HomeMy WebLinkAboutSW7070906_CURRENT PERMIT_20071108STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW cD70�f
DOC TYPE
CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
TO
YYYYMMDD
r
1
Mr. Phillip W. Harrington, Manager
Earth Shakers, LLC
760 Pitts Chapel Road
Elizabeth City, NC 27909
Dear Mr. Harrington:
Michael F. Easley, Go(J
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
November 8, 2007
Subject: Permit No. SW7070906
Harbor Center
High Density Stormwater Project
Pasquotank County
Coleen H. Sullins, Director
Division of Water Quality
The Washington Regional Office received a completed Stormwater Application for the subject project on
September 10, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will
comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW7070906 dated November 8, 2007 to Earth Shakers, LLC for the construction and operation of a wet detention
pond to serve Harbor Center located at 107 Nance Court in Elizabeth City, NC.
This permit shall be effective from the date of issuance until November 8, 2017 and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance
requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater
management system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This
request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes,
and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such
demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Roger
Thorpe or me at (252) 946-6481.
Icerel ,
�� V
Al Hodge, Regional Supervisor
Surface Water Protection Section
Washington Regional Office
cc: Hyman & Robey, PC
City of Elizabeth City Inspections
ashington Regional Office
Central Files
North Carolina Division of Water Quality Internet: nctxatergual n nn, One
943 Washington Square Mall Phone (252) 946-6481 No Karnoll=
Washington, NC 27889 Fas (2521946-9215 /vt�turt>4{[J/
State Stormwater Management Systems
Permit No. SW7070906
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and
other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Earth Shakers, LLC
Harbor Center
Pasquotank County
FOR THE
construction, operation and maintenance of stormwater management systems in compliance with the provisions of
15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management
plans and specifications and other supporting data as attached and on file with and approved by the Division of Water
Quality and considered a part of this permit for a wet detention pond to serve the proposed Harbor Center located at
107 Nance Court in Elizabeth City, NC.
This permit shall be effective from the date of issuance until November 8, 2017 and shall be subject to the following
specified conditions and limitations:
DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater described in the application
and other supporting data.
2. This stormwater system has been approved for the management of stormwater runoff as described on page
2 of this permit, the Project Data Sheet.
3. A maximum of 27,684 square feet of built upon area is allowed on this 1.65 acre site.
4. All stormwater collection and treatment systems must be located in either dedicated common areas or
recorded easements. The final plats for the project will be recorded showing all such required easements, in
accordance with approved plans.
5. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of
the permit.
DIVISION OF WATER QUALITY
PROJECT DATA
Project Name:
Harbor Center
Permit Number:
SW7070906
Location:
Pasquotank County
Applicant:
Earth Shakers, LLC
Mailing Address:
760 Pitts Chapel Road
Elizabeth City, NC 27909
Application Date:
9/10/07
Receiving Stream:
UT to Knobbs Creek
Classification of Water Body:
C-SWP
Total Site Area:
1.65 ac
Drainage Area to Basin:
0.84 ac
Total Impervious:
0.64 ac
Pond Depth:
4.0 feet
Required Storage Volume:
2,244 cf
Provided Storage Volume:
2,905 cf
Required Surface Area:
2,788 sf
Provided Surface Area:
3,099 sf
Controlling Orifice:
7/8 in @ elev. 5.0 ft
6. No homeowner/lot ownerldeveloper shall be allowed to fill in, alter, or pipe any vegetative practices (such as
swales) shown on the approved plans as part of the stormwater
management system without submitting a revision to the permit and receiving approval from the Division.
The following items will require a modification to the permit:
a. Any revision to the approved plans, regardless of size
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area
e. Further subdivision of the project area.
In addition, the Director may determine that other revisions to the project should require a modification to the
permit.
8. The Director may notify the permittee when the permitted site does not meet one or more of the minimum
requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written
.time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall
provide copies of revised plans and certification in writing to the Director that the changes have been made.
II. SCHEDULE OF COMPLIANCE
The permittee will comply with the following schedule for construction and maintenance of the stormwater
management system.
a. The stormwater management system shall be constructed in its entirety, vegetated and operational
for its intended use prior to the construction of any built -upon surfaces except roads.
b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be
repaired immediately.
2. The facilities must be properly maintained and operated at all times. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals.
3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted
stormwater system functions at optimum efficiency including, but not limited to:
a. Semiannual scheduled inspections (every 6 months)
b. Sediment removal
C. Mowing and revegetation of side slopes
d. Immediate repair of eroded areas
e. Maintenance of side slopes in accordance with approved plans and specifications
f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping.
4. Records of maintenance activities must be kept and made available upon request to authorized personnel of
DWQ. The records will indicate the date, activity, name of person performing the work and what actions were
taken.
5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of
this permit, the approved plans and specifications, and other supporting data.
6. Upon completion of construction and prior to operation of this permitted facility, a certification must be
received from an appropriate designer for the system installed certifying that the permitted facility has been
installed in accordance with this permit, the approved plans and specifications, and other supporting
documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall,
Washington, North Carolina, 27889, attention Division of Water Quality.
A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the
project.
III. GENERAL CONDITIONS
1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is
a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality
accompanied by an application fee, documentation from the parties involved, and other supporting materials
as may be appropriate. The approval of this request will be considered on its merits and may or may not be
approved.
2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to
enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-
215.6(a) to 143-215.6(c).
3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules,
regulations, or ordinances which may be imposed by other government agencies (local, state, and federal)
which have jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the
Permittee shall take immediate corrective action, including those as may be required by this Division, such as
the construction of additional or replacement stormwater management systems.
5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a
permit modification, revocation and reissuance or termination does not stay any permit condition.
6. The Permittee, at least six (6) months prior to the expiration of this permit, shall submit in writing a request for
an extension along with appropriate application fee.
Permit issued this the 8 th day of November, 2007.
NORTH CA�RO�LIN`A ENVIRONMENTAL MANAGEMENT COMMISSION
.-�r Coleen H. Sullins Director
Division of Water Quality
By Authority of the Environmental Management Commission
Permit Number SW7070906
Earth Shakers, LLC — Harbor Center, Pasquotank County
Stormwater Permit No. SW7070906
Designer's Certification
I, , as a duly
registered Professional Engineer in the State of North Carolina, having been authorized to observe
(periodically/weeklyffull time)
the construction of the project,
(Project)
for (Project Owner)
hereby state that to the best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial compliance and intent of the
approved plans and specifications.
Signature
Registration Number
Date
Certification Requirements:
_1. The drainage area to the system contains approximately the permitted acreage.
_2. The drainage area to the system contains no more than the permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the runoff drains to the
system.
_4, All roof drains are located such that the runoff is directed into the system.
_5. The outlet/bypass structure elevations are per the approved plan.
_6. The outlet structure is located per the approved plans.
_7. Trash rack is provided on the outlet/bypass structure.
_8. All slopes are grassed with permanent vegetation and are no steeper than 3:1.
_9. The inlets are located per the approved plans and do not cause short-circuiting of the system.
_10. The permitted amounts of surface area and/or volume have been provided.
_11. All required design depths are provided.
_12. Required drawdown devices are correctly sized per the approved plans.
13. All required parts of the system are provided, such as a vegetated shelf, forebay and vegetated
filter if required.
_14, The required system dimensions are provided per the approved plans.
r.i, -/'r Y LITIAMIa1
OFFICE USE ONLY
Date Received
Fee Paid
Permit Number
SEP
1
2
DWQ_WA6 91 State of North Carolina-5UJACK 9 /11 /0 /
�L epartment of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
L/ GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
Earth Shakers, LLC
2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance):
Phillip W. Harrington, Manager
3. Mailing Address for person listed in item 2 above:
760 Pitts Chapel Road
City: Elizabeth City State: NC Zip: 27909
Telephone Number: ( 252 ) 335-4520
4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
Harbor Center
5. Location of Project (street address):
107 Nance Court
City: Elizabeth City County: Pasquotank
6. Directions to project (from nearest major intersection):
From US 17 at Halstead Blvd (SR 1152) take Halstead Blvd.
aooroximately 2 miles. Project is on riqht at end of Nance Ct.
7. Latitude: 360 17' Longitude: 76c' 13' of project
8. Contact person who can answer questions about the project:
Name: Kinterly D• lknrrby Telephone Number: ( 252 ) 335-1888
II. PERMIT INFORMATION:
1. Specify whether project is (check one): X New Renewal Modification
Form SWU-101 Version 3.99 Page 1 of 4
1
FINANCIAL RESPONSIBILITY/OWNERSHIP FORM -
SEDIMENTATION POLLUTION CONTROL ACT
No person may initiate any land -disturbing activity on one or more acres as covered by the .Act before this
form and an acceptable erosion and sedimentation control plan have been completed and aoproved by the
Land Quality Section, N.C. Department of Environment and Natural Resources. (Please t ((��oofID
the question is not applicable or the e-mail and/or fax information unavailable, place NIA in e�tank.
Part A. SEP 1 1 2007
1. Project Name Harbor Center
2. Location of land -disturbing activity: County Paseuotank CitvorTownship Elizabezh Ci-v
Highway/Street_ Nance Court Latitude 36° 17' Longitude 760 13' 1
3. Approximate date land-disturbing.activity will commence: 1Ia'eescber 2007
4. Purpose of development (residential, commercial, industrial, institutional, etc.):
5. Total acreage disturbed or uncovered (including off -site borrow and waste areas):
5. Amount of fee enclosed: $ i nn _ nn . The application fee of S50.00 per acr _ (round=_:
up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is S_50).
7. Has an erosion and sediment control plan been filed? Yes X No Enciosed X
S. Person to contact should erosion and sediment control issues arise during land-disturbinc activity:
Name Phillip Harrinqton E-mail Address
Telephone 252-335-4520 Cell# 252-312-4500 F2x# 252-335-7656
9. Landowner(s) of Record (attach.accompanied page to list additional owners):
Earth Shakers, LLC 252-335-4520 252-33E-7656
Name Telephone Fax Numbe-
760 Pitts Chaple Road
Current Mailing Address Current Street Address
Elizabeth City, NC 27909
City State Zip
10. Deed Book No. 898 Page No.
Part B.
City
384
State
Provide a copy of the most current deed.
Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide a
comprehensive list of all responsible parties on an attached sheet):
Earth Shakers, LLC
Name
760 Pitts Ehapel Road
Current Mailing Address
E1_zabezh 4c.v, 27rno
fv Sias= _i-
Telephone -='2- -=2CI
E-mail Address
Current Street Address
2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the
existing permit number and its issue date (if known)
3. Specify the type of project (check one):
Low Density X_High Density Redevelop General Permit Other
4. Additional Project Requirements (check applicable blanks):
_CAMA Major X Sedimentation/Erosion Control _404/401 Permit X NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748.
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
Rmoff am mpervicus szs ces will be cmllected in an wnd� chairiage system arr] rcuted to a
detentiat pad designed for 90% TES Kano
2. Stormwater runoff from this project drains to the
Pasquotank
River basin.
3. Total Project Area: 1.65 acres
4. Project Built Upon Area:
39
5. How many drainage areas does the project have? 2
G. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area 2
Receiving Stream Name
Knobbs Creek
Knobbs Creek
Receiving Stream Class
C SW
C SW
Drainage Area
0.84 ac
0.81 ac
Existing Impervious' Area
0
0
Proposed Impervious*Area
200 SF
%Impervious' Area (total)
65%
0.6%
Impervious* Surface Area
Drainage Area I
Drainage Area 2
On -site Buildings
9 340 SF
On -site Streets
On -site Parking
16,562 SF
200 SF
On-siteSidewalks/EU;ster per,
Other on -site
1 782 SF
Off -site
Total: 4 .64
Total: 200SF
Impervious area is defined as the Guilt upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
7. How was the off -site impervious area listed above d
IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than N/A square feet of any lot shall be covered by structures or impervious materials.
Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway, crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
I. Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
In' ials
• Original and one copy of the Stormwater Management Permit Application Form
• One copy of the applicable Supplement Form(s) for each BMP I G
• Permit application processing fee of $420 (payable to NCDENR) P�
• Detailed narrative description of stormwater treatmerit/management
• Two copies of plans and specifications, including: ir(
Development/Project name
Engineer and firm
-Legend
- North arrow
- Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
- Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
- Wetlands delineated, or a note on plans that none exist
- Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
- Vegetated buffers (where required)
VIL AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf,,please complete this section.
Designated agent (individual or firm): HTman & nhA�z, Pr
Mailing Address: PO Box 339
NC
27921
Phone: ( , 252 ) 335-1888 Fax: ( 252 ) 338-5552
Vill. APPLICANT'S CERTIFICATION
1, (print or type name of person listed inGencrallnformation,.item2) %Phillip W. Harrington
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A
NCAC 2H .1000.
Signature:
Form SWU-101 Version 3.99 Page 4 of 4
Date: - 6 /L V/d 7
Permit No
(to be provided by DWQ)
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality REGERVED
STORMWATER MANAGEMENT PERMIT APPLICATION FORM '.t; 'w? b!p
SEP 1 0 2007
WET DETENTION BASIN SUPPLEMENT
This form may be photocopied for use as an original MOM
DWQ Stormwater Management Plan Review:
A complete stormwater management plan submittal includes an application form, a wet detention basin
supplement for each basin, design calculations, and plans and specifications showing all basin and outlet
structure details.
I. PROJECT INFORMATION
Project Name:
er
Contact Persom. Kimberly D. Hamby Phone Number: (252) 335-1888
For projects with multiple basins, specify which basin this worksheet applies to: 1
elevations
Basin Bottom Elevation 1.0 ft. (floor of the basin)
Permanent Pool Elevation 5.0 ft. (elevation of the orifice)
Temporary Pool Elevation 5.83 ft. (elevation of the discharge structure overflow)
areas
Permanent Pool Surface Area 3 , 099 sq. ft.
Drainage Area
Impervious Area
volumes
Permanent Pool Volume
Temporary Pool Volume
Forebay Volume
Other parameters
SA/DAI
Diameter of Orifice
Design Rainfall
Design'TSS Removal 2
Form SWU-102 Rev 3.99
0.84 ac.
0.64 ac.
(water surface area at the orifice elevation)
(on -site and off -site drainage to the basin)
(on -site and off -site drainage to the basin)
4,080 cu. ft. (combined volume of main basin and forebay)
2,905 cu. ft. (volume detained above the permanent pool)
895 cu. ft. (approximately 20% of total volume)
7* (surface area to drainage area ratio from DWQ table)
.875 in. (2 to S day temporary pool draw -down required)
5.75 in. (10 year storm)
90 % (minimum 85%. required)
Page 1 of 4
Footnotes:
When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the
actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non-
standard table entries.
2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide
90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal.
II. REQUIRED ITEMS CHECKLIST
The following checklist outlines design requirements per the Stormwater Best Management Practices Manual
(N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code
Section: 15 A NCAC 2H .100&
Initial in the space provided to indicate the following design requirements have been met and supporting
documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit
Application Form, the agent may initial below. If a requirement has not been met, attach justification.
Applicants Initials
RO�1pM�� a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet).
y�q,VY� b. The forebay volume is approximately equal to 20% of the basin volume.
P�lJ c. The temporary pool controls runoff from the design storm event.
d. The temporary pool draws down in 2 to 5 days.
---- e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow
calculations)
f. The basin length to width ratio is greater than 3:1.
g. The basin side slopes above the permanent pool are no steeper than 3:1.
h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail).
ahi. Vegetative cover above the permanent pool elevation is specified.
_ (AM j. A trash rack or similar device is provided for both the overflow and orifice.
---------- k. A recorded drainage easement is provided for each basin including access to nearest right-
of-way.
1. If the basin is used for sediment and erosion control during construction, clean out of the
basin is specified prior to use as a wet detention basin.
_P&h_ in. A mechanism is specified which will drain the basin for maintenance or an emergency.
(pump)
III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT
The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the
vegetated filter if one is provided.
This system (check one) 0 does JD does not incorporate a vegetated filter at the outlet.
This system.(check one) 0 does R)Ooes not incorporate pretreatment other than a forebay.
Form SWU-102 Rev 3.99 Page 2 of 4
Attachment to WET DETENTION BASIN SUPPLEMENT
For Harbor Center
e. Pond has been designed for 90% TSS removal.
k. The pond is located entirely on the project property and discharges into an
existing ditch located on the project property.
Maintenance activities shall be performed as follows:
After every significant runoff producing rainfall event and at least monthly:
a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation,
vegetated cover, and general condition.
b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within
2 to 5 days as designed.
2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative
cover to maintain a maximum height of six inches, and remove trash as needed.
3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain
proper functioning.
4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is
reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of
in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e.
stockpiling near a wet detention basin or stream, etc.).
The measuring device used to determine the sediment elevation shall be such that it will give an accurate
depth reading and not readily penetrate into accumulated sediments.
When the permanent pool depth reads 3 feet in the main pond, the sediment shall be removed.
When the permanent.pool depth reads 22 55 feet in the forebay, the sediment shall be removed.
BASIN DIAGRAM
6611 in the blanks)
Permanent Pool Elevation 5 . 0
Sediment ReTNC
val El. 2 . 75 1 75°
-- Sediment Removal Elevation . 0 75%
Bottom El e anon 2 . 0 %-`--"'-'----'------------- - '--'--`-' "-`
Bottom Elevation 1 • 0 25%
FORE13AY MAIN POND
5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These
plants shall be encouraged to grow along the vegetated shelf and forebay berm.
6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through
the emergency drain shall be minimized to the maximum extent practical.
Form SWU-102 Rev 3.99 Page 3 of
7. All components of the wet detention basin system shall be maintained in good working order.
I acknowledge and agree by my signature below that I am responsible for the performance of the seven
maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any
changes to the system or responsible party.
Print name: Phillip Vi. Harrington
Title: Manager, Earth Shakers, LLC
Address: 760 Pitts Chapel Road, El i 7.ahpth Ci ty, NC 27909 _
Phone: 252-335-4520
Date:
Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a
resident of the subdivision has been named the president.
a Notary Public for the State of�ot
County of �-L�Sc vs�%Got�c� do hereby certify that {phi w j�
personally appeared before me this cry t day of and acknowledge the due
13
execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal,
MARIANNE L COOPER
NOTARY PUBLIC
MQUOTANN COUNTY NC
SEAL
My commission expires & - ( '� - <�:)�
Form SWU-102 Rev 3.99 Page 4 of 4