Loading...
HomeMy WebLinkAboutSW8080725_CURRENT PERMIT_20210603STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 090125 DOC TYPE CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Eo2\O�po 3 YYYYMMDD ROY COOPER Governor DIONNE DEW-GATi7 S--tury BRIAN WRENN Dhe r June 3.2021 NORTH CAROLINA Enr6nnmental Quality Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 Subject: Permit Renewal State Stormwater Management Permit No. SW8 080728 TECOM (SIO) Interim Facilities- MCB CLNC Onslow County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 080728 has been renewed on June 3, 2021 and shall be effective until December 30, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on July 28, 2008 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, C Ro ,� Brian Wrenn, Director Division of Energy, Mineral and Land Resources Wr ®V& 10%�� North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Wilmington Regional office 1127 Cardinal Drive Extension I Wiin ingtom North Carolina 28405 wnrv,inou r 910.796.7215 State Stormwater Permit No. SW8 080728 Page 2 of 2 Enclosures: DES/ams: cc: Attachment C — Permitting History Renewal Application Documents \\\Stormwater\Permits & Projects\2008\080728 HD\2021 06 permit 080728 NCDEQ-DEMLR Wilmington Regional Office ®VR North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resoumes Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 �� 910.796.7215 State Stormwater Management Systems Permit No. SW8 080728 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY COMMERCIAL DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO USMC Base Camp Lejeune TECOM (SIO) Interim Facilities, MCB, CLNC — Camp Geiger Off Hoover Road Jacksonville, NC in Onslow County FOR THE construction, operation and maintenance of 1 wet detention pond(s) in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until December 30, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 1 of this permit. The stormwater control has been designed to handle the runoff from 68,971.14 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 on page 2 of this permit, and per approved plans. The built -upon area for the future development is limited to 0 square feet. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 1 of 5 State Stormwater Management Systems Permit No. SW8 080728 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: b. Total Impervious Surfaces, ft2: Onsite, ft2: Offsite, ft2: C. Design Storm, inches: d. Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMSL: g. Permanent Pool Surface Area, ft2: h. Permitted Storage Volume, ft': i. Temporary Storage Elevation, FMSL: j. Predevelopment 1 year 24 hour, cfs: k. Post development 1 year 24 hour, cfs: I. Controlling Orifice: M. Permitted Forebay Volume, ft': n. Fountain Horsepower, HP o. Receiving Stream/River Basin: p. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 99,608.62 99,608.62 0 68, 971.14 68,971.14 0 1.5 3.07 90 15 10,505 15,151 16 4.4 9.6 2"0 pipe 6,460 1/6 Edwards Creek / White Oak 19-13 "SC, HQW, NSW" 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design condition. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: 111 5. 1.1 a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. The permittee shall submit to the Division an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Access to the stormwater facilities shall be maintained via appropriate easements at all times Page 2 of 5 State Stormwater Management Systems Permit No. SW8 080728 7. Decorative spray fountains are allowed in the pond, subject to the following criteria: a. The minimum permanent pool volume is 30,000 cubic feet. b. The fountain must draw its water from less than 2' below the permanent pool surface. C. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. d. The fountain may not be placed into the forebay. e. The falling water from the fountain must be centered in the main pond, away from the shoreline. f. The maximum horsepower for a fountain in this pond is 1/6 horsepower. 8. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 10. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 13. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. Page 3 of 5 State Stormwater Management Systems Permit No. SW8 080728 III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. 4. Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants; b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121, 5. Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project, C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. Page 4 of 5 State Stormwater Management Systems Permit No. SW8 080728 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 21-1.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit renewed, updated and reissued this the 3rd day of June 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION 0 1/11L1Y.l��u �i►KA nan vvrenn, erector` Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 5 of 5 Attachment C - Permitting History TECOM (SOI) Interim Facilities MCB CLNC Permit No. SW8 080728 Approval Date Permit Action BIMS Version Description of the Changes 7/28/2008 Original Approval 1.0 6/3/2021 Renewal 2.0 9,. Permit Number: S tL-TYO 0 0 / (to be provided by DWQ) Drainage Area Number: Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be n ept­i i�z�t� log in a known set location. Any deficient BMP elements noted in the inspecti wilts e t� TT corrected, repaired or replaced immediately. These deficiencies can affect rity 2 2 2008 of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: — Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). — No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. — Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. — If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. — Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.3 Page 1 of 4 Permit Number: SLJky WO 7471 t} (to be p ' ed by DWO Drainage Area Number: BMP element: Potentialproblem: How I will rem diate tie Foblem: The inlet device: pipe or The pipe is clogged. Unclog the pip pose of the swale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the . sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50`90 of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50%, of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.3 Page 2 of 4 PermitNumber: SLABU ceU / �V (to be provided by DbYQ) Drainage Area Number: BMP element: Potentialproblem: How I will remediate theproblem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. 6� When the permanent pool depth reads $if feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 7.0 feet in the forebay, the sediment shall be removed. Sediment Removal Bottom E 9_0 1 ----------------- BASIN DIAGRAM (fill in the blanks) Lft Min. Sediment Storage Permanent Pool Elevation 15.0 % Pool Sediment Removal Elevation 8_0 volume \— —- -------------------------------------- ------ Bottom Elevation 7.0 1 1-ft Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.3 Page 3 of 4 Permit Number: J� 7UY`J 7 ;,;'y (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: BMP drainage area number: Print Title:Deputy Public Works Officer Address:1005 Michael Rd.: Camp Lejeune, NC 28547 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. e6:�AF,2_- , a Notary Public for the State of Af e2V C-A4r, inlla County of 50:5.t 7�1_t 5 do hereby certify that z21 ISAPF,,P_ personally appeared before me this 2O?W day of :;�u_ A)F 76()? , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires Y / 6- 2669 Form SW401-Wet Detention Basin O&M-Rev.3 Page 4 of 4 UEMLH USE UNLY ate R ceived Fee Paid Permit Number L;;� d I #WPIv-,276 3 Sb5= I Suw 'p36)-7a NC DEQ Division of Energy, Mineral and Land Resources IECEIVE STATE STORMWATER: a�, � PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 080728 2. Project name: TECOM (SIO) Interim Facilities, MCB CLNC - Camp Geiger High Density Commercial Wet 3. Project street address: XXX City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, if any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https:Hdeg.nc.gov/about/divisions/energv- mineral-land-resou rces/ene rgv-m ineral-land-rules/stormwater-pros ram/post-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: https://deg.nc.gov/about/divisions/enerav-mineral-land- resources/enerav-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paul@usmc.mil MAY 11 1021 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/GRIN). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEO. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a: Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https://www.sosnc.gov/online services/search/bv title/ Business Registration MAY 17 2021 Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CE TIFICA/TION I, o k �. (00 4,e, the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or o ership. All infpprry ation provided on this permit renewal application is, to the best of my knowledge, corr t a om�oete. 1, Signature: if Date: J Z NOTARIZATION: a Notary Public for the State of NNyy\ UVl VLACN , County of 02�S( bv✓ do hereby certify rn that l' L� r)i2 A t /� I Lbacu r personally appeared before me this the t day of IM fiA 1) 2021 , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, `��rurrrr�� (Notary Seal) \,v ERSO, _ Lj%OSPRY Notary Signature: — ' 2_ �J My commission expires � `b2�5— :_0,;:%,P11 MAY 17 2021 BY.•-_ Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 ,� i' . _ f. �: .tl 111 l; 11 / /y, �. � � �in��• f/,� I , -'. 11111111l 1!\ Permit No. -O t�U-%�.p ito be provided by DWO) W01471, 1710 STORMWATER MANAGEMENT PERMIT APPLICATION FORM - i 1 V) 401 CERTIFICATION APPLICATION FORM JUC 2 2 20p8 WET DETENTION BASIN SUPPLEMENT $y, This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Project name Contact person Phone number Date Drainage area number 910-692-5616 Camp Geiger DA 1 tJ 3+1 i4fi r' S '� Ng++'*'^h 1 W 3Y II°1£DESIGN<INFORMAT,ION�+.la,,,,�`°�„ a. S? ' stu iii,: r 5v,+?a-. t,..,initsir;t i'�d�7 r,.�,.3 S1.,n!.«.tvs� � �v:�,t. Site Characteristics Drainage area 99,609 ft2 Impervious area 68,971, ft' %impervious 69.24213989 Design rainfall depth _ 1.5 in Storage Volume: Non -SR Waters Minimum volume required 8,382 ft' Volume provided 15,151 ft3 Storage Volume: SR Waters 1-yr, 24-hr runoff depth in Pre -development 1-yr, 24-hr runoff ft3 Post -development l-yr, 24-hr runoff it Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is pre/post control of the 1-yr 24-hr peak flow required? Y (Y or N) 1-yr, 24-hr rainfall depth 3 5„ in Rational C, pre -development 0.3 (unitless) Rational C, post -development 0.7 (unitless) Rainfall intensity: 1-yr, 24-hr storm 5.9 inlhr Pre -development 1-yr, 24-hr peak flow 4.4 ft'/sec Post -development 1-yr, 24-hr peak flow 9.6 ft'Isec Pre/Post 1-yr, 24-hr peak flow control 5.2 ft'Isec Basin Elevations Basin bottom elevation 7.00 ft Sediment cleanout elevation 8.00 it Bottom of shelf elevation 14.50 ft Permanent pool elevation 15.00 ft Top of shelf elevation 15.50 ft Temporary pool elevation -- 16.00 ft Volume and Surface Area Calculations SAIDA,ratio 8.10 (unitless) Wk urface area at the bottom of shelf 8145.00 ft' Volume at the bottom of shelf 27629.25 ft3 Permanent pool, surface area required 4,676 ftz Permanent pool, surface area provided 10,505 it Permanent pool volume 32,292 ft3 Average depth for SAIDA tables 3.073964779 ft Surface area at the top of shelf 43330 ft2 Volume at the top of shelf 38134 ft3 OK OK Form SW401-Wet Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 1 of 2 Permit No. L �-Y6 G (to be provided by DWQ) Forebay volume 6,460 ft' Forebay % of permanent pool volume 20 % OK Temporary pool, surface area provided 16,322 (t2 Orawdown Calculations ^ ✓�� `.jL Treatment volume drawdown time 3.55 days OK 2 Treatment volume discharge rate 0.11 ft'Is Z <20QB Pre -development 1-yr, 24-hr discharge 4.40 ft'Is OK Post -development 1-yr, 24-hr discharge 0.11 ft'Is OK \ Additional Information Diameter of orifice 2.00 in Design TSS removal 90 % Basin side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10 -ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 3 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? IN - (Y or N) Need a recorded drainage easement Capures all runoff at ultimate build -out? Y (Y or N) OK Drain mechanism for maintenance or emergencies Y Owner to be required to provide pump for pond draining Form SW401-Wet Detention BasinPaveParts I. & II. Design Summary, Page 2 of 2 Permit No. 6t..�cSFfc:5�7'ay (to be provided by DWQ) III: REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. , Pagel Plan Initials Sheet No. M,) A -4 L) �'0 _q 6ec.(osal ofA 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High Flow bypass system, Maintenance access, Recorded drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: - Outlet structure with trash rack or similar, - Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. 3. Section view of the dry detention basin (1" = 20' or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. Z a 2 ZOO6 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. 6. An assurance that the installed system will meet design specifications upon initial operation once the project is complete and the entire drainage area is stabilized. 7. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. 8. The supporting calculations. 9. A copy of the signed and notarized inspection and maintenance (I&M) agreement. 10. A copy of the deed restriction. Form SW401-Wet Detention Basin-Rev.1 Part III. Required Items Checklist, Page 1 of 1 �u)D'At oT 6a43 State Stormwater Management Systems Permit No. SW8 080728 TECOM (SIO) Interim Facilities, MCB, CLNC — Camp Geiger Stormwater Permit No. SW8 080728 Onslow County G� Designer's Certification's I, J/*0 J , t�N�, , as a duly registered �"'L�� in the State of North Carolina, having been authorized to observe e(odicall weekly/ full time) the construction of the project, (Project) for U_cm (- C#fA P 47ty �, (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: A&A-( N� Registration Number Date 3 9",p 13 0 .......... SEAL ! . SER , �G/NEED' g FS J. Boy" nnnnn:��' AGE gip 0 9 2013 gV:---� Page 7 of 8 State Stormwater Management Systems Permit No. SW8 080728 Certification Requirements: The drainage area to the system contains approximately the permitted acreage. -DY/2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. �-f4. All roof drains are located such that the runoff is directed into the system. __VJ5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. _02!�_7. Trash rack is provided on the outlet/bypass structure. 8._ All slopes are grassed with permanent vegetation. A- _9. Vegetated slopes are no steeper than 3:1. �a10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ` \,�. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. tIA -- 13. All required design depths are provided. AA 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. (�"-- 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Onslow County Building Inspections DEPARTMENT OF THE NAVY OFFICER IN CHARGE OF CONSTRUCTION MARINE CORPS INSTALLATIONS EAST 1005 MICHAEL ROAD CAMP LEJEUNE NC 28547-2521 IN REPLY REFER TO N40085-08-C-8459 PRJ215/jjb 03 September, 2013 From: Commanding Officer, Officer in Charge of Construction, Marine Corps Installations East, Camp Lejeune, NC To: Commanding Officer, Marine Corps Base Camp Lejeune (Atin PWD) Subj: N40085-08-C-8459, TECOM (SOI) INTERIM FACILITIES AT CAMP GEIGER, MCB, CAMP LEJEUNE, NC, STORM WATER PERMIT SW8-080728 Ref: (a) Storm Water Permit SW8-080728 Encl: (I) Engineering Certification 1. As required by reference (a), enclosure (I ) provides the Engineer's Certification. 2. If there are any further questions concerning the subject contract, please call the undersigned at (910) 449-5587. 9JJ. Burns, P.E. By direction