HomeMy WebLinkAboutSW4131202_COMPLIANCE_20140506STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
Pet it: SW4131202
County: Guilford
Region: Winston-Salem
Compliance Inspection Report
Effective: 02/03/14 Expiration: Owner: NC DENR / Division of Parks and Recreation
Project: Haw River State Park - Church Street Phase 1
6064 Church St
Contact Person: Erin Lawrence Title:
Directions to Project:
Type of Project: State Stormwater - Low Density
Drain Areas:
On -Site Representative(s):
Related Permits:
Inspection Date: 05/0612014 Entry Time: 09:15 AM
Primary Inspector: Aana Taylor -Smith
Secondary Inspector(s):
Reason for Inspection: Routine
Permit Inspection Type: State Stormwater
Facility Status: ■ Compliant D Not Compliant
Question Areas:
■ State Stormwater
(See attachment summary)
Greensboro NC 27455
Phone: 919-707-9322
Exit Time: 09:35 AM
Phone: 336-771-5000
Inspection Type: Compliance Evaluation
Page: 1
c . R
Permit: SW4131202 Owner - Project: NC DENR / Division of Parks and Recreation
Inspection Date: 05/06/2014 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
Project not yet built.
File Review
Yes
No
NA
NE
Is the permit active?
■
❑
❑
❑
Signed copy of the Engineer's certification is in the file?
❑
❑
■
❑
Signed copy of the Operation & Maintenance Agreement is in the file?
❑
❑
■
❑
Copy of the recorded deed restrictions is in the file?
■
n
❑
❑
Comment: Project not yet built.
Built Upon Area
Yes
No
NA
NE
Is the site BUA constructed as per the permit and approval plans?
❑
❑
■
❑
Is the drainage area as per the permit and approved plans?
❑
n
■
❑
Is the BUA (as permitted) graded such that the runoff drains to the system?
❑
❑
■
❑
Comment: Project not yet built.
SW Measures
Yes
No
NA
NE
Are the SW measures constructed as per the approved plans?
❑
❑
■
❑
Are the inlets located per the approved plans?
❑
❑
■
❑
Are the outlet structures located per the approved plans? ❑
❑
■
❑
Comment: Project not yet built.
Operation and Maintenance Yes
No
NA
NE
Are the SW measures being maintained and operated as per the permit requirements? DDE
❑
Are the SW BMP inspection and maintenance records complete and available for review or provided to DWQ ❑
❑
■
❑
upon request?
Comment: Project not yet built.
Other Permit Conditions Yes
No
NA
NE
Is the site compliant with other conditions of the permit?
Comment:
Other WQ Issues
Is the site compliant with other water quality issues as noted during the inspection?
Comment:
Yes No NA NE
■❑❑❑
Page: 2
9
State Stormwater Inspection Report
General
Project Name: Npv4 p4aSjV'je PaVV_0 )UVC1gS1r. -Pin -I
Permit No: S W 4 t312o2
Expiration Date:
Contact Person: eyin LAWrehCz
Phone Number: q32
Inspection Type: CC -I
Inspection Date: o951 oln IZoA
Time In: mts
Time Out: (DGt35
Current Weather: YVI , CIULA l ) —1()S
Recent Rain (Date)?
Rain — in
Location
Facility Address / Location: (,00j.0e} CMUY(,I,t St•
City: Creeyxs%DY-o Zlp: 21g55 County: C1UIIord Lat "N Long: - 0 1"W
Permit Information
Rule Subject to (circle one): 1988 Coastal Rule 1995 Coastal Rule 2008 Coastal Rule Session Law 2006-246
Goose Creek High Quality Waters Outstanding Resource Waters
Density (circle ate): High (HD) CL 0 7 (L
Stormwater Best Management Practices (BMPs) (insert number of each):
Wet Ponds Infiltration Basins _Infiltration Trenches ) LD Swales Stormwater Wetlands
_Dry Ponds Bioretention _Permeable Pavement Sand filters (circle one) Open Closed
_Cistern Level Spreader/Filter Strip Other (specif}):
File Review Yes No N/A N/E
I. Is the permit active?
�(
2. Signed Engineer's Certification on file?
3. Signed Operation and Maintenance agreement on tile?
4. Recorded Deed Restrictions on file?
Site Visit: Built Uoon Area (BUAI Yes No NIA N/E
5. BUA is constructed and consistent with the permit requirements?
6. BUA aspermitted) is graded such that the runoff drains to the system? (high density only)
7. Drainage area is consistent withpermit? (i.e. no un ermitted drainage to the SW BMPs)
8. Drainage area is stabilized? (to reduce risk of sedimentation to the SW BMPs)
Site Visit: Stormwater BMPs Yes No NIA N/E
9. Stormwater BMPs are located per the approved plans?
10. Stormwater BMPs have dimensions (eg. length, width, area) matching the approvedplans?
11. Stormwater BMPs are constructed per the approvedplans?
Site Visit: Operation and Maintenance Yes No N/A N/E
12. Access points to the site are clear and well maintained?
13. Trash has been removed as needed?
14. Excessive landscape debris (grass clippings, leaves, etc) is controlled?
aAv.
15. Stormwater BMPs being operated and maintained as per the permit requirements?
16. Inspection and Maintenance records are available for inspection? (high density only, 1995 — present onl y)
1 17. Is the site compliant with other conditions of the permit? I v I I i I
i 18. Is the site compliant with other water quality issues as noted during the inspection? I V I I II
State Stormwater Inspection Report, Version 3.0_3-09 Page 1 of 2
State Stormwater Inspection Report
, . ,
Nb wunt yes% Vro)ta nor bu i I.X.
Inspection Pictures (some of the pictures taken during the site visit)
Compliance Status
)4
Compliant ❑
Non -Compliant
Letter Sent (circle one):
Yes
® Letter type:
CEI NOV NOVRE Other
Date
Reference Number:
Inspector Name and Signature: AM Ta Iny-cYylrm Date: nc�iiolo I I F
I
State Stomnrater Inspection Report, Version 3.0_3-09 - Page 2 of 2