Loading...
HomeMy WebLinkAboutSW7101202_APPROVED PLANS_20101221STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW yZ&I1,0A DOC TYPE ❑ CURRENT PERMIT P2VAPPROVED PLANS `❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE20 ��, YYYYMMDD MOON PROJECT P'141 MARINE CORPS AIR STATION a EMS,FIRE VEHICLE FACILITY CHERRY POINT, NC g IX eHFF-r wnFx• ABBREVIATIONS DESIGN TEAM: Ea. NAME OF PROJECT: EMS/Fire Vehicle Facility Project Address, F Street Offices, Apparatus Bay, and ZIP: Cherry Point, NC 27808 Proposal Use: Dormitor Owner/Agent: NAVFAC/ Kevin Hanna Contact Persian: Kevin Kane, Architect Phone: 757-322-4143 Fax: 757-322-8285 Phone: 919-833-3737 Fooc 919-755-1771 E-mail: ksvin.honnaOnavy.mil E-mail: kkaneOdaviskone.com Lead Design Profeesjonal: Kevin Kane Designer Designer/ Firm L'Nxnse Contact Info Architectural Kevin M. Kane 5698 PH: 9197833-3737 FX: 919- 755-1771 Davis Kane Architects, PA kkane®daviskone.com Site/C•iv8 George Finch 375 PH: 919-833-1212 FX: 919-834-3203 George Finch, Boney and Associates gfinchOgfbo.net Electrical James Derek Ham James 31466 PH: 919-778-9064 919-- 778- 9069 En -Tech Engineering dhom®en tech-pme. cam Fge Algyyn Buford Lovett 16616 PH; 704-545-8383 X: 704-545-2483 Lovett Consultants, PLLC blovettOlovettacom Plumbing Benny Rollins Y 12641 PH: 919-778-9064 FX: 919- 778- 9069 En -Tech Engineering broil in sOentech-pme.com Mechanical BennyRollins 12641 PH: 919-778-9064 FX: 919- 778- 9069 En -Tech Engineering brollins®en tech-pme.com - Sprinkler/ Standpipe Buford Lovett 16616 PH: 919-545-8383 FX: 919-545-2483 Lovett Consultants, PLLC _ blovett®lovettc.com PH: 919-782--1833 Structural Anna L ch 035055 FX: 919- 782- 7630 Stroud, Pence and Associates u alynch*stroudpence.com Life Safety Buford Lovett 16616 PH: 704-545-8383 FX: 704-545-2483 Lovett Consultants, PLLC blovett®lovettacom Pull COIiiT NCPC TABLE 403.1 AREA USE CATEGORY 61 9> � 2 Amy A-3 56 SO 50 2B 28 .3 0 .2 .5 .2 0.0 0.1 Buainmes 23 50 50 12 12 .5 0 .2 .5 .2 a0 0.2 Residential R-2 26 50 50 13 13 1.3 0 1.3 1.3 1.3 13 1.0 Suxage S-2 28 50 50 14 14 0.3 0 0.3 0.3 0.3 0.0 O.0 TOTAL IDOURES FOR YAlFS 3 1 2(8 TOTAL FIXTURES FOR FEMALES 3 4 TOTAL F1XMl5 FOR ALL 2 2 3 ' - Aabove finish floor MIN minimum FT PLUMBING, MECHANICAL, W 1H r` ACT acoustical tile MISC miscellaneous D TITLE SHEETS: FIRE ALARM ADJ adjacent MVBL moveable CLIENT: AND ELECTRICAL ENGINEER: U Z T-101 BUILDING CODE SUMMARY; VICINITY MAP, SHEET INDEX FA-101 OVERALL FIRE ALARM DEVICE PLAN ALUM duminum AB anchor bolt NOi nominal c LS-1 LIFE SAFETY GENERAL NOTES FA-201 FIRE ALARM DETAILS ANOD anodized NIC not in contract NAVFAC En -tech Engineering N LS-2 LIFE SAFETY FLOOR PLAN FA-301 FIRE ALARM NOTES AND LEGEND APPROX approximate Nis not to scale ARCH architectural Gc on center Cherry Point, North Carolina Goldsboro, North Carolina K a LANDSCAPE: SPECIAL SYSTEMS BSMT basement OPNG opening MG beo;ngg OPP opposite Contact: Kevin Hanna Contact: Benny Rollins � N C-101 EXISTING CONDTIONS SS-101 OVERALL SECURITY SYSTEM DEVICE PLAN BID bid alternate DD outside diamete BD board OF outside face 757-322-4143 p: 919-778-9064, f: 919-778-9069 C-102 EXISTING CONDITIONS SCHEDULES AND NOTES SS-102 ENLARGED SPECIAL SYSTEM PLANS DETAILS BOT bottom Ol overhang BLDG building OHO over head p' email: brollins®entech- me.com email: kevin.hannoOnavy.mii P C-201 SITE DEMOLITION PLAN SS-201 SPECIAL SYSTEM C-202 SITE STAKING PLAN SS-202 SPECIAL SYSTEM DEVICES CPT carpet PLANplastic laminate Pot( ) G coot iron PTN FIRE PROTECTION DESIGNER partition CLG PT pp Mt C-203 SITE ATFP PLAN C-204 GRADING PLAN ceiling CT ceramic tine PLYWD plywood GENERAL CONTRACTOR: OF RECORD ' PVC pdywnyl < i C-205 STORMWATER AND EROSION CONTROL PLAN noutclassroom sq. ft. CO dean out PSF pounds/ sq. ft. 00 clean PSI in. C-206 UTILITY PLAN poundsertyQ. COL column PROP propCLR clew Chovl% Inc. Lovett Consultants. PLLC : ,I C-207 SITE'OUTLET DRAINAGE AREAS CO4C concrete CMU coca mosatry unit CITY quantity Maxton, Mint Hill, North Carolina North Carolina _ v C-208 TRAFFIC SIGNAL DESIGN *r STREET PLAN CO45T conetructknn OT quarry tile CM construction manager Contact: Fitz Chavis Contact: Buford M. Lovett i „ - C-209 TRAFFIC SIGNAL METAL POLE PLAN C-301 SITE DETAILS CONT continuous R radius CJ control joint REF reference 910-369-4518, f: 910-369-4559 p: 704-545-8383, f: 704-545-2483 WK r CSK counter sunk REINF reinforcing(e) p: C-302 SITE DETAILS REDO required email: fitZ.chavis®Chavisinc.com email: blovett0ovettc.com C-303 SITE DETAILS DEPT department RA return air DET detail REV rsvlsion(s), revised C-304 SITE DETAILS DIA diameter REBAR steel ranforc._bara C-305 JOINING DIAGRAM DIM dimenalm RD roof drain DS down spout ROIL roof drain loader RM room GENERAL SUBCONTRACTOR: L-101 LANDSCAPE PLAN DWG drawing RB rubber base Eeach 1L ARCHITECTURAL: ELL EC electric SECT section SS service sink Barnhill Contracting Company �`Zti BEg , A-100 KEY SHEET & UL DETAILS EWC elec. water cooler EL elevation stir sheet Raleigh, North Carolina A-101 BUILDING FLOOR PLAN ELEV elevator SIM simile EO equal SC solid core Contact: Gail Susan �ba m 5898 A-102 REFLECTED CEILING PLAN EQUIP eeqquipment SPEC specification(s) EXIST exMIngSPKLR Winkle 919-785-9167, f: 919-781-5348 A-103 ROOF PLAN EJ expansion joint SF square feet p: A-104 FURNITURE, FIXTURES & EQUIPMENT EJC expansion joint cover SO IN square inch ansiSTD standard email: gsuson®barnhillGontracting.com A-105 FINISH PLAN EXP exposed EXT exterior STL steel C' C STOR storage �. IGH A-201 ELEVATIONS FOC face of concrete STRUCT structural A-202 ELEVATIONS Ntfinish of masonry SDI suapeidc�' ARCHITECT: sEnl A-301 BUILDING SECTIONS FFE finished flow elev. TEL telephone FE fire extinguisher THRES threshold A-302 BUILDING SECTIONS FLR flow TOM top of masonry Davis Kane Arc hiteel P.A. s ENERGY SUMMARY ENERGY REQUIREMENTS A-303 WALL SECTIONS A-304 WALL SEC110NS FD flow drain TOS top of steel FLUOR fluorescent TyP typical FTG footingUPS Raleigh, North Carolina ,b The following data shall be considered minimum and any special attributes, required to the FIND foundation power supply unless Contact: Kevin Kane, Project Architect meet the energy code once also be provided. Each Designer shell furnish required If budget A-305 WALL SECTIONS DOM otherwise GALV galvanizes ua4 aalesa otnerwiee noted portions of the project information for the plan data ehwL energy cost rtwthoQ state the annual energy coot budget ve allowable annual energy cost budget A-306 WALL SECTIONS GA gauge VCT vinyl composition toe p• 919-833-3737, f' 919-755-1771 > SE THERMAL ENVELOPE A-307 WALL DETAILS GC general contract(or) VERT vertical OIL glass VB vinyl base email: kkane®doviskone.com *' P Method of C flenw: mP A-308 WALL DETAILS A-309 WALL DETAILS glazing GWB/GYP BD gypsum board WWF welded wire fabric N.C. X ara.a wJ Am MIryyAli mesh o Qrtwmill Parkenanoa Q Fnwer Cal eueH A-310 WINDOW & DOOR DETAILS HD hea y duty TAT ter all e HT height y WIC ware daeet LANDSCAPE ARCHITECT: Roof/ Calling Assembly ("oh aseeaWyt A-311 WINDOW & DOOR DETAILS HM hollow metal WG I I A/E INFO Ras/aMb9 AesemalY teodh armMY A-401 ENLARGED PLANS & INTERIOR ELEVATIONS HORIZ horizontal w re gas Standing awn, msd er. s/s" shoo vartA not w:rsl A-402 ENLARGED PLANS &INTERIOR ELEVATIONS HB hose bibb W/ with hwalaewn eraam r/t' all aaae and S�rgid h•ubW a, WD weed George Flneh BOn"y Assoc. APPaNFD over nwtd root dank and atad be Jokkn A-601 CASEWORK DETAILS ID inside diameter WB wood base STRUCTURAL DESIGN u-vdM a told awamMy.. .054 (LTM - 18.5) Raleigh, North Carolinu -- R-vdw a Mrolaaah is A-602 CASEWORK DETAILS IF inside face DESIGN LOADS Skylights In each anenblY . INSl1L insulation APPROVED Importance Factors Wind I 1.15 _ Fkterlar Ware (sod, aewnM Z A-701 DOOR SCHEDULE, WINDOW SCHEDULE, DETAILS MT interior Contact: George Finch NORTH CAROLINA ENVIRONMENTAL Snow fle _ 9.1 3 s/e' break 2' a4 peas. Ti flow Na d'em, tY u u _ 0.072 KPL kickplate , MANAGEMENT COMMISSION _ \ FOR CO 919-833-1212 f: 919-834-3203 MMAND N A Seismic 01 _ 1.5 u-vow a teed Insulation assembly 10 STRUCTURAL: p R-vow a told DIVISION OF WATER OUAUTY Acewly Live Loads: Roof 20 pef 3 5/9' alai. Y air apace. 2' rieid Insulation, r GMU STR-001 GENERAL NOTES LAM laboratory to email: gfinch®gfba.ra.:i - Mezzanine vet u-vaa. a tad aeeenMy ao74 LAN laminate ` `_.�, , FINAL DESIGN MeSlozzanine _�QO pof R-Yalw a totalinsulan 0. STR-002 GENERAL NOTES LAV lavatory --- LVR louver STR-101 FOUNDATION PLAN LPT low point J (= ` 11 12 1O Ground Snow Load: pal' STRUCTURAL ENGINEER SATISFACTORY aATE 3 5/s' brlcu. Y ah epees. Y rlgM, meld .ae w/out STR-102 ROOF FRAMING PLAN MH manhole SICm'%:. P@fig NO M079 SYR-201 TRUSS DETAILS MFR manufacture(r) DES DRW $O CH K KO Wind Load: Basic Wind Speed 1211 mph (ASCE-7) D Vdt+e of told Insulation 10 MBL marble EXPRESS Exposure Category C R-vase a fneulatian STR-301 SECTIONS NOS masonry ? a a.8 PROJECT MANAGER Stroud. Pence and Associates NO masonry opening BRANCH ahNACEfl Wend Base Sows (for MWFRS) V. - 60 KIPS Vy - 130 KIPS 3 ev'r MUM Y or epos, 2' rel ld, metal suds w/ "awn STR-302 SECTIONS MATL material h C ! I i ! � i S, li board a teal *"way ease STR-501 TYPICAL DETAILS MAX maximum Raleigh, North Carolina L,, CHIEF ENG/ARCH KEVIN M. KANE MECH mechanical SEISFAC DESIGN CATEGORY ❑ A ❑ 8 ®C ❑ D R-VWM of insulation - -70 S7R-502 TYPICAL DETAILS MTL, metal Contact: Anna Lynch Provide the following Seismic Design Parameters Opw*W (�� or won, ash 9�oBi MR moisture resistant nt r 1.7 ..< STR-50 TYPICAL DETAILS o ` e, j Spectral R Category (Table 180b5) ❑ I ❑ N ❑ 111 ®IV u_ynni a assembly B Spectral Response Acceleration Be 16.0 Rg S;_ 7 D xg Storf* m Tnen'd B'°dr Single """g _ •y sTR-504 TYPICAL DETAILS a 919-782-@ stro f: nco.co 2- - z Site Classification D ® Field Test ❑ Presumptive ❑ Historical Data Lamkwadt seam r/Pve .030 ! 1/Y as pee. summer a28 email: alynch®stroudpenc�.com 2 s Basic structural system (check ale) sister M31 PLUMBING: _1L-_Bearing Wall _Dual w/ Special Moment Frame shodaidw't .... 0.37 O �5 ___Building Frame _Dual w/ intermediate R/C or Special Steil Projection,;r",pp get P-101 OVERALL PLUMBING PLAN (DWV) U a Z Moment Frame _ Inverted Pendulum Door R-Volum (Externs MOW s P-102 OVERALL PLUMBING PLAN (WATER & CA) SYMBOL LEGEND VICINITY MAP: z Seismic Base She Vg- 105 KIPS ._ Vy- 105 KIPS Doan R-Values - rdl up doe 7.35 r } X Andyas Procedure Simplified ._Equivalent Lateral Force .-Modal vices apoent to unanditimea space (soda "" MY) P-103 ENLARGED PLUMBING PUNS (DWV) `i in Arohitecturd, Mechanical, Components anchored? _NO_.- P-104 ENLARGED PLUMBING PLANS (WATER & CA) w I Z LATERAL DESIGN CONTROL, Earthquake Vx Wind Vv aims was grade (each wambly) ROOM / AREAS 1 � UC? Z � = J Z N/A P-201 PLUMBING RISER SOIL BEARING CAPACITIES e w yr Flaee oar unandiliaaed apace (each orawnMY) t , Fled Test (provide copy of test repot) psf N/A P-202 PLUMBING RISER O WINDOW TYPE �' - w U U w Presumptive Bearing capacity Psf neon elan anod grade P-301 PLUMBING DETAILS F Pile size, typo, and Capacity U-Vdw a total a..wdxy R-Vol"Ir Insulation M/A P-302 PLUMBING DETAILS Q- WALL PARTITIONS p° . s L t1- U-Rehearsed a � osee°My ........ ........set P-303 PLUMBING DETAILS J dab �m W a R-VAM oflnokillm M/A P-401 PLUMBING FIXTURE SCHEDULE AND LEGEND O DDOORS --- > V Q P-402 PLUMBING SCHEDULE AND NOTES KEY NOTE \ z Z V FIRE PROTECTION: O SITE Q FP-100 FIRE PROTECTION PIPING PLAN O MISCELLANEOUS � _.m°=�;/* 6yj � - . IJ- W Z Q MECHANICAL: 101OVERALL MECHANICAL DUCT PLAN (SUPPLY & RETURN AIR) e O °° W > M-102 OVERALL ME04ANICAL PIPING PLAN (EXHAUST & OUTSIDE AIR) ELEVATION U �- a w M-103 OVERALL MECHANICAL PIPING PLAN Ti7" / %� - LL _ M-104 ENLARGED MECHANICAL PLANS - m - O ''p^y M-105 MECHANICAL SITE PLAN EXTERIOR ELEVATIONS ®®�� M-201 MECHANICAL FLOW DIAGRAMS /� o M-301 MECHANICAL DETAILS -`� CENTERLINE OF COLUMN +m® �y\\ ��, �/ Z c~ W W M-302 MECHANICAL DETAILS o v • G� e O '" (-� 4 M-303 MECHANICAL DETAILS SECTIONS //j [ ° W C d' 0 M-401 MECHANICAL SCHEDULE & NOTES ^ - / M-402 MECHANICAL SCHEDULES V V < r o Of ELECTRICAL: / DETAIL // SE-001 ELECTRICAL SITEC GJ PLAN 4� I �_ CD E-101 OVERALL ELECTRICAL POWER AND RECEPTACLE E PLAN m E-102 OVERALL ELECTRICAL LIGHTING PLAN ,,. �! / < � � ° MJ 0 d NORTH ARROW E-103 ENLARGED ELECTRICAL PLANS E-104 LIGHTENING PROTECTION PLAN TEMPERED GLASS � O = � O TEMPERED t71../LSS \ m SCALE.NTS E-201 ELECTRICAL DETAILS E-202 ELECTRICAL DETAILS O I I - CONSTR. . NO.: O. 529348 E-203 ELECTRICAL DETAILS L LAMINATED, INSULATED GLASS ' NOT TO SCALE consTR. aoN0 - E-204 ELECTRICAL DETAILS r�I�tp - N40085-10-C-5319 E-301 ELECTRICAL RISER, LOAD SUMMARY & LEGEND 1 ,WVLATED WIRE GLASS was, NAVFAC DRAWING NO. E-302 ELECTRICAL PANEL SCHEDULES ELEVATIONS ONLY) 12580822 - E-401 ELECTRICAL LIGHTING SCHEDULE & NOTES FINAL DESIGN SET NO. SHEET 1 OF 97 INTERIOR ELEVATIONS T-101 C O S 0 LU tip\ 0 M1�i' M1M1 IQ titi" 6 titibtiti",�� ti} `` M1}� �y g ti9 1' T I 0 E W. AVV— y °_41f 9 T.O.Lt MhYlf PAWl� 60 1 ' Ob c , y 6 \G►A ,yk�� \� M1}M1 �yk1� ryy �k�0u N -rp 1k\ M1 �M1} x x x�1p F S • x �1ti tik��e� M1� x \\ tip' ti ti ti b y `\ rm — � .OLD V* ,�\• ,�\• ti M15 , tip' `y r0a 1 Mti T.O.LZ 0 01O ti' pE 0V 11'E. S \9 .0.6 i x yti k`y ros 6k ti� ti\ xR 1� k ti 6' E. IY. (Avffl".. LAC) ° \� .4.7. 0 \\ x x1 x1k \ . x 5x ��Ix yk. kti 0 0. A. x� x� x �6 tiky x k � o 4,1 1 k 511' E M A ybr X. LG1^ � 1 k k L.n3• T .8 — \. ^µ 11' E W. (APPlft2i: LAC —T'T � ygx�ky0 ��x�k�j1 ,��jgxoiyl tik �, 'x vf.. x x TBM ELEV. = CONTROL POINT P.K_WI-L -- -------- N = 427,823.88 T0.& -F�j• M1� a+ 6 f.� E = 2,629,426.65 Q1 19 F�k• 6 ELEV. = 24.05 1k' �1x1 x x1k� k\1 x 1k�1 x01 �k\ ° x x�k. C o. kpti PA � k x �k"J �kb x x x h NEW BER r a a 0 N r N N Z 0 N o a D zg cc o � a � m � Cn N p 'H�P.kt Pb'N7 Mr AS, PIGRtN CARDUM NAIRAC 2 1 VICINITY MAP NOT TO SCALE 1 9 k C SEAL tik' g _ gf lba bflC Pbl114rg • 1OMKVC2 dCINlGINR GRASS— k x x M • bra • f�k• -_118�— George Finch I Bonet' and Associates, P.A. 309 North Boylan F 'L M1M1pe \ \Y1 �• \`\ O �� k\ xfik� Y ` r l �L - _-'•! Raleigh, NC 27606-1402e C-1568 1• 15 '�' M1'6•M ^ g k\ k5 k6 ,aA• x� 6 �kryV ll ►-141 E1b J Post Office Box 10472 ^ \." • YVkr ` ^• \ xt� T .., Raleigh. NC 276050472 -n ' J V Y O Y l`• 0 T 9191833-1212 a 1 y \ \ kp x \ (Ik I F 919183CI203 ((��xj^y,.D" O ® �kO 0 l• 0 " • J \ k� n� x 1 \ 1�• t1•y. ME No 0 Y CONTRO POI 6 — • — — — 6 D �k. • �k0 x Y �knJ �k19 I1 wvwam o P.K.S \ 31i 1\ v N ..q f \ x a> i02, 29.6 \ \ 0 \k 9 1�' 1 ' k j IN carivml NFAc = 22. t ti • .�• x��j• kh �1k • � � 0 �Ir y11b �31 �y9 61` k\� ' FINAL DESIGN NC oGK SIVIN W m ME x "� S 1 91 I DES DRW cNtc 1ti6 \`M1M1' \r a 1\ bg ti ' ti 3� ti� ti�-_ _ GA__ k9\\j�T�, Fyn �3 gS xti x .a., .e PRWECT MAXIM 'lx yR1 \F 1�yCHU ENG/ARCH KEVIN M. K/WE x1 �6 x\ ! 4`1. � \ tik� ��• �' , tip` z Z B x 'l h� 3 SITE AREA MAP o s z tit 6 1\ PA�kNT 1�' tip'L A NOT TO SCALE ° p j \ �0 11�\R\' ti� 1y tik6� S. ti��1 ,yak W \• �5 0 1e \ \• g' �oe 1 Aa &A?#VW SIRvo x1�, �k� x x �yhx z J_ ti y ti 11 x1k rp ti 6 3kti ,yg`� N U ��•� ry\ \ 1 �k\ y tip' 1�' 1 ��j• S W N\ O 17 f� ti�i O caw �,� � g _U 180E S�— Z o ti' ti ^ ti 01 S 0 ti 3 \ 19 0 Og \ 'v 90 \p� ti9 g [- III+ p ,yg. q11 x gk ,�01 ti x b�' 50 W O Q 11• \0 o� 15 • \ ' LDGE A� W 76 ,y1. \ I I� 1ti' ti ' 'l ' g U g \g \ \Cp. \e \� 9� \� C `' / ' // SURVEY NOTES:Cr z 1. TOPOGRAPHIC SURVEY PREPARED BY C. ALLAN BAMFORTH, JR., Z oz X \00 CCT4 1�� �g\� 1 I �■ 1'�' ENGINEER -SURVEYOR LTD., DATED APRIL, 2009. ti ~�� \ (�� .96,amLff PROVIDED BY OWNER Q 2 W 2. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT W ,,pp x II ' ti 1 GUARANTEED BY THIS SURVEY. UTILITIES SHOWN ARE BASED _� T \ 1J 1B 1 1 \� �O I III �y'6' `1�R1 tit ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY = ¢ It 1111\ I II "q�\l� �1B'E_ ^, PLANS. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION V r O a 1�\ �o�+ o t \\\ \ �6 I H y �— 41 V 1k OF ALL UTILITIES PRIOR TO CONSTRUCTION. o o a A g�,\1V y\ �j 11 11 1 3. ELEVATIONS ARE IN FEET AND REFER TO NORTH AMERICAN ! U • * ti \�\ N p \ ,�1� II F ti� F�� VERTICAL DATUM (NAVD) 1988 AND ARE BASED ON CHERRY h1 w g' O 1 1 \rp \\• 11• • k ti POINT CONTROL STATION 12-93 HORIZONTAL. z i O •tts/ \, 11,tt+�01 #� \� \9 A A. SQ ��_-15'ES O M1�1° 4. TEMPORARY BENCHMARK (TBM) IS P.K. NAIL (#1) C GJ $ + O \6 \� • E —� -`-AS INDICATED, ELEV. = 24.05 \ 3f 'T \3 \ \9`y ,y1. 1ti d7 0 M1S' 1 _ 30 •, f. �o� ��ti ti\� f5'� O5. HERE ARE NO WETLANDS PRESENT ON THIS SITE. — ' EPROJEGT Ni 529348 g \' ' CONSTR. CONTR. NO. 0 1\O t�n 1g 41 \ g\k 8'' x ( N40085-10-C-5319 4B 0 \ 1k NAVFAC DRAWING NO. Oil�, �SHM 14 580F 97 C-101 30 0 30 60 EXISTING STORM SEWER SCHEDULE EXISTING SANITARY SEWER SCHEDULE LEGEND: &ww (EJ O1 E, C.B. 25 F.E.S. 18' 18.78 O E. C.B. R/M = 12.45 O1 E, sw.. AOl. ® E Sw MN. RAW = 23,62 R/M = 22.2.9 SPOT ELEVATION Xti"y �1 h/ fiW = 2.110 kW. = 8' = 16.49 2 11 /NV. = %A NW. 18' (AW), = 19.96 AW. 6' (AE) = 19.06 AV (SW) qG 16 F.E.S. AW. 24' (NW) = 19.40 AW. 18" (NE) = 19.26 AW 6' (NW) = 1868 AW 8' (NE) = 15.90 AW 6' (SEJ = 18.61 /NY 8' (SEJ = J5.75 TOP OF CURB ELEVATION SCALE IN FEET OCaW, hV#L AW 18' = 19.57 AW 12' = I&W A O E. C.B. ZO E. S4A! A0L 5Q E. S9N A6! TOP OF WALL (TW) ELEVATION Oam NAw ?7 PPE ENO AW. 12' = 18.48 RAW = 22.67 AW 15' (SE) = 20.39 RM1 = 22.94 RAW = 2202 Ala. 8' (SW) = 1681 AW. 8' (NWJ = 1659 #W. 18= 19.55 AW, 8' (NW) = 1659 AW 8' (SW = 16..55 - - AW. 8' (SE) = 16.54 AW. 8' = 15.77 BITUMINOUS PAVEMENT 18 PIPE EAD O E. C.B. 4OP/PE EJWJ AW. 12' = 1841 AW = 21.81 INK 12' = 22.04 INV 15' (NW) = 19.80 0 E. sw MN. BUILDING (BLDG.) OP/PE ENO fiW = 22.88 AW. 8' ft = 1671 O P6'E END AW, 12' = 17V O E. C.B, AW 8' (.Si) = J6.64 INV. 12' = 22.00 RIM = 22.51 BUSH AV 15' (NW) = 21205 6 O APE DW O PFE AW. 1�= 1d34 /NK 24 (NW) = 19. If EXISTING ELECTRIC /TELEPHONE SCHEDULE CENTERLINE OF DITCH/swALE AW 15'= 20.96 AV 24'(SE) = 19.01 OFE.S 31 Ph9E ENO AW. 12' = 1784 47 E. C.O. ® E EZEC AW.. CONCRETE (CONC.) CANG AW. 15' = 20,67 RM/ = 2279 RAW = 23.05 AW. 24' (SW) = 19.08 O aWC hV#L O PACE END AW. 18' = 17.81 INK 24' (SE) - 19.01 m E. a& A& m E EZEC. MN, CONTOUR ------ 22------ AYV. 11' = 20.45 O RAW = 22.40 AW = 23.13 9 O COAL NOWL O pff / 1Do f7.79 F.E.S. AW /5' = 19.23 FENCE X AW. 1? = 19.94 Oo OE. C,8. FES. AW. 15' = 19.15 POST ° 10 '""' = 2'" VK (NIYJ = 5. = 2°`" 19.5 hW. 15 0 O E. C.B. EXISTING STRUCTURE SCHEDULE v SIGN AW. 15' (SE) = 19.48 RIM = 22.52 11 P/PE END 1AN. 6'tj): = 19.80 #VV 15' = X..94 O E. C.B. INV 15 (NW) = 19.34 IM! 15' (Z) = 19.29 © E A17L Can ® E hO7L CW TEMPORARY BENCH MARK (TBM) TBM R/AI = 22.65 RN = 22.42 RAJ = 22.84 11 Fhcr END 1NK 15 (Sr) = 19.42 1M! 12' = 22.15 AW, 15' (NW) = 19.J8 0 EA11L . Clot � E. A0L cm. TOP OF BANK (T.O.B.) T.O6I - Rdl = 22..48 RAW = 2.E26 13 IV 1W. O E. C.& 6 /M! = 2 RAW = ??.10 11W 6' s = 20.23 1 0 E c14z ® E All C TREE ° bW 15 (�J = 19.33 1rM = ?1.20 R/Al = 23.50 14 MPE END /AW. 15' (SW) = 19.31 OVERHEAD (OH.) LINEE ° [ACE XV f8' = 20.18 © E A07L CW. 37 E. C8 RAY = 22.10 f5 PPE END RIM = 22.00 SANITARY (SAN.) SEWER 8*,E SW./AV 18" = 19.82 AW 4'ISE) = 19.31 AVK 15 (A4) = 19.41 16 E7WI AW 15' (5W) = 19,19 STORM (S.) SEWER _ _110f. S_ AW. 18' = 20.W O E. CR " fiW = 2455 19. 9 UNDERGROUND COMMUNICATIONS � JDw 19.68 � f5' (�) = SURVEY CONTROL POINTS IS PIPE END 39 E. c.Ez UNDERGROUND ELECTRIC lA& t2EC CONTROL POINT #1 CONTROL POINT #6 AW 18' = 19.44 flGl = 2&07 AVK 4" (AWJ = 21.37 P.K. NAIL P.K. NAIL INK 6' (Aff) = 21.22 N = 427,823.88 N = 427,580.33 UNDERGROUND STEAM 019 SKEW 19 1YPE END lNK 6' fNwJ = 1075 E = 2,629,426.65 E = 2,629,094.26 AW.. 18' = 193d AW. 15 (SW) = M55 ELEV. = 24.05 ELEV. = 22.11 WATER (W.) MAIN 8'E W (APPAM tOC) OCONC HD& O E. OR INK 18' = 18.95 A351 = 22.45 INK 18' (NE) = 19.91 CATCH BASIN (C.B.) ElAW 18' (SW) = 19.87 21 D COX IA9 X AW. 18' = 18.86 4f O E C8 FIRE HYDRANT (F.H.) OE. C.D. RAW = 21,32 AW. 18' (AfJ = 19.68 RAW = 2L67 AW 18' (5W) = 19.57 GUY WIRE F--- AW, 2'ISW) = 2441 AW 12 (A6) = 20.21 42 E. C.B. Tw = 22.85 LIGHT POLE & 23 q� CM.. hV#L AW 6'rAE) = 20.55 AW. 12' = 19.28 AW. 18 (W) = 26!39 MANHOLE (MH.) O E. A6i. 24 E. CR MY = 2Z71 AW. 18' (SF)= 18.81 TRANSFORMER AVK 18' (SW) = 18..80 UTILITY POLE r UTILITY POLE W/ LIGHT rt-Q WATER VALVE (W.V.) APPROXIMATE SURVEY NOTES: COMMUNICATIONS 1. TOPOGRAPHIC SURVEY PREPARED BY C. ALLAN BAMFORTH, JR., COVER (CVR.) CtR ENGINEER -SURVEYOR LTD., DATED APRIL, 2009. PROVIDED BY OWNER 2. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT INNACESSIBLE %A GUARANTEED BY THIS SURVEY. UTILITIES SHOWN ARE BASED ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY SHALL FIELD THE LOCATION INVERT 1NV, OF ALL UTiLITIESS PRIOROTO CONSTRUCTION.RIFY 3. ELEVATIONS ARE IN FEET AND REFER TO NORTH AMERICAN VERTICAL DATUM (NAVD) 1988 AND ARE BASED ON CHERRY LOCATION POINT CONTROL STATION 12-93 HORIZONTAL. 4. TEMPORARY BENCHMARK (TBM) IS P.K. NAIL (#1) METAL (MT-) 0L AS INDICATED, ELEV. = 24.05 STRUCTURE 59Gi/M N 0 0 N � w r O N Z 0 0 w � w 0 W a z O VV) G Z a m m N p 1731 la dnlanning • Iandscanearchft ct. emlengineang • iendwFv yhg Gearge Flinch I Barley and Au°d dm, P.A. 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 9191833-1212 F 9191834-3203 wo �yl �ld� ]X•�ePi SIMIREmRr TO WE DES I ORW ICHK PROTECT Ill BRANCH MANAM CHEF MG/ARM KEVIN M. KANE 0 5 U Z 0 CSC U z ? z a w w > O CE J z W U aU LL w J J <Z D U_ o � a 2 w = o W U ILL O Q LL t= Z U) p 0 O U) W CU z r ¢ d- (� T F- 0 0 (n X w W w Z a o $ g SCALE: 1 = 30 EPROIECT NO.: 529348 CONSTR. CONTR. NO. N40085-10-C-5319 NAVFAC DRAVANG NO. 12580826 SHEET 5 OF 97 I C 0 8 C-102 C C Fr 0 30 0 30 60 N go „ /i vv l Il SIREE x k x x x s x Y x _ TOB - _ ----- :F.'.'..'. .'.'.� e� NONTROL POINT x x TBM LEI .K. NAIL - --------------/--- ---- — 427,803.88 \ —------- ioa-- - — - — Toe —.— ............65 24.05 k .... ... --- L . 7 T ` ...................... .. \ ...... REMOVE EX. FIR HYDRANT. PORTION \ z } ro;� OF WATERLINE I TO BE ABANDONED: �x6E. Y/ (AP LITIM LOCH REMOVE EXISTING SEE SHEET C- 6. x'.'.'.'.'.'.'.'.'.'.'. SITE DE x BRICK BL Qt3 ®i/ \ sT 1tELL REMOVE EXISTIN ............................ STRUCTURE \� \ x \\ �Po L� ��> ..... ABANDON EX. WELL jo, \V < .... ....... o ............. 3. \ ,Z ...-.... x \ r x a> \\\ 14 TREE TO BE \ Q REMOVED (TYP) REMOVE EX. WALL \\p \\ (1r`� vJ /, \ �9 CON RO1 POI 6 P.K_ N48_ ..'.........''''''''''''':.'.'.. ''.'. N -- 427,580.33 1 REMOVE EXISTING .... ......... 6329,094.26 ::. \ PAVEMENT TYP) (::.'.::'.:..:: :.::.:. �PAYEMENr- .........'.' X \; \ ..'.'....... '.'.'..'. REMOVE EX. POST ....\:........:..�.............. ................ _ C frt9„ ..:. \6,"c .'.'. '•. '.'...!.... .. -- ............. ........... REMOVE EX. wx ........ ........................� \ x. ..............\.. .�..' \ ..... J91 N� REMOVE EXISTING LNI p'<1\\ oo \ o x ' �. ti . 11 REMOVE EX. .:.::... :::. ❑ ®� \9 \T g II" G41GYN0I�9V $%lPi/rI (� �• � 1 4"E� ® CONC. i �. \ 24 27 47 I ' 8 —12' E S. �� -` I I {' � � tttttt______JJJJJJ______ > _ x T \ � `e19 x o 25 ,4,r\ T-- ���F, II"" x \ / I In CPA NT o k (-PA7EMENT��I� x \� \�. �o '" PAY£ Nr---�..� `\ 14a ` 6 "(� ✓ ,— `96- CHAIN LINK FFNC�y�` � �_ B f J \ x II v h x v E. \ \ \ \ 11�b� C4) 9 o a \Q�o \ -- 31�'j \ \\ \ 37 15� s� (✓ 22 �9, 8 BR/CY, RET. VIAL l� SCALE IN FEET MOLITION NOTE O O N N r Z O 0 W � a z Z W D < Z 0 F Z O F < m U � o CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING UNDERGROUND UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR OR REPLACE ANY DAMAGES TO EXISTING UTILITIES. PRIOR TO DEMOLITION, ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AS SHOWN ON SHEET C-205. ONLY DISTURB AREAS NECESSARY FOR INSTALLATION OF SAID MEASURES. DEPTH OF EXISTING UNDERGROUND STEAM LINE (ABANDONED) `„11IJJJ1Jt,, IS UNKNOWN. REMOVE AS NECESSARY FOR NEW CONSTRUCTION `,` `� CAl>'0�'', — W — �, 375 °''�M;JJ1111s� gf lba lanai—ning • lanascacearchitect di i.ginamig • II George Finch I Soney and Assoclates, P.A. 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post °nice Box 10472 Raleigh, NC 27605-0472 T 9191833-1212 P 91918343203 FOR CMUVM MUM Awn FINAL DESIGN SQg/cm m WE DEs DHW I DRw DHW CNtc GMF PROJECT MANM,FR BRANCH MANAGER cHU BC/ARCH KEVIN M. KANE i U Z 0 U o h Z z O Z ck: < w J W U V W Z g P: < Z W J a- < Uz Z Q = O_ o W L- > J U W :2 LLJ V- Q z z '\^ C0 Ld O W Q C t 1- 0 z � w z << inZ M SCALE: 1 = 30 EPROJECT NO.: 529348 CONSTR. CONTR. NO. N40085-10-C-5319 NAVFAC DRAWING NO. 12580827 SHEET 6 OF 97 C-201 IN 0 I C 1� 14 I I I PAINT D F ° STREET E. OH. LINE to T.OB. --- T9..e. roa M IIJVIYf\ 1 II f1LLJ AND GATES 30 0 30 60 SCALE IN FEET GENERAL SITE NOTES 1. SIDEWALK ADJACENT TO PAVED SURFACES SHALL BE 6' WIDE. ALL OTHER SIDEWALK SHALL BE 4' WIDE 2. 30" CURB AND GUTTER SHALL BE 4000 PSI CONCRETE WITH 3' CURB TAPERS AT ENDS. 3. UNLESS OTHERWISE NOTED ALL WORK SHALL BE IN ACCORDANCE WITH THE "PROJECT PROGRAM" AND ANY ADDITIONAL REFERENCED STANDARDS AND SPECIFICATIONS. 4. SEE SHEET C-305 FOR CONCRETE PAVEMENT JOINTING DIAGRAM. 5. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND GRADES AND REPORT ANY DISCREPANCIES TO THE LANDSCAPE 1 2 ARCHITECT FOR ADJUSTMENTS 302 C-302 6. ALL DIMENSIONS AND STAKING POINTS TO BACK OF CURB UNLESS OTHERWISE NOTED. 7. CONTRACTOR SHALL AT ALL TIMES MAINTAIN ADEQUATE 0),SAFETY MEASURES, ACTIVITIES AND BARRICADES FOR THE PROTECTION OF ALL PERSONS ON OR ABOUT THE LOCATION OF THE SITE• ALL CONSTRUCTION OPERATIONS SHALL BE IN ACCORDANCE WITH THE APPLICABLE REGULATIONS OF THE OCCUPATIONAL SAFETY AND HEALTH DIVISION OF THE NORTH CAROLINA DEPARTMENT OF LABOR. COPIES OF THE APPLICABLE REGULATIONS MAY BE OBTAINED FROM THE NORTH CAROLINA DEPARTMENT OF LABOR OCCUPATIONAL HEALTH AND SAFETY DIVISION, 413 N. SALISBURY STREET, RALEIGH NC. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN, INSTALLATION AND MAINTENANCE OF ADEQUATE SHORING AND BRACING IN ALL TRENCHES AND EXCAVATIONS THAT ARE A PART OF THE CONSTRUCTION OPERATIONS OF THIS PROJECT, AND THE PROTECTION OF ALL PERSONS AND PROPERTY ON OR ABOUT THE CONSTRUCTION SITE. 8. CONTRACTOR SHALL DELINEATE PARKING SPACES, DIRECTIONAL ARROWS, LANE MARKINGS, 'STOP" MESSAGES, ETC. AS SHOWN ON THE PLANS WITH TRAFFIC MARKING PAINT ACCORDING TO THE MANUFACTURES SPECIFICATIONS. USE WHITE COLOR. 9. CONTRACTOR SHALL INSTALL SIGNS AS PER THE NORTH CAROLINA STATE BUILDING CODE FOR ALL HANDICAP CPAlENEN. PARKING SPACES NOTED ON THE PLANS 10. ALL PERMITS RELATNE TO THIS PROJECT SHALL BE OBTAINED PRIOR TO BEGINNING ANY CONSTRUCTION. 11. NO WETLANDS OR FEMA FLOOD BOUNDARIES EXIST ON THIS PROJECT. PAVEMENT KEY CONCRETE PAVEMENT DETAIL 9/C-301 BITUMINOUS CONCRETE PAVEMENT LIGHT DUN SECTION DETAIL 16/C-301 BITUMINOUS CONCRETE PAVEMENT HEAVY DUTY SECTION DETAIL 16/C-301 a 0 0 N a\i N �22 p Z 0 In & N � a z f o 0 z o K < m U N p CAR�I'� = 375 -,M F1; \V SFAIL I rdplanning • Iond,capeurcNtectum ,ene�ee�a • land,.reirg George Pinch I Banay and Assoalates, P.A. 309 North Bohan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 9191833-1212 F 9191834-3203 FOR OM1l MAX FINAL DESIGN SMACMm WE Dips DHWIDRw DHW CHK PROJECT MANAM BRANCH MANAGER a,iff EM/ARM KEVIN M. z z v Z z g_ O o: W = � z z Uj 2 J W �r<i " U E J Q 1L J z g a _U 2 o w w�•yr Q Ll_ Ct a U- z z � o a � i w W Q 't F- N C T 1 IL o a w z SCALE: 1 " = 30' EPROJECT NO.: 5293M CONSTR. CONTR. NO. N40085-10-C-5319 NAVFAC DRAWING NO. 12580828 SHEEP 7 OF 97 C-202 z a_ z Y Q V w u 14 0 0 T O..8. _ E OH LINE E.OH_. LNE _ T.O.B -___- -- j -- TDB--- ---'� - - i- - --- / ------ -- - 0 — o ..- — T.o.9 -- �r.o.e —_ \._ - -- - ro.o 4 — -- ---- - - - -- AINT d_.1..0..9.— b F " STREET \ r '/1- (I 3.2' BERM SEE CROSS SECTION: THIS SHEET A /------- --------- - -WHITE PAIN, TOR _ D1 '�-�-------- - -- ------------------ _ _ - - - -- 1 EX. DITCH108 o \ / 3 SITE WALL: • FOR ATFP I • 3 8" BOLLARD (TYP) n .l 1 C-3033 C 19 0 �f ' x r©RICK ' STANDOFF BLo 82 DISTANCE \ I 10 \\ \ \ O00 w \ \ N� • � C x� ` I °J I P-141 EMS/FIRE VEHICLE FACILITY 8" BOLLARD (TYP) 30 0 30 60 SCALE IN FEET 3' 25•p6 2•s — WALK 18" RAISED CURB 14 SECTION A —A C N.T.S. 15 WHEEL STOP (TYP) I \ \ \ \I C-301 L\ \ \�\ \ \ \` \— — • 8" BOLLARD FOR r3 ATFP SPACED c-303 \ \ _ __ _ • AT 4' OC r 18 RAISED CURB / I! • \\✓ F� \ \ \ \\ \ \ . ANTI -VEHICULAR DITCH \ • STANDARD 36' THIS SHEET �D iS�\N\ SEE CROSS SECTION: �scJ \ \ / lST NC�OF------- XX,_' \ \ 1 I 9gAP \T� \ \\ / 11 x B ail �r II a _020 z �PA. �E �Nr_ \\ n \ � I SHEET _ \PAS NT- PA �96" CHAIN L FINISH —GRADE FINISH jGWE ATFP STANDARD ANTI -VEHICULAR DITCH PROFILE WITH MAXIMUM INCLINE SLOPE NOT REQUIRING STABILIZATION SECTION B—B N.T.S. FINISH 25 2.5• GRADE S�OpE SECTION C—C N.T.S. NOTE: -CROSS SECTIONS SHOWN ARE REPRESENTATIVE. ACTUAL BERM HEIGHT AND DITCH DEPT MAY VARY. SEE GRADING PLANS FOR FINISH GRADES. N 0 N r a 0 0 o: F w � o a jr m D z o 0 0 0 a m V, N p �� CAR Z 375 ��,ttittt Ilt �` \ SriAL gflba 7 land plannn0 • landreope arcM1ikclue ciWl mginee�inB • land sur.�ha Geary" Finch I Battey and Associates, P.& 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 91918331212 F 9191834-3203 MR CpBv10ER K IFAC ACM FINAL DESIGN DO DHW ORDHW (;K GN PRIXIM M4 IAM mkwm Offf EM/ARM KEVIN M. Kp o U Z 0 F- z Z o ` w > `Jr- Z Lr W " U ::i W z _ Z zg v g Q = o W n > U W Q IIr fLLI - z Z Ln o � i W Q� W Q d- F_ to T o n- W z o� SCAM 1 " = 30' EPRWECT NO.: 529348 CONM. CONM. NO. N40085-10-C-5319 MWAC WAwiNG NO. 12580829 Sim 8 OF 97 C-203 0 0 w I \ / I C .A 3.75 / 3.75 x� x 1�x a� AI). . t�N WHITE PAINT x v t i 1 4.90 1 1 tik6 1 24.95 1 I 80 1 25 25 1 1 I 1 tia f i I I 24.9 1 1 1 1 tia I 051 R. ,gyp titi� 30 O 0 30 60 SCALE IN FEET 4� x GRADING NOTES 1. UNLESS OTHERWISE NOTED ALL WORK SHALL BE IN ACCORDANCE WITH THE "PROJECT PROGRAM" AND ANY ADDITIONAL REFERENCED STANDARDS AND SPECIFICATIONS. 2. FINISH GRADE WITHIN BIO-RETENTION CELL AREAS SHALL BE UNIFORM p3. TOPOGRAPHIC SURVEY PREPARED BY C. ALLAN BAMFORTH, JR., ' ENGINEER -SURVEYOR LTD., DATED APRIL, 2009. x PROVIDED BY OWNER 4. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT GUARANTEED BY THIS SURVEY. UTILITIES SHOWN ARE BASED ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY PLANS. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION. C r•9 o c y ¢"E p a a 0 N � N rQQ O Z O 0 C w o a w Z WO o � o 0 G rL m N o NAVFAC CA pwuunq o 375 =, 'y F``,i E ya Iona planting • landscape achitecture civil engineefing land surv,mg George Finch I Roney and Associates, P.A. 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 27605-0472 T 919I833-1212 F 9t9I834-3203 �f0 LOW CMIM l Warn JCMM FINAL DESIGN S1110N 0M' TO DUE DES DHW IDRWDHW ICHK GMF PROJECT NPNAGER BRhNCH WFNAAGER CHIEF ENG/ARCN KFVIN M KANF Z z U z 0 U � Z Z � r w Lj w U U to E � LL Z UJI _I F- o W z C) W p cr Q ry '< V Z z //��� VJ O V) W Q� Z w Qf d T d, ~ N a- T O d- r Z a SCALE: 1 " = 30, Ef'ROJECT NO.: 529348 CONSM CONfR. NO. N40085-10—C-5319 NAVFAC DRAWING NO, 12580830 SHEET 9 OF 97 I C 09 rA C-204 30 0 30 G T� ub ti g �� Q `la � 1G ti ��� 1 T. I `6 n11 y 1� O 9 ,��. /yb �� \ . Q E. CH L/NF T 10 t 110 E ov N TOR 60 N q k -xn J' D x c=-==- '�---- __ JT.Gy. _ .U-- J� _--__- - _ �__ '-_-_- _ ---]B • --� --__ b" I rn Ai ,• � • ��� �-- 1G , � a ------ tip. � �-- -- --- --->� -'�,,� � - -----�------�----�-----^-�---1.- g -- -- - --Q�-- --�- y � z ��' 0 ` 6 ZG 3, a) o nj. 1 ��' yh kd Tg n y ���1 �h �y1 1k'g AFTER REMOVA 5' ��X. ASPHALT 1f l ti 1 G ti 1 6 1 ti 5� &� k' k� I TALLA N W CURB A R o h 1 ti� u n tik' G'ti ti; ti L x x xl x° x SIRE S x xy 4x HEADWALL TYP ��� L x x 4 CONSTRUQf6N ENTRANCE EXTEND SILT FENCE AS SHOWN TO SCALE IN FEET PIPE INLET PROTECTION TFjB) 1^6 h� 9� -302 �. _ 1 9 �9 C-30 k0 ` SIDE OF CONSTRUCTIOt�y/�N1NCE w �� 8 �� b ------------- ----- SILT FENCE o a -. ------ - --- -- - --A --------- -- e - - - - - - "' i- D TREE PROTECTION FENCE \ �L---rJ'-`--`�- ---- "`J f1. n1• f7 --W1-1'�- -�, n �i � ._'y�,'�',4 . �iv,.a ❑ w � zap •�' 1 `l- ® CHECK DAM 3 2' Li' ti' 4. p j' ry ,•',.' , ti ti TOR. - " h `)- • . ♦ •.. >• ' "a , x _ --x --x o 0 0 0 �•' B -- ° '��',*+;�;' ,• �1 5 °o°o° PIPE INLET PROTECTION in 1 TRM PROTECTION FEN ,E (TYP) IN R - 21.80 2 ti� 1 1 6�♦ 5 c-3o x / 1 112 LF 15+ RCP O 0.14X a` '"'S ` / ♦ x ti r a 3�* x 1- 1 / x STORM STRUCTURE INLET PROTECTION m b'. 5 ♦ xti CHECK DAM (TYP) 8 i 11 JUNC N BOX 7 I .y •>: / v, x `\ ♦ ti C-30 g T - 8 SHAPE FOR DRAINAGE ° NCDENR-DWQ - Construction Sequence \ ♦ c-30 0 1 2 INVERT IN=21.96 A LIMITS OF DISTURBANCE 95 r TO BIO-RETENTION rE = 1) Obtain letter of approval from N.C. Department of Environmental ^�h ,♦ n ♦ n ! y gyp, a INVERT OUT=21.�6 shy T 1 0 A and Natural Resources, Division of Land Resources, Land Quality ® \�� 0 \ ♦ x . c < �a a. Lk. �• k' x x ha x Section certifying approval of the Erosion and Sediment Control Plan ♦ n y^ dRECK BCO x 1� x x x xti x 111 submitted by the Owner's representative for the project. ♦ tip' 5 2S UNDE DRAIN TH „ 17 �qv o ♦ / ♦ '-� / 2) Notify the N.C. Department of Environmental and Natural 3 (/� 1� �\ \ , ♦ Y1YE[L 9� �E CLEAN OUTS ( C-30 �h� 0 Resources, Division of Land Resources prior to beginning any land \ ^�p' \ ♦ LIMITS OF DISTURBANCE / 26 x x disturbing activities. A pre -construction conference may be required xlpl \\ \ (� ♦� AREA = 3.9 AC BIO-RETENTION CELL 1 1 x when deemed necessary by the representative of the Land Quality 1 \ / Division a N ✓�, 'S� \ / �\ • ti ti WITH UNDER DRAINS C-3o \�k� 3) Prior to demolition or construction, contractor shall install all n� , \` 9 �� l �� \� \ s „' tk� 5 �(tl�� x i�EDIMENT TRAP WITH 5 tree protection, silt fence, construction entrance and check dams \\ of hk j I ��. h� r'� Q DEWATERING D CE C-30 shown on this drawing. Install stormwater structures #1 through #5 NAMFAC o x I 1 x x nk5 ti' OTTOM = 22. 0 and associated stormwater pipe, connect to existing stormwater x x a structure north of the exist. retention pond as shown. Clear only 00 %9 1 S OR D INAGE x \ \ 1 //� those areas necessary for the installation of the stormwater system p,a+,rnq. SILT CE ) TO . N CELL \\ ti BIO RETENTION CELL 1 1 components. At Structure YI#1 through Y!#4 excavate the area �o�C� �A ''o,, sa \\ o C-30 ♦ ` tik �` 3 WITH UNDER Q AINS C-30 required for sediment control in area shown, see calculations, this h ♦ � �y F.F.E. 26.33 1g+ l x sheet. Excavate a minimum 24" below the inlet elevation of noted°,. �pN�Scgp♦2% n. 0 l ♦ 7 UNDE D AIN WITH YARD IN T 1 k * a 9•�9? \� TOP=24 YARD INLET 2 6 `1 structure. Attach skimmer (detail 5/C-301) to the structures, at 1 \ 30 G EAN 0 TS (TYP) I ro -141 EMS FIRE VEHICLE �ACI�ITY x O• TOP=24.50 C-30 excavated grade. Contractor shall install a silt fence outlet in low e�::0� 0/0 v INLET=24.10 N =: � ��' � ♦ �' S IN ET lying areas per detail 7/C-301. Adjustments and modifications of 1 ti 9 IN = 0.5 h x 1 \ \ ♦ / 4• Oj,' erosion control measures may be required for unforeseen field ,P,*b ti;•1 1� O r ti 'I.' a INVERT IN=20.10 , x na SHAPE F RAINAGE conditions, however, all relocations or modifications shall have the •. (i'F'4.a...sa•G 91 \ ♦ \�o �h x x NTI CELL r PRIOR approval of the Landscape Architect and the Erosion Control 4M• FVNaaa � Inspector. \l qG ��h \ �l• ♦ \\\\ N �k) ° L i SEDI ° RAP WITH 5 4) Proceed with grading and installation of utilities and additional SEAL \ 1 \ \ \ x �k' DEWATE VG DEVICE C-30 storm drainage. As fill is placed maintain functional integrity of gf ba \l \\, ♦ \9 ° x 21.75 J - diversion swales to convey runoff to sediment basin. vW m n° w d °Pe °rch4e we 26 ° 11�• t ci lenpF,enkg land surreyirg 0 1•���\ I I 5) Inspect all erosion control measures each week and after each c 66 \ BIO-RETENTION CELL 4 1 k George Finch I Boney and Auoclates. P.A. r Gtil \ \ 1 ti rainfall event over 0.5'. Provide required maintenance on all erosion 309 North Boylan Avenue C-1568 0 ♦ WITH Uf4DER DRAINS 6 C-� 0. x 2S I NiO� control measures and repair an damaged or weakened segments. Raleigh, NC 276D61402 titi' n 9 n 1 ^k. k. 1 ti P Y 9 9 \�^ ♦ �' y 1 j x / �"� Clean out sediment basins when accumulated sediment reaches Post Office Box 10472 h`9x� \\ To x x YARD INLET 4 6 x`l / I I one-half of the design capacity. Restore basins to original design Raleigh, NC 27605-0472 ca acit �n TOP=24.25 C-3o 1 I P Y• T 9191833-1212 o . 1l' Oxa� `\ h IN T=23.50 ° ` 0 99 �k' 6) For temporary erosion control purposes areas shall be needed F9791834-3zo3 TJ RT OUT=19.35 25 5 ® I ��' within 21 calendar days on slopes and 15 working days, or 30 �9 r 16 �♦ O 5 b� x �9 calendar days for other areas, in accordance with NCDENR A/cwo _ regulations/requirements. 1PPp�p ti ' ` 5 ♦ ♦ 0 1• -S I;M II f TRAP 4 WITH 5 I SHAPE FOR DRAINA ti `\ �o0 1 ° \ titi�q ♦ I - TO.. WELLS FOR HEAT PUMP 1/ x 24 T01'BIO-RETENT�N CEL4 7 Maintain soil erosion control measures until g 2 D WATERING DEVICE C-30 -") ) permanent round so 1G �ti5 11♦ \ B TTOM 1.50 ° SYSTEM LOCATED WITHIN x� �5• �� cover is established. p \ ♦ 2� - 0 ° THIS AREA. SEE PM&E k Ax' x x \x �� 1 YARD fNLET� \ LAN h x DRAWI S �i 0 I lk 8) Upon stabilization of the site and contractor staging and FOR aaBwatx Ngf/D .: � 2x � Q, � lay -down areas, contact engineer or N.C. Department of Environmental wtBm C� C 0 TOP=22.80 ♦ 1. `\ R SILT FEN x �' x 24 0�I �R and Natural Resources, Division of Land Resources, Land Quality n. INLET=22. 5 ♦ ` TO ALLOW CONSTRUCTIO ° 60 x Section, Regional Office to determine site stability prior to removing FINAL DESIGN \ ° NAIO-RETENTION CELL 5 1 x RT /� 11�y ♦ ��= OF PAVING �6 I I 1 temporary erosion and sediment control measures. When approved, c \ 1�0 \\F 1G ��y ♦` F� ° U ER DRAINS C-30 x �1. ka 1 �9 remove all temporary erosion and sediment control measures, sv M WE "9q sA ` 23 ° 5 SEDIMENT TRAP 3 WITH 1 y x� `� excluding sediment basins, and complete finish grading and sodding DES DHW �'DHW CHK GMF TEMPORARY SEEDING FOR EROSION CONTROL ° `t ° x1 ti� x of resulting bare areas. Sod placed on slopes greater then 3:1 shall \\ter \ �` �l' j�x,, ♦♦ 6"x8" RED CER ° C-30 DEWATERING DEVICE x Ni lix� � 6 be secured with wooden pegs as indicated in the specifications. s n " \ ° BOTTOM =21.00 x ^ Y INLET 3 6 1� c 1) Chisel composted areas and spread topsoil 3 inches deep over adverse soil _ k 8 HDP '1• , ° aD x ) aiU EM/I KEVIN M. KANE v / ♦ 6 TOP=24.25 C_30 9 Remove all sediment from sediment basins and excavate an 8 conditions, if available. 1'0 ♦ \ ? Zq additional 12" beyond sediment level. z 2 Rip the entire area to a 6-inch depth. � g. 2 \ x � � J '� INLET=23.50 Y B 33 Remove all loose rocks, roots, and other obstructions leaving surfaces reasonably smooth �� `� ♦ 1, n o U r ^' ♦ \ x INVERT IN=19.50 10) Complete bio-retention cells per detail 1 C-303, see z t and uniform. �< \ ` .\/\ 1 INLET \` x INVERT OUT=19.40 b� 5� specifications for additional information. / Z z 4) Apply agricultural lime, fertilizer, and superphosphate uniformly and mix with soil (see \� 01 ET=21.5Q - . 1 X le-, •, s S below). ti ♦ \ A x 11) When vegetation has become established, request final inspection o z ' 5) Continue tillage until a well pulverized, firm reasonably uniform seedbed is prepared 4-6 Gc 020 N = 19. ♦ 2� " , `\ ) 5 ECK DP M. 8 a Z 2 SIT FENCE (TYP) �� ( by Erosion Control Inspector. Obtain Letter of Compliance and submit 0 O inches deep. �� \ 11 RT A 1 ♦ 1 \ , x p C_� �k = to Landscape Architect and Owner (Environmental Affairs Deportment). z 6) Seed on a freshly prepared seedbed and cover seed lightly with seeding equipment or �� o N 0 IS ♦ \ b C-30 x I y 44i cultipack after seeding. '9AN -� a 5 9. ti5 0 x w 1 9 1' 1 x LIMITS OF ��. _ 1 �5x a * Construction phasing may be improved by the relocation of certain i _ 0- 7) Mulch immediately after seeding and anchor mulch. �t 1 <d 1 �t 1 `2" x ^� �, p 9 erosion control measures or the installation of additional measures. It c� < w 8 Inspect all seeded areas and make necessary repairs or reseeding within the planting season 4 1 RC�� `l, ♦ x\ AREA = 3.9 AC �' h< -303 `� -J 2 \ j, 00 x ( WI xUNPER DRAIIN �� is the intent of the Owner to limit the disturbed area wherever w �' U J $ if possible. If grass stand should be over 60% damaged, reestablish following original lime, -302 OX. H D 1. 00' 1 E fertilizer, and seeding rates. q� "3 x N WIN RT=19.1 + possible by flexibility with the erosion control measures as construction in > U 0 Of 9) Consult ConservationInspectoron maintenance treatment and fertilization after permanent L�1 - 18� qG \h° � I' \ "� �C-30 WITH INLET PROTECTION w� �---x____, tit progresses. All phasing proposals by Contractor shall be submitted to J Q cover is established. Q\ 1 �\ \ ~ t. I �11k 1q the Landscape Architect for approval with subsequent approval by the �,j� Z J ' Erosion Control Inspector if determined to be required. Contractor U + * Apply: Agricultural Limestone - 2 tons/acre (3 tons/acre in clay soils) \ ♦ 1 ,�� 0 c ® w: �1 ,, \ 14. j C 42) 0 shall provide, install, and maintain all measures necessary to complete ♦- W Fertilizer - 10-10-10 analysis ® 1000 Ibs/acre / (, ,� �,�. , ! r� n , D Z J 0 3 Superphosphate - 500 Ibs yacre of 20% analysis superphosphate \�.s ' ♦ 1 4 ' Ll� 'l CCNC--r ��' the work shown on these drawings. / Y�' 1 �� \ \., a ( l g Mulch - 2 tons (approx. 90 bales) small grain straw/acre ,. 0 . \ ,1� �"'� \ ` ` `, t -- _:_ _--. ---x ----'- --- Q' �� �I I�HN" 0 --- _ v z 4. p Anchor - Tack with asphalt emulsion ® 300 gals/acre or erosion control matting c / `\ ` �, % xn II )�l 0 !- � e n. \ v 6 0° ♦\ \ \ 1. n 0, `^ 2> 1�' EOGf CF WA TER � � F "Q� i I Q_ w � N Shoulders, Side Ditches, Slopes (Max. 3:1) l) \\\ \ �� \ - C 1 oe ti' w 9 ` 0 DATE TYPE RATE \ "b1g �c��_\\•\ \ "h ♦� , \ \\, _ August 15 - November 1 Fescue Mix* 300 Ibs/acre `"; ,, "; H - - ei u,J W f Lill November 1 - March 1 Fescue Mix* 300 Ibs/acre 6' \"C'\\ \ ., 1 1'' r- Q \ 1. Sri, F x 46 vq <^ PAF NJ ;� PAI7£,�Q�-� LL _ OR Winter Rye (grain) 125 Ibs/acre \\ / '3G�``, yf I �� .o \ .,r I. ''I,Q March 1 - April 15 Fescue Mix* 300 Ibs/acre \` 9? ` / 17 \ 0 \\ 9 _ II \� 5 n^I,. LL Z April 15 -July 15 Hulled Common Bermudagross 25 Ibs/acre \d / y�+, 1 0 0 18' Z 1 11 Q �. �_ The NPDES Construction permit re Z z g July 15 - August 15 Fescue Mix and 120 Ibs/acre o7 \ \ \ / 6g �9 ✓\ \of o ^1l F Sediment Trap/Inlet #1 Sediment TraR/Inlet #2 p quires erosion control devices and O (n Browntop Millet** 25 Ibs/acre \ �' n1 ti 1 \`- \ \\ 1 Drainage Area=.55 ac Drainage Area=.27 ac storm water outfalls be inspected weekly (every 7 calendar days) and i=Of - e' or Sorghum -Sudan Hybrids** 30 lbs/acre \ so\ / \ b -� 1 • 5 \o�, ! * * Q e g �s \ 2 l p ^ \� �' I, Required Storage=Area(ac) 1800 Required Storage=Area(ac) 1800 within 24 hrs of a 0.5" rain event. It will be the responsibility of F- C W Slopes (3:1 to 2:1) STORMWATER/EROSION CONTROL NOTES �� 1,' �-� �.,, �,• `\ \�-2 Q !I .55 as*,6DD=99D of .27 as*,6DD=486 cf the contractor to conduct these inspections and maintain records a N W Q \. �., Provided Storage= Provided Storage= until the area has stabilized, evident by 95% vegetative growth for z r March 1 -June 1 Kobe Lespedeza (scarified) 50 Ibs/acre \ \ ` s N ^ ,' F \ Surface Area Depth= Surface Area Depth= areas provided seeding. To facilitate rainfall monitoring, a rain gauge w Q and I- 9A ` , !' ^ oo \ 0 9 687*1.5=1030 cf 33741.5=505 cf is required to be on site. Additionally the contractor is responsible I=- N r March 1 Aril 15 add Fescue Mix* 120 Ibs acre 1. UNLESS OTHERWISE NOTED ALL WORK SHALL BE IN C \ : 19'' \ T ( - P ) / Trapping C a' March 1 - June 30 or add Weeping Lovegross 10 Ibs acre ACCORDANCE WITH THE "PROJECT PROGRAM" AND ANY \ a \ om \ PP g Efficiency Trapping Efficiency for conducting "self inspections" indicating the date BMPs are w i (March 1 -June 30) or add Common Hulled Bermuda 25 Ibs/acre ADDITIONAL REFERENCED STANDARDS AND SPECIFICATIONS. �, �`, �� \ \ ,15' \ \\ 9a l Run off = Q=CIA Run off=Q=CIA installed and stabilization measures (seeding/mulching or sod) are O a. 1 V initiated. The self inspection reports will be maintained along with ~ June 1 - September 1 Tall Fescue" and 120 Ibs acre .55*7.2*.40=1.58 cfs .27*7.2*.40=.77 cfs Ld U Browntop Millet 35 Ibs/acre 2. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE =1I L�J g \ , �(o `\ �, \ pi Required Area-Q 435=687 sf Required Area=Q 435=337 sf the "NPDES" inspection reports. Once stabilization has been 2 Z or Sorghum -Sudan Hybrids** 30 Ibs/acre THROUGH THE CONSTRUCTION ENTRANCE SHOWN.l �> \ 1 1 Provided Surface Area=916 sf Provided Surface Area=559 sf accomplished inspection records are to be forwarded to EAD and all a September 1 -March 1 Kobe Lespedeza 70 Ibs/acre i� �\ ` x\" G9 1 \ , Sediment Trap/Inlet #3 Sediment Trap/Inlet #4 temporary erosion/sedimentation control devices removed. A copy of c a (unhulled-unscarified) 3. FOR PERMANENT STABILIZATION, SITE SHALL BE SODDED WITH CENTIPEDE III {.7 n 1 Drainage Area=.47 ac Drainage Area=.33 ac the erosion and sediment control plan, letter of approval and NPDES and Tall Fescue 120 Ibs/acre SOD IN ACCORDANCE WITH THE SPECIFICATIONS. SEE SHEET L-101 FOR 5 \ '� �` * . construction ermit will me maintained b the contractor at the 1" = 30' + (November 1 - March 1) add Winter Rye (grain) 25 Ibs/acre E.� \ 4'\ 1 \ Required Storage=Area(ac) 1800 Required Storage=Area(ac) 1800 P YE' ADDITIONAL INFORMATION. 22 \<o\� ti * s onsite office. If soil is removed from, or brought onsite, the EPROJECT No.: 529348 0 y\ C - �,. n \ 47 ac 1800=846 cf 33 ac 1800=594 cf 9 i Consult Conservation Engineer or Soil Conservation Service for additional information concerning 4. STORM PIPE LENGTHS AND SLOPES ARE GIVEN FOR CONVENIENCE ONLY \ �� ` ^u 7 � V� �'1a' Provided Storage= Provided Storage= applicable solid waste management permit number, erosion CONSTrt CONTR. No. other alternatives for vegetation of denuded areas. The above vegetation rates are those which-� l x Surface Area*De th- Surface Area*De t sedimentation ermit number or minin ermit number will be CONTRACTOR SHALL VERIFY IN THE FIELD. \r . A �[� 0 p - P h= p g P N40085-10-C-5319 do well under local conditions, however, other seeding rate combinations are possible. 4" 9 `` J 587*1.5=880 cf 413*1.5=619 cf disclosed. *Fescue Mix shall be 75% Kentuck -31 Fescue and 25% Rebel Fescue 5. PROTECT CRUSHED AGGREGATE BASE COURSE FROM INFILTRATION OF \� ` ''" ^� ` ` NAVFAC DRAWING NO. Y Trapping Efficiency Trapping Efficiency a **Temporary - Reseed according to optimum season for desired permanent vegetation. Do not SEDIMENT FROM AREAS NOT YET STABILIZED Run off = Q=C*I*A Run off = Q=C*I*A 12580831 W allow temporary cover to grow over 12 inches in height before mowing, otherwise fescue may 6. ALL CONSTRUCTION, LAY DOWN, PARKING AND STAGING SHALL BE CONFINED .47*7.2*.40=1.35 cfs .33*7.2*.40=.95 cfs SHEET 10 OF 97 be shaded out. TO THE LIMITS OF CONSTRUCTION Required Area=Q*435=587 sf Required Area=Q*435=413 sf Provided Surface Area=1531 sf Provided Surface Area=973 sf r-205 C M1y* tiM1�a JT h t a R ti,ya i tya 3 ti rr,ADRAINAGE `$ z - H,a H tiy� H'i� aDELINEATION ire O 60 I20 N .tne, e a ■ ■ i • ■ ■ ■ ■ ■ �i�Y ■ ■ ■ r_ ■ ■ • ■ ^■ ■ ■\ — sai P rce it c me J J • � wwr. ° SCALE IN FEET - ♦ rceFvu:x g ' r\\ �� \ OUTL Rf 1 DR INAGE — - _ i --- ---+-"--- \\. \ �� Z a i�A1AiAGE �� ,•E , DRAINAGE 1 AREA/ 1 \ 4 ti� �-► OUT ET 3 \ DRAINA� a a OUTLET 3 \, \ �♦ r AREA 1 6' •� a \\ DRAINAGE ` \� ♦— - \\\. AREA "2 \ 00000 \��F • `- ■'111111111111110 ♦\ P-141 ENIS RE CLE FACILTY •DRAINAG . 09 RAINAGE a \\ REA 2'� AREA 2 DRAINAGE DELINEATI -- a� ♦ \\ ' \4 �� DRAINAGE' j \ F�. AREA 2 �` ". � d \ t � � � �♦ , DRAINAGE U-3 e I! e \ \ AREA 2 p C F \ r■ �' \ e @ \ \ F \�y \ ♦ Nk I nu , I I Yr awr u. m.r �6 \\\ `♦ \ \� I �\ Cn"ay.'� I Cnuarxr� x OUTLET 2 G • �\ � i �� OUTLET 2 _ `♦ , � � � ^~���, \ �� , ,� ,t EXISTING CONDITIONS: DRAINAGE OUTLETS sT9F� 01 �- ` PROPOSED CONDITIONS: DRAINAGE OUTLETS 'P-141 EMS/FIRE VEHICLE FACILITY STORMWATER SUMMARY g z ;TOTAL SITE AREA 3.90 AC _ -- \\ --'' - �y�F, �_� - — — i Tl __ _ - __.. _ . _. _ _ ' t EXISTING IMPERVIOUS 0 47 AC F' __ PROPOSED IMPERVIOUS AREA= 1 30 AC \\ ^ ¢ y* 1 h R • ^ _mO-RETENTION CELL DESIGN RAINFALL = 1.5" -- - --- ,_ 'HYDROLOGIC SOIL GROUP - B L QMINAIIIEAREA ae 7y— . RUNOFF DEPTH (VOLUME) - SCS CURVE NUMBER { flRA1NAGF AREA:. • S _ I IMPERVIOUS SURFACE CURVE NUMBER - 98 _.. PERVIOUS SURFACE CURVE NUMBER - 61 I 1 DRAINAGE TO BIO-RETENTION PERV. SURFACE IMP. SURFACE STORAGE1 REQUIRED PROVIDED CELL DRAINAGE (SF) DRAINAGE (SF) DEPTH STORAGE (CF) STORAGE (CF) 1 17909 7726 6" 949 962 2 2641 6774 9" 824 824 3 14537 8764 6" 1159 1159 4 9056 4187 6" 564 705 5 10414 8746 6" 1199 1224 _ I V litL L 4 u> o"o 0 0 0 0 0 0 0 0 0 0 0 o s' . I_- _ _ ....-__. _... _. ..._._ o 0 0 0 0 0 0 0 0 0 0 0 0 0 'EXISTING IMPERVIOUS AREA 20,473 SF � °°°°°°o° O°O°O°O°°°O°O°O°O°O°O °°°O°O°O ° PROPOSED IMPERVIOUS AREA 56,6281 SF °°°°°°°°°°°°°°°°° ° ° ° ° 0 CE F 00°°°°°°00 °° LL ._-._ ___.._.. ___. _ _._. .._._. __ .. . _-_. + __._... T.._.._. _ —-------.._.___.._i ° ° ° ° ° ° ° o o T 4s ADDITIONAL IMPERVIOUS AREA = 36,155'SF ° o 0 0 0 0 0 0 0 0 ° o °o - _ _ 000000000 00° CELL 4 :-TREATED IMPERVIOUS AREA = 36,197 SF \�� \ "� °0000000000°° °0°0°°°°0 CE 3 1-Yr POST--DEVELLOPEDD FLOW 8.57'CFS OW - 4.31,CFS 9.04 CFS - 4.73 CF \ 00000°° a 0O°00 O° O CS SURVEY NOTES: DRAINAGE �� , .... �.�= \, PRE -DEVELOPMENT POST -DEVELOPMENT TO CELL 5� a R'€�s4R TO 51 '� --� AREA* FLOW* AREA* FLOW* 1. TOPOGRAPHIC SURVEY PREPARED BY C. ALLAN BAMFORTH, JR., eon \ {;(� (SEE :ABOVE -I a ENGINEER —SURVEYOR LTD., DATED APRIL, 2009. AC CFS AC CFS i \> PROVIDED BY OWNER ® \ �P \ \• _ \, ' y� OUTLET 1 1.74 4.85 0.95 2.40 2. THE EXISTENCE, SIZE AND/OR LOCATION OF UTILITIES ARE NOT CELL 5 OUTLET 2 GUARANTEED BY THIS SURVEY. UTILITIES SHOWN ARE BASED Cil 2.65 7.21 3.43 12.04** \� J� OUTLET 3 0.31 1.22 0.21 0.85 ON ABOVE GROUND STRUCTURES AND AVAILABLE UTILITY \�. 1 i a PLANS. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION �` \ '� I I d OF ALL UTILITIES PRIOR TO CONSTRUCTION. °O I\\ (I * 3. ELEVATIONS ARE IN FEET AND REFER TO NORTH AMERICAN I♦ \ I 1— �� —� AREAS AND FLOWS FOR OUTLETS #2 AND #3 ARE BASED ON THE LIMITS OF CONSTRUCTION. ADDITIONAL AREAS CONTRIBUTE VERTICAL DATUM (NAND) 1988 AND ARE BASED ON CHERRY a \ \\ , , II (\ TO TO EACH OUTLET S, FLOW BUT ARE BEYOND THE SURVEY LIMITS. POINT CONTROL STATION 12-93 HORIZONTAL. `� I \ ** DOES NOT INCORPORATE BIO-RETENTION CELL RUNOFF REDUCTION NOTES: PROPOSED CONDITIONS: DRAINAGE PATTERNS 1) FLOWS INDICATED ARE CALCULATED BY THE RATIONAL METHOD (Q=CIA, 1=7.22 IN/HR)�- 2) THERE ARE NO OFFSITE AREAS THAT DRAIN THROUGH THE PROJECT -S a 0 N F<< O � N Z Cl In w� o a D zof o K o 0 m y o 9 NAfFAC llillllrr.rr y,,,,,lCAR 5)IIw ITA � srx gf lba I.dplannhg 1°rd.pe.r it°°Nre uhi a,gine g - bnd wrw hg Georg& pitch I Boney and Aaaclat", P.& 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Bo. 10472 Raleigh. NC 27605-0472 T 9191833-1212 F 9191834-3203 P/E■O g� RR CMWAWt NOW ACNr FINAL DESIGN SNBFA=10 DOE DO DHW D'DHW aec GMF PROJECT NI:N m BRmm NAllom Diu m/mm KEMN M. KME z Z o v ~ Z � o � r z Z CK _ -� (n w w > U U E Q J 1, B.L Z J a g w Q = Q o W z > Q U W o Iz > a H Lij Z Z j w w r < Ld N a d. A 2 � z 0- � � o SCALE: 1 " — s EPRWECT NO.: 529348 CONSTR. CONTR. NO. N40085-10-C-5319 NAVFAC DRAWING NO. 12580833 SHEET 19 OF 97 i M C MINIMUM 14 GAUGE LINE WIRES — 7 X 7 OA14MM WEATHERPROOF SIGN — V181BE ON ALL SIDES Cr F04CM AREA MIJMIA ONE SIGN ON EAC14 SIDE AND/OR EVERY'00 LP. ALTISM115 WORDING - •IRS SAVE AREA. KEEP our VARIABLE AS DIRECTED BY THE ENGINEER FRONT VIEW STEEL POST MAVEN WIRE FABRIC -SILT FENCE FABRIC ANCHOR SKIRT AS DIRECTED BY ENGINEER flr4'N. SIDE VIEW TEMPORARY SILT FENCE DETAIL SHALL ALSO CONFORM TO NCDENR STANDARD EROSION CONTROL DETAIL 6.62 TEMPORARY SILT F MM NOT TO SCALE 5deal Fans• Pe•1 Win, F:.- Put, Fd Uord.o,• awn an c�oane br of 1" olom•tar mhed Stan. ` fury Kra Fnm• Doth u SECTION ®�9260'oea--60 g60$6a ghee 860 ado ge&o'6Q� 1Vg o6 60960 c6 P.- 80 00§ oe 60R860 ed A0 VZ^0 SI Arm A•tembly ` d 51e Faroe •C Encln5ure 4' Nin. M GAUGE PERSPECTIVE VIEW wmUIit NDIAIAtE MARES �. MESH PVC End PVC Vent rap PIPE Elbow PIPE Schedule 4C WLZ PVC Pipe AM W u PVC End Cop Schedule 40 PVC Tee PVCPipe PVC Pipe \ I' Holes; in Y PVC Tee Orifice Tar aRXFence Mw Underside Flexible Plete - % of La®t 1' Ano.• Hose Uvo Tar m en Woeh.d ',»e, O Sleet pose Post Set Mai. T Mv[ Got'm Surface END VIEW FRONT VIEW SILT FENCE OUTLET NOT TO SCALE DEWATERING DEVICE SHALL ALSO CON=ORM TO NCOE'32 STANDARD B20SION CONTROL DETAIL 6.64 FIG. 6b4A lit"75-ISEDWENT WIN MTFI DEWATIERM DEVICE NOT TO SCALE STANDARD METAL POSTS Y-O• N GROUND �- 1B GAUGE GALVANIZED HARDWARE WIRE EXTENDS TO TOP OF BOX (lei `-• � . i � li/'(,� : ��,r rye':.• :. pia• '1•OD �1 57 v err TO A HEIGHT ABOVE16* .• OF :• INLET PROTECTION DETAIL SHALL ALSO CONFORM TO NODENR••1 EROSION CONTROL DETAIL 6.51 �I • • •• •> BUTS ICIEENT KEEP 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENIStff u. a • CONSTRUCTION ENTRANCE •ar CONSTRUCTION ON •.. IS NOT REMOVED BY THE VEHICLE=NMUr 2*-S* STONE TO BE USED T BE W OR VJVT14 Cr STONF, THEN THE TIRES OF THE % B1 RGE STONEOR .PROPOSED 6,RW, BEFORE ENTERING ROAD. WHICHI!VER is ROADWAY 'j. GREATER 35• MALL � 15. � NEW CONSTRUCTION l9fIBTI4G ROADWAY FABRIC UNDER STONE CROSS SECTION CONSTRUCTION ENTRANCE DETAIL SHALL ALSO CONFORM TO NCDENR STANDARD EROSION CONTROL DETAIL 6.06. 3000 PSI CONC. a 4 BARS 17 O.C. BOTH WAYS 3• CLEAR y PIPe SIe SHOWN ON PLA 1/7 CHAW14M MANHOLE TYPIC,AL ><4 BARS 6' = BOTH WAYS FRONT VIEW CHECK DAM DETAIL SHALL ALSO CONFORM TO NCDENR STANDARD EROSION CONTROL DETAIL 6.83. COVER B ROCK CHECK DAM NOT TO SCALP • r :-•• dZi II • Ord • •• / •�• /. ••••Ord 41, _ /% • - _. .Pro = ^ . M 11 NOTES WELL COMPACTED I. SEE SHOT C-305 FOR JOINT LOCATIONS AND 5IC-303 FOR DETAILS SLEBGRADE 2 ALL IONM SHALL BE CAUJ® N ACCORDANCE WITH THE SPECIFICATIONS F-9-1 CONCRETE PAVFJv�VT �i NOT TO TO SCALE I FRONT NEW BUry Hire Force. F••r Fabric rid Pbrtle.ie aou, N T•rK• NOTES D CUB AND GtMM SHALL BH LAD N la LENGTHS WITH US' METAL 8PAOM 0 EXPANSION JONTS IITALL EE SPACED AT 40' MHNALS W CLRB E GUTTER NOT 10 SCALE Fill .UNCTION BOX NOT TO SCALE OONOM LE rn>ts PLAN 9000 PAL L S74M SOLD NO= OR SOW SACK MIRY l Lem 2 FOR 24• RW.. AND LARM LM PR' DIA PLUS IT I= ASaASA 148OE owtrAm011 • YARD HAM DEEM THAN Kt' GNALL MMM OO M WAUA 1271 BRICK DROP mer - TYPE A NOT TO SCALE NOTES D WALKS SNAIL BE CONSTRUCT® OF 3000 PSI CONCRETE ON A WELL COWACTED SLIBMADE 2) WALKS SHALL NAVE BROOM FINISH LN.ESS OTPOMISE NOTED 3) SEE DETAIL 610-300 FOR JOINfNG AS NOTED ON PLAN FINISH GRADE SLOPE I/4' PEW FT. SECTION AS NOTED ON PLAN 1• C14A FINISH GRADE SLOPE I/4' PER FT. of ... 17 e• WALK AT CURB - SECTION rial CONCRETE WALK NOT TO SCALE EM © ❑r • 0 0 N O\o N �a O O K I- w � O w li a W W z Of W O GO fn O 4f. landplanning lands apeomhhect re cml engine land rvveyirg George Finch I Bonet' and Associates, P.A. 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Box 10472 Raleigh, NC 276050472 T 9191833-1212 F 9171834-3203 FOR COM A R NUM wTMn FINAL DESIGN SBS FACIOIT A WE DES DHW 1DRWDHW ICHK GMF PROJECT MANAGER BRIVICH MANAGER Cliff ELK;/ARCH KEVIN M. KANE OF CURB OR ]. r OF > . ] ]] ENT i444 �����.IyI�•�I•I♦�1I♦I.I I Iyly` • -dT•-. 4 , 4 v ITT d tiT� ..::s{a•, -1 1 • • ], W LONG COUNTERSINK 1/2- 1 1 1 T WHEEL •• NOT TO SCALE z SLRFACE COLIRSE FOR INTERMEDIATE- . • S ONLY- : COMPACTED BASE COLIRSE LL .AGGREQATE c •�•:r•.•. •.s-c.•:as.�:•�.-:cc•s:w•:•.¢•:cccccc•ww:¢¢•:u:•:� • a- �� i � � • •-sir •i • !� ILI THAT WILL NOT ATTAIN ADeGLATE COMPACTION AOCORDINIGI TO STANDARD. SWALL BE _ •- _• TO THE LANDSCAPE•• BY •. ,TOR POOR TO PLACM ANY BASE MATERIAL. AADE • _ _ ° CONSM. CONTR. NO. N 0 / L - • :�: • �•�.��� �1 NOT TO SCALE LH FINISHED SHEET C-205 FOR LOCATIONS PLANTING SOIL MIX 85% SAND 8% FINES D 7% COMPOST NON -WOVEN FILTER FABRIC #57 WASHED STONE HDPE PIPE SHALLOW PONDING STRUCTURE INLET ELEV. .7770 00 0 0000. . . oo oo oQ oo oo o000000000000000. . . -70 000 7CN I I.I I—III—III—III=III—) —I TOP BOT. INLET OF OF SURFACE CELL ELEV SIOL STONE AREA (SF) 1 24.10 23.60 20.60 916 2 23.75 23.00 20.00 796 3 23.50 23.00 20.00 1720 4 23.50 23.00 20.00 896 5 23.50 23.00 20.00 2075 l� SLIP bl2�lSLOpE YARD INLET OUTLET STRUCTURE SEE SITE PLAN FOR INVERT ELEVATIONS SEE DETAIL 6/C-301 k �.:::` � l 1. CONSTRUCT BIORETENTION AREA ONLY AFTER COMPLETION OF ALL OTHER GRADING ACTIVITIES AND VEGETATIVE STABILIZATION OF ALL GROUND AREAS 2. BIORETENTION AREA SHALL BE SODDED PER THE SPECIFICATIONS. 3. ALL CLEAN OUTS SHALL BE PLACED IN A VALVE BOX PER DETAIL 7/C-304 I BIORETENTION AREA SECTION C12102!NOT TO SCALE 3000 PSI CONCRETE_/ SJBGRADE COMPACTED ACCORDING I 1/2' EXPANSION JOINT TO SPECIFICATIONS SECTION NOT TO SCALE 6'-O' I 4'•O' I TOP OF WALK .................... GUTTER LINE VARIABLE SLOPE NOT TO ECCE® 142 ELEVATION NOT TO SCALE • DETECTABLE WARNNVG DOMES SEE NOTE NO. I tiw. d ' SIDEWALK AS SWOWN CON PLAN a i.... PLAN NOT TO SCALE NOTES I. THE WALKING SURFACE SHALL Be SLIPPED RESISTANT. DETECTABLE WARNING DOMES SHALL COVER THE R.LL.. WIDTH AND DEPTH OF THE RAMP PLOOR. THE DETECTABLE WARNINGS SHALL CONSIST OF RAISED TRUNCATED DOMES WITH A DIAMETER OF NOMINAL 0.9', A HEIGHT OP OZ. AND CENTER-TO-CBVTE 2 SPACING OF NOMINAL 235'. 2 TI-E RAMP SHALL BE A CONCRETE COLOR THAT PROVIDES A 70S CONTRAST RATIO TO THE ADJACENT CONCRETE WALUC 3. PROVIDE TOOLED EDGE AT ALL JOINTS 2 HANDICAP RAMP Vwj SCALE AS SHOWN �A PIPE BOLLARD NOT TO SCALE Imo. - ��x r n ,t L POET GRADE SE: SPECIFICATIONS 318'(o X ?-0' PLAN DOWEL BARS AT W O.C. CENTH2® ON JOINT COAT BAR WITH GREASE PAPER SLEEVE CLASS B RIP RAP (SEE SECTION THRU BASIN BELOW) � o SOW \ �\\ \ � \ \ / / �/ / . • .. j / / RIP RAP HEADWALL #05 WASHED STONE. 1'-0• THICIJ x 3'-0• HIGH MINIMUM to 3i � / AFEA,� / / d PERSPECTIVE VIEW 6X6 - KM Will 14 ; STRUCTURE OR 4A4t PAVEMENT 5' MP INSTALL AT BIULDNG, STRUCTURES, CURB INLETS. AND AT PAVEMENT MATERIAL CHANGER AS INDICATED TRANSITION AS SHOWN WHERE PAVEMENT 11-Ig0NES6 IS LESS THAN MN 6 RMOUIRIED AT JOINT FLOOD STORAGE ZONE Ti47ES 1. GRAVEL 8 RIP RAP FILTER BERM BASIN DETAIL IS DESIGNED TO PROTECT EXISTING PIPE INVERTS THAT DRAIN 5 ACRES OR LESS. 2- DIMENSIONS ARE MINIMUM ACCEPTABLE UNLESS OTHERWISE NOTED. - f✓ _� AREAS TO BE DISTURBED mww JI-' I (CUT, FILL, ETC.) I�TL CLASS B RIP -RAP MAXIMUM SEDIMENT DEPTH #5 WASHED STONE (CLEAN OUT POINT) SECTION THRU BASIN. FILTER AND CULVERT PIPE PIPE INLET PROTECTION SHALL ALSO CONFORM TO NCDENR EROSION CONTROL STANDARD DETAIL 6.55. NOTES a PIPE INLET PROTECTION L ON CONCRETE WALKS, CONTRACTION JOINTS SHALL BE SPACED AT AN INTERVAL WIX2 NOT TO SCALE EQUAL TO THE WIDTH OF THE WALK BUT BHALLL NOT EXCEED 5 AC. 2 CN CONCRETE WAUCS, EXPANSION ,ANTS SHALL BE PLACED AT A MAXIMUM OF 3O' O.C. AND AT ALL LACATK7NS V"M A WALK IS ADJACENT TO A BIJLDN' OR OTHER PD® OBJECTS, 3. DOWTi BARS ARE NOT RBOUREO ON WALK& 5-1 CONCRETE PAVEMENT NT JOINTS a o C E NOT TO SCALE GA a P OGP I m �4,-0•--I CURB TAPER: SEE z 3/8' Ems. JOINT DETAIL THIS SHEEP F TOP OF CURB 3'-0 ROLL DOWN TOP OF- CURB :• 30 0l J W mU I' R 6•� .. 7 -O• - — — — — — — — - - - r - - - - - PROPOSED CURB AND GUTTER 4'-0• I STORM PIPE - — — — — — — — — ----- LiOTTO aOF GUTTER q�7 6NTT13t PAVEMENTI--- 'a 3000 PSI ATE FOOTNB 3000 P NOTES PS N USE SIGNS 27-8 AND 117 8D AS PER NCAC 04AFI 6t 4, SECTION 412 OF THE NORTI4 CAROLNA + STATE BUILDING CODE r-4-1 HC PARKING SIGN O.30 NOT TO SCALE JOINT CLASS'A RPRAP 1? 4'-O' I I W-O' I / NO _MW0 PROPOSED STORM STRUCTURE SEE SHEET C-205 FOR MORE INFORMATION IPA N NOTES 1) USE 4000 PSI CONCRETE W W y W ISOMETRIC W 0 0 N 0) N t�t.I C 0 w o a. z w Z � o � K z m s�F y id'} NA/��AIC CARD```�pttNn4pq' 375 —ate �.■ land planning • Wnda ow achaechxe ala engNeer:y IafM wrvrnkre George Hmh I Bony and Am=k tes, P.A. 309 North Boylan Avenue C-1568 Raleigh, NC 27606-1402 Post Office Box ID472 Raleigh, NC 27605-0472 T 9191833-1212 f 9191834-3203 rF7 FOR 011111111101011101 NUX ACMW FINAL DESIGN SIIOUX pO' M DOE M DHW DRW DHW CHX GM PROJECT 111myi R BRANCH LLNVM CHU EW/ARCH KEVIN M. KAN o U Z 0 0 ~ Z O a z Of U(n Q Y LL W �g v Q = v) W J _o > V W u— Z Z U) o � Q (7~) W Z w 0= T Q tt O_ o a �W Z Li` w G Q SCALE: EPRCJECT NO.: 529348 CONSTR. CONTR. NO, N40085-10-C-5319 NAVFAC DMWRIO NO. 12580838 SHM 17 OF 97 C-303 C C �� tgV 6 t\' I" SG c y5 11 a 1 tG �;b ti F STRE t8 t� ��� ��� a ���G. 30 0 30 60 N g / 11 QUO ------ AE --WHITE PAINT- - - - -tL-------�.. T.O.& --- ---- -}�� -- h — - -�— - - - - - LOB - - - - - - - •� - — --#` - --- =:0.6 _ (G tj. I N W T.QH.T. TOB __ j/ \\ O , - --- - — — —�--- r`, \ I LIMITS OF __ -_ �G" - 2 / -- SCALE IN FEET N 0 1 I \ ♦ Io \ DISTURBANCE / & N 1 ♦ 10 k' D \ \ ♦ 6_E W (APPROX. LOC )-- -- >�\ O 1 d W ♦ o / ` LIMITS OF o a D ♦ ♦ �'e ♦ I ?c I I/ - - �, - - DISTURBANCE Z /� \ ♦♦ tiF BRCK BVJ . / NOTES: o 0 DETAIL APPLIES TO SINGLE STEM o ,3 v(,/,(5 \ ' ♦♦ 'WELL 9� / TREES AND MULTI -STEM TREES k o J` �♦ ` ♦ \ DO NOT PRUNE OR CUT LEADER. m ♦ / BIO-RETENTION THIN BRANCHES BY 1/3 RETAINING ♦ \\ / NORMAL SHAPE TREE SHAPE o V moo= ♦♦�� � � ` lop1 CELL ; (SEE SPECIFlCATK)NS FOR DETAILS) ��Q�o ♦\\ho _ - I \ I FLUORESCENT TAPE 00 I 1 REMOVE TOP 1/3 OF BURLAP !�� ♦♦\\\ �� 3 a /\ I ARBORTAPE OR 3/4' WOVEN TQPORQpOM B&B T BALL BE MIN. co o \ ♦ \ BELT SYNTHETIC FABRIC STRAP. 2 /MAX. 3 ABOVE 2�,\ ♦ a 1 GREEN. FINISHED GRADE ram \�♦ ` \ a tiQ _ 1 `, BIO RETENTION 1 4' LAYER OF MULCH ��� \ ♦ ` CE 1 1'0*08' WOOD Sr KFlLL AMENDED \ \ \\ \ I �W 6' UNMULCH WITH C 3 8 /— AS SPECIFIED P-141 EMS/FIRE VEHICLE FACILITY HOLE OR DPLAC RADIUS FINISHED GRADE �\ \ �\ \ \ ♦♦ \ BIOLRETENTIO 1 I ANCHORS. PLACE OUTSIDE 1 BACKFlLLNAfFAC CEL-\\�\♦ .1 MIN. T `� nungU \\ l \/ �G ? \'\ ♦ ` ^ \ L 4' HIGH WATER BERM ; . `�CAR U ''.. \ ♦ L � \ ` \\ \\♦ ` I I (IFDSOILRHAS 8 IL LINE \\ 1 ♦ ` ` PREVIOUSLY DISTURBED E"O 375 \�- \ \ \ \ ♦ \ \ I FIRM SOIL UNDER R001 PREPARE PLANT BED F o \ \ LIGHT POLE: BALL ♦ \ \ ) REMOVE TOP 2/3 OF WIR (SEE SPECIFICATIONS) \� SEE NOTE RREEMKOVVE FROM PIT.PRESENT. F �0 \ ♦ T I 1 NOTES: M I I J 1. DO NOT INSTALL DURING PERIODS OF 5. SOAK ROOT BALL AND PLANT PR SEAL rP WET OR FROZEN SOIL CONDITIONS IMMEDIATELY AFTER INSTALLATION 2. REMOVE ALL BALL TIES OR STRAPPING 6. IF TREE GUYED EVENLY SPACE GUYS. gf ba \ I STALL STRAPS TO ALLOW PLANT MOVEMENT cnaawnninc ianamaxarchie th \\ \\\ \ - ♦ ♦ - - - - - - / ( 3. INSTALL TOP OF BALL MIN. 2'/MAX. 3' SEE SPECIFICATIONS FOR DETAILS), awl enemee os iaay:orve mq ABOVE FINISH GRADE. INSTALL TO MINIMIZE SETTIJNG \ " �� ♦ ♦ T.O.S. ; I 1 7. 4' SAUCER WILL BE OUTSIDE OF BACKFlLL 09 North h Boylann Avenue d A�1C--t1568r A yn\\ G ti� �9 ♦ WELLS FOR HEAT PUMP I I 4. SET TREE VERTICAL IN ALL DIRECTIONS 8. SEE SPECIFICATIONS FOR OTHER PLANTING Raleigh. NC 27606-1402 PRIOR TO STAKING. s� � � ti ♦ - REQUIREMENTS o � ti ♦ \ SYSTEM LOCATED WITHIN 1 1 Post Office Box 10472 -�� % \ THIS AREA. SEE PM&E Raleigh. NC 27605-0472 \�\ ♦ 16 F \ DRAWINGS I I i 1 TREE PLANTING DETAIL r 919IM1212 \ �\ ♦ \ \� \\ �O 1 L-101 NOT TO SCALE F 9191834-3203 G"TT115 ♦♦ \ ��j. I 1 VEGETATIVE STABILIZATION \^ 77 SG ♦ x Am / �' r YT. ♦ \ 6" E. (APPROr.. 10C Na APPRam �A�o ♦♦ `� /' - All disturbed areas of the project site, not shown otherwise, shall be stabilized with \ LIMITS OF \ _ p. ♦♦ DISTURBANCE / / I - - / vegetative cover in accordance with the drawings and written specifications, and in G \ BIO-RETENTION 1 accordance with all provisions of the North Carolina Sedimentation Pollution Control Act of R1111 a1111111ao1111t ILrrFrc \ \ �' CELL / 1973, with all revisions. As indicated on the drawings and in the written specifications, AC W \� �\� �Q�� ♦♦ \ \\ �— / / permanent vegetative stabilization is by installation and maintenance of Centipede sod FINAL DESIGN ti . \\ ♦ \�\ J / throughout the project site. Should earthwork operations be completed at a time of year sli TO WE v ��� \ o ♦ / \ / outside the indicated allowable planting time fthe lid ng me or e listed permanent vegetation, the \ F ti� m ♦ \ � ' — / 1 bllOm DHW r>Im DHW cHK GMF \� \ \ s ♦ x — \ / contractor shall complete the vegetative stabilization in accordance with the seeding R.4i rafillm �B ♦♦ \ \ \ o\ \\ i schedules shown on the plans for temporary stabilization, to meet the applicable erosion and BRkgm MOM \ ♦ -'a x 2 / sedimentation control requirements. During the following planting season for the permanent a+rr EW/ARM KEVIN M. KANE II V,410� ♦- - - -vegetation, the contractor shall install the Centipede sod in accordance with the following ---------NCDENR specifications, and Section 32 92 23 of the written specifications, whichever is z z 11 / \\� I F-�s � more stringent. � 4 / 4 LI 44 42 I CO/VC. SODDING SPECIFICATIONS (NCDENR Practice Standards and Specifications 6.12) Z_ O � l•' G� _ �� {� _.� X � _.JIB `���Y❑� �s 191 �\ S� Sod Installation - A step-by-step procedure for installing sod is illustrated in Standards and \ ` \I ♦♦` . zs h 1g0 E OF WATER__ ��a /' \�F Ily II` Specifications Figure 6.12a, and described below: W J xB \ \ �\ ♦♦ \ ` 91a ��\il \ 0 - - l' 1. Moistening the sod after it is unrolled helps maintain its viability. Store it in the shade W Q 8 \ \ (6�: G ti �� during installation. `� NT 2. Rake the soil surface to break the crust just before laying sod. During the summer, lightly < C) �- \ z p 46 YooPo\. �PAVINi' PA�ENE J Y g g P y W z irrigate the soil, immediately before laying the sod to cool the soil and reduce root burning < Z g Aso I 196 - -- and dieback. g V PA<EA(¢YT�� � 8 L96" CHAIN LINK EEN � 3. Do not sod on gravel, frozen soils, or soils that have been treated recently with sterilants Q = or herbicides. �8 ti1 , �, �e , � II tih�----.---x o w z / \ 0� fl'� I II 48 ti E. 4. Lay the first row of sod in a straight line with subsequent rows placed parallel to and W 18 E s _ B butting tightly against each other. Stagger strips in a brick -like pattern. Be sure that the sod U W U o is not stretched or overlapped and that all joints are butted tightly to prevent voids. Use a Q knife or sharp spade to trim and fit irregularly shaped areas. j LL �p -- - __- PLANT LIST' - _ _ __ __ - _ _ slope.slopes 3.1 Z � - __ _ __ _ _ __ _ _ ___ _ _,i greater, or ever e o ion may a p oblemn secure sold with pegs. egs sloo I LANDSCAPE NOTES or �e a _ 6. As soddingf clearly defined areas is completed, roll sod to provide firm contact between o KEY �QUAN IBOTANICAL NAME ,COMMON NAME HT SPD CAL ROOT ;REMARKS 1. ALL DISTURBED AREAS OF PROJECT SITE SHALL BE to W roots and so o earl T SODDED E SHOWN OTHERWISE. INSTALL UNLESS S WN H - - -- - - - - . After rolling, irrigate until the soil is wet 4-inches below the sod. a TREES I l CENTIPEDE GRASS SOD IN ACCORDANCE WITH W Q - -..-I -I - ` "" ' — - - -- - -- - THE SPECIFICATIONS. SEEDING SHALL LIMITED TO 8. Keep sodded areas moist to a depth of 4-inches until the grass takes root. This can be r T TEMPORARY STABILIZATION FOR EROSION CONTROL ONLY. n- i ~ A R 1 A c e r R u b r u m 'Red Sunset' Red Sunset Maple p l e 1 2 -14 ' 6' M 1 n 2.5 -3 ^ B& e determined by gently tugging on the sod - resistance indicates that rooting has occurred.cr A 6' M i n 1 5' M In B& B i M u I i t-Stem ,Tree Form , H e a vy S p e c 1 m e n 2. IN AREAS OF BIO-RETENTION CELLS, CONTRACTOR SHALL 9. Mowing should not be attempted until the sod is firmly rooted usually 2-3 weeks. a MC 6 Myrica Cenfera Wax Myrtle 6-8' COMPLETE CONSTRUCTION AND PREPARATION FOR i LI 2 ILagerstroemia lndica'Natchez yNatchezCrepe Myrtle j 8-10 5'Min 1Y5 Min B&B 3-4 Stem,HeavySpecimen w -L - ._. _._ __. — f -_ _ i _F _ ___ __ -_ PLANTING/SODDING BY HAND, LIMITING SOIL COMPACTION. Z QV 1 Q u e rc u s v i rg i n i a n a L 1 ve oak 1 2 -1 4' 1 s h i n 3 3 5" B B Sodded Waterways - Sod provides a resilient channel lining providing immediate protection -� -- . - 3 ' o_ 1 ( _ 3. SOD ON SLOPES GREATER THEN 3:1 SHALL BE SECURED from concentrated runofiand eliminating the need for installation mats or mulch. o ' — WITH WOODEN PEGS AS INDICATED IN THE SPECIFICATIONS. (G -- o ii N U COVERS vE R s _ _ _ _._ , .-_ . _. _._ _ _. _ _ _ The following points apply to the use of sod in waterways: sue: 1 " = 30' .___ . - '_ _ - _. i _ _ _ �- _ _ _ _ _ _ E 1. Prepare the soil as described in Practice 6.30, Grass -lined Channels. The sod type must be �Ecr uo-: 529348 _... _ __ _._ _ _ . PARKING LOT LIGHT POLES SHOWN ARE APPROXIMATE LM t Lino a Muscan Silver Mid et' }SllverMid et Lino e } ( 2 3 Bib Clum 12 O.C. _ ___J __. __ P. -- _.-- ----- -_— ___ 9_ __ __-_--.___1 _ _._.. 9 _. __..- P—_--- _I _ --_- _._ ___.-- _ ---_-- _ . _--- —_--_------1_ _ -_ _ __?. _ __ ___-- - -- ----; ONLY. SEE LIGHTING PLAN FOR ACTUAL LOCATION. able to withstand the velocity of flow specified in the channel design (Appendix 8.05). �"� "o _ __...___ __-- ._-'_ __---_ _._...... ___ _.-__ ___1_-___ { _.---__-_ _ . -___---_....-----__._. ___.._.L _----.__ _.__. _ N40085-10-C-5319 I ____- : 5. CONTRACTOR SHALL VERIFY LOCATION OF ALL EXISTING 2. Lay sod strips perpendicular to the direction of flow, with the lateral joints staggered in a _,_ _ _ __- __._______ _______ __. _ _ _ _ _-. ___ _ _. _.___ _ ____.__I UNDERGROUND UTILITIES. CONTRACTOR SHALL BE RESPONSIBLE NA�AC MMNG NO. -- -- -- brick -like pattern. Edges should butt tightly together. TO REPAIR OR REPLACE ANY DAMAGES TO EXISTING UTILITIES. 12580841 L, - - - - -- - - - - -- 3. After rolling or tamping to create a firm contact, peg individual sod strips to resist SHEETr 20 or 97 ' - washout during establishment. Jute or other netting material may be pegged over the sod for __ extra protection on critical areas. L-101