Loading...
HomeMy WebLinkAboutSW8080510_CURRENT PERMIT_20210601STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8bs0510 DOC TYPE] CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE 2oZ1 O�,D o t YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI BRIAN WRENN 0tremr June 1, 2021 Marine Corps Base Camp Lejeune Attn: Neal Paul, Deputy Public Works Officer 1005 Michael Road Camp Lejeune, NC 28547 NORTH CAROLINA Envtronmentat Qua(Uy Subject: Permit Renewal State Stormwater Management Permit No. SW8 080510 MCAS New River, FRC Maintenance Facility Onslow County Dear Mr. Paul: Effective August 1, 2013 the State Stormwater program has been transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this permit will now reference DEMLR as the Division responsible for issuance of the permit. The Wilmington Regional Office received a complete 8 year Stormwater Management Permit Renewal Application for the subject project on May 17, 2021. The Division is hereby notifying you that permit SW8 080510 has been renewed on June 1, 2021 and shall be effective until December 30, 2029. For your records, please find enclosed a renewed, updated, and re -issued permit and a copy of the renewal application. Please keep this permit on file at all times. Please note that the renewed, updated, and re -issued permit does not impose new or different terms; it merely restates some of the previous terms to provide you with a better understanding of your obligations under the permit. The renewal and reissuance of this stormwater permit does not imply that the site is currently in compliance with the terms and conditions of this state stormwater permit. The plans originally approved on May 30, 2008 will remain in full force and effect in accordance with the regulations set forth in Title 15A NCAC 2H.1000. This permit is subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the fight to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150E of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAli.com. Unless such demands are made this permit shall be final and binding. If you have any questions, need additional copies of the permit or approved plans, please contact Ashley Smith in the Wilmington Regional Office, at (910) 796-7215 or ashleym.smith@ncdenr.gov. Sincerely, av ayBrian Wrenn, Division of Energy, Mineral and Land Resources D � ��� North Carolina Department of Environmental Quality I Division of Energy. Mineral and land Resources ./ wdmington Regional ice 1 127 Cardinal Drive Extension I Wlimington. North Carolina 211405 ����� / 910.796.7215 Arcbitecture & Engineering 6160 Xempsville Circle Suite 200A Norfolk. Virginia 23502 Direct 757 961-7805 sax 757 455-5638 jban@clarknexsen.com bttp://www.clarknexsen.com Jeffrey J. Bass, P.E. Civil Engineer Associate IN 1sG State Stormwater Permit No. SW8 070831 Page 2 of 2 Enclosures: Attachment C — Permitting History Renewal Application Documents DES/ams: \\\Stormwater\Permits & Projects\2008\080510 HD\2021 06 permit 080510 cc: NCDEQ-DEMLR Wilmington Regional Office If ®Ws QZ/ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington. North Carolina 28405 910,796,7215 State Stormwater Management Systems Permit No. SW8 080510 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO US Marine Corps FRC Maintenance Facility at MCAS New River Campbell & White & Foster Streets, Camp Lejeune, Onslow County FOR THE construction, operation and maintenance of two sand filters in compliance with the provisions of 15A NCAC 2H .1000 and the Session Law 2006-246 and (hereafter referred to as the "stormwater rules' and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral and Land Resources (the "Division" or "DEMLR") and considered an enforceable part of this permit. This permit shall be effective from the date of issuance until December 30, 2029, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 17,631 square feet of impervious area. 3. This basin must be operated with a 30 foot vegetated filter. 4. The tract will be limited to the amount of built -upon area indicated on page 3 of this permit, and per approved plans. There is no built -upon area for the future development allocated in this permit. Any additional BUA will require a modification of this permit. The BUA on the west side of the FRC Maintenance Building in the drainage area #43 will be treated by a modification when the future hangar is built due to site drainage/elevation limitations. 5. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 6. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 1 of 4 State Stormwater Management Systems Permit No. SW8 080510 7. The following design criteria have been permitted for the sand filters and must be provided and maintained at design condition: Sand Filter Number #1 & 2 same None Drainage Area Name DA-1 & 2 DA-23 a. Drainage Area, acres 0.184 each 0.52 Onsite, ft2 7989 each 22,651 Offsite, ft2 None None b. Total Impervious Surfaces, ftz 7989 1653 c. Design Storm, inches 1.5 N/a d. Sedimentation Basin Surface Area, ft2 99 N/a e. Sand Filter Surface Area, ft2 99 N/a f. Inside Bottom Elevation, FMSL 18.22 N/a g. Bypass Weir Elevation, FMSL 21.47 N/a h. Permitted Storage Volume, ft' 949 N/a i. Type of Soil Engineered Sand N/a Expected Infiltration Rate, ft/day 3.5 N/a k. Time to Draw Down, hours <40 N/a I. Receiving Stream/River Basin Stick Creek/ Lumber m. Stream Index Number 19-15 n. Classification of Water Body SC:HWQ,NSW II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at the design standard. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. 9. A clear access path to the bypass structure must be available at all times. Records of maintenance activities must be kept and made available upon request to authorized personnel of the Division. The records will indicate the date, activity, name of person performing the work and what actions were taken. The facilities shall be constructed, operated and maintained in accordance with the provisions of this permit, the approved plans and specifications, and the supporting documents attached to this permit and on file with the Division. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. Page 2 of 4 State Stormwater Management Systems Permit No. SW8 080510 Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. Access to the stormwater facilities shall be maintained via appropriate easements at all times. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 10. No person or entity, including the permittee, shall alter any component shown in the approved plans and specifications. Prior to the construction of any modification to the approved plans, the permittee shall submit to the Director, and shall have received approval for modified plans, specifications, and calculations including, but not limited to, those listed below. For changes to the project or SCM that impact the certifications, a new or updated certification(s), as applicable, will be required and a copy must be submitted to the appropriate DEQ regional office upon completion of the modification. a. Any modification to the approved plans and specifications, regardless of size including the SCM(s), BUA, details, etc. b. Redesign or addition to the approved amount of BUA or to the drainage area. C. Further development, subdivision, acquisition, lease or sale of any, all or part of the project and/or property area as reported in the approved plans and specifications. d. Altering, modifying, removing, relocating, redirecting, regrading, or resizing of any component of the approved SCM(s), the stormwater collection system and/or vegetative conveyance shown on the approved plan. e. The construction of any allocated future BUA. f. The construction of any permeable pavement, #57 stone area, public trails, or landscaping material to be considered a permeable surface that were not included in the approved plans and specifications. g. Other modifications as determined by the Director. 11. Prior to transfer of the permit, a file review and site inspection will be conducted by Division personnel to ensure the permit conditions have been met and that the project and the on -site stormwater system complies with the permit conditions. Any items not in compliance must be repaired, replaced restored, or resolved prior to the transfer. Records of maintenance activities performed to date may be requested. III. GENERAL CONDITIONS 1. Any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the requirements of the stormwater rules is subject to enforcement procedures as set forth in NCGS 143 Article 21. 2. The issuance of this permit does not preclude the permittee from complying with and obtaining any other permits or approvals that are required for this development to take place, as required by any statutes, rules, regulations, or ordinances, which may be imposed by any other Local, State or Federal government agency having jurisdiction. Any activities undertaken at this site that cause a water quality violation or undertaken prior to receipt of the necessary permits or approvals to do so are considered violations of NCGS 143-215.1, and subject to enforcement procedures pursuant to NCGS 143-215.6. 3. If the facilities fail to perform satisfactorily, the permittee shall take immediate corrective actions. This includes actions required by this Division and the stormwater rules such as the construction of additional or replacement on -site stormwater systems. These additional or replacement measures shall receive a permit from the Division prior to construction. Page 3 of 4 State Stormwater Management Systems Permit No. SW8 080510 Permit Transfer: This permit is not transferable to any person or entity except after notice to and approval by the Director. The permittee shall submit a completed and signed "Permit Transfer Application Form" (available on the Division website) accompanied by the required fee and supporting documentation as listed on the form, to the Division at least 60 days prior to any one or more of the following events: a. The sale or conveyance of the project area in whole or in part, except in the case of an individual lot sale that is made subject to the recorded deed restrictions and protective covenants, b. Dissolution of the partnership, corporate, or LLC entity, subject to NCGS 55-14-05 or NCGS 57D-6-07 and 08; C. Bankruptcy; d. Foreclosure, subject to the requirements of Session Law 2013-121; 5. Current Permittee Name or Address Changes: The permittee shall submit a completed "Permit Information Update Application Form" (available on the Division website) to the Division within 30 days to making any one or more of the following changes: a. A name change of the current permittee; b. A name change of the project; C. A mailing address change of the permittee; 6. The permittee is responsible for compliance with all terms and conditions of this permit until the Division approves the transfer request. Neither the sale of the project, in whole or in part, nor the conveyance of common area to a third party constitutes an approved transfer of the permit. 7. The permittee grants Division Staff permission to enter the property during normal business hours to inspect all components of the permitted project. 8. The permit issued shall continue in force and effect until the permittee files a request with the Division for a permit modification, transfer, renewal, or rescission; however, these actions do not stay any permit conditions. 9. Approved plans, application documents, supplements, calculations, operation and maintenance agreement, and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of this permit, application, supplements, operation and maintenance agreement, and approved plans and specifications shall be maintained on file by the permittee. 10. Unless specified elsewhere, permanent seeding requirements for the on -site stormwater system must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual, 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit for cause as allowed by the laws, rules, and regulations contained in Title 15A NCAC 2H.1000 and NCGS 143-215.1 et.al. 12. A permit renewal request must be submitted at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate application, documentation and the processing fee as outlined in Title 15A NCAC 02H.1045(3). Permit renewed, updated and reissued this the 1 day of June 2021. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION G 9A .9,-. Bnan�6ire for Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Page 4 of 4 Attachment C - Permitting History FRC Maintenance Facility Permit No. SW8 080510 Approval Date permit Action Bps Version Description of the Changes 5/30/2008 Original Approval 10 6/1/2021 Renewal 2.0 PermitNumber:s'(.e3 /i nosr) (to be provided by DWQ Drainage Area Number: SANv riL Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures — The drainage area will be carefully managed to reduce the sediment load to the sand filter. — Once a year, sand media will be skimmed. — The sand filter media will be replaced whenever it fails to function properly after vacuuming. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The adjacent pavement Sediment is present on the Sweep or vacuum the sediment as (if applicable) pavement surface. soon as possible. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to sand filter erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. The pretreatment area Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than s ra in . Form SW401-Sand FilterO&M-Rev.3 RECEIVED MAlpage It(fkBJ8 BY: BMP element: Potentialproblem: How I will remediate theproblem: The filter bed and Water is pending on the Check to see if the collector system underdrain collection surface for more than 24 is clogged and flush if necessary. If system hours after a storm. water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. The outflow spillway Shrubs or trees have started Remove shrubs and trees and pipe to grow on the embankment. immediately. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. I Repair or replace the pipe. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786, Form SW40I-Sand FilterO&M-Rev.3 Page 2 of 3 I Permit Number: 5Ioxoxus l o (to be provided by DWQ) 1 acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:FRC Maintenance Facility, MCAS NEW RIVER AIR STATION BMP drainage area number: Print name: Carl Baker Title: Deputy Public Works Officer Address: 1005 Michael Rd., Camp Lejeune, NC 28574-2521 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County of , do hereby certify that / personally appeared before me this 4� day of o26YJ' , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, 1 41 AWE A EONNEIIE Notary Pwuc Onslow County stag of NorM Cato"M My Commission EWres Oct 23. 2010 11 SEAL My commission expires " �V �0/4 Form SW401-Sand Filter O&M-Rev.3 Page 3 of M Cowwiaalou Erblict pCl SY S010 VGO of NOUu Caallua Oualom CONWA No3OUl MPItc WrICE Y BONNEld Permit Number: 4,510 O5C0510 (to be provided by DWQ) Drainage Area Number: Z Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the sand filter. — Once a year, sand media will be skimmed. — The sand filter media will be replaced whenever it fails to function properly after vacuuming. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The adjacent pavement Sediment is present on the Sweep or vacuum the sediment as (if applicable) pavement surface. soon as possible. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to sand filter erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair, The pretreatment area Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the In Form S W401-Sand Filter O&M-Rev.3 mp MAY I Pag?qDgf BMP element: Potentialproblem: How I will remediate theproblem: The filter bed and Water is pending on the Check to see if the collector system underdrain collection surface for more than 24 is clogged and flush if necessary. If system hours after a storm. water still ponds, remove the top few inches of filter bed media and replace. If water still ponds, then consult an expert. The outflow spillway Shrubs or trees have started Remove shrubs and trees and pipe to grow on the embankment. immediately. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to Prevent future erosion problems. The outflow pipe is damaged. I Repair or replace the pipe. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW40I-Sand Filter O&M-Rev.3 Page 2 of 3 Permit Number: f—p t,�-p Q�X0S / C) (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible parry. Project name:FRC Maintenance Facility, MCAS NEW RIVER AIR STATION BMP drainage area number:2 Print Title: Deputy Public Works Officer Address: 1005 Michael Rd., Camp Leieune, NC 28574-2521 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. day of a Notary Public for the State of County ofdo hereby certify that personally appeared before me this and acknowledge the due execution of the forgoing sand filter maintenance requirements.. %Witness my hand and official seal, MICE A IOXNVU "NOW htbllC Onmw Caatly 81aN of Nam Caraa SEAL My commission expires �� 41�11a Form SW401-Sand Filter O&M-Rev.3 Page 3 of g��3 �u; s S M S '�, Permit Name: ljU-)S Ug ostc) (to be provided by DWQ) Drainage Area Number: (l Z, Z Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide time and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Grassed Swale O&M-Rev.3 MAY 16 2008 Page 1 of 2 Permit Number. 15U30 O125Orj(O (to be providedby DlVQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:FRC Maintenance Facility, MCAS NEW RIVER AIR STATION BMP drainage area number: Print name: Carl Baker Title: Deputy Public Works Officer Address: 1005 Michael Rd., Camp L jeunc, NC 28574-2521 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. 1124 �y'f Z�� , a Notary Public for the State of County of &C/O) do hereby certify that (/ C, personally appeared before me this day of //�lr, and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, MCI ADOORM Nolo1y ftoft Orm" County sk" of Math Coo SEAL My commission expires ';;'Vl/ :4gdd Form SW401-Grassed Swale O&M-Rev.3 MAY 16 Z008 Page 2 of 2 I CGWUJIItleu Exbltmt OC1 59*solo Bii99 011101W CCIG W Owm* COnutA ROMA �iC COYMS Permit Number: d W p ocbc I Q) (to be provided by DWQ) Drainage Area Number: l 2� �✓ Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation — Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. — Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC, 1993). Forested filter strips do not require this type of maintenance. — Once a year, the soil will be aerated if necessary. — Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire filter strip Trash/debris is present. Remove the trash/debris. system The flow splitter device The Flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of any sediment off -site. The Flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. RECEIVED MAY 1 4 2008 Form SW U401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M -Re .3 Page 1 of 3 BY: BMP element: Potentialproblem: How I will remediate theproblem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off -site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 "I Permit Number: J W'8O % 5 I O (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:FRC Maintenance Facility, MCAS NEW RIVER AIR STATION BMP drainage area number:1, 2, 23 Print name: Carl Baker Title: Deputy Public Works Officer Address: 1005 Michael Rd., Camp Lejeune, NC 28574-2521 Date: .7 — & — 6)Y Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of County ofdo hereby certify that personally appeared before me this lid day off, and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, AUCE A SONNEi1E Notary Public Orbbw County Etafr. of North Caroll Minion Expires Oct SEAL My commission expires Form SWU40I-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 0 to yyA CowwIttlov E1bUo1 ocI SIT I 81O10 of Ndlu CaoI4vo ovolow CORUA NOIOIA oMOc Yi ICE ! somff IE UEMLH USE ONLY I Date R ceived Fee raid Permit Number S NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: ECE!"k,"IE PERMIT RENEWAL APPLICATION FORM MAY In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW8 080510 2. Project name: FRC Maintenance Facility at MCAS New River, Camp Leieune High Destity Project 3. Project street address: City: MCB Camp Leieune County: Onslow ZIP: 28542 4. What, it any, changes have been made to the project as permitted? If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at., https:Hdeg.nc.gov/about/divisions/e B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at: httl)s://deg.nc.gov/about/divisions/energv-mineral-land- resources/energv-mineral-land-rules/stormwater-program/post-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: MCB Camp Leieune 2. Signing Official's Name: Neal Paul 3. Signing Official's Title: Deputy Public Works Division 4. Mailing Address: MCB Camp Lejeune 1005 Michael Rd. City: MCB Camp Leieune State: NC ZIP: 28547-2521 5. Street Address: City: State: ZIP 6. Phone: (910) 451-2213 Email: neal.paui@usmc.mil b MAY 17 2021 AV. Stormwater Permit Renewal Form Page t of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: HEB 1. A permit application processing fee of $505.00 payable to NCDEO. HEB 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. HEB 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. HEB 4. O&M Agreements, Please select one: ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. HEB 5. Designer Certifications, Please select one: ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. 6. [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 1 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). hhftps://www.sosnc.gov/online services/search/by title/ Business Registration MAY 11 2021 Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMRTfiF'S CERTIFICATIO I, _ _ V 11� t4 • the person legally responsible for the permit, certify that I have a copy of'the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, ' eo In, rship. All? ation provided on this permit renewal application is, to the best of my knowledge, cc r ct co letel. ' 21 Signature: Date: S NOTARIZATION: fL 1, l�r ut I Iky,5 ot/\ a Notary Public for the State of Narkb. C(yy-L�cL , County of do hereby certify that _ ✓A— LD',J d-A-✓ personally appeared before me this the L day of M " 20 ( , and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, (Notary Seal) t%"r 1 r o N ERS , lUQ?-NpTAR Y Notary Signature: My commission expires Z�2 �� 7 O`'•. PUBOG -2 "'%how co�?•��, MAY 17 1011 Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 " i.:• . .. .�i ' Permit Number:si��kc)RC S1,3 (to be provided by DWQ) .. cp W A7FH ©�•AL O2 OG g NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information. 11. PROJECT INFORMATION I Project name FRC MAINTENANCE FACILITY Contact name JOSH HURST & JEFF BASS Phone number 91M28-1876 & 757-455-5800 Date May 14, 2008 Drainage area number ,2, 23 II. DESIGN INFORMATION Site Characteristics Drainage area 38,629.00 ft2 Impervious area 17,631.00 ftZ Percent impervious 45.6% % Design rainfall depth 1.50 inch Peak Flow Calculations 10-yr storm runoff depth 0.75 in 1 0-yr storm intensity 7.00 in/hr Post -development 10-yr storm peak flow 3.32 ft3isec Velocity Maximum non -erosive velocity (peak 10-year storm) 11.50 fUsec Soil characteristics (enter'x' below) Sand/silt (easily erodible) Clay mix (erosion resistant) x Grass Type (enter'x' below) Bermuda X Tall fescue X Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: n (Y or N) Maximum velocity Side slopes :1 Swale length It Option 2: Conveyance Swale, Seeking Pollutant Credit: Y (Y or N) Maximum velocity for 10-yr storm 0.20 fUsec OK Side slopes 15A0 y :1 OK Swale length 158.00 It OK MAY 1 4 2008 Form SW401-Grassed Swale-Rev.3 Parts I and 11, Project Design Summary, Page 1 of 2 Permit Number:S�5—C2 1 Li (to be provided by DWQ) Swale Characteristics Swale Shape: Enter an 'x' in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the swale Width of the top of the Swale Additional Information Is the swale sized for all runoff from ultimate build -out? Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the distance from the bottom of the swale to the SHWT? What is the ground level elevation? What is the elevation of the bottom of the Swale? What is the SHWT elevation? What is the longitudinal slope of the swale? What is the depth of freeboard? M 2.00 ft 105.00 It Y (Y or N) Insufficient sizing NA (Y or N) Insufficient ROW location. 0.00 ft 18.60 fmsl 17.35 fmsl 17.35 fmsl 0.67 % OK 0.30 ft OK Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 j Permit No: W U0`90'SIO (to be assigned by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attachjustification. Initials Pagel Plan Sheet No. ffo`)i C11Xo 1. Plans (1" = 50' or larger) of the entire site showing: DP •Z - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Grass species, and - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the grassed swale showing: v - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Grass species, - Off -site drainage ('If applicable),and - Boundaries of drainage easement. xf}-9 to 4 3. Section view of the grassed swale (1" = 20' or larger) showing: v- Side slopes, - Longitudinal slope, - Freeboard - Swale dimensions, and - SHWT level(s) Codes 4. Supporting calculations (including maximum velocity calculations for applicable storms) ,ka,,W 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. Nbw N 1 A 6. A copy of the deed restrictions (if required). SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 NCDENR`�' c STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER, FILTER STRIP AND RESTORED RIPARIAN BUFFER SUPPLEMENT This farm must be completely filled out, printed and submitted. DO NOT FORGET TO ATTACH THE REQUIRED ITEMS CHECKLIST AND ALL REQUIRED ITEMS (NEXT WORKSHEET)! 1. PROJECT INFORMATION Project name FRC MAINTENANCE FACILITY - NEW RIVER AIR STATION Contact name JOSH HURST & JEFF BASS, BOTH WITH CLARK NEXSEN Phone number 919-828-1876 & 757455-5800 Date Drainage area number For Level Spreaders Receiving Type of BMP Drawdown Flow from the BMP For Level Spreaders Receiving Flow from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Where Does the Level Spreader Discharge? To a grassed bioretenlion cell? To a mulched bioretention cell? To a wetland? To a filter strip or riparian buffe(? Other (specify) Filter Strip or Riparian Buffer Characterization (if applicable) Width of grass Width of dense ground cover Width of wooded vegetation Total width Elevation at downslope base of level lip Elevation at top of bank of the receiving water Slope (from level lip to to top of bank) Are any draws present? Level Spreader Design Forebay surface area Feet of level lip needed per cfs Answer "Y" to one of the following: Length based on the 1 inmr storm? Length based on the 10-yr storm? Length based on the BMP discharge rate? Design flow Is a bypass device provided? 1, 2, 23 SAND FILTERS 0.00 cfs 38,629.00 fh 17,631.00 ftz 45.64 % 0.54 0.48 cfs 5.00 min 7 inthr 3.35 cfs N (Y or N) N (YorN) N (YorN) Y (YorN) Please complete filter strip characterization below. 30.00 It 0.00 It 0.00 ft 30.00 ft 17.45 fmsl 16.59 first 2.87 % OK N (YorN) OK NA sgIf 13 fticfs Y (Y or N) N (Y or N) N (YorN) 3.35 cfs N (YorN) OK RECEIVED MAY 1 4 2008 B���$y�5/ A bypass device must be provided. 014, Form SW401-Level Spreader, Fitter Strip, Restored Riparian Buffer-Rev.5 Parts I. and II. Design Summary, page 1 of 2 Length of the level lip Are level spreaders in series? Bypass Channel Design (if applicable) Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Dimensions of the channel (see diagram below): M B W y Peak velocity in the channel during the 10-yr storm Channel lining material M II 43.55 ft Level spreader length OK. N J...(YorN) (Y or N) Do not complete this section of the worksheet. (Y or N) Do not complete this section of the worksheet. Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. ft Do not complete this section of the worksheet. - ft Do not complete this section of the worksheet. cfs Do not complete this section of the worksheet Do not complete this section of the worksheet M Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Parts I. and I. Design Summary, page 2 of 2 III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. -�J— Dp•2 Plans (1"- 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. C 1 ° (0 2. Plan details (1" = 30' or larger) for the level spreader shoving: -Forebay (if applicable), -High flow bypass system, -One foot topo lines between the level lip and top of stream bank, -Proposed drainage easement, and -Design at ultimate build -out. C t ° & 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric. 4. Adate-stamped photograph of the filter strip that clearly shows the type of b 5. A construction sequence that shows how the level spreader will be protected from drainage area is stabilized. �� 6. The supporting calculations. �44,ae) 7. A copy of the signed and notarized operation and maintenance (0&M) agreement N 1A 8. A copy of the deed restrictions (if required). vegetation that is present. C 10 sediment until the entire Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Form SW401-Level Spreader, Filter Strip, Restored Riparian Buffer-Rev.5 Part III, page 1 of 1 Permit Number- SSC XC)St,�) ♦ (to be provided by DWD) OF W A rEA NCDENR .'r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section NQ and the l&MAgreement (Section IV) Project name Contact name Phone number Dale Drainage area number Il:;DESIGN, INFORMATIONV . , Site Characteristics , Drainage area (AD) 7 989 00 ftZ OK 7 :00 k is :,, Impervious area y%,„ 7,989.00)ryr % Impervious (IA) 100.0% % Design rainfall depth (Ro) 1'=: 0 i'' [4a1i50 in Peak Flow Calculations 1-yr, 24-hr runoff depth r`3.60r�., xin 1-yr, 24-hr intensity in/hr Pre -development 1-yr, 24-hrrunoff 3/sec Post -development 1-yr, 24-hr runoff k" '0 03='-? t:1113/sec Pre/Post 1-yr, 24-hr peak control 0.00 ft3/sec Storage Volume Design volume (WOV) 949.00,ft Adjusted water quality volume (WOVAd) 711.75 ft3 Volume contained in the sedimentation basin and on lop of the sand filter 712.80 Maximum head on the sedimentation basin and sand filter (hM„Fk.) )' °= . ,4 3.60 ft Average head on the sedimentation basin and sand filter (hA) ' 1 Ch1i80;If Runoff Coefficient (Rv) 0.95 (unitless) Type of Sand Filter Open sand filter? If this is an open sand filter: The clearance between the bottom of the sand filter and the SHWT (dsHm) Closed/precast sand filler? If this is a closed sand filter: The clearance between the bottom of the sand filter and the SHWT (ds wr) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dsp, ,) IN',-1 _�A YorN I � cM yVry 3�(.r Y or N _. .1ft �ih ly�y AW:�T t 350111 OK OK OK RECF,TV' ,D MAY 7. 7 2008 BY: __ Form SW401-Sand Filler-Rev.3 Parts I and II. Project Design Summary, Page 1 of 3 Sedimentation Basin Permit Number. L. TIJNCO S1l7 (to be provided by DWO) Surface area of sedimentation basin (As) Sand Filter Surface area of sand filler (Ar) Depth of the sand media filter bed (dr) Coefficient of permeability for the sand filter (k) Time to drain the sand filter (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow -splitting device used? Does volume in excess of the design volume flow evenly distributed through a vegetated filler? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (5011 if SA waters)? Is the BMP located at least 10011 from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chambedforebay (Wsd)? What is the depth of sand over the outlet pipe? Figure 1: Open Sand Filter Seduueutation Bwd Filter' Ctuvu6er Cher Fier (or Fat eba}} �...... OK. Meets minimum, but may need to be increased to 99.00 ft, contain the required volume if error under Storage -":5j Volume section. '• OK. Meets minimum, but may need to be increased to 99.00 ft2 contain the required volume if error under Storage Volume section. :150 ft .. .. „a..3.50 t (f /day) "A0.00'hours OK. Submit drainage calculations. 1.67 days YorN OK YorN OK YorN OK YorN OK YorN OK YorN OK YorN OK YorN Insufficient ROW location. OK OK Form SW401-Sand Filter-Rev.3 Parts I and H. Project Design Summary, Page 2 of 3 Permit Number:�s� (to be provided by DWQ) Figure 2: Closed Sand Filter Colic, CIC (01' OHICI" sbilch" A Innfn'ial) In -Sint Soil Water Collected Chafes Pipe SJ, SvIdFJtei• CIi51i1Ga' (Trapped Solids) OF Form SW401-Sand Filter-Rev.3 Parts I and 11. Project Design Summary, Page 3 of 3 " Permit Nol-,(Jy�75 fr�) (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete su mittal package will result in a re uest for additional information. This will delay final re iew and appro al of the pro ect. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a re uirement has not een met attach ustification. Initials Page Plan Sheet No. . G� 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries l D f�2 - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and 407 - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the sand filter showing: / - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and Boundaries of drainage easement. �� 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media - Connection between the sedimentation chamber and the sand filter chamber, - SHWT level(s) - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (if applicable) 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. ✓ 5. Supporting calculations (including drainage calculations) 8 6. Signed and notarized operation and maintenance (0&M) agreement /vl,9- 7. A copy of the deed restrictions (if required). Form SW401-Sand Filter-Rev.3 Part III, Page 1 of 1 / r� NCDENR Permit Number i(Ci$lp (to be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section ///) and the l&MAgreement (Section IV) Project name Contact name Phone number Date Drainage area number II.`DESIGN'INFORMATION`�s fir,';-�y?at', - ?� � 1. Site Characteristics Drainage area (AD) Impervious area % Impervious (IA) Design rainfall depth (Ro) Peak Flow Calculations 1-yr, 24-hr runoff depth 1-yr, 24-hr intensity Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Pre/Post 1-yr, 24-hr peak control Storage Volume Design volume (WOV) Adjusted water quality volume (WOVAq) Volume contained in the sedimentation basin and on lop of the sand filter Maximum head on the sedimentation basin and sand filter (Irmwgw) Average head on the sedimentation basin and sand filter (hA) Runoff Coefficient (Rv) Type of Sand Filter Open sand filter? If this is an open sand filter: filter and the SHWT (dSHWr) Closed/pre-cast sand filler? If this is a closed sand filter: filter and the SHWT (ds�ryq) The clearance between the bottom of the sand The clearance between the bottom of the sand If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground structure (dsp, ) x ;7,989,00 n2 OK d :`.'--7,989.00n2 100.0% % ! >Y(3.60,,, ;:akin k4 e0118 t in/hr 0.03 ...0 /sec 003, ft"Isec 0.00 ft3/sec 949:00 If 711. 55 fi3 OK Z`� 712:80 , r 3:60.0 OK 71.8Qft�) OK 0.95 (unitless) N ) YorN a 9 Y YorN � ton RECEIVED MAY 2 7 2008 BY: Form SW401-Sand Filter-Rev.3 Parts I and It. Project Design Summary, Page 1 of 3 Sedimentation Basin Permit NumberS(� (to be provided by DWQ) Surface area of sedimentation basin (As) Sand Filter Surface area of sand filter (A,) Depth of the sand media filler bed (dr) Coefficient of permeability for the sand filter (k) Time to drain the sand filter (t) Time to drain the sand filter (1) Additional Information Does volume in excess of the design volume bypass the sand filler Is an off-line flow -splitting device used? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Is the BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamberRorebay (Wssd)? What is the depth of sand over the outlet pipe? Figure 1: Open Sand Filter Sedunenimion _ - Cl :ambij . (or Forebay) Floyd aWIN ?J )f- e soil:: Seasanabhs` High WafeiXable ' OK. Meets minimum, but may need to be increased to k; p�99 00 2 contain the in volume if error under Storage Volume section. OK. Meets minimum, but may need to be increased to contain the required volume if error under Storage Volume section. OK. Submit drainage calculations. 1.67 days YofN OK Wl�-I(z 013f"- #3 C 10r7 YorN OK YorN OK YorN OK YorN OK YorN OK YorN OK Y or N Insufficient ROW location. OK OK �6a Form SW401-Sand Filter-Rev.3 Parts I and 11. Project Design Summary, Page 2 of 3 Figure 2: Closed Sand Filter Permit Number: 'S 1. :,'RQ 0 S RZ) (to be provided by DWO) Wa. Flow Overland. Flow ig Concrete (01' OdIci 0111C h U it InAtcria 1) III-Sih, Soil s6smlabh. High Water i.1151C Water Collected Debris) ec Gates Smid 11 Outlet Pipe (lF 9 01 .............. c6vn ........... (Trapped Scilids) Form SW401 -Sand Filter-Rev.3 Parts 1 and It Project Design Summary, Page 3 of 3 i , , Permit No.sb.3` o 0 SL O (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete su mittal package will result in a re uest for additional information. This will delay final re iew and appro at of the pro ect. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a re uirement has not een met attach ustification. Initials Page Plan Sheet No. L101 1. Plans (1" - 50' or larger) of the entire site with labeled drainage area boundaries - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (f applicable), and - Boundaries of drainage easement. 007 2. Plan details (1" = 50' or larger) for the sand filter showing: - System dimensions (length, width, and depth) for both the sedimentation chamber and the filter chamber - Maintenance access, - Flow splitting device, - Proposed drainage easement and public right of way (ROW), - Design at ultimate build -out, - Off -site drainage (if applicable), and - Boundaries of drainage easement. CAn 3. Section view of the sand filter (1" = 20' or larger) showing: - Depth(s) of the sedimentation chamber and sand filter chamber, - Depth of sand filter media - Connection between the sedimentation chamber and the sand filler chamber, - SHWT level(s) - Outlet pipe, and - Clearance from the surface of the sand filter to the bottom of the roof of the underground structure (ff applicable) 4. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. v 5. Supporting calculations (including drainage calculations) v 6. Signed and notarized operation and maintenance (0&M) agreement 7. A copy of the deed restrictions (if required). Form SW401-Sand Filter-Rev.3 Part III, Page 1 of 1 State of North Carolina Deparimnt of Environment and Natural Resources Division of Water Quality STORM WATER MANAGEMENT PERMIT APPLICATION Regional Review: Sand Filter Project Information Pro eet name FRC maim bltl at Cam le'eune air Station Contact name Joshua Hurst, PE Phone number 919-828-1876 Draina a area number 11 and 2 the same size approximately Desi n Variable I Variable Equation Value Units Volume to Treat Volume to Treat, Reported WQVs'a 94911 Volume to Treat. Required WQVs h-1.,=3,630-Rn- Rv-AT-1 949 tt Volume to Treat, Atljustetl WQVga� 712 n- Drainage area AT." 7,989 tt Drainage area JAT.. 0.18 acres Percent lmperviot Design Storm Runoff Coefficient Surface area total (sedimentation basin+send filter), As+AF 198 tt° Reported Maximum head on the sedimentation basin and sand filter hu.iF,n., =WQVSchuelerl(As+AF) 3.59 fl Average head on the sedimentation basin and sand filter It, =hv..rn.12 1.80 It Table 1: Max Filter Depths and Minimum Surface Area Combinations hMUFne1 (tt) As+AF (ft') WQVxy (ft) 2.0 356 712 2.2 323 712 2.4 296 712 2.6 274 712 2.8 254 712 3.0 237 712 3.2 222 712 3.4 209 712 3.6 1 198 712 3.8 187 712 4.0 178 712 4.2 169 712 4.4 162 712 4.6 155 712 4.8 148 712 5.0 142 712 5.2 137 712 5.4 132 712 5.6 127 712 5.8 123 712 6.0 119 712 Rif Permit Number: fro be provided by DWQ) STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Reouired Items Checklist /Section III) and the 18M Agreement ( Project name FRG maint bldg at camp lejeune air station Contact name Joshua Hurst, PE Phone number 919-828-1876 Date May 14, 2008 with update 5127/2008 Drainage area number t and 2 the same size approximately SW8 080510 II. DESIGN INFORMATION Site Characteristics Drainage area (AD) 7,989 It' OK Impervious area 7,989 fe % Impervious 0A) 100.0% % Design rainfall depth 1.5 in Peak Flow Calculations Does this project require pre/post control of the 1-yr 24-hr peak flow? y Y or N 1-yr, 24-hr runoff depth 3.6 in 1-yr, 24-hr intensity 0.18 inmr Pre -development 1-yr, 24-hr runoff 0.03 ft'/sec Post -development 1-yr, 24-hr mnoff 0.03 tt'/sec PrelPost 1-yr, 24-hr peak control 0.0 ft/sec Storage Volume Design volume 949 ft' Adjusted water quality volume (WOV,) 712 ft' OK Volume contained in the sedimentation basin and on top of the sand filter. 713 Maximum head on the sedimentation basin and sand filter (hp Rtx) 3.6 ft OK Average head on the sedimentation basin and sand filter (hq) 1.8 it Runoff Coefficient (Rv) 0.95 (unitless) Type of Sand Filter Open sand filter? n Y or N If this is an open sand filter: The clearance between the bottom of the sand ft filter and the SHWT (dSHWT) Closed/pre-cast sand filter? y YorN If this is a closed sand filter: The clearance between the bottom of the sand ft filter and the SH WT (ds,nvr) If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground 3.5 It structure (dsp.) Sedimentation Basin Surface area of sedimentation basin (As) Sand Filter Surface area of sand filter (Ar) Depth of the sand media filler bed (or) .Coefficient of permeability for the sand filter (k) .Time to drain the sand filler (t) Time to drain the sand filter (t) Additional Information Does volume in excess of the design volume bypass the sand filler? Is an off-line flow -splitting device used? Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? Is the BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamberlforebay (W.)? What is the depth of sand over the outlet pipe? 99 ft' OK 99ft OK 1.5 ft 3.5 (fUday) 40 hours OK 1.67 days y YorN y YorN OK y YorN 30 ft y YorN y YorN y YorN y YorN OK Y or N Insufficient ROW location. 5.5ft OK 1tt OK Camp Lejeune Form SW401-Sand Filter-Rev.t Parts I and It. Project Design Summary, Page 1 of 4 Stale Slormwater Management Systems Permit No. SW8080510 ERG Maintenance Facility at MCAS New River, Camp Lejuene Slormwater Permit No. SW8 080510 Onslow County Designer's Certification I, ��'-1 �• ��� , as a duly registered �,a'iL ���^�'�" _ in the Slate of North Carolina, having been authorized to observe eriodicall weekly/ full time) the construction of the project, 7 (Project) for UNVEAC (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is Included in the Certification. Noted deviations from approved plans and specification: � � SEAL Signature Registration Number Date oFCSsro••, y` RFY J �V^^h Paco 6 of 7 MAY 17 2011 By. State Stormwater Management Systems Permit No. SW8080510 Certification Requirements: _ ✓/1. The drainage area to the system contains approximately the permitted acreage. V 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓3. All the built -upon area associated with the project is graded such that the runoff drains to the system. _t� All roof drains are located such that the runoff is directed into the system. V 5. The bypass structure weir elevation is per the approved plan. ✓6. The bypass structure is located perthe approved plans. _�w/ 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. V/'9. Vegetated slopes are no steeper than 3:1. _Z10, The inlets are located per the approved plans and do not cause short-circuiting of the system. (Co,._. - Ss uks Rao-F ) 1. The permitted amounts of surface area andlor volume have been provided. _Z12. All required design depths are provided. ✓ 13. All required parts of the system are provided. V 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWO Regional Office Onslow County Building Inspections Page 7 0l 7 MAY 17 2021 �E