Loading...
HomeMy WebLinkAboutSW7910903_COMPLIANCE_20150731STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW%4 �( � DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE.��9/� YYYYMM DD t-- Compliance Inspection Report IPenn it: SW761090� Effective: 08/04/11 Expiration: 08/04/25 Project: ,Shoreside Center-Walmart-Kitty Hawk Store # 2000-0� / Owner: Peachtree Shoreside LLC CCounty: _Dare 7 Adress: 5400 N Croalan Hwy Region: Washington City/State/Zip: Kitty Hawk NC 27949 Contact Person: Thomas W Wheeler Title: Phone: 770-476-4801 Directions to Project: North on US Hwy 158, the main site entrance is approx 1,100 feet west from the intersection of US Hwy 158 and Ocean Blvd Type of Project: Stale Stormwater - HD - Infiltration Drain Areas: 1 - (Kitty Hawk Bay) (03-01-56 ) (SC) 2 - (Kitty Hawk Bay) (03-01-56 ) ( SC) On -Site Representative(s): Related Permits: Inspection Date: 07/31/201! _. —__. — _-- J Primary Inspector: William J Moore Secondary Inspector(s): State Stormwater - HD - Detention Pond EntryTime: 10:00AM Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: IN Compliant ❑ Not Compliant Question Areas: ■ State Stormwater (See attachment summary) Exit Tlme: 10:30AM Phone: 252-946-6481 Ext.264 Inspection Type: Transfer Renewal PE C- t-t -0-/, y 2rZ/ 207,,40 ZS Ga/IrV¢ e.,5 r'A :79 -0 4�-/ter. A e page: 1 Permit: SW7910903 Owner • Project Peachtree Shoreslde LLC Inspection Date: 07/31/2015 Inspection Type Transfer Renewal Reason for Visit-. Routine Inspection Summary: site inspection 07/31/2015 at existing Walmart site in Kitty Hawk. BUA & SW measures appear to be constructed according to plans. O&M good; no apparent problems. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? M ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? 0 ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? 0 ❑ ❑ ❑ Comment: SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? 0 ❑ ❑ ❑ Are the inlets located per the approved plans? E ❑ ❑ ❑ Are the outlet structures located per the approved plans? E ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? 0 ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWO upon request? Comment: page: 2 (1 StiO 5/ �`�. C.� �._�Iliy"�iblG�✓� '• i^� Al !"'^-'/— 712 Z9 3 57 3. 7,v - <. �o 1 6Z Ho- VP (/¢c 1. v N� —!h 04)15 � 217-3/0q A�4 At,, IT ✓ :1 �' 1 P r' r! 16 •i, r 777 Ir � +(. r a 7,j C LA ✓` yti i/ `4 i 'ti. j