Loading...
HomeMy WebLinkAboutNCC215826_Site Plan or Location Map_20211020THE PROPOSED CLOANINGER SUBDIVISION PROJECT IS WITHIN THE TOWN LIMITS OF MOORESVILLE, IREDELL COUNTY, NORTH CAROLINA. THE TOTAL DISTURBED ACREAGE FOR THE PROPOSED DEVELOPMENT IS APPROXIMATELY +/- 25 ACRES. THE SCOPE OF WORK INCLUDES CLEARING, STRIPPING AND GRADING FOR THE ROADWAYS AND BUILDING PADS, INSTALLATION OF EROSION CONTROL MEASURES, GRASS -LINED DITCHES, STORM DRAINAGE PIPES, UTILITIES, AND PAVING. BASED ON SCS SOIL SURVEY MAP, SITE CONSISTS OF: ChA - CHEWACLA LOAM, 0 TO 2 PERCENT SLOPES LcB2 - LLOYD CLAY LOAM, 2 TO 6 PERCENT SLOPES LcC2 - LLOYD CLAY LOAM, 6 TO 10 PERCENT SLOPES LcD2 - LLOYD CLAY LOAM, 10 TO 15 PERCENT SLOPES PrE - POINDECTER-ROWAN COMPLEX, 15 TO 25 PERCENT SLOPES DOWNSTREAM RECEIVING WATER IS ROCKY RIVER. THIS SITE IS PARTIALLY IN ZONE AE FLOODPLAIN PER FEMA FLOOD DFIRM PANEL 4655. EROSION CONTROL NOTES: \ 1. ON -SITE BURIAL PIT LOCATIONS MUST BE DOCUMENTED ON FINAL PLAT. \ 2. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE STATE EROSION - CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3. NO MORE THAN 20 ACRES TO BE DISTURBED AT ONE TIME. 4. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION \ CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. \ 5. ALL AREAS ARE TO BE SEEDED AND MULCHED PER THE NEW STABILIZATION TIMEFRAME TABLE ON SHEET. I- 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT I MAY BE REQUIRED BY IREDELL COUNTY EROSION CONTROL INSPECTOR. 7. MAXIMUM TEMPORARY GRADED SLOPES ARE 3:1. WHEN STEEPER SLOPES MUST BE USED, PLANS SHALL BE SEALED BY A GEOTECHNICAL ENGINEER FOR SLOPE STABILITY AND FINAL SURFACE STABILIZATION. I 8. ALL WORK IMPACTING STREAMS MUST HAVE APPROPRIATE NCDENR-DWQ AND U.S.A.C.E. (401/404) PERMITS. ALL WORK IN THE 100-YEAR FLOODPLAIN REQUIRES A FLOODPLAIN I DEVELOPMENT PERMIT FROM THE TOWN OF MOORESVILLE AND IREDELL COUNTY. 9. ALL FLOW FROM PERMANENT / TEMPORARY DITCHES SHOULD BE I DIRECTED TOWARDS SEDIMENT TRAPS UNTIL SITE IS COMPLETELY STABILIZED. I 10. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL HAVE EROSION CONTROL MAT EQUIVALENT TO NORTH AMERICAN GREEN SC75. I 11. DE -WATERING OF THE WORK AREA DIRECTLY INTO A STREAM, CREEK, WETLAND, ETC. IS PROHIBITED. 10. ANY OFF -SITE BORROW OR SPOIL SITE USED DURING CONSTRUCTION SHALL HAVE AN APPROVED EROSION CONTROL PLAN. MAINTENANCE PLAN THE FOLLOWING MAINTENANCE PLAN SHALL BE FOLLOWED UNTIL THE SITE IS COMPLETELY STABILIZED AFTER CONSTRUCTION. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL STRUCTURES. 1. ALL EROSION CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING ANY RAINFALL PRODUCING RUNOFF AND AT LEAST ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY SO THAT ALL EROSION CONTROL MEASURES ARE MAINTAINED AS DESIGNED. 2. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED IN ACCORDANCE WITH THE SEEDING SPECIFICATIONS IN ORDER TO MAINTAIN A DENSE VEGETATIVE COVER. 3. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SEDIMENT FENCE AFTER EACH STORM EVENT OR SEDIMENT FENCE SHOULD BE REPLACED. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SEDIMENT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 4. SEDIMENT BASINS SHALL BE CLEANED OUT WHEN THE LEVEL OF SEDIMENT REACHES THE MID -DEPTH POINT BELOW THE WEIR ELEVATION. WASHED STONE SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT BASIN NO LONGER DRAINS PROPERLY. 5. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED SLOPES PER THE NEW STABILIZATION TIMEFRAME TABLE ON SHEET C6.7. 6. SEDIMENT DEPOSITS SHALL BE REMOVED FROM TEMPORARY CHECK DAMS AND/OR WATTLES AFTER EACH STORM EVENT. STONE FACING SHALL BE CLEANED OF CONTAMINATED STONE AND REPLACED WITH CLEAN WASHED STONE. CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM IREDELL COUNTY. 2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH IREDELL COUNTY AT (704) 832-2352 TO DISCUSS EROSION CONTROL MEASURES. 3. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE. 4. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. PHASE 1 1. CLEAR ONLY AS NECESSARY TO INSTALL EROSION CONTROL MEASURES IN THIS PHASE. 2. INSTALL CONSTRUCTION ENTRANCE AND ALL SILT FENCE, INCLUDING OUTLETS. 3. INSTALL EROSION CONTROL BASINS SB-1 AND SK-2. STOCKPILE EXCESS SOIL UPHILL OF AND ADJACENT TO EACH BASIN. 4. CONSTRUCT DIVERSION CHANNELS AND INSTALL WATTLES. 5. SEED, MULCH, AND TACK EACH BASIN. 6. CALL EROSION INSPECTOR FOR APPROVAL PRIOR TO BEGINNING FULL GRADING OPERATION PER PHASE 2. SEE PHASE 2 FOR CONTINUED OPERATION. a 1). CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2). CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAG MEN, ETC., AS NECESSARY TO INSURE SAFETY. 3). ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND LOCAL MUNICIPALITIES. 4). SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. l C6.2,_ \ \ \ _ PROPERTY LINE /�c� // �// // I (TYP) 770/I / � I I I I I I I I I I II\ \�\ \\ I \I'` f 11 1 1�,1 I//// � I \ I I I I I I I ! \\\\ \\ I I 750 L ► I \ I I I / I I I l \ \ \ \ \ \ ��\ \ \ ,,/ 111 t\ \\ / Q /I I ` \ 0/ o I \ / / ) I I 1 o \ \ \ 1 I \ \ \ \ II // I \1 \\ TREE PROTECTION A\R�EA z / l .7 40-�- � - \-1041 STOCKPILE AREAL -780 CD` 1750' I zz SIOTE: 2ND ROW LT FENCE O BE \ \I 11 \ \\\ \ \ \ \ \ -770- / / / / ) J - - J / / / /' / / / I i / / / / • COMBINED SILT FENCE • . I ORANGE TREE - / / \ / / I / . /� PROTECTION FENCING / \ \ \mil � \ \ \ \- �� /�/ �� I J J r -� /• �. � � / -_ �/ I I \ 1 ' I f J\\ \ %� ✓�`\\ \ \ " - / - - - / / // / / / / TREE PROTECTION /AREA 4\."-FLOODWAY (TYP) ..i: : 50' STREAM BUFFER (TYP) a . 30' UNDISTURBED / / \ SB-1 a \ STREAM BUFFER (TYP) / STREAM (TYP) I FUTURE SCM-1 / WETLANDS 1 (TYP) . \ / \ �� X GREENWAY (TYP) - \ / 100 YEAR FLOOD PLAIN \\ i 0, (TYP) -j U p E o M 2 0 U U a00 m rn z (0 .• U c N ao o m U �_ z E� N N QN -rn00Nr U c in � v M a0 d U M LL or 0 W N=LM4 LEGEND ' PROP. DISTURBANCE LIMITS PROP. MAJOR CONTOUR 820 `\ 1111IN111111� i R PROP. MINOR CONTOUR 818 PROP. SEDIMENT BASIN = LICENSE NO.: DRAINAGEAREA _ F-1407 TEMP. SILT FENCE X X ''� 9' STRAW WATTLE `ttltttili4ii:lltetl/ if STONE OUTLET .``N{y' u 2/* EXIST. TREE LINE._" 17582 EXIST. MAJOR CONTOUR 700 - � •' �A/G ���� �' �� EXIST. MINOR CONTOUR 700 i1tti t,Xt TEMP. DIVERSION DITCH N0 GRtO� P 3D 0a 1 GRAPHIC SCALE 100, 0 50' 100, 200' ( IN FEET) 1 inch = 100 ft. Town of Mooresville, North Carolina Plan Approval for Roadway, Drainage, Water & Sewer Director of Engineering Date Fire Department Planning Department Date 400' m a U) F_ z w O U H z O U J J w 0 w a: w z a O w 52 W W Z Q a z J J W ICL U J O 0 Z O W J J Z N O LLl o U / � 0 O M Q Z o W J H Q O W W LL.W O Q _ LLl a a O LLl W J 0 0 O O W OW PROJECT INFORMATION PROJECT MANAGER: DEB DESIGNED BY: AMP DRAWN BY: MSS PROJECT NUMBER: HQ61.400 ORIGINAL DATE: 4/23/2021 SHEET: C6.0