HomeMy WebLinkAboutNCC215826_Site Plan or Location Map_20211020THE PROPOSED CLOANINGER SUBDIVISION PROJECT IS WITHIN THE
TOWN LIMITS OF MOORESVILLE, IREDELL COUNTY, NORTH CAROLINA.
THE TOTAL DISTURBED ACREAGE FOR THE PROPOSED
DEVELOPMENT IS APPROXIMATELY +/- 25 ACRES. THE SCOPE OF
WORK INCLUDES CLEARING, STRIPPING AND GRADING FOR THE
ROADWAYS AND BUILDING PADS, INSTALLATION OF EROSION
CONTROL MEASURES, GRASS -LINED DITCHES, STORM DRAINAGE
PIPES, UTILITIES, AND PAVING.
BASED ON SCS SOIL SURVEY MAP, SITE CONSISTS OF:
ChA - CHEWACLA LOAM, 0 TO 2 PERCENT SLOPES
LcB2 - LLOYD CLAY LOAM, 2 TO 6 PERCENT SLOPES
LcC2 - LLOYD CLAY LOAM, 6 TO 10 PERCENT SLOPES
LcD2 - LLOYD CLAY LOAM, 10 TO 15 PERCENT SLOPES
PrE - POINDECTER-ROWAN COMPLEX, 15 TO 25 PERCENT SLOPES
DOWNSTREAM RECEIVING WATER IS ROCKY RIVER.
THIS SITE IS PARTIALLY IN ZONE AE FLOODPLAIN PER FEMA FLOOD
DFIRM PANEL 4655.
EROSION CONTROL NOTES:
\
1.
ON -SITE BURIAL PIT LOCATIONS MUST BE DOCUMENTED ON FINAL
PLAT.
\
2.
GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED
EROSION CONTROL PLAN IS A VIOLATION OF THE STATE EROSION
-
CONTROL ORDINANCE AND IS SUBJECT TO A FINE.
3.
NO MORE THAN 20 ACRES TO BE DISTURBED AT ONE TIME.
4.
STABILIZATION IS THE BEST FORM OF EROSION CONTROL.
TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION
\
CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN
SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION
SEQUENCE SHOWN ON THE PLAN.
\
5.
ALL AREAS ARE TO BE SEEDED AND MULCHED PER THE NEW
STABILIZATION TIMEFRAME TABLE ON SHEET.
I-
6.
ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT
I
MAY BE REQUIRED BY IREDELL COUNTY EROSION CONTROL
INSPECTOR.
7.
MAXIMUM TEMPORARY GRADED SLOPES ARE 3:1. WHEN STEEPER
SLOPES MUST BE USED, PLANS SHALL BE SEALED BY A
GEOTECHNICAL ENGINEER FOR SLOPE STABILITY AND FINAL
SURFACE STABILIZATION.
I
8.
ALL WORK IMPACTING STREAMS MUST HAVE APPROPRIATE
NCDENR-DWQ AND U.S.A.C.E. (401/404) PERMITS. ALL WORK IN THE
100-YEAR FLOODPLAIN REQUIRES A FLOODPLAIN
I
DEVELOPMENT PERMIT FROM THE TOWN OF MOORESVILLE AND
IREDELL COUNTY.
9.
ALL FLOW FROM PERMANENT / TEMPORARY DITCHES SHOULD BE
I
DIRECTED TOWARDS SEDIMENT TRAPS UNTIL SITE IS
COMPLETELY STABILIZED.
I
10.
ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL HAVE
EROSION CONTROL MAT EQUIVALENT TO NORTH AMERICAN
GREEN SC75.
I
11.
DE -WATERING OF THE WORK AREA DIRECTLY INTO A STREAM,
CREEK, WETLAND, ETC. IS PROHIBITED.
10.
ANY OFF -SITE BORROW OR SPOIL SITE USED DURING
CONSTRUCTION SHALL HAVE AN APPROVED EROSION CONTROL
PLAN.
MAINTENANCE PLAN
THE FOLLOWING MAINTENANCE PLAN SHALL BE FOLLOWED UNTIL
THE SITE IS COMPLETELY STABILIZED AFTER CONSTRUCTION.
DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE
FOR INSPECTION AND MAINTENANCE OF ALL EROSION AND
SEDIMENT CONTROL STRUCTURES.
1. ALL EROSION CONTROL MEASURES SHALL BE CHECKED FOR
STABILITY AND OPERATION FOLLOWING ANY RAINFALL
PRODUCING RUNOFF AND AT LEAST ONCE EVERY WEEK. ANY
NEEDED REPAIRS SHALL BE MADE IMMEDIATELY SO THAT ALL
EROSION CONTROL MEASURES ARE MAINTAINED AS DESIGNED.
2. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS
NECESSARY, AND MULCHED IN ACCORDANCE WITH THE SEEDING
SPECIFICATIONS IN ORDER TO MAINTAIN A DENSE VEGETATIVE
COVER.
3. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SEDIMENT
FENCE AFTER EACH STORM EVENT OR SEDIMENT FENCE
SHOULD BE REPLACED. THEY MUST BE REMOVED WHEN
DEPOSITS REACH APPROXIMATELY HALF THE HEIGHT OF THE
BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER
THE SEDIMENT FENCE IS REMOVED SHALL BE DRESSED TO
CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED.
4. SEDIMENT BASINS SHALL BE CLEANED OUT WHEN THE LEVEL OF
SEDIMENT REACHES THE MID -DEPTH POINT BELOW THE WEIR
ELEVATION. WASHED STONE SHALL BE CLEANED OR REPLACED
WHEN THE SEDIMENT BASIN NO LONGER DRAINS PROPERLY.
5. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED SLOPES
PER THE NEW STABILIZATION TIMEFRAME TABLE ON SHEET C6.7.
6. SEDIMENT DEPOSITS SHALL BE REMOVED FROM TEMPORARY
CHECK DAMS AND/OR WATTLES AFTER EACH STORM EVENT.
STONE FACING SHALL BE CLEANED OF CONTAMINATED STONE
AND REPLACED WITH CLEAN WASHED STONE.
CONSTRUCTION SEQUENCE:
1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM
IREDELL COUNTY.
2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH
IREDELL COUNTY AT (704) 832-2352 TO DISCUSS EROSION
CONTROL MEASURES.
3. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL
MEET WITH EROSION CONTROL INSPECTOR PRIOR TO
COMMENCING WITH EACH PHASE.
4. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO
REMOVAL OF ANY EROSION CONTROL MEASURES.
5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY
MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES.
6. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN
ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL
PLANNING AND DESIGN MANUAL.
PHASE 1
1. CLEAR ONLY AS NECESSARY TO INSTALL EROSION CONTROL
MEASURES IN THIS PHASE.
2. INSTALL CONSTRUCTION ENTRANCE AND ALL SILT FENCE,
INCLUDING OUTLETS.
3. INSTALL EROSION CONTROL BASINS SB-1 AND SK-2. STOCKPILE
EXCESS SOIL UPHILL OF AND ADJACENT TO EACH BASIN.
4. CONSTRUCT DIVERSION CHANNELS AND INSTALL WATTLES.
5. SEED, MULCH, AND TACK EACH BASIN.
6. CALL EROSION INSPECTOR FOR APPROVAL PRIOR TO BEGINNING
FULL GRADING OPERATION PER PHASE 2.
SEE PHASE 2 FOR CONTINUED OPERATION.
a
1). CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING
APPROPRIATE PARTIES AND ASSURING THAT EXISTING
UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION.
2). CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES
USING FLAG MEN, ETC., AS NECESSARY TO INSURE SAFETY.
3). ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE
REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION AND LOCAL MUNICIPALITIES.
4). SHORING WILL BE ACCORDING TO OSHA TRENCHING
STANDARDS PART 1926 SUBPART P, OR AS AMENDED.
l
C6.2,_
\ \ \
_
PROPERTY LINE
/�c�
// �// // I (TYP)
770/I / � I
I
I I I I I I I I II\
\�\ \\ I
\I'` f
11 1 1�,1 I////
� I \
I I I I I
I I ! \\\\ \\
I I
750
L ► I \ I I
I / I I I l
\ \ \ \ \ \ ��\
\ \
,,/ 111 t\ \\
/ Q /I I `
\ 0/ o
I \ / / ) I I 1
o
\ \ \ 1 I
\ \ \ \
II // I \1 \\ TREE PROTECTION
A\R�EA
z /
l
.7 40-�-
� -
\-1041
STOCKPILE AREAL
-780
CD`
1750'
I
zz
SIOTE: 2ND ROW LT FENCE O BE
\ \I 11 \ \\\ \ \ \ \ \
-770- / / / / ) J
- - J / / / /' / / /
I i / / / /
• COMBINED SILT FENCE
• . I ORANGE TREE
- / /
\
/ /
I / . /� PROTECTION FENCING
/ \ \ \mil � \ \ \ \-
�� /�/ ��
I J J r -� /• �.
� � /
-_
�/
I I
\ 1 ' I f J\\ \ %� ✓�`\\ \ \ " - /
- - - / / // / /
/ / TREE PROTECTION
/AREA
4\."-FLOODWAY
(TYP)
..i: : 50' STREAM BUFFER (TYP)
a . 30' UNDISTURBED
/
/
\ SB-1
a \
STREAM BUFFER (TYP)
/
STREAM (TYP)
I
FUTURE SCM-1
/ WETLANDS
1 (TYP) .
\ /
\ �� X
GREENWAY
(TYP)
-
\ /
100 YEAR FLOOD PLAIN
\\ i
0,
(TYP)
-j
U p
E
o
M 2 0 U U
a00 m rn z (0
.• U c N ao o m
U �_ z E� N N
QN -rn00Nr
U c in � v M a0
d U M LL or 0
W N=LM4
LEGEND '
PROP. DISTURBANCE LIMITS
PROP. MAJOR CONTOUR 820 `\ 1111IN111111� i
R PROP. MINOR CONTOUR 818
PROP. SEDIMENT BASIN = LICENSE NO.:
DRAINAGEAREA _ F-1407
TEMP. SILT FENCE X X ''� 9'
STRAW WATTLE
`ttltttili4ii:lltetl/ if
STONE OUTLET .``N{y' u 2/*
EXIST. TREE LINE._"
17582
EXIST. MAJOR CONTOUR
700 - � •' �A/G ���� �' ��
EXIST. MINOR CONTOUR 700 i1tti t,Xt
TEMP. DIVERSION DITCH
N0 GRtO� P 3D 0a 1
GRAPHIC SCALE
100, 0 50' 100, 200'
( IN FEET)
1 inch = 100 ft.
Town of Mooresville, North Carolina
Plan Approval for Roadway, Drainage, Water & Sewer
Director of Engineering Date
Fire Department
Planning Department Date
400'
m a
U)
F_
z
w
O
U
H
z
O
U
J
J
w
0
w
a:
w
z
a
O w
52
W W
Z
Q
a
z
J
J
W
ICL
U
J
O
0
Z
O
W
J
J
Z
N
O
LLl
o
U
/
�
0
O
M
Q
Z
o
W
J
H
Q
O
W
W
LL.W
O
Q
_
LLl
a
a
O
LLl
W
J
0
0
O
O
W
OW
PROJECT INFORMATION
PROJECT MANAGER:
DEB
DESIGNED BY:
AMP
DRAWN BY:
MSS
PROJECT NUMBER:
HQ61.400
ORIGINAL DATE:
4/23/2021
SHEET:
C6.0