Loading...
HomeMy WebLinkAboutNCC216413_ESC Approval Submitted (2)_20211116DocuSign Envelope ID: DB20F362-A1C1-42E6-8323-5FC8C8F4EDC0 14ENDERSO HENDERSON COUNTY GOVERNMENT SITE DEVELOPMENT DEPARTMENT SOIL ERSOSION AND SEDIMENT CONTROL DIVISION Natalie J. Berry P.E. Deb Johnston, PE Director Assistant Engineer ------------------------------------------------------------------------------------- ------------------------------------------------------------------------------------- November 1, 2021 LETTER OF APPROVAL WITH CONDITIONS Brian Etheridge D.R. Horton, INC A Delaware Corporation 8001 Arrowridge Boulevard Charlotte, NC 28723 RE: Project Name: Acres Approved: Project ID: County: City: Address: River Basin: Stream Classification Submitted By: Date Received by HC Plan Type: Date Received by HC Plan Type: Dear Mr. Etheridge; Tap Root Subdivision Phase EC-1a 39.29 2021-04-05-EC-1a Henderson N/A 296 Tap Root Lane (Various - see approved plan) French Broad French Broad River, B,6-(54.5)b; and Cane Creek, C, 6- 57-(9)b and unnamed tributaries of Cane Creek Michael Cain, PE 04-08-2021 New 10-13-2021 Revised This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 DocuSign Envelope ID: DB20F362-A1C1-42E6-8323-5FC8C8F4EDC0 Letter of Approval with Conditions Tap Root Subdivision Phase EC-1a 11-01-2021 Page 2 of 3 deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, •. Site Develo ment Di ector Soil Erosion & Sedimentation Control Office Enclosures: Certificate of Approval NCG01 Fact Sheet ec: Michael Cain, PE, Civil Design Concepts PA Deb Johnston, PE, Assistant Engineer Stan Aiken PE, DEQ - Asheville 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553 DocuSign Envelope ID: D1320F362-A1C1-42E6-8323-5FC8C8F4EDC0 Letter of Approval with Conditions Tap Root Subdivision Phase EC-1a 11-01-2021 Page 3 of 3 CONDITIONS OF APPROVAL • CONDITIONAL LETTER OF APPROVAL DATED JUNE 7, 2021, (FILE #2021-M404) AND CONDITIONAL DISTRICT (CD-2020-01) MUST BE ADHERED TO OR A REVISED APPROVAL LETTER MUST BE SUBMITTED TO OUR OFFICE FOR THE FILES. • ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. PROJECT CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE. • FLOOD DEVELOPMENT PERMIT IS REQUIRED FROM HENDERSON COUNTY SITE DEVELOPMENT, PLEASE PROVIDE APPROVED PERMIT PRIOR TO ANY WORK WITHIN THE SPECIAL FLOOD HAZARD AREA. • A DRIVEWAY PERMIT REQUIRED FROM NC DEPARTMENT OF TRANSPORTATION. NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • AN ENCROACHMENT AGREEMENT FOR WORK PROPOSED IN THE RIGHT OF WAY, SUCH AS SIDEWALK, UTILITIES, ETC FROM NCDOT. NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS DOCUMENT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • USACE AND DEQ APPROVED PERMITS REQUIRED PRIOR TO ANY WORK BEGINNING IN THE AREAS DESIGNATED ON THE APPROVED PLAN AS STREAM CROSSINGS AND WETLANDS, ETC. • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER AND FOLLOW THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS DESCRIBED ON SHEET D3.3 OF THE APPROVED DRAWING WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL. • FOLLOW THE INSPECTION REQUIREMENTS OF NPDES AND SELF INSPECTION AS DESCRIBED ON SHEET 4 OF THE APPROVED DRAWING TITLED "TAP ROOT SUBDIVISION PHASE 14" AND DATED OCTOBER 06, 2021. • THE APPROVED SOIL EROSION AND SEDIMENTATION CONTROL PLAN TITLED "TAP ROOT SUBDIVISION PHASE 14" AND DATED OCTOBER 06, 2021, IS REFERENCED HERE AND Ih100].1all tvWIII 1111►Ytoil YII R120VAWY119.1119:19 9KGIVIAx • PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE Permit not valid until Financial Responsible Person siens this document and returns to our office. :o.c ned by: Financial Responsible Ownership Signature: '35C35'6E75T41 .. Brian Etheridge, Carolina Region President of D.R. Horton, INC, a Delaware Corporation Date: 11/1/2021 240 SECOND AVENUE EAST, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6553