Loading...
HomeMy WebLinkAboutSW7080214_HISTORICAL FILE_20080221STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD WATER Michael F. Easley, Governor rol Company, LLC Hayes, Jr. Land Company Dear Mr. Hayes: William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources February 21, 2008 Subject: Stormwater Review SW7080214 Burton Farm Village Pool Clubhouse Pamlico County Coleen H. Sullins, Director Division of Water Quality The Washington Regional Office of the Division of Water Quality received a Coastal Stormwater permit application and plans for the subject project on February 14, 2008. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. /I. The Calculations show the required volume to be 7,276 cf and provided volume as 14,554, while the Wet Detention Basin Supplement shows provided volume as 12,263 cf. Please revise or explain; 2. Revise the Wet Detention Basin Supplement to show the diameter of orifice (page 2 of 2 — under additional information); V 3. The calculations show that pipe P-4 have a diameter of 24", while the plans show 18", thence the calculations show that pipes P-5 and P-12 have a diameter of 30" each, while the plans show 24". Please / revise; V 4. Provide a level spreader (the scour hole) where the outlet pipe discharges into the wetlands. Provide signed and notarized Operational & Maintenance agreement for scour hole (use the level spreader Operation & Maintenance agreement and edit it out to fit the scour hole requirements). The calculations and detail for scour hole can be shown on plans; On the Outlet Pipe Detail (sheet 8 of 8) of the plans, move orifice up to match the Permanent Pool elevation; 6. Provide two sets of signed and sealed corrected sheets and documents. The above requested information must be received in this office prior to February 28, 2008 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. O N�n` Carolina vWura!!y North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Internet: h2o.encstate.nc.us 943 Washington Square Mall, Washington, NC 27889 An Equal OpportunitylA(firma&ve Acton Employer - 50% Recycled110% Post Consumer Paper Customer Service 1-877-623-6748 Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3959. Sincerely, r Samir Dumpor, PE Environmental Engineer Washington Regional Office cc: Bobby Billingsley, PE (Thomas Engineering, PA, PO Box 1309, 309 Metcalf Street, New Bern, NC 28563) ✓Washington Regional Office Thomas Engineering, P.A. Civil Engineering -Land Development- Project Management FEDEX TRK#: 7920 0994 0234 To: NCDENR Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Attn: Samir Dumpor Re: State Stormwater Management Revisions Burton Farm Village Pool Clubhouse Pamlico County 2004-009 Dear Samir, rrRbruary:22Q008� Lr v - --• .y Ira 11) FEB `c f 04,008 Please find enclosed your comment letter dated February 21, 2008 and two (2) copies of documents addressing these comments. 1 have the following comments regarding your comments: 1) The wet detention supplement sheet has been updated to reflect a provided volume of 14,554 cft. The wet detention supplement had not been updated from a previous pond design calculation. 2) The wet detention supplement sheet now shows an orifice of 1 ". 3) The pipe table in the plans has been changed to reflect the calculations. These were typos. 4) A scour hole and level spreader has been added to the outlet of the outlet pipe. It has been sized based on the BMP manual (smallest size applicable). Operation and maintenance forms are enclosed and struck through where not applicable. 5) The detail now shows the pipe skewed to an outlet elevation of 29.0 (permanent pool). 6) Two sets of all are enclosed. Please review and let me know if you have any questions or concerns. Thank yy�ou, Aevdi Bobby Billingsley, PE BobbyBillingsley@ThomasEngineeringPA.com Enclosures 309 Metcalf Street-P.0.. Box /309•New Bern, NC 28563 Phone: (252)637-2727•Fax: (151)636-1438-1 ebsite: www.ThomasEngineeringPA.com Burton Farm Village Pool and Clubhouse Facilities at Mill Creek February 1. 2008 Pamlico County 2004-009 ENGINEERING REPORT QOB STORMWATER MANAGEMENT EROSION AND SEDIMENTATION CONTROL AT BURTON FARM VILLAGE POOL AND CLUBHOUSE FACILITIES AT MILL CREEK PAMLICO COUNTY 2004-009 OWNER: BURTON FARM DEVELOPMENT CO. P. O. BOX 1908 ROCKY MOUNT, NORTH CAROLINA �1802 ENGINEER: THOMAS ENGINEERING, P.A. 309 METCALF STREET P.O. BOX 1309 °,,•:NF;,�y NEW BERN, N.C. 28563-1309 pa.�Ra�',y'e (252) 637-2727-OFFICE of SEAL :(252) 636-2448-FACSIMILE °JOHNTHOMAS THOMASENGINEERINGPA. a NARRATIVE PROJECT DESCRIPTION This project consists of clearing, grubbing, grading, and site improvements for the proposed community facilities. These facilities include 6 club house, tennis courts, swimming pools, basketball courts, sidewalks, gazebos, parking and driveways, etc. The project site is located in Pamlico County just south of Arapahoe and is bordered by previous development. Approximately 4.0 acres will be disturbed during development. SITE DESCRIPTION This site varies between elevation 36.0 ft and 29.0 ft NGVD 88. The site has been cleared for improvements, clearing and grubbing only. SOILS The Pamlico County Soil Survey indicates two (2) soil types on this tract, which are included in the Exhibits: Baymeade sand, which is well drained and Leon sand, which is poorly drained. The majority of the upland portion of the tract is Baymeade sand. STORMWATER This subdivision is being developed as a high density project with an overall percent of impervious cover of 41.4%. Stormwater will be collected by underground storm sewers and grass -lined swales and transported to a wet detention pond before being discharged into an existing wetland. STORMWATER POND COMPUTATIONS A. Site Data 1. Built Upon Area: Tennis: 14,000 SF Basketball: 4,800 SF Building: 3,300 SF Driveways and Parking: 18,170 SF Misc. sidewalks, pool exterior, gazebos, etc: 33,500 SF Totals: 73.770 2. Total Project Area: 221,629 SF (Wetlands = 43,285 sf <= 25% of total) Drainage Area: 178,344 SF (Wetlands not included 3. Percent Impervious Area: (73,770 SF/178,344 SF) x100 = 41.4% B. Determination of Wet Detention Pond Surface Area 1. Reference Attachment "A" 90% TSS removal without vegetative filter. 2. Proposed Pond Depth: 4.0 ft. 3. Impervious Percent: 41.4 %. 4. Drainage Area: 178,344 SF 5. Surface Area/Drainage Area: 3.6 Interpolated from attachment "A" for 90% TSS Removal Where Impervious% = 41.4%, Permanent Pool = 4.0 ft. 6. Pond Surface Area: a) Required 178,344 SF x 0.036 = 6,420 SF b) Provided design pond surface area (SA) = 7,150 SF @ PP Elev. C. Determination of required storage following a one inch rainfall event: Where C for Impervious 0.9 average, green areas = 0.2. 1. Impervious (73,770 SF) (0.9) (1") (1'/12") = 5,533 CFT 2. Green: (104,574 SF) (0.2) (1") (1712") = 1743 CFT 3. Required Storage Volume = 7,276 CFT 4. Storage Depth (1" rainfall) H = Volume/SA (estimated) H = 7,276 CFT/ 7,150 SF H = 1.01' Try H=1.5 ((Temp Pool SF @ Elev. 31.5 + Perm Pool SF @ Elev. 30)/2) x 1.5 {(9,200 + 7,150) / 2) x1.5 = 12,263 CFT > 7,276 CFT 4 OK 5. Provided Storage Volume 4 12,263 CFT D. Draw down determination (based on 1" rainfall) 1. Q (2 dys) = 5,889 CFT / (2 dys)(24 hrs/day)(60 min/hr)(60 sec/min) = 0.034 cfs 2. Q (5dys) = 5,889 CFT / (5 dys)(24 hrs/day)(60 min/hr)(60 sec/min) = 0.014 cfs 3. Orifice Size a. Orifice Formula Area = [(Q/Cd)/(sgrt(2gh)] x 144 spin/sf, where h=H/2, Cd = 0.6, g=32.174 ft/seCA2 b. Area for Q (2 dys) Area = [((0.034) / 0.6) / sgrt((2)(32.174)(0.5)] x 144 = 1.44 inA2 Pipe Diameter = 2 x sgrt(A/Pi) = 2 x sgrt (1.44/3.14) = 1.35 inches c. Area for Q (5 dys) Area = [((0.014) / 0.6) / sgrt((2)(32.174)(0.5)] x 144 = 0.59 inA2 Pipe Diameter = 2 x sgrt(A/Pi) = 2 x sgrt (0.59/3.14) = 0.87 inches d. Selected Orifice Size 4 Use 1.00 in. orifice E. Runoff calculation for riser sizing and overflow: 1) Rational Method Q=CIA Where: Q = Peak rate of runoff (cfs) C = Runoff coefficient: Buildings + Pavement = 0.9 Green = 0.2 = Average intensity of rainfall (in/hr, 10 yr design storm) A = Drainage area (acres). 2. Determination of Peak Flow (Q) C = (73,770 SF)(0.9) + (104,574 SF)(0.2) / 178,344 SF C = 0.49 H (height difference) = 5 ft L (length of travel) = 700 ft Tc (time of concentration) = 5 min 110 = 7.5 in/hr. from IDF Curves Q = CIA = (0.49)(7.5 in/hr)(4.09) = 15.0 cfs F. Weir Length Determination 1. Inflow Q = 15.0 cfs (from above) Q = 3.33(L-0.2H) H1.5 (Weir overflow formula for riser determination) H = 4 inches Solve for L. L = ((15.0 cfs)/((3.33)(4"/12)15))+(0.2)(4"/12) L = 27.1 ft 4 SAY 30 ft Thomas Engineering, P.A. Civil Engineering -Land Development -Project Management HAND DELIVERED To: NCDENR Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Attn: Lyn Hardison Re: State Stormwater Management Permit Application Burton Farm Village Pool Clubhouse Pamlico County 2004-009 Dear Lyn, February 13, 2008 EXPRESS FEB 142008 TIMPIAZI Please find enclosed the State Stormwater Management Permit Application for site improvements at the proposed Burton Farm Village Pool Clubhouse in Pamlico County. Enclosed items include an (1) original and one (1) copy of the Stormwater Management Permit Application Form, two (2) wet detention pond supplements, two (2) copies each of the stormwater management report, specifications, and plans, and one (1) check for $4,000.00 (Check No.7922) for the express permitted application processing fee. I believe all comments from the initial review meeting have been addressed, either in the plans, report, or forms. Please review and let me know if you have any questions, concerns, or need additional information. Thank you, Bobby Billingsley, PE BobbyBillingsley@ThomasEngineeringPA.com Enclosures 309 Metcalf Street-P. 0. Box 1309•New Bern, NC 28563 Phone: (252)637-2727•Fax: (252)636-2448•Website: www.ThomasEngineeringPA.com For DENR Use ONLY North Carolina Department of Environment and Natural Resources Request for Express Permit Review NCDENR Reviewer:.c r Submit j--t 4 0 Time: Confirm L� It FILL-IN all the information below and CHECK the Permit(s) you are requesting for express review. FAX or Email the completed form to Express Coordinator along with a completed DETAILED narrative site plan (PDF file) and vicinity map (same items expected in the application package of the project location. Include this form in the application package. • Asheville Region -Alison Davidson 828.296.4698;alison.davidson(dncmail.net • Fayetteville or Raleigh Region -David Lee 919.791.4203; david.lee(alncmail.net • Mooresville 8 -Patrick Grogan 704-663.3772 or patrick.grogan(amcmail.net • Washington Region -Lyn Hardison 252-946-9215 or Ivn.hardison(ibmcmail.net EXPRESS • Wilmington Region -Janet Russell 910-350-2004 or ianet.russell(@.ncmail.net NOTE: Project application received after 12 noon will be stamped in the following work day. FEB 14 2008 Project Name: BURTON FARM VILLAGE POOL CLUBHOUSE County: PAMLICO NC DENR Applicant: CHARLES J. HAYES, JR. Company: BURTON FARM VILLAGE POOL CLUBHOUSE Address: P. 0. BOX 229 City: KITTY HAWK, State: NC Zip: 27949 Phone:252-261-2131 Fax:252-261-3083 Email: insflyeranearthlink.net Project is Drains into NEUSE waters Project Located in NEUSE River Basin Engineer/Consultant: John G. Thomas, PE Company: Thomas Engineering, PA Address: P. 0. BOX 1309 City: NEW BERN, State: NC Zip: 28563 Phone: 252-637-2727 Fax::252-636-2448 Email:iohnthomas(o),thomasengineeringpa.com (Check all that apply) ❑ Scoping Meeting ONLY ❑ DWQ, ❑ DCM, ❑ DLR, ❑ OTHER: _ ❑ Stream Origin Determination: # of stream calls — Please attach TOPO map marking the areas in questions ® State Stormwater ❑ General ❑ SFR, ❑Bkhd & Bt Rmp, ❑ Clear & Grub, ❑ Utility ❑ Low Density ❑ Low Density -Curb & Gutter _ # Curb Outlet Swales ElOff-site(SW _(Provide permit #)] ® High Density -Detention Pond 1 # Treatment Systems [:]High Density -Infiltration _ #Treatment Systems ❑ High Density -Bio-Retention _ # Treatment Systems ❑ High Density —Constructive Wetlands _ # Treatment Systems ❑ High Density -Other _ # Treatment Systems ❑ MODIFICATION SW _ (Provide permit #) ❑ Coastal Management ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information ❑ Upland Development ❑ Manna Development ❑ Urban Waterfront ❑ Land Quality ❑ Erosion and Sedimentation Control Plan with _ acres to be disturbed.(CK #_ (for DENR use)) w'E7LAND5 QUESTIONS MUSTBE ADDRESSED BELOW ❑ Wetlands (401): Check all that apply Wetlands on Site ❑ Yes ❑ No Wetlands Delineation has been completed: ❑ Yes ❑ No US ACOE Approval of Delineation completed: ❑ Yes ❑ No 404 Application in Process w/ US ACOE: ❑ Yes ❑ No Permit Received from US ACOE ❑ Yes ❑ No Fee Split for multiple permits: (Check# 7')22 ) Isolated wetland on Property ❑ Yes ❑ No Buffer Impacts: ❑ No ❑ YES: acres) Minor Variance: ❑ No ❑ YES Major General Variance ❑ No ❑ YES 401 Application required: ❑Yes ❑ No If YES, ❑ Regular Perennial, Blue line stream, etc on site ❑ yes ❑ No For DENR use only Total Fee Amount $ 400 SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance ❑ Ma'; Min)$ SW ( HD, E) LD, Gen) Q& i4 -U 8 $ cc� 401: $ LQS $ Stream Deter,_ $ North Carolina Secretary of State http://www. secretary. state.nc. us/corporations/Corp. aspx?Pitemld=7734771 CORPORATIONS North Carolina Elaine F, Marshall DEPARTMENTOF THE Secretary SECRETARY OF STATE PO Box 29622 Raleigh, NC 27626-0622 (919)607-2000 Corporations Home Search By Corporate Name Search For New Corporation Search By Registered Agent Important Notice Corporations FAQ Homeowners' Association FAQ Tobacco Manufacturers Dissolution Reports Non -Profit Reports Verify Certification Online Annual Reports LINKS & LEGISLATION KBBE B2B Annual Reports SOSID Number Correction 2001 Bill Summaries 1999 Senate Bills Annual Reports 1997 Corporations 1997 Register for E-Procurement Dept. of Revenue ONLINE ORDERS Start An Order New Payment Procedures CONTACT US Corporations Division Secretary of State's web site TOOLS Secretary of State Home Secretary of State Site Map Printable Page Date: 2/18/2008 Click here to: View Document Filings I Sign Up for E-Notifications I Print apre-populated Annual Report Form I Annual Report Count I File an Annual Report I Corporation Names Name Name Type NC Burton Farm Development Legal Company, LLC Limited Liability Company Information SOSID: 0778425 Status: Current -Active Date Formed: 4/21/2005 Citizenship: Domestic State of Inc.: NC Duration: Perpetual Registered Agent Agent Name: Anderson, Douglas E Registered Office 1021 Noell Ln Address: Rocky Mount NC 27804 Registered PO Box 1908 Mailing Address: Rocky Mount NC 27802 Principal Office 1021 Noell Ln Address: Rocky Mount NC 27804 Principal Mailing PO Box 1908 Address: Rocky Mount NC 27802 For questions or comments about the Secretary of State's web site, please send e-mail to Webmaster. I of 1 2/18/2008 2:19 PM