Loading...
HomeMy WebLinkAboutNCC215798_ESC Approval Submitted_20211019ROY COOPER Governor £ ELIZABETH S. BISER ; #` Secretary BRIAN WRENN Director — October 12, 2021 LETTER OF APPROVAI_, WITH MODIFICATIONS NVR, Inc. Attention: Luke Huther, Production Manager 13924 Professional Center Drive, Suite 100 Huntersville, North Carolina 28078 RE: Project Name: Springshire Creek (Lots 1-3) Acres Approved: 0.51 Project ID: UNION-2022-017 County: Union, City: Indian Trail Address: Oak Spring Rd. River Basin. Yadkin-PeeDee Stream Classification: Other Submitted By: Wayne Harris, PE, Harris Engineering Date Received by LQS: September 28, 2021 Plan Type: Revised Dear Mr. Huther: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval arc listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by -Title 1 5A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.govl.NCG0I. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.ciark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEML.R Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B-0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: Noah Carolina ionar�testt orEnvironmental10East to Quality Division 1 Energy. yle, No and Land Resources tt[ces Mooresville Regional Office' 610 East Center Avenue, Suite 30I �[goresville, North Carolina 28l 13 704-663-1699 Letter of Approval with Modifications NVR, Inc. October 12, 2021 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land - disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGOI Fact Sheet c: Inspection Department Wayne Harris, PE Letter of Approval with Modifications NVR, Inc. October 12, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Springshire Creek (Lots 1-3) Project ID: UNION-2022-017 County: Union 1. Plan revision was to change project name from Oak Springs (Lots 1-3) to Springshire Creek (Lots 1-3).