Loading...
HomeMy WebLinkAboutNCC215365_Site Plan or Location Map_20211011�a VICINITY MAP a GENERAL NOTES: 1. ALL WORK AND MATERIALS SHALL CONFORM TO THE LATEST EDITION OF THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL (CLDSM) AND THE LATEST EDITION OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES UNLESS OTHERWISE SPECIFIED IN THE CHARLOTTE—MECKLENBURG LAND DEVELOPMENT STANDARDS MANUAL. 2. LAND DEVELOPMENT ENGINEER SHALL BE GIVEN 48 HOURS NOTICE PRIOR TO CONSTRUCTION. 3. ALL TESTS SHALL BE PERFORMED BY THE DEVELOPER AT NO COST TO THE CITY. 4. CONTRACTOR SHALL MAINTAIN TWO WAY TRAFFIC AT ALL TIMES WHEN WORKING WITHIN EXISTING STREETS. THE CONTRACTOR SHALL PLACE AND MAINTAIN SIGNS, DANGER LIGHTS, BARRICADES, AND FURNISH WATCHMEN OR FLAGMEN TO DIRECT TRAFFIC IN ACCORDANCE WITH THE WORK AREA TRAFFIC CONTROL HANDBOOK (W.A.T.C.H.). 5. SUBGRADE FOR SIDEWALKS SHALL BE COMPACTED TO 95% OF THE MAXIMUM DENSITY OBTAINABLE WITH THE STANDARD PROCTER TEST. THE SURFACE OF THE SIDEWALK SHALL BE STEEL TROWEL AND LIGHT BROOM FINISHED AND CURED WITH AN ACCEPTABLE CURING COMPOUND. TOOLED JOINTS SHALL BE PROVIDED AT AN INTERVAL NOT LESS THAN FIVE (5) FEET AND EXPANSION JOINTS AT INTERVALS NOT MORE THAN 45 FEET. THE SIDEWALK SHALL HAVE A LATERAL SLOPE OF 1/4" PER FOOT. 6. THE DEVELOPER SHALL MAKE A DILIGENT EFFORT TO PRESERVE AREAS OF REQUIRED BUFFERS WHERE SIGNIFICANT VEGETATION EXISTS. THESE AREAS SHALL REMAIN UNDISTURBED EXCEPT TO THE EXTENT NECESSARY TO ACCOMMODATE THE ABOVE ITEMS OF THIS SECTION. 7. UNDER DRAINAGE SHALL BE PROVIDED AS DIRECTED BY GEO—TECHNICAL ENGINEER. DETERMINATION SHALL BE MADE IN THE FIELD. DRAINS TO BE INSTALLED PER CMLD STD #30.05. 8. SUBSURFACE DRAINAGE FACILITIES MAY BE REQUIRED IN THE STREET RIGHT—OF—WAY IF DEEMED NECESSARY BY THE INSPECTOR. 9. "AS —BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, INCLUDING DESIGNED DITCHES, MUST BE SUBMITTED PRIOR TO SUBDIVISION FINAL INSPECTION TO THE CITY/COUNTY ENGINEERING DEPARTMENT IN ACCORDANCE WITH THE CITY/COUNTY SUBDIVISION ORDINANCE. 10. ALL ROAD IMPROVEMENTS ON WEST SUGAR CREEK ROAD & NORTH GRAHAM STREET ARE TO BE COORDINATED WITH THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT PRIOR TO CONSTRUCTION. 11. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 12. ALL DEVELOPMENT CREATING A TOTAL 20,000 SQUARE FEET OF IMPERVIOUS AREA SINCE SEPTEMBER 1978 WILL REQUIRE STORM DRAINAGE DETENTION. 13. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF A SIDEWALK OR TRAVEL LANE MUST BE APPROVED BY CDOT AND WILL REQUIRE A R/W USE PERMIT OR R/W LEASE DEPENDING UPON THE PROPOSED DURATION OF CLOSURE. THESE APPROVALS ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT CDOT AT (704) 432-1562 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348 AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS. 14. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 704-336-7086) TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60— 90 DAYS WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER 15. PRIVATE DEVELOPMENT UTILITY RELOCATION COORDINATION — FOR UTILITY COORDINATION RELATED TO BOTH EXISTING UTILITY RELOCATION NEEDS AND PROPOSED NEW UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, CDOT ROW UTILITY COORDINATOR AT 704-336-4248 OR RTRUITTOCHARLOTTENC.GOV. 16. NON—STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT—OF—WAY REQUIRE A RIGHT—OF—WAY ENCROACHMENT AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. FOR CITY OF CHARLOTTE MAINTAINED STREETS, CONTACT CDOT AT 704-336-3888. 17. ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF A SIDEWALK OR TRAVEL LANE MUST BE APPROVED BY CDOT ANDWILL REQUIRE A R/W USE PERMIT OR R/W LEASE DEPENDING UPON THE PROPOSED DURATION OF CLOSURE. THESE APPROVALS ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT CDOT AT (704) 432-1562 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348 AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS. 18. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 704-336-7086) TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60— 90 DAYS WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER. 19. DEVELOPER TO CONTACT CDOT (ANTHONY MENDEZ: 704-336-4971) DURING SITE PLAN PREPARATION TO DISCUSS STREET LIGHTING REQUIREMENTS, IF ANY, FOR THIS PROJECT. COORDINATE WITH DUKE ENERGY AND CDOT AS NECESSARY TO DETERMINE LIGHTING LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION. 20. PRIVATE DEVELOPMENT UTILITY RELOCATION COORDINATION — FOR UTILITY COORDINATION RELATED TO BOTH EXISTING UTILITY RELOCATION NEEDS AND PROPOSED NEW UTILITY INSTALLATIONS, PLEASE CONTACT RALPH TRUITT, CDOT ROW UTILITY COORDINATOR AT 704-336-4248 OR RTRUITTOCHARLOTTENC.GOV. 21. A JOINT USE MANHOLE (MEET —ME MANHOLE) IS TO BE PROVIDED BY THE DEVELOPER TO ACCOMMODATE ALL UTILITY TELECOM SERVICE PROVIDERS. THE JOINT USE MANHOLE SHALL BE LOCATED ON PRIVATE PROPERTY OUTSIDE OF THE CITY RIGHT—OF—WAY. A LO w LU 2 a Q 0 LO 0 CV _ 0 wULoOrOi Cc LU CD v�~z00 DC �_ fr LU (0Q J J LU 0000 c�moLLN U) LU � U 0 LU o 0 O 0 U Z 0 Mineral Sr)rin Demolition & Erosion Control S 2022 W. Sugar Creek Rd., Charlotte, NC 28262 PID: 047-025-23, 047-025-24, 047-025-30, 047-025-32 RPNPe GIN �PSN�o Ca I? 250 NO�A ��w . �SNo.� NJSQE �F�RENG1 / vo NAG MiN NcDo VI RA '3 Rp \ �I ROL/FC SpFFO �F pug` �S \EFFR��C� 4S PH NO. 19 / MARIA A D.B.30740PTE G. 67 I I PIN: 047-025-22 I / F ZONING: R-17MF, USE: SF r JORGE & GLENDA DAVADI I I D.B. 32554, PG. 624 PIN: 047-025-27 I ZONING: R-17MF, USE. SF / I I � I I Ir. c� I I I I I I I I I I I GRADY & HATTIE STUTTS D.B. 6617, PG. 847 \ I -20 ZONING. R 45 17MF,USE: SF I PARCEL A M.B. 24, PG. 362 \ EBENEZER BAPTIST CHURCH AT CHARLOTTE, INC D.B. 24587, PG. 296 PIN: 047-025-31 ZONING: R-17MF, USE. CHURCH I � CONTACT INFORMATION ,0h► WESLEY COMMUNITY DEVELOPMENT CORP. CONTACT: JOEL GILLAND ADDRESS: 13816 PROFESSIONAL CENTER DR., STE. 200 HUNTERSVILLE, NC 28078 PHONE: 980-441-5123 CIVIL ENGINEER & LANDSCAPE ARCHITECT: URBAN DESIGN PARTNERS PLLC CONTACT: BRIAN D. SMITH, PE ADDRESS: 1213 W. MOREHEAD ST., STE 450 CHARLOTTE, NC 28206 PHONE: 704-334-3303 FAX:704-334-3305 REFERENCE MINERAL SPRINGS (PROJECT NUMBER: SDRMF-2021-00042) APPROVED PLANS & CALCULATIONS FOR FULL SUBDIVISION PLANS. U R B A N DESIGN PARTNERS 1213 w morehead st ste 450 charlotte, nc 28208 P 704.334.3303 urbandesignpartners.com nc firm no: P-0418 sc coa no: C-03044 08/10/2021 +-� CL 0 Eco ♦"' a� U I- o O � U E U) U Z >- CL p o 0_ o N U) N C,9 co a: (ll T VJ 2 SHEET INDEX N 00 C-1.0 COVER SHEET N C-1.1 SUBMITTAL TABLE U z C-2.0 EXISTING CONDITIONS C-2.1 DEMOLITION PLAN C-7.0 EROSION CONTROL - PHASE 1 C-7.1 EROSION CONTROL - PHASE 2 U) Cz C-8.5 EROSION CONTROL DETAILS U C-8.6 EROSION CONTROL DETAILS +_J i v J U) U (z C/) O N UN O N PROJECT SCHEDULE: PROJECT COMMENCEMENT: SEPTEMBER 2021 PROJECT COMPLETION: NOVEMBER 2021 ObN GRAPHIC SCALE 40 0 20 40 80 1 INCH = 40 FEET Z O U) LU Ir u W a 0 O z N J Q m U) 0 Z Q rr 0 J a - CV 0 r 00 0 0 Project No: 20-CLT-159 Date: 03.26.2021 Designed By: UDP Checked By: BDS Sheet No: C-1 00