ Fax 910-418-9917 info@getsolutionsinc.com C7 � I August 16, 2011 TO: Cape Fear Engineering, Inc. (1 151 Poole Road, Suite 100 I Belville, NC 28451 Attn: Mr. Perry Davis, P.E. RE: Preliminary Report of Subsurface Investigation and CI Geotechnical Engineering Services Project 1269C Devil.Dog Stormwater Enhancements MCB Camp Lejeune, North Carolina fi GET Project No: JX11-110G �J Dear Mr. Davis: l In compliance with your instructions, we have completed our Geotechnical Engineering Services for the referenced project. The results of this study, together with our recommendations, are presented in this report. Often, because of design and construction details that occur on a project, questions arise concerning subsurface conditions. G E T Solutions, Inc. would be pleased to continue its role as Geotechnical Engineer during the project implementation. CI We trust that the information contained herein meets your immediate need, and we would ask that you call this office with any questions that you may have. Respectfully Submitted, G E T SN CAI? FFfSolutions, Inc. • `'OQ �Essip��y PE Na 1 oas5zs Glenn W. Hohmeier, P.E: `i;1 �cINE�P E� Senior Project Engineer W. ", HONE 'NC Reg. # 033529 w ROB '%, Camille A. Kattan, P.E. Principal Engineer SEAL NCYReg # 0141V :: c : 014103 (� msFNCINEFQ �i . � 11 415-A Western Boulevard . Jacksonville, NC 28546 • Phone: (910) 478-9915, ' Fak: (910) 478-9917 info@getsolutionsinc.com (I TABLE OF CONTENTS (1 1.0 PROJECT INFORMATION..............................................................................1 �I 1.1 Project Authorization .......... :.................................................... I .............. 1 1.2 Project Location and Site Description ................................................ ;... 1 1.3 Purpose and Scope...............................................................................1; l 2.0 FIELD AND LABORATORY PROCEDURES..................................................2 j2.1 Field Exploration....................................................................................2 {j 2.2 Laboratory Testing ................... :............................................................. 2 3.0 SITE AND SUBSURFACE CONDITIONS......................................................:.3 3.1 Site Geology..........................................................................................3 3.2 Subsurface Soil Conditions....................................................................4 f 1 3.3 Groundwater information .......................................................................4 4.0 IL EVALUATION AND RECOMMENDATIONS...................................................5 L1 4.1 Soil Permeability....................................................................................5 4.2 Structural Fill and Placement.......:.........................................................5 4.3 Suitability of On -site Soils......................................................................6 5.0 CONSTRUCTION CONSIDERATIONS...........................................................6 5.1 Drainage and Groundwater Concerns...................................................6 5.2 Site Utility Installation.............................................................................6 i5.3 II Excavations........................................................................................... 7 6.0 REPORT LIMITATIONS...................................................................................8 APPENDIX I TEST PIT LOCATION PLAN APPENDIX II TEST PIT LOGS APPENDIX III GENERALIZED SOIL PROFILE I APPENDIX IV CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Il ECEavE t 1 JAN 3 12013 BY.- rI Preliminary Reportof Subsurface Investigation and Geotechnical Engineering Services August 16, 2011 r Project 1269C Devil Dog Stonmwater Enhancements MCB Camp Lejeune, North Carolina GET ProjectNo: JX11-110G I1.0 PROJECT INFORMATION 1.1 Project Authorization G E T Solutions, Inc. has completed our Preliminary Geotechnical Engineering study for the proposed Project 1269C Devil Dog Stormwater Enhancements located within the Marine Corps Base (MCB) Camp Lejeune, North Carolina. The geotechnical engineering services were conducted in general accordance with the. scope agreed upon with Cape Fear Engineering, Inc..Authorization to proceed with our preliminary subsurface investigation and geotechnical engineering services was received from Mr. Perry Davis of Cape Fear Engineering, Inca 1.2 Project Location and Site Description The project site is located within the Devil Dog Training Complex of MCB Camp Lejeune, () North Carolina. This project includes the preliminary evaluation and development of 6 stormwater management system alternatives to enhance the existing stormwater facilities at the. Devil Dog site. - The 163 acre site is located within a mostly wooded tract and includes partially open areas; of land near the center portion of the site. The project site also includes the existing Devil Dog Training facilities located within the approximate center of the project site which contains existing buildings, new buildings currently under construction, gravel parking areas and other infrastructure components. The site generally is gently sloping in various directions towards several natural drainage features and is bordered in all directions by vacant parcels of land. 1.3 Purpose and Scope of Services: The purpose of this study was to obtain preliminary information on the general subsurface I conditions at the proposed project site. The subsurface conditions encountered were then evaluated with respect to the available project characteristics. In this regard, engineering assessments for the following items were formulated: L 1 1. General assessment of the soils revealed by the borings performed at the (( proposed development. L.I 2. General location and description of potentially deleterious material encountered in the borings that may interfere with construction progress or (} performance, including existing fills, surficial/subsurface organics, or l J expansive soils. 3. Soil preparation and construction considerations including grading, and compaction, as well as providing Engineering criteria for placement and compaction of approved structural fill material, including weather and equipment effects. Solutions, Inc. I Preliminary Report of Subsurface investigation and Geotechnical Engineering Services August 16, 2011 r Project 1269C Devil Dog Stormwater Enhancements MCB Camp Lejeune, North Carolina GET Project No: JX11.110G 4. Estimated permeability (infiltration) values are provided based on the soil types encountered as well as our experience with similar soil conditions (� Seasonal high groundwater table (SHWT) was also estimated. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic material in the soil, bedrock, surface water, groundwater or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, color, unusual or suspicious items or ! l conditions are strictly for the information of the client. Prior to development of this site, an [ environmental assessment is advisable. (1 2.0 FIELD AND LABORATORY PROCEDURES [ j 2.1 Field Exploration In order to explore the general nature and composition of the subsurface soils at this site, a total of seven (7) 6.5 to 10-foot deep test pits (designated as P-1 through P-7) were excavated using a track mounted excavator supplied and operated by C.M. Mitchell. These test pits were completed within the limits of the proposed storm water management basin areas. A representative portion of each disturbed test pit sample was collected, placed in a ziplock bag, sealed, labeled, and returned to our laboratory for review. The test pit locations were surveyed in the field by the client. The- approximate test pit locations are shown on the attached "Test Pit Location Plan" (Appendix 1), which was reproduced based on the site plan provided by the client. 2.2. Laboratory Testing Representative portions.of all soil samples collected during the test excavation activities were sealed in ziplock bags, labeled and transferred to our laboratory for classification and analysis. The soil classification was performed by a Geotechnical Engineer in accordance with ASTM D2488. Twenty (26) representative soil samples were selected and subjected to laboratory testing, which included natural moisture and 4200 sieve wash testing and analysis, in order to corroborate the visual classification. These test results are provided in the table on the following page (Table I — Laboratory Test Results) and are presented on the "Test Pit Log" sheets (Appendix 11), included with this report. it 2 ECEIVE&T r � ii JAN 3 12013 ' i BY:—_ Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services r Project 1269C Devil Dog Stormwater Enhancements MCB Camp Lejeune, North Carolina GET ProjectNo: JX11-110G' Table I - Laboratory Test Results I H H August 16, 2011 ;Boring $' NQ' Sample, * 1 TYPe' Depth (Feet) ;Natural ' Moisture' % r "Passing'] �','4200, ? Attei6erg Limits . ; LIJPL/PI . 'USCS Classificatio. :;dn..; P-1 Test Pit 0.5-2 11A 19.4 Non -Plastic SM P-1 Test Pit 2-4.5 11.5 20.8 Non -Plastic SM P-1' Test Pit 4.5-6.5 .9.5 10.7 Non -Plastic SP-SM P-2 Test Pit 0.5-2 12.5 20.5 Non -Plastic SM P-2 Test Pit 2-5 10.6 27.0 Non -Plastic SM P-3 Test Pit 0.67-3 13.9 42.2 Non -Plastic SM P-3 Test Pit 3-8 13.8 49.8 Not -Tested SC P-3 Test Pit 8-10 8.9 11.9 Non -Plastic SP-SM P-4 Test Pit .0.33-1.5 14.3 46.0 Non -Plastic SM P-4 Test Pit 1.5-6 '11.2 32.8 Not -Tested SM P-4 Test Pit 6-7 8.2 23.7 Non -Plastic SM P-5 Test Pit 0.5-1.5 12.3 32.4 Non -Plastic SM P-5 Test Pit 1.5-4 16.2 58.2 Not -Tested CL P-5, Test Pit 4-7.5 20.0 78.4 Not -Tested CL P-6 Test Pit 0.67-1.5 11.0 �15.4 Non -Plastic SM P-6 Test Pit 1.5-3.5 12.7 '29.2 Non -Plastic SM P-6 Test Pit 3.5-6.5 10.0 15.9 Non -Plastic SM P-7 Test Pit 0.5-1.5 12.5 29.2. Non -Plastic SM P-7 Test Pit 1.5-8 15.9 42.8 Not -Tested SC P7 Test Pit 8-9 7.5 8.9 Non -Plastic SP-SM 3.0 SITE AND SUBSURFACE CONDITIONS 3.1 Site Geology The project site lies within a major physiographic province called the Atlantic Coastal Plain. Numerous transgressions and regressions of the Atlantic Ocean have deposited marine, lagoonal, and fluvial (stream lain) sediments. The regional geology is very complex, and generally consists of interbedded layers of varying mixtures of sands, silts and clays. Based on our review of existing geologic and soil boring data; the geologic stratigraphy encountered in our subsurface explorations generally consisted of marine deposited sands, silts and clays. .I ', ,1'• q ,'rt 41 Solutlons, Inc ' Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services August 16, 2011 r l Project 1269C Devil Dog Stormwater Enhancements MCB Camp Lejeune, North Carolina GET Project No: JX11-110G 3.2 Subsurface Soil Conditions: I The results of our field exploration program indicated the presence of approximately 4 to 8 inches of topsoil at the test pit locations. Underlying the topsoil and extending to the test pit termination depths of 6.5 to 10 feet below existing site grades, the natural subsurface soils generally consisted of SAND (SP-SM, SM, SC) with varying amounts of silt and clay. A subsurface deposit of CLAY (CL) was encountered at the location of test pit P-5 at a depth ranging from 1:5 to 7.5 feet belowexisting grades. The subsurface description is of a generalized nature provided to highlight the major soil strata encountered. The records of the subsurface exploration are included on the "Test Pit Log" sheets (Appendix II) and in the "Generalized Soil Profile" (Appendix III); which should be reviewed for specific information as to the individual test pits. The stratifications shown on the records of the subsurface exploration represent the conditions only at the actual test pit locations. Variations may occur and should be expected between test pit locations. The stratifications represent the approximate boundary between subsurface materials and the transition may be gradual or occur between sample intervals. It is noted that the topsoil designation references the presence of surficial organic laden soil, and does not represent any particular quality specification. This material is to be tested for approval prior to use. 3.3 Groundwater Information: Groundwater was not encountered at test pits P-1 through P-7 locations at the time of excavation to depths explored. Also, the soils recovered from test pit P-1 through P-7 locations were visually classified to identify color changes to aid in indicating the normal estimated Seasonal High WaterTable (SHWT). It is noted that soil morphology may not be a reliable indicator of the SHWT. However, color distinctions (from tan to light gray and/or light gray-orangish brown) were observed within the soil profile of soil samples collected at the location of test pits P-1 through P-7. As such, the normal SHWT depth was estimated to occur ranging from approximately 1.5 to 5 feet below the existing site grades at the test pit locations. The estimated SHWT depths are presented on the "Test Pit Log" sheets (Appendix ll), included with this report. It should be noted that the shallow estimated SHWT of 1.5 feet below existing grades at Test Pit P-4 through P-7 locations is likely the result of perched water conditions which may occur above an encountered restrictive Silty SAND (SM) with Clay; Clayey SAND (SC) and Sandy CLAY (CL) horizons at these boring locations. Groundwater conditions will vary with environmental variations and seasonal conditions, I such as the frequency and magnitude of rainfall patterns, as well as man-made influences; such as existing swales, drainage ponds, underdrains and areas of covered soil (paved parking lots, sidewalks, etc.). Seasonal groundwater fluctuations of t 2 feet are common in tj the project's area; however, greater fluctuations have been documented. We recommend I that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact on the construction procedures. EGEUVE ET JAN 3 12013 r I rl Preliminary Report of Subsurface Investigation and Geotechnical Engineering Semites I Project 1269C DevilDog'Stormwater Enhancements MCB Camp Lejeune, North Carolina GET Project No: At 1-110G ll 4.0 EVALUATION AND RECOMMENDATIONS I August 16, 2011 Our preliminaryrecommendations are based on previously discussed project information, our interpretation of the soil test borings and laboratory data, and our observations during. our site. reconnaissance: If the proposed construction should vary from what was described, we request the opportunity to review our recommendations and make any necessary changes. 4.1 Soil Permeability Infiltration testing at the test pit locations was not included in the scope of work for this project. However, based on the soils encountered at the test pit locations and as corroborated with laboratory testing results (published values compared to classification results), the estimated range of the hydraulic cohductivity'of the shallow soils is tabulated below (Table II). Table II — Estimated Infiltration Rates Based on Soil Type Rangwof Hydraulic Conductivity, %•'Soil Type. ,Classification,,, ;(Irdhour-.cmisec) - !hlhour _ :.' 'cm/sec Silty SAND SM 1.44 to 1.44E-2 1.0E-03 to 1.0E-05 Clayey SAND SC 1.44E-2 to 1.44E-3 1.0E-05 to 1.0E-06 Sandy CLAY CL 1.44E'3 to 1.44E-4 1.0E-05 to 1.0E-07 [� 4.2 Structural Fill and Placement �t Any material to be used for backfill or structural fill should be evaluated and tested by G E T Solutions, Inc. prior to placement to determine if they are suitable for the intended use. Suitable structural fill material should consist of sand or gravel containing less than 20 percent by weight of fines (SP, SP-SM, SM, SW, SW-SM, GP, GP -GM, GW, GW-GM), having a liquid limit less than 20 and plastic limit less than 6, and should be free of rubble, organics„ clay, debris and other unsuitable material. All structural fill should be compacted to a dry density of at least 95 percent of the Modified Proctor maximum dry density (ASTM D1557). In general, the compaction should be accomplished by placing the fill in maximum 10-inch loose lifts and mechanically compacting each lift to at least the specified minimum dry density. A representative of G E T Solutions, Inc. should perform field density tests on each lift as necessary to assure that adequate compaction is achieved. 5 GET _. . ?y• r r Preliminary Report of Subsurface Investigation and Geotechnical Engineering ServicesAugust l6, 2011 r I Project 1269C Davit Dog Stormwater Enhancements MCB Camp Lejeune, North Carolina GETProjectNo: JX11-110G 4.3 Suitability of On -site Soils Based on the laboratory testing program, the shallow subsurface SAND (SM) soils encountered at the test pit P-1 and P-2 locations (beneath the topsoil) appear to meet the criteria recommended in this report for reuse as structural fill. Further classification testing (natural moisture content, gradation analysis, and Proctor testing) should be performed in the field during construction to evaluate the suitability of excavated soils for reuse as structural fill. The encountered on -site soils (Topsoil, CLAY (CL) and SAND (SC) are not anticipated to be suitable for re -use as structural fill but may be used as fill within green areas. Backfill material in utility trenches within the construction areas should consist of structural N fill (as described above), and should be compacted to at least 95 percent of ASTM D1557. This fill should be placed in 4 to 6 inch loose lifts when hand compaction equipment is used. 5.0 CONSTRUCTION CONSIDERATIONS 5.1 Drainage and Groundwater Concerns: It is expected that dewatering may be required for excavations that extend near or below the existing groundwater table. Dewatering above the groundwater level could probably be accomplished by pumping from sumps. Dewatering at depths below the groundwater level will likely require well pointing. It is recommended that the contractor determine the actual groundwater levels at the time of the construction to determine groundwater impact throughout the project site and at specific proposed excavation locations. It would be advantageous to construct all fills early in the construction. If this is not accomplished, disturbance of the existing site drainage could result in collection of surface, water in some areas, thus rendering these areas wet and very loose. Temporary drainage ditches should be employed by the contractor to accentuate drainage during construction. 5.2 Site Utility Installation: The base of the utility trenches should be observed by a qualified inspector prior.to the pipe and structure placement to verify the suitability of the bearing soils. Based on the results of our field exploration program it is expected that the utilities and structures located in the vicinity of test pit P-5 may bear in wet, soft clayey soils. In these instances the bearing soils will likely require some stabilization to provide suitable bedding. This stabilization is typically accomplished by providing additional bedding materials (No. 57 stone). In addition depending on the depth of the utility trench excavation, some means of dewatering may be required to facilitate the utility installation and associated backfilling. Excavations extending below the groundwater level will likely require well pointing. LI 6 'ECERVE ET CI JAN 3 12013 BY: ,I Preliminary Report of Subsurface Investigation and Geotechnical Engineering Services August 16, 2011 r) Project 1269C Devil Dog Stormwater Enhancements MCB Camp Lejeune; North Carolina GET Project No: J,X11-110G I I Generally, the subsurface soils encountered at the test pit locations, generally meet the criteria recommended in this report for reuse as structural trench backfill. Accordingly, bulk soil sampling acid classification testing is recommended to be performed to substantiate the suitability of their Intended use at the time of construction. Additionally, stockpiling and. allowing the soils to air dry may be required in order to obtain a moisture content suitable �I for compaction procedures. The encountered on -site soils (Topsoil, CLAY (CL) 1.and SAND (SC) are not anticipated to be suitable for re -use as structural fill but may be used as MI within green areas. 5.3 Excavations: In Federal Register, Volume 54, No. 209 (October, 1989), the United States Department of Labor, Occupational Safety and Health Administration (OSHA) amended its "Construction Standards for Excavations, 29 CFR, part 1926, Subpart P". This document was issued to better insure the safety of workmen entering trenches oir excavations. It is mandated by this federal regulation that all excavations, whether they be utility trenches, basement excavation or footing excavations; be constructed in accordance with the new (OSHA) guidelines. It is our understanding that these regulations are being strictly enforced and if they are not closely followed, the owner and the.contractor could be liable for substantial penalties. The contractor is solely responsible for designing and constructing stable, temporary t excavations and should shore, slope, or bench the.sides of the excavations as required to C l maintain stability' of both the excavation sides and bottom. The contractor's responsible person, as defined in 29 CFR Part 1926, should evaluate the soil exposed in the excavations as part of the contractor's safety procedures. In no case should slope height, slope inclination, or excavation depth, including utility trench excavation depth, exceed r I those specified in local, state, and federal safety regulations. We are providing this information solely as a service to our client. G E T Solutions, Inc. is not assuming responsibility for construction site safety or, the contractor's activities; such t responsibility is not being implied and should not be inferred. 7 GET Preliminary Report of Subsurface Investigation and'Geotechnical Engineering Services r Project 1269C Devil Dog Stormwater Enhancements MCB Camp Lejeune, North Carolina GET Project No: JX11-116G r I 6.0 REPORT LIMITATIONS t H H August 16, 2011 The recommendations submitted are based on the available soil information obtained by G E T Solutions, Inc. and the information supplied by the client for the proposed project. If there are any revisions to the plans for this project or if deviations from the subsurface conditions noted in this report are encountered during construction, G E T Solutions, Inc.. should be notified immediately to determine if changes in our recommendations are required. If G E T Solutions, Inc. is not retained to perform these functions, G E T Solutions, Inc. can not be responsible for the impact of those conditions on the geotechnical recommendations for the project. The Geotechnical Engineer warrants that the findings, recommendations, specifications or professional advice contained herein have been made in accordance with generally accepted professional geotechnical engineering practices in the local area. No other warranties are implied or expressed. After the plans and specifications are more complete the Geotechnical Engineer should be provided the opportunity to review the final design plans and specifications to assure our engineering recommendations have been properly incorporated into the design documents, in order that the earthwork recommendations may be properly interpreted and implemented. At that time, it may be necessary to submit supplementary recommendations and/or complete an additional subsurface investigation. This report has been prepared for the exclusive use of the Client and their consultants for the specific application to the proposed Project 1269C Devil Dog Stormwater Enhancements located within the MCB Camp LeJeune military installation in North Carolina. °.ECEIVE JAN 3 12013 Solutions, Inc. APPENDICES I TEST PIT LOCATION, PLAN II TEST PIT LOGS III GENERALIZED SOIL PROFILE IV CLASSIFICATION SYSTEM FOR SOIL EXPLORATION APPENDIX I TEST PIT LOCATION PLAN ECEIVE JAN 3 12013 • VP ` _y TEST PIT LOCATION PLAN PROJECT P roJect 1268C Devil Dog Stormwater Enhancements SCALE: As Drawn MCB Camp Lejeune, North.Carolina PROJECT NO: JX11,110G DATE: 811612011 CLIENT: Cape Fear Engineering, Inc. PLOT BY: GH APPENDIX II TEST PIT LOGS ECEIVE JAN 3 1 2013 BY:_ •GE® �•....�.® TEST PIT LOG ,pp yo P-1 PROJECT: Devil Dog Slormwaler Enhancement CLIENT: Cape Fear Engineering, Inc. MCB Camp T EST PIT LOCATION: See Attached Test Pit Location Plan . SURFACE ELLEVATION:bne, NC PROJECT NO.: 11 24 MSL EXCAVATOR: C.M. Mitchell LOGGED BY: gwh METHOD: Backhoe DATE: 8.10.11 DEPTH TO WATER -INITIAL*: S _ AFTER 24 HOURS: 3 CAVING> L ioE 55 DBSCfIp110D u n g ° n . `D m v TEST RESULTS PlasticUmdt H Liquid Limit Moisture Content - • N-Value - 4 e1210 0. o 6-inches of Topsoil I I lI ... T I .t j I �. j I [ t t Tan, moist, Silty fine to medium SAND ISM) SHWT Estimated at 4.5 eel Below Existing Grade Tan, moist, Poorly Graded fine to medium SAND (SP-SM) with trace Silt !A(k irrl ;t'� „t,• !+E). r airr 4S 20 4 Is a 2.4 - Boring terminated at 0.5 ft. • 10 4 14. to' i Notes: SS = Splil Spoon Sample ST = Shelby Tube Sample ' HA = Hand Auger Sample ' BS - Bulk Sample Cl - PAGE,1 0/1 - ' Standard Penefrefion Tests were performed /n the field in general accordance with ASTM D 1586. rl a GE® r.4w.: •r.v..•.-,....,„„ TEST PIT LOG P-2 PROJECT: Devil Dog Stormwater Enhancement CLIENT: Cape Fear Engineering Inc. PROJECT LOCATION: MCB Camp Lejeune NC PROJECT NO.: JX11-110G TEST PIT LOCATION: See Attached Test Pit Location Plan SURFACE ELEVATION: 22.5 MSL EXCAVATOR: C.M. Mitchell LOGGED BY: gwh METHOD: Backhoe DATE: 8-10-11 DEPTH TO WATER -INITIAL*: .4 _ AFTER 24 HOURS: 3 _ CAVING> L z @ g' d E o Description - u O u Z m m.2 E > E r b 3 �' > z $ TEST RESULTS Plastic Limit Fi Liquid Limit Moisture Content - • N-Value - 7 g 9` 6-inches of Topsoil 4; I l i .: 'I ' l 7 • • - -^ • • •- • EC:EIVi E. JAN 3 2013 Tan and orangish brown, moist, Silty fine to madium,SAND (SM) 20 Orangish brown, moist, Silty fine to medium SAND ISM) SHWT Estimated at 5 Feet Below Existing Grade 4 is Tan. moist, Poorly Graded fine to medium SAND (SP-SM) with trace Si!t !3:N: r•n t t i:Ctr r:e t t a:tr 18 Boring terminated at 7 fl. 14 4 10 4 Notes: ' SS = Split Spoon sampla ST = Sharby Tube Sample RA = Hand Auger Sample BS - Bulk Sample PAGE T of 1 Standard Penetration Tests were performed in the field in general accordance with ASTM D 1586, I GET c.�.,..ya•q,® TEST PIT LOG P-.3 PROJECT: Devil Dog Storrnwaler Enhancement CLIENT: Cape Fear Engineering Inc. PROJECT LOCATION: MCB Camp Leleune NC PROJECT NO.: JX11.110G TEST PIT LOCATION: See Attached Test Pit Location Plan SURFACE ELEVATION: 22 MSL EXCAVATOR: C.M. Mitchell LOGGED BY: gwh METHOD: Backhoe DATE: 8-10-11 DEPTH TO WATER -INITIAL': H _ AFTER 24 HOURS: b _ CAVING L c.c n g Eto n `• $ Description o n ,� o d z m a m y y F b m v$ i zz ti Y TEST RESULTS it Plastic Limit H Uquld Limit Moisture Content - • N-Value - '8-Inches of Topsoil iiii ..:) ..: ...:. :.... ;I : I r( I� f: I: I I it S I I = l i .67 Tan, moist. Silty fine to medium SAND ISM) .SHWT Estimated at 3. Feet Below Existing Grade All- Light gray and orangish brown, moist, Clayey fine to medium SAND ' (SC)18 t Tan and orangish brown, moist, Poorly Graded fine to medium SAND (SP-SM) with trace Silt Zli t:4(l iM t i ;art r (V 4 14 32 — Boring terminated at 10 B. i Notes: SS = Sprit Spoon Sample - ST = Shaby Tube Sample HA = Hand Auger Sample BS = Bulk Sample PAGE 1 of 1 Standard Penetration Tests were performed In the field in genial accordance with ASTM 0 1586. L. rl I H I GET a•v:,.rq.r„a...,w.nq„ r TEST PIT LOG P-4 PROJECT: Devil Dog Stormwater Enhancement CLIENT: Cabe Fear Engineering Inc. PROJECT LOCATION: MCB Camp Leieune, NC PROJECT NO.: JX11-110G TEST PIT LOCATION: See Attached Test Pit Location Plan SURFACE ELEVATION: 19.5 MSL EXCAVATOR: C.M. Mitchell LOGGED BY: gwh METHOD: Backhoe DATE: 8.10-11 I DEPTH TO WATER -INITIAL*: 8 _ AFTER 24 HOURS: S _ CAVING> .G DBScri tlorl P (9 o n d E � Z m E m E in io ii m f g v TEST RESULTS Plastic Limit H Liquid Limit Moisture Content - • N-Value - e. 2. 3. BY 4-Inches of Topsail ) I: I: ; i t ( I . I •I ..I I t I: "—PEIVE . JAN 3 9 2M 3 Tan, moist, Silty fine to medium SAND ISM) SHWT Estimated at 1.5 Feet Below Existing Grade 1.5 Light gray and orangish brown, moist. Silty fine to medium SAND ISM) with little Clay Tan and orangish brown, (mist, Silty fine to medium SAND ISM)12 aF i to 4 14 'a 10 Boring terminated at 9 ft. '' Notes: SS = Split Spoon Sample ST - Shelby Tube Sample HA - Hand Auger Semple BS - Bulk Sample PAGE. i of 1 Standard Penetration Tests were performed in the field In generel accordance with ASTM D 1586. r) GE ®' TEST PIT LOG P-5 PROJECT: Devil Dog Stormwater Enhancement CLIENT: Cape Fear Engineering Inc. PROJECT LOCATION: MCB Camp Lefeune NC PROJECT NO.: JX71.110G TEST PIT LOCATION: See Attached Test Pit Location Plan SURFACE ELEVATION: 29.0 MSL EXCAVATOR: C.M. Mitchell LOGGED BY: gwh METHOD: Backhoe DATE: 8-10-11' DEPTH TO, WATER -INITIAL*: 8 _ AFTER 24 HOURS: S _ CAVING> C Lry� c m r j y E C u o ` N Description a �e, m E d in 3� E eft m E `p°r 1p al o j f, 8 v TEST RESULTS. Plastic Limit H Liquid Limit Moisture Content - • N•Value - S. 6-inches of Topsoil I ci t : I. I: I' is l ...:.. I . . . .:.....:. ..: 6 t f ...: 9 e Tan, moist, Silty fine to_medium SAND (SM) s . .SHWTEstimated at-15 Feet Below Exitingrae, Grade, t o 1 f 7. Slightly mottled light gray-orangish Gown, moist, Sandy CLAY (CL) e I 4 7 Light gray, moist," Sandy CLAY (CL)24 I 22 Boring terminated at 7.5 B. 10 Is r Is 41 f Notes: SS - Split Spoon Sample ' ST = Shelby Tube Sample RA - Hand Auger Sample 'Ma Initial gn�ndwmfor BS - Bulk Sample PAGE i. of 1 Standard Penetration Tests were pedormed In the field Ingeneml accordance with ASTM 0 1566. M GETPROJECT: ���+-r�:•r•�.-w.�•e,N..' TEST PIT LOG P-s Devil Dog Stormwater Enhancement CLIENT: Cape Fear Engineering Ind. PROJECT LOCATION: MCB Camp Lejeune NC PROJECT NO.: JX11-110G TEST PIT LOCATION: See Attached Test Pit Location PlanSURFACE ELEVATION: 18.5 MSL EXCAVATOR: C.M. Mitchell LOGGED BY: gwh METHOD: Backhoe DATE: 8.10-11 1 DEPTH TO WATER -INITIAL': 4 _ AFTER 24 HOURS: S _ CAVING> C o,E .W dr o Descriptionz u �d m o m a a ro M .fD m k v m g TEST RESULTS Plastic Limit H Liquid Limit Moisture Content -• N-Value - 2. 512 18 8-inches of Topsoil .67 iXX 4 I I I I j 3 cEQVE J4P 31 2013 sx: Tan, moist, Silty fine to medium SAND ISM) SHWT Estimated at 1.5 Feet Below Existing Grade Light gray and orangish brown, moist, Silty fine to medium SAND ISM) with little Gay 3. Orangish brown, moist, Silty fine to medium SAND ISM) with littla Clay14 ° Boring terminated at 6.5 6. ID •4 - 4 Notes: SS =. Split Spoon Sample ST -Shelby TUbe Sample HA = He Auger Sample BS - Bulk Sa PAGE 1 of i Standard Penetration Tests were peAormed in the field In general accordance with ASTM D 1566. rIt GE® PROJECT: Devil Dog Slormwater Enhancement CLIENT: Cabe Fear Engineering a. Inc. PROJECT LOCATION: MCB Camp Leieunej NC PROJECT NO:: JX11.110G �. ts...ar..ui.....„•.r.,e„ TEST PIT LOCATION: See Attached Test Pit Location Plan SURFACE ELEVATION: 21.0 MSL TEST PIT LOG 6CAVATOR: C.M. Mitchell LOGGED BY: awh METHOD: Backhoe DATE: 8.10-11 P-% DEPTH TO WATER - INITIAL': 8 _ AFTER 24 HOURS: 3. CAVING> C lc B 9 d e- m m g TEST RESULTS Plastic Umtt H Liquid Limit N 8 V g DeSCri lion P �• E d Z R E Y S.� � v 1 E V, N N. t' rn $ Moisture Content - o' K N•vaWe • DJ%%JIIJ� PAGE i of Standard Penetietion Tests were performed in the field in general accordance with ASTM U 1586. APPENDIX III GENERALIZED SOIL PROFILE ' ECEIVE JAN 3 12013 BY:- 25 25. MY,,., WMtG e N W,2.5 NWU.S ]e - Nwg.B Nup06 i0 .1 a: C i rawas x�«,ta W-n.a. rai.13.0 M 112 , Izl ,s s NM.,a.a -1:1: C i Nub.9 , 1W 62 ,a- 'a- 5 a--- 0 Strata El BMWIS Tomil GET Solutions, Inc. im Silly Sand GENERALIZED SOIL PROFILE pppm, lj p Sena scwLe DRAWN BV/A ROVED BY DATE DRAWN 9!r with sin srwLe r-s h 8/16/2011 Clayey Sand Devil Dog StormwaterEnhancement ® Lein clay FIGURE NUMBER PROJECT NO. JX11-110G }5 T7 A 1 w15.9 is I5. B T!i 10 5 10 5 3 0 0. strata El symWis Topsail ..,.m.w nv. . ` 4 : GET Solutions, Inc: satysario ` D GENERALIZED SOIL PROFILE no r DRAWN BV/APPROVED BY DATE DRAWN IPIO Sillgraded wrn scuE:-r-s h 8/16/2011 Clayey Sand 11020 Devil Dog Stormwater Enhancement ® Haan Clay W 'FIGURE NUMBER PROJECT NO. JX11-110G APPENDIX IV CLASSIFICATION SYSTEM FOR SOIL EXPLORATION r�I I 11 GET GwnM,rei •rme..rum•raaa V-trginia Beach Office 204 Grayson Road Virginia Beach, VA 23462 (757) 518-1 703 Williamsburg Office 1592 Penniman Rd. Suite E Williamsburg. Virginia 23185, (757)564-6452 CLASSIFICATION SYSTEM FOR SOIL EXPLORATION Elizabeth City Office 504 East Elizabeth St. Suite 2 Elizabeth City, NC 27909 (252)335-9765 Standard Penetration Tots (SPI) were performed in the field in general accordance with ASfM D 1586. The soil samples were obtained with a standard 1.4" I.D.,.2" O.D., 30" long split -spoon sampler. The sampler was driven with blows of 140 lb. hammer falling 30 inches. The number of blows required to drive the sampler each 6-inch increment (4 increments for each soil sample) of penetration was recorded and is shown on the boring lags. The win of the second and third penetration increments is termed the SPf N-value. NON COHESIVE SOILS (SILT, SAND, GRAVEL and Combinations) Relative Density Very Loose 4 blows/ft. or less Loose 5 to 10 blows/ft. Medium Dense II to 30b1owdR. Dense 31 to 50 blowa/ft. Very Dense 51 blows/ft. or more Particle Size Identification Boulders 8 inch diameter or more Cobbles 3 to 8 inch diameter Gravel Coarse 1 to 3 inch diameter Medium '12 to 1 inch diameter Fine '/s to 1/1 inch diameter Sand Coarse. 2.00 mm tot/a inch (diameter of pencil lead) Medium 0.42 to 2.00 mm (diameter of broom straw) Fine 0.074 to 0.42 into (diameter of human hair) Silt 0.002 to 0.074 Tom (cannot we particles) Se2aTaaGtaige�l.St7I65 FincGs4itu;d_Sg)]a Mare than 50% retained on No. 200 sieve 50% or coon passes the No. 200 sieve �� GW - Well -graded Gravel CL - Lean Clay GP- Poorly graded Gravel CL-ML - Silty Clay L I GW-GM - Well -graded Gravel w/Silt ML- Silt. GW-GC - We11-graded Gravel w/Clay OL- Organic Clay/Silt GP -GM- Poorly graded Gravel w/Silt Liquid Limit%% or greater GP -GC - Poorly graded Gravel w/Clay CH - Fat Clay GM - Silty Gravel MH - Elastic Silt GC - Clayey Gravel OH - Organic Clay/Silt GC -GM - Silty, Clayey Gravel l SW - Well -graded Sand milwv Organic SOB Il SP - Poorly graded Sand I PT - Peat SW-SM - Web -graded Sand w/Silt SW -SC =Well -graded Sand w/Clay SP-SM = Poorly graded Sand w/Silt I SPSC - Poorly graded Sand'w/Clay SM - Silty Sand /E` SC -Clayey Sand r v ECEI SCSM.silly, Clayey Sand I BAN 3 12013 P of I GET Revision IV12Nr RY:------- � COHESIVE SOILS (CLAY, SILT and Combinations). Very Soft Consistency 2 blows/ft. or less Soft 3 to 4 blows/ft. Medium Stiff 5 to 8 blows/ft. Stiff 9 to 15 blows/ft. Very Stiff 16 to 30 blows/ft. Hard 31 blows(ft. or more v Trace 0-5 Few 5-10 Little 15-25 Some 30-45 Moody 50-100 Strata Changes In the column "Description" on the boring log, the horizontal lines represent approximate strata changes. Groundwater Readings Groundwater conditions will vary with. environmental variations and seasonal conditions, such as the frequency and magnitude of rainfall patterns, in well as tidal influences and man-made influences, such as existing swales, drainage ponds, underdnins and areas of covered soil (paved parking lots, side walks, etc.). Depending on percentage of fined (friction smaller than No. 20D sieve size), coarse -grained soils are classified as follows: Less than 5 percent GW'.GP,SW',SP More than 12 percent GM, GC, SM, SC 5 to 12 percent Borderline cases requiring dual symbols fill 1[ se 40 20 q ID K 0 ■■E■N■■.., NUNN all EOM■■■■. LIQUID LIMIT (LL) (%) For OENR Oae ONLY R.,e.l CIO 2a North Carolina Department of Environment and �e�i/ 1 Natural Resources S"I —Z) CCAY-) NCDENR Request for Express Permit Review nth•: �_°O Conlin,: —I(_IU FILL-IN all the information below and CHECK the Pemrit(s) you am requesting for express review. FAX or Email me completed form to txpress ^ _ Coordinator along with a completed DETAILED narrative, site Plan fPDF file) and vicinity map /same Items expected in the application package of the project location. Please include this forth In the application package. • Asheville ReglomAllson Davidson 828.296-469&oliwn.davklsonftcmail.m • Fayetteville or Raleigh Region -David Lee 919-791-4203, davld.lee®ncmail.net • Mooresvilled -Patrick Grogan 704-663-3772 or aamick.groganoncmaltnef • Washington Region -Lyn Hardison 252-946.9215 or Nn.hardisonftminaRnet 1 • Wilmington Region Janet Russell 910-350-2004 or lanetmsselRdncmailnef NOTE: Project application received after 12 noon will be stamped in the following work day. Project Name:P_;,--1269 DEVIL DOG ISOII FIELD TRAINING FACILITY— Counly _ONSLOW_ - Field Code Changed Applicant US GOVERNMENT-MCB CAMP LEJEUNE Company: MCS CAMP LEJEUNE PUBLIC WORKS Address: 1005 MICHAEL ROAD Gty: CAMP LEJEUNE State: NC Zip: 28542- Phone: 910451-2213 Fax: 910-451-2927 Email, CARL.H.BAKER USMC,MIL Physical Locadon:PERIMETER ROAD Project Drains into SOUTHWEST CREEK waters- Water classification qNSW (for dassifiration see. htm:lfi2o enr.state nc.usihims/reoodslmoortsWB.Mtn) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N , whin Y, mile and draining to class SA waters N or within 1 mile and draining to clan HOW waters? N EngineerlConsultant MELISSA PRITCHARD Company: EARSONS BRINCKERHOFF— .... . ..... . ...... - Field Code changed Address, 999 THIRD AVENUE SUITE 3200 City: SEATTLE, State: WA Zip 98104-_ Phone: 206-382.6325 Fax:: - - Email: PRITCHAROMJ(dPBWORLD,CObt—_......... _-------- _------------------ _----.-----_--_--__-_--__--_-_-_.._ Field Code Changed SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑ Scoping Meeting ONLY ® OWQ, ❑ DCM, -❑ DLR, ❑ OTHER:_ SECTION TWO: CHECK ONLY THE PROGRAM is) YOU ARE REQUESTI ❑401 Unit ❑ Stream Origin Determination: _#of stream calls- Please attach TOPO map marking fire areas in questions ❑ IntermihentlPerennial Detenninadom _ # of stream calls - Please allach TOPO map marking the areas in questions ❑ 401 Water Quality Gertficabon ❑ Isolated Wetland Llinear ft or_acros) ❑ Riparian Buffer Authorization ❑ Minor Variance ❑ Major General Variance V ® Slate Stonmwater ❑ General ❑ SFR, ❑SkhdB at Rmp, ❑ Gear 8 Grub, ❑ U01ity ❑ Low Density ❑ Low Density -Curb 8 Gutter _# Curb OudetSwales ❑ Off -site (SW— (Provide permh#)j ❑ High Density-Detendon Pond _# Treatnrent Systems ❑ High Density -Infiltration _#Treatment Systems ❑ High Density-Bio-Retention # Teatment Systems ❑ High Densitotomrwater Wetlands _#Tmatment Systems❑ High Density - Other _# Tmabnent Systems /®MODIFICATION: ®Major ❑Minor ❑Revision SW 80 813(Pmim nor" #) ❑ Coastal Management ❑ Excavation 8 Fill ❑ Bridges 8 Culverts ❑ Structures Information ❑ Upland Oevelopment ❑ Marina Development ❑ Urban Waterfront V ® Land Quality ® Erosion and Sedimentation Control Plan with 5 acres to be disWiDed (CK if (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both Scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: —acre(s) Wetlands Delineation has been completed: ® Yes ❑ No Isolated werand on Pmperty ❑ Yes ® No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ® No Pennit Received from US ACOE ® Yes ❑ No For DENR us any Fee Split for multiple pmmlb: IChecka 1 ToW Fee Amoml4 SUBMITTAL DATES I Fee SUBMITTAL DATES Fee LAMA 9 Verance JLJ Mal; LJ MIn1 { See ju HD, U W, U Gen) I 1 S "1- S Los 1 1 9 Stream Near,_ { NCDENR EXPRESS Septemeer 2008 ECEIVE JAN 14 2013 BY: 4 Range Rd, Camp Lejeune, NC 28445, USA G 8e� X L Project Narrative P-1269 Camp Devil Dog SOi Stormwater Enhancements MCB Camp Lejeune, Onslow County, North Carolina Project Description Camp Devil Dog is an approximately 142 acre site located within Camp Lejeune on the west side of New River. The main drive, Perimeter Road, can be accessed from U.S. Route 17 and Verona Loop Road. A study was completed to evaluate the existing stormwater management and flooding problems routinely occurring within the Camp Devil Dog watershed and the objective of this project is to alleviate the identified flood areas and also provide stormwater management for current and future development. Existing Conditions Camp Devil Dog is one of many training sites located within MCB Camp Lejeune. The majority of the 142 acre site is forested land with low density development. There is a pocket of high density development within the site that consists of academic, administrative, storage, and other miscellaneous support buildings, barracks, latrines, outdoor training course, paved roadways, detention ponds, and a large parking lot. Overall, the terrain for the site is relatively flat with slopes not exceeding 2%. The existing site has problems with erosion control, sustaining vegetation and flooding or standing water. Camp Devil Dog drains to the Non -SA waters of either Mill Run or Hicks Run and then eventually to Southwest Creek. Southwest Creek is in the New River subbasin, the largest and most populated of the White Oak River Basin. Southwest Creek is located in the White Oak river basin, its Index number is 19-17-(6.5) and its class is C; HQW; NSW. Mill Run and Hicks Run are both class C; NSW. Erosion and Sediment Control There is an existing state erosion and sediment control permit for the previous phase of this project that expires December 31, 2014. The proposed disturbed area for this project is approximately 5 acres. 1.15 acres of disturbance are in the existing permit boundary. The remaining area is new area to be disturbed. ECEI V E JAN 14 2013 BY: Range Rd, Camp Lejeune, NC 28445, USA Yf :Y` Planned Erosion and Sediment Control Practices North Carolina Department of Natural Resources ce Temporary Gravel Construction Entrances— 6.06 Three construction entrances will be installed at access points onto Perimeter Road. During wet weather it may be necessary to wash vehicle tires at this location. See page 6.06.1 for specifications. Rolled Erosion Control Products — 6.17 Rolled erosion control products should be used to aid permanent vegetated stabilization when runoff velocity will exceed 2 ft/sec on bare earth during 2 year rainfall event that produces peak runoff. The product selected must have a permissible shear stress that exceeds the shear stress of the design runoff event. OSilt Fence— 6.62 sF Silt fence will be located around stock pile areas, the proposed parking lot, and proposed buildings as indicated in the erosion control plans. See 6.62.1 for specifications. vu Diversion Dikes —6.22 Permanent ditches will be installed east of the construction activity for the AIF building to transferring runoff to sediment trap. See 6.22.1 for specifications. sr Sediment Trap — 6.60 Sediment traps are often installed in outlets for diversions, channels, slope drains, and other points where sediment -laden water is concentrated. Restricted to drainage areas less than 5 acres. uP Outlet Protection — 6.41 Riprap is to be placed at indicated pipe outlets to dissipate energy. See 6.41.1 for specifications. R<o Rock Check Dams — 6.83 Check dams will be installed upstream of the sediment traps to reduce concentrated flow velocity and help increase the sediment basin's effectiveness. See 6.83.1 for specifications. Surface Roughening — 6.03 Surface roughening will be provided on the AIF building's east embankment. Provide a rough soil surface with horizontal depressions to aid in the establishment of vegetative cover and reduce runoff velocities. See 6.03.1 for specifications. Reservations may be changed or cancelled, without a charge, via one of the following methods: • From our View/Change/Cancel Reservation page. • By calling our Reservations Center— in the U.S. or Canada and giving them your confirmation number. • By calling the hotel directly. n Two Trips One Night Free Take two separ ate trips betwe en Augu st 30 and Nove n at over 1,500 hotels More Detail It Book early and save up to 20% Save up to 0% off our Best Rate when you book in More details 4 Top soiling (Stockpile) — 6.04 Topsoil will be stripped from graded areas and stockpiled for later use as indicated on the plans. Stockpile areas will be protected by silt fence and seeded if they are to remain in place for longer than 21-days. See 6.04.1 for specifications. Temporary Seeding — 6.10 All denuded areas which will be left denude for a period greater than 21 days shall be seeded with fast germinating temporary vegetation immediately following grading. Selection of the seed mixture will depend on the planting season. See 6.10.1 for specifications. OPermanent Seeding —6.22 PS Surface stabilization will be accomplished with vegetation and mulch as specified in the landscape plan. Rolled Erosion Control Products — 6.17 Erosion control blankets will be installed over fill slopes of 3:1 or greater which have been constructed to final grade and seeded to protect the slope. Mulch (straw or fiber) will be used on relatively flat areas and will be applied as a second step in the seeding operation. See 6.17.1 for specifications. Stormwater Management Existing Site There is an existing state stormwater permit impacted by the project, SW8 080813 TECOM (SOI) Interim Facilities and Field Training Facility P1269 Camp Devil Dog. The existing permit consists of two wet detention facilities and five sand filters. Proposed Site The proposed site will redirect the flow of drainage to one of the existing basins (SWM-1) which will require the basin to be modified. The outfall location of this basin will also be moved during the modification. The other existing basin (SWM-2), near the AIF building, will not be affected with this project. A new basin is proposed with the project to alleviate flooding and also provide water quality treatment to existing and future development. The modification to the existing wet detention basin and the addition of a new stormwater basin will make it possible to remove the sand filters treating both Billet buildings and the Classroom building. The two existing sand filters located on the Thunderdome will not be affected by this project. Camp Lejeune Public Works would like to modify the existing State Stormwater Management permit boundary to include all of Camp Devil Dog. See below figure for approximate proposed permit boundary. r�CEIVE . JAN 14 20B Land Quality Section: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796.7215 Linda Willis, DWQ - " j cc: - TGH Revised 4/29/2011 Page 2 of 2 SOUTHWEST 9TORMWATER PERMIT OUNDARY P GONMN D POST ROAD SEMAC ROAD P �. I PHASE UNEE '/ ROAD JAN 14 20B :6 BY: N y �1 J Mud o 805 0 For DENR Use ONLY aA North Carolina Department of Environment and Renexer it Natural Resources s,tsou, i-0 tAo NCDENR Request for Express Permit Review Time: : co Coro", FILL-IN all the information below and CHECK the Parmit(s) you are requesting for express review. FAX or Email the completed hand to Express Coordinator along with a completed DETAILED narrative, site plan (PDF file) and vicinity mad (same items expected in the application package of the project location. Please include this form in the application package. • Asheville Region -Alison Davidson 828-296-4698;alfson.davidson(&ncnino • Fayetteville or Raleigh Region -David Lee 919-791-4203; david.leefdncmail.net®�� • Mooresville& -Patrick Grogan 704-663-3772 or patdck.moganAmcmail.ne( ob (dil.ne • Washington Region -Lyn Hardison 252-946.9215 or lvn.hardisonncr l ,l • Wilmington Region -Janet Russell 910-350-2004 or janetrusselkiiincmail.net n n NOTE.. Project application received after 12 noon will be stamped in the following work day. N T„ \ Project Name: P-1269 DEVIL DOG (SOI) FIELD TRAINING FACILITY _ _ County.. ONSLOW _ _ _ _ _ Applicant: US GOVERNMENT-MCB CAMP LEJEUNE Company: NICE CAMP LEJEUNE PUBLIC WORKS Address: 1005 MICHAEL ROAD City: CAMP LEJEUNE, State: NC Zip: 28542- O L Phone: 910-451-2213 Fax*:910-451-2927 Email: CARL.H.BAKER@USMC.MIL Vr 1 Physical Locabop.PERIMETER ROAD Project Drains into SOUTHWEST CREEK waters - Water classification C�SW (for classification see- htto:/ih2o,enr.slate.nc.uslbimsirepons/reoonsWB.html) Project Located in WHITE OAK River Basin. Is project draining to class ORW waters? N within h mile and draining to class SA waters N or within 1 mile and draining to class HOW waters? N Engineer/Consultant: MELISSA PRITCHARD Company: PARSONS BRINCKERHOFF Address: 999 THIRD AVENUE SUITE 3200 City: SEATTLE, State: WA Zip 98101 Phone: 206-382-6325 Fax:: - - Email: PRITCHARDMJAFBWORLD.COM. SECTION ONE: REQUESTING A SCOPING MEETING ONLY .® Scalping Meeting ONLY ® DWQ, ❑ DCM,p DLR,_❑ OTHER__ SECTION TWO: CHECK ONLY THE PROGRAM (SI YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑401 Unit ❑ Stream Origin Determination: _ # of stream calls- Please attach TOPO map marking the areas in questions ❑ IntennittenVPerennial Determination: _# of stream calls -Please attach TOPO map marking the areas in questions ❑ 401 Water Quality Codification ❑ Isolated Welland (_linear ft or acres) ❑ Riparian Buffer Authanzation ❑ Minor Variance ❑ Major General Vanance State Stonnwater ❑ General ❑ SFR, ❑Bkhd & Bt Ral ❑ Clear & Grub, ❑ Utility jyY� ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ❑ Off -site SW 8080813 (Provide permit it)] 7I I ❑ High Density -Detention Pond _ # Treatment Systems ❑ High Density -Infiltration _ #Treatment Systems ❑ High Density-Bio-Retention _ It Treatment Systems ❑ High Density-Stornwater We Treatment Systems❑ High Density - Other _# Treatment Systems /® MODIFICATION: ® Major ❑ Minor ❑ Revisipn S �a permit IT ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Upland Development ❑ Manna Development ❑ Structures Information ❑ Urban Waterfront ® Land Quality ❑ Erosion and Sedimentation Control Plan with _acres to be disturbed ,(CK # (for DENR use)) SECTION THREE - PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT (for both scoping and express meeting request) Wetlands on Site ® Yes ❑ No Buffer Impacts: ® No ❑ YES: _acre(sl Wetlands Delineation has been completed: ® Yes ❑ No Isolated wetland on Property ❑ Yes ® No US ACOE Approval of Delineation completed: ® Yes ❑ No 404 Application in Process wl US ACOE: ❑ Yes ® No Permit Received from US ACOE ® Yes ❑ No Fv DFNR use rndy SUBMITTAL DATES Fee 1 1 SUBMITTAL DATES Fee CAMA I I b I varunce (LJ Mal; ❑ Min) I b SW 1❑No, ❑LD,❑Gen) I 8 1 401: 1 b LOS I b I Stream Deter,_ 1 b NCDENR EXPRESS September 2005 SEP 1`9 2012 r 13Y: L _ I i Russell, Janet From: Pritchard, Melissa J. [pritchardmj@pbworld.com] Sent: Wednesday, September 19, 2012 3:53 PM To: Russell, Janet Cc: Towler GS03 David Subject: Request for Scoping Meeting - Camp Devil Dog Attachments: REQUEST FOR SCOPING MEETING P-1269 Devil Dog SOI.doc; P-1269 Devil Dog SOI Mod Narrative.docx; P-1269 Camp Devil Dog Proposed Design.pdf Hello Janet — I hope you're having a good summer. I've begun work on the modification to state stormwater permit SW8 080813 TECOM (SOI) Interim Facilities and Field Training Facility P1269 Camp Devil Dog. I'm hoping to shorten this title to just P- 1269 Camp Devil Dog SOL I will be in the Virginia/North Carolina area from September 27`"-October 2nd and would like to sit down with DENR staff for a Scoping meeting to gain some direction on this modification. I have attached the request for Scoping meeting along with the project narrative and a preliminary design. October 1" or 2"d work best for me. Is DENR staff able to meet either of those days? Let me know if you need anything else from me. Thanks — Melissa Melissa J. Pritchard, PE, LEED AP Senior Stormwater Engineer Parsons Brinkerhoff 999 Third Avenue, Suite 3200 Seattle, WA 98104 Desk 206.382.6325 Cell 586.855.8647 www.pbworld.com NOTICE: This communication and any attachments ("this message") may contain confidential information for the sole use of the intended recipient(s). Any unauthorized use, disclosure, viewing, copying, alteration, dissemination or distribution of, or reliance on this message is strictly prohibited. If you have received this message in error, or you are not an authorized recipient, please notify the sender immediately by replying to this message, delete this message and all copies from your e-mail system and destroy any printed copies. N`CFIVED SEP 1 9 2012 F: v - �e Project Narrative P-1269 Camp Devil Dog SOI MCB Camp Lejeune, Onslow County, North Carolina Project Description Camp Devil Dog is an approximately 163 acre site located within Camp Lejeune on the west side of New River. The main drive, Perimeter Road, can be accessed from U.S. Route 17 and Verona Loop Road. A study was completed to evaluate the existing stormwater management and flooding problems routinely occurring within the Camp Devil Dog watershed and the objective of this project is to alleviate the identified flood areas and also provide stormwater management for current and future development. Existing Conditions Camp Devil Dog is one of many training sites located within MCB Camp Lejeune. The majority of the 163 acre site is forested land with low density development. There is a pocket of high density development within the site that consists of academic, administrative, storage, and other miscellaneous support buildings, barracks, latrines, outdoor training course, paved roadways, detention ponds, and a large parking lot. Overall, the terrain for the site is relatively flat with slopes not exceeding 2%. The existing site has problems with erosion control, sustaining vegetation and flooding or standing water. The existing storm system is filled with sediment compounding the drainage problems onsite. Camp Devil Dog drains to the Non -SA waters of either Mill Run or Hicks Run and then eventually to Southwest Creek. Southwest Creek is in the New River subbasin, the largest and most populated of the White Oak River Basin. Southwest Creek is located in the White Oak river basin, its Index number is 19-17-(6.5) and its class is C; HOW; NSW. Mill Run and Hicks Run are both class C; NSW. Stormwater Management Existing Site There is an existing state stormwater permit impacted by the project, SW8 080813 TECOM (SOI) Interim Facilities and Field Training Facility P1269 Camp Devil Dog. The existing permit consists of two wet detention facilities and five sand filters. Proposed Site The proposed site will redirect the flow of drainage to one of the existing basins (SWM-1) which will require the basin to be modified. The outfall location of this basin will also be moved during the modification. The other existing basin (SWM-2), near the AIF building, will not be affected with this project. A new basin is proposed with the project to alleviate flooding and also provide water quality treatment to existing and future development. The modification to the existing SEP 1 9 Z012 �;V: wet detention basin and the addition of a new stormwater basin will make it possible to remove the sand filters treating both Billet buildings and the Classroom building. The two existing sand filters located on the Thunderdome will not be affected by this project. Camp Lejeune Public Works would like to modify the existing State Stormwater Management permit boundary to include all of Camp Devil Dog. See below figure for approximate proposed permit boundary. COMMAND POST ROAD SEM AC ROAD PHASE ROAD n PERMIT RUN SEP 1 S 2012 RY• `- ♦^� j�t '` / j ♦A♦�-- -'' RETROFIT - EXISTING hilt- ------- \ POND � \G♦'' ^ _ //_✓�/�pV FHUNOERDOME C� .,� � �_-�♦ � ``�```` I1ry/sz ,vim- 1�, , � - w�, , --- Ic REMOVE ' j1 �/' ��� �.1 _, ♦�`�S ¢ .Oj .r FILTER1 i 1,= __ 1,-"' �/• \\ \�� - ) -�/�/ s' 7 '!�`�s'/ - ��' 'ti �„'_�_--_. -__ / _ .�\� °Y _ �ySS- it li%'"� N' - \ 1 ♦., ``;% / � � /� '•,@` " _ � I �---cVf'-_— I'` / i_ ___� Y W , _ g PROPOSED---\ / ', / // _ - '♦♦ / i ry I' / __ 1� Y ;r�; jJ BASIN � I REMOVE SAND , _ FFE 15.70' s � FILTERS _ i o c IJ BILLET 1 FFE= 15.79' I - -�rowE-w goy 1 _"- � e _G tZJ- - .� �'7 '"mow': � 'r _- __ " -"ri.J•_ ______ , - _ __--NIL- ----= ---- — DEPARTMENT OF THE NAVY TELEPHONE: A. OFFICER IN CHARGE OF CONSTRUCTION 910-449-5587 RESIDENT OFFICER IN CHARGE OF CONSTRUCTION FAX 910.449-6403 NAVAL FACILITIES ENGINEERING COMMAND CONTRACTS IN REPLY REFER TO: 1005 MICHAEL ROAD CAMP LEJEUNE, NC 28547.2521 JAX/ijb 19 Jul 2011 From: Jim Burns, SCM OICC To: Carl Baker, Deputy PWO Subj: N40085-08-C-8462, TECOM (SOI) INTERIM FACILITIES AT CAMP DEVIL DOG, STORM WATER PERMIT SW8-080813 Ref: (a) Storm Water Permit SW8-080813 Encl: (1) Engineering Certification 1. As required by reference (a), enclosure (1) provides the Engineer's Certification. 2. If there are any further questions concerning the subject contract, please call the undersigned at (910) 449-5587. J. urns, P.E. )riginal permit) !uality Performance ... Quality Results