Loading...
HomeMy WebLinkAboutNCC216082_ESC Approval Submitted_20211103TOWN of WAKE FOREST EROSION AND SEDIMENT CONTROL LAND DISTURBING PERMIT LETTER OF APPROVAL G98 Commercial, LLC Attn: Beth Middleton 201 E Las Olas Blvd, Ste 1200 Ft. Lauderdale, FL 33301 Corporation Service Company Attn: Jaime Steele 2626 Glenwood Ave, Ste 550 Raleigh, NC 27608 RE: Project Name: Grove 98 PUD (North Infrastructure) 301 S. Brooks Street Wake Forest, NC 27587 1919.435.9400 www.wakeforestnc.gov October 27, 2021 Permit No: 2021-00002522 Location: 0 Dr Calvin Jones Hwy and 0 Capital Blvd (1830876113 and 1830872437) Wake Forest, NC 27587 Acres Approved: 30.14 acres Submitted By: ColeJenest & Stone Date Approved: October 27, 2021 Dear Ms. Middleton: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. Final signature copies shall be submitted to the Town of Wake Forest, as well as a digital copy at least one week prior to the preconstruction meeting. The land disturbance permit shall expire two (2) years from the date of approval and can be renewed in one-year increments. Per Section 12.3.2 of the Unified Development Ordinance (UDO), a copy of the approved erosion control plan shall be on file at the job site. Also, this letter gives the notice of our right to periodically inspect the jobsite to ensure compliance with the approved plan as outlined in the UDO. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and Local water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form. You are requested to file an amended form if there are any changes in the information. Please set up a preconstruction conference with all parties involved through the Planning Department. A preconstruction meeting must be held with the Town prior to starting any work, including installation of erosion control measures, demolition, any clearing and grubbing or earth moving activities. Be aware that your project is subject to the NPDES General Stormwater Permit NCGO1000 (Construction Activities). The Town will no longer distribute the NCG01 permit, you will have to obtain the permit from NC DEMLR. To receive a Certificate of Coverage, you must submit an electronic Notice of Intent with this approval letter. You will also need to have copies of the compliance plans sheets, (Ground Stabilization and Material Handling, and Inspection, Recordkeeping, and Reporting), if they were not included in the approved erosion and sediment control plan. Sincerely, Carrie Mitchell, PE Environmental Engineering Manager