Loading...
HomeMy WebLinkAboutSW8080734_CURRENT PERMIT_20210607STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0,�O"l3'- DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2021 U to O`I YYYYMMDD 4 ROY COOPER Governor DIONNE DELLI-GATTI secretary BRIAN WRENN Dlrecror June 7, 2021 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 NORTH CAROLINA Em6onmentaf QuaUty Subject: Permit Renewal State Stormwater Management Permit No. SW8 080734 Intel BN Interim Facilities Onslow County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete 8 year Storm water Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 080734 has been renewed on June 7, 2021, and shall be effective until December 30, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terns to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on September 15, 2008 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdem.gov. Sincerely, l_I'YLV3.-Q 3 Brian Wrenn, Director ' Division of Energy, Mineral and Land Resources lf�V%k � �North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 wam crnauru °+�msae.�uo.m 910.796.7215 State Stormwater Permit No. SW8 080734 Page 2 of 2 Enclosures: Attachment A — Designer's Certification Form Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2008\080734 HD\2021 06 permit 080734 cc: NCDEQ-DEMLR Wilmington Regional Office ®M& �-. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1127 Cardinal Drive Extension I Wilmington, North Carolina 28405 ��+� 910.796.7215 State Stormwater Management Systems Permit No. SW8 080734 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMCB Camp Lejeune Intel BN Interim Facilities Birch St., Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of 3 infiltration basin(s) in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until December 30, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 1 of this permit. The stormwater controls A, B and C have been designed to handle the runoff from 51,836 square feet, 41,817 square feet, and 44,431 square feet, of impervious area, respectively. 3. Each basin must be operated with a 50' vegetated filter. 4. The tract will be limited to the amount of built -upon area indicated on page 2 of this permit, and per approved plans. The built -upon area for the future development is limited to 0 square feet. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 6 State Stormwater Management Systems Permit No. SW8 080734 The following design criteria have been permitted for the infiltration basin(s) and must be provided and maintained at design condition: Basin: A Basin: B Basin: C a. Drainage Area, acres: 3.36 1.27 1.34 Onsite, ft 146,362 55,321 57,934 Offsite, ft2 0 0 0 b. Total Im ervious Surfaces, ft . 51,836 41,817 44,431 C. Design Storm, inches: 1.5 1.5 1.5 d. Basin Depth, feet: 2.1 1.8 1.5 e. Bottom Elevation, FMSL: 18.3 18.8 19.3 f. Bottom Surface Area, ft : 2,479 2,257 3,120 9. Bypass Weir Elevation, FMSL: 20.4 20.6 20.8 h. Permitted Storage Volume, ft: 6,749 5,120 5,537 i. Type of Soil: Ba meade Ba meade Ba meade Expected Infiltration Rate, in/hr: 2.16 0.85 1.7 k. Seasonal High Water Table, FMSL: 17.3' 16.8 16.3' I. Time to Draw Down, hours: 15 32 12 M. Receiving Stream/River Basin: Beaverdam Creek / White Oak n. Stream Index Number 19-20-2 o. Classification of Water Body SB NSW II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. 6. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 6 State Stormwater Management Systems Permit No. SW8 080734 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. Access to the stormwater facilities shall be maintained via appropriate recorded easements at all times. 9. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 11. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215,1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 3 of 6 State Stormwater Management Systems Permit No. SW8 080734 Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants, b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121, 5. Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit renewed, updated and reissued this the 7th day of June 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION f., ria�ector Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Management Systems Permit No. SW8 080734 Intel BN Interim Facilities Stormwater Permit No. SW8 080734 Onslow County Attachment A Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Management Systems Permit No. SW8 080734 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet / bypass structure weir elevation is per the approved plan. 6. The outlet / bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet / bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short-circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. 15. All components of the stormwater BMP are located in either recorded common areas or recorded easements. cc: NCDEQ-DEMLR Wilmington Regional Office Page 6 of 6 Attachment C - Permitting History Commanding Officer Marine Corps Base Camp Lejeune Permit No. SW8 080734 Approval Date Permit Action BIMS Version Description of the Changes 9/15/2008 Original Approval 10 6/7/2021 Renewal 2.0 Permit Number6w �o (to be provided by DWQ) Drainage Area Number: Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and Lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. -system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev3 Page I of 3 BMP element: Potentialproblem: How I will remediate theproblem: The Swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of (if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 1 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit Number. S W (to be provided by DWQ) I acknowledge and agree by my signature below that I um responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB - Intel BMP drainage area number: I (A),2 (13).3(C) Print,name: Carl Baker Title: Deputy Public Works Officer Address: 1005 Michael Rd. Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of eni✓1/✓ do hereby certify that personally appeared before me this day of ya , and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or levelll 7s readerrmaintenance requirements. Witness my hand and official seal,�'- AUCE A KNOMM Notary Iubtlo Orulow County Btate of North Caroltno My CO"UnIsMon Euplret 0 23. 2010 SEAL My commission expires 02� eV I_k10 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 f, RA NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS II PRr1.IFCT INFORMATION - - - -' - - /' - - - I Project name Contact name Phone number Date Drainage area number II. DESIGN INFORMATION — - For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP cfs For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 inmr stcmh Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr stone Where Does the Level Spreader Discharge? To a grassed biorelention cell? To a mulched biorelention cell? To a wetland? To a filter strip or riparian buffer Other(specify) Filter Strip or Riparian Buffer Characterization Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of/gwater Elevation at top of bank of the rSlope (from level lip to to top of Are any draws present? Level Spr/DesignsignForebay seaFeet of levde percfs Answer"Yof a following: Lengththe 1 inlhr storm? Lengthn the 10-yr storm? Lengthn the BMP discharge rate? Design floIs a bypas provided? Length the level lip Are lev I spreaders in series? cfs min cfs N (Y cr N) N (Y or N) N (Y a( N) Y (Y or N) 50.00 ft 0.00 ft 0.00 It 50.00 It 19.50 fmsl 16.00 fmsl 7.00 % N (Y or N) 508.00 'sq ft 13 fvcfs N (Y or N) Y (Y or N) N (Y or N) 9.83 cfs N (Y or N) 128.00 ft N (Y or N) Please complete filter strip characterization below. OK J"JXN01] A 8011A olldu9 h(totON vtnuoo woteno OK Drftloto.i t11wK to ofof8 0i .&S uC :eflgn9 nolufmmoo YM A bypass device is not needed. Level spreader length OK Forth SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and It Design Summary, page 1 of 2 'i Permit Number: t�J�altCU) Sy (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 Pale 1 01' 3 v BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75%, sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 Paac 2 of 3 i Permit Number: ti(T o 3 L (to be provided by DW ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB Lejeune - Intel BMP drainage area number: Pri Title: Deputy Public Works Officier Address: Bldg. 1005 Michael Rd., Came Lejeune NC 28547-2521 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of Oz✓�iJ , do hereby certify that personally appeared before me this -Z� day of and acknowledge the due execution of the forgoing infiltration basin maintenance ALICE A DONUifE "OkXY Public Onskm County go* of Ift Comm SEAL requirements. Witness my hand and official seal, My commission expires � �� �d�� Form SW401-Infiltration Basin O&M-Rev3 Page 3 of 3 BMP element: The forebay main treatment area HIM The outlet The Sediment has accumulated and reduced the depth to 75 of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of has accumulated Water is�standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An annual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred The outlet device is damn ec water Erosion or other signs of damage have occurred at the outlet. How I will remediate the2 roblem: Search for the source 999999 the sediment and remthe problem if possible. Remov he sediment and dispose of it in a location where it will not caus impacts to streams or the BMP. Provide kclitional erosion protect' on such as reinforced turf mat ing or riprap if needed to ent future erosion problems. emove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees olidua Y10t061 '(inuo.) WC14no onem03 Afrovl to WWI of the sediment off -site Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 Permit Number: J W D 0 0 0_7 3 Y (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate the roblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev3 Page I of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 757, sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rcv.3 Pagc 2 of 3 Permit Number. C U ix - (to be provided by DWQ I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB Lejeune - Intel BMP drainage area number: Print name: Title: Deputy Public Works Officier Address: Bldg t005 Michael Rd., Camp Lejeune NC 28547-2521 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. L / ('A e. �;Q AK e ft7�_, , a Notary Public for the State of 01-�1y4 i-v if nos/, County of O/Ili , do hereby certify that /�'/ personally appeared before me this -Ze day of and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, MICE A EO/ *TM "wow Fwaft Onetot► Carly 81016 of llalh Cdlelrq [MY Comminlon ODl 2i. E010 SEAL My commission expires oo�Z10elo:*/y Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 Permit Number: � 0OU 3y (to be provi d by DWQ) Drainage Area Num r. C Infiltration Basin Operation and Maintenance I will keep a maintenance record on this BMP. This maintenance r cord will be kept in a log in a known set location. Any deficient BMP elements noted 'K the inspection will be corrected, repaired or replaced immediately. These deficienci99can affect the integrity of structures, safety of the public, and the removal efficiency f the BMP. Important maintenance procedures: — The drainage area will be carefully managed to/educe the sediment load to the infiltration basin. — hmediately after the infiltration basin is es bushed, the vegetation will be watered twice weekly if needed until the ants become established (commonly six weeks). — No portion of the infiltration basin wi e fertilized after the initial fertilization that is required to establish the vege lion. — The vegetation in and around the sin will be maintained at a height of approximately six inches. After the infiltration basin is estal 24 hours after every storm event County). Records of operation at and will be available upon requV, Inspection activities shall be be repaired immediately. d, it will be inspected once a quarter and within rater than 1.0 inches (or 1.5 inches if in a Coastal maintenance will be kept in a known set location as follows. Any problems that are found shall BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of th Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is estab is e 0-Y id P ' and one-turke rt i�Qr a , lication. The inlet dev' e: pipe or swale The pipe is clogged (if applicable). Unclog thelpi ose of the sediment off;Zrt The pipe is cracked or uReplace teagip�eg notesimmoo vm .. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev3 Permit Number:_ w c i D- u! 1 cl (to be provided bY DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I•will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. — The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Rcgrade the soil if necessary to infiltration basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide time and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the swale applicable). sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the swale if necessary to swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. Form SW401-Infiltration Basin O&M-Rev.3 Pale 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The forebay Sediment has accumulated Search for the source of the and reduced the depth to 75% sediment and remedy the problem if of the original design depth. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred or Provide additional erosion riprap is displaced. protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. The main treatment area A visible layer of sediment Search for the source of the has accumulated. sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Water is standing more than Replace the top few inches of filter 5 days after a storm event. media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Weeds and noxious plants are Remove the plants by hand or by growing in the main wiping them with pesticide (do not treatment area. spray). The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediatelv. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 Page 2 of 3 PermitNumber:J'_� D O 0c)—I 3t (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:USMCB Lejeune - Intel BMP drainage area number: Print Title: Deputy Public Works Officier Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, e'6"Cr a Notary Public for the State of County of do hereby certify that personally appeared before me this' day of 710611 , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, ALICE A flOHNIM "Maly ►ubile Omtow County State of North CaFaw o +v CorrtMMMM. Ott 23. 2010 SEAL My commission expires Form SW401-Infiltration Basin O&M-Rev.3 Page 3 of 3 BMP element: The forebav The main treatment area outlet The Potential problem: Sediment has accumulated and reduced the depth to 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of has accumulated. Wateris standing more than 5 da, s after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment An annual inspection by an appropriate professional shows that the embankment needs reoair. Clogging has occurred The outlet device is damn ec water Erosion or other signs of damage have occurred at the outlet. How I will remediateAeproblem: Search for the sour of the sediment and remedy the problem if possible. Reno e the sediment and dispose of it/in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf Patting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas Replace the top few inches of filter media and see if this corrects the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees .31!C1N VrDtOi1 :mu07'w01er+0 Dnt'010, r1noli 10 0101$ Clean"n'otT'h-eo�uiledevic`e. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. Form SW401-Infiltration Basin O&M-Rev.3 —Rage2 Of_ DEMLH USE ONLY Date Rea ive Fee Paid Permit Number % 9A lit-U) V10C2 I '� 6u)g C)O 3 NC DEO Division of Energy, Mineral and Land STATE STORMWATER: CCEOVE PERMIT RENEWAL APPLICATION FORM M•aY'?r In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 080734 2. Project name: Intel BN Interim Facilities Const. Control No: N40085-08-B-0056 High Density Proiect 3. Project street address: City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/abouVdivisions/energv- m ine ral-land-resources/energy-mineral-land-ru les/stormwate r-program/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https:Hdeg.nc.gov/abouUdivisions/enerqv-mineral-land- resources/energy-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP: 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil MAY 17 2021 ; BY.•�_ Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEO. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity— a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ 1 do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/by title/ Business Registration MAY 17 2021 BY.•_ Stormwater Permit Renewal Application Form Page 2 of 3 1 May 11, 2018 D. PERMITTEE$' r7I_ERTIFIICATIION' I, IGO6�� rl • the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs wnership. All ' mation provided on this permit renewal application is, to the best of my knowledge, rrect d complet Signature: Date: NOTARIZATION: 'ublic for the State of do hereby certify appeared before me this the — nn day of f' " 20 2-1 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, NERSO.,, (Notary Seal) :............. ti :'NOTARY` Notary Signature: j = PL) My commission expires `��� 'y3'�' •• r1�.` �yCT- MAY 17 2021 i Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 :lL_ w pf WA, ®gin W`� E NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This form must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)I I.PROJECTINFORMATION Project name JSMC - Intel Contact name Bryan Dick Phone number 919-854-6254 Date July 8, 2008 Drainage area number A, B, and C II. DESIGN INFORMATION ' For Level Spreaders Receiving Flow From a BMP Type of BMP Drawdown flow from the BMP cis For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 inlhr storm Time of concentration Rainfall intensity, 10-yr storm Peak Flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretention cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffer? Other(specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cis Answer "Y" to one of the following: Length based on the 1 inlhr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? Length of the level lip Are level spreaders in series? j 259,61L00 gz 138,084.00 fit" 53.19 % 0.66 3.93 cis 87.00 min 2.5 i1 9.83 cis N (Y or N) N (Y or N) N (Y or N) Y (Y or N) Please complete filter strip characterization below. 50.00 It 0.00 It 0.00 it 50.00 ft 19.50 fmsl 16.00 fmsl 7.00 N (Y or N) OK 508.00 so it 13 fucfs N (Y or N) Y (Y or N) N (Y or N) 9.83 cis N (Y or N) 128.00 ft N (Y or N) OK A bypass device is not needed. Level spreader length OK Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.S Parts I. and II. Design Summary, page 1 of 2 Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material M 1 B 1 (Y or N) Do not compete dus section of the workOwL (Y or N) Do no compete this section of the werksheet Do not complete this section of the wurksheel fl Do not complete this section of the worhsheeL it Do not complete this section of the worksheet. it Do not complete this section of the worMheeL it Do not complete this section of the worksheec cfs Do no complete this section of the worksheet Do not complete this section of the workshmi. NI Form SW401-Leve1 Spreader, Filter Stdp, Restored Riparian Buffer-Rev.5 Pans I. and II. Design Summary, page 2 of 2 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initial;, _ No. amo am.0 Plans (1"- 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. G $ 2. Plan details (V = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and top of stream bank, Proposed drainage easement, and Design at ultimate build -out. 3. Section view of the level spreader (V = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and 2007 - Downslope filter fabric. aEruR� 4. Adate-stamped photograph of the filter strip that clearly shows the type of vegetation that is present. C S 5. A construction sequence that shows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. The supporting calculations. 147Y*4 7. A copy of the signed and notarized operation and maintenance (0&M) agreement. /VA 8. A copy of the deed restrictions (if required). Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Permit 14,51,U& l &):7 3Y Ito be provided by DWO) 2 F W Arf'9 9 STORMWATER MANAGEMENT PERMIT APPLICATION FORM o NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT 4-A This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project Name Contact Person Phone Number Date Drainage Area Number Bryan M. Dick 919-854-6252 7/28/2008 A II.: DESIGN INFORMATION.. „ k' �%•'u3 i; 4x s w 4. �, - i. „s k.._ "; `.e Site Characteristics Drainage area 146,362.00 ftz Impervious area 51,836.00 f? Percent impervious 0.35 Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff volume Post -development 1-yr, 24-hr runoff volume Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non -SR Waters Minimum design volume required Design volume provided Storage Volume: SR Waters 1-yr, 24-hr rainfall depth Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum volume required Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage SA Top elevation Basin Bottom Dimensions Basin length Basin width Bottom SA 3.70 in 0.90 Nhr U.uI n/SE 1.69 n3/sc 1.68 fl3/er 6,746.00 n3 6,749.00 n3 in It n3 n3 n3 Baymeade 2.16 in/hr 16.20 fmsl 0.63 days 3.00 :1 18.30 fmsl 20.40 fmsl 3,948.00 fl3 21.50 fmsl 67.00 It 37.00 If 2,479.00 ftz OK for non -SR waters OK OK OK RECEIVED Lo 8 2008 _ -- Form SW401-Infiltration Basin-Rev.2 Parts I. & If. Design Summary, Page 1 of 2 Permit Na 2rU� U oxa-73V (to be provided by DWO) Additional Information Total runoff volume captured by basin 1.86 ac-in Length of vegetative filter for overflow 50.00 ft Distance to structure 328.00 ft Distance from surface waters 765.00 it Distance from water supply wells) NA ft Separation from impervious soil layer NA>4' ft Naturally occuring soil above shwt 4.33 ft Bottom covered with 4-in of clean sand? N (Y or N) Proposed drainage easement provided? NA (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Bypass provided for larger storms? Y (Y or N) Pretreatment device provided Y _ Swale OK OK OK OK OK OK OK Must cover bottom with 4-in of clean sand OK OK OK $ 1p0� S�P Form SW 401-Infiltration Basin-Bev.2 Parts I. & I. Design Summary, Page 2 of 2 Permit No.S W `6()''o-7 SC[ (to be provided by DINO) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. S_ 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. /� r3-,Z 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and `� 074y $ - Pretreatment device. 3. Section view of the infiltration basin (1" = 20' or larger) showing: Pretreatment and treatment areas, and Inlet and outlet structures. Q/n 10/4 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. Jl[[� RfY 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. C'$� 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. _e!n_'Q Ame'u. 7. The supporting calculations. '3/AQ &rr cry 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. !f 4 Ma-- 9. A copy of the deed restrictions (it required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III. Required Items Checklist, Page 1 of 1 Permit No��O O0 L 3 (to be provided by TWO) sT• 0 2pp W ATFgq A- a�a�{ '� /�i STORMWATER MANAGEMENT PERMIT APPLICATION FORM o NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT 4'5 This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information, I. PROJECT INFORMATION :.- I -. Project Name USMCB Camp Lejeune - Intel Contact Person Bryan M. Dick Phone Number 919-854.6252 Date 7/20/2008 Drainage Area Number B 111. DESIGN INFORMATION Site Characteristics Drainage area 55,321.00 }lz Impervious area 41,817.00 fe Percent impervious 0.76 Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.70 in 1-yr, 24-hr intensity 0.90 in/hr Pre -development 1-yr, 24-hr runoff volume 0.40 ff'/sec Post -development 1-yr, 24-hr runoff volume 0.93 ft'/sec Pre/Post 1-yr, 24-hr peak flow control 0.53 ft'/sec Storage Volume: Non -SR Waters Minimum design volume required 5,050.00 ft' Design volume provided 5,120.00 ft' OK for non -SR waters Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff It, Post -development 1-yr, 24-hr runoff to Minimum volume required ft' Volume provided h' Soils Report Summary Soil type Baymeade Infiltration rate 0.85 irdhr SHWT elevation 16.60 fmsl Basin Design Parameters Drawdown time 1.33 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 18.80 fmsl OK Storage elevation 20.60 first Zvi Storage SA 3,432.00 f? V Top elevation 21.50 fmsl (ZVI �QQ� Basin Bottom Dimensions Basin length Basin width 61.00 37.00 ft ft Bottom SA 2,257.00 ft' $� Form SW401-Wiltration Basin-Rev.2 Pans 1. & 11. Design Summary, Page 1 of 2 Permit No. I D (to be provided by DWO) Additional Information Total runoff volume captured by basin 1.39 ac-in Length of vegetative filter for overflow 50.00 It Distance to structure 365.00 It Distance from surface waters 750.00 fl Distance from water supply well(s) NA ft Separation from impervious soil layer NA>4' It Naturally occuring soil above shwl 4.33 It Bottom covered with 4-in of clean sand? N (Y or N) Proposed drainage easement provided? NA (Y or N) Capures all runoff at ultimate build -out? Y (Y or N) Bypass provided for larger storms? Y (Y or N) Pretreatment device provided Y Swale OK OK OK OK OK OK OK Must cover bottom with 4-in of clean sand OK OK OK �,k .- 1Q* SEP Fonn SW401-Infiltration Basin Rev.2 Pans I. & If Design Summary, Page 2 of 2 Permit No. Swkow-7 .S 7 (to be provided by DWO) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initia Sheet No. f= S 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and 6"^ - Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and C$ Pretreatment device. 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and - Inlet and outlet structures. 1 � 3 4. A table of elevations, areas, incremental volumes & accumulated volumes to verity the volume provided. 4 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. C S 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized. AWW4 7. The supporting calculations. R f 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. A!� 1VA 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III, Required Items Checklist, Page 1 of 1 H Permit No.S 1 32 MSO] 3 7 (to be provided by DWG) AA �02p4 W ATFgOG ia STORMWATER MANAGEMENT PERMIT APPLICATION FORM o� NCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENTS This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I.:;PROJECTINFORMATION Project Name USMCB Camp Lejeune - Intel Contact Person Bryan M. Dick Phone Number 919-854-6252 Date 7/29I2008 Drainage Area Number C IL, DESIGN INFORMATION ' "?' Site Characteristics Drainage area 57,934.00 ftz Impervious area 44,431.00 ft' Percent impervious 0.77 % . Design rainfall depth 1.50 in Peak Flow Calculations 1-yr, 24-hr runoff depth 3.70 in 1-yr, 24-hr intensity 0.90 in/hr Pre -development 1-yr, 24-hr runoff volume 0.42 ft3/sec Post -development 1-yr, 24-hr runoff volume 0.98 h'/sec Pre/Post 1-yr, 24-hr peak flow control 0.56 h'/sec Storage Volume: Non -SR Waters Minimum design volume required 5,361.00 ft' Design volume provided 5,537.00 ft' OK for non -SR waters Storage Volume: SR Waters 1-yr, 24-hr rainfall depth in Pre -development 1-yr, 24-hr runoff tt' Post -development 1-yr, 24-hr runoff Its Minimum volume required Its Volume provided Its Soils Report Summary Soil type Baymeade Infiltration rate 1.70 in/hr SHWT elevation 17.20 fmsl Basin Design Parameters Drawdown time 0.52 days OK Basin side slopes 3.00 :1 OK Basin bottom elevation 19.30 fmsl OK Storage elevation 20.80 fmsl Storage SA 4,263.00 f? Top elevation 21.50 Imsl Basin Bottom Dimensions Basin length 78.00 It CEP 0 8 ?008 Basin width 40.00 It Bottom SA 3,120.00 h' Fonn SW401-Infiltration Basin-Rev.2 Parts I. & II. Design Summary, Page 1 of 2 Permit No. 51 0�60 4�5 (to be provided by DWO) Additional Information Total runoff volume raptured by basin 1.48 ac-in OK Length of vegetative filter for overflow 50.00 It OK Distance to structure 450.00 it OK Distance from surface waters 765.00 ft OK Distance from water supply well(s) NA ft OK Separation from impervious soil layer NA >4' If OK Naturally occuring soil above shwt 4.33 It OK Bottom covered with 4-in of clean sand? N (Y or N) Must cover bottom with 4-in of clean sand Proposed drainage easement provided? NA (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Pretreatment device provided Y Swale t,- S�e 4 a 1p00 Form SW401-Infiuration Basin-Rev.2 Parts I. & I. Design Summary, Page 2 of 2 Permit No. S hJkO'�>y-] 3c/ (to be provided by D WO) III. REQUIRED.ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. MITI Pagel Plan Sheet No. (45 C5 C6 C6 Plans (1"- 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: Bypass structure, Maintenance access, Basin bottom dimensions, Basin cross-section with benchmark for sediment cleanout, Flow distribution detail for inflow, Vegetated filter, and Pretreatment device. 3. Section view of the infiltration basin (1 20' or larger) showing: Pretreatment and treatment areas, and Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verity the volume provided. h7Mr 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWO, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. 6.5 6. A construction sequence that shows how the infiltration basin will be protected from sediment until the entire drainage area is stabilized. _drJJqL 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. /v14" 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.2 Page 1 of 1 Part III, Required Items Checklist, Page 1 of 1 State Stormwater Management Systems Permit No. SW8 080734 Intel BN Interim Facilities Stormwater Permit No. SW8 080734 Onslow County Designer's Certification II__ n j` 1 I, �C`�r'\ UCV, as a duly registered PfC1 Ysfi�. / L I Arrr in the State of North Carolina, awng been authorized to obsery(periodicall wsektyL#ali -time) the construction of the project, T3M -14ef (Project) 06 -C - 6W for man'" %BPS &Sfr 6wO Cr,r�e (Project Owner) hereby state that, to the best of my abilitie , due care and biligCnce was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date 'r— /(61 O� SEAL SEAS. 14433 H MAY 17 2021 Page 6 of 7 State Stormwater Management Systems Permit No. SW8 080734 Certification Requirements: �1. The drainage area to the system contains approximately the permitted acreage. �2. The drainage area to the system contains no more than the permitted amount of built -upon area. L�--3. All the built -upon area associated with the project is graded such that the runoff drains to the system. �. All roof drains are located such that the runoff is directed into the system. �. The outlet / bypass structure weir elevation is per the approved plan. The outlet / bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet / bypass structure. All slopes are grassed with permanent vegetation. Vegetated slopes are no steeper than 3:1. 0. The inlets are located per the approved plans and do not cause short- circuiting of the system. / 11. The permitted amounts of surface area and/or volume have been provided. V All required design depths are provided. All required parts of the system are provided. The required system dimensions are provided per the approved plans. All components of the stormwater BMP are located in either recorded common areas or recorded easements. cc:. NCDENR-DWQ Regional Office MAY 17 2021 Page 7 of 7 By -Le �� FAST TRACK SEWER ENGINEERING CERTIFICATION PERMITTEE: US Marine Corps- Camp Lejeune vCi_ UC{ PERMIT #: WO0033314 (" cc UU 66 PROJECT: Intel Interim Facilities Sewer ISSUE DATE: August 15, 2008 COUNTY: Onslow This project shall not be considered complete nor allowed to operate in accordance with Condition 6 of this permit until the Division has received this Certification and all required supporting documentation. Consequently, it should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Surface Water Protection Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received. A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CERTIFICATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION I,#4{yI!��•r as a duly re istered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 2T; the Division of Water Quality's (Division) Gravity Sewer Minimum Design Criteria adopted February 12, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting material - North Carolina Professional Engineer's Seal w/signature & date CERTIFICATION COMMENTS OR DETAILS Final ❑ Partial Comments: MAY 11 2021 i NC Division of Water Quality 127 Cardinal Drive Extension Wilmington, gton, NC 28405 Wilmington Regional Office Phone: 910-796-7215 FAX:910-350-2004