HomeMy WebLinkAboutNCC215365_Site Plan or Location Map_20211011�a
VICINITY MAP a
GENERAL NOTES:
1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL
(CLDSM) AND THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATIONS
FOR ROADS AND STRUCTURES UNLESS OTHERWISE SPECIFIED IN THE CHARLOTTE—MECKLENBURG LAND DEVELOPMENT STANDARDS
MANUAL.
2. LAND DEVELOPMENT ENGINEER SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO CONSTRUCTION.
3. ALL TESTS SHALL BE PERFORMED BY THE DEVELOPER AT NO COST TO THE CITY.
4. CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES WHEN WORKING WITHIN EXISTING STREETS. THE CONTRACTOR SHALL
PLACE AND MAINTAIN SIGNS, DANGER LIGHTS, BARRICADES, AND FURNISH WATCHMEN OR FLAGMEN TO DIRECT TRAFFIC IN
ACCORDANCE WITH THE WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H.).
5. SUBGRADE FOR SIDEWALKS SHALL BE COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTER
TEST. THE SURFACE OF THE SIDEWALK SHALL BE STEEL TROWEL AND LIGHT BROOM FINISHED AND CURED WITH AN ACCEPTABLE
CURING COMPOUND. TOOLED JOINTS SHALL BE PROVIDED AT AN INTERVAL NOT LESS THAN FIVE (5) FEET AND EXPANSION JOINTS
AT INTERVALS NOT MORE THAN 45 FEET. THE SIDEWALK SHALL HAVE A LATERAL SLOPE OF 1/4" PER FOOT.
6. THE DEVELOPER SHALL MAKE A DILIGENT EFFORT TO PRESERVE AREAS OF REQUIRED BUFFERS WHERE SIGNIFICANT VEGETATION
EXISTS. THESE AREAS SHALL REMAIN UNDISTURBED EXCEPT TO THE EXTENT NECESSARY TO ACCOMMODATE THE ABOVE ITEMS OF
THIS SECTION.
7. UNDER DRAINAGE SHALL BE PROVIDED AS DIRECTED BY GEO—TECHNICAL ENGINEER. DETERMINATION SHALL BE MADE IN THE FIELD.
DRAINS TO BE INSTALLED PER CMLD STD #30.05.
8. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT—OF—WAY IF DEEMED NECESSARY BY THE INSPECTOR.
9. "AS —BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO
SUBDIVISION FINAL INSPECTION TO THE CITY/COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY/COUNTY
SUBDIVISION ORDINANCE.
10. ALL ROAD IMPROVEMENTS ON WEST SUGAR CREEK ROAD & NORTH GRAHAM STREET ARE TO BE COORDINATED WITH THE CITY OF
CHARLOTTE ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION.
11. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE
IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT.
12. ALL DEVELOPMENT CREATING A TOTAL 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WILL REQUIRE STORM
DRAINAGE DETENTION.
13. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF A SIDEWALK OR TRAVEL LANE MUST BE APPROVED BY CDOT AND
WILL REQUIRE A R/W USE PERMIT OR R/W LEASE DEPENDING UPON THE PROPOSED DURATION OF CLOSURE. THESE APPROVALS
ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
CONTACT CDOT AT (704) 432-1562 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS.
CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348 AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY
EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS.
14. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 704-336-7086) TO IDENTIFY ANY
CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60— 90 DAYS WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER
SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER
15. PRIVATE DEVELOPMENT UTILITY RELOCATION COORDINATION — FOR UTILITY COORDINATION RELATED TO BOTH EXISTING UTILITY
RELOCATION NEEDS AND PROPOSED NEW UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, CDOT ROW UTILITY COORDINATOR
AT 704-336-4248 OR RTRUITTOCHARLOTTENC.GOV.
16. NON—STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT—OF—WAY REQUIRE A RIGHT—OF—WAY ENCROACHMENT
AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE
INSTALLATION. FOR CITY OF CHARLOTTE MAINTAINED STREETS, CONTACT CDOT AT 704-336-3888.
17. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF A SIDEWALK OR TRAVEL LANE MUST BE APPROVED BY CDOT
ANDWILL REQUIRE A R/W USE PERMIT OR R/W LEASE DEPENDING UPON THE PROPOSED DURATION OF CLOSURE. THESE APPROVALS
ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL
CONTACT CDOT AT (704) 432-1562 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS.
CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348 AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY
EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS.
18. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 704-336-7086) TO IDENTIFY ANY
CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60— 90 DAYS WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER
SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER.
19. DEVELOPER TO CONTACT CDOT (ANTHONY MENDEZ: 704-336-4971) DURING SITE PLAN PREPARATION TO DISCUSS STREET LIGHTING
REQUIREMENTS, IF ANY, FOR THIS PROJECT. COORDINATE WITH DUKE ENERGY AND CDOT AS NECESSARY TO DETERMINE LIGHTING
LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION.
20. PRIVATE DEVELOPMENT UTILITY RELOCATION COORDINATION — FOR UTILITY COORDINATION RELATED TO BOTH EXISTING UTILITY
RELOCATION NEEDS AND PROPOSED NEW UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, CDOT ROW UTILITY COORDINATOR
AT 704-336-4248 OR RTRUITTOCHARLOTTENC.GOV.
21. A JOINT USE MANHOLE (MEET —ME MANHOLE) IS TO BE PROVIDED BY THE DEVELOPER TO ACCOMMODATE ALL UTILITY TELECOM
SERVICE PROVIDERS. THE JOINT USE MANHOLE SHALL BE LOCATED ON PRIVATE PROPERTY OUTSIDE OF THE CITY RIGHT—OF—WAY.
A
LO
w
LU
2
a
Q
0
LO
0 CV
_ 0
wULoOrOi
Cc LU CD
v�~z00
DC �_ fr LU (0Q J J LU 0000
c�moLLN
U) LU
� U 0
LU
o
0
O
0
U
Z
0
Mineral Sr)rin
Demolition & Erosion Control
S
2022 W. Sugar Creek Rd., Charlotte, NC 28262
PID: 047-025-23, 047-025-24, 047-025-30, 047-025-32
RPNPe GIN �PSN�o
Ca I? 250
NO�A ��w . �SNo.�
NJSQE �F�RENG1 /
vo
NAG
MiN
NcDo VI RA '3 Rp \
�I ROL/FC SpFFO �F pug` �S
\EFFR��C� 4S PH
NO.
19
/ MARIA
A D.B.30740PTE G. 67 I I PIN: 047-025-22 I
/ F ZONING: R-17MF, USE: SF
r JORGE & GLENDA DAVADI I
I D.B. 32554, PG. 624
PIN: 047-025-27 I
ZONING: R-17MF, USE. SF
/ I
I
� I
I Ir.
c�
I
I
I
I
I
I
I
I
I
I
I
GRADY & HATTIE STUTTS
D.B. 6617, PG. 847
\ I -20
ZONING. R 45 17MF,USE: SF
I
PARCEL A
M.B. 24, PG. 362 \
EBENEZER BAPTIST CHURCH
AT CHARLOTTE, INC
D.B. 24587, PG. 296
PIN: 047-025-31
ZONING: R-17MF, USE. CHURCH
I �
CONTACT INFORMATION
,0h►
WESLEY COMMUNITY DEVELOPMENT CORP.
CONTACT: JOEL GILLAND
ADDRESS: 13816 PROFESSIONAL CENTER DR., STE. 200
HUNTERSVILLE, NC 28078
PHONE: 980-441-5123
CIVIL ENGINEER & LANDSCAPE ARCHITECT:
URBAN DESIGN PARTNERS PLLC
CONTACT: BRIAN D. SMITH, PE
ADDRESS: 1213 W. MOREHEAD ST., STE 450
CHARLOTTE, NC 28206
PHONE: 704-334-3303 FAX:704-334-3305
REFERENCE MINERAL SPRINGS (PROJECT
NUMBER: SDRMF-2021-00042) APPROVED
PLANS & CALCULATIONS FOR FULL
SUBDIVISION PLANS.
U R B A N
DESIGN
PARTNERS
1213 w morehead st ste 450
charlotte, nc 28208
P 704.334.3303
urbandesignpartners.com
nc firm no: P-0418 sc coa no: C-03044
08/10/2021
+-�
CL
0
Eco
♦"'
a�
U
I-
o
O
�
U
E
U)
U
Z
>-
CL
p
o
0_
o
N
U)
N
C,9
co
a:
(ll
T
VJ
2
SHEET
INDEX
N
00
C-1.0
COVER SHEET
N
C-1.1
SUBMITTAL TABLE
U
z
C-2.0
EXISTING CONDITIONS
C-2.1
DEMOLITION PLAN
C-7.0
EROSION CONTROL - PHASE 1
C-7.1
EROSION CONTROL - PHASE 2
U)
Cz
C-8.5
EROSION CONTROL DETAILS
U
C-8.6
EROSION CONTROL DETAILS
+_J
i
v J
U)
U
(z
C/)
O
N
UN
O
N
PROJECT SCHEDULE:
PROJECT COMMENCEMENT: SEPTEMBER 2021
PROJECT COMPLETION: NOVEMBER 2021
ObN
GRAPHIC SCALE
40 0 20 40 80
1 INCH = 40 FEET
Z
O
U)
LU
Ir
u
W
a
0
O
z
N
J
Q
m
U)
0
Z
Q
rr
0
J
a -
CV
0
r
00
0
0
Project No: 20-CLT-159
Date: 03.26.2021
Designed By: UDP
Checked By: BDS
Sheet No:
C-1 00