Loading...
HomeMy WebLinkAboutSW8080317_HISTORICAL FILE_20080624STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW8 0 2 031"1 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE /Ooy YYYYMMDD \OF wA'Fq O� � r O 'c Randy Blanton, Owner PO Box 10137 Wilmington, NC 28404 June 24. 2008 Michael F Easley, Governor William G Ross lr , Secretary North Carolina Department of Environment and Natural Resources Subject: State Stormwater Permit No. SW8 080317 Covil Gardens High Density Commercial Wet Pond Project New Hanover County Dear Mr. Blanton: Coleco H Sullins Director Division of Water Quality The Wilmington Regional Office received a complete State Stormwater Management Permit Application for Covil Gardens on June 23, 2008. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2006-246 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 080317 dated June 24, 2008 for the construction of the subject project. This permit shall be effective from the date of issuance until June 24, 2018, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements In this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within sixty (60) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Steve Pusey, or me at (910) 796-7215. Sincer Edward Beck Regional Supervisor Surface Water Protection Section ENB/ sgp: S:\WQS\STORMWATER\PERMIT\080317.jun08 cc: Charles Cazier, PE, Tripp Engineering, PC New Hanover County Building Inspections City of Wilmington Development Services Beth E. Wetherill, New Hanover County Engineering Steve Pusey EW ilmington.Regiona l=Offices Central Files Nor`ihCarolina Aatura//y North Carolina Division of Water Quality 127 Cardinal Dnve Extension Wilmington, NC 28405 Phone (910) 796-7215 Wilmington Regional Office Internet. www ncwate,qualityo¢ Fax (910)350-2004 An Equal Oppodunity/Affirmative Action Employer- 50 % Recycled110% Post Consumer Paper Customer Service 1-877-623-6748 State Stormwater Management Systems Permit No. SW8 080317 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Randy Blanton, Owner Covil Gardens 115 Covil Avenue, Wilmington, New Hanover County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 24, 2018, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from 50,928 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 on page 3 of this permit, and per approved plans. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent surface waters. Page 2 of 7 State Stormwater Management Systems Permit No. SW8 080317 The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: Onsite, ft : Offsite, ft2: b. Total Impervious Surfaces, acres: Onsite, ft Offsite, ftz: C. Design Storm, inches: d. Average Pond Depth, feet: e. TSS removal efficiency: f. Permanent Pool Elevation, FMS�: g. Permanent Pool Surface Areq, ft h. Permitted Storage Volume, ft : i. Temporary Storage Elevation, FMS�: j. Pre -development flow -1 yr, 24 hr (ft /s): k. Post -development flow -1 yr, 24 hr (ft%): I. Controlling Orifice: M. Permitted Forebay Volume, ft3: n. Fountain Horsepower, HP o. Receiving Stream/River Basin: P. Stream Index Number: q. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 9 1.93 84,076 0 1.17 50,928 0 1.5 5 90% 29.0 3,992 9,516at temporary pool elev. 31.0 2.7 0.86 1"OJ pipe 3,426 NA Burnt Mill Creek / Cape Fear 18-74-63-2 "C; Sw" The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.Q and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Page 3 of 7 State Stormwater Management Systems Permit No. SW8 080317 6. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. Page 4 of 7 State Stormwater Management Systems Permit No. SW8 080317 III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 21-1.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. Permit issued this the 24th day of June, 2008. NORT AROLINA VIRONMENTAL MANAGEMENT COMMISSION for en . Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Page 5 of 7 D W Q USE ONLY Date Received Fee Paid Permit Number State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I.. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Randy lanton Owner 3. Mailing Address for person listed in item 2 above: City:Wdmington State:NC Zip:28404 Phone: (910 ) 270-1978 Fax: (910 ) 2704683 Email: 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 5. Location of Project (street address): City:Wilmington County:New Hanover 6. Directions to project (from nearest major intersection): from the intersection of S. Kerr Ave and US 17 travel 0.85 mile west turn left on Covil Ave approximately 7. Latitude:N 34 14' 11" Longitude:W 77 54' 15" of project 8. Contact person who can answer questions about the project: Name:Charles Cazier Telephone Number: (910 ) 763-5100 Email: trippeneec. rr. com H. PERMIT INFORMATION: 1. Specify whether project is (check one): ®New ❑Renewal �' i iqy, , MAR: 9 6 1UU8 js;A.1 FormSWU-101 Version 8.07 Pagel of4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit numberNA and its issue date (if known) 3. Specify the type of project (check one): ❑Low Density ®High Density ❑Redevelop ❑General Permit ❑Universal SMP ❑Other 4. Additional Project Requirements (check applicable blanks) ❑CAMA Major ®Sedimentation/Erosion Control 0404/401 Permit KNPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. ❑I. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. wet detention basin sized for 1 5" 1-year 2*-hour pre -post state requirements 2. Stormwater runoff from this project drains to the Cape Fear River basin. 3. Total Site Area: 2.22 acres 4. Total Wetlands Area: 0.29 acres 5. 100' Wide Strip of Wetland Area: NA acres (not applicable if no wetlands exist on site) 6. Total Project Area**:1.93 acres 7. Project Built Upon Area:5�-86 1y0' (v 8. How many drainage areas does the project have?1 9. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name Burnt Mill Creek Stream Class & Index No. C-SW / I fi 7q 63 2 Drainage Area (so 84,076 sf Existing Impervious* Area (so - Proposed Impervious*Area (so 50,928 sf % Impervious* Area (total) 60.6% Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings (so 17,648 sf On -site Streets (so _ On -site Parking (so 28,075 sf On -site Sidewalks (so 5,205 sf Other on -site (so - Off -site (so _ Total (so: 50,928 sf Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. **Total project area shall be calculated based on the current policy regarding inclusion of wetlands in the built upon area percentage calculation. Form SWU-101 Version 8.07 Page 2 of 4 10. How was the off -site impervious area listed above derived?NA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS One of the following deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. Form DRPC-1 High Density Commercial Subdivisions Form DRPC-2 High Density Developments with Outparcels Form DRPC-3 High Density Residential Subdivisions Form DRPC-4 Low Density Commercial Subdivisions Form DRPC-5 Low Density Residential Subdivisions Form DRPC-6 Low Density Residential Subdivisions with Curb Outlets By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required in the above form, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SW401-Low Density Low Density Supplement Form SW401-Curb Outlet System Curb Outlet System Supplement Form SW401-Off-Site System Off -Site System Supplement Form SW401-Wet Detention Basin Wet Detention Basin Supplement Form SW401-Infiltration Basin Infiltration Basin Supplement Form SW401-Infiltration Trench Underground Infiltration Trench Supplement Form SW401-Bioretention Cell Bioretention Cell Supplement Form SW401-1-evel Spreader Level Spreader/Filter Strip/Restored Riparian Buffer Supplement Form SW401-Wetland Constructed Wetland Supplement Form SW401-Grassed Swale Grassed Swale Supplement Form SW401-Sand Filter Sand Filter Supplement Form SWU-101 Version 8.07 Page 3 of VI. SUBMITTAL. REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Office. (Appropriate office may be found by locating project on the interactive online map at http'//h2o enr state nc.us/su/msi maps.htm) 1. Please indicate that you have provided the following required information by initiating in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form l✓� • Original and one copy of the Deed Restrictions & Protective Covenants Form Ord • Original of the applicable Supplement Form(s) and O&M agreement(s) for each BMP • Permit application processing fee of $505 ($4,000 for Express) payable to NCDENR • Calculations & detailed narrative description of stormwater treatment/management • Copy of any applicable soil report • Three copies of plans and specifications (sealed, signed & dated), including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm):Tripp Engineering Mailing Address:419 Chestnut street City:Wilmington State:NC Zip:28401 Phone: (910 ) 763-5100 Fax: (910 ) 763-5631 Email:trippeng@ec.rr.com Vill. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Infornmtion, item 2) Randy Blanton certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenanlslyVill be recorded, and that the proposed project complies with the requirements of 15A NCAC 21-1.1000. Signature: ) Date: 11-30-0Z4 Form SWU-101 Version 8.07 Page 4 of TRIPP ENGINEERING, P.C. 0 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 June 23, 2008 NCDENR Division of Water Quality 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Mr. Steve Pusey Re: Covil Gardens New Hanover County, NC SW8 080317 TE 07041 Dear Steve: JUN z 8 4008 In response to your email comments dated June 12, 2008 we offer the following: 1. Impervious numbers have been updated. 2. Dimensions have been added and radii have been provided. 3. Dimensions for the buildings are the floor plan dimensions. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. Charles D. Cazier, P. CDC:dcb Enc. Covil Gardens Subject: Covil Gardens From: Steve Pusey <Steven.Pusey@ncmai1.net> Date: Thu, 12 Jun 2008 15:40:37 -0400 To: Charles Cazier <charhe-trippeng@ec.rr.com> Charles, In the final review, I noticed that the impervious areas on your plans don't match the impervious areas listed in the application form. Please clarify. Furthermore, we would like to see dimensions, radii, and slopes for roads, parking areas, and sidewalks. Also, please include dimensions for the buildings and clarify whether you are showing the roof plan or floor plan. Please revise and resubmit by no later than June 26, 2008. If you have any questions, please don't hesitate to call. Regards, Steve Steve Pusey Environmental Engineer NCDENR - Division of Water Quality Wilmington Regional Office 910-796-7334 1 of 1 6/17/2008 6:54 PM 07041 Cord Gardens Pond r Stormwater Calculations Totat Drain a Area ft. I acres 84,076 1.93 Impervious Area Land Use sq.ft. acres Building 17,648 0.41 Asphalt Parking 28,075 0.64 Concrete 5,205 0.12 0 0.00 Total 50,928 1.17 Time of Concentration Hydraulic Length (L) = 17 ft. change in Height (H) = 10 ft. TO = (L' /H) ° / 128 = 5.48 min. Flow for 10 year, 6 hour Storm (Q1e) QPRE _ (CPRE) x (110) x (Area) 3.04 cfs QPOST = (CP T) x (110 x (Area) 8.27 cfs Detention Pond Desicn: Pond Size Elevation ft. Surface Area . ft. Normal Pool 29.00 3,992 Flood Pool 31.00 5,524 Top of Bank 33.50 5,524 Bottom of Pool 20.00 74 Bottom of Shelf 28.50 1,093 Top of Shelf 29.50 4,141 % impervious = 0.606 = 60.6% say 61.0% CPRE - 0.25 CPOST= (%imp.)(.95)+(1-%imp.)(.25) = 0.68 Iro = 6.30 in/hr Imo= 7.79 Whr Flax for 50 year, 6 hour Storm (Q,) QPRE _ (CPRE] x (I10) x (Area) 3.76 cis QPOST = (CP T) x (110) x (Area) 10.22 cis State Surrace Area Hequirement at normal POOL Pond side slopes = 3 1 Depth below N.P. = 4.9 ft. SA/DA = 0.0437 (Chart for 90% TSS Removal for Wet Detention Pond without Vegetative Fitter Required SA = (SA/DA) x (Total Drainage Area) 3,674 sq. ft. Total Provided Storage Volume: State Volume Reg. for Storage of first 1 S' runoff: Vol. _ [(Normal pool SA + Flood Pool SA) / 2] Rv = .05+ ,009(% imp) x (F.P elev. - N.P elev.) = 0.5951639 = 9,516 cu. ft. V= (Design minfall)(Rv)(Dminage Area) = 6,255 cu, ft. 1C ARol���� \20. •�FESS/p i� a� SEAL r•� - 032555 - 07041 pondl\l op 1 of 2 6/6/2008 Covil Gardens 07041 CDC Pond Stonmrater Calculations Pond Volume, Bottom SA = 74 sq. ft. Normal Pool SA = 3,992 sq. ft. Vol. _ [(N.P. SA + Bottom SA) / 21 x (N.P. el. - Bottom el.) 18,297 cu. ft. Forebav Required Volume Vol. = 20% of storage volume 3,659 cu. ft. Provided Volume Bottom SA = 222 sq. ft. Normal Pool SA = 1,491 sq. ft. Vol. _ [(N.P. SA + Bottom SA) / 21 x (N.P. el. - Bottom el.) = 3,426 cu. ft. depth = 4 ft. Outlet Structure Desicn: Flow for 2-day dmwdown: for 1 st 15' of stonnwater, Q = Required Vol. 1172,800 sec. (2-days) 0.036 cfs Required Area of Pipe for 2-day drawdovm: A= Q/ [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 322 ft./s2 h = (F.P. elev.- N.P. elev.) J2 A = 0.0075 sq. ft. Diameter of Pipe for 2-day drawdo , DIA. = SORT[(A x 4) / pi] 0.0978 ft. 1 17 in. Drawdown Calculation 21 snicOnfce Used= Drawdown rate= 0.02 Drawdown time= 2.7621 d Outlet Structure Check: Using a 4' x N Basin, Perimeter L = i6 ft. Q = CIA C = (% imp.)(.95) + (1-% imp.)( 25) 068 1 = 6.30 in. for a 10 yr. Stone A = 1.93 Acres = 8.27 cfs Flow for 5-day dravvd n for 1 st 1.5' of stormvmter, Q = Required Vol. 1432,000 sec. (5-days) 0,014 cfs Required Area of Pipe for 5-day drawdown: A= Q/ [Cd x SQRT(2 x g x h)] Cd = 0.6 g = 32.2 ftJsz h = (F.P. elev. - N.P. elev.)/2 A = 0.0030 sq. ft. Diameter of Pipe for 5-day drawdown. DIA. = SQRT[(A x 4) / pi] 0.0619 ft. 0.74 in. Q= CwxLx H' H= [Q/(CwxQ]" Cw = 3 = 0 31 ft. Peak elevation = Flood pool elevation + H 31 31 ft. 07041 pondNewop 2 of 2 6=2008 Covnl Garderrs 07041 CDC SW mxrater Pond Rot&V. 1-year 24hr Storm WATERSHED DATA WATERSHED AREA 1.93 ACRES HYDRAULIC LENGTH 627 FT CHANGE IN HEIGHT 10 FT RUNOFF COEF 'C' 025 TIME OF CONCENTR 5.48 MIN INTENSITY 1 YR 5.63 IN/HR Qa = 2.72 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF P = 3 93 INCHES 1yr, 24hr PRECIPITATION CN = 81 S = (1000/CN)-10 S = 2.35 Depth (D) _ (P-0 2S)A2/(P+0 8S) D = 2.06 IN - 1yr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = ((43.5)(D)(Area)] / Qp Tp= 23.44 MINUTES Storage Volume Req'd = (Qp-Qa)'Tp'1 39*60 9,133 cu ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 29.00 feet WATERSHEDAREA 1.93 ACRES HYDRAULIC LENGTH 627 FT CHANGE IN HEIGHT 10 FT RUNOFF COEF.'C' 0.68 TIME OF CONCENTR 5.48 MIN INTENSITY 1 YR 5.63 IN/HR Qp= 7.39 CFS Qp = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) (cu ft) (Cu ft) (ft) (ft) 290 3,992 0 0 0 0 0 0 300 4,758 4,375 4,375 1.0 8.3837 0 1.00 31.0 5.524 5,141 9,516 2.0 9.1607 0.6931 2.00 32.0 5,524 5,524 15,040 3.0 96185 1.0986 302 330 5,524 5,524 20,564 4.0 9.9313 1.3863 4.01 34.0 5,524 5,524 26,088 5.0 10.1692 1.6094 4.96 35.0 2,762 28,850 6.0 10.2699 17918 5.43 360 - 28,850 7.0 10.2699 1.9459 5.43 37.0 - 28,850 &0 10.2699 2.0794 5.43 Regression Output: Ks = 4393 b = 1.11 Constant 839 6/6/2008 Covil Gardens 07041 CDC Stommater Pond Routing. 1-year 24hr Stone CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Oa = 2.72 cfs Op = 7.39 cfs Tp = 23.4 min dT = 4 min BASIN DATA Ks = 4393 b= 1.11 Zo = 29.00 ft Normal water elev = 29.00 It Peak Outflow = 0.86 cfs Box Weir Length = 16 ft Peak Stage = 3158 ft Cw = 3.0 Maximum Storage = 12,583 cu ft Zcr = 32.50 ft Control Holes State Orifice: Dia = 1.00 In Dd = 18 in Inv = 29.0 ft Cd = 0.59 Weir L = 7.5 in Zi = 290 ft Inv = 31.00 ft Time Inflow Storage Stage Outflow W Riser Barrel Orifice City Weir (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) 0 0.0 0 29.00 0 0 0 0 000 4 05 0 29.00 0 0.00 0 0 000 8 1.9 124 29.04 0.00 0.00 0.0 0.00 000 12 3.8 587 29.16 0.01 0.00 0.3 0.01 0 00 16 5.7 1505 29.38 0.02 0.00 0.9 0.02 000 20 7.0 2869 29.68 0.02 0.00 2.2 0.02 000 24 7.4 4545 30.03 0.03 0.00 4.1 003 0.00 28 6.7 6309 30.38 0.03 0.00 6.4 0.03 0.00 32 5.4 7915 30.70 0.03 0.00 8.1 .0.03 0.00 36 4.4 9212 30.95 0.04 0.00 9.1 0.04 0.00 40 3.5 10248 31.14 0.14 0.00 9.9 0.04 0.10 44 2.8 11052 31.29 0.33 0.00 10.4 0.04 0.30 48 2.2 11642 31.40 0.52 0.00 10.7 0.04 0.48 52 1.8 12055 31.48 0.66 0.00 11.0 0.04 0.62 56 1.4 12327 31.53 0.76 0.00 11.1 0.04 072 60 12 12489 31.56 0.82 0.00 11.2 0.04 078 64 0.9 12567 31.57 0.85 0 00 11.3 0.04 081 68 0.7 12583 31.58 0.86 0.00 11.3 0.04 082 72 0.6 12554 31.57 0.85 0.00 11.3 0.04 081 76 0.5 12492 31.56 0.82 0.00 11.2 0.04 078 80 0.4 12408 31.54 0.79 0.00 112 0.04 075 84 0.3 12308 31.53 0.75 0.00 11.1 0.04 0.71 88 0.2 12200 31.51 0.71 0.00 11.1 0.04 0.67 92 0.2 12087 31.48 0.67 0.00 110 0.04 063 96 0.2 11973 31.46 0.63 0.00 10.9 0.04 059 100 0.1 11859 31.44 0.59 0.00 109 0.04 055 104 0.1 11747 31.42 0.55 0.00 10.8 0.04 0.51 108 01 11638 31.40 0.52 0.00 10.7 0.04 0.48 112 0.1 11534 31.38 0.48 0.00 10.7 0.04 0.44 116 0.1 11433 31.36 0.45 0.00 10.6 0.04 0.41 120 00 11338 31.35 0.42 0.00 10.6 0.04 0.38 124 0.0 11247 31.33 0.39 0.00 105 0.04 0.35 128 0.0 11161 31.31 0.37 0.00 104 0.04 0.33 132 0.0 11079 31.30 0.34 0.00 10.4 0.04 0.30 136 0.0 11002 31.28 0.32 0.00 10.3 0.04 0.28 140 0.0 10929 31.27 030 0.00 10.3 0.04 0.26 6(6r2008 Covi1 Gardens 07041 CDC Stomnrater Pond Routing. 1-year 24hr Storm 144 0.0 10860 31.26 0.28 0.00 10.3 0.04 0.24 148 0.0 10795 31.24 0.26 0.00 10.2 0.04 0.23 152 0.0 10734 31.23 0.25 0.00 10.2 0.04 0.21 156 0.0 10676 31.22 0.23 0.00 10.1 0.04 0.20 160 0.0 10621 3121 0.22 0.00 10.1 0.04 0.18 164 00 10569 3120 0.21 0.00 10.1 0.04 0.17 168 0.0 10520 31.19 0.20 0.00 10.0 0.04 0.16 172 0.0 10474 31.18 0.19 0.00 10.0 0.04 0.15 176 0.0 10429 31.18 0.18 0.00 10.0 0.04 0.14 ISO 0.0 10388 31.17 0.17 0.00 9.9 0.04 0.13 184 0.0 10348 31.16 0.16 0.00 9.9 0.04 0.12 188 0.0 10310 31.15 0.15 0.00 9.9 0.04 0.11 192 0.0 10275 31.15 0.14 0.00 9.9 0.04 0.11 196 0.0 10241 31.14 0.14 0.00 9.8 0.04 0.10 200 0.0 10208 31.13 0.13 0.00 9.8 0.04 009 204 0.0 10177 31.13 0.12 0.00 9.8 0.04 009 208 0.0 10148 31.12 0.12 0.00 9.8 0.04 0.08 212 0.0 10119 31.12 0.11 0.00 9.8 0.04 0.08 216 0.0 10092 31.11 0.11 0.00 9.8 0.04 007 220 0.0 10066 31.11 0.10 0.00 9.7 0.04 0.07 224 0.0 10042 31.10 0.10 0.00 9.7 0.04 0.06 228 0.0 10018 31.10 0.09 0.00 9.7 0.04 0.06 232 0.0 9995 31.09 0.09 0.00 9.7 0.04 0.05 236 0.0 9973 31.09 0.09 0.00 9.7 0.04 0.05 240 0.0 9952 31.09 0.08 0.00 9.7 0.04 0.05 244 00 9932 31.08 0.08 000 9.6 0.04 0.04 248 00 9913 31.08 0.08 0.00 9.6 0.04 0.04 252 0.0 9894 31 M 0.08 0.00 9.6 0.04 0.04 256 0.0 9876 31.07 0.07 0.00 9.6 0.04 0.04 260 OD 9859 31.07 0.07 0.00 9.6 004 003 264 0.0 9842 31.07 0.07 0.00 9.6 0.04 003 268 0.0 9825 31.06 0.07 0.00 9.6 0.04 0.03 272 00 9810 31.08 0.06 0.00 9.6 0.04 003 276 00 9794 31.06 0.06 0.00 9.5 0 04 0.03 280 00 9780 31.05 0.06 0.00 9.5 004 002 284 0.0 9765 31.05 0.06 0.00 95 0.04 002 288 0.0 9751 31.05 0.06 0.00 9.5 0.04 0.02 292 0.0 9738 31.05 0.05 0.00 9.5 0.04 0.02 296 0.0 9725 31.04 0.05 0.00 9.5 0.04 0.02 300 0.0 9712 31.04 0.05 0.00 9.5 0.04 0.02 304 0.0 9699 31.04 0.05 0.00 95 0.04 0.01 308 0.0 9687 31.04 0.05 0.00 95 0.04 0.01 312 00 9675 31.03 0.05 000 9.5 0.04 0.01 316 00 9664 31.03 0.05 0.00 9.5 0.04 0.01 320 0.0 9653 31.03 0.05 0.00 9.4 0.04 0.01 324 0.0 9642 31.03 0.04 0.00 9.4 0.04 0.01 328 0.0 9631 31.03 0.04 0.00 9.4 0.04 0.01 332 0.0 9620 31.02 0.04 0.00 9.4 0.04 0.01 336 0.0 9610 31.02 0.04 0.00 9.4 0.04 0.01 340 0.0 9600 31.02 004 0.00 9.4 0.04 0.01 344 0.0 9590 31.02 0.04 0.00 9.4 0.04 0.00 348 0.0 9580 31 02 0.04 000 9.4 0.04 0.00 352 00 9571 31.01 0.04 0.00 9.4 0.04 0.00 356 00 9561 31.01 0.04 0.00 9.4 0.04 0.00 360 0.0 9552 31.01 0.04 000 9.4 0.04 0.00 364 0.0 9543 31.01 0.04 0.00 94 0.04 0.00 368 0.0 9534 31.01 0.04 000 9.4 0.04 000 372 0.0 9525 31.01 0.04 000 9.4 0.04 0.00 376 0.0 9516 31.00 0.04 0.00 9.4 0.04 000 380 0.0 9507 31.00 0.04 0.00 93 004 0.00 384 0.0 9498 31.00 0.04 0.00 9.3 0.04 0.00 388 0.0 9490 31.00 0.04 0.00 93 0.04 0.00 392 0.0 9481 31.00 0.04 0.00 9.3 0.04 0.00 396 0.0 9472 31.00 0.04 0.00 9.3 0.04 0.00 400 0.0 9464 30.99 0.04 0.00 93 0.04 0.00 404 0.0 9455 30.99 0 04 0.00 9.3 0.04 0.00 408 0.0 9447 30.99 0.04 0.00 9.3 004 0.00 TRIPP ENGINEERING, P.C. is 419 Chestnut Street Wilmington, North Carolina 28401 Phone: (910) 763-5100 • FAX: (910) 763-5631 May 6, 2008 NCDENR Division of Water Quality 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Mr. Steve Pusey Re: Covil Gardens New Hanover County, NC SW8 080317 TE 07041 Dear Steve: In response to your letter dated May 1, 2008 we offer the following: RECEIVED JUN " 6 7008 Y------- I . Item 1 1 1.6 on page 2 has been corrected to 1.93 acres. 2. Average depth has been recalculated and the new SA/DA value is provided. 3. Surface areas and volumes have been updated. 4. We have been informed that a soils report is not necessary if the outlet discharges to the wetlands. Our normal pool is above the wetlands we discharge to therefore we should not cause the drainage of wetlands. An approximate Seasonal High Water Table has been provided. QA corrected O & M agreement is provided. 6. An updated supplement and revised drawdown calculations are provided. J�7Q�. Revised calculations are enclosed. V The pond detail has provided the correct clean out elevation and an approximate Seasonal High Water Table Elevation. / The permanent pool contour has been dimensioned. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P.C. CQ Charles D. Cazier, P.E. CDC:dcb Enc. F WATF 90 Mmhael P. �� Easley, Governor 0 7 WdhamG Ross Jr, Secretary > r North Carolina Depanment of Environment and Natural Resources -i Coleen H. Sullins Director Division of Water Quality May 1, 2008 Randy Blanton, Owner P.O. Box 10137 Wilmington, NC 28404 Subject: Request for Additional Information Stormwater Project No. SW8 080317 Covil Gardens New Hanover County Dear Mr. Blanton: The Wilmington Regional Office received a NPDES Phase II Post Construction Permit Application for Covil Gardens on March 26, 2008. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Please change total project area to 1.93 acres on item 111.6 on page 2 of the application. 2. Please recalculate the average pond depth using the correct depth from permanent pool elevation to cleanout elevation, and enter the SA/DA tables with this average pond depth. You may want to use the new average depth calculation formula to maximize your average depth. Do not round numbers off until you get to the final result. 3. Using the correct average depth, recalculate surface area and volume, and enter the values in the supplement. Do not round numbers off until you get to the final result. 4. A soils report for all engineered systems is required. The report should contain the estimated Seasonal High Water Table elevation at the wet pond location. 5. Please resubmit basin elevation diagram in the O&M Agreement with correct sediment removal elevation, bottom elevation, and depth reading for sediment removal. Please recalculate the drawdown time based on the correct head and enter the new values in the supplement. The average head to use in the orifice equation is approximately one-third of the distance between the permanent pool elevation and the elevation of the next available outlet above the permanent pool. Do not round numbers off until you get to the final result. 7. Please provide a new table of elevations, areas, incremental volumes, and accumulated volumes for overall pond and for forebay to verify volumes provided. 8. Pond section detail should include elevation for sediment cleanout and elevation of seasonal high water table (SHWT). 9. Please provide dimensions for each line and arc formed b the permanent pool contour. y p N�o�`n Carolina �Vatura(!y North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet. www newaterqualtvorg Fax (910)350-2004 1-877-623-6748 An Equal OppoitunitylAffrmative Action Employer — 50 % Recycledl10% Post Consumer Paper Randy Blanton May 1, 2008 Stormwater Application No. SW8 080317 Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to May 30, 2008, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7215 or email me at steven.pusey@ncmail.net. Sincerely, "A� .� / Steve G.Pusey Environmental Engineer ENB/sgp: S:\WQS\STORMWATER\ADDINFO\2008\080317.may08 CC: Charles Cazier, PE, Tripp Engineering, P.C. Steve Pusey Page 2 of 2 Re: Covd Gardens Subject: Re: Covil Gardens From: Steve Pusey <Steven.Pusey@ncmai1.net> Date: Mon, 28 Apr 2008 17:08:04 -0400 To: charlie-trippeng@ec.rr.com Yes, the old calculation will be okay in this case. Steve Charlie wrote: Hey Ste ve, I understand that the new calculation gives us a deeper a verage depth. Can we not simply use the more conservative calculation for this submittal? I will be glad to use your suggested method fro -in here on out. Thank you, Charles D. Cacier, P.E. Tripp Engineering 910-763.5100 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Tripp Engineering, P.C. unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. Steve Pusey Environmental Engineer NCDENR - Division of Water Quality Wilmington Regional Office 910-796-7334 i 1 of 1 4/28/2008 5:24 PM r;, . -1. FAX COVER SHEET Date: 4/24/08 No. of Pages: 2 To: Charlie Cazier, PE From: Steve Pusey Company: Tripp Engineering Dept. of Surface Water Protection FAX #: 910-763-5631 FAX # 910-350-2004 Phone # 910-796-7334 DWQ Stormwater Project Number: SW8 080317 Project Name: Covil Gardens MESSAGE: Please reference the attached new formula for calculating average pond depth. This new formula takes into account that the permanent pool covers 5 feet of the shallow shelf area (one half of the shelf area in the lateral direction). The result is a greater average depth than that calculated by the old formula. Please use this approved method to calculate the average depth for this project. Thanks, 1-1 Steve77 ENB/sgp: S:\WQS\STORMWATERWDDINFO\2008\080317.apr08 1/egetalion notshown *Freeboard & hardened emergency overflow not show,17 d.,,,: Average depth of permanent pool to use in the SA/DA tables (ft) _ �.?5 X I -{- Ahm—shelf + Abot_shelf + Abot_prnt`( X De7ih / fi boo shef ***Side slope stabilized per PIS judgment Outlet above temnorary nc Temporary pool Permanent pool Bottom ol'vegetated shelf Vegetated* Side slope Vegetated shelf I nli 1n.1 Forebav Side slopes —2 : I RE: Covil Gardens Subject: RE: Covil Gardens From: "Charlie" <Charlie-trippeng@ec.rr.com> Date: Thu, 24 Apr 2008 14:31:29 -0400 To: "'Steve Pusey"' <Steven.Pusey@ncmail.net> Ste ve, The average depth calculation is as follows Sec 1` (Np sf+ Btm sl)/2 Ap el — Btm el)/Np sf The clean out elevation was done as the old 7516 rule. When the sediment reaches 75% of the depth then that is when you clean it out. Iknow this is read differently now, so Owe can change this if necessary. 14 `x 0.75 = 10.5' there fore 29e1— 10.5' = 18.5 el / That was the thought process. Please let us know if we need to revisit something. Thank you for your pa tience, Charles D. Caziei• P.E. Tripp Engineering 910-763-5100 NOTICE: This electronic correspondence and all attachments may contain privileged information intended only for the use of the addressee. Any information contained within this correspondence is provided for your convenience. No assertion of accuracy is made by Tripp Engineering, P.C. unless physical documents are obtained, sealed AND signed. User assumes all responsibility for use of this digital information. I of 1 4/24/2008 3:55 PM TRwp ENGINEERING, P.C. 0 419 Chestnut Street Wilmington, North Carolina 28401 ^� / Phone: (910) 763-5100 • FAX: (910) 763-5631 March 26, 2008 i NCDENR Division of Water Quality 127 Cardinal Drive Wilmington, NC 28405-3845 Attn: Ms. Rhonda Hall Re: Covil Gardens New Hanover County, NC TE 07041 Dear Rhonda: NR -4 8 ?p0B Enclosed please find two (2) sets of plans, one (1) stormwater permit application form with narrative, one (1) wet detention basin supplement, two (2) sets of calculations, wetland determination with map, and one check for the application fee. Please review for approval and contact us with any questions, comments or if you need additional information. Thank you. Sincerely, Tripp Engineering, P C. aw Charles D. Cazier, P. CDC:dcb Enc. 1 /22/2008 CDC Cant Garden* Pond 1 Calcuations 5 O 07041 Total Drainage Area sq ft acres 84.076 1 93 Ira emous Aran Land Use sq. R aches buildings 17,648 0.41 rkin /as halt 28,075 0.64 Concrete 5,205 0.12 Total 1 50,928 1.17 Stormwater Calculations' Time of Concentration Hydraulic Length (L) = 627 ft. change in Height (H) = 10 ft. Tc = (L'1H)—/128 548 min Flow for 2 year, 6 hour Storm (CJ CPRE _ (CPRE) x (I2) x (Area) 2.55 cfs CPosT = (CPosT) x (I2) x (Area) 6.93 cfs Soil Storage Capacity for 2 year Storm CN = (98)(% imp) + (60)(1- = 84 P = 3 30 in. (or2yr, 6 hr storm S = 1000/CN - 10 190 Depth (Dp [P-(02)(S)]'! 1.77 Time to Peak Flow TP= [(435)(D)(Area))/Dx 21 40 min Detention Pond Design Pond Size, Elevation (ft) Surface Area (sq. R) Normal Pool 2900 2.220 Flood Pool 31 W 4,008 To of Bank 32.00 4,852 Bottom of Pool 15 00 5 Provided Storage Volume: Vol_ _ [(Normal pool SA+ Flood Pool SA) 12] x F.P. elev - N.P elev ) 6,228 cu. ft. RECEIVED MAR 2 6 2008 BY: 07041pondl %impemous= 0.61 = 606% say 61 0% CPRE = US C,,,,= (%imp.)(95)+(1-%imp)(25) 068 1,= 528 in/hr Zia= 6.30 m/hr Flaw for 10 year, 6 hour Storm (Clio) oPVE _ (CP'E) x (1+o) x (Area) 3 04 cfs CPosT = (CPosT) x (Ira) x (Area) = 8 27 cfs CN= (98)(%imp) +(60)(1-%imp.) = 84 P = 4.82 in for 10 yr, 6 hr storm S= IOOO/CN-10 190 Depth (D)= [P-(0.2)(S)]` / [P+(0 8)(S)I = 3.11 in Time to Peak Flow' TP= [(43.5)(D)(Area))/Oio,RosT 31 54 min. State Surface Area Requirement at normal pool. Pond side slopes = 3 1 Avg D below N.P. = 7.0 ft. SA/DA = 0.0245 (Chart for 90% TSS Removal for Wet Detention Pond without VeqeMtrve Filter) Required SA = (SA/DA) x (Total Drainage Area) 2,060 sq. ft. State Volume Reauued for Storage of first 1.5" of runoff Rv = 05+ 009(% imp) 0 529 V= (Design ramfall)(Rv)(Drainage Area) 5.560 cu. ft. -0\ C IA R �1% o - `2: a SEAT. 9f . _ 0325a5 _ in . VGIP\ti.4���t�� ES 0. G i of 2 1- 22— ZPV5 1/222008 Covil Gardens 07041 CDC Pond 1 Calculations Pond Volume: Main Pool Bottom SA = 5 sq. R Main Normal Pool SA = 1,323 sq. ft- Vol = ([(M P.N.P. SA + Bottom SA)121 x (M.P.N.P. el. - Bottom el.)H(F.B.N P SA + Bottom SA) / 21 x (F.B.N.P. el. - Bottom el.) 11,523 cu. ft orF Required Volume Vol. = 20% of storage volume 2,305 cu. R Outlet Structure Design. Flow for 2-day dawdown. for 1 st 1 5' of stormwater, O = Required Vol. / /72,800 sec. (2-days) 0.032 cfs Reouued Area of Pice for 2dav dawdown A= Q/fCdxSQRT(2xgxh)] Cd = 0.6 9 = 32.2 ftJs1 h = IF P elev.- N.P. elev.) 2 A = 00067 sq. ft. Diameter of Pace for 2dav dawdown DIA. = SQRT[(A x 4) / pi] = 0.0922 ft_ = 1.11 in. 'Use1.00 in diameter pipe Outlet Structure Check: Using a 5 x 5 Basin, Perimeter (L) = 24 ft Q = CIA C = I% imp.)(.95) + (1-% imp)(25) 068 1 = 6 30 in for a 25 yr. Storm A= 1 93 Acres 827 cfs Q= CwxLx H' H= (Q/(CwxL)]' Cw= 3 0.24 ft Peak elevation - flood pool elevation + H 31 24 ft. Provided Volume Bottom SA = 92 sq. fL Normal Pool SA = 897 sq. ft Vol. _ [(F B.N P. SA + Bottom SA) / 21 x IF B.N P. el. - Bottom el.) = 2,225 cu, ft. Flow for ay dawdown' for 1st 1.5' of stormwater, O = Required Vol. / 432,000 sec. (5-days) 0.013 cfs Required Area of Pipe for 5-day dawdown' A= Q/[Cdx SORT(2xgxh)] Cd= 06 9 = 32 2 ftJs' It = (F.P elev - N.P. elev) / 2 = ft. A= 00027 sq ft, Diameter of Pice for 5-day drawdown' DIA = SQRT[(A x 4) / pi] 0.0583 ft 0.70 in. 07041 pondl 2 of 2 122/2008 CDC WATERSHED DATA BEFORE DEVELOPMENT WATERSHED AREA 1.93 ACRES HYDRAULIC LENGTH 627 FT CHANGE IN HEIGHT 10 FT RUNOFF COEF.'C' 0.25 TIME OF CONCENTR 5.48 MIN INTENSITY (1 YR) 5.63 IN/HR Qa= 2.72 CFS Qa = PRE -DEVELOPED PEAK DISCHARGE COMPUTE DEPTH OF RUNOFF Cavil Gardens Storm ater Pond Routing 1-year 24hr Stonn P = 3.93 INCHES 1yr, 24hr PRECIPITATION CN = 81 S = (1000/CN)-10 S = 2.35 Depth (D) _ (P-0 2S)^2/(P+0.8S) D= 2061N- lyr, 24hr RUNOFF DEPTH SET VOLUME AND COMPUTE TIME TO PEAK Tp = [(43 5)(D)(Area)] / Qp TIP = 23.44 MINUTES Storage Volume Req'd = (Op-Qa)'Tp'l 39'60 9,133 cu ft. CALCULATE Ks AND b SET NORMAL ELEVATION AT = 29.00 feet WATERSHED AREA 1.93 ACRES HYDRAULIC LENGTH 627 FT CHANGE IN HEIGHT 10 FT RUNOFF COEF.'C' 0.68 TIME OF CONCENTR 5.48 MIN INTENSITY (1 YR) 5.63 IN/HR Qp= 7.39 CFS Op = POST -DEVELOPED PEAK DISCHARGE S Z CONTOUR INCR ACCUM CONTOUR AREA VOL VOL STAGE In S In Z Z est (sq ft) ICU ft) (cu ft) (ft) (ft) 290 2,220 0 0 0 0 0 0 300 3,114 2,667 2,667 1.0 T8887 0 1.01 310 4.008 3.561 6,228 2.0 8.7368 0.6931 1.97 32.0 4,852 4,430 10,658 3.0 9.2741 1.0986 300 330 4,852 4,852 15,510 4.0 9.6492 1.3863 4.03 340 4,852 4,852 20.362 5.0 9.9214 1.6094 5.00 350 2.426 22.788 60 10.0340 1.7918 546 36.0 - 22,788 70 10.0340 1.9459 546 370 - 22,788 80 10.0340 2.0794 546 Regression Output: __> Ks = 2639 b = 1.27 Constant 788 '0491E 1 /2212008 Covil Gardens CDC Storrrnrater Pond Routing 1-year 24hr Storm CHAINSAW METHOD FOR RISER BARREL ROUTING STORM DATA Qa = 2.72 cfs Qp = 7.39 cis Tp = 234 min dT = 4 min BASIN DATA Ks = 2639 b = 1 27 Zo = 2900 It Normal water elev = 29.00 It Peak Outflow = 196 cfs Box Weir Length = 16 It Peak Stage = 3201 It CW = 3.0 Maximum Storage = 10.712 cu It Zcr = 32.50 It Control Holes: State Onfice. Dia = 1 00 in Dd = 24 in Inv = 290 ft Cd = 0.59 Weir: L = 75 in Zi = 29.0 it Inv = 31 00 it Time Inflow Storage Stage Outflow W Riser Barrel Orifice City Weir (min) (cfs) (cu ft) (ft) (CIS) (CIS) (CIS) (CIS) (CIS) 0 00 0 29.00 0 0 0 0 000 4 0.5 0 29.00 0 0.00 0 0 000 8 1.9 124 29.09 0.01 0.00 0.1 001 0.00 12 3.8 586 2931 0.01 000 0.9 001 000 16 57 1503 2964 0.02 0-00 2.7 0.02 000 20 70 2866 3007 0.03 000 5Z 0.03 0.00 24 74 4540 3053 0.03 000 100 0.03 000 28 67 6304 30.99 0.04 0.00 147 0.04 0.00 32 5.4 70-M 31.37 0.47 0.00 174 0.04 0.43 36 4.4 9100 31.65 1 03 000 191 004 098 40 3.5 9899 31.83 1.47 0.00 20.1 0.04 142 44 2.8 10384 31.94 1 76 0.00 207 0.04 1.71 48 2.2 10633 32.00 191 0.00 21.0 0.04 186 52 1 8 10712 3201 1 96 0.00 21.1 0.04 1.91 56 14 10672 3Z01 193 0.00 2L0 0.04 1.89 60 1.2 10553 31 98 1 86 0.00 20.9 _ 004 1 82 64 0.9 10383 31.94 1 75 0.00 20.7 004 1 71 68 0.7 10183 31.90 1 63 0.00 20.4 004 1 59 72 0.5 9968 31.85 1.51 0.00 20.2 0.04 1.46 76 0.5 9748 31.80 1.38 0.00 199 004 1 34 80 04 9530 31 75 1 26 000 196 0.04 1.22 34 03 9320 31.70 1 14 000 194 004 1 10 88 0.2 9118 31.65 1.04 0.00 191 004 099 92 02 8928 31 61 0.94 0.00 189 004 090 96 02 8750 31.57 0.85 000 186 004 081 100 0 1 8584 31 53 0 77 0 00 18.4 004 073 104 01 8430 31 50 0.69 000 182 004 0.65 108 0.1 8287 31.46 063 000 180 004 059 112 0.1 8155 31 43 057 0 00 178 004 053 118 0.1 8034 31 40 052 &GO 1 Z6 0.04 048 120 0.0 7921 3138 0.47 0 DO 174 004 043 124 0.0 7818 31.35 043 0.00 173 0.04 039 128 00 7723 3133 0.39 0-00 17.1 0.04 0.35 132 00 7635 31 31 0.36 0.00 17.0 0.04 032 136 0.0 7553 31 29 0.33 0.00 16.9 0.04 029 140 00 7478 31 27 0.30 0.00 16.7 0.04 026 07D41 1/22/2008 C IGrddens 07041 CDC Stoarmater Pond Routing 1-year 24hr Storm 144 0.0 7409 31.25 028 0.00 16.6 0.04 0.24 148 0.0 7344 31.24 026 0.00 16.5 0.04 0.22 152 0.0 7285 3122 0.24 0.00 16.4 0.04 020 156 00 7229 3121 0.22 0.00 16.3 0.04 018 160 0.0 7178 31.20 0.20 0.00 16.3 0.04 0.17 164 00 7130 31.19 0.19 0.00 16.2 0.04 0.15 168 00 7085 31.18 0.18 0.00 16.1 0.04 0.14 172 0.0 7044 3117 0.16 0.00 16.0 0.04 0.13 176 00 7005 31.16 0.15 0.00 16.0 004 0.12 180 0.0 6968 31.15 0.14 0.00 15.9 0.04 011 184 0.0 6934 31.14 0.14 0.00 159 004 010 188 00 6902 31.13 0.13 000 158 0.04 009 192 0.0 6871 31.12 0.12 0.00 15.7 004 008 196 00 6843 31.12 Oil 0.00 15.7 004 008 200 00 6816 31.11 Oil 0.00 157 0.04 007 204 00 6790 31.10 0.10 000 15.6 0.04 006 208 0.0 6766 31.10 010 000 156 0.04 006 212 00 6743 31 09 0.09 000 15.5 0.04 0.05 216 0.0 6722 31 09 0.09 0.00 15.5 004 0.05 220 0.0 6701 31 08 0.08 000 15.5 004 0.04 224 0.0 6682 31.08 0.08 0.00 154 0.04 004 228 0.0 6663 31.07 0.07 0.00 15.4 0.04 004 232 0.0 6645 31.07 0.07 0.00 15.4 0.04 003 236 0.0 6628 31 07 007 0.00 15.3 0.04 003 240 00 6612 31.06 a07 0.00 15.3 0.04 0.03 244 00 6596 31.06 006 000 15.3 0.04 003 248 0.0 6581 31 05 006 0.00 152 0.04 0.02 252 0.0 6567 31.05 006 0.00 152 004 0.02 256 0.0 6553 31.05 006 0.00 152 0.04 002 260 0.0 6540 31.04 0.05 0.00 152 0.04 002 264 0.0 6527 31.04 0.05 0.00 151 0 04 002 268 0.0 6515 31.04 0.05 0 00 15.1 0.04 0.01 272 00 6503 31.03 005 000 151 0.04 001 276 00 6491 31.03 0.05 000 15.1 0.04 001 280 0.0 6480 31.03 0.05 000 15.1 0.04 001 284 00 6469 31.03 0.04 000 15.0 0.04 001 288 0.0 6455 31 02 0.04 000 150 004 001 292 0.0 6448 31 02 0 Oa 000 15.0 004 0.01 296 00 6438 31 02 004 0.00 15.0 0.04 0.00 300 00 6428 31 02 004 0-00 15.0 0.04 000 304 0.0 6419 31 01 004 0.00 150 0.04 000 308 00 6409 31 01 004 0 00 14.9 0.04 000 312 00 6400 31 01 004 0.00 149 0.04 0.00 316 0.0 6391 31 01 004 OM 149 0.04 000 320 0.0 6382 31 00 004 0.00 149 0.04 0.00 324 0.0 6373 31 00 0.04 0.00 149 0.04 0.00 328 0.0 6364 31 00 0.04 000 149 0 04 0.00 332 0.0 6356 3100 0.04 0.00 14.9 0.04 0.00 336 0.0 6347 31 00 0.04 0.00 14.9 004 000 340 00 6338 3099 004 000 14.8 004 0.00 344 00 6330 3099 004 000 148 004 0.00 348 00 6321 3099 004 000 148 004 0.00 352 00 6313 3099 004 000 148 0.04 000 356 0.0 6304 3099 004 0 00 147 004 000 360 0.0 6295 30.98 004 000 147 004 000 364 0.0 6287 30.98 004 000 14.7 004 000 368 00 6278 30.98 004 000 147 004 000 372 00 6269 30.98 0 04 000 14.6 004 000 376 00 6261 30.97 004 000 14.6 0.04 0.00 380 00 6252 3097 004 0.00 14.6 0.04 0.00 384 00 6244 90.97 004 000 14.6 004 000 388 0.0 6235 30.97 0.04 000 14.5 004 0.00 392 0.0 6226 3097 004 0.00 14.5 0.04 0.00 396 0.0 6218 3096 0.04 0.00 14.5 0.04 000 400 0.0 6209 30.96 0.04 OM 14.5 0.04 000 404 0.0 6201 3096 0.04 0.00 14.4 0.04 000 408 0.0 6192 3096 004 0.00 14.4 0.04 000 RECEIVED MAR ? 6 2008 Action i$SA' W-2008-00519 WILMINGTON DISTRICT U.S.G.S. Quad: Wilmington "<wf dYa3 1 7 U nt 5-G>-W6 tLL&; County: New Hanover NOTIFICATION OF JURISDICTIONAL DETEMM INATION Property Owner: Randv Blanton Address: PO Box 10137 Wilmington. NC 28404 Telephone No: 910-270-1138 Property description: Size (acres) 2.22 Nearest Waterway Burnt Mill Creek USGS HUC 03030007 Agent: Southern Environmental Group. Inc attn: David Scibetta 5315 College Road, Suite E Wilmington, NC 28412 910452-2711 Nearest Town Wilmington River Basin Northeast Cape Fear River Coordinates N 34.2365 W-77.9038 Location description The property is located at 115 Covil Avenue (parcel ID# R04917-004-010-000), New Hanover Countv, Wilmington, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination _ Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC S 1344). Unless there is a change in the law or our published regulations, this determination may he relied upon for a period not to exceed five vears from the date of this notification. We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. The wetland on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The wetlands have been delineated and surveved and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on 03/21/2008. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our Page 1 of puousnea regutauons, mis determination may be relied upon for a period not to exceed rive years from the date of this notification. X_ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Wilmington at 910-796-7215 to determine their requirements. Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Jessica Hooted at 910-2514637 or Min Garvev at 910-2514482. C. Basis For Determination This site exhibits wetland criteria as described in the 1987 Corps Wetland Delineation Manual and are adiacent to Burnt Mill Creek. which Bows into Smith Creek, a Traditional Navigable Water of the U.S- D. Remarks This determination is based on information provided by Southern Environmental Group. Inc and by site visit conducted by Jessica Hooten on 02/11/2008. E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination, you may request an administrative appeal under Corps regulations at 33 CFR part 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: Jessica Hooten, Project Manager, Wilmington Regulatory Field Office PO Box 1890 Wilmington , North Carolina 28402 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 05/21/2008. **It is not necessary to submit an RFA form to die District Office if you do not objec die determination in this correspondence." Corps Regulatory Official: •�7/'�.t,ly CtOa(fi•y �� Date 03/21/2008 Expiration Date 03/21/2013 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at http://reeulaturv.usacesurvev.com/ to complete the survey online. Page 2 of 2 16 N 89'36'49" W 27.97 L7 N 69-29'33" W 22.47 L8 S 29'45'48" W 45.04 L9 S 37'15'18" W 24.43 LID S 28'32'36" E 26.99 111 S 74'41'03" E 22.37 L12 S 82'58'08" E 19.47 L13 N 70'11'32" E 19.32 L14 N 44'34'45" E 26.93 L15 N 51'44'33" E 24.43 L16 N 21'16'04" E 13.53 L17 N 43'38'53" E 42.21 L18 S 04'02'13" W 26.66 1-79 S 03'03'58" W 37.41 S 03'03'58" W 69.98' Tie Line 1 01'29'26" E - 149.97' 0 F- ..r,y,,,oa,o rrvuu„uv umu,vuuun Manual, as determined by the undersigned on this date. Unless L there Is a change In the low of our published regulations, this determination of Section 404 Jurisdiction may be relied upon for a period of five years from this o S7 Army Corp �JKrL of Engineers Official 6�2f Zc0 Oat 5,w-30G DB 4942 Pg 1251 n/f Market North Investors, LLC I DB 5017 Pg 919 n/f Peter R. & M w Catherine R. Davis DB 4359 Pg 660 r� r° W U W a \ / \ CV M M ID 1----- \ \ 300.T 290.87' / \ \ Inset"A" / \ \ Not to \ Scale Tie Line - r� 70. N 02'M'00_E ���/ 300.22' See inset"A" S 04'02'13" W 171.55' 19 1-781���� 14-4.90' rl � I Wetlands Iw N/ N ` IJ 2.22 Acres Uplands , _ i / \ / I Inset"8"\ Not to \ 70.00' I Scale 1 \=<� N 02'36'0( See Inset"B" Covil E 290.87 Avenue AI 1 I I-- Rc'� I I BROAD Sr VIICINITY MAP N.T.s. Notes: 1) 404 Wetland area Is 7,940 s.f. Q.' 1� C,(r.I S 2) Wetlands flagged by. Southern Environmental Group, Inc. 5315 South College Rd Wilmington, NC 28403 pw `-'- IFEB 2 5 2008 o I I c I c Q I � I I I a -D o? CD m o 5' -om S -n I �/I Tie /� - S 62-36'00" W -� 141.22' (60' Public R/W) — — — — — — — — — — — — — — — — — — — — Scale: 1 "=100' Legend, 0 Existing Iron Pipe 100' 50' 0' 100" I] Existing Monument WETLAND SURVEY FOR: Randy Blanton 115 Covil Avenue 2.22 Acres City of Wilmington, New Hanover County, NC Date: September 28, 2007 Survey Reference: I, Paul D. Talbot, do certify that this actual survey and map was �.`'Z\{ CAROB,, performed and drawn under my ;��0�:'ESSi."••. y supervision in accordance with "The Standards of Practice for _ SEAL Land Surveying in North Carolina" _ JCYS ` witness my original signature, L-4099 license ,nufnber ands I.pNp.SURlE,t``�: Paul . TaTbot.P.L.S. L-4099 0 January 25, 2008 Stormwater Narrative Covil Gardens Wilmington, NC TE 07041 Covil Gardens is a vacant 2.22-acre tract proposed for a multifamily project. Proposed impervious areas include 17,648 sf of building, 28,075 sf of parking area, and 5,205 sf of concrete sidewalk. This a total built upon area of 50,928 sf or 52.66% total impervious area. All impervious area will be routed to the proposed wet detention pond. The pond is sized for 1.93 acres and 50,928 sf (1.17 ac) total impervious area. The pond will treat runoff for the State's 1.5", 1-year 24-hour pre -post and the City's 10-year pre - post requirements. Overflow from this basin will be directed to Burnt Mill Creek, classification C-SW.