Loading...
HomeMy WebLinkAboutSW7070520_HISTORICAL FILE_20210604STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE- c12! YYYYMMDD ROY COOPER Governor DIONNE DELLI-GATTI Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality June 4, 2021 Tandemloc, Inc. Attention: John DiMartino, Jr., President 824 Fontana Boulevard Havelock, NC 28532 Subject: Stormwater Permit Renewal Stormwater Management Permit SV 7070520 Tandemloc Facility Craven County Dear Mr. DiMartino: Waco A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SV 7070520 for a stormwater treatment system consisting of a wet detention basin serving the Tandemloc facility located on Outer Banks Drive, Havelock, NC expires on August 9, 2021. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Also, it was noted in the file review that a designer's certification that the project was constructed in accordance with the approved plans as required by the permit has not been submitted. Please include this with your application. Permit application forms for renewal can be found on our website at: https://deq. nc.gov/about/d ivisions/energy-m inera I-and-land- resources/stormwater/stormwater-program/post-construction-2. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at roger.thorpe(u-)ncdenr.gov. Sincerely, Roger K. Thorpe Environmental Engineer Not Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Washington Regional Office 'i 943 Washington Square Mall I Washington, North Carolina 27889 252946.n481 - . ( S rcd2 S;7t. �roy-L Permit Number SW7070520 - �>'/ 4` -/ Program Category State SW Permit Type State Stormwater Primary Reviewer ernest.odei-larbi Coastal SWRuIe Coastal Stormwater - 1995 Permitted Flow Facil Facility Name Tandemloc Facility Location Address Havelock Industrial Park Outer Banks Or Havelock Owner Owner Name John /5-'?!leM /oC /G Try/ S -r.�G: /0 C�/-W, �prYfPfJ-o NC 28532 S(A70.E S �j' C n d "', / c) Central Files: APS _ SWP 5/26/2021 Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Major/Minor Region Minor Washington County Craven Facility Contact Affiliation Owner Type Z Individual Dimartino wner Affiliation John Dimartino 94 7 -7iss 824 Fontana Blvd Dates/Events Havelock INC 28532 Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue EffectiveC8/D9/202l 8/9/2007 5/22/2007 8/9/2007 8/9/2007 Regulated Activities Requested /Received Events State Stormwater - HD - Detention Pond Deed restriction requested d5�S9U¢/g6 9i0 ;� 74 Deed restriction received Additional information requested 6/21107 Additional information requested 7/26/07 Additional information received 715107 Additional information received 811/07 Outfall Waterbod`y�Name /lJ //JS5/PGj/�',S 04V0 //S Streamindex Number Current Class Subbasin AVOLIS ENGINEERING, P.A. P.O. Box 15564 • New Bern, North Carolina 28561 • (252) 633-0068 August 2, 2007��' ,/ AUG - 3 2001 Mr. Emest Odei-Larbi. EI Environmental Engineer DWQ-VVA► O State of North Carolina Division of Water Quality 934 Washington Square Mall Washington, NC 27889 Re: Stormwater Review SW7070520, Tandemloc Facility, Craven County Dear Ernest: As we discussed by telephone this date, enclosed please find three copies of revised plan sheet C5 for the above -referenced project relating the orientation of the vegetative shelf. We appreciate your prompt review of this project. Should you have any questions, please do not hesitate to give me a call. Sincerely, AVOLIS ENGINEERING, P.A. —�� P.O. Box 15564 • New Bern, North Carolina 28561 • (252) 633-0068 July 31, 2007 AUG - 1 20007 Mr. Ernest Odei-Larbi, EI Environmental Engineer ®YtlQ VVAiO Division of Water Quality 943 Washington Square Mall Washington, NC 27889 Re: Stormwater Review S W7070520, Tandemloc Facility, Craven County Dear Ernest: Enclosed please find two sets of revised plans for the above -referenced project in response to you letter of July 26, 2007. • I have checked the 1-inch storage elevation and feel that it is correct. Please refer to page 2 of the calculations, copy attached. The runoff volume from the 1-inch storm is 5,826 CF. Between the elevation of 16.6' and 17.0' (0.0'— 0.4' stage), the pond will store 2,659 CF. Please see the Pond Stage Storage Table at the top of the calculation page. 5,826 CF subtract 2,659 CF leaves 3,167 CF to be stored above pond elevation 17.0'. Between the elevation of 17.0' and 18.0', the pond stores 7,466 CF. Please see the Pond Stage Storage Table for "Delta" Volume Stored. The ratio of the rise between the 17.0' and the 18.0' contours is obtained by dividing 3,167 by 7,466 to get 0.42. The number 0.42 is a ratio which in this case applies to the one foot elevation increase. Therefore, 1-inch storm elevation equals 17.42'. Our method of calculating the pond rise takes into account the additional storage volume created due to the sloping pond sides. • We have revised the pond plan and cross-section to clarify the new requirement for positioning of the vegetated shelf. • Since the 1-inch storm level is correct, we are not forwarding a new wet basin supplement. We appreciate your assistance with this project. Should you have any questions, please do not hesitate to give me a call. rr a2 E 7-96&6 (AeoyE Iaoi. RdoL u r) ft�Eh�F+z) A Va�.51uQEv/�f3) O"m V6, &14 7-1 ca 014 14.0 (00875 2ros z,�s9 1, 4 18-0 8,06-7 �,4lolO lo, �zs 2,4 HID 913o9 8,683 /S,BoB CAr-CuG4rE. kunDr-F VvU4,me 04510alo+rED RA-ra FAZc. EU�r CXA = (1.0)(1 'YZ0,000 SF) = 1 (�(' � FT-1 . Q (0.g s)(il l(,4s,9 0 4sF) = 3,Co 34 Pt Zo,LlB&5F) = SZS F*3 F+ 3 4 '1 Q +k STh O<ff, V 6-F7 H IA) Po�9 T3ET�£f� 11o•fo' � I�:U'� ��5cj; r�3 IS 57uRED IREMAIMJA)4 VULumC- 7D 5F— 5T'a2g-V 6$STl 6ie:A) 17,0 18. 0 S$Z& Ft3 - Z,GS�j Ft 3 = 31& - E±-3 y 'j Fr it51= = 3,k(o4Z Ft. 4�G F43 , -rac H 5To2wt 14, 4Z u1+1cH 1s 4 -mTA1, RisE or- O.$z- F4- l iz. 5-" Or- AA-1— V E.514-4 O url fir ' rV-MG7-LtRZ Tp /hAr �TfFl,U /mil E p,Q-E VrGolOin EA)T- paA).4Fr— CU,17J� rI onJS rnl OR9E�2 7n SAT�SF� i?f�= Cr�k UG tFA+�£.r�ock. `R EG2�U r 2FNMEn1Tb, 1 Michael F. Easley, Governor IJ July 26, 2007 Tandemloc, Inc. Attn.: John DiMartino 824 Fontana Boulevard Havelock, NC 28532 Coleen H. Sullins, Director Division of Water Quality Subject: Stormwater Review SW7070520 Tandemloc Facility Craven County Dear Mr. DiMartino: This office received a Coastal Stormwater permit application and plans for the subject project on July 05, 2007. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. • Please check your 1-inch storage elevation calculation. Per your calculation, when you divide cubic feet by cubic feet, that gives you a constant without unit. The volume of the 1" runoff should be divided by the surface area at the permanent pool or you need to extrapolate the 3644 clt from stage/storage table between elevation 17 and 18 ft. Please dimension width of aquatic shelf on plan view and show the top and bottom elevation of aquatic shelf on plan/section view. Your wet pond plan does not clearly show half the aquatic shelf above the permanent pool and half below. A minimum of 10 foot wide vegetative shelf shall be installed around the full perimeter, the inside edge of shelf shall be 6" below the permanent pool and the outside edge of shelf shall be 6" above the permanent pool. (This requirement is in accordance to new NCDWQ regulation for wet pond design) • Please you will need to submit a new wet detention basin supplement. The above requested information must be received in this office prior to August 26, 2007 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules .require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3843. Sincerely, Em ei-Larbi, E.1 Environmental Engineer Washington Regional Office cc: Joseph C. Avolis, P.E., Avolis Engineering, and P.A Washington Regional Office Dm Craven County Planning/Inspection N�C�ttCarolina ,Naturn!!il North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet h2o.enr.state.nc.us 943 Washington Square Mall, Washington, NC 27889 1-877-623.6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled11046 Post Consumer Paper b9VX!i:-XVKD SOIL BORING DATA Tandemloc Facility . Outer Banks Drive Havelock Industrial Park Havelock, North Carolina JUL 0 5 2007 DWO-WAR® The soil boring was conducted by using a hand auger in the proposed stormwater detention pond location for the new Tandemloc manufacturing facility. The site is currently wooded and is located on a sloping area adjacent to 404 Wetlands and the riparian buffer area of Shop Branch (a "blue line"- stream). The soil was observed to have the following characteristics: Date: Apfi24�2 07 � + ' ..DEPaTH a 0 - 4 Inches Top Soil 4 Inches - 16 Inches Sandy Loam 16 Inches - 56 Inches Sandy Clay The seasonal high water table level was 42 inches below grade which is at an elevation of 15.5 feet. The Craven County soil survey classifies the soil type on the site as Lynchburg. Lynchburg is classified as a Drainage Class C Soil. The soil is described as being a sandy loam in the upper fourteen inches and a sandy clay loam below that depth. The soil condition at the site closely matched the description of the Lynchburg soil as shown in the Craven County Soil Survey. The Craven County Soil Survey describes the Lynchburg soil type as follows: ^��DESCRIPaTION� :nFOML W .YWr¢C.r. 0 - 14 Inches Fine Sandy Loam 14 Inches - 65 Inches Sandy Clay Loam 65 Inches - 74 Inches Fine Sandy Loam L The sandy clay soils are suitable for the construction of the stormwater detention pond. The soil is stable and will work well for maintaining the pond banks. �1/0�5 Cr' �Ne2r, /1 �� �* i' ' u � `-�3.Tcx x i a'* k L�. 't: wocRo Michael F. Easley, Governor William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources Y Alan W. Klimek, P.E. Director Division of Water Quality June 21, 2007 Tandemloc, Inc. Atm.: John DiMartino 824 Fontana Boulevard Havelock, NC 28532 Subject: Stormwater Review SW7070520 Tandemloc Facility Craven County Dear Mr. DiMartino: This office received a Coastal Stormwater permit application and plans for the subject project on May 22, 2007. A preliminary review of the project indicates that before a State Stormwater permit can be issued the following additional information is needed. • Please sign, seal and date the calculation. • Please check your average drawn down calculation and explain how the 5286cft used in the calculation was derived. • Please revise the calculation for the associated level rise for the first inch runoff. Per your pond stage storage table, the 1-inch storm elevation should be 17.46ft. • Please the temporary pool volume to report on the wet detention basin supplement is the volume provided between the permanent pool elevation and the temporary pool elevation. • Please show access to riser structure on plan view for maintenance. • Please dimension each line and arc of the permanent pool contour. If it is irregular, provide approximate dimension and call out the square feet. • Please show calculation for riprap at the inlet of pipe to forebay and outlet of mainbay of pond. • Please attach Ref. Table 8.05d and Ref. Fig. 8.06a to calculation. • Please show north arrow and legend on sheet C5. • Please specify the type of vegetation to be planted on the side slope (i.e. 3:1) of the pond above the aquatic shelf and add a note on the plan/section view of the wet detention pond. • Please revise the pond section/plain view to show half the aquatic shelf above the permanent pool and half below. • Please provide seasonal high water table (SHWT) level in your soil report and detail soils report that relates on -site soil borings to the NRCS Craven County Soils Map. Soil report should discuss soil types and suitability for placement of proposed stormwater control measure. Show location of project on county soils map and date when soil boring was done. Please ensure that in your pond design the permanent pool elevation is above the SHWT. • Please specify a maximum opening size of 4" on the trash rack. N7ocpt"jr,�,}�Caro��'on rNaiu z North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet h2o.enr.state.naus 943 Washington Square Mall, Washington, NC 27899 1-877.623-6748 An Equal Opportunity/Afinnative Action Employer— 50% Recycled/10% Post Consumer Paper The above requested information must be received in this office prior to July 21, 2007 or your application will be returned as incomplete. The return of this project will necessitate resubmittal of all required items including the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 21-1.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3843. Sincerely, Em�-Larbi, E.I Environmental Engineer Washington Regional Office cc: Joseph C. Avolis, P.E., Avolis Engineering, and P.A Vivashington Regional Office STORMWATER MANAGEMENT NARRATIVE MAY 2 2 2007 Tandemloc Facility ®WQ-WARO Outer Banks Drive Havelock, North Carolina This project proposes the construction of a new 20,000 square foot manufacturing facility on a wooded and undeveloped lot. The project also includes the construction of vehicle parking areas, unloading areas and open grassed areas. The project is geographically separated from a previous Tandemloc project approved by Permit No. S W7050523. The project disturbed area is 4.5 acres. The western side of the site will not be developed at.this time. At some point in time if it is developed, it will likely require a second BMP. The stormwater runoff from the new building and the parking area will be directed to the wet stormwater detention pond by a combination of a grass swale and a piping system. The pond is sized to provide 90% TSS removal and will have a permanent pool depth of four feet. A ten foot wide littoral shelf is incorporated into the pond with plantings. The pond discharge is to.a shallow Swale before discharge into 404 Wetlands and eventually to an on -site riparian buffer. This project will comply with the City of Havelock Stormwater Ordinance which also includes the Neuse River Basin Nutrient Reduction requirements. The project provides runoff attenuation from the 10-year storm. Grading activities, which are allowable, will take place in Zone 2 of the Neuse River Riparian Buffer in order to complete the pond slopes. Zone I of the riparian buffer will not be disturbed. There are no 404 or Coastal Wetlands disturbed by this project. r c' AVOLIS ENGINEERING, P.A. ZI-%33 P.O. Box 15564 • New Bern, North Carolina 28561 • (252) 633-0068 dllECEUVED July 2, 2007 JUL 0 5 2007 Mr. Emest Odei-Larbi, EI ®�� q 11 �� Environmental Engineer State of North Carolina Division of Water Quality 934 Washington Square Mall Washington, NC 27889 Re: Stormwater Review SW7070520, Tandemloc Facility, Craven County Dear Ernest: In response to you review comments of June 21, 2007 for the above -referenced project, enclosed please find two sets of revised plans and calculations. Our response to the review comments is as follows: - We have provided a cover with a seal and date on the calculations. - The 5286 cubic foot value was reversed from 5826. The preliminary orifice size would change. However, the more accurate routing of the selected 1-1/4" orifice shows that its drawdown is satisfactory. Therefore, there is no design change. The calculation has been corrected. - The correct 1-inch storm stage is 17.42 ft. (0.82 ft. stage). - The temporary pool volume reported on the wet detention basin supplement is the volume associated with the one inch storm and occurs above the permanent pool level. - We have shown the access route for maintenance of the riser. Access is provided by walking on the exposed top of the pipe which is above both the temporary and permanent pools. We have also tapered the contours in the area of the riser in order to make it easier to access. - We have added dimensioning of the permanent pool configuration to the drawings. - We have added additional rip rap calculations to the stormwater calculations. - We have added a copy of table 8.05d and figure 8.06a from the Sedimentation and Erosion Control design manual to the stormwater calculations. - We have added a north arrow and a legend on sheet C5. - We have added a specification for the pond side slope vegetation - We have revised the aquatic shelf to show it one-half above and below the permanent pool. - We have added the seasonal high water table (SHWT) information to the soils report. The pond permanent pool elevation is above the SHWT. r-• We have dimensioned the trash rack opening size as four inches. We appreciate your prompt review of this project. Should you have any questions, please do not hesitate to give me a call. Cc: Mr. Pete West, Custom Building Company AVOLIS ENGINEERING. P.A. P.O. Box 15564 • New Bern, North Carolina 28561 • (252) 633-0068 May 14, 2007 Mr. Bill Moore Environmental Engineer NCDENR - Water Quality Section 943 Washington Square Mall Washington, NC 27889 RE: Tandemloc, Inc. Facility Outer Banks Drive, Havelock, NC 28532 AE Project No. 06130 Dear Bill: Enclosed please find the following for the above -referenced project: • Stormwater Management Permit (Original and One Copy) • Wet Detention Basin Supplement (Original and One Copy) • Stormwater Narrative (2 Copies) • Project Plans (2 Copies) • Stormwater Calculations (2 Copies) • $420 Permit Fee Should you have any questions relating to this matter or need any additional information or assistance, please do not hesitate to call. Sincerely, .los h C volis, P.E. Pr ide RECE EIVED JUL 0 5 2007 DWQ-WAR® COASTAL STORMWATER CALCULATIONS Tandemloc Facility Outer Banks Drive Havelock Industrial Park Havelock, North Carolina Prepared by: Avolis Engineering, P.A. P.O. Box 15564 New Bern, NC 28561 (252)633-0068 Office (252)633-6507 Fax July 2, 2007 I l r I, � T/fiJDEMtcu�Gi•__�.F�{C V► i�' � j r t off; 7?4 OM!Sr t. _ _R�iU ►OrJsj isFr?� Wl _ G os-np, 6✓!rft .77te _ L /�_1F._.c(SE _.�s�.�_ .�uaES � S,�ccuD�rJ(►I-!.7?fE i__; �� �,``jJ_.OFI- -- -- ---�1%Ei.oCe; l�.-urfLllf�rr .�E7�uC.Tio-•J� �cQutRF_ME,JTS'. . _�12o7ECr. Wiw. f�E__�/ l+��N DF�S►r�, poG�ET_ OA� OVER?cu% .. f.h�R-GVILLTAT �►+� �:---- lS_; r'�ADE t l p_ OF TW° . "7 5- ` Tor4c, $u[c�W� fkEEk . f P opos.Ep . ZO► DDO.SF_ �O. QloAc) /D9- vE _ A198A :-4s, 9'04_. sr ( l osA} )_: + o.: Bul,vT-G�Pe(054045F �ErEaznnW�� Af �Qu►P,6y /.Jt'r- f0.JlJ 6I.7E.;_ u6f !- t4-'+;--LTEP1l{ ► :_ j5-I�E__�ol9:`_ r I r 1 J _-MINIMUM �it62.1.c1CLE��. POND.�.S�'//l.G/}GE'A��{� i(/.SSt°��C�%► S9O5F) i _�SEr_;_�uav-�ERHht1E.Jr �ud(, I%,cf'�•i __if�'T. ! EI.EU,4�f1o�__' �(0_.Cn...F�' i �D�D_ Jrti2FA�T.E �wctt.- �AT �% 6;- �i CO,/JTUN(Z =1 64ZI _5►-_ I t s► I J J ' 'ST6lL415�E T�984 ; 0VE PEkrPi. Pa aL. Gc'✓cl . t��,.., i , 1l� • to � _ -' 1�,4z1 I_ .. �l_ _` � _. 0.4 '_ __ i_l•o ,_ ; �,5}s 2,co5.9. .: . I, 4 V 2,4 L 19.0 9, 'oq. ;. 8,653. .. .: I3,80.8;_ CA�Cut,,q�r� RuaoFF Vntc(•�-�E iQ5�i0Gi�rED. l.JlTh! �.. .._._. , , Burt,D�aG% _Q= CTh= �•0)� I '1/20,00ot,(a67- FT3 31(v3.4. Ff �MssED Ag-f—Ek.sf �" Sroft 1. 5Tbtz VSFrN la Fbrj9: 7 h�cMAr,�ial, Vv�urrrE :7D [iE, 57'oR.ED_' 6�Td_✓�.E!J_ _4- 5,8 F+13 y 43 i I fI1�'r.F 1 �,'� _DE511-f£ OuTGET 7 N_GT?tR� /HQ/Jr /Au _ pQE FVEGgpi►�Eiu7�' /�cirleF_r_ CU-JVir/oA)s — t� _ OR_ OErZ ;----ro 5 Pr_r15F�. i}tEI Ctry. UG PfFh�ELx(c. I _ �iEC,2'Ur2�r!?F,UTS,I i T 3 I ' i 1 ICA "a , -� �p AMC 0,;IfAjo c f 772f 7/Z- 1-4 6ocl U/ZB4J-' p44H5 5.4 I icri k r -6, '6 cc E'AP- 15-n R-AO rhiu u K 14 SpECIF)50Ourt4F-r I F-Av— L'�4L -5-1494 p 4-1 -S-D M.1 Al, o.4-- )A, I t4— J— 3. 01- IUD T -7-T ---- ------ A-r 57': —r A- L)F VAAW Dew-? -WiSiL. 0-023 R3, p, + 3 z ii's 2j c(r-i sri k6E: 0- bt:5� C-D :-6bLtour�L' Foit 75W,46� ==-71 A.:� , Ty ----- 14 . O,i 0 �i 0 V, F, I CEE L A o f:� belrl.6i- 4— Dry- I I 0.40-- V6L_7=- �-ITAC C AL r7jb 0, 2-6 ------ -4—L . ..... -- - - 0; \0- A— - - /ir —T .. . .... 0.00 - \ 000 ZjObD 31 DOC) 4'000 5,000 (01 G, I -I !--1 j Auaoxrowg v wuoorj USIn76, • 4. I-Fvu0. ZroiCkE:uE RSFDt_TiME_ - . $btii, l�cl... 1 E'KAD Q Q tVdL I i ✓ul. RENtA� tilafi : - :.5-30j__ : o.v3¢_:- IZ . ' :. _; ..g8/9)_ . D•ro3 O.o33_... g�S _ .4344- 1 14 4344 .` 0,51p.. 1 0,031_ ; 44, E 3898' o.oag_- - 24- 1 - .3480 _ _ o,44 .. 0, 02} r _ 38q �...- 30cl r- ZB' _3 9. .. 2,7).W 31 _ _'2,ZI� 0,33 0.o24_L..34/0! .34 0,a:a - 0vo22 31�_ 40... __ . 205¢ _. _.._.. o, Z4 o,e2'0, .. 2806 kJWO; pJ 0,01�. 9f3 ISo O, lln. �. Dllp' ; 23a 12,E sL 12�� ' o• t3. a. aIS a1� I;o�l_ ' � _.low! o.lo ©.o13 I� _ Ste• 64 G-4 -+Itpl 0,05- 0,061 .._ l30 SBA h fob. Silo o.03 0.00-+ 1o1 0.02. 0,00(0 39 3°li 0.01 0,004- `i sq 340_ .. .. . 80 340_; 0: u v f}FTE2 'gyp 11}oK25 POJD _ SKQFAP.F LEVEC,_ IS 0"Os -F{ Dom'_ I,JtiIG�;...lS b�L-IfAZF Ur0 of !NE r f�J p�ENi LAsY 3 3¢� . F+.. -10 'i2\ GYBE 0 u T' ' ' '- '•-�_�� i. �ORat=10E l5._; SATI�j'F/}GT'o. -- _ I- Ct+ �i A;JTT jfjATgj-lpa r)r- ourcEr• �SniH�ruR 1 � r , 1 _J R_aLAIRF_p �iJeHor FGE.lE�1f� R`isE�{ ,_ UDL _Co�CQEnE' .R£QUIKEd7: �.(�;� 4k FP - _ I- I.ISEi x Y BAaaE� FwrA-rio,J S, z f Fb = i;cui4f,v,Fb-gT_l)F f3Ay? EL [is L43 I �s I b - 1�4.1 16 C A1; euvA�rE Vo( url D� &R-,n C4_) As o L, I� 12•E3AM' Fu v oaWAyoL. e w-Vac. l3•0' • E 'Z i l4 0 4►� _ , .. _ 335, I 428 E 4-4 1 � , i I MitIN Qb10o 'wb Fo 14- u_ _ .15(02 1. _z _i. 35`.L _�, I I,ii_4 _ a f f Is.O_ J__' 3233i II - - , 'I/ i « �� ._FU�B_VALU'MF_ I-ra J7VA.U.nr r_dr-ri.int I S // ✓-///lei f I SEaIM AT oa .4?��OSI ; _ _oA)i C��JTR 0t-+ --6 CiC U ..o s - -= , -, _^: t9 r1 _a I oN n7 TES _ aa^a Q P = �A �0• j(5. 4: i;�/Hk Swale SID' fe : : -2 ; p _ Zv USE . RASA rrAD AE1)4003 7-"wnWAsr64.- Sofrwk2E . Jr�EfA�to;. Z,J .. . _ 1 . Ou�T QR,4T7_ena,3 Foil. PIT 1a� SYSTEM p15eNA�L� J�IJ f{c,e�s J .! rI GA _!* G, ! Nv 5Pee 1 CIO A) f2?rVu�R�.. +-. - 1 1 • ' `CIt�ECIc I' Rip ! RE6Luig4t44AJrS ! I I 1 li? .,�R s, ai . ptseNgR�� per_M owrcT , ti«ci+Rc ?.APE 'Sim - IS" . {.... _ 1 I I , � 4 3 M>_ ' --Q dPECT!Aa. GIIART. /VD SPeaF�c F{EG2N�RIEMm'.<�a .._ . i prvlecE r- a- LV^v) .r i� P�►rrCanc.�: 1 1 • • ' , , • I 1 I r __ 1 Appendices r.. - 'Labtet1O5dt�„ - Maximum Permissible Materials Maximum Permissible Velocities for Unprotected Velocities (fps) Soils in Existing Channels. Fine Sand (noncolloidal) 2.5 Sand Loam (noncolloidal) 2.5 Sift Loam (noncolloidal) 3.0 Ordinary Firm Loam 3.5 Fine Gravel 5.0 Stiff Clay (very colloidal) 5.0 Graded, Loam to Cobbles (noncolloida0 5.0 Graded, Silt to Cobbles (colloidal) 5.5 Alluvial Sifts (noncolloidal) 3.5 Alluvial Sifts (colloidal) 5.0 Coarse Gravel (noncolloidal) 6.0 Cobbles and Shingles 5.5 Sample Problem 8.O5a Design of a grass -lined channel. Given: Design 010 = 16.6 ds Proposed channel grade = 20% Proposed vegetation: Tall fescue Sold: Creedmoor (easily erodible) - Permissible velocity, Vp = 4.5 ft/s (cable 8.05a) Retardance class: 'B' uncut, -D' cut (table 8.05c). Trapezoidal channel dimensions: designing for low retardance condition (ietardance class D) design to meet Vp. Find: Channel dimensions Solution: Make an initial estimate of channel size A = O(V; 16.6 cls/4.5 ft/sec = 3.69 ftz Try bottom width = 3.0 it w/side slopes of 3:1 Z=3 A=bd+Zdz P=b+2d R=A/P An iterative solution using Figure 8.05a to relate flow depth to Manning's n proceeds as follows: Manning's equation is used to check velocities 'Fr Fig. BnSc, pg. 8.05.7. Rcrardar class d (VR-e5zO54=243) d in) A (n) R in) • n V (tps) Q (cfs) comments 0.8 4.32 0.54 0.043 3.25 14.0 V<Vp OK, Q<Q1o. (too small, try deeper channel) 0.9 5.13 0.59 0.042 3.53 18.10 V<Vp, OK, Q>Q1o, OK Now design for high retardance (class B): For the ease of construction and maintenance Assume and Try d = 1.5 it and trial velocity, Vt = 3.0 ff/sec d (tt) A (ft') R (ft) V7 (fps) n V (fps) Q lets) Comments 1.5 1125 0.90 3.0 0.08 2.5 28 reduce Vt 2.0 0.11 1.8 - 20 reduce Vr 1.6 - 0.12 1.6 18 ..1.5 0.13 1.5 17 Q>Q10 OK "These assumptions = actual V (fps.) (duct confined on rext page) 8.05.9 Rev. 12193 Hydrograph Summary Report Page 1 Hyd. No. Hydrograph type (origin) Peak Flow (cfs) Time Interval (min) Time to peak (min) Volume (cuff) Return period (yrs) " Inflow hyd(s) - Maximum elevation (ft) Maximum _ storage (cult) Hydrograph description 1 Rational 6.91 1 20 8,290 10 - 10-YR, 20-MIN 2 Rational 5.67 1 30 10,206 10 - 10-YR, 30-MIN 3 Rational 4.87 1 40 11,697 10 - 10-YR, 40-MIN 4 Rational 4.31 1 50 12,932 10 - 10-YR, 50-MIN 5 Rational 3.89 1 60 13,997 10 - 10-YR, 60-MIN 6 Rational 3.56 1 70 14,938 10 - 10-YR, 70-MIN 7 Rational 3.29 1 80 15,786 10 - 10-YR, 80-MIN 8 Rational 3.07 1 90 16,560 10 - 10-YR, 90-MIN 9 Rational 2.88 1 100 17,274 10 - 10-YR, 100-MIN 10 Rational 2.72 1 110 17,939 10 - - 10-YR, 110-MIN 11 Rational 2.58 1 120 18,562 10 - 10-YR, 120-MIN 12 Rational 2.46 1 130 19,150 10 - 10-YR, 130-MIN 13 Rational 2.35 1 140 19,706 10 - 10-YR, 140-MIN 14 Rational 2.25 1 150 20,235 10 - 10-YR, 150-MIN 15 Rational 2.16 1 160 20,740 10 - 10-YR, 160-MIN 16 Rational 2.08 1 170 21,223 10 - 10-YR, 170-MIN 17 Reservoir 1.19 1 37 5,403 10 1 17.66 7,605 18 Reservoir 1.79 1 51 7,276 10 2 17.76 8,369 19 Reservoir 1.99 1 64 8,733 10 3 17.81 8,723 20 Reservoir 2.02 1 77 9,938 10 4 17.84 8,919 21 Reservoir 2.04 1 89 10,973 10 5 17.85 9,007 Cgt,Oj,S 22 Reservoir 2.04 1 100 11,886 10 6 17.85 9,025 23 Reservoir 2.03 1 111 12,705 10 7 17.85 8,998 24 Reservoir 2.03 1 121 13,450 10 8 17.84 8,943 25 Reservoir 2.01 1 130 14,135 10 9 17.83 8,871 Proj. file: TANDEMLOC(NEW). PMDF file: NEW BERN.IDF Run date: 05-09-2007 Hydrograph Report Page 1 - English Hyd. No. 21 Hydrograph type = Reservoir Peak discharge = 2.04 cfs Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 5 Reservoir name = TANDEMLOC (NEW) Max. Elevation = 17.85 ft Max. Storage = 9,007 cuft smmee Mil on meV uses. ToW Volume = 10,973 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.93 3.63 17.45 1.31 0.05 - - 0.11 - - - 0.16 0.95 3.69 17.48 1.38 0.05 - - 0.17 - - - 0.22 0.97 3.76 17.51 1.44 0.05 - - 0.25 - - - 0.30 0.98 3.82 17.54 1.49 0.05 - - 0.39 - - - 0.44 1.00 3.89 << 17.56 1.54 0.05 - - 0.53 = - - 0.58 1.02 3.82 17.59 1.58 0.05 - - 0.66 - - - 0.71 1.03 3.76 17.61 1.63 0.05 - - 0.80 - - - 0.85 1.05 3.69 17.64 1.68 0.05 - - 0.96 - - - 1.00 1.07 3.63 17.66 1.72 0.04 - - 1.10 - - - 1.14 1.08 3.56 17.68 1.76 0.04 - - 1.23 - - - 1.27 1.10 3.50 17.69 1.80 0.04 - - 1.35 - - - 1.39 1.12 3.43 17.71 1.83 0.04 - - 1.47 - - - 1.49 1.13 3.37 17.72 1.85 0.04 - - 1.59 - - - 1.57 1.15 3.30 17.74 1.87 0.04 - - 1.70 - - - 1.64 1.17 3.24 17.75 1.90 0.04 - - 1.81 - - - 1.71 1.18 3.18 17.76 1.92 0.04 - - 1.90 - - - 1.78 1.20 3.11 17.77 1.93 0.03 - - 1.99 - - - 1.83 1.22 3.05 17.78 1.95 0.03 - - 2.07 - - - 1.89 1.23 2.98 17.79 1.96 0.03 - - 2.14 - - - 1.93 1.25 2.92 17.80 1.98 0.03 - - 2.21 - - - 1.98 1.27 2.85 17.81 1.99 0.03 - - 2.27 - - - 1.99 1.28 2.79 17.81 1.99 0.03 - - 2.34 - - - 1.99 1.30 2.72 17.82 2.00 0.03 - - 2.39 - - - 2.00 1.32 2.66 17.83 2.01 0.02 - - 2.44 - - - 2.01 1.33 2.59 17.83 2.01 0.02 - - 2.49 - - - 2.01 1.35 2.53 17.83 2.02 0.02 - - 2.53 - - - 2.02 1.37 2.46 17.84 2.02 0.02 - - 2.57 - - - 2.02 1.38 2.40 17.84 2.03 0.02 - - 2.60 - - - 2.03 1.40 2.33 17.84 2.03 0.02 - - 2.62 - - - 2.03 1.42 2.27 17.85 2.03 0.02 - - 2.64 - - - 2.03 1.43 2.20 17.85 2.03 0.02 - - 2.66 - - - 2.03 1.45 2.14 17.85 2.03 0.02 - - 2.67 - - - 2.03 1.47 2.07 17.85 2.04 0.02 - - 2.67 - - - 2.04 1.48 2.01 17.85 << 2.04 0.02 - - 2.67 - - - 2.04 << 1.50 1.94 17.85 2.03 0.02 - - 2.67 - - - 2.03 1.52 1.88 17.85 2.03 0.02 - - 2.66 - - - 2.03 Continues on next page Page 2 Hydrograph Discharge Table Time - Inflow- Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs -ft cfs cfs cfs cfs cfs cfs cfs cfs cfs_ 1.53 1.81 17.85 2.03 0.02 - - 2.64 - - - 2.03 1.55 1.75 17.85 2.03 0.02 - - 2.63 - - - 2.03 1.57 1.68 17.84 2.03 0.02 - - 2.60 - - _ - 2.03 1.58 1.62 17.84 .2.02 0.02 - - 2.57 - - - 2.02 1.60 1.56 17.94 2.02 0.02 - - 2.54 - - - - 2.02 1.62 1.49 17.83 2.01 0.02 - - 2.51 - - - 2.01 1.63 1.43 17.83 2.01 0.02 - - 2.46 - - - 2.01 1.65 1.36 17.82 2.00 0.02 - - 2.42 - - - 2.00 1.67 1.30 17.82 2.00 0.03 - - 2.37 - - - 2.00 1.68 1.23 17.81 1.99 0.03 - - 2.31 - - - 1.99 1.70 1.17 17.81 1.98 0.03 - - 2.26 - - - 1.98 1.72 1.10 17.80 1.97 0.03 - - 2.19 - - - 1.97 1.73 1.04 17.79 1.96 0.03 - - 2.14 - - - 1.93 1.75 0.97 17.78 1.95 0.03 - - 2.08 - - - 1.89 1.77 0.91 17.78 1.94 0.03 - - 2.02 - - - 1.85 1.78 0.84 17.77 1.93 0.03 - - 1.96 - - - 1.81 1.80 0.78 17.76 1.91 0.04 - - 1.89 - - - 1.77 1.82 0.71 17.75 1.90 0.04 - - 1.83 - - - 1.72 1.83 0.65 17.74 1.89 0.04 - - 1.76 - - - 1.68 1.85 0.58 17.74 1.87 0.04 - - 1.69 - - - 1.63 1.87 0.52 17.73 1.86 0.04 - - 1.62 - - - 1.59 1.88 0.45 17.72 1.84 0.04 - - 1.55 - - - 1.54 1.90 0.39 17.71 1.83 0.04 - - 1.48 - - - 1.49 1.92 0.32 17.70 1.81 0.04 - - 1.41 - - - 1.45 1.93 0.26 17.69 1.80 0.04 - - 1.35 - - - 1.39 1.95 0.19 17.68 1.78 0.04 - - 1.28 - - - 1.33 1.97 0.13 17.67 1.76 0.04 - - 1.22 - - - 1.27 1.98 0.06 17.67 1.74 0.04 - - 1.16 - - - 1.20 2.00 0.00 17.66 1.72 0.04 - - 1.10 - - - 1.14 2.02 0.00 17.65 1.70 0.05 - - 1.04 - - - 1.08 2.03 0.00 17.64 1.68 0.05 - - 0.98 - - - 1.03 2.05 0.00 17.63 1.67' 0.05 - - 0.93 - - - 0.97 2.07 0.00 17.62 1.65 0.05 - - 0.87 - - - 0.92 2.08 0.00 17.62 1.64 0.05 - - 0.83 - - - 0.87 2.10 0.00 17.61 1.62 0.05 - - 0.78 - - - 0.83 2.12 0.00 17.60 1.61 0.05 - - 0.74 - - - 0.78 2.13 0.00 17.60 1.60 0.05 - - 0.70 - - - 0.75 2.15 0.00 17.59 1.59 0.05 - - 0.67 - - - 0.72 2.17 0.00 17.58 1.58 0.05 - - 0.64 - - - 0.69 2.18 0.00 17.58 1.57 0.05 - - 0.61 - - - 0.66 2.20 0.00 17.57 1.56 0.05- - - 0.59 - - - 0.64 2.22 0.00 17.57 1.55 0.05 - - 0.56 - - - 0.61 2.23 0.00 17.56 1.54 0.05 - - 0.54 - - - 0.59 2.25 0.00 17.56 1.53 0.05 - - 0.51 - - - 0.56 2.27 0.00 17.56 1.53 0.05 - - 0.49 - - - 0.54 2.28 0.00 17.55 1.52 0.05 - - 0.47 - - - 0.52 2.30 0.00 17.55 1.51 0.05 - - 0.45 - - - 0.50 2.32 0.00 17.54 1.50 0.05 - - 0.43 - - - 0.48 2.33 0.00 17.54 1.50 0.05 - - 0.41 - - - 0.46 Continues on next page... Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.35 0.00 - 17:54 1.49 0.05 - - 0.39 - - - 0.44 . 2.37 - 0.00 17.53 1.48 0.05 - - 0.38 - - - 0.42 2.38 0.00 17.53 1.48 0.05 - - 0.36 - - - 0.41 2.40 0.00 17.53 1.47 0.05 - - 0.34 -. - - 0.39 2.42 0.00 17.52 1.47 0.05 - - 0.33 - - - 0.38 2.43 0.00 17.52 1.46 0.05 - - 0.31 - - - 0.36 2.45 0.00 17.52 1.46 0.05 - - 0.30 - - - 0.35 2.47 0.00 17.51 1.45 0.05 -- - 0.28 - - - 0.33 2.48 0.00 17.51 1.45 0.05 - - 0.27 - - - 0.32 2.50 0.00 17.51 1.44 0.05 - - 0.26 - - - 0.31 2.52 0.00 17.51 1.44 0.05 - - 0.25 - - - 0.29 2.53 0.00 17.50 1.44 0.05 - - 0.23 - - - 0.28 2.55 0.00 17.50 1.43 0.05 - - 0.22 - - - 0.27 2.57 0.00 17.50 1.43 0.05 - - 0.21 - - - 0.26 2.58 0.00 17.50 1.42 0.05 - - 0.21 - - - 0.26 2.60 0.00 17.50 1.42 0.05 - - 0.20 - - - 0.25 2.62 0.00 17.49 1.41 0.05 - - 0.20 - - - 0.25 2.63 0.00 17.49 - 1.41 0.05 - - 0.20 - - - 0.24 2.65 0.00 17.49 1.40 0.05 - - 0.19 - - - 0.24 2.67 0.00 17.49 1.40 0.05 - - 0.19 - - - 0.24 2.68 0.00 17.49 1.39 0.05 - - 0.18 - - - 0.23 2.70 0.00 17.48 1.39 0.05 - - 0.18 - - - 0.23 2.72 0.00 17.48 1.38 0.05 - - 0.18 - - - 0.22 2.73 0.00 17.48 1.38 0.05 - - 0.17 - - - 0.22 2.75 0.00 17.48 1.37 0.05 - - 0.17 - - - 0.22 2.77 0.00 17.48 1.37 0.05 - - 0.16 - - - 0.21 2.78 0.00 17.48 1.37 0.05 - - 0.16 - - - 0.21 2.80 0.00 17.47 1.36 0.05 - - 0.16 - - - 0.20 2.82 0.00 17.47 1.36 0.05 - - 0.15 - - - 0.20 2.83 0.00 17.47 1.35 0.05 - - 0.15 - - - 0.20 2.85 0.00 17.47 1.35 0.05 - - 0.15 - - - 0.19 2.87 0.00 17.47 1.35 0.05 - - 0.14 - - - 0.19 2.88 0.00 17.47 1.34 0.05 - - 0.14 - - - 0.19 2.90 0.00 17.46 1.34 0.05 - - 0.14 - - - 0.18 2.92 0.00 17.46 1.33 0.05 - - 0.13 - - - 0.18 2.93 0.00 17.46 1.33 0.05 - - 0.13 - - - 0.18 2.95 0.00 17.46 1.33 0.05 - - 0.13 - - - 0.17 2.97 0.00 17.46 1.32 0.05 - - 0.12 - - - 0.17 2.98 0.00 17.46 1.32 0.05 - - 0.12 - - - 0.17 3.00 0.00 17.46 1.32 0.05 - - 0.12 - --. - 0.17 3.02 0.00 17.45 1.31 0.05 - - 0.12 - - - 0.16 3.03 0.00 17.45 1.31 0.05 - - 0.11 - - - 0.16 3.05 0.00 17.45 1.31 0.05 - - 0.11 - - - 0.16 3.07 0.00 17.45 1.30 0.05 - - 0.11 - - - 0.15 3.08 0.00 17.45 1.30 0.05 - - 0.11 - - - 0.15 3.10 0.00 17.45 1.30 0.05 - - 0.10 - - - 0.15 3.12 0.00 17.45 1.29 0.05 - - 0.10 - - - 0.15 3.13 0.00 17.45 1.29 0.05 - - 0.10 - - - 0.14 3.15 0.00 17.44 1.29 0.05 - - 0.10 - - - 0.14 Continues on next page... Page 4 Hydrograph Discharge Table - Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (his) Cfs ft Cfs Cfs eft Cft Cfs Cft Cfs Cfs Cft 3.17 0.00 -17.44 1.29 0.05 ._ - - 0.09 - - - 0.14 3.18 0.00 17.44 1.28 0.05 - - 0.09 - - - 0.14 3.20 0.00 17.44 1.28 0.05 - - 0.09 - - - 0.13 3.22 0.00 17.44 1.28 0.05 - - 0.09 - - 0.13 3.23 0.00 17.44 1.28 0.05 - - 0.08 - - - 0.13 3.25 0.00 17.44 1.27 0.05 - - 0.08 - - - 0.13 3.27 0.00 17.44 1.27 0.05 - - 0.08 - - - 0.13 3.28 0.00 '17.44 1.27 0.05 - - 0.08 - - -- 0.12 3.30 0.00 17.44 1.26 0.05 - - 0.07 - - - 0.12 3.32 0.00 17.43 1.26 0.05. - - 0.07 - - - 0.12 3.33 0.00 17.43 1.26 0.05 - - 0.07 - - - 0.12 3.35 0.00 17.43 1.26 0.05 - - 0.07 - - - 0.12 3.37 0.00 17.43 1.26 0.05 - - 0.07 - - - 0.11 3.38 0.00 17.43 1.25 0.05 - - 0.07 - - - 0.11 3.40 0.00 17.43 1.25 0.05 - - 0.06 - - - 0.11 3.42 0.00 17.43 1.25 0.05 - - 0.06 - - - 0.11 3.43 0.00 17.43 1.25 0.05 - - 0.06 - - - 0.11 3.45 0.00 17.43 1.24 0.05 - - 0.06 - - - 0.10 3.47 0.00 17.43 1.24 0.05 - - 0.06 - - - 0.10 End ikeservoir Report Page , English Reservoir No. 1 - TANDEMLOC (NEW) Pond Data Pond storage is based on known contour areas Stage I Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cuft cult 0.00 16.60 6,421 0 0 0.40 17.00 6,875 2,659 2,659 1.40 18.00 8,057 7,466 10,125 2.40 19.00 9,309 8,683 18,808 Culvert/ Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise in = 18.0 1.5 0.0 0.0 Crest Len It = 3.1 0.0 0.0 0.0 Span in = 18.0 1.5 0.0 0.0 Crest El. ft = 17.42 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 16.60 16.60 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 50.0 0.1 0.0 0.0 Multistage = Yes No No No Slope % = 0.20 0.10 0.00 0.00 N-Value = .024 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwater Elevation = 16.80 ft Nora: Al oudj a have Doan analyzea ,mar inlet aM outlet eon Vol. Stage I Storage I Discharge Table Stage Storage Elevation Clv A Clv B CIv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 16.60 0.00 0.00 - - 0.00 - - - 0.00 0.04 266 16.64 0.00 0.00 _ - - 0.00 - - - 0.00 0.08 532 16.68 0.00 0.00 - - 0.00 - - - 0.00 0.12 798 16.72 0.00 0.00 - - 0.00 - - - 0.00 0.16 1,064 16.76 0.00 0.00 - - 0.00 - - - 0.00 0.20 1,330 16.80 0.00 0.00 - - 0.00 - - - 0.00 0.24 1,596 16.84 0.08 0.01 - - 0.00 - - - 0.01 0.28 1,861 16.88 0.17 0.02 - - 0.00 - - - 0.02 0.32 2,127 16.92 0.25 0.02 - - 0.00 - - - 0.02 0.36 2,393 16.96 0.33 0.02 - - 0.00 - - - 0.02 0.40 2,659 17.00 0.37 0.03 - - 0.00 - - - 0.03 Continues on next page TANDEMLOC (NEW) Stage / Storage / Discharge Table Page 2 Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge - ft cult ft cfs cfs cfs cfs cfs cfs - cfs cfs cfs 0.50 3,406 17.10 0.57 0.03 - - 0.00 - - - 0.03 0.60 4,152 W.20 0.74 0.04 - - 0.00 - - - 0.04 - 0.70 4,899 17.30- 0.98 0.04 - - 0.00 - - - 0.04 0.80 5,646 17.40 1.18 0.05 - - 0.00 - - - 0.05 0.90 6,392 17.50 1.43 0.05- - - 0.21 - - - 0.26 1.00_ 7,139 17.60 1.60 0.05 - - 0.72 - - -- 0.77 1.10 7,885 17.70 1.81 0.04 - - 1.40 - - - 1.44 1.20 8,632 17.80 1.98 0.03 - - 2.21 - - - 1.98 1.30 9,379 17.90 2.09 0.00 - - 3.13 - - - 2.09 1.40 10,125 18.00 2.18 0.00 - - 4.16 - - - 2.18 1.50 10,994 18.10 2.10 0.00 ' - - 5.28 - - - 2.10 1.60 11,862 18.20 2.96 0.00 - - 6.49 - - - 2.96 1.70 12,730 18.30 3.63 0.00 - - 7.78 - - - 3.63 1.80 13,598 18.40 4.19 0.00 - - 9.14 - - - 4,19 1.90 14,467 18.50 4.69 0.00 - - 10.57 - - - - 4.69 2.00 15,335 18.60 5.13 0.00 - - 12.07 - - - 5.13 2.10 16,203 18.70 5.55 0.00 - - 13.64 - - - 5.55 2.20 17,072 18.80 5.93 0.00 - - 15.27 - - - 5.93 2.30 17,940 18.90 6.29 0.00 - - 16.96 - - - 6.29 2.40 18,808 19.00 6.63 0.00 - - 18.71 - - - 6.63 End 21 - Reservoir - 10 Yr - Qp = 2.04 cfs 3- 2- CY 0, 0 5 10 15 io 25 Time (hrs) Hyd. 5 / Hyd. 21 EROSION AND SEDIMENTATION CONTROL PLAN TANDEMLOC FACILITY OUTER BANKS DRIVE HAVELOCK INDUSTRIAL PARK HAVELOCK, NORTH CAROLINA Prepared for: Mr. John DiMartino, President Tandemloc, Inc.. . 824 Fontana Boulevard Havelock, NC 28563 Prepared by: Avolis Engineering, P.A. P.O. Box 15564 New Bern, NC 28561 (252)633-0068 Office (252)633-6507 Fax May 11, 2007 p IECCIEr., MAY 2 3 2007 '1 1 ' LAND QUALITY SEC'@Oi WASHINGTON REGIONAL OFFICE TABLE OF CONTENTS 1.0 Project Description...............................................................................................................1- 2.0- Site Description...................................................................................................................1 3.0 Adjacent Property...............................................................................................................1 4.0 Soils..........................................................................................................»..........................2 5.0 Planned Erosion and Sedimentation Control Practices.....................................................2 6.0 Schedule of Erosion and Sedimentation Control Activities............................................3 7.0 Maintenance Plan................................................................................................................4 8.0 Vegetative Seeding..............................................................................................................5 Appendices Appendix A - Calculations n 1.0 PROJECT DESCRIPTION This project consists of the construction of a new building in the Havelock Industrial Park in Havelock, Craven County, North Carolina. The building will consist of drive connections, parking and a stormwater detention pond: The project site covers a total area of 4.5 acres. The project disturbed area will be 4.5 acres. The area to be vegetatively stabilized will be approximately 3.0 acres and will consist of grassing and the stormwater detention pond area. The project area is currently wooded and undeveloped. The proposed impermeable surfaces consist of 65,904 square feet. A 50 foot wide Neuse Riparian buffer exists in the wooded area on the eastern side of the site. Some pond side slope grading will take place in Zone 2 only and is an allowable activity. Zone 1 will remain wooded and undisturbed. - Section 404 Wetlands exist on the property but area located outside of the work area and will not be disturbed. A total of 4.5 acres of land will be disturbed in order to make the necessary improvements and to clear the area not to otherwise be developed. A permit fee in the amount of $250.00 is included with this permit application. 2.0 SITE DESCRIPTION The Tandemloc facility will be a separate building and site from their other nearby manufacturing plant. The building addition, associated parking and drive and the stormwater detention pond will consist of a separate project area. The project area will require clearing to construct the site improvements. The site is relatively flat with the exception of a sloping area at the western side of the site adjacent to Shop Branch. The 50 foot Neuse Riparian buffer and the 404 Wetlands on the site will remain undisturbed with the exception of allowable grading within Zone 2 of the buffer to construct the detention pond back slope. 3.0 ADJACENT PROPERTY The site is located in an industrial setting. The subject property is bordered to the north by City of Havelock recreational fields.. The site is bordered on the east by undeveloped woodsland. The site is bordered along the east across Shop Branch by City of Havelock Public Works offices. South of the site across Outer Banks Drive is another undeveloped industrial park. The proposed construction activities will not adversely effect any of the adjacent properties nor cause sediment to be transported off -site. 4.0 SOILS The Craven County Soils Survey indicates Lynchburg soil type to be present on the site. Lynchburg is described as a fine sandy loam to a depth of fourteen_ inches and is described as a sandy clay loam below that depth. 5.0 PLANNED EROSION AND SEDIMENTATION CONTROL PRACTICES Erosion and Sedimentation Control practices to be utilized on the project include: Land Grading, Gravel Control Entrance, Grassing, Surface Preparation, Surface Stabilization, Dust Control, Inlet Protection, Silt Fencing, Outlet Protection and a Stormwater Detention Pond. Construction details and specifications for each planned erosion control device are included on the project plans and are described in this Erosion Control Plan. This Erosion Control Plan will become a part of the construction documents. 5.1 Land Grading Land Grading will be required on the total project area of 4.5 acres to make the necessary site improvements. Any material needed to reach the required grades will be obtained from a mining facility which is properly permitted through the North Carolina Department of Environment and Natural Resources's Land Quality Section. All exposed slopes will be graded 2:1 or flatter and will be fine graded immediately after rough grading. Exposed soil surfaces will be disced, vegetated and mulched according to the vegetation plan in order to produce stabilized surfaces. Material excavated from the stormwater detention pond will be utilized on site as fill. 5.2 Gravel Control Entrance Gravel control entrances will be constructed on the project site as indicated. During wet weather, it may be necessary to wash vehicle tires at these locations to prevent the transport of soil onto the adjacent areas. A detail of the gravel control entrances is included on the project drawings. Any soil material transported onto the adjacent public roads will be removed immediately. 5.3 Grassing The areas disturbed by this project will be stabilized with grass as specified on the project vegetation plan. = _ _ 5.4 Surface Preparation All cut and fill slope surfaces will be lightly roughened by discing prior to vegetating. The surfaces of the slopes will be left in a loose condition -and grooved on the contour: 5.5 Surface Stabilization Surface stabilization will be accomplished with seeding and mulching. 5.6 Dust Control Dust will be controlled on the site by sprinkling should excessive dust be generated during the course of construction. 5.7 Inlet Protection Inlet protection will be provided around the catch basins proposed for the project. Detail of the inlet protection is included on the project plans. 5.8 Silt Fencing Silt fencing will be utilized on the project to prevent any transport of sediment off of the project site during construction. 5.9 Outlet Protection Rip rap outlet protection devices will be provided at the inlet to the stormwater pond and at the pond discharge. 5.10 Stormwater Detention Pond A stormwater management pond will be excavated on the site to meet the Coastal Stormwater requirements and the nitrogen treatment requirements of the Neuse Riparian Buffer Rules. The pond will also be used as a protective measure during construction to remove sediment. The pond will be cleaned of any accumulated sediment at the conclusion of construction activities. 6.0 SCHEDULE OF EROSION AND SEDIMENTATION CONTROL ACTIVITIES I. Obtain Project Erosion and Sedimentation Control Plan approval. 2. Review erosion and sedimentation control requirements at the site. _ 3 3. Erect silt fencing. 4. Perform land clearing. 5. Construct gravel control entrance. 6. Construct stormwater detention pond to be used as a temporary sediment basin. 7. Provide fill for building pad and driveway areas. 8. Construct drainage structures and piping and provide inlet protection devices. 9. Rough grade remainder of the site. 10. Fine grade and stabilize site. 11. Seed and mulch the site. Water and replace as necessary. 12. Finish site improvements. 13. Remove temporary erosion and sedimentation control devices. 14. Remove silt fence baffles and accumulated sediment from the stormwater detention pond. 7.0 MAINTENANCE PLAN Erosion and sedimentation control devices shall be checked for stability and for need of cleaning out after every runoff producing rainfall event and at least weekly. Maintenance and repairs shall be performed as needed. 1. Gravel control entrances shall be reshaped where rutted or soft. 2. Sediment shall be removed from behind inlet protection devices when it accumulates to a - depth of six inches. Stakes and fabric shall be straightened and repaired as necessary. 3. Sediment shall be removed from the stormwater detention pond and piping at the conclusion of construction operations and shall be returned to its design grades. 4. Reseeding shall occur where necessary. 2 8.0 VEGETATIVE SEEDING All grassing on this project shall provide a stabilized surface and neat finished appearance. The slopes on this project are relatively flat and no other special measures are required to resist erosion. Groundcover on exposed slopes shall be established within 15 working days or 30 calendar days (whichever is shorter), following completion of any phase of grading. Permanent groundcover shall be established for all disturbed areas within 15 working days or 30 calendar days (whichever is shorter) following completion of construction or development. Fertilizer (8-8-24) shall be placed on prepared soil at a rate of 1,000 lbs/acre. Ground agricultural limestone shall be applied at a rate of 3,000 Ibs/acre. Apply landscaping area mulch (pine straw) at a rate of 4,000 lb/acre. Where not anchored by surrounding shrubbery, tack straw with asphalt to resist blowing or washing. Rye Grain 50 lbs per Acre Tall Fescue 100 Ibs per Acre May through August Centipede 5 Ibs per Acre oa _ APPENDIX A l VAtJ KS— f V.21 VrECiAT eat-, i.. _-.... _:._.;._�_ . _. N-A�t.UCK. ' sn?D�rs-r_2/.M!. , P�•+2K .:. ' i� P�r..IJICI; �£; E}1(N IJErJstn1 j.JT 7)EgM6, tip; 7}}E Asn4t.,i S-r�iQ.MWA�� _ RtG,u�.q-n aa5; .4�!0. U�,u:.... C�o.•�� l�_ G✓!rH• � 7�te /JFc(SE 845i,J_ AuGES l}t4V��oCe NurjLlEniT R�DUC.T/n,Jt ��Qt�/QFr✓lE.J7-3. }�iZgTECr WIw _� f3E. - A ►+IXH . OEWs, POCk,+ET o.A) •A- -- OVE(LPM -. f.h2GElL' TRpGT T}fF�,. lS ✓v14DE u-p DF TcJo LdTS, , Di�AG cJATERsH� A-P-Es} - Slog Bgo T'OT*tl3wi-PO4 Ae� aoposcD 120/ aao sF (a,.46..fc) �10. BU1;c.T-UPe;J E,Q = lC5g045F- _ 7S 004 47*61WE utR,Q 6JI T f D SIDE . F _.?E PT1 F .. ;S l c F� K ._ g 0 °/ -T5 S _M.�atMwh 'gt6Lu12ED.._ POND 6a2< /<TI-010 lo, 890 sF)_ _ SEri _, poav ReWvt vtr. uoc, ��r'TH_ 'A-r_ EI,EUf1-MorJ I (o. Co_.Ff - �ma�:Su2r�+r.E Ate+ A-r llo.(o: ��'. CC4A v G4zr. { - , }�E 51a2i46E %18_Gr✓ i (A8 ' fh26 r-4)-J A Va i. 4" Pd eel 4twcG ��f3� Curom l/et; i�w��/4z1- i.. , 59 = ! r z,4 ,tq.o 913o9 8,�83 /8,80.8 CALLCul.,eirE . RUA)LO r- . VZIW,-vnE 1g530,Gi.�QTBD.. !.�/Th! j21/2o,000-SF C 31634.Ft3 51=1. REtw£_.._ . Ilo•(a' l�•U�i r, rt3 l5 ;57Di?ER ; .. EMAItiI(nl�._ .VUi um� -Tp 6E. 57ap-ER . ge- G- _ E_5826 Ft3 - z,Gsq Ff 3 = 3,lfv"?FF3 .. PcSSoCiArf- i ' -�41,6F+3 —. 4 ! F - iP(LE-�FVI Gp/oiriE.uT t �ur!er'rco�j TlonlS IN_ D.R9EtZ . 7n S A4l5F i}tE ._ C/ OF fFAtiEL__ocfc. _ a I �r �E✓v�O.HE.ur Ru-F /?a a/.irsH 6',Qo: V' c rr�1z ' ., .. ,?E�• . /1'%�1?-CoM_,� „EG�i*rE.✓Ts i �.- Gt/28Po� r uS£_ DRq.FcacJ /f�pfz�D�/ hvHS 5ei�?'W/�i?E .7D PE51o,A lb D� . Sn2�tcrcJR� '�; Hr +ATE 7rrE /a-y,e 5rb" -Tb ??iE- p/zEr��vEu��ori r' Go�D�ri�� o) (20, 000 Ftz-) f (0.gS)146A04 Gf2) (0, 3)�zoA9 6 W) - 8(o, BA Ft-Z OAATE, 1%Jkp-1ou5 PV"Pu.) U-y�g2 STo2M5 rhl-"U4!4 W1114 SffclFlc- 0urinEr �•ol�Fl�Gri2AT/D J- p�Esuc.TS.. ig12£ AS FOLLUvJS_- -_ \o-u�(t STo2M DttRATIu.J lVeA1C. FwW (CFs) f EAk UurFW,,)(Af, 8 q 2,03 4-7 Cowl¢ .... q.o _ M �_.: _ __.:3 0.._ _ __ .. 2, 03_ _ { ��-_ �wr���' -- ' a•= p3 _ Cis ' L_ ��, '/I _ GFs . OIL-... CA A.) 14W24-rIVA) I, i I 1 � I I Z _ rSER. JA CI 'CIRCu fE N Ckc7' rD �R�7. AW'. C-A17w— Hr of Sly! C�Q�FIL EAR- 2-S VAI lPRAW-P,O,,j4 .0F VoL'Ar-I I-o 'P(LAL-4. DOPJPJ = SSZCo F+3 . '?A•w 9Dw,J OJS(L 3, P PF21U1� Avg;..` Q = •sass F+3I 3-DA�s DAHYSI !oo✓nla (p0 SEG SEG. s I b "TY-- 17e -1 9, 6 J;J;J U1�. 7 kiE orb `� Trl� �.._ 57ro 2N1 VXU. 41 ✓ -� `. T3F t SA-T/Ao /}aTDRy 58z6 1p —• -- _ u.5/iJ 6� 7 /fo�e2' t/`i!il�ilN. t'^�TS 1 , . ' __... . 71M� VOLaj VUe.' REM4rAr,�16, 6.6 41c4 : - 3 40_►j_,_ . 2 4- i 34011 _- ---:0' _416 I O.¢l o. 0284 0.02�2 ,..'3 0 - 4-;- - t - 29 `� 3(a ,- 22(r,2 ,--; ; 0 3'Q L. 0. 0224-_'- o,,ozo5 29S_ �4 IG44 I.0.2 . • 'o.ol��.. ,...._1�4.4 13:�4_ . . 48 _ I3�-4 �__ o.�� 2310 ; .. 113a; SZ0_0148 212,' g2(7_. > 0,09; 0.0123 &D o.o�; ... o.olo$ 0. 042 o,00s¢_.....- lo`b.. -; 4?Z o..O23 oeo0z__.L 9 GE Is R-r .4 _: 9EPn4 OF.. - :",�.:. /473 _BIZ Gr95T.. 363. F73 Tb 7X/C.!K . Du T. ; _. ._ CH-EGk• s: Fw•rA�/n� .' .. ' -1 1 •-_I- __.'_ _l __I 57 .................... 77 l-t- I J _ 1 Llldr Tt, SrA�_ A - L rr I 1 i 1 I CAI,SMLA-M .Vr-G2uIP-Eft ArJrKoM6k E. 561L RuSER V D L, Co,3CPe-rE REau I ZIED I (� 145 (63— &4,$ F u5E A 2 CAt eu4Ion(5 2 , 1 R:' W 141CY l5 5' x 5' X 17-„ BP22 EL . F(,r)TAT/off F� _ _l i -511-(1 Z Fb = I I s al- I IS (b = 4 3 Ffi3 14s lb _ &4-A Ib Tk � LJlDE x /p " i,�ieX'— r-ahoDATIlc-) Fu orjL-1 i 1. H Vo 12. to, 205 13•o' 7-" I4.o 410 IS-0 591 \6.0 IO&P 'o•(p l7v} 12.1p� q85 l3 • o' 114-1 Is.o Zo19 I(o•u 3233 wto .,4.G95 Fv AVOL. Cuw Uolr q3 93 3b6 42S S01 a2q 83� - VW6 cd 4-4 Z(o 12- A.\1DL 0/0 Forzem b' VOLUME_ = v26 1.2- _ '21/ ll f 8,5?2 . 42S 35(o8 ...... ... . .A4 b4 e\JkLCl47rz,l AS -'6AW-- 0. 4 0 USE RA-i `rrAp METWO05i F &o Frtv,4a V 6�L4 =Ok. TA . ..... - 4- A,3 o 6I r2, 2j p Ac�§ 64:5 Ls ---- -- JL f -A. CA Hydrograph Summary Report _ Page t Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak. (min) Volume (cuft) Return period (yrs) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cuft) Hydrograph description_ 1 - Rational 6.91 1 20 8,290 10 - 10-YR, 20-MIN - 2 Rational 5.67 - 1 30 10,206 10 - 10-YR, 30-MIN 3 Rational 4.87 1 40 11,697 10 - 10-YR, 40-MIN 4. Rational 4.31 1 50 12,932 10 - 10-YR, 50-MIN 5 Rational 3.89 1 60 13,997 10 - 10-YR, 60-MIN 6 Rational 3.56 - 1 70 14,938 10 - 10-YR, 70-MIN 7 Rational 3.29 1 80 15.786 10 - 10-YR, 80-MIN 8 Rational 3.07 1 90 16,560 10 - -. 10-YR, 90-MIN 9 Rational 2.88 1 I 100 17,274 10 - 10-YR, 100-MIN 10 Rational 2.72 1 110 '17,939 10 - 10-YR, 110-MIN 11 Rational 2.58 1 120 18,562 10 - 10-YR, 120-MIN 12 Rational - 2.46 1 130 19,150 10 - 10-YR, 130-MIN 13 Rational 2.35 1 140 19,706 10 - -10-YR, 140-MIN 14 Rational 2.25 1 150 20,235 10 - 10-YR, 150-MIN 15 Rational 2.16 1 160 20,740 10 - 10-YR, 160-MIN 16 Rational 2.08 1 170 21,223 10 - 10-YR, 170-MIN 17 Reservoir- 1.19 1 37 5,403 10 1 17.66 7,605 18 Reservoir 1.79 1 51 7,276 10 2 17.76 8,369 19 - Reservoir 1.99 1 64 8,733 10 3 17.81 8,723 _ 20 Reservoir 2.02 1 77 9,938 10 4 17.84 8,919 - 21 Reservoir 2.04 1 89 10,973 10 5 17.85 9,007 CgtO(,S 22 Reservoir 2.04 1 100 11,886 10 6 17.85 9,025 23 Reservoir 2.03 1 111 12,705 10 7 17.85 8,998 24 Reservoir 2.03 1 121 13,450 10 a 17.64 8,943 25 Reservoir 2.01 1 130 14,135 10 9 17.83 8,871 Proj. file:-TANDEMLOC(NEW). KIDF file: NEW BERN.IDF Run date: 05-09-2007 Hydrograph Report Page 1 English Hyd. No. 21 Hydrograph type = Reservoir Peak discharge = 2.04 cfs Storm frequency = 10 yrs - Time interval = 1 min Inflow hyd. No. = 5 Reservoir name = TANDEMLOC (NEW) Max. Elevation = 17.85 ft Max. Storage = 9,007 cuft Slomg. tr im an mal u3W, Total Volume=10,973 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) Cfs ft Cfs cis Cfs Cfs Cfs Cfs Cfs Cfs Cfs 0.93 3.63 17.45 1.31 0.05 - - 0.11 - 0.16 0.95 3.69 17.48 1.38 0.05 - - 0.17 - - - 0.22 0.97 3.76 17.51 1.44 0.05 - - 0.25 - - - 0.30 0.98 3.82 17.54 1.49 0.05 - - 0.39 - - - 0.44 1.00 3.89 << 17.56 1.54 0.05 - - 0.53 - - - 0.58 1.02 3.82 17.59 1.58 0.05 - - 0.66 - - - 0.71 1.03 3.76 17.61 1.63 0.05 - - 0.80 - - - 0.85 1.05 3.69 17.64 1.68 0.05 - - 0.96 - - - 1.00 1.07 3.63 17.66 1.72 0.04 - - 1.10 - - - 1.14 1.08 3.56 17.68 1.76 0.04 - - 1.23 - - - 1.27 1.10 3.50 17.69 1.80 0.04 - - 1.35 - - - 1.39 1.12 3.43 17.71 1.83 0.04 - - 1.47 - - - 1.49 1.13 3.37 17.72 1.85 0.04 - - 1.59 - - - 1.57 1.15 3.30 17.74 1.87 0.04 - - 1.70 - - - 1.64 1.17 3.24 17.75 1.90 0.04 - -- 1.81 - - - 1.71 1.18 3.18 17.76 1.92 0.04 - - 1.90 - - - 1.78 1.20 3.11 17.77 1.93 0.03 - - 1.99 - - - 1.83 1.22 3.05 17.78 1.95 0.03 - - 2.07 - - - 1.89 1.23 2.98 17.79 1.96 0.03 - - 2.14 - - - 1.93 1.25 2.92 17.80 1.98 0.03 - - 2.21 - - - 1.98 1.27 2.85 17.81 1.99 0.03 - - 2.27 - - - 1.99 1.28 2.79 17.81 1.99 0.03 - - 2.34 - - - 1.99 1.30 2.72 17.82 2.00 0.03 - - 2.39 - - - 2.00 1.32 2.66 17.83 2.01 0.02 - - 2.44 - - - 2.01 1.33 2.59 17.83 2.01 0.02 - - 2.49 - - - 2.01 1.35 2.53 17.83 2.02 0.02 - - 2.53 - - - 2.02 1.37 2.46 17.84 2.02 0.02 - - 2.57 - - - 2.02 1.38 2.40 17.84 2.03 0.02 - - 2.60 - - - 2.03 1.40 2.33 17.84 2.03 0.02 - - 2.62 - - - 2.03 1.42 2.27 17.85 2.03 0.02 - - 2.64 - - - 2.03 1.43 2.20 17.85 2.03 0.02 - - 2.66 - - - 2.03 1.45 2.14 17.85 2.03 0.02 - - 2.67 - - 2.03 1.47 2.07 17.85 2.04 0.02 - 2.67 _ - - 2.04 1.48 2.01 17.85 << 2.04 .- 0.02 - - 2.67 - - - 2.04 << 1.50 1.94 17.85- 2.03 0.02 - - 2.67 - - - 2.03 1.52 1.88 17.85 2.03 0.02 2.66 - - - - 2.03 Continues on next page... Page 2 Hydrograph Discharge Table - Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs - ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 1.53 1.81. 17.85 2.03 0.02 - - 2.64 - - - 2.03 1.55 1.75 17.85 2.03 0.02 - - 2.63 - - - 2.03 1.57 1.68 17.84 2.03 0.02 - - 2.60 - - - 2.03 1.58 1.62 17.84 2.02 0.02 - - 2.57 - - 2.02 1.60 1.56 17.84 2.02 0.02 - - 2.54 - - - 2.02 1.62 1.49 17.83 2.01 0.02 - - 2.51 - - - 2.01 1.63 1.43 17.83 2.01 0.02 - - 2.46 - - - 2.01 1.6.5 1.36 17.82 2.00 0.02 - - 2.42 - - 2.00 1.67 1.30 17.82 2.00 0.03 - - 2.37 - - - 2.00 1.68 1.23 17.81 1.99 0.03 - - 2.31 - - - 1.99 1.70 1.17 17.81 1.98 0.03 - 2.26 - - - 1.98 1.72 1.10 17.80 1.97 0.03 - = 2.19 - - - 1.97 1.73 1.04 17.79 1.96 0.03 - - 2.14 - - - 1.93 1.75 0.97 17.78 1.95 0.03 - - 2.08 -- - - 1.89 1.77 0.91 17.78 1.94 0.03 - - 2.02 - - - 1.85 1.78 0.84 17.77 1.93 0.03 - - 1.96 - - - 1.81 1.80 0.78 17.76 1.91 0.04 - - 1.89 - - - 1.77 1.82 0.71 17.75 1.90 0.04 - - 1.83 - - - 1.72 1.83 0.65 17.74 1.89 0.04 - - 1.76 - - - 1.68 1.85 0.58 17.74 1.87 0.04 - - 1.69 - - - 1.63 1.87 0.52 17.73 1.86 0.04 - - 1.62 - - - 1.59 1.88 0.45 17.72 1.84 0.04 - - 1.55 - - - 1.54 1.90 0.39 17.71 1.83 0.04 - 1.48 - - - 1.49 1.92 0.32 17.70 1.81 0.04 - - 1.41 - - - 1.45 1.93 0.26 17.69 1.80 0.04 - - 1.35 - - - 1.39 1.95 0.19 17.68 1.78 0.04 - - 1.28 - - - 1.33 1.97 0.13 17.67 1.76 0.04 - - 1.22 - - - 1.27 1.98 0.06 17.67 1.74 0.04 - - 1.16 - - - 1.20 2.00 0.00 17.66 1.72 0.04 - - 1.10 - - - 1.14 2.02 0.00 17.65 1.70 0.05 - - 1.04 - - - 1.08 2.03 0.00 17.64. 1.68 0.05 - - 0.98 - - - 1.03 2.05 0.00 17.63 1.67 0.05 - - 0.93 - - - 0.97 2.07 0.00 17.62 1.65 0.05 - - 0.87 - - - 0.92 2.08 . 0.00 17.62 1.64 0.05 - - 0.83 - - - 0.87 2.10 0.00 17.61 1.62 0.05 - - 0.78 - - - 0.83 2.12 0.00 17.60 1.61 0.05 - - 0.74 - - - 0.78 2.13 0.00 17.60 1.60 0.05 - - 0.70' - - - 0.75 2.15 0.00 17.59 1.59 0.05 - - 0.67 - - - 0.72 2.17 0.00 17.58 1.58 0.05 - - 0.64 - - - 0.69 2.18 0.00 17.58 1.57 0.05 - - 0.61 - - - 0.66 2.20 0.00 17.57 1.56 0.05 - - 0.59 - _ - 0.64 2.22 0.00 17.57 1.55 0.05 - - 0.56 - - - 0.61 2.23 0.00 17.56 1.54 0.05 - - 0.54 - - - 0.59 2.25 0.00 17.56 1.53 0.05 - - 0.51 - - - 0.56 2.27 0.00 17.56 1.53 0.05 - - 0.49 - - - 0.54 2.28 0.00 17.55 1.52 0.05 - 0.47 - - - 0.52 2.30 0.00 17.55 1.51 0.05 - - 0.45.. - -_ - - 0.50 2.32 0.00 17.54 1.50 -0.05 - 0.43 - - - 0.48 2.33 0.00 17.54 1.50 _ 0.05 - - 0.41- - - - 0.46' Continues on next page...- - - page 9 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 2.35- 0.00 17.54 1.49 0.05 - - 0.39 - - - 0.44 2.37 0.00 - 17.53 1.48 0.05 - - 0.38 - - - 0.42 2.38 0.00 17.53 1.48 0.05 - - 0.36 - - - 0.41 2.40 0.00 17.53 -1.47 0.05 - - 0.34 - - - 0.39' 2.42 0.00 17.52 1.47 0.05 - 0.33 - - - 0.38 2.43 0.00 17.52 1.46 0.05 - - 0.31 - - - 0.36 2.45 0.00 17.52 1.46 0.05 - - 0.30 - - - 0.35 2.47 0.00 17.51 1.45 0.05 - - 0.28 -- - - 0.33 2.48 - 0.00 17.51 1.45 0.05 - - 0.27 - - - 0.32 2.50 0.00 17.51 1.44 0.05 - - 0.26 -- - - 0.31 2.52 0.00 _ 17.51 1.44 0.05 - - 0.25 - - - 0.29 2.53 0.00 17.50 1.44 0.05 - - 0.23 - - - 0.28 2.55 0.00 17.50 1.43 0.05 - - 0.22 - - - 0.27 2.57 0.00 17.50 1.43 0.05 - - 0.21 - - - 0.26 2.58 0.00 17.50 1.42 0.05 - - 0.21 - - - 0.26 2.60 0.00 17.50 1.42 0.05 - - 0.20 - - - 0.25 2.62 0.00 17.49 1.41 0.05 - - 0.20 - - - 0.25 2.63 0.00 17.49 1.41 0.05 - - 0.20 - - - 0.24 2.65 0.00 17.49 1.40 0.05 - - 0.19 - - - 0.24 2.67 0.00 17.49 1.40 0.05 - - 0.19 - - - 0.24 2.68 0.00 17.49 1.39 0.05 - - 0.18 - - - 0.23 2.70 0.00 17.48 1.39 0.05 - - 0.18 - - - 0.23 2.72 0.00 17.48 1.38 0.05 - - 0.18 - - - 0.22 2.73 0.00 17.48 1.38 0.05 - - 0.17 - - - 0.22 2.75 0.00 17.48 1.37 0.05 - - 0.17 - - - 0.22 2.77 0.00 17.48 1.37 0.05 - - 0.16 - - - 0.21 2.78 0.00 17.48 1.37 0.05 - - 0.16 - - - 0.21 2.80 0.00 17.47 1.36 0.05 - - 0.16 - - - 0.20 2.82 0.00 17.47 1.36 0.05 - - 0.15 - - 0.20 2.83 0.00 17.47 1.35 0.05 - - 0.15 - - - 0.20 2.85 0.00 17.47 1.35 0.05 - - 0.15 - - - 0.19 2.87 0.00 17.47 1.35 0.05 - - 0.14 - - - 0.19 2.88 0.00 17.47 1.34 0.05 - - 0.14 - - - 0.19 2.90 0.00 17.46 1.34 0.05 - - 0.14 - - - 0.18 2.92 0.00 17.46 1.33 0.05 - - 0.13 - - - 0.18 2.93 0.00 17.46 1.33 0.05 - - 0.13 - - _ - 0.18 2.95 0.00 17.46 1.33 0.05 - - 0.13 - - - 0.17 2.97 0.00 17.46 1.32 0.05 - - 0.12 - - - 0.17 2.98 0.00 17.46 1.32 0.05 - - 0.12 - - - 0.17 3.00 0.00 17.46 1.32 _0.05 - - 0.12 - - - 0.17 3.02 0.00 17.45 1.31 0.05 - - 0.12 - - - 0.16 3.03 0.00 17.45 1.31 0.05 - - 0.11 - - - 0.16 3.05 0.00 17.45 1.31 0.05 - - 0.11 - - - 0.16 3.07 0.00 17.45 _ 1.30 0.05 - - 0.11 - - _ 0.15 3.08 0.00 17.45 1.30 0.05 - - 0.11 - - - 0.15 3.10 0.00 17.45 1.30 0.05 - - 0.10 - - - 0.15 3.12 0.00 17.45 1.29 0.05 - - 0.10 = - - 0.15 3.13 0.00 17.45 1.29 _ 0.05 - - - - 0.10 - - - 0.14 3.15 0.00 17.44 1.29 0.05 - - 0.10 - - - 0.14 Continues on next page... Page 4 Hydrograph Discharge Table - Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cfs cfs efs cfs cfs cfs cfs cfs cfs 3.17 0.00 17.44 1.29 0.05 - _ - 0.09 - - - 0.14 3.18 0.00 17.44 1.28 0.05 - - 0.09 - - - 0.14 3.20 0.00 17.44 1.28 0.05 - - 0.09 - - - 0.13 3.22 0.00 17.44 1.28 0.05 - - 0.09 - - - 0.13 3.23 0.00 17.44 1.28 0.05 - - 0.08 - - - 0.13 3.25 0.00 17.44 1.27 0.05 - - 0.08 - - - 0.13 3.27 0.00 17.44 1.27 0.05 - - 0.08 - - - 0.13 _ 328 0.00 17.44 1.27 0.05 - - 0.08 - - - 0.12 3.30 0.00 17.44 1.26 0.05 - - 0.07 - - - 0.12 3.32 0.00 17.43 1.26 0.05 - - 0.07 - = - 0.12 3.33 0.00 17.43 1.26 0.05 - - 0.07 - - - 0.12 3.35 0.00 17.43 1.26 0.05 - - 0.07 - - - 0.12 3.37 0.00 17.43 1.26 0.05 - - 0.07 - - - 0.11 3.38 0.00 17.43 1.25 0.05 - - 0.07 - - - 0.11 3.40 0.00 17.43 1.25 0.05 - - 0.06 - - - 0.11 3.42 0.00 17.43 1.25 0.05 - - 0.06 - - - 0.11 3.43 0.00 17.43 1.25 0.05 - - 0.06 - - - 0.11 3.45 0.00 17.43 1.24 0.05 - - _ 0.06 - - - 0.10 3.47 0.00 17.43 1.24 0.05. - - 0.06 - - - 0.10 r�i Reservoir Report _ Pa , _ English Reservoir No. 1 - TANDEMLOC (NEW) Pond Data Pond storage is based on known contour areas Stage I Storage Table Stage Elevation Contour area Incr. Storage Total storage It ft sgft cuft cuft 0.00 16.60 6,421 0 0 0.40 17.00 6,875 2.659 2,659 1.40 18.00 8,057 7,466 10,125 _ 2.40 19.00 9,309 8,683 18,808 _ Culvert / Orifice Structures Weir Structures [A] [Bl [C] [D] [A] [B] [C] [D] Rise in = 18.0 1.5 0.0 0.0 Crest Len ft = 3.1 0.0 0.0 0.0 Span in = 18.0 1.5 0.0 0.0 Crest El. ft = 17.42 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 0.00 0.00 0.00 Invert El. ft = 16.60 16.60 0.00 0.00 Eqn. Exp. = 1.50 0.00 0.00 0.00 Length ft = 50.0 0.1 0.0 0.0 Multistage = Yes No No No Slope % = 0.20 0.10 0.00 0.00 N-Value = .024 .013 .000 .000 - Orif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwater Elevation = 16.80 ft Note: M outllovn have Been analymd u inlet end outlet wnhol. Stage / Storage / Discharge Table Stage Storage Elevation Civ A CIv B Clv, C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 16.60 0.00 0.00 - - 0.00 - - - 0.00 0.04 266 16.64 0.00 0.00 - - 0.00 - - - 0.00 0.08 532 16.68 - 0.00 0.00 - - 0.00 - - - 0.00 0.12 798 16.72 0.00 0.00 - - 0.00 - - - 0.00 0.16 1,064 16.76 0.00 0.00 - - 0.00 - - - 0.00 0.20 1,330 16.80 0.00 0.00 - - 0.00 - - - 0.00 0.24 1,596 16.84 0.08 0.01 - - 0.00 - - - 0.01 0.28 1,861 16.88 0.17 0.02 - - 0.00 - - - 0.02 0.32 2,127 16.92 0.25 0.02 - - 0.00 - - - 0.02 0.36 2,393 16.96 0.33 0.02 - - 0.00 - - - 0.02 0.40 2,659 17.00 0.37 0.03 - - 0.00 - - - 0.03 Continues on next page TANDEMLOC (NEVI - -" Page 2 Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cis cfs cfs cfs cfs cfs 0.50 3,406 17.10 0.57 0.03 - - 0.00 - - - 0.03 0.60 4,152 _ 17.20 0.74 0.04 - - 0.00- - - - 0.04 0.70 4,899 17.30 0.98 0.04 - - 0.00 - -- - 0.04 0.90 5,646 17.40 1.18 -0.05 - - 0.00 - - - 0.05 0.90 6,392 17.50 1.43 0.05 - - 0.21 - - - 0.26 1.00 7,139 17.60 1.60 0.05 - - 0.72 - - - 0.77 1.10 7,885 17.70 1.81 0.04 - - 1.40 - - - 1.44 1.20 8,632 17.80 1.98 0.03 - - 2.21 - - - 1.98 1.30 9,379 17.90- 2.09 0.00 - - 3.13 - - - 2.09 1.40 10,125 18.00 2.18 0.00 - - 4.16 - - - 2.18 1.50 - 10,994 18.10 2.10 0.00 - - 5.28 - - - 2.10 1.60 11,862 18.20 2.96 0.00 - - 6.49 - - - 2.96 1.70 12,730 18.30 3.63 0.00 - - 7.78 - - - - 3.63 1.80 13,598 18.40 4.19 0.00 - - 9.14 - - - 4.19 1.90 14,467 18.50 4.69 0.00 - - 10.57 - - - 4.69 2.00 15,335 18.60 5.13 0.00 - - 12.07 - - - 5.13 2.10 16,203 18.70 5.55 0.00 - - 13.64 - - - 5.55 2.20 17,072 18.80 5.93 0.00 - - 15.27 - - - 5.93 2.30 17,940 18.90 6.29 0.00 - - 16.96 - - - 6.29 2.40 18,808 19.00 6.63 0.00 - - - 18.71 - - - 6.63 ...End -jAA)Vr�1 w C F::A c,z(,f I 21 - Reservoir -10 Yr - Qp = 2.04 cfs 4 W w- 2 d 1 0. 0 5 10 15 20 25 Time (hrs) / Hyd. 5 O Hyd. 21