Loading...
HomeMy WebLinkAboutSW7131016_APPROVED PLANS_20131106STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. Sw lZ_ DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M D 0 GAS PIEDMONT NATURAL GAS 1.ii EXECUTIVE PARKWAY NEW BERN, NC 28560 (252) 634-1651 TELEPHONE CENTURY LINK tOi9 S. GLENBURNIE ROAD NEW BERN, NO 28563 (252) 636 3861 Umpic CITY OF:NEW BERN ELECTRIC UTILITIES 606 FT. TOTTEN DRIVE NEW BERN, NC 28563 (252) 636-4070 WATER & SANITARY SEWER CITY OF NEW BERN WATER AND SEWER DIVISION 2825 NEUSE BOULEVARD NEW BERN, NC 28560 (252) 639-7541 STORMWATER THE CITY OF NEW BERN 300 POLLOCK STREET NEW BERN. NC 28563" (252) 636-4000 ADDITIONAL GOVERNING AGENCIES CONTACTS: EROSION CONTROL NCDENR WASHINGTON REGIONAL OFFICE 943 WASHINGTON SOUARE MALL WASHINGTON NC 278" (252) 975-9716 IIFPARTMENT OE HIGHWAY NCDOT HIGHWAY DIVISION 2 101 PACTOLUS HIGHWAY GREENVILLE, NC 27835 (252) 439-2800 ENGINEER- BOHLER ENGINEERING 800 WEST H I LL STREET, SU ITE 101 CHARLOTTE, NC 28208 TELEPHONE(980) 272-3400 FAX (980) 272-3401 7 1 ------ 1:11111 will ® ® r - r DEVEOPER- WAL-MART STORES EAST, L.P. STORE #7218-00 2001 S.E. 1 Oth STREET BENTONVILLE, ARKANSAS 72716 TELEPHONE (479) 2 73-4000 C+3 4} 4� SITE LOCATION MAP SCALE: f"=2000' ALERT TO CONTRACTOR: I. THE SITEWORK FOR THE GROCERY STORE PORTION OF THIS PROJECT SHALL MEET OR EXCEED THE "STANDARD SITEWORK SPECIFICATIONS." 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO CONTRACT COMPLETION AND THE FINAL CONNECTION OF SERVICES. 5I~EET INDEX 1. COVER SHEET 2. NOTES GENERAL NOTES 3. SW -I SWPPP NOTES 4. SW-2 SWPPP NOTES 5. SW-3 PHASE I EROSION AND SEDIMENTATION CONTROL PLAN 6. SW-4 PHASE 2 EROSION AND SEDIMENTATION CONTROL PLAN 1. SW-5 EROSION AND SEDIMENTATION CONTROL DETAILS 8. SW-6 EROSION AND SEDIMENTATION CONTROL DETAILS 9. SW-7 EROSION AND SEDIMENTATION CONTROL DETAILS 10. SW-8 EROSION AND SEDIMENTATION CONTROL DETAILS 11. DM -I DEMOLITION PLAN 12. C-1 ZONING PLAN 13. C-2 SITE PLAN 14. C-3 GRADING & DRAINAGE PLAN 15. C-4 UTILITY PLAN 16. C-5 VEHICLE CIRCULATION PLAN 17. C-6 LANDSCAPE PLAN 18. C-7 LANDSCAPE DETAILS 19. C-8 LIGHTING PLAN 20. D-1 CONSTRUCTION DETAILS 21. D-2 CONSTRUCTION DETAILS 22. D-3 CONSTRUCTION DETAILS 23. D-4 CONSTRUCTION DETAILS 24. D-5 CONSTRUCTION DETAILS STORMWATER APPROVED.% NORTH CAROLINA ENVIR MEIITAL MANAGEMENT COMMISSION DIVISION �� OFJZ/A"p*$MAMf g IAAA _L q (- 20-8— 4>>C*� CA Ito 7�t� F-S3ip�f 030304 balf ER Vk. �92 4or V:\13\PT30190\_CA0\LD P;_ANS\REV DETAILS-5----->LAY0U7 01-- COVER I 2 3 4 I m - --I - - __ - - - I 7 101 9 10 I 1 1 1 12 13 A 8 c ra E F G m DEMOLITION NOTES 1. THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY.- G�) SOHLER ENGINEERING 22636 DAMS DRIVE, SUITE 250 STERLING, VIRGINIA 20164 ENTITLED: ALTA/ACSM LAND TITLE SURVEY PREPARED FOR', BOHLER ENGINEERING ALE NO, SNGC138113 DATED: 8/15/1.3 2. THE FIRM OR ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY OR SUPERVISION. CONTRACTOR IS TO PROCEED WITH THE DEMOLITION IN A SYSTEMATIC AND SAFE MANNER, FOLLOWING ALL THE OSHA REQUIREMENTS. To ACTOR SAFETY. 3. ALL DEMOLITION ACTIVITIES ARE TO BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS, AND REFERENCED DOCUMENTS AS WEIJ_ AS ALL FEDERAL, STATE AND LOCAL REGULAnONS. ANY DISCREPANCIES OR DEVIATIONS SHALL BE IDENTIFIED BY THE CONTRACTOR TO THE ENGINEER IN WRITING FOR RESOLUTION PRIOR TO INITIATION OF ACTIVITY, 4. PRIOR TO STARTING ANY DEMOLITION CONTRACTOR IS RESPONSIBLE FDR/TO: A. ENSURE COPIES OF ALL PERMITS AND APPROVALS ARE ON SITE FOR REVIEW. B� THE REQUIRED SOIL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE IN PLACE PRIOR TO SITE DISTURBANCE. C. ALL UTILITIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS. WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC, "THIN THE LIMITS OF DISTURBANCE, SHALL BE VERTICALLY AND HORIZONTALLY LOCATED, THE CONTRACTOR SHALL USE AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. D, PROTECT AND MAINTAIN IN OPERATION, ALL ACTIVE SYSTEMS THAT ARE NOT BEING REMOVED DURING ALL DEMOLITION ACTIVITIES. E. FAMILIARIZE THEMSELVES WITH 114E APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENT AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLIHON AS IDENTIFIED OR REQUIRED FOR PROJECT. THE CONTRACTOR SHALL PROVIDE THE OMER WITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE NTH JURISDICTION AND UTILITY COMPANY REQUIREMENTS. F. COORDINATION WITH U11LITY COMPANIES REGARDING WORKING "OFF-PEAK4 HOURS OR ON WEEKENDS AS MAY BE REQUIRED TO MINIMIZE THE IMPACT ON THE AFFECTED PARTIES, 6. A COMPLETE INSPECTION FOR CONTAMINANTS, BY A LICENSED ENVIRONMENTAL TESnNG AGENCY, OF ALL BUILDINGS AND/bR STRUCTURES TO BE REMOVED SHALL BE DONE IN ACCORDANCE NTH ALL APPLICABLE LOCAL. STATE, AND FEDERAL ENVIRONMENTAL REGULATIONS. ALL CONTAMINANTS SHALL BE REMOVED AND DISPOSED OF BY A FEDERALLY LICENSED CONTRACTOR IN ACCORDANCE NTH FEDERAL, STATE, AND LOCAL REGULATIONS, ALL ENVIRONMENTAL WORK INCLUDING HAZARDOUS MATERIAL, SOILS, ASBESTOS, OR OTHER REFERENCED OR IMPLIED HEREIN IS SOLELY THE RESPONSIBILITY OF THE OWNEWS ENVIRONMENTAL CONSULTANT. 5, THE CONTRACTOR SHALL PROVIDE ALL THE "MEANS AND METHCOS� NECESSARY TO PREVENT MOVEMENT, SETTLEMENT, OR COLLAPSE OF EXISTING STRUCTURES, AND ANY OTHER IMPROVEMENTS THAT ARE REMAINING ON OR OFF SITE, B. IN THE ABSENCE OF SPECIFIC REQUIREMENTS, THE CONTRACTOR SHALL PERFORM EARTH MOVEMENT ACTIVITIES, DEMOLITION AND, REMOVAL OF ALL FOUNDATION WALLS. FOOTINGS. AND OTHER MATERIALS WITHIN THE LIMITS OF DISTURBANCE IN ACCORDANCE WITH DIRECTION BY OWNER'S GEOTECHNICAL ENGINEER. 7, EXPLOSIVES SHALL NOT BE USED WITHOUT PRIOR WRITTEN CONSENT OF BOTH THE OWNER AND APPLICABLE GOVERNMENTAL AUTHCRITIE& ALL THE REQUIRED PERMITS AND EXPLOSIVE 'CONTROL MEASUIRES THAT ARE REQUIRED BY THE FEDERAL, STATE. AND LOCAL GOVERNMENTS SHALL BE IN PLACE PRIOR TO STARTING AN EXPLOSIVE PROGRAM. THE CONTRACTOR IS ALSO RESPONSIBLE FOR ALL INSPECTION AM SEISMIC VIBRATION TESnNG THAT IS REQUIRED TO MONITOR THE EFFECTS ON ALL LOCAL STRUCTURE& a. CONTRACTOR SHALL PROVIDE TRAFFIC CONTROL AND GENERALLY ACCEPTED SAFE PRACTICES IN CONFORMANCE NTH: THE 'MANUAL ON UNIFORM TRAFFIC CONTROL," AS WELL AS FEDERAL, STATE, AND LOCAL REGULATIONS WHEN DEMOLITION RELATED ACTIVITIES IMPACT ROADWAYS OR ROADWAY RIGHTS-OF-WAY� 9. THE CONTRACTOR SHALL CONDUCT DEMOLITION ACTIVITIES IN SUCH A MANNER TO INSURE MINIMUM INTERFERENCE NTH ROADS, STREETS. SIDEWALKS. WALKWAYS, AND OTHER ADJACENT FACILITIES- STREET CLOSURE PERMITS MUST BE RECEIVED FROM THE APPROPRIATE GOVERNMENTAL AUTHORITY MERE REQUIRED. M DEMOLITION ACTIVITIES AND EQUIPMENT SHALL NOT USE AREAS OUTSIDE THE DEFINED PROPERTY LINES, WITHOUT WRITTEN PERMISSION OF THE OWNER, AND/`OR APPROPRIATE GOVERNMENT AGENCY. 11- USE DUST CONTROL MEASURES TO UMIT THE AMOUNT OF AIRBORNE DUST AND DIRT RISING AND SCATTERING IN THE AIR TO WITHIN FEDERAL, STATE, AND/OR LOCAL STANDARDS. AFTER THE DEMOLITION IS COMPLETE. ADJACENT STRUCTURES AND IMPROVEMENTS SHALL BE CLEANED OF ALL DUST AND DEBRIS GAUSED BY THE DEMOLITION OPERATIONS. THE CONTRACTOR IS RESPONSIBLE FOR RETURNING ALL ADJACENT AREAS TO THEIR OPRE-DEMOUTION� CONDITION. 12. THE CONTRACTOR IS RESPONSIBLE TO SAFEGUARD THE SITE AS NECESSARY TO PERFORM THE DEMOLITION IN SUCH A MANNER AS TO PREVENT THE UNAUTHORIZED ENTRY OF PERSONS AT ANY TIME- 13. THIS DEMOLITION PLAN IS INTENDED TO IDENTIFY THOSE EXISTING TEMS/CONDInONS WHICH ARE TO BE REMOVED. IT IS NOT INTENDED TO PROVIDE DIRECTION OTHER THAN THAT ALL METHODS AND MEANS ARE TO BE IN ACCORDANCE NTH STATE, FEDERAL, LOCAL, AND JURISDICTIONAL REQUIREMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL OSHA AND OTHER SAFETY PRECAUTIONS NECESSARY TO PROVIDE A SAFE WORK SITE. 14, THE DEMOLITION CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS OF DAMAGE TO ALL ITEMS THAT ARE TO REMAIN AS A RESULT OF HIS ACTIVITIES. ALL REPAIRS SHALL USE NEW MATERIAL. THE REPAIRS SHALL RESTORE THE ITEM TO THE PRE-DEMOUTION CONDITION. 15. DEBRIS SHALL NOT BE BURIED ON 114E SUBJECT SITE. ALL EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL TOWN, COUNTY, STATE� AND FEDERAL LAWS AND APPLICABLE CODES. THE CONTRACTOR SHALL PROPERLY REMOVE AND DISPOSE OF HAZARDWS/UNSUITABLE MATERIAL OFF -SITE IN ACCORDANCE NTH ALL APPLICABLE CODES, ORDINANCES, AND LAWS. 16. DEMOLITION OF THE EXISTING STRUCTURES AND FOUNDATIONS SHOULD INCLUDE FULL REMOVAL OF ALL REMNANT UTILITIES, FOOTINGS� FOUNDATION WALLS, AND SLABS. REMNANT FOUNDATIONS AND SLABS MAY REMAIN IN PLACE Two FEET 13ELOW PAVEMENT SU13GRADES AND LANDSCAPED AREAS, PROVIDED THEY ARE ADEQUATELY BROKEN TO PROMOTE POSITIVE DRAINAGE AND THAT THEY WILL NOT INTERFERE NTH FUTURE CONSTRUCTION. THE RESULTING EXCAVATIONS NTH STRUCTURAL ALL PLACED IN MAXIMUM NINE INCH LOOSE LIFTS AND COMPACTED TO AT LEAST 95 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR (ASTM D 1557), ANY IMPORTED MATERIAL PLACED AS STRUCTURAL FILL OR BACKFILL TO RAISE ELEVATIONS OR RESTORE GRADES SHOULD CONSIST OF CLEAN, RELATIVELY WELL GRADED SAND OR GRAVEL NTH A MAXIMUM PARTICLE SIZE OF THREE INCHES AND FIVE PERCENT TO 20 PERCENT OF MATERIAL FINER THAN A #200 SIEVE. SILTY OR CLAYEY SANDS AND GRAVELS WTH HIGHER PERCENTAGE OF FINES AND WITH A LIQUID LIMIT LESS THAN 40 AND A PLASTICITY INDEX LESS THAN 12 MAY BE CONSIDERED SUBJECT TO THE OMER'S APPROVAL, PROVIDED THAT THE REQUIRED MOISTURE CONTENT AND COMPACTION CONTROLS ARE MET, THE MATERIAL SHOULD BE FREE OF CLAY LUMPS, ORGANICS, AND DELETERIOUS MATERIAL. IMPORTED STRUCTURAL FILL MATERIAL SHOULD BE APPROVED BY A QUALIFIED GEGlECHNICAL ENGINEER PRIOR TO DELIVERY TO THE SITE. 17, THE CONTRACTOR SHALL MAINTAIN ALL UTILITY SERVICES TO THE EXISTING SITE AT ALL TIMES. UTILITY SERVICES SHALL NOT BE INTERRUPTED WITHOUT APPROVAL FROM THE CONSTRUCTION MANAGER AND COORDINATION NTH ON LOT USERS. 18. THE CONTRACTOR SHALL COORDINATE NTH RESPECTIVE UTILITY COMPANIES PRIOR TO THE REMOVAL AND/OR RELOCATION OF UTILITIES. THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY COMPANY CONCERNING PORTIONS OF WORK MICH MAY BE PERFORMED BY THE UTILITY COMPANY'S FORCES AND ANY FEES WHICH ARE TO BE PAID TO THE UTILITY COMPANY FOR 114EIR SERVICES, THE CONTRACTOR IS RESPONSIBLE FOR PAYING ALL FEES AND CHARGES, M CONTRACTOR MUST PROTECT THE PUBLIC AT ALL TIMES wITH FENCING, BARRICADES, ENCLOSURES, ETC., (AND OTHER APPROPRIATE BEST MANAGEMENT PRACTICES) AS APPROVED BY CONSTRUCTION MANAGER. 20. CONTINUOUS ACCESS SHALL BE MAINTAINED FOR THE SURROUNDING PROPERTIES AT ALL TIMES DURING CONSTRUCTION. 21� PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE To BE INSTALLED. 22- DAMAGE TO ALL EXISTING CONDITIONS TO REMAIN WILL BE REPLAGED AT CONTRACTOR'S EXPENSE. V-1 11 :4 :4 .f� 0 1 ALL WALMART GENERAL CONTRACTOR WORK TO BE COMPLETED (EARTHWORK, FINAL UTILITIES, AND FINAL GRADING) BY THE MILESTONE DATE IN PROJECT DOCUMENTS. OUTLOT AREA TO BE KEPT FREE OF JOB TRAILERS AND STORAGE AFTER THE CONTRACT MILESTONE DATE FOR THE OUTLOT. WM GENERAL CONTRACTOR TO PROVIDE CLEAR ACCESS FOR OUTLOT CONTRACTOR TO THE SPECIFIC PARCEL AT ALL TIMES AFTER MILESTONE DATE. PURCHASER OF OUTLOT TO PROVIDE PERMIT DOCUMENTS AND SWPPP REQUIRED BY STATE/LCICAL REQUIREMENTS FOR SPECIFIC OUTLOT. DEWATERING NOTE: WHEN PERFORMING GRADING OPERATIONS DURING PERIODS OF WET WEATHER, DEWATERING, DRAINAGE AND GROUND WATER MANAGEMENT TO CONTROL MOISTURE OF SOILS. REFER TO MASTER SITE SPECIFICATIONS. A � V:\l3�P`,3O190\_CAD\;.D PLANS\REV - 5\P1130190 SITE-5- ­>LAYOJT� 02- NOTES SITE/RECORD PLAN GENERAL NOTES SITE/RECORD PLAN GENERAL NOTES 1, THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY: o,) EICHLER ENGINEERING 22636 DAMS DRIVE, SUITE 250 STERLING, VIRGINIA 20164 ENTITLED: ALTA/ACSM LA14D TITLE SURVEY PREPARED FOR: EICHLER ENGINEERING FILE NO. SNOC138113 DATED: 8/15/13 2, SPECIFIC RESOURCES, TECHNICAL REPORTS, DESIGN DOCUMENTS, ETAL RELATED TO THIS PROJECT ARE AS FOLLOWS: -SURVEY EICHLER ENGINEERING 22636 DAVIS DRIVE, SUITE 250 STERLING, VIRGINIA 20164 ENTITUEDZ ALTA/ACSM LAND TITLE SURVEY PREPARED FOR� BOHLER ENGINEERING FILE NO. SNCC138113 DATED: 8/15/13 -GEOTECHNICAL S&ME, INC 3201 SPRING FOREST ROAD RALEIGH, NORTH CAROLINA 27616 ENTITLED: INITIAL GEOTECRNICAL EXPLORATION REPORT PREPARED FOR: EICHLER ENGINEERING FILE NO. 1051-13-234-A DATED: 8/6/13 -ENVIRONMENTAL S&ML INC 3201 SPRING FOREST ROAD RALEIGH. NORTH CAROLINA 27616 ENTITLED- DRAFT PHASE I ENVIRONMENTAL SITE ASSESSMENT PREPARED FOR: EICHLER ENGINEERING FILE NO- 1051-13-234A DATED: 8/5/13 CONTRACTOR IS RESPONSIBLE TO OBTAIN THESE DOCUMENTS AND FAMILIARIZE HIMSELF NTH SAME FOR APPLICATION BOTH PRIOR TO AND DURING CONSTRUCTION. 3. ALL ELEVATIONS SHOWN ARE IN ACCORDANCE NTH T14E REFERENCED SlJRVEYOR'S BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUNDBREAK. 4. APPLICANT.' WAL-MART REAL STORES EAST, L.P. STATUTORY TRUST 2001 S,E. 10TH STREET, BENTONVILLE, ARKANSAS, 72716-0550 5, OWNER: JAMES 0. MORTON, JR. AND WIFE, REBECCA P, MORTON 6. PARCEL DATA: D.B. 1648 PC, 0608 PID. d-240-035-A 7. ALL ACCESSIBLE PARKING STALLS, ACCESSIBLE ROUTES, RAMPS AND ALL OTHER PROMSIONS FOR ADA COMPLIANCE (INTERNALLY TO SITE FEATURES AND FROM SITE FEATURES TO PUBLIC WAYS) SHALL BE CONSTRUCTED IN COMPLIANCE NTH ALL APPLICABLE ADA REQUIREMENTS AND REGULATIONS. THE OWNER AND CONTRACTOR SHALL BE RESPONSIBLE FOR ADA COMPLIANCE FOR ALL PROPOSED FEATURES DEPICTED ON THESE PLANS. IT IS THE OWNIER'$ RESPONSIBILITY TO ESTABLISH AND MAINTAIN CONTINUED COMPLIANCE WITH THE ADA REGULATIONS PERTAINING TO ON AND OFF SITE FEATURES. I B. ALL FEATURES ARE EXISTING TO REMAIN UNLESS OTHERWISE NOTED. 9. FEATURES TO BE REMOVED ARE NOTED (TOR), 10, PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE 13EEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS BY ALL OF THE PERMITTING AUTHORITIES. HALL BE FAMILIAR WITH AND RESPONSIBLE FOR ANY/ALL CERTIFICATIONS, INSPECTIONS, IERNING JURISDICTIONAL AGENCIES DURING AND AFTER CONSTRUCTION FOR SIGN -OFF AND Y ISSUANCE. INCLUDING BUT NOT LIMITED TO PROCUREMENT OF SERVICES, SCHEDULING OF MORDINA71ON NTH REPRESENTATIVES OF THE APPROPRIATE PARTIES, CONTRACTOR IS TE CERTIFICATIONS, SIGN -OFFS, ETC. NECESSARY FOR JOB CLOSE-OUT AND ISSUANCE OF 12. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS, REFERENCED DOCUMENTS, AND THE REQUIREMENTS AND STANDARDS OF THE LOCAL GOVERNING AUTHORITY. 13. THE SOILS REPORT AND RECOMMENDATIONS SET FORTH THEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND IN CASE OF CONFLICT SHALL TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IN WRITING OF ANY SUCH DISCREPANCY BETWEEN SOILS E 14. THE PROPERTY SURVEY SHALL BE CONSIDERED A PART OF THESE PLANS. 15. THESE PLANS ARE BASED ON INFORMATION PROVIDED TO OUR OFFICE AT THE TIME OF PLAN PREPARATION. CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS AND NOTIFY OUR OFFICE IF ACTUAL SITE CONDITIONS DIFFER FROM THAT SHOWN ON THE PLAN, OR IF THE PROPOSED WORK WOULD BE INHIBITED BY ANY OTHER SITE FEATURES, 16. ALL DIMENSIONS SHOWN ON THE PLANS SHALL BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION - CONTRACTOR SHALL NOTIFY ENGINEER IN WRITING IF ANY DISCREPANCIES EXIST PRIOR TO PROCEEDING NTH CONSTRUCTION, NO EXTRA COMPENSATION SHALL BE PAID TO THE CONTRACTOR FOR WORK HAVING TO BE REDONE DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS IF SUCH NOTIFICATION HAS NOT BEEN GIVEN. 17. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL/BUILDING PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, EXACT BUILDING UTILITY LOCATIONS AND SITE LIGHTING ELECTRICAL DESIGN AND LAYOUT. 18. DEBRIS SHALL NOT BE BURIED ON THE SUBJECT SITE. ALL EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) SHALL BE DISPOSED OF IN ACCORDANCE WITH ALL TOWN, COUNTY, STATE AND FEDERAL LAWS AND APPLICABLE CODES. 00"ACTOR SHALL PROPERLY REMOVE & DISPOSE OF HAZARDOUS/UNSUITABLE MATERIAL OFF -SITE IN ACCORDANCE NTH ALL APPLICABLE CODES, ORDINANCES & LAWS. 19. THE CONTRACTOR IS RESPONSIBLE FOR ALL SHORANG REQUIRED DURING EXCAVATION AND SHALL BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS, AS WELL AS ADDITIONAL PROVISIONS TO ASSURE STABILITY OF CONTIGUOUS STRUCTURES, AS FIELD CONDITIONS DICTATE. 20. THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURE, ETC. TO REMAIN, CONTRACTOR SHALL BE RESPONSIBLE FOR TAKING THE APPROPRIATE MEASURES AS NECESSARY TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT TO REMAIN. AND PROVIDE A SAFE WORK AREA. 21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL REPLACE ALL SIGNA� INTERCONNECT CABLE, CONDUITS, AND ANY UNDERGROUND ACCESSORY EOUIPMENT DAMAGED DURING CONSTRUCTION. 22. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING THE DAMAGE DONE TO ANY EXISTING ITEM DURING CONSTRUCTION SUCH AS BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING. CURB, ETC. REPAIR SHALL BE EQUAL TO OR BETTER THAN, EXISTING CONDITIONS. CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISTING DAMAGE AND NOTIFY CONSTRUCTION MANAGER PRIOR TO CONSTRUC11ON START. 23. ALL CONCRETE SHALL HAVE THE MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS AS INDICATED IN SPECIFICATIONS AND REFERENCED DOCUMENTS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR GEOTECHNICAL REPORT. 25 THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUC71ON METHODS/MEANS FOR COMPLETION OF THE WORK DEPICTED ON THESE PLANS NOR ANY CONFUCTS/SCOPE REVISIONS WHICH RESULT FROM SAME, CONTRACTOR RESPONSIBLE FOR DETERMINING METHODS/MEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT OF CONSTRUCTION AND NOTIFICATION OF OWNER AND ENGINEER OF RECORD WHEN A CONFLICT IS IDENTIFIED. 26. THE ENGINEER OF RECORD HEREIN IS NOT RESPONSIBLE FOR JOB SITE SAFETY NOR HAS HE BEEN RETAINED FOR SUCH PURPOSES 27. ALL CONTRACTORS MUST CARRY STATUTORY WORKERS COMPENSATION, EMPLOYERS LIABIUTY INSURANCE AND APPROPRIATE LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL) ALL CONTRACTORS MUST HAVE THEIR CCL POUCIES ENDORSED TO NAME EICHLER ENGINEERING, ITS SUB CONSULTANTS AS ADDITIONAL INSURED AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE THE HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNIS14 BOHLER ENGINEERING NTH CERIIFICAIIONS OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMFNCINC WORK AND UPON THE FULLEST EXTENT PERMITTED BY LAW, INDEMNIFY AND HOLD HARMLESS EICHLER ENGINEERING AND ITS SUB CONSULTANTS FROM AND AGAINST ANY DAMAGES, LIABILITIES OR COSTS, INCLUDING REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANY WAY CONNECTED NTH THE PROJECT. INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS. 28. NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING OR ITS EMPLOYEES AND SUB CONSULTANTS AT A CONSTRUCTION/PROJECT SITE, SHALL REUEVE THE GENERAL CONTRACTOR OF ITS OBLIGATIONS. DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION D , TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE NTH THE CONTRACT DOCUMENTS AND ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES. EICHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION NTH THEIR WORK OR ANY HEALTH OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY. EICHLER ENGINEERING SHALL BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND SHALL BE MADE ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOWS POLICIES OF GENERAL LIABILITY INSURANCE. 29. BOHLFR ENGINEERING SHALL REVIEW AND ADVISE OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES AND OTHER DATA, WHrICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE NTH THE DESIGN CONCEPT AND THE INFORMATION SHOWN IN THE CONSTRUCTION MEANS OR METHODS, COORDINATION OF THE WORK WITH OTHER TRADES OR CONSTRUCTION SAFETY PRECAUTIONS, ALL OF WHICH ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. B044LER ENGINEERING'S REVIEW SHALL BE CONDUCTED NTH REASONABLE PROMPTNESS MILE ALLOWING SUFFICIENT 11ME TO PERMIT ADEQUATE REVIEW, REVIEW OF A SPECIFIC ITEM SHALL NOT INDICATE THAT EICHLER ENGINEERING HAS REVIEWED THE ENTIRE ASSEMBLY OF MICH THE ITEM IS A COMPONENT, BOHLER ENGINEERING SHALL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT BROUGHT TO THE ATTENTION OF BOHLER ENGINEERING IN WRITING BY THE CONTRACTOR. EICHLER ENGINEERING SHALL NOT BE REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR M41CH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED. M IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED THEREON, WITHOUT FIRST OBTAINING PRIOR MITTEN AUTHORIZATION FOR SUCH DEVIATIONS FROM 'THE OWNER AND ENGINEER, IT SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL COSTS TO CORRECT ANY WORK DONE, ALL FINES OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND IT SHALL INDEMNIFY AND HOLD THE OWNER AND ENGINEER HARMLESS FROM ALL SUCH COSTS TO AND FROM ALL SUCH FINES AND PENALTIES, COMPENSATION AND PUNITIVE DAMAGES AND COSTS OF ANY NATURE RESULTING THEREFROM. 31. ALL WORK AND MATERIALS SHALL COMPLY NTH ALL CITY/COUNTY REGULATIONS AND CODES AND O.S.H.A. STANDARD& 32 CONTRACTOR SHALL REFER TO THE ARCHITECTURAL PLANS FOR EXACT LOCATIONS AND DIMENSIONS OF VESTIBULES, SLOPE PAVING, SIDEWALKS, EXIT PORCHES, TRUCK DOCKS. PRECISE BUILDING DIMENSIONS AND EXACT BUILDING UTILITY ENTRANCE LOCATIONS. 33. ALL DISTURBED AREAS ARE TO RECEIVE FGUR INCHES OF TOPSOIL, SEED, MULCH AND WATER UNTIL A HEALTHY STAND OF GRASS IS ESTABLISHED. SEE 02900 SPECIFICATION. 3k ALL CURBED RADII ARE TO BE 5' UNLESS OTHERWISE NOTED. STRIPED RADII ARE TO BE 5'. 35, ALL DIMENSIONS AND RADII ARE TO THE FACE OF CURB UNLESS OTHERWISE NOTED, 36, EXISTING STRUCTURES WITHIN CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED OR RELOCATED AS NECESSARY. ALL COST SHALL BE INCLUDED IN BASE Bit). 37. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, (UNLESS OTHERWISE NOTED ON PLANS) INCLUDING BUT NOT LIMITED TO, ALL UTIIJTIES� STORM DRAINAGE, SIGNS. TRAFFIC SIGNALS & POLES, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES REQUIREMENTS AND PROJECT SITE WORK SPECIFICATIONS D BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID- 38. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN FROM A SURVEY BY A LAND SURVEYOR. 39. WALMART LEASE AREA IS 3.83± ACRES. 40� THE SITE WORK FOR THIS PROJECT SHALL MEET OR EXCEED 'THE SITE SPECIFIC sPECiACATIONS'. 41. REFER TO ARCH. PLANS FOR SITE LIGHTING ELECTRICAL PLAN. 42. ALL IMPROVEMENTS SHALL BE INSTALLED OR CONSTRUCTED IN ACCORDANCE NTH THE LATEST EDITION OF THE CITY'S IMPROVEMENTS SPECIFICATIONS MANUAL. 43- ALL TRAFFIC CONTROL DEVICES SHALL MEET THE STANDARDS OF THE LI DEPARTMENT OF TRANSPORTATION MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD). AS AMENDED, AND ALL CONSTRUCTION AND MATERIALS SHALLBE IN ACCORDANCE NTH PENNDOT SPECIFICATIONS, PUBLICATION 408, LATEST EDITION, AND PENNDOT 212. 44, THE PROPOSED BUILDING SHALL MATCH THE EXISTING SHOPPING CENTER IN REGARD TO DESIGN AND BUILDING MATERIALS. 45. ALL PROPOSED RODE TOP MECHANICAL AND SERVICE EQUIPMENT S14ALL BE SCREENED FROM PUBLIC RIGHT -OF WAY. 46. THE SITE ADDRESS SHALL BE POSTED IN A TEMPORARY FORM AND UPON COMPLETION IN A PERMANENT FORM IN A VISIBLE LOCATION IN 6 INCH CHARACTERS IN A REFLECTIVE MATERIAL & CONTRASTING COLOR. (IFC 505.1) , I" " [*]I i;p Eel WL I.' I 11 I ... 1, It 11F-1 01 J-A I I Ilk, F.A,Tci :4 III, 1. CONTRACTOR IS RESPONSIBLE FOR DEMOLITION OF EXISTING STRUCTURES INCLUDING REMOVAL OF ANY EXISTING UTILITIES SERVING THE STRUCTURE. UTILITIES ARE TO BE REMOVED TO THE RIGHT-OF-WAY. Z THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS Of THE VARIOUS u-nUTY COMPANIES. AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES MICH CONFLICT NTH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 3� ALL CUT OR ALL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED. 4. PRECAST STRUCTURES MAY BE USED AT CONTRACTORS OPTION, 5. STORM PIPE SHALL BE AS FOLLOWS UNLESS OTHERWISE NOTED� (SEE MASTER SITE SPECIFICATIONS SECTION 02630 FOR ALLOWED MATERIALS. DEC TO LIST SPECIFIC PIPE MATERIALS ON THIS PLAN IF REQUIRED.) 6. EXISTING PIPES TO BE CLEANED OUT TO REMOVE ALL SILT AND DEBRIS. 7- EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT. 8. PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT INTERVALS. 9. IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY To RETURN IT TO EXISTING CONDITIONS OR BETTER. 10. ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT. It ALL STORM SEWER MANACLES IN PAVED AREAS SHALL BE FLUSH NTH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6` ABOVE FINISH GRADE, LIDS SHALL BE LABELED "STORM SEWEF". 12. THE CONTRACTOR SHAL ADHERE TO ALL TERMS & CONDITIONS AS OUTUNED IN THE EPA OR APPLICABLE STATE GENERAL N.RD.E.S. PERMIT FOR STORM WATER DISCHARGE ASSOCIATED NTH CONSTRUCTION ACTIVITIES AND THE WALMART SPECIAL CONDITIONS, SECTION 8, ENVIRONMENTAL COMPLIANCE AND STORM WATER POLLUTION PREVENTION. THIS APPLIES TO WALMART BUILT PROJECTS ONLY. 13, CONTRACTOR SHALL ASSURE POSITIVE ORA114AGE AWAY FROM BUILDINGS FOR ALL NATURAL AND PAVED AREAS. 14. TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN T14E CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. 15. ALL UNSURFACED AREAS DISTURBED BY GRADING OPERATION SHALL RECEIVE 4 INCHES OF TOPSOIL. CONTRACTOR SHALL APPLY STABILIZATION FABRIC TO ALL SLOPES 3H.IV OR STEEPER. CONTRACTOR SHALL STABILIZE DISTURBED AREAS IN ACCORDANCE WITH GOVERNING SPECIFICATIONS UNTIL A HEALTHY STAND OF VEGETATION IS OBTAINED. 16. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME, 17. ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR INVERT FROM INVERT IN TO INVERT OUT. 18. SITE GRADING SHALL BE PERFORMED IN ACCORDANCE NTH THESE PLANS, SPECIFICATIONS, AND REFERENCED DOCUMENTS, AND THE RECOMMENDATIONS SET FORTH IN THE REPORT PREPARED AS A RESULT OF THE GEOTECHNICAL INVESTIGATION AND REFERENCED IN THIS PLAN SET. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING AND REPLACING WITH SUITABLE MATERIALS AS SPECIFIED IN THE SOILS REPORT, 19. PAVEMENT SHALL BE SAW CUT IN STRAIGHT LINES TO THE FULL DEPTH OF THE EXISTING PAVEMENT. ALL DEBRIS FROM REMOVAL OPERATIONS SHALL BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED. 20. THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS SHALL BE ADJUSTED, IF REQUIRED, TO MATCH THE GRADING AND U11UTY PLAN(S). THE SANITARY CLEANOUT TOPS SHALL BE RE -INSTALLED IN THE SAME MANNER AS THE ORIGINAL CLEANOUTS. 21, THE CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVA71ONS PRIOR TO COMMENCEMENT OF ANY CONSTRUCnON. CONTRACTOR TO ENSURE 1,0% MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5X MINIMUM ON ASPHALT, AND 2.0% MINIMUM IN LANDSCAPED AREAS TO PREVENT PONDING. ANY DISCREPANCIES THAT MAY AFFECT THE PUBLIC SAFETY OR PROJECT COST MUST BE IDENTIFIED TO THE ENGINEER IN WRITING IMMEDIATELY. PROCEEDING NTH CONSTRUCTION WITHOUT N01IRCAIION IS DONE SO AT THE CONTRACTOR'S OWN RISK. 22. PROPOSED TOP OF CURB ELEVATIONS ARE GENERALLY 6" ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS OTHERWISE NOTED. FIELD ADJUST TO CREATE A MINIMUM OF 1.0% GUTTER GRADE ALONG CURB FACE, ENGiNEER TO APPROVE FINAL CURBING CUT SHEETS PRIOR TO INSTALLATION. 23� IN CASE OF DISCREPANCIES BETWEEN PLANS. THE SITE / RECORD PLAN WILL SUPERSEDE IN ALL CASES. THE ENGINEER OF RECORD MUST BE IMMEDIATELY N071FIED IN WRITING OF ANY CONFLICTS. 24. THE CONTRACTOR SHALL BE REQUIRED TO SECURE ALL NECESSARY PERMITS (INCLUDING D,EP,. ETC.) FOR ALL OFF -SITE HAUL AND/OR` BORROW SITES. CONTRACTOR SHALL SUPPLY A COPY OF APPROVALS TO ENGINEER AND OIANER PRIOR TO INITIATING WORK, 25- TOP AND BOTTOM OF WALL ELEVATIONS (TW & DW) REPRESENT THE PROPOSED FINISHED GRADE AT THE FACE OF WALL AND DO NOT REPRESENT THE ELEVATION OF THE PROPOSED WALL (INCLUDING THE CAP UNIT OR FOOTING). THE CONTRACTOR MUST ENSURE ALL WALLS SHOWN HEREON MUST BE DESIGNED BY A LICENSED STRUCTURAL ENGINEER AND THAT SIGNED AND SEALED SHOP DRAWNGS ARE APPROVED BY THE MUNCIPAI-ITY PRIOR TO THEIR CONSTRUCTION. FURTHER THE CONTRACTOR SHALL ENSURE THAT FENCING, GUIDERAIL, UTILITIES, AND OTHER SITE AMENITIES IN THE VICINITY OF THE RETAINING WALL(S), PROPOSED SCHEMATICALLY IN THESE PLANS, SHALL BE CONSIDERED AND INCORPORATED INTO THE RETAINING WALL DESIGN (BY OTHERS). 26. THE STORM WATER MANAGEMENT FACILITIES CONSTRUCTED AS A RESULT OF THIS LAND DEVELOPMENT PROJECT SHALL BE SUBJECT TO THE REQUIREMENTS AND CONDITIONS OF THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL PROTECTION (NGDEP). UTILITY NOTES 1. ALL FILL MATERIAL IS TO BE IN PLACE, AND COMPACTED BEFORE INSTALLATION OF PROPOSED URLITIES. 2. CONTRACTOR SHALL NOTIFY THE UTILITY AUTHORITIES INSPECTORS 72 HOURS BEFORE CONNECTING TO ANY EXISTING LINE. 3. SANITARY SEWER PIPE SHALL BE AS FOLLOWS! 8" PVC SDR35 PER ASTM D 3034, FOR PIPES LESS THAN 12' DEEP a" PVC SDR26 PER ASTM D 3034, FOR PIPES MORE THAN 12' DEEP 6" PVC SCHEDULE 40 DUCTILE IRON PIPE PER AWWA C150 4. WATER LINES SHALL BE AS FOLLOW& 6' AND LARGER, PVC C-900 PER ASTM D 2241 CLASS 200 UNDER COUNTY ROADS, OTHERWISE CLASS 151D 6" AND LARGER DUCTILE IRON PIPE PER AWWA CISO SMALLER THAN 6" EITHER COPPER TUBE TYPE "L" (SOFT) PER ANSI 816,22 OR PVC, 200 P,S.I,, PER ASTM D1784 AND D2241. 5. MINIMUM TRENCH WIDTH SHALL BE 2 FEET. 6, ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS NTH THRUST BLOCKING AS CALLED OUT IN SPECIFICATIONS, 7, IN THE EVENT OF A VERTICAL CONFLICT BETWEEN WATER LINES, SANITARY LINES, STORM LINES AND GAS LINES (EXISTING AND PROPOSED), THE SANITARY LINE SHALL BE DUCTILE IRON PIPE WITH MECHANICAL JOINTS AT LEAST 10 FEET ON BOTH SIDES OF CROSSING, THE WATER LINE SHALL HAVE MECHANICAL JOINTS NTH APPROPRIATE THRUST BLOCKING AS REQUIRED TO PROVIDE A MINIMUM OF 18" CLEARANCE. MEETING REQUIREMENTS OF ANSI A21.10 OR ANSI 21.11 (ANNA C-151) (CLASS 50). 8. LINES UNDERGROUND SHALL BE INSTALLED, INSPECTED AND APPROVED BEFORE BACKFILLING. 9. TOPS OF EXISTING MANHOLES SHALL BE RAISED AS NECESSARY TO BE FLUSH NTH PROPOSED PAVEMENT ELEVATIONS, AND TO BE ONE FOOT ABOVE FINISHED GROUND ELEVATIONS WITH WATER TIGHT LIDS. 10. ALL CONCRETE FOR ENCASEMENTS SHALL HAVE: A MINIMUM 28 DAY COMPRESSION STRENGTH AT ,3000 P.S1 11. REFER TO INTERIOR PLUK48ING DRAWINGS FOR TIE-IN OF ALL UTILITIES. 12, CONTRACTOR IS RESPONSIBLE FOR COMPLYING TO THE SPECIFICATIONS OF THE LOCAL AUTHORITIES WITH REGARDS TO MATERIALS AND INSTALLATION OF THE WATER AND SEWER UNES. 13. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS BASED ON RECORDS OF THE VARIOUS U11LITY COMPANIES, AND WHERE POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THE INFORMATION IS NOT TO BE RELIED ON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST 72 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTIUTIES, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES MICH CONFLICT NTH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. 14. CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY INSPEC11ONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES. THIS AND THE FINAL CONNECTIONS OF THE SERVICE SHALL BE COMPLETED 30 DAYS PRIOR TO STORE POSSESSION. M CONTRACTOR SHALL COORDINATE WITH ALL UTILITY COMPANIES FOR INSTALLATION REQUIREMENTS AND SPECIFICATIONS. 16. REFER TO BUILDING PLANS FOR SITE LIGHTING ELECTRICAL PLAW T7. THE LOCATION OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE CONFIRMED INDEPENDENTLY WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION ' SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS SHALL BE CONFIRMED INDEPENDENTLY BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES SHALL BE REPORTED IMMEDIATELY IN WRITING TO THE ENGINEER. CONSTRUCTION SHALL COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT, PROPOSED INTERFACE POINTS (CROSSINGS) NTH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONSTRUCTION, M ALL UTIIJTIES AND SERVICES, INCLUDING BUT NOT LIMITED TO GAS� WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE, SHALL BE VERTICALLY AND HORIZONTALLY LOCATED. THE CONTRACTOR SHALL USE AND COMPLY NTH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRS OF DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION, AT NO COST TO THE OWNER. 19. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS, SPECIFICATIONS, AND SSOCIATED NTH THE PROJECT WORK SCOPE PRIOR TO THE INITIA71ON OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS Of? APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PRGJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAININGS AND IN FULL COMPLIANCE WITH LOCAL REGULATIONS AND CODES. 20, DEFINE AND LOCATE VERTICALLY AND HORIZONTALLY ALL ACTIVE UTILITY AND/OR SERVICE SYSTEMS THAT ARE NOT TO REMAIN. THE CONTRACTOR IS RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE SYSTEMS THAT ARE NOT BEING REMOVED/RELOCATED DURING SITE ACTIVITY. 21. THE CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND 15 RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDEN11FIED OR REQUIRED FOR PROJECT. THE CONTRACTOR SHALL PROVIDE THE OWNER WRITTEN NOTIFICATION THAT THE EXISTING UTILMES AND SERVICES HAVE PEEN TERMINATED AND ABANDONED IN ACCORDANCE NTH JURISDICTION AND UIIUTY COMPANY REQUIREMENTS. 22. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS/DETAILS, DOOR ACCE$S� AND EXTERIOR GRADING. THE UTILITY SERVICE SIZES ARE TO BE DETERMINED BY ARCHITECT, THE CONTRAC70R SHALL COORDINATE INSTALLATION OF UIILInES/SERMCES NTH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND ENSURE PROPER DEPTHS ARE ACHIEVED. THE TOWN UTILITY REQUIREMENTS SHALL ALSO BE MET, AS WELL AS COORDINA71NG THE UTILITY IIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE_ WOHERE CONFLICTS EXJST WITH THESE PLANS, THE ENGINEER OF RECORD SHALL BE NOTIFIED PRIOR TO CONSTRUCTION TO RESOLVE SAME. 23. WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS SHALL BE SPECIFIED BY THE LOCAL UTILITY COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE SHALL INCLUDE ALL FEES AND APPURTENANCES REQUIRED BY THE UTILITY TO PROVIDE A COMPLETE WORKING SERVICE. 24. ALL NEW UTILITIES/SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED UNDERGROUND. ALL NEW UTIUTIES/SERVICES SHALL BE INSTALLED IN ACCORDANCE NTH THE UTIUTY/SERMCE PROVIDER INSTALLATION SPECIFICA11ONS AND STANDARDS. - 25, ALL UTILITIES SHOULD BE KEPT TEN (10) FEET APART (PARALLEL), OR WHEN CROSSING, AT 18 INCHES VERTICAL CLEARANCE (OUTSIDE EDGE OF PIPE TO OUTSIDE EDGE OF PIPE.) PROVIDE 4.0 FEET OF COVER OVER WATER LINES, A MfNIMJM OF 18 INCHES SHALL BE MAINTAINED BETWEEN SANITARY SEWER LINES AND STORM LINES OR WATER LINES, [F THE MINIMUM CLEARANCE CAN NOT BE MAINTAINED, A CONCRETE ENCASEMENT SHALL 13E PROVIDED. 26. ALL WATER JOINTS ARE TO BE MECHANICAL JOINTS WITH THRUST BLOCKING AT ALL CHANGES IN DIRECTION, AND/OR AS DEFINED IN THE SPECIFICATIONS/OETAILS. 27. THE INSTALLATION OR REPAIR OF ANY UNDERGROUND FACILITIES OR PIPING WHICH CONNECTS To OR FURNISHES WATER FOR THE FIRE PROTECTION SPRINKLER SYSTEM SHALL BE PERFORMED ONLY BY A LICENSED UTILITY CONTRACTOR, FIRE PROTECTION SPRINKLER CONTRACTOR, OR LICENSED PLUMBER. SEE O.C.G.A, TITLE 25_11-7-(l)� A COPY OF THE LICENSE OR CERTIFICATE OF COMPETENCY SHALL BE PROVIDED TO THE INSPECTOR AT THE FINAL INSPECTION, 28. SEE SPECIFICATIONS FOR BACKIFILLING AND COMPACTION REQUIREMENTS ON UTILITY TRENCH. ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION SHALL BE AS PER THE RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT AND SHALL BE COORDINATED NTH THE APPLICABLE UTILITY COMPANY SPECIFICATION& 213� THE CONTRACTOR SHALL COMPLY TO THE FULLEST EXTENT NTH THE LATEST STANDARDS OF OSHA DIRECTIVES, OR ANY OTHER AGENCY HAVING JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR 15 RESPONSIBLE FOR DETERMINING THE "MEANS AND METHODS" REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION ANE)/OR TRENCHING PROCEDURES. 30. IN CASE OF DISCREPANCIES BETWEEN RLANS, THE SITE / RECORD PLAN WILL SUPERSEDE IN ALL GASES. THE ENGINEER OF RECORD MUST BE IMMEDIATELY N011FIED IN WRITING OF ANY CONFLICTS. 31. ACCESS AND WATER SUPPLY SHALL BE ESTABLISHED PRIOR TO AND MAINTAINED DURING VERTICAL COMBUSTIBLE CONSTRUCTION- (NFPA 241). 31 PUBUC HYDRANTS SHALL BE PAINTED YELLOW AND PRIVATE HYDRANTS SHALL BE PAINTED RED. ALL NEW HYDRANTS SHALL BE EQUIPPED WITH A 5' STORZ FITTING, 33, STRUCTURES UNDER CONSTRUCTION ARE REQUIRED TO HAVE TEMPORARY FIRE EX11NGUISHERS ON SITE DURING CONSTRUCTION. 34. CONTRACTOR SHALL OBTAIN CITY OF NEW BERN SPECIFICATIONS AND STANDARD DETAILS FOR ALL APPLICABLE UTILITY CONSTRUCTION. UTILITIES SHALL BE CONSTRUCTED PER CITY OF NEW BERN REQUIREMENTS AS LI 35. CONTRACTOR SHALL VERIFY THE DEPTH OF EXISTING WATER MAIN AND LOWER AS NECESSARY BASED ON CITY OF NEW BERN REQUIREMENTS IN ORDER TO CONSTRUCT RIP -RAP APRON. REVISIONS BY PER CITY COMMENTS CINS PER OUT TO BID - GWs PER ARCH. COORDINATION GINS -_ IE CWS ­_ PER WATER REVISIONS CWS - __ I - le 19 0 *1 0 ��ffl2 1 td 1 P4 Z w 2� a al 5 9 b-4 � ;; 1. 44 9 **#**� 04 5111 �j -'� I W 0 � ljj� lIii=4 10 it -1 W a H * k z III ?00 0 *** *. 0-4 ko 0 1 . 1. . 0 1� is Z z w 15 1 I . 11 pq 'r � F t: 11 w, �4 w = " pq R 0 Z , M wl 5 � � � � I ;� � � I � if I I 11 ! j 6 � til E I 0 rj 11 -- 11 I - R 0�/z . . " �/ ,,, / V . iis 0 - +;�, . * pi; I . , I . I : = . . . ,z , . . 0"3011 . = . .4z 1: . 11 . , A 0 1 ;1� - * . I , 0 0�1 . . . z � t \ - I - - (_)! Z� � 1 >_7 (D I__ CD z I :D 0 1-ki C-) - � C�q a- r� __j �#z - r ... I < I­_- cn C-0 I-- (_'f� (>Y- I < � Ld __ � �Z < Ld Lj_j r�_ a� �___ LLJ CNJ LLJ ��- V) Q�__ r__ < __J 0�� LLIJ �__ i�i ,::) I-Ij l7t:� cf) Qf 0 M 0 < 0 m I--- = 0 ��: U) �- L.d 0 L_j LLJ C) __J = V� I-_ D!� =) Z7 6� � _j 0 LLJ LL_ < LLJ > m 2! 0 :5 C/) = 0 = I , 1-- (D L(-I >_ -J C) z � 5-i m 1-- < CD L'i = (N G, ��: C­j m % P so 4= I III = = IIIIIIIIIIIII All� EIK-% s TO AIIIIIIIIII111111111111111 � I t: DRAWN I H_L�H. CHECKED J.R.H. DATE I __ Q9/09/13 SCALE AS NOTED [ jo�l No. NCC138113 -_ NOTES 2 OF 24 SHEETS - - - - ___ __ - - � IF- - - - ___ - � - - r___ __ - - - - - - - - - � -, - - - _. - - - , . .. t - -I - - I I . I I I I . I . I � I , I .11. . i � , ; '. , I , : I I I . . � I I : � I � � - . I . � I � : � � " : : , - �, , k . m I L .1 I . . , . . : i , . I . � .� . . I I I I . . I � . I . , : ; Kemm Uute; UCtober Zti, YV16 ­%� 3 __ ,�_ :Al..._.',:ll.--.. .._9' _ __ _ I 5 O 7 u 0 UN 11 12 13 GENERAL NOTES A. PROJECT OFFICE WALL SWPPP POSTINGS - THE FOLLOWING ITEMS MUST BE POSTED TOGETHER IN A SINGLE, ORGANIZED LOCATION ON A WALL INSIDE THE. PROJECT OFFICE: 1) SWPPP SITE MAPS (ALL PHASES), 2) SWPPP DETAIL SHEETS, 3) MAP SHOWING LOCATION OF OFFSITE IMPORT OR EXPORT FACILITY; 4) REM51ONS TO DETAILS, SITE MAPS, OR SWPPP-RELATED REIS, 5) SITE SWPPP BINDER; 6) SWCT PLACARD; 7) CURRENT OWNER STORMWATER COMPLIANCE TRAINING CERTIFICATES FOR SUPERMTI NOW(S) AND COMPLIANCE OFFICER(S); AND 8) A CERTIFICATIONS AND/OR TRAINING CERTIFICATES REQUIRED TO PERFORM INSPECTIONS BY THE APPLICABLE CONSTRUCTION GENERAL PERMIT OR AUTHORITY HAAANO JURISDICTION. B, PERMITTED PROJECT AREA FOR PURPOSES OF THIS SWPPP AND ASSOCIATED STORMWATER PERMIT, 'PERMITTED PROJECT AREA' IS DEFINED AS ANY AND ALL AREAS WITHIN THE PROJECT LIMITS OF DISTURBANCE, AS SHOWN ON THE SWPPP SITE MAPS AND IDENTIFIED IN THE NOTICE OF INTENT TO THE -AGENCY. ALL GROUND -DISTURBING AND CONSTRUCTION -RELATED ACTIVITIES (MATERIAL STORAGE, DUMPSTERS, PARKING AREAS, PROJECT OFFICE RETAILER. ETC.) MUST BE INCLUDED WITHIN THE PERMITTED PROJECT AREA LIMITS OF DISTURBANCE. OFFSITE AREA(S) TO BE DISTURBED AS PART OF THIS PROJECT (NOT ON OWNER PROPERTY): NO OFFSITE AREA IS BEING DISTURBED ALL AREAS OUTSIDE THE PERMITTED PROJECT AREA (LE„ LIMITS. OF DISTURBANCE) ACQUIRED FOR USE BY THE GC OR A SUBCONTRACTOR OF THE GC (SORROW .SOURCES, DISPOSAL AREAS, ETC.) MUST BE MANAGED IN ACCORDANCE WITH APPENDIX- E - TAB 21 OF THE: 02370 SPECIFICATION THE CONTRACTOR IS REQUIRED TO LOCATE OFFICE TRAILERS AND MATERIAL STORAGE: AREAS: FOR THE PROJECT WITHIN THE LIMITS DO- DISTURBANCE. THE CONTRACTOR MAY REQUEST USE OF OFF -SITE LOCATIONS FOR OFFICE TRAILERS OR: NON -ERODIBLE MATERIAL STORAGE;: HOWEVER, APPROVAL MUST BE OBTAINED FROM THE CONSTRUCTION MANAGER, THE CEC *0 THE WAL-MART SWCT PRIOR TO THEIR USE. REQUESTS WILL BE REVIEWED ON A CASE BY CASE BASIS AND IF APPROVED, LIMITATIONS ON USE WILL BE PROVIDED BY THE DEC. C. SPECIAL PROJECT AREAS - THERE ARE. NO SPECIAL PROJECTS, LOCATED BEYOND THE OWNER PERMITTED PRO,ECT AREA, REQUIRING INSPECTION AND MAINTENANCE ASSOCIATED WITH THIS CONSTRUCTION PROJECT, D, NON-STORMWATER DISCHARGES - THE GENERAL PERMIT FOR, STORMWATER DISCHARGES. ASSOCIATED: WITH CONSTRUCTION ACTIVITIES PROHIBITS MUST NON-STORMWATER DISCHARGES DURING THE CONSTRUCTION PHASE. ALLOWABLE NON-STORMWATER DISCHARGES THAT OCCUR WRING B CONSTRUCTION CON THIS: PROJECT, ARE INCLUDED IN THE GENERAL PERMIT. BEST MANAGEMENT PRACTICES (BMPS) MUST BE IMPLEMENTED FOR THE GENERAL. PERMIT ALLOWABLE DISCHARGES FOR THE DURATION W THE PERMIT. THE T€CHNIQ S DESCRIBED IN THIS FOCUS ON PROVIDING CONTROL F POLLUTANT DISCHARGES WITH PRACTICAL H QUE SC. q APPROACHES THAT UTILIZE READILY AVAILABLE EXPERTISE. MATERIAL, AND EQUIPMENT. EXPERTISE NON-STORMWATER COMPONENTS OF SITE DISCHARGES MUST BE UNCONTAMINATED NON-TUEBID WATER. ALL NON-STORMWATER DISCHARGES - MUST BE ROUTED TO A STORMWATER CONTROL PRIOR TO DISCHARGE WATER USED F tCONSTRUCTION WHICH DISCHARGES FROM THESITE MUST ORIGINATE NATEFROM APUB ♦C WATER SUPPLY OR PRIVATE PL APPROVEDTHE HEALTH DEPARTMENT, WATER USED FOR CONSTRUCTION THAT DOES NOT ORIGINATE FROM AN APPROVED PUBUG SUPPLY MUST NOT DISCHARGE FROM THE SITE, IT AN BE RETAINED IN RETENTION PONDS UNTIL IT INFILTRATES OREVAP RATES. N NON -SIT RMWATRIS DISCHARGED FROM THE SITE 3T MUSE BE DONE IN A MANNER SUCH THAT IT DOES NOT CAUSE EROSION OF THE SOIL DURING DISCHARGE PRDCESSWATER SUCH AS POWER WASHING WATER AND CONCRETE CUTTING EFFLUENT, AMONG OTHERS. MUST. BE COLLECTED FOR TREATMENT AND DISPOSAL. 11 MUST NOT BE FLUSHED INTO THE SITE STORM DRAIN SYSTEM OR DISCHARGED OFF -SITE. E DISCHARGE PORTS ALL DISCHARGE POMTSMUST DE INSPECTED TO D€ERMNE WHETHER EROSION AND SEDIMENTAnON CONTROL MEASURES ARE EFFECTIVE INPREVENTING DISCHARGE OF SEDIMENT FROM THE SlEAND OR IMPACTS TO RECEIVING WATERS. SEDIMENT ACCUMULATION 70WNGRAD£NT OF DISCHARGE LOCATIONS SHALL BE RPORTED AS A SEDIMENT DISCHARGE(SEE AP END X E - TAB 14 SEDIMENT RELEASES. P nG T PREVENT U CONTACT THE 02370 SPECIFICATION) AND THE POTENTIAL UPSTREAM CRUISE SHALL DE ACED O RT E TURF OCCURRENCE. CON AC �TERMINE THE GM, CEC AND SWCT TO DISCHARGED T THE APPROPRIATE ACTION FOR CLEANUP OF DISCHARGED SEDIMENT THAT MAY BE OUTSIDE OF THE LIMITS OF DISTURBANCE. SEE SAMPLING' AND MONITORING OF EFFLUENT PLAN (IF APPLICABLE). G EROSION AND SEDIMENT A. CONTRACTOR SHALL IMPLEMENT BEST MANAGEMENT PRACTICES. AS REWIRED BY THIS STORM WATER POLLUTION PREVENTION PLAN, ADDITIONAL BEST MANAGEMENT PRACTICES SHALL BE IMPLEMENTED AS DICTATED BY CONDNONS AT NO ADDITIONAL COST OF OWNER THROUGHOUT R C ONS'RRUCTINL ALL PHASES C HA OF C B. BEST MANAGEMENT PRACTICES (BMP'S) AND CONTROLS SHALL CONFORM TO FEDERAL, STATE, OR LOCAL REQUIREMENTS OR MANUAL. OF PRACTICE, AS APPLICABLE. CONTRACTOR SHALL IMPLEMENT ADDITIONAL CONTROLS AS DIRECTED BY PERMITTING AGENCY OR OWNER, C. SITE MAP MUST CLEARLY DELINEATE ALL STATE WATERS. PERMITS FOR ANY CONSTRUCTION ACTIVITY IMPACTING STATE WATERS OR REGULATED WETLANDS MUST BE MAINTAINED ON SITE AT ALL TIMES. D CONTRACTORS TO LIMIT DISTURBANCE OF SITE IN STRICT ACCORDANCE NTH SWPPP IMPLEMENTATION SEQUENCING, OR AS REOUIRED BY THE APPLICABLE GENERAL PERMIT. NO UNNECESSARY OR IMPROPERLY SEQUENCED CLEARING AND/OR GRADING SHALL BEPERMITTED. E. ALL DENUDED/BARE AREAS THAT WILL BE INACTIVE. FAR 4 DAYS OR MORE, MUST BE STABILIZED. IMMEDIATELY UPON COMPLETION OF MOST F' - MA A G AIN VARIETIES, STRAW / HAY MULCH WOOD CELLULOSE REGENT GRADING ACTIVITY, WITH THE USE OF AST GERM TWIG ANNUAL RA55/GR ES, f D FIBERS, TACKIFIERS, NETTING AND/OR BLANKETS, COMPLETION MUST BE ACHIEVED MTHTN 4 DAYS, F DISTURBED POSITIONS OF THE S{TE WHERE CONSTRUCTION ACTIVITY HAS PERMANENTLY- STOPPED SHALL BE PERMANENTLY STABILIZED AS IMMEDIATELY, .ANC Pt£ NO LATER THAN 14 SHOWN ON THE PLANS. THESE AREAS :SHALL. BE SEEDED,. SODDED, AND/OR VEGETATED.COMPLETED DAYS AFTER THE LAST CONSTRUCTION ACTIVITY OCCURRING M THESE AREAS. REFER TO THE GRADING PLAN AND/OR LANDSCAPE. PLAN, G. SLOPES SHALL BE. LEFT IN A ROUGHENED CONDITION DURING THE GRADING PHASE TO REDUCE RUNOFF VELOCITIES AND EROSION, TEMPORARY AND/OR PERMANENT STABILIZATION :SHALL BE APPLIED PER ABOVE REQUIREMENTS. H DUE TO THE GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT, THE CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION AND SEGMENT CONTROL MEASURES (SILT FENCES,. ETC.) TO PREVENT EROSION AND POLLUTANT DISCHARGE OFF -SITE. I,. ALL MEASURES STATED ON THIS SITE MAP, :AND: IN THE STORM WATER POLLUTION PREVENTION PLAN; SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTO.. NO LONGER REQUIRED FOR A COMPLETED PHASE OF WORK OR FINAL STABIL1ZAToN OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURE'S SHALL BE CHECKED BY A QUALIFIED PERSON IN ACCORDANCE NTH THE CONTRACT DOCUMENTS OR THE APPLICABLE PERMIT, WHICHEVER. IS MORE STRINGENT, AND REPAIRED IN ACCORDANCE WITH THE SITE PLANS. J. STORM WATER POLLUTANT CONTROL MEASURES INSTALLED DURING CONSTRUCTION, THAT WILL ALSO PROVIDE STORM WATER MANAGEMENT BENEFITS AFTER CONSTRUCTION,. ARE INCLUDED IN THE CONTRACT DOCUMENTS, THE SITE SPECIFIC POST CONSTRUCTION STORM WATER OPERATION AND MAINTENANCE (O&M) MANUAL IS INCLUDED IN THE CONTRACT DOCUMENTS. K. ALL CONTROLS AND: SYSTEMS MUST BE INSTALLED AND FUNCTIONING AS DESIGNED AND FREE OF ACCUMULATED SEDIMENT AND DEBRIS DURING FINAL PROJECT INSPECTION AND APPROVAL E HAZARDOUS MATERIAL MANAGEMENT & SPILL REPORTING ANY HAZARDOUS OR. POTENIIALLY HAZARDOUS MATERIAL THAT IS BROUGHT ONTO THE CONSTRUCTION SITE SHALL BE HANDLED PROPERTY TO REDUCE THE POTENTIAL FOR STORMWATER POLLUTION. ALL MATERIALS USED ON THIS CONSTRUCTION SITE SHALL BE PROPERLY STORED, HANDLED. DISPENSED AND DISPOSED OF FOLLOWING ALL APPLICABLE LABEL DIRECTIONS. FLAMMABLE AND COMBUSTIBLE LIQUIDS SHALL BE .STORED AND HANDLED ACCORDING TO APPLICABLE. REGULATIONS; AND, AT A MINIMUM, ACCORDING TO 29 GFR 1926.152. ONLY APPROVED CONTAINERS AND PORTABLE TANKS SHALL. BE USED FOR STORAGE AND HANDLING OF FLAMMABLE AND COMBUSTIBLE LIQUIDS. MATERIAL SAFETY DATA SHEETS (MSOS) INFORMATION. SHALL BE KEPT ON SITE FOR ANY AND ALL APPLICABLE MATERIALS. HOWEVER, MSDS MAY ALSO BE ACCESSED VIA TELEPHONE OR. OTHER ELECTRONIC. MEANS OR APPARATUS. IN THE EVENT OF AN ACCIDENTAL SPILL, IMMEDIATE ACTION SHALL BE TAKEN. BY THE GC TO CONTAIN AND REMOVE THE SPILLED MATERNAL. THE SPILL SHALL BE REPORTED TO THE APPROPRIATE. AGENCIES IN THE REQUIRED TIME FRAMES.. AS REQUIRED UNDER THE PROVISIONS OF THE CLEAN. WATER ACT, ANY SPILL OR DISCHARGE. ENTERING WATERS OF THE UNITED STATES SHALL BE PROPERLY REPORTED. F ALL HAZARDOUS MATERIALS, INCLUDING CONTAMINATED SOIL AND LIQUID CONCRETE WASTE,. SHALL BE DISPOSED OF BY THE CONTRACTOR. IN THE MANNER SPECIFIED BY FEDERAL, STATE AND LOCAL REGULATIONS AND BY THE MANUFACTURER OF SUCH PRODUCTS. A 'N RECORD Y SPILL AND ASSOCIATED CLEAN -OP ACTIVITIES OFPETROLEL44 PRODUCTS OR HAZARDOUS THE SHALL PREPARE WRITTEN E Of AN . ..I S. OFT GALLON TALE QUANTITIES, WHICHEVER IS LEI$,. ON. ONE OF LtiE SPILL. THE GC SHALL MATERIALS N EXCESS RI AVAI NOTICE .. ANY E TO OWNER,. YHA THE ONLINE CRITICAL INCIDENT REPORT, IMMEDIATELY UPON IDENTIFICATION OF ANY SPILL. SPILL REPORT FORMS ARE AVAILABLE IN INCIDENT THE ONLINE SWPPP REPORTING SYSTEM PRQNDED BY THE OWNER COPIES OF SPILL CRITICAL. INCIDENT REPORTS SHOULD BE PRINTED AND MAINTAINED M THE JOBSPE BINDER ANY SPILLS OF PETROLEUM PRODUGTS OR HAZARDOUS MATERIALS IN EXCESS OF REPORTABLE QUANTITIES AS DEFINED BY EPA OR THE STATE OR LOCAL AGENCY REGULATIONS, SHALL BE IMMEDIATELY REPORTED TO THE EPA NATIONAL RESPONSE CENTER (1-800-424-8802) AND THE CITY OF NEW BERN. TO MINIMIZE THE POTENTIAL FOR A SPILL OF PETROLEUM PRODUCT OR HAZARDOUS MATERIALS TO COME IN CONTACT NTH STORMWATER,. THE FOLLOWING STEPS SHALL BE IMPLEMENTED: I)ALL MATERIALS WITH HAZARDOUS PROPERTIES, SUCH AS PESTICIDES, PETROLEUM PRODUCTS, FERnUZERS; SOAPS, DETERGENTS, CONSTRUCTION CHEMICALS, ACIDS;BASES, PAINTS: PAINT SOLVENTS, ADDITIVES FOR SOIL STABILIZATION, CONCRETE, CURING COMPOUNDS AND ADDITIVES, ETC_ SHALL BE STORED IN A SECURE LOCATION UNDER COVER AND IN APPROPRIATE, TIGHTLY SEALED CONTAINERS WHEN NOT IN USE. 2) THE MINIMUM PRACTICAL QUANTITY OF ALL :SUCH MATERIALS SHALL BE KEPT ON THE J08 SITE AND SCHEDULED FOR DELIVERY AS CLOSE TO TIME O USE AS PRACTICAL. 3) A. SPILL CONTROL AND CONTAINMENT KIT (CONTAINING FOR EXAMPLE, ABSORBENT MATERIAL SUCH AS KITTY UTTER OR SAWDUST, ACID;. BASE, G NEUTRALIZING AGENT, BROOMS, DUST PANS, MOPS, RAGS, GLOVES, GOGGLES, PLASTIC AND METAL TRASH CONTAINERS, ETC.) SHALL BE PROVIDED AT THE CONSTRUCTION. SITE AND ITS LOGATION(S) SHALL. BE IDENTIFIED NTH LEGIBLE SICNAGF AND SHOWN ON SITE MAPS. OAHE SPILL CONTROL AND CONTAINMENT KIT :SUPPLIES SHALL BE OF SUFFICIENT QUANTITIES AND APPROPRIATE. CONTENT TO CONTAIN A SPILL FROM THE LARGEST ANTICIPATED PIECE OF EQUIPMENT AND FROM THE LARGEST ANTICIPATED QUANTITIES OF PRODUCTS STORED ON THE SITE AT ANY GIVEN TIME. bP CONTENTS SHALL BE INSPECTED DAILY DURING THE DAILY STORMWATER INSPECTION:. 4) ALL PRODUCTS SHALL BE STORED IN AND USED FROM THE ORIGINAL CONTAINER NTH THE ORIGINAL PRODUCT LABEL. CONTAINERS MUST BE STORED IN A MANNER It PROTECT THEM FROM THE ELEMENTS AND INCIDENTAL DAMAGE. 5) ALL. .PRODUCTS SHALL BE USED IN STRICT COMPLIANCE NTH INSTRUCTIONS ON THE PRODUCT LABEL. 6) THE DISPOSAL OF EXCESS OR USED PRODUCTS SHALL BE IN STRICT COMPLIANCE NTH INSTRUCTIONS ON THE PRODUCT LABEL AND REGULATIONS,. H GENERAL CONSERVATION NOTES AND SPECIFICATIONS C CATIONS L GENERAL INFORMATION A. THIS EROSION AND SEDIMENT CONTROL PLAN SHALL BE. AVAILABLE AT THE SITE, B: NO SEDIMENT OR SEDIMENT LADEN WATER MUST BE ALLOWED TO LEAVE THE SITE WITHOUT FIRST BEING PROPERLY RLT RED. C. ANY SEDIMENT THAT IS TRACKED ONTO THE ROAD MUST BE CLEANED OFF BEFORE THE. END OF THE DAY. D, DISTURRED AREAS ON WHICH EARTHMOVTNG ACTIVITIES HAVE CEASED AND WHICH WILL REMAIN EXPOSED SHALL BE STABILIZED E, AREAS. THAT FAIL TO GERMINATE MUST BE RE -SEEDED OR MULCHED. F. WHERE. DISTURBED AREAS ARE DIFFICULT TO STABIUZE NETTING MOULD BE USED TO HOLD SEED AND MULCH: IN PLACE; THIS IS. ESPECIALLY IMPORTANT. AROUND WATERCOURSES, IN SWALES AND AREAS OF CONCENTRATED FLOWS, STEEP SLOPES. G. UNTIL THE SITE IS STABILIZED. ALL. EROSION AND SFOMFNTATION. MUST RE MAINTAINFII PPf PURTY MAWWNANrF uIHST run Imir IN - OF ALL EROSION AND SEDIMENT CONTROL AFTER EACH RUNOFF .EVENT AND ON A WEEKLY BASIS. ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT, REPAIR, REPLACEMENT, RE -GRADING, RE SEEDING, RE -MULCHING, AND RE-NETIING, MUST BE PERFORMED IMMEDIATELY. H. IF AT ANY TIME PRIOR TO SITE STABILIZATION ANY E&SP PROBLEMS OCCUR WHICH REQUIRE ADDITIONAL .CONTROLS, IMMEDIATE ACTION MUST BE TAKEN TO CORRECT THE PROBLEMS 1. THE CONTRACTOR MUST DEVELOP AND COORDINATE PITH OWNER AND HAVE APPROVED BY THE COUNTY CONSERVATION DISTRICT, A SEPARATE EROSION AND. SEDIMENT POLLUTION CONTROL PLAN FOR EACH SPOIL, BORROW OR OTHER WORK AREA NOT DETAILED ON THE PERMITTED PLANS, WHETHER LOCATED WITHIN OR OUTSIDE OF THE LIMITS OF CONSTRUCTION. J. CONTRACTOR SHALL. NOTIFY THE COUNTY CONSERVATION DISTRICT OF DISPOSAL METHOD AND LOCATION. OF MATERIALS (IF ANY) TO BE REMOVED FROM SITE, K. STANDARD FOR DISPOSAL OF MATERIALS ALL MATERIALS TO BE RECYCLED OR DISPOSED OF MUST DO SO IN ACCORDANCE NTH ALL APPLICABLE STATE AND LOCAL, REGULATIONS. .STOCKPILES TO BE HAULED OFF SITE MUST HAVE AN APPROVED EROSION AND SEDIMENT CONTROL PLAN AT THE DESTINATION LOCATION. L, THE CONTRACTOR IS RESPONSBLE TO MAINTAIN SOIL. STABILIZATION THROUGHOUT CONSTRUCTION. ADDITIONAL ME ASURES REWIRED TO ENSURE -SITE AND OFF -SITE STABILIZATION ADJACENT N TO ON M AND TO CONSTRUCTION N A SHALL BE THE NE RESPONSIBILITY THE ACTIVITIES LE ESPONSIBIL TY OF CONTRACTOR AND HALL � AT NO COST TO THE OWNER. IMMEDIATE NOTIFICATION SHALL BE GIVEN TO THE OWNER AND ENGINEER. SHOULD ADDITION STABILIZATION MEAN NECESSARY. I' A A TIES BEN ACCORDANCE WITH THE NPDES OR SWPPP REQUIREMENTS FORE ROJECT. AND/ STHE P II, STANDARD GRADING A. DEFINITION: RESHAPING E ROUND Y THE GROUND SURFACE B ..GRADING TO PLAN GRADES WHICH A DETERMINED TOPOGRAPHIC SURVEY RE DETER ED BY TOPOGR 1 VE AND LAYOUT. 1. PROVISIONS SHALL BE MADE TO SAFELY CONDUCT SURFACE WATERFULL SLOPES. STORM DRAINS OR SUITABLE WATER COURSES AND TO PREVENT SURFACE RUNOFF FROM DAMAGING UT FACES AND FULL M DING C CE TI SLOPES. 2. ADJOININGPROPERTY SHALL BE PROTECTED :R OM EXCAVATION AND FILLING OPER ATIONS, 8. INSTALLATION REQUIREMENTS I. AMBER, LOGS, BRUSH, STABILITY ROCKS, STUMPS AND VEGETABLE MATTER D DI WILL INTERFERE WITH THE GRADING OPERATION OR DISPOSAL PLANNED S A ITT AFFECT THE LAN D T 81L OR FILL AREAS SHALL BE REMOVED AND I ACCORDANCE WITH STANDARD FOR DISPOSED O N CGORA CE DISPOSAL OF MATERIALS 2. FILL MATERIAL IS TO BE FREE OF BRUSH RUBBISH TIMBER LOGS VEGETATIVE VE MATTER AND STUMPS AMOUNTS THAT WI LL BE DETRIMENTAL TO CONSTRUCTING STABLE FI LLS. 3, ALL FILLS SHALL BE COMPACTED SUFFICIENTLY FOR THEIR INTENDED PURPOSE AND AS REQUIRED TO REDUCE SUPPING EROSION OR EXCESS SATURATION 4 ALL DISTURBED AREAS SHALL BE LEFT WITH A NEAT AND FINISHED APPEARANCE AND SHALL BE PROTECTED FROM EROSION. 5 ( SEE' ITEM I.D. ABOVE) OIL STANDARDFOR UTILITY TRENCHEXCAVATION A. LIMIT ADVANCE CLEARING AND GRUBBING OPERATIONS TO A DISTANCE EQUAL TO TWO TIMES THE LENGTH OF PIPE INSTALLATION THAT CAN BE COMPLETED IN ONE DAY, B. LIMIT DAILY TRENCH EXCAVATION TO THE LENGTH OF PIPE PLACEMENT, PLUG INSTALLATION AND BACKFILLING THAT CAN BE COMPLETED THE SAME DAY. DAILY BACKFILLMG OF THE TRENCH MAY BE DELAYED FOR A MAX. OF SIX DAYS FOR CERTAIN CASES REQUIRING TESTING OF THE INSTALLED PIPE C. WATER WHICH ACCUMULATES IN THE OPEN TRENCH WILL BE COMPLETELY REMOVED BY PUMPING TO A FACILITY FOR REMOVAL OF SEDIMENT (SEDIMENT FILTER BAG, SEE DETAIL) BEFORE PIPE PLACEMENT AND/OR BACKFILUNG BEGINS, 0. ON THE DAY FOLLOWING PIPE PLACEMENT AND TRENCH. B CKFILLI THE DISTURBED R AN A NG AREA WILL BE GRADED TO FINAL CONTOURS D APPROPRIATE TEMPORARY EROSION AND SEDIMENT POLLUTION CONTROL MEASURE FMULCHING U S FACILITIES WILL BE INSTALLED. SEEDING AND OF ALL DDSTURBED AREAS WILL BE DONE IMMEDIATELY.: / E WORK CREWS AND EQUIPMENT FOR TRENCHING PLACEMENT PIPE PLUG CONSTRUCTION W OF AND OPERATIONS, LUNG WILL BE SELF CONTAINED AND ON A SEPARATE FORM CLEARING: AND GRUBBING AND SITE. RESTORATION AND STABILIZATION - Z HE OPERATIONS. F. ALL SOIL EXCAVATED FROM THE TRENCH WILL REPLACED ON THE UPHILL SIDE OF THE TRENCH, IV, STAW6N FOR TEMPORARY STABILIZATION A. STANDARD. FOR TEMPORARY STABILIZATION NTH FIBERMULCi 1. MULCHING IS MOST APPLICABLE TO THOSE AREAS SUBJECT TO PERIODIC DISTURBANCE AND REWORKING. IN ADDITION, STABILIZATION NTH FIBER MULCH SHALL BE USED DURING NON GERMINATION PERIODS. 2 PERFORM ALL CULTURAL OPERATIONS AT RIGHT ANGLES TO THE SLOPE, 3. GRADE AS NEED AND FEASIBLE, SEE STANDARD FOR LAND GRADING. 4, PROTECTIVE MATERIALS TO BE USED: A. UNROTTED SMALL -GRAIN UN -CHOPPED OR HAY T 3.0 N A 3 TONS PER ACRE TONS PER ACRE BETWEEN NOVEMBERACCORDANCE 7 AND MARCH t) SPREAD UNIFORMLY AND ANCHORED WITH LIQUID MULCH BINDER. KINDER PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE PRODUCT MANUFACTURER'SSPECIFICATIONS, . B. HYDROMMMEDIA: USE IS LILTED TO FLATTER SLOPES AND RURING OPTIMUM E LOSS PERIODS M SPRING AND FALL. TO MULCH BINDERS,, APPLY ACCORDANCE NTH AFTER PLACEMENT IF HAY OR STRAW MULCH TO MINIMIZE LOSS BY WIND OR WATER. PRODUCTS TO BE INSTALLED IN ACCQRANCE NTH MANUFACTURER SPECIFICATIONS. B. STANDARD FOR TEMPORARY :STABILIZATION WITH SEED 1. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN TWELVE (12) MONTHS: MUST BE SEEDED AND MULCHED IMMEDIATELY WITH A TEMPORARY COVER. 2. ALL AREAS TO BE PERMANENTLY SEEDED SHALL ALSO RECEIVE TEMPORARY SEEDING CONCURRENTLY. 3. SEEDBED PREPARATION FOR TEMPORARY SEEDING A. PERFORM ALL CULTURAL OPERATIONS AT RIGHT ANGLES TO SLOPE. B, APPLY AGRICULTURAL LIME AT A RATE OF 1 TONE PER ACRE C. APPLY 10-10-.10 FERTILIZER A RATE OF 500 POUNDS PER ACRE D. WORK LIME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF FOUR (4) INCHES. C, SEEDING: SEE SEEDING SPECIFICATIONS V. STANDARD FOR PERMANENT STABILIZATION A SPECIFICATION FOR SEEDING & SOIL TREATMENT FOR PERMANENT VEGETATIVE. COVER 1. SITE PREPARATION A. GRADE AS NEEDED AND FEASIBLE TO PERMIT THE USE OF CONVENTIONAL .EQUIPMENT FOR SEEDBED PREPARATION, SEEDING, MULCH APPLICATION AND ANCHORING, AND MAINTENANCE B. SUBSOIL SHOULD BE TESTED FOR LIME REQUIREMENT AND LIMESTONE, IF NEEDED, SHOULD BE APPLIED TO BRING. SOIL PH TO BETWEEN 5-5 AND 7 AND INCORPORATED INTO THE SOIL AS NEARLY AS PRACTICAL TO A DEPTH OF 4 INCHES. C. IMMEDIATELY PRIOR TO TOPSOIL DISTRIBUTION. THE SURFACE SHOULD BE SCARIFIED OR OTHERWISE LOOSENED TO A DEPTH OF 3-5 INCHES TO PROVIDE A GOOD BOND NTH THE TOPSOIL- 2 APPLYING TOPSOIL A. TOPSOIL SHOULD BE HANDLED ONLY WHEN IT IS DRY ENOUGH TO WORK MTHWT DAMAGING SOIL STRUCTURE: B: ALL DISTURBED TOPSOIL ON -SITE IS TO BE REDISTRIBUTED ON-STHE IN AREAS NOT COVERED BY IMPERVIOUS SURFACES NO REMOVAL OF TOPSOIL PS ALLOWED UNLESS. APPROVED BY THE. TOWNSHIP, UNIFORM APPLICATION TO A DEPTH OF 4-8 INCHES (UNSETTLED) 15 RECOMMENDED. SOIL$ WITH A PH OF 4.0 OR LESS OR CONTAINING IRON SULFIDE SHALL BE COVERED WITH. A MINIMUM DEPTH OF 12 INCHES OF SOIL HAVING A PH OF SO OR MORE 3. SEEDBED PREPARATION A.: A SOIL TEST SHALL BE CONDUCTED TO ACCURATELY DETERMINE NECESSARY SOIL AMENDMENTS. S. PERFORM ALL CULTURAL OPERATIONS AT RIGHT ANGLES: TO SLOPE.. C: SOIL MWIFICATGNIS. 1. APPLY 10-10-40 RATED FERTILIZER At A RATE OF 1000 POUNDS PER ACRE - POUNDS PER 100 ARE ET OR AS 1 A E OR ?5 PW Q SW FEET. DIRECTED BY U TEST. 2, APPLY AGRICULTURAL LIME AT A RATE OF 8 TONS PER ACRE OR 240 POUNDS PER 1000 SQUARE FEET, OR AS :DIRECTED BY SOIL TEST. D. WORK UME AND FERTILIZER INTO THE SOIL AS NEARLY AS PRACTICAL TO A.DEPTH OF 4 INCHES CONTINUE TILLAGE UNTIL A REASONABLY UNIFORM FINE SEEDBED IS PREPARED. E. REMOVE FROM THE SURFACE ALL STONES ONE INCH€ (t') OR LARGER IN ANY DIMENSION, REMOVE ALL OTHER DEBRIS, SUCH AS WIRE. CABLE, TREE ROOTS, PIECES OF CONCRETE, CLODS, LUMPS OR OTHER UNSUITABLE MATERIAL, F. INSPECT SEEDBED JUST .BEFORE SEEDING. IF TRAFFIC HAS LEFT THE SOIL COMPACTED, THE AREA MUST BE RE -TILLED AND FIRMED AS ABOVE. - 4. SEEDING: SEE SEEDING SPECIFICATIONS e: STANDARD FOR PERMANENT STABILIZATION WITH SOD 1. METHODS AND MATERIALS A. CULTIVATED -SOD IS PREFERRED OVER NATIVE OR PASTURE SOD SPECIFY 'CERTIFIED SOD," OR OTHER HIGH .QUALITY CULTIVATED SOD. B, SOD SHOULD BE FREE OF WEEDS AND UNDESIRABLE COARSE WEEDY GRASSES. C. SOD SHOULD BE OF UNIFORM THICKNESS APPROXIMATELY 5/8 INCH, PLUS OR MINUS 1/4 INCH, AT TIME OF CUTTING. (EXCLUDES TOP GROWTH). 0. SOD SHOULD BE VIGOROUS AND DENSE AND BE ABLE TO RETAIN ITS OWN SHAPE AND WEIGHT WHEN SUSPENDED VERTICALLY WITH A FIRM GRASP FROM THE UPPER OX OF THE STRIP_ BROKEN PADS OR TORN AND UNEVEN ENDS WILL NOT BE ACCEPTABLE. E. A SOD OF KENTUCKY 31 TALL FESCUE NTH BLUEGRASS, OR A FESCUE BLEND IS PREFERRED. F. ONLY MOIST FRESH UNHEATED SOD SHOULD BE USED. SOD SHOULD BE HARVESTED, DELIVERED VERED EL AN INSTALLED WITHIN A PERIOD OF D 36 HOURS. 2; SITE PREPARATIONS: SEE SPECIFICATION FOR SEEDING & SOIL TREATMENT FOR PERMANENT VEGETATIVE COVER (ITEM V.A. ABOVE) 3. SOD PLACEMENT A SOD STRIPS SHOULD BE LAID ON. THE CONTOUR, NEVER UP AND DOWN THE SLOPE, STARTING AT THE 80TFOM OF THE SLOPE AND WORKING UP, ON STEEP SLOPES, THE USE OF LADDERS WILL FACILITATE THE WORK AND PREVENT DAMAGE TO THE SOD. DURING PERIODS OF HIGH TEMPERATURE. LIGHTLY IRRIGATE THE SOIL IMMEDIATELY PRIOR TO LAYING THE SOD. B. PLACE SOD STRIPS NTH SNUG EVEN JOINTS THAT ARE STAGGERED; OPEN SPACES INVITE EROSION. C. ROLL OR TAMP SOD IMMEDIATELY FOLLOWING PLACEMENT TO INSURE. SOLID CONTACT OF ROOT MAT AND SOIL SURFACE. DO NOT OVERLAP SOD. ALL JOINTS SHOULD BE BUTTED TIGHTLY IN ORDER TO PREVENT VOIDS, WHICH WOULD CAUSE DRYING OF THE ROOTS. D. ON SLOPES GREATER THAN 3 TO 1. SECURE SOD TO SURFACE SOIL WITH WOOD PECS, WORE STAPLES OR A BIODEGRADABLE FASTENER. E. SURFACE WATER CANNOT ALWAYS BE DIVERTED FROM FLOWING OVER THE FACE Of THE SLOPE, BUT A CAPPING STRIP OF HEAVY ,CUTE OR PLASTIC NETTING PROPERLY SECURED, ALONG THECROWN OF THE -SLOPE AND EDGES WILL PROVIDE EXTRA PROTECTION AGAINST LIFTING AND UNDERCUTTING OF SOD. THE SAME TECHNIQUE CAN BE USED TO ANCHOR SOD IN WATER CARRYING CHANNELS AND OTHER CRITICAL AREAS. WIRE STAPLES MUST BE USED TO ANCHOR NETTING IN CHANNEL WORK. F. IMMEDIATELY FOLLOWING INSTALLATION, SOD SHOULD BE WATEREDUNTIL MOISTURE PENETRATES THE SOIL LAYER BENEATH SOD TO A. DEPTH OF 4 INCHES. MAINTAIN OPTIMUM MOISTURE FOR AT LEAST TWO WEEKS. 4. FOLLOW-UP INSPECTION: AFTER THE FIRST GROWING SEASON, THE SOD SHOULD BE INSPECTED TO DETERMINE IF ADDITIONAL FERTIUZATION OR LIMING IS NEEDED. SEEDING S G A SEED MIXTURES: SEED MIXTURE TO 8E USED ON THIS SITE SHALL CONSIST OF ME FOLLOWING UNLESS OTHERWISE NOTED ON THE PUNS, RATES ARE IN THE FORM OF PONDS PER ACRE (LB/A) PER PURE UVE SEED (POUNDS / ACRE PLS) WHTRACTOR TALL NEED TO ADJUST AOCOMMOLY BASED ON THE SEED GERMINATION AND PURITY RATING (ME ITEM R3 BELOW)- B. TEMPORARY SEED MIXTURES DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE DISTURBED AGAIN WITHIN iWIELW (12) MONTHS MUST BE MEIN WITH A TEMPORARY SEEDMIXTURE -AS FOLLOWS'. RYE GRAIN (25POUNDS -/ ACRE. PUS) ORWREAT PER 555 (25 POUNDS / ACRE PLS) OR'ROANE WHEAT (25 POUNDS / ACRE PLS) G PERMANENT SEEDING SHALL. CONSIST OF A WAPGRARY SEED MIXTURE (SEE ABOVE) AS A NURSE CROP PLUS A PERMANENT SEED MIXTURE AS FOLLOWS (VALUES IN LBS./ ACREL MARCH 1 - AUGUST 31: TALL FESCUE 50 LOS PLUS CENTPLDE, TG LES PLUS BERMUDA GRASS (MU 0), 25 LBS 11. SEPTEMBER I. - FEBRUARY 29: TALL FESCUE 50 LBS PLUS CENTIPEDE. 10 LBS. PLUS BERMUDA CRASS (UNHUO.ED). 35 LBS D. PURE DVE SEER i. SEED USED FOR THE PURPOSE OF PERMANENT5TABNJZATON SHALL RE LABEL® WIOT UERMINAOON AND PtMETY .PERCENTAGES 2. UNLABELED SEED WILL BE REJECTED. SEED SNAIL NOT BE USED MORE IRAN ONE (1) YEAR BEYOND ONE LABEL DATE 3. DETERMINING ONE PERCENT PURE LOVE SEED (PERCENT PLS) OF A UBFJ.ED SEED MULTWPLY BY THE PERCENTAGE OF PURE 4 SEED BY THE PERCENTAGE OF G19RMNAVON AND DIVIDE THE RESULT BY 1W ( DIPURE X.'XGERWiARON) / 100 ) 5. DETERMINING THE ACTUAL SEED RATE: SIMPLY DIMDE THE PERCENT PLS RATMG OF THE SEED INTO THE PLS REIXMMED. AS 6. NOTE ABOVE. ME RESULT M THE POUNDS OF SEED: REQUIRED. FOR EXAMPLE: F THE REQUIRED RAZE 15 64 POUNDS PLS. AND THE SEED IS RATED AT 35% PLS, DIVIDE 94 BY B 35. TO GET 1829 POUNDS,. WHICH IS THE AMOUNT OF THAT SEED WQIIHEO PER ACRE. E APPLICATION OF SEED+ I. SEW SHALL. RE APPLIED IN A NON-COWACTED. R9UUGHENED TOPSOIL 2. SEED MAY SE APPLED THROUGH ANY OF THE FOLLOW4NG MEANS AND METHODS, OR OTHER ACCEPTED INDUSTRY PRACTICES, 3. UNLESS .SPECIFICALLTHESE PLANS, NOTED OTHERWISE' ON TPLANS; 4, DRILL Smwo 5. BROADCAST SEEDING (PAN CIREOTIONS) P. HYORGSMINNG (TWA OIRECTICRS) F. ALL SEED SHALL BE 1710PORARILY OR P6TMANENAY STASIDJM UNTIL A 70% PERENNFAL COVER IS ACHIEVED: 1. TEMPORARY STAMLIZATODN WITH STRAW 4 STRAW MULCH SHALL. BE APPLIED ON TOP OF THE FRESHLY SEEDED AREAS AT A RAZE OF 3 TONS PER ACRE (4 TONS PER ACRE BETWEEN. NOWM9ER 1ST AND MARCH 1ST), b. STRAW SNALL. BE STA&UMD'WITH A WOOD OR PAPER RWR MULCH AND TACKIFER SOLUTION IN ACCORDANCE WITH THE PRODUCT MANUFACTURER'S SPECIFICATONS: 2. TEMPORARY/PEMMANENT STABILIZATION WIN EROSION CNNTROI. MATTING/BLANKETS WERE SPECIFIED). a MATTINO/BLANI(ETS SHALL BE INSTALLED. IN AREAS AS NOTED LINT THE EROSION k SEDIMENT. CONTROL PLAN OR WIOTW SG FEET OF PONDS, STREAMS OR WETLANDS RE PRODUCT SHALL BE INSTALLED AND STAPLED ON TOP OF THE SEEDING IN ACCORDANCE V4114 MANUFACTURER SPECIDCATICNS. b. AREAS WITH MATDNG/KMKETS SHALL NOT BE TRACKED. (CATWNURED) AFTER INSTALLATION. c MATTNG/BLAFWIETS SHALL BE VISUALLY INSPECTED DAILY TO ENSUW MAT IRE PRODUCT IS 11 N 11009I0 PROPERLY. IS HELD FAST TO THE SOIL SURFACE AND IS IN COW CONDITION. G ONCE SEED HAS BEEN SET. VEHICULAR TRAFFIC OR OTHER SOURCES OF COMPACTION SHALL BE AVOIDED H. IRRIGAICK: NEW SEED APPLICATIONS SHOULD BE SUPPLIED WITH ADEQUATE WATER, A MINIMUM OF X* TWICE A DRY, UNTIL VEGETATION IS WELL ESTABDSLm (A MINIMUM OF 75% COVER)- MATERIAL MANAGEMENT NOTES A. SOLID WASTE DISPOSAL - SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY ANY MEANS NECESSARY TO ENSURE THAT THOSE DO NOT DISCHARGE FROM THE SITE. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHALL BE STORED AND HANDLED IN A MANNER CONSISTENT WITH THE RISK OF IMPACT THOSE REPRESENT, AND ACCORDING WITH THE REGULATIONS. NO SOLID MATERIALS, INCLUDING BURRING MATERIALS, ARE ALLOWED TO BE DISCHARGED FROM THE SITE WITH SIORMWATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS, RUBBISH, TRASH, .GARBAGE, LITTER; OR OTHER SUCH MATERIALS $HALL BE DEPOSITED INTO SEALED CONTAINERS MATERIALSSHALL BE PREVENTED FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. THE CONTAINERS SHALL BE HAULED AWAY FROM THE SITE AND EMPTIED WHEN THOSE .BECOME 95X FULL, OR AS NECESSARY, BY A CERTIFIED TRASH DISPOSAL SERVICE LIDS OR COVERS FOR THE CONTAINERS SHALL BE PROVIDED FOR USE DURING RAIN EVENTS TO PREVENT WASTE CONTACT WITH STORMWATER, WASTES THAT CANNOT BE STORED IN A CONTAINER MUST BE STORED UNDER COVER OR INDOORS, THE LOCATION. OF SOLID WASTE RECEPTACLES SHALL BE SHOWN ON THE SITE MAPS, B. SANITARY FACILITIES - ALL. PERSONNEL INVOLVED WITH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY OR SEPTIC SYSTEM REGULATIONS. PORTABLE TOILETS MUST BE LOCATED AT LEAST 30 FEET FROM INLETS, CHANNELS. SWALES, OR PERMITTED LIMITS OF DISTURBANCE, AND MUST BE LOCATED AT LEAST 50 FEET FROM WATERS OF THE STATE, OR WATERS. OF THE U.S. PORTABLE TOILETS MUST BE SECURELY ANCHORED AND/GR TIED DOWN. SECONDARY CONTAINMENT SHALL BE PROVIDED AND FULL CAPACITY SHALL. BE RESTORED IMMEDIATELY UPON DISCOVERY OF ITS DIMINISHMENT. THE LOCATION OF SANITARY FACILITIES SHALL BE SHOWN ON THE SITE MAPS. C. TEMPORARY PARKING - THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION. (SUITABLE .FOR PARKING- AND STORAGE). THIS MAY REQUIRE ..PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AREA AS CONDITIONS DEMAND. D. MATERIAL STORAGE AREAS - MATERIAL STORAGE AREAS SHOO BE LOCATED, WHEN POSSIBLE, SHOULD ORI D. TE GHAT A TO MINIMIZE EXPOSURE O WEATHER. OF, OR THE SHALL EVALUATEDISTURBEDAREAS AND. AREAS USED FOR STORING MATERIALS FROM ARE SITE. IF TO. RAINFALL FOR EVIDENCE. OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM OR DISCHARGING FROM THE SITE. S NECESSARY, THE MATERIALS MUST BE COVERED OR RUNOFF COVERS MUST BE REPAIRED OR GC SHALL ADHERE ALSO, STATE BERMS MUST BE CONSTRUCTED. IF NEEDED, TO -----IN RUNOFF FROM MATERIAL STORAGE AREAS. GC SHALL ADHERE TO ALL STATE AND LOCAL. REGULATIONS PERTAINING TO CHEMICALS PAINTS,. SOLVENTS. FERTILIZERS, AMID OTHER TOXIC MATERIALS MUST BE. STORED M WATERPROOF CONTAINERS. EXCEPT DURING APPLICATION, CAnQN THE CONTAINERS AND THE CONTENTS MUST BE KEPT TRUCKS OR INSIDE OF STORAGE EAOIUTIES RUNOFF CONTAINING MMC SUCH MATERIAL MUST BE COLLECTED. REMOVED FROM THE SITE, TREATED, AND DISPOSED OF AT AN APPROVED SOLID" WASTE AND CHEMICAL DISPOSAL FACILITY.. E. CEMENT. AND CONCRETE WASTE MANAGEMENT; CONCRETE WASHOUT - CONCRETE WASTE MANAGEMENT PERTAINS TO WASTE FROM CONCRETE READY -MIX TRUCKS. MASONRY OPERATIONS, AND SIMILAR WASTE. DISCHARGE E DISCHARGE EXCESS WASTE CONCRETE AND OR WASH A OF OR WATER FROM. CONCRETE TRUCKS R NOT ALLOWED AT / RUC THE CONSTRUCTION SITE. ONLY COMMERCIALLY AVAILABLE GROUND PORTABLE CONCRETE ND WASHOUT CONTAINERS ARE ALLOWED AND MUST BE A14D A F FROM VEHICLE TRAFFIC AND CLEARLY IDENTIFIED BY LEGIBLE SIGNAGE,AND MUST LOCATED BE L TE OUTSIDE OF VEGETATED WASHO ERS AND AS FAR AS PRACTICABLE FROM TER CONVEYANCES AN ABL FR STORMWATER ON CES D IMPOUNDMENTS AND. WATER BODIES, PORTABLE CONCRETE WASHOUT CONTAINERS SHALL CONTAIN AND/OR ACTIVELY MANAGE BOTH, D FLU COMPONENTS TH SDU AND tB OF THE MIX, CONCRETE FL T CONTAINERS /SHWMUST BE CLEANED OR EXCHANGED WHEN THE REMAINING VOLUME IS : REDUCED BY BSX TO PREVENT ANY POTENTIAL OVERFLOW IN ASTORM EVENT ALTERNATIVELY WASTE CONCRETE CAN BE PLACED . C€ INTO FORMS T0 MAKE RIP RAP AND/OR OTHER N USEF UL CO NCRETE PRODUCTS. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL BE DISPOSED IN ACCORDANCE WITH APPLICABLE STATE AND FEDERAL RE UIOTHE S RESPONSIBLE FOR ASSURING THAT THESE PROCEDURES APPLICABLE LAWS AND ENVIRONMENTAL REWLA11ONS ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT CONTAINERS SHALL BE SHOWNON THE SITE MAPS. F. MASONS' AREA - THE GC SHALL IDENTIFY MASONS' AREA NTH LEGIBLE SIGNAGE ON THE SITE. TO THE EXTENT PRACTICAL, ALL. MASONRY TONS, MATERIAL, INCLUDING SAND AND SACKED CEMENT AND/OR MORTAR MATERIALS. MIX. AND EQUIPMENT SHALL BE LOCATED WITHIN THE AREA IDENTIFIED. MATERIALS VULNERABLE TO WEATHER ELEMENTS SHALL BE STORED M CONTAINERS AT THE END OF EACH WORK DAY; SUCH MATERIALS SHALL REMAIN STORED IN CONTAINERS WHEN NOT IN USE, RUNOFF CONTROL., SUCH AS DIVERSION BERMS, SILT FENCE; SILT DIKE, OR OTHER MEANS OF CONTAINMENT SHALL BE PROVIDED: TO PREVENT THE MIGRATION OF 5TORMWATER POLLUTANTS FROM THE MASONS AREA. COVERED RECEPTACLES FOR DEBRIS AND TRASH DISPOSAL SHALL ALSO BE PROVIDED, THE MASONS' AREA SHALL MEET OSHA AND OTHER REGULATORY REQUIREMENTS FOR PERSONAL PROTECTIVE EQUIPMENT (PPE), FIRE EXTINGUISHERS, .ETC. OC SHALL PROVIDE SCREENING OR OTHER TECHNOLOGIES FOR MASONS' AREA TO PREVENT AIRBORNE TRANSPORT OF CEMENT. DUST AND OTHER PARTICULATES DUE TO HIGH SPEEDWI ND OR OTHER I110NS. THE LOCATION CORD LOCH ON OF THE MASONS' AREA SHALL BE SHOWN : ON THE SITE MAPS. G. FUEL TANKS THE GC SHALL. IDENTIFY FUELING AREAS NTH LEGIBLE REGULATIONS. ON THE SITE. SINGLE R 51 TEMPORARY ON -SITE FUEL TANKS .FOR CONSTRUCTION VEHICLES SHALL MEET ALL LOCAL, STATE AND FEDERAL REGULATIONS. ALL TANKS SINGLE AND DOUBLE WALLED, SHALL BE PROVIDED WITH SECONDARY CONTAINMENT (THAT IS CONTAINMENT EXTERNAL TO AND SEPARATE FROM PRIMARY CONTAINMENT). TANKS SHALL HAVE APPROVED SPILL CONTAINMENTWITH THE CAPACITY REQUIRED BY THE APPLICABLE REGULATIONS. SECONDARY CONTAINMENT SHALL BE CONSTRUCTED OF MATERIALS OF SUFFICIENT THICKNESS, DENSITY. AND COMPOSITOR SO AS NOT TO BE STRUCTURALLY WEAKENED AS A RESULT OF CONTACT WITH THE FUEL STORED AND CAPABLE OF CONTAINING DISCHARGED FUEL. FOR A PERIOD OF TIME EQUAL TO OR LONGER THAN THE MAXIMUM ANTICIPATED TIME SUFFICIENT TO ALLOW RECOVERY OF DISCHARGED FUEL. IT SHALL BE CAPABLE OF CONTAINING IIOX OF THE VOLUME OF THE PRIMARY TANK IF A SINGLE TANK IS USED, OR IN THE CASE OF MULTIPLE TANKS, 150% OF THE LARGEST TANK OR 110% OF THE AGGREGATE, WHICHEVER IS LARGER. THE TANKS SHALL BE IN SOUND CONDITION, FREE OF RUST OR OTHER DAMAGE WHICH MIGHT COMPROMISE CONTAINMENT. FUEL STORAGE AREAS .SHALL MEET ALL EPA, OSHA AND OTHER REGULATORY REQUIREMENTS. FOR SIGNAGE, FIRE EXTINGUISHERS, ETC, HOSES, VALVES, FITTINGS, CAPS,. FILLER NOZZLES, AND ASSOCIATED HARDWARE SHALL BE MAINTAINED IN PROPER WORKING CONDITION AT ALL TIME$ TANKS SHALL BE LOCATED TO MINIMIZE EXPOSURE TO WEATHER AND SURFACE WATER DRAINAGE FEATURES THE LOCATION OF FUEL TANKS SHALL BE SHOWN ON THE SITE MAPS. A SPILL PREVENTION. CONTROL AND COUNTERMEASURE (SPGC) PLAN MUST BE DEVELOPED IF ABOVEGROUND OIL STORAGE CAPACITY AT THE CONSTRUCTIDN SITE EXCEEDS 1,320 GALLONS OR AS SPECIFIED BY STATE. CONTAINERS NTH A STORAGE CAPACITY OF 55-GALLONS OR LESS ARE NOT INCLUDED WHEN CALCULATING SITE STORAGE CAPACITY. THE GC SHALL WORK WITH THE DEC TO DEVELOP AND IMPLEMENT A SPCC PLAN IN ACCORDANCE WITH THE OIL POLLUTION PREVENTION REGULATION AT TIRE 40 OF THE CODE OF FEDERAL REGULATIONS PART 112. (40 GEN 112). H. EQUIPMENT CLEANING AND MAINTENANCE AREAS - THE GC SHALL DESIGNATE AREAS ON THE SITE MAPS FOR EQUIPMENT CLEANING, MAINTENANCE, AND REPAIR. THE GC AND SUBCONTRACTORS SHALL UTILIZE SUCH DESIGNATED AREAS. CLEANING, MAINTENANCE, AND REPAIR AREAS SHALL BE PROTECTED BY A TEMPORARY PERIMETER BERM, SHALL NOT OCCUR WITHIN 150 FEET OF ANY WATERWAY, WATER BODY OR WETLAND, AND SHALL. OCCUR IN AREAS LOCATED AS FAR AS PRACTICAL FROM STORM SEWER INLETS. DRIP PANS SHALL BE USED FOR VEHICLE MAINTENANCE ACTIVITIES AND RESULTANT WASTES SHALL BE DISPOSED OF IN ACCORDANCE WITH THE HAZARDOUS MATERIAL MANAGEMENT AND SPILL REPORTING PLAN NOTES INCLUDED. ON THIS PLAN SHEET. USE OF DETERGENTS FOR LARGE SCALE WASHING IS PROHIBITED (FOR EXAMPLE, WASHING VEHICLES, BUILDINGS, PAVEMENT SURFACES, ETC.). ALL WASH WATER SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED. NCDENR EROSION AND SEDIMENT CONTROL NOTES 1, ON -SITE BURIAL PITS ARE NOT ALLOWED. AT ANY LOCATION WITHIN THE TOWN OF KERNERSVILLE. 2. ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS: PLAN IS SUBJECT TO A FINE. 3 GRADING' 1 ACRE OR: MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND SUBJECT TO A FINE, 4, GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER ARES AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. 5, BASIN OUTLET STRUCTURES WITH DRAINAGE AREAS EQUAL OR GREATER THAN ONE ACRES MUST WITHDRAW WATER FROM THE SURFACE. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE NCDENR EROSION CONTROL INSPECTOR.. 7. ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING.: B. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, D.S. DEPT. OF AGRICULTURE, AND ANY APPLICABLE LOCAL LAWS AND. CODES. 9, PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION :SHOULD BE CONSTRUCTED AT i:t(HGR(ZONTAL TO VERTICAL) OR FLATTER, PERMANENT OP OF 3:1 SHOULD CONSTRUCTED SL ES QUID BE RWHEREMOWING OWING IS DESIRABLE AND AS INDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR I WASTE MATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALL DISCLOSE THE LOCATION OF ANY ON -SITE AND/OR OFF -SITE BARROW LOCATION AR/09 WASTE BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR. 10. ANY REPORT SUBMITTED TO NCDENR MUST ALSO BE SENT TO THE TOWN OF KERNERSVILLE ENGINEERING DEPARTMENT ATTENTION DIRECTOR INCLUDING ANY SELF INSPECTION REPORTS. 11. LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHER GRADING REQUIREMENTS. 12. CONTRACTOR SHALL INSTALL ALL. EROSION CONTROL MEASURES AS INDICATED PRIOR TO GRADING OPERATIONS. NO DEVICE MAY BE REMOVED WITHOUT APPROVAL OF EROSION CONTROL COORDINATOR, 13. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY NTH EXISTING CONTOURS. 14. ALL DISTANCES ARE HORIZONTAL GROUND. 15. TOTAL DENUDED AREA - 6.52 AC RL ANCHOR SILT FENCE WITH COMPACTED BACKFILL ON TREE PROTECTION ZONES. DQ NOT BURY 17, ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR. STORM EVENT. IF ANY FAILURES ARE FOUND, THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. 18, ANY ASSOCIATED DEMOLITION PERMITS AND METHODS OF DEMOLITION ARE TO BE OBTAINED AND ARRANGED BY THE CONTRACTOR PRIOR TO CONSTRUCTION; 19, SEDIMENT TRAPS AND BASINS NEED TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. 20. STONE OUTLETS SHOULD BE INSTALLED AT LOW POINTS OF THE SILT FENCING, BASED ON FIELD CONDITIONS. 21. EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND. DISTURBING ACTIVITIES MUST INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF-iNSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF-INSPEC71ON REPORT, AS WELL AS DETAILS OF THE SELF -INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WESSITE IF YOU HAVE QUESTIONS OF THE SELF -INSPECTION PROGRAM, PLEASE CONTACT (704) 663-1699. 11R Ap SCALE: i"=2000' SITE LOCATION MAP SCALE: IR=2000' DEVELOPER /OWNERI 11: 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-1195 SIAL CCONTRACTCR; T: VIVDRTANTT GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC, SWPPP NOTES REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BED CwS ____-n._-_-. �.__-_ PER ARCH. COORDINATION CWS PER NCDENR COMMENTS PER WATER REVISIONS CWS CWS V �j i 9uly .1 1�1 t� TAM p � . 1 D % w St gg 1i i IH � 6 nu O ffi 5 1 ry, Pi € 9 z z•a- .a H, 0 Q 11 g� a z 6 z 1 L 2 I- ?c 4 < eg p zi w. u n m � 4 z z m �$ igm w t TJ i 8 i a I � >a U ��4 0 .R t�ri� a Q-..'...SSJ .. 4 w r. Q� I �. i MY� ._ a 4 ; z z V ' t., -.. '+« 4*CIF � ,..w *` /// lk• yRGX t JJ III It CD F-- 0 z I 00 0 � C-) . N 1 W ZNZ LZLJ I-- � m LLf r � cc < E__ T-- r- `S Q ( W L.Lj W cN < W z �. W � (� [� 1[[ (r) (Dm d m a Q I- (% ,I-- « 0 LLJ W = V) z CD W i_ W m = Q W LL_ CQC W (n Z m Z 0 G = I C7 � �I �t I ,� W CD Z Q [�m z CN 0I CD !AJ (Nm so on qw ow an N . ED.13ETEDo.113T- lil 4 SHEETS V:\13\P130190\_CAD\LD PLANS\REV - 5\14130100 DETAILS-5 >LAY{rJT.. 03- SWPPP NOTES -... - - ,IT TFf h,F II I� j 'ii - 1 Ill _ '_ 'i'. !IT HEN Il., .i .I r l� I I,.. I I r I 'l ,t R) , I b I " Revision Date: October 2$, 2013 1 1 2 1 3 1 4 1 5 1 6 1 7 8 1 9 IN 11 12 13 A I C U E F G H PHASE 1 LIMITS OF WORK N.T.S. PHASE 2 LIMITS OF WORK N.T.S. SWPPP IMPLEMENTATION SEQUENCE NOTE: UPON IMPLEMENTATION AND INSTALLATION OF THE FOLLOWING AREAS: TRAILER, PARKING, LAY DOWN, PORTA-POTTY, WHEEL WASH, CONCRETE WASHOUT, MASON'S AREA, FUEL AND MATERIAL STORAGE AREAS/CONTAINERS, SOLID WASTE CONTAINERS, ETC., IMMEDIATELY DENOTE THEM ON THE SITE MAPS AND NOTE ANY CHANGES IN LOCATION AS THEY OCCUR THROUGHOUT THE CONSTRUCTION PROCESS. IN ADDITION, NOTE ALL AREAS WHERE FILL IS IMPORTED FROM OR SOIL IS EXPORTED TO ON THE SITE MAPS. NOTE: DOWN SLOPE PROTECTIVE MEASURES MUST ALWAYS BE IN PLACE BEFORE SOIL IS DISTURBED. ACTIVITIES ARE PRESENT IN THE ORDER OR SEQUENCE IN WHICH THEY ARE REQUIRED TO BE COMPLETED. PHASE 1 1. INSTALL THE SWPPP INFORMATION SIGN AND POST REQUIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION EXIT, AND WITHIN EASY ACCESS TO THE GENERAL PUBLIC WITHOUT ENTERING THE SITE. 2. STAKEIFLAG THE LOD (WHERE STAKING IS NOT POSSIBLE/PRACTICAL, THE LOD MUST BE CONSPICUOUSLY, AND PROMINENTLY, MARKED TO DENOTE THE BOUNDARY). LOD MUST REMAIN CONSPICUOUSLY MARKED THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT. 3. INSTALL PERIMETER SEDIMENT CONTROL BMPS IN THE VICINITY OF, AND DOWN GRADIENT FROM, THE LOCATION OF THE PLANNED CONSTRUCTION EXIT, CONSTRUCTION OFFICE TRAILER, AND TEMPORARY PARKING AND STORAGE AREAS. CLEAR ONLY THE MINIMUM AREA ABSOLUTELY NECESSARY TO INSTALL THESE PERIMETER CONTROL BMP& 4. INSTALL STABILIZED CONSTRUCTION EXIT(S) WITH SEDIMENT TRAPS, AND SET THE PROJECT OFFICE TRAILER. 5. INSTALL REMAINING PERIMETER SEDIMENT CONTROL BMI% AS SHOWN ON THE SITE MAPS. CLEAR ONLY THE MINIMUM AREA NECESSARY TO INSTALL PERIMETER CONTROL BAEM 6. INSTALL SEDIMENT BASIN AND CONSTRUCT DRAINAGE SWALES, IN CONCERT WITH PREPARATION, STRIPPING, AND FILLING OF PROPOSED BUILDING PAD, Y CONTACT THE CEC TO PERFORM INSPECTION AND CERTIFICATION OF BMPS. BMP CERTIFICATION MUST OCCUR BEFORE STORMWATER PRE -CONSTRUCTION MEETING. (THIS MAY SHOULD BE SCHEDULED IN ADVANCE, IN ANTICIPATION OF THE EXPECTED DATE WHEN THE ABOVE SEQUENCE ITEMS WILL BE COMPLETED.) ALL EXCEPTIONS NOTED ON THE BMP CERTIFICATION FORM MUST BE ADDED AS DEFICIENCIES WITHIN THE BMP CERTIFICATION FORM AND RESOLVED WITHIN 24-HOURS. BMPS MUST NOT BE CERTIFIED IF ONE OR MORE OF THE EXCEPTIONS WILL NOT BE RESOLVED WITHIN 24-HOURS OF THE BMP CERTIFICATION BY THE CEC. IF THE CEC IS UNABLE TO CERTIFY THAT SITE CONDITIONS ARE PER PLANS AND SPECIFICATIONS, THE CERTIFICATION OF BMPS MUST BE RESCHEDULED. THE STORMWATER PRE -CONSTRUCTION MEETING MAY ONLY OCCUR AFTER BMPS CAN BE CERTIFIED. GENERAL CONTRACTOR SHALL SCHEDULE AND CONDUCT THE STORMWATER PRE -CONSTRUCTION MEETING WITH THE CEC, OWNER'S CONSTRUCTION MANAGER, AGENCY(IES) AND SUBCONTRACTORS BEFORE PROCEEDING WITH CONSTRUCTION. DAILY STORMWATER INSPECTION REPORTS IN THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER MUST START ON THE NEXT BUSINESS DAY AFTER THE SITE BMPS & PRECONSTRUCTION MEETING CERTIFICATION IS SIGNED/CERTHTED BY THE CEC. PHASE 2 1. BEGIN CLEARING, GRUBBING, AND STRIPPING THE SITE. (PHASE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TAME) 2. UPON STRIPPING ALL TOPSOIL, CONTRACTOR SHALL PERFORM LIME STABILIZATION IN ACCORDANCE WITH THE RECOMMENDATIONS MADE IN THE GEOTECHNICAL REPORT. CONTRACTOR SHALL IMPORT STRUCTURAL FILL AS NECESSARY AND BEGIN BULK EARTHWORK ACTIVITIES. 3. BEGIN GRADING THE SITE. 4. CONTINUE WITH CONSTRUCTION OF BUILDING PAD AND STRUCTURES. 5. TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 6. IMMEDIATELY PERMANENTLY STABII,i7.F AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 7. INSTALL UTILITIES, UNDERDRAINS, STORM SEWERS, WET POND, FORBAYS, CURBS, AND GUTTERS. CONTRACTOR MAY COMMENCE WORK ON OFF -SITE IMPROVEMENTS UPON COORDINATION WITH NCDOT. 8. INSTALL RIP RAP AROUND OUTLET STRUCTURES AS EACH OUTLET STRUCTURE IS INSTALLED. 9. INSTALL INLET PROTECTION AT ALL STORM SEWER STRUCTURES AS EACH INLET STRUCTURE IS INSTALLED. 10. PREPARE SITE FOR PAVING. 11. PAVE SITE. 12. INSTALL APPROPRIATE INLET PROTECTION DEVICES FOR PAVED AREAS AS WORK PROGRESSES, PER BMP DETAILS. 13, COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS, INCLUDING OUT LOTS AND PONDS. 14. OBTAIN CONCURRENCE FROM THE OWNER CONSTRUCTION MANAGER (CM) THAT THE SITE HAS BEEN FULLY STABILIZED AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: A. REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), B. STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY BMPS, AND C. ASK THE CM TO CONTACT THE CEC TO COMPLETE THE CEC PRE -NOT SITE INSPECTION AND REPORT (ONLY CM MAY DO THIS). 15. CONTINUE DAILY INSPECTIONS AND REPORTS UNTIL THE CM FINAL DAILY INSPECTION REPORT, MARKED 'READY TO TERMINATE PERMFT', IS SIGNED BY THE CONSTRUCTION MANAGER AND SUBMITTED VIA THE ONLINE SWPPP REPORTING SYSTEM PROVIDED BY THE OWNER. NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION -RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. BMP-RELATED STEPS IN THE ABOVE SEQUENCE ARE BOLDED FOR CLARITY. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE SWPPP IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR ON THE SOIL EROSION/SEDIMENATION CONTROL OPERATION TIME SCHEDULE ON SHEET SW-5. LEGEND LIMITS OF DISTURBANCE PERMITTED LIMITS OF DISTURBANCE LIMITS OF WORK MINIMIZATION OF DISTURBED AREAS: 1. CONTRACTOR SHALL MANAGE CONSTRUCTION ACTIVITIES TO REDUCE EROSION AND RETAIN SEDIMENT AND OTHER POLLUTANTS IN THE SOIL AT THE CONSTRUCTION SITE. 2. CONTRACTOR SHALL MINIMIZE THE TIME BARE SOIL IS EXPOSED, 3. CONTRACTOR SHALL MINIMIZE SITE DISTURBANCE BY MINIMIZING THE EXTENT OF GRADING AND CLEARING TO EFFECTIVELY REDUCE SEDIMENT YIELD. NOTE TO GC: OWNER HAS AUTHORITY AT ANY TIME TO LIMIT SURFACE AREA OF ERODIBLE EARTH MATERIAL EXPOSED BY CLEARING AND GRUBBING, EXCAVATION, BORROW AND EMBANKMENT OPERATIONS AND TO DIRECT THE GC TO PROVIDE IMMEDIATE PERMANENT OR TEMPORARY POLLUTION CONTROL MEASURES. DEVELOPER/OWNER: 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-1195 SITE OPERATOR/GENERAL CONTRACTOR: T. IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS L%UM BY THE CEC. SWPPP IMPLEMENTATION SEQUENCE AND M TS OF WORK REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CWS PER WATER REVISIONS i CWS d w J If g i ! 12 �11-4 g3`>b �S z...... rr 0z Z k � e y u lit "�'...... T tN 0ARD 4 IS DEALter; 036308 •�' z� o � o z I � O' O (N I a < Of< � Ld c3 EC > w L, W CN w ZI cn r` o m m 0 cnQ O w� = U) z F L j o � o O w L Q (W Z m Z C)O iL I � 0 Ln 7- ~ m t,._ Q ow z v CAI m DRAWN N.L.H. CHECKED J.R.H. DATE 09/09 13 SCALE AS NOTED JOB No. NCC138113 SHEET SW-2 4 OF 24 SHEETS V:\13\P130190\_CAD\LD PLANS\REV - 5\Pi30190 DE'.AILS-5----- >LA"OUT: 04- SWPPP NOIES Revision Date: October 28, 2013 A 1-570RY i FRAME of { BUILDING r rr a:•':•: e elB \C W17T UT 4_XPR£SS1NG A 1ECA1 ORNlON �+ AS TO THE OWNERSHIP OR LEGAZ i C NRTURE OF THE PQSO&E GAP, THIS SURVEYOR HAS OBSERWD A POSSSLE GRP OF AD101NfR TO SURVfY PARCEL AS SHOW11 HEREON 1-STORY BREX a BUILDING 2 3 4 5 6 ( 7 8 0 10 I i STORMWATER OUTFLOW SHEET FLOW TO A BASK BASINi i ^ TO A CONVEYANCE SYSTEM THAT FLOW8��TO THENEUSE RIVER [ I j I APPROX, 036 ham TO THE NORTH t I SHED � - — � . _ — -- _, _ _ ✓ i �; � , H if -SSE-„,,, ;,�^',Y.Q-.,. jam•_ ,.� ^-18R-,r_<.,, ..,- r,:x^c'; ':t"18.•zas�:: t;�'^"�` ,�..,ae w, ,,,. '�'_.. \',�.�/ If - �t_tyr 4fl -aster-r•ex±,w�a:�rvxr:��.�sr,aa�z..�._�:."""xn.taa.. ."e',°" �:�.+i..rs��as....,,,.,,r�._„�,..�'.r" w, _T if if t 4 SS g IAI ♦ ♦ : it GW „ CE 4 t it r t TB r' ....� I fly IT GoA i rr r Ip CF it if r� , 1 ! llws,.717 j t RI<I r I r/ ONS[TE DRAINAGE'.Fm g SUB ( .. .^ i S B AREA — B �' _ ...: _-.. �a II l I r I y II# j�I ' / 1 49 I Ill It t i I tiI' AREA = 2,11s AC SF2 Q -- llal I 1 r 4. " �' i TPS t? 13) t s / `STORMWATER OUITFLOW ' E [1 / I# I I D 1 I F,R? FLOW TO CHANNEL IN HEAR CHANNEL I y 1 [ tt SF4 t 1 I I I i FLOWS TO A CONVEYANCE SYSTEM WHICH41 / I �� CF I I ,/ I I FLOWS TO THE NEIII,SE RIVER MM -'� 1 k I y l I F APEX. OAO t TO THE NORTH ` I t l d� I#I ! I 1 \ rA M o� i RPI If tA arm`: Si...13g j!`•L, X3 ff te' ` ' ... t B } ONSITE DRAINAGE ©NSITE DRAINAGE JTI SUB AREA — C `. > SUB AREA — A AREA 3.82 AC Tat I i V AREA — 1.38 AC 411 STORMWATER OUTFLOW I i CONVEYANCE SYSTEM I TO THE NEUSE RIVER 41 ! t to f'\/\/ / /\/\ AFFROX 025 MILES TO THE NORTH SB 0- Roa II1,110 1-57ORY .l "# `1 i r r. r. a may\ \ I$i BRCK 3d SA � A C. #\\lf"�>wx•• �. ��r,?-=�.a-,�-�-r-xd. �r� +y,.».x..,`�; =.�i- ,-,-1->,.,•..wt'�c."$-`�T+- ^18., ,..sue . -� ...._--•-�` � R## kl 1 o.ax 1' ��� i \ l � =.- i�-.,3'-�r «r.aeria•�ete'-- -^c. ...�, .. s..,d -•."'s �,...:='.� -- "w.--�>'.-" ---- -- I , i I IR=1 Li 1 \ ' - ---4ts- F a lit I \ -�' ! i ----- - — 1 _ - _ R — OH it � •.-_ -_,_. � r � � � rpt----w+�--...-.-..ly W .. M>_'------W. I SWPPP UPDATES AND AMENDMENTSq THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER ARID SITE ^ a� I G MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND" GENERAL CHANGES TO THE PROJECT SITE. UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIES OCCUR: BMP �4 INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTION ACTIVITIES (E.G., PAVING, STORM SEWER INSTALLATION, FOOTING INSTALLATION, FTC.), G OR OR TEMPORARY OR PERMANENT` CLEARING, GRUBBING GRADING, � � I STABILIZATION, pig" IMPORTANT: THE GENERAL CONTRACTOR MUST SUBMIT A REQUEST FOR INFORMATION WD TO THE CEC AND OBTAIN WRITTEN CEC APPROVAL BEFORE DOING ANY OF THE FOLLOWING: 1. MODIFYING EROSION OR SEDIMENT CONTROL BMPS (SUBSTITUTIONS ARE H TYPICALLYONLY APPROVED IF SPECIFIED MATERIALS ARE NOT AVAILABLE- OR THERE IS A VALID REASON THE SPECIFIED BMP WILL NOT WORK) 2. ADDINGIDELETING EROSION OR SEDIMENT CONTROL BMPS; 3. MODIFYING THE SWPPP IMPLEMENTATION SEQUENCE; OR 4. PERFORMING ANY ACTIONS OR IN ANY MANNER THAT IS CONTRARY TO THE SWPPP: THE CONTRACTOR, MAY MODIFY OR ADD ADDITIONAL BMPS, WITHOUT CEC APPROVAL, IN AN EMERGENCY SITUATION TO PREVENT SEDIMENT DISCHARGE OR PROTECT WATER QUALITY; HOWEVER, GC MUST NOTIFY THE CEC AS SOON NOTE TO GENERAL CONTRACTOR: AS PRACTICAL AS TO THEIR ACTIONS TO DISCUSS THE NEED FOR ADDITIONAL OR SUPPLEMENTAL MEASURES AND TO OBTAIN THE, REQUIRED APPROVALS, PRIOR TO CONSTRUCTION, GC MUST CLEARLY DELINEATE AND MARK OFF THE CONTRACTOR IS ULTIMATELY RESPONSIBLE TO ENSURE COMPLIANCE AREAS IDENTIFIED IN THE SWPPP OR IN THE FIELD, TO BE PROTECTED WITH THE PERMIT AND PROTECTION OF DOWNSTREAM WATER QUALITY. (SUCH AS, NATURAL BUFFERS, TREES, HABITATS OF ENDANGERED/ THREATENED SPECIES, HISTORIC PROPERTIES, ETC.). AMENDING THE SWPPP DOES NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, NEW SECTIONS, DETAILS, AND/OR REVISED DRAWINGS THAT HAVE THE CEC NAME IN PRINT, ARE STAMPED, SIGSNEID, DATED, AND ARE ACCOMPANIED BY WRITTEN COPY OF THE ASSOCIATED RM AND ITS RESPONSE FROM CEC. ENGINEERED ITEMS MUST BE SIGNED AND STAMPED BY THE CEC OF RECORD FOR THE PROJECT, V:\13\P13C19C\_CAD\LD PLANS\REV - 5\P1301,30 SIrE 5-- >LAYOUT: 05- SWPPP i A DEVELOPER/OWNER: 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-1195 SiTE OPERATOR/GENERAL CONTRACTOR: aill,�dlli1XV011 nkI IMPORTANT: GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. T.B.M. ELEVA77ONS ARE BASED ON NA VD 88 PER NGS MONU,t/ENT J 746 WTV A PUBLISHED E7.EVA77ON OF 204.1. BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE -CALL CENTER fT'S THE LAW! 12 LEGEND 0 SITE FEATURES EXISTING PROPERTY BOUNDARY EXISTING LEGAL ROW - - - - EXISTING ADJACENT PROPERTY LINE PROPOSED LIMIT OF EARTH DISTURBANCE/ PROJECT BOUNDARY - EXISTING TREE LINE - PROPOSED TREE LINE X 'X--X EXISTING FENCE - - - - EXISTING CURB TO BE REMOVED EXISTING STORM SEWER LINE EXISTING' SANITARY SEWER LINE r f T EXISTING TELEPHONE --OH- ----1xl-- OH--- ------- EXISTING OVERHEAD ELECTRIC .. - EXISTING STORM SEWER LINE (TBR) EXISTING CONTOUR W/ELEVATION ----J-�-----t5----- --7/ PHASE 1B CONTOUR W/ELEVATION �1 LIMITS OF DRAINAGE SUB -BASIN - �• - - ^ - -. SOIL BOUNDARY 0.9xSLOPE —r► ARROW 0 EROSION DETAILS CE TEMPORARY CONSTRUCTION EXIT .� &TEMPORARY SOIL STOCKPILE. AREA "- CW TEMPORARY CONCRETE WASH AREA -o— 0------ o— OF. TEMPORARY CONSTRUCTION FENCE TPF TPF TEMPORARY TREE PROTECTION FENCE SF. TEMPORARY SUPER SILT FENCE TPS TEMPORARY PARKING & MATERIAL E\ STORAGE AREA TEMPORARY BAFFLE BF PROPOSED BUILDING FOOTPRINT SWPPP INFORMATION SIGN i3L5 NAG SC150 EROSION. CONTROL BLANKET RPi RISER/PiPE INLET PROTECTION -o SK TEMPORARY SKIMMER SB TEMPORARY SEDIMENT BASIN SEE SWPPP NOTES SHEETS FOR EROSION & SEDIMENTATION CONTROL NOTES PHASE 1 EROSION AN[ SEDIMENTATION CON TRO PLANT GRAPHIC SCALE 40 0 20 40 60 1&0 ( IN FEET ) i inch = 40 fi, 13 REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS. PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CWS PER WATER REVISIONS CWS z I� x Q0 Z pq;Q [t 'L 0 19 EM . ,� ..:... �. 9g ; Q 0 w Yfp Lid V ��; •� bit �` E ti .Q 4Cr UAL esi34A IN IN o z I 00 I o CN 0— LLLI F < W Q f� > W LLj U-1 N Q Lam[ z U I ty CL Lu r- m O t/) Q m _ O LEI LJ E Lc1 S Of O W El- d (1-i m z o o (7 Ln > J (D f - Q CD LW 3�: N M DRAWN H:L.H. CHECKED J.R,H. DATE 09 09/13 - SGALE _ AS NOTED JOB No., NCC138113 SHEET SW-3 5 OF 24 SHEETS Kevislon Ucte: October zb, ZUIS 1 I 2 i 3 4 5 6 I 7 8 A I i t STORY fRaifE ar BUILDIKG i 1 - zL. A r 3 WfTHOUT EXPRESSING A LEOAL DFPlTON i .. AS TO THE OWNERSHIP OR LEG4L NATURE OF THE POSSIBLE 64F; THIS *. •. �: �+ SUR11WR HAS OBSERWO A POSSI&F I 6AP OF ADJOINER TO SUPYEY PARCEL AS 9*70 HEREON 1-STORY , o BRTCX 8UILDIMO RR 7 E D IS FOUND li-Y'e+�al+.iY PS R-1 I ; 3-- � Y STORMWATER OUTFLOW SHEET FLOW TO A BASH. BABN D9K*IAFKllEB TO A CONVEYANCE SYSTEM _r THAT FLOWS TO A PORTION OF THE NEUM RNM APPROX. Q307l LJ98 TO THE NOTR H .t I�,.w:r•I*^�lFI jf I lgR11Ml Illlllplasr ----'. ��--_-.. - RR ' 'RR, e • w•.-- w c w � 1311*6111AMW1' 1 i BOX L'VT 152 o PS s'SD I-STORY- W,CK BUICDINc 1pi / SD m= F f lr.y SWPPP UPDATES AND AMENDMENTS �-R THE GC MUST UPDATE THE SWPPP, INCLUDING THE JOBSITE BINDER AND SITE,cizo � 0 G MAPS, TO REFLECT THE PROGRESS OF CONSTRUCTION ACTIVITIES AND GENERAL CHANGES TO THE PROJECT SITE, UPDATES SHALL BE MADE DAILY TO TRACK PROGRESS WHEN ANY OF THE FOLLOWING ACTIVITIES OCCUR: BMP INSTALLATION, MODIFICATION OR REMOVAL, CONSTRUCTION ACTIVITIES (E.G., [� I PAVING, STORM SEWER INSTALLATION, FOOTING INSTALLATION, ETC.), CLEARING, GRUBBING OR GRADING, OR TEMPORARY OR PERMANENT: STABILIZATION. IMPORTANT: THE GENERAL CONTRACTOR MUST SUBMIT A REQUEST FOR INFORMATION (RFI) TO THE. CFG AND OBTAIN WRITTEN CEC APPROVAL BEFORE. DOING ANY OF THE FOLLOWING: I. MODIFYING EROSION OR SEDIMENT CONTROL BMPS (SUBSTITUTIONS ARE H TYPICALLY ONLY APPROVED IF SPECIFIED MATERIALS ARE NOT AVAILABLE OR THERE IS A VALID REASON THE SPECIFIED BMP WILL NOT WORK) 2. ADDINGIDELETING EROSION OR SEDIMENT CONTROL BMPS; 3. MODIFYING THE SWPPP IMPLEMENTATION SEQUENCE; OR 4. PERFORMING ANY ACTIONS OR IN ANY MANNER THAT IS CONTRARY TO THE SWPPP. THE CONTRACTOR MAY MODIFY OR ADD ADDITIONAL BMPS, WITIOUT CEC APPROVAL, IN AN EMERGENCY SITUATION TO PREVENT SEDIMENT DISCHARGE OR PROTECT WATER QUALITY; HOWEVER, GC MUST NOTIFY THE CEC AS SOON AS PRACTICAL AS TO THEIR ACTIONS TO DISCUSS THE NEED FOR ADDITIONAL OR SUPPLEMENTAL MEASURES AND TO OBTAIN THE REQUIRED APPROVALS. THE CONTRACTOR IS ULTIMATELY RESPONSIBLE TO ENSURE COMPLIANCE WITH THE PERMIT AND PROTECTION OF DOWNSTREAM WATER QUALITY, AMENDING THE SWPPP DOES NOT MEAN THAT IT HAS TO BE REPRINTED. IT IS ACCEPTABLE TO ADD ADDENDA, SKETCHES, NEW SECTIONS, DETAILS, AND/OR REVISED DRAWINGS THAT HAVE THE CEC NAME IN PRINT, ARE STAMPED, SIGNED, DATED, AND ARE ACCOMPANIED BY WRITTEN COPY OF THE ASSOCIATED RFI AND ITS RESPONSE FROM CEC. ENGINEERED ITEMS MUST BE SIGNED AND STAMPED BY THE CEC OF RECORD FOR THE PROJECT. V.\13\Dl30190\ GAD\LD PLANS\REV - 5\P130190 SITE.`_----SLAYOj-: 06- SWPPP 2 10 ALC TPS IM PS © if 1 = I zo it x s I / EE PLANS $D BY RAMEY KEMP & _ ASSOCIATES FOR ALL - - OfF SITE IMPROVEMENT FOO -x. 4'S L 4`rr 4"S 4"S� PS NOTE TO GENERAL CONTRACTOR: PRIOR TO CONSTRUCTION, GC MUST CLEARLY DELINEATE AND MARK OFF AREAS IDENTIFIED IN THE SWPPP OR IN THE FIELD, TO BE PROTECTED (SUCH AS, NATURAL BUFFERS, TREES, HABITATS OF ENDANGERED/ THREATENED SPECIES, HISTORIC PROPERTIES, ETC..). LIMITS OF EARTH DISTURBANCE AND J PROJECT BOUNDARY AREA = 10 AC DEVELOPER/OWNER: 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-1195 SITE OPERATOR/GENERAL CONTRACTOR: SUPERINTENDENT. P4MRTANT. GC MUST SIGN ALL PLAN SMLFS AND ANY NEW PLAN SHEETS MUEDBY THE CEC. I I STORMWM ATER OUTFLOW CONVEYANCE SYSIM TO AR IOF THE NEIJBE I WBi II APPFK))L O,35 haJM TO THE NOFI H p I Ps I �YY I I SD 4 m I; o PS _ ! I � I i T.B.M. ELEVATIONS ARE BASED pN NA VD 88 PER NGS MONUMENT J 146 W9TH A PUBLISHED ELEVATION OF 204,1. BEFORE YOU Di GI CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAW! LEGEND 0 SITE FEATURES EXISTING PROPERTY BOUNDARY EXISTING LEGAL ROW - - - - EXISTING ADJACENT PROPERTY LINE PROPOSED LIMIT OF EARTH DISTURBANCE PROJECT BOUNDARY - EXISTING TREE LINE - PROPOSED TREE LINE - -- - — - - SOIL BOUNDARY -----#------3f- -X- ---- EXISTING FENCE ._._ .-_.. .. . , , .... EXISTING CURB TO BE REMOVED EXISTING STORM SEWER LINE EXISTING SANITARY SEWER LINE - - - - EXISTING CONTOUR. W/ELEVATION PROPOSED CONTOUR W/ELEVATION PROPOSED RETAINING WALL X. X PROPOSED CHAIN LINK FENCE PROPOSED CURB PROPOSED FLUSH CURB PROPOSED STORM SEWER PROPOSED ELECTRIC LINE PROPOSED TELEPHONE LINE PROPOSED GAS LINE ---------- - ---- - ------------- PROPOSED SANITARY LINE PROPOSED WATER LINE UGE&T UGE&T PROPOSED UNDERGROUND ELECTRIC & TE -TP TP TP PROPOSED TAMPER SWITCH .tea. SLOPE ARROW EROSION DETAILS 71 TEMPORARY CONSTRUCTION EXIT / TEMPORARY SOIL STOCKPILE AREA CW TEMPORARY CONCRETE WASH AREA 0 0 0 CF TEMPORARY CONSTRUCTION FENCE --- TPF TPF TEMPORARY TREE PROTECTION FENCE .,• -�• ._.. SDP SILT DIKE ON PAVEMENT SSF SF TEMPORARY SUPER SILT FENCE TPS TEMPORARY PARKING & MATERIAL STORAGE AREA $$ SWPPP INFORMATION SIGN 8 BLOCK & AGGREGATE CURB INLET PROTECTION IP2 TRUCK WELL INLET PROTECTION RR I. RIP -RAP O EROSION NOTES - - L'r• AREA TO BE MULCHED PERMANENT SEEDING SD PERMANENT SODDING VI-9 NAG SC150 EROSION CONTROL BLANKET SEE SWPPP MOTES SHEETS FOR EROSION & SEDIMENTATION CONTROL NOTES PHASE 2 ERO SEDIMENTATION S1ON PLAN GRAPHIC SCALE 40 AO ( IN FEET ) 1 inch = 40 ft. AN ONTR 13 �I REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID GWS PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CWS PER WATER REVISIONS CWS _ wz 44 0-4 PR N a I u x •�r•rr Y Fp g p v a SEAL 03001 CD o o IZ Z > C)f<V > Li Q Ls J U) Cl_� h m C) Q m r I— = O w S Cl Ld J 0 � Q Ll mm W Lt.. I z o o Ln \ CD a = W —m ~ d O W R < i : i'V m sw ANIM F= to DRAWN CHECKED J.R.H. DATE iw 09/09/13 SCALE AS NOTED JOB No. NCC 38113 SHEET SW-4 & OF 24 SHEETS KeYISlon Date; October 28, 2013 e t• REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CW5 PER WATER REVISIONS CWS r^ z 93� M HIM RAW �. ■ � i4 ♦.�+sas 6� 0 M F� Ci q, f P v z� g d p m 4 1.. z � o r f X J f Alto, 0300 1+�►I fll� }�l� Ul z, o CD z I � 00 0 T" N a- W J U Lj < W W r -:> N W CP LJ� 0 O m d o m >- S O � cn Lq 1— -j cn z 1— © J Cif O W LL Q Li m z o :5 Ui o €D Ln >- --, LLI I-- < Q LLJ Z J � CV m AR of sm �III� DRAWN H.L.H. CHECKED J:R.H. DATE 09/09(13 SCALE AS NOTED 1 '08 No. NCC138113' SHEET 5W-5 7 OF 24 SHEETS Keviston Dote: October 28, 2013 _. _ _ • - __ — 5 0 13 0 1:1 C 3I 9 a G m SILT FENCE ATTACH THE SILT FENCE FABRIC AND_. WOVEN OR. WELDED WIRE FENCE TO EACH POST WITH THREE PARE TIES OR OTHER FASTENERS (SEE NOTE 2) :SILT FENCE FABRIC - OVER WIRE .FENCE SILT FENCE: FABRIC TO BE FASTENED SECURELY TO WOVEN OR WELDED HIRE FENCE WITH THREE TIES HORIZONTALLY SPACED AT 3W ON CENTER (TYP.) COMPACTED 13ACKFU- TLON1 SECURELY FASTEN OVERLAPPING ENDS OF SILT J/ FENCE FABRIC TO ADJACENT STAKES WITH THREE WARE TIES OR OTHER FASTENERS WOVEN OR. WELDED WORE FENCE.. WITH SILT FENCE FABRIC COVER WOODEN SLAT TIED TO STAKE TIE BACKS (TYP.) WITH TWO ADDITIONAL TIES AT FINISHED GRADE FLOW I lift LIED Tv III 1 f ELEVATION WOVEN OR WELDED WIRE WITH SILT FENCE FABRIC FINISHED .6" X 6' TRENCH EXTEND WOVEN OR WELDED WARE A MIN. OF C INTO TRENCH 48" MIN'.. STEEL POSTS (SO' MIN. ON SLOPES 3H:tV OR GREATER), DRIVEN MIN. 20" INTO GROUND (MIN. 30" ON SLOPES 3H:1V OR GREATER). WOVEN OR WELDED WIRE FENCE ADJUST POST SPACING SUCH THAT A VERTICAL WIRE IS AT POST POSTS: STEEL T OR U TYPE. FENCE: WOVEN OR WELDED WIRE, 14 GA., 6'0' MAX. MESH OPENING I- `/ -TIE BACKS (TYP.) X 6" TRENCH FEND WOVEN OR -DED WIRE A MIN: OF INTO TRENCH I EMBEDDED SILT FENCE FABRIC MIN. ' I 6- INTO GROUND W/ 6' LAID ALONG "o I BOTTOM OF TRENCH. SOIL SLICING IN I EMBEDDED SILT FENCE FABRIC MIN. a I o BOTTOM GROUND Wj 8" LAID ALONG ACCORDANCE WITH ASTM D 6482 BOTTOM OF TRENCH SOIL SLICING IN I 8.2.2 IS ALSO ACCEPTABLE. i ACCORDANCE WITH ASTM D 6462 f i 8.2.2 IS ALSO ACCEPTABLE. f / A A -SECTION A -A -SECTION (FOR SLOPES LESS THAN 3: 1) (FOR SLOPES 3.1 AND GREATER) TIE BACK SPECIFICATIONS FOR SILT FENCE INSTALLATION A TEEL POST WIRE FENCE EN SLAT ABRIC INSIDE CORNER - PLAN VIEW 1. MATERIALS AND. INSTALLATION SHALL COMPLY WITH ASTM 06462 LATEST EDiTIOW 2. INSTALL SILT FENCE AT A FAIRLY LEVEL GRADE ALONG THE CONTOUR WITH THE ENDS CURVED UPHILL TO PROVIDE SUFFICIENT UPSTREAM STORAGE VOLUME FOR THE ANTICIPATED. RUNOFF. 3.ATTACH THE GEOTEXTILE. OR FABRIC TO THE WOVEN OR WELDE D WIRE FENCE WITH THREE WIRE TIES OR OTHER FASTENERS (HORIZONTALLY SPACED EVERY 30"), ALL SPACED WITHIN THE TOP 8" OF THE FABRIC. ATTACH EACH TIE DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE AT LEAST I' VERTICALLY APART. AT EACH POST, ATTACH THE GEOTEXTILE OR FABRIC AND THE WOVEN OR WELDED MIRE FENCE TO THE POST AS PREVIOUSLY STATED. IN ADDITION, EACH TIE PLACED ON A TABLE 1. Temporary SIt Fence Moterid Property Requirements POST SHOULD BE POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING Supported' Unsupported' Type of Test Method Units Slit Fence Sift Fence Value Grab SbbngU AMM D 4632 N Gm) Mod** Dbectidn 400. 550 MARV (40) (26) X-*Whkl* 0"00 n 400 490 MARV (00) (90) perv,maye AMU D 44gi ver -t 0.05 0.95 MARV AppimInt Opening SMM AMM D 4751 " (US Slew 0) 0,60 t 1 0.00 (30) Mm. AR`F %Mldned after 70% Typ" Mt,a .t STaSpity MaM: 0 `iM6 S2, stra gh :SILT FENCE ! SILT FENCE SECTION TYPE (WIRE BACK OR SLICED) SECTION LENGTH (FT) DRAINAGE. AREA (ACRES) AVERAGE SLOPE OF AREA SECTION: 1 WIRE BACK &QO 2-10 7.509, SECTION 2 WIRE BACK 300 3.R 0,50% SECTION 3 WiRE BACK 840 0.30 1.0DR SECTION 4 WIRE BACK 350 1.40 1.50% 4. WHEN TWO SECTIONS OF SILT FENCE FABRIC ADJOIN EACH OTHER, THEY SHALL BE OVERLAPPED A MINIMUM OF 6(r ACROSS TWO POSTS, AS SHOWN. 5. ALL SILT FENCE SHALL INCLUDE WIRE SUPPORT UNLESS THE STATIC SUCING EQUIPMENT IS UTILIZED TO INSTALL THE FENCE PER DETAIL, "SILT FENCE INSTALLATION (SLICING METHOD)". 6. WRAP APPROXIMATELY 6" OF FABRIC AROUND THE END POSTS AND SECURE WITH 3 TIES, 7. COMPACT THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 POUNDS PER SO, INCH. COMPACT THE UPSTREAM SIDE FIRST. COMPACT EACH SIDE TWICE FOR A TOTAL OF FOUR TRIPS. 8_ ADD POST CAPS AS NEEDED BASED ON SITE CONDITIONS AND APPLICABLE AGENCY REQUIREMENTS. MA INTENANCE NOTES E I.SP AASO iwp. wppp t Wxg qa'W of 14 9ao,, vied aka xNN a mtWry e,,XkIe of 150 mm (e M.).a preebrkuted pdyrber mean of a4pi Wt 1. SILT FENCES .SHALL BECTED ALONG ITS ENTIRETY AND MUST WHEN HAS BE CLEANED EN SEDMENT S ACCUMULATED TO ONE-THIRD THE Rau -wit wWq w bwll do MnP •.Mwc4 .Nb a wrlsty of ",AnWt Fa' enNronff"y eerwRiw me®. a rWMee W Prello. HEIGHT OF THE SILT FENCE. MAINTENANCE CLEANOUT MUST BE axpxi and/n .1w err -""dly wee geets*tg4 tab M xcprdonn .11b Teat Method 0 SIC dwdd be perfumed by 0n ne,,v fe CONDUCTED REGULARLY TO PREVENT ACCUMULATED SEDIMENTS FROM ..*. wkdany of th. r"&**i IU, REACHING ON -THIRD THE HEIGHT OF THE SILT FENCE. dAa meewmd it weer . eRn Teat Mf%W 0 49J2. rAelr t TAxyu rRDM Asm n 64fn-, pt2oon 2. ALL MATERIAL EXCAVATED FROM BEHIND SILT FENCE SHALL BE STOCKPILED ON AN UPLAND PORTION OF THE SITE IF SUITABLE FOR REUSE. SEDIMENTATION SILT FENCE WITH WIRE BACKING 3. SPECIAL ATTENBQN SHOULD 8E PAD TO ENSURE THAT NO SF - UNDERMINING OF SILT FENCE HAS OCCURRED AND THAT NO BYPASS N.T.S. IS OCCURRING AT JOINING SECTIONS. 4. IF EXCESS SEDIMENT IS ACCUMULATING IN ANY SECTION OF SILT SOURMELOX FENCE, THE CONTRACTOR SHOULD IMPLEMENT ADDITIONAL UPSTREAM j- STABILIZATION MEASURES OR ADDITIONAL SNIPS (PENDING CEC LAST REVISED: I WAL-MART APPROVAL) TO PREVENT EXCESSIVE BUILDUP tN4 SILT FENCE. STANDARD 5. SILT FENCES SHALL BE REPAIRED TO THEIR ORIGINAL. CONDITIONS IF JUNE 2012 DETAIL DAMAGED. _ CONSTRUCTION EXITS AND SWPPP SIGN NOTES: 4' (MINIMUM) 6' CRUSHED-7 STONE BASE MIRAFI 140NI GEOTEXTILE FABRIC FOR DRAINAGE AND FILTRATION 107 MIN. 2'-3' CLEAN 1. ALL SITE ACCESS MUST BE CONFINED TO THE CONSTRUCTION EXiT(S). BARRICADE TO PREVENT USE OF ANY LOCATIONS, OTHER THAN THE CONSTRUCTION EXITS) WHERE VEHICLES OR EQUIPMENT MAY ACCESS THE SITE, 2 CONTRACTOR TO LOCATE TEMPORARY CONSTRUCTION FENCING, JERSEY BARRIERS, OR BOTH ALONG THE SIDES OF THE CONSTRUCTION EXIT TO PREVENT CONSTRUCTION TRAFFIC FROM SHORT CIRCUITING/BYPASSING THE EXIT. 3 IF THE ACTION OF VEHICLES. TRAVELING OVER THE GRAVEL CONSTRUCTION EXFE(S) IS NOT SUFFICIENT TO PREVENT TRACKING OF DIRT; DUST OR MUD, THEN TIRES MUST BE WASHED BEFORE THE VEHICLES ENTER A PUBLIC ROAD. ALL WASH WATER MUST BE ROUTED TO A SEDIMENT TRAP OR OTHER TREATMENT AREA AND SHALL. NOT BE DIRECTLY DISCHARGED OFF -SITE. 4 LOCATIONS WHERE VEHICLES ENTER AND EXIT THE SITE MUST BE INSPECTED FOR EVIDENCE OF SEDIMENT TRACKING BEYOND THE PERMITTED PROJECT AREA. ALL MATERIALS SPILLED, DROPPED, WASHED OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. 5. ANY SEDIMENT DEPOSITED ON THE ROADWAY SHALL: BE SWEPT AS NECESSARY (AND. WITHIN THE SAME DAY AS DISCOVERY) AND DISPOSED OF IN AN APPROPRIATE MANNER. SEDIMENT SHALL NOT, BE WASHED INTO STORM SEWER SYSTEMS. 6 EMT(S) SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD BEYOND THE EXIT(S),. THIS MAY REWIRE PERIODIC TOP DRESSING OF THE CONSTRUCTION EXIT(S) AS CONDITIONS DEMAND. 7. CONTRACTOR SHALL BE PERMITTED TO: TURN THE STONE WHEN THE SURFACE BECOMES SMOOTH AND SURFACE VOIDS ARE FILLED TO MAINTAIN EFFECTIVENESS OF CONSTRUCTION EXIT UNTIL SUCH TIME THAT VOIDS BELOW. THE SURFACE BECOME FILLED AND THE CONSTRUCTION EXIT IS NO LONGER EFFECTIVE, AT SUCH A TIME THE CONTRACTOR SHALL REMOVE THE INEFFECTIVE STONE AND REPLACE PER DETAIL. 8. IF EXIT BMP IS STILL INEFFECTIVE, GC MUST CONTACT THE .ENGINEER AND SUBMIT AN RFI AS NECESSARY. PLAN VIEW 25' MINIMUM ---.IOD•.. VA- RI�S EDEXISTING PAVEMENT CONCRETE OR MIRAFI 140N ASPHALT PAVEMENT GEOTEXTILE FABRIC FOR DRAINAGE AND FILTRATION 10' MIN. DEPTH 2 ' 3" CLEAN STONE SECTION A -A LAST REVISED_ WAL-MART STANDARD JUNE 2012 DETAIL �®1 All ® 1 fiLl MLRAFT 14ONi GEOTEXTILE FABRIC FOR SEPARATION "GRADE NOTE TO GC THE GOAL OF A CONSTRU CTION EXIT AND D ASSOCIATED WASH OUT AREAS IS TO ELIMINATE TRACK OUT. SIMPLY MANAGING TRACK OUT THROUGH GH DESIGNATED OR CONTINUAL STREET SWEEPING IS NOT AN ACCEPTABLE PRACTICE, WHILE STREET SWEEPING IS AN ACCEPTABLE PRACTICE FOR REMOVING DUST AND MINIMAL AMOUNTS OF FINE SEDIMENT, OBSERVABLE TRACK OUT FROM THE PROJECT CONSTRUCTION EXIT SHOULD TRIGGER THE USE OF ADDITIONAL MEASURES (WHEEL WASH), CONSIDERATION OF ALTERNATE EXITS, OR DISCONTINUING VEHICLE TRAFFIC. UNTIL CONDITIONS ON -SITE HAVE CE N.T: S. IMPROVED. TRACK OUT IS A SEDIMENT RELEASE. ALL SEDIMENT RELEASES MUST BE: REPORTED TO THE SWCT VIA THE ONLINE CRITICAL INCIDENT REPORT. NOTES: NOTES: NOTES i_ CONSIDERATION MUST BE OVEN TO ANTICIPATED CLIMATE AND SEASONAL CONDITIONS WHEN PLANTING SEED: I 1. THE GC !S REQUIRED TO, AT A MINIMUM, INITIATE SOIL STABILIZATION MEASURES IMMEDIATELY WHENEVER ANY 1. PERMANENT STABILIZATION SHALL BE ACCOMPLISHED IN ALL DISTURBED AREAS BY COVERING THE. SOIL WITH CLEARING, GRADING; EXCAVATING OR OTHER EARTH DISTURBING ACTIVITIES HAVE PERMANENTLY CEASED ON PAVEMENT, BUILDING STRUCTURES, VEGETATION, OR OTHER FORMS OF SOIL STABWZATION. 2 SEED SHALL BE FREE OF WEEDY SPECIES AND APPROPRIATE FOR SITE SOILS AND REGIONAL CLIMATE. SEED ANY PORTION OF THE SITE, OR TEMPORARILY CEASED ON. ANY PORTION OF THE SITE AND WILL NOT LIKELY AND MULCH PER THE CONSTRUCTION DRAWINGS AND THE 02900 PLANTING SPECIFICATION IMMEDIATELY AFTER RESUME FOR A PERM EXCEEDING 14 CALENDAR DAYS. 2- THE GC. IS REQUIRED TO INITIATE PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY UPON REACHING FINAL TOPSOIL IS APPLIED AND FINAL GRADE IS REACHED. GRADE. FOR THOSE AREAS NOT AT FINAL GRADE THAT WILL NOT BE DISTURBED FOR GREATER THAN 14 DAYS, 2. THE GC HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETE SOIL PREPARATION, SEEDING, MULCHING, THE CONTRACTOR SHOULD INITIATE TEMPORARY STABILIZATION PER THE TEMPORARY SEEDING OR STABILIZATION 3. THE SITE HAS ACHIEVED FINAL STABILIZATION ONCE ALL AREAS ARE COVERED WITH BUILDING FOUNDATION OR AND ANY OTHER REQUIRED ACTIVITIES RELATED TO THE PLANTING AND ESTABLISHMENT OF VEGETATION. THE DETAIL. PAVEMENT, OTHER LANDSCAPING COVER (STONE, MULCH, ETC.), OR HAVE A STAND OF GRASS WITH A MINIMUM GC ALSO HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETELY INSTALL NON -VEGETATED MEASURES, OF 70 PERCENT DENSITY OVER THE ENTIRE VEGETATED AREA, OR GREATER IN ACCORDANCE WITH THE IF UTILIZED. 3. THE GC HAS 7 DAYS FROM INITIATION OF STABUZATION TO COMPLETE SOIL PREPARATION, SEEDING. MULCHING, GENERAL PERMIT REQUIREMENTS- AND ANY OTHER REQUIRED ACTIVITIES RELATED TO THE PLANTING AND. ESTABLISHMENT OF VEGETATION. THE GC j 3. ALL DISTURBED AREAS MUST BE STABILIZED TEMPORARILY WITH THE USE OF FAST -GERMINATING ANNUAL, ALSO HAS 7 DAYS FROM INITIATION OF STABILIZATION TO COMPLETELY INSTALL NON -VEGETATED MEASURES, IF ! 4. VEGETATED AREAS MOST BE WATERED, FERTILIZED, AND. RESEEDED AS NEEDED TO ACHIEVE THIS REQUIREMENT. GRASS/GRAIN VARIETIES APPROPRIATE FOR SITE SOIL AND CLIMATE CONDITIONS MULCH IS REQUIRED FOR ALL UTILIZED. SEEDING APPLICATIONS, AND ALL MULCH APPLICATIONS MUST INCLUDE A SUITABLE FORM OF MULCH 5. THEVEGETATIVE DENSITY MUST BE MAINTAINEO THROUGH PROJECT COMPLETION TO BE CONSIDERED STABILIZED. ANCHORING TO MINIMIZE MOVEMENT OF MULCH BY WIND OR WATER. 4. SOILS MUST BE PREPARED BEFORE INSTALLATION OF SOD OR SEED, SEE 02900 SPECIFICATION FOR INSTRUCTION AREAS PROTECTED BY EROSION CONTROL BLANKETS ARE NOT PERMANENTLY STABILIZED UNTIL THE APPLICABLE ON. PROPER SOIL PREPARATION. GENERAL PERMIT REQUIREMENT FOR FINAL. VEGETATIVE. DENSITY IS ACHIEVED, 4. ALTERNATIVE STABILIZATION MEASURES TO SEEDING, SUCH AS. ANCHORED MULCH APPLICATION (WITHOUT SEEDING), MAY 8E UTILIZED DURING PERIODS WHEN VEGETATIVE GROWTH IS UNLIKELY (E.G. WINTER MONTHS). S AT THE COMPLETION OF GROUND -DISTURBING ACTIVITIES,. THE ENTIRE SITE MUST HAVE PERMANENT VEGETATIVE 6. RIP --RAP, MULCH,. GRAVEL, DECOMPOSED GRANITE OR OTHER EQUIVALENT PERMANENT STADIUZATION MEASURES COVER MEETING VEGETATIVE DENSITY REQUIREMENTS IN THE GENERAL PERMIT, OR MULCH PER LANDSCAPE PLAN, MAY BE EMPLOYED IN LIEU OF VEGETATION BASED ON SITE -SPECIFIC CONDITIONS, DESIGN .AND GOVERNING 5. IT IS. NOT ACCEPTABLE TO ALLOW BARE SOIL TO REMAIN EXPOSED AT ANY 71ME DURING THE YEAR, IN ALL AREAS NOT COVERED BY HARDSCAPE (STONE, PAVEMENT, BUILDINGS, ETC.). AUTHORITY APPROVAL. REGARDLESS OF WEATHER/TEMPERATURE/SITE CONDITIONS. B. SEEDED AREAS SHALLBE PROTECTED WTH STRAW MULCH, HYDRAULIC MULCH OR A ROLLEDEROSION CONTROL 7. ALL SEEDED AREAS SHALL BE INSPECTED REGULARLY TO CONFIRM THAT A HEALTHY STAND OF GRASS IS 6. ALTERNATIVE STABILIZATION MEASURES INCLUDE, BUT ARE NOT LIMITED TO: ANCHORED STRAW/HAY MULCH, PRODUCT. STRAW MULCH MOST BE TAGWRED OR CRIMPED BY DISC OR OTHER MACHINERY, AND ROLLED MAINTAINED: WOOD CELLULOSE FIBER. MULCH, SPRAY ON SOIL GLUES/BINDERS. AND ROLLED EROSION CONTROL PRODUCTS. EROSION CONTROL PRODUCTS MUST BE INSTALLED PER MANUFACTURER VE ANCEJNDATIONS. ONLY ROLLED EROSION CONTROL PRODUCTS ARE PERMITTED TO BE USED IN FLOW CONVEYANCES. 7. ALL ROLLED EROSION CONTROL PRODUCTS SHALLHAVE CURRENT ODOR(TM) STATUS ISSUED BY THE EROSION 7. ALL AREAS TO BE SEEDED MUST MEET TOPSOIL DEPTH, PH AND ORGANIC CONTENT REQUIREMENTS. AS SPECIFIED CONTROL TECHNOLOGY COUNCIL (ECTC) PLUS ANY STATE OR AGENCY -SPECIFIC REQUIREMENTS. EVIDENCE OF IN THE 02900 SPECIFICATION - PLANTING OR XERISCAPE SPECIFICATION. ODOR(TM) APPROVAL. SHALL ACCOMPANY THE. PRODUCT SHIPPED TO THE JOBSITE FOR READY IDENTIFICATION BY "THE CONTRACTOR OR AGENCY INSPECTOR. 8. FINAL SITE STABILIZATION IS ACHIEVED WHEN. PERENNIAL VEGETATIVE COVER PROVIDES PERMANENT STABILIZATION WITH A UNIFORM DENSITY GREATER THAN 70 PERCENT OVER 'HE ENTIRE AREA TO BE STABILIZED BY VEGETATIVE 8. ROLLED EROSION CONTROL PRODUCTS (NETS, BLANKETS, TURF REINFORCED MATES) AND VEGETATED AREAS COVER. THIS AREA IS EXCLUSIVE OF AREAS THAT ARE COVERED WITH ROCK (CRUSHED GRANITE, GRAVEL, ETC:) NOT MEETING REQUIRED VEGETATIVE DENSITIES FOR FINAL STABILIZATION MUST BE. INSPECTED DAILY. RILING, OR LANDSCAPE MULCH, PAVED OR HAVE A BUILDING OR OTHER PERMANENT STRUCTURE ON THEM. RUTTING AND OTHER SIGNS OF EROSION INDICATE THE SPECIFIED EROSION CONTROL DEVICE IS NOT I FUNCTIONING OR INSTALLED PROPERLY AND/OR ADDITIONAL EROSION CONTROL DEVICES ARE WARRANTED. SEEDING/VEGETATION REQUIREMENTS _ TEMPORARY SEEDING OR STABILIZATION TS PERMANENT SEEDING, SOD OR MULCHING 5 N.T.S. N.T.S. N:T.S. sox SOURCE BOX BOUNCE BOX LAST REVISED; WAL-MART LAST REVISED; WAL-MART LAST REVISED: WAL-MART STANDARD STANDARD STANDARD JUNE 2012 DETAIL JUNE 2012 DETAIL JUNE 2012 DETAIL I _ "SWPPP INFORMATION" MUST -- ----�- BE DISPLAYED PROMINENTLY WPPP INFORMATION ACROSS THE TOP OF THE SIGN, AS SHOWN IN THE DETAIL. [AP PY OF COPY OF COPY OF DENR. NCDENR WAL-MART ER OF STATE CONSTRUCTION RQVAL STORMWATER SITE NOTICE SIGN TO BE CONSTRUCTED OF PERMIT A RIGID MATERIAL, SUCH AS PLYWOOD OR. OUTDOOR SIGN BOARD. SIGN MUST BE CONSTRUCTED IN A MANNER TO PROTECT DOCUMENTS FROM DAMAGE DUE TO WEATHER cOPr of (WIND, SUN, MOISTURE, ETC.). NCDEt+R CERTIFICATE OF APPROvaI DETAILED DESCRIPTION OF THE LOCATION OFF THE SWPPP .DOCUMENTATION (BINDER AND SITE MAPS) ON THE SITE, Try -v-�i i Z g d NOTES: 1- 1 L-v T. THE SWPPP INFORMATION SIGN MUST BE LOCATED IN A PROMINENT, PUBLICLY ACCESSIBLE LOCATION NEAR THE MAIN ENTR ANCE OF THE SITE SUCH THAT THE DOCUMENTATION CAN BE READ WITHOUT ACCESSING THE JOBSITE BUT I - NOT OBSTRUCTING LNG VIEW BS T SAS TO CAUSE A TRAFFIC SAFETY AF C S ETY HAZARD, 2, ALL POSTED DOCUMENTS MUST BE MAINTAINED IN A CLEARLY READABLE CONDITION AT ALL TIMES THROUGHOUT CONSTRUCTION AND UNTIL THE NOTICE -OF -TERMINATION (NOT) IS FILED FOR THE PERMIT. 3. ALL PAGES OF NOTICES OF INTENT AND PERMIT AUTHORIZATIONS MUST BE POSTED. THE CONTRACTOR MAY UTILIZE ACCESSIBLE WATERPROOF FOLDERS TO STORE THESE DOCUMENTS IF IT WILL BE DIFFICULT TO POST ALL PAGES INDIVIDUALLY, 4, CONTRACTOR SHALL POST OTHER STORMWATER AND/OR EROSION AND SEDIMENT CONTROL RELATED PERMITS ON THE SIGN AS REQUIRED BY THE GOVERNING AGENCIES, 5. SUBSEQUENT PERMIT MODIFICATION REQUESTS OR RENEWAL APPLICATIONS AND THEIR ASSOCIATED AUTHORIZATIONS OR RESPONSES SHALL BE POSTED ON THE SWPPP SIGN. 6. SIGN SHALL BE LOCATED OUTSIDE OF PUBLIC RIGHT-OF-WAY AND EASEMENTS UNLESS APPROVED BY THE GOVERNING AGENCY. T CONTRACTOR IS RESPONSIBLE FOR ENSURING STABILITY OF THE SWPPP INFORMATION SiGN. SWPPP INFORMATION SIGN SS -- N,T.S. SOURCE BOX LAST REVISED: WAL-MART STANDARD JUNE2012 2 DETAIL FOPRAP APRONS AT PIPE OUTLETS NTH END WALL RR Wi H FAL 1p W PLAN VIEW YOX SLOPE? -GEOTEXTILE SECTOQN Y Y D -L,_- EO�SLOOP,E), L GEITEXTiLE SECTION U RCE BOX LAST REVISED: BOHLER DETAIL MARCH 2O1.3 SOU _ OUTLET NO. PIPE Die Pa I RIP RAP APRON SIZE R THICK a IN LENGTH L (F INITIAL WIDTH WITw "TERMINAL WIDTH R- 6 5 7 W 4 R-4 12 4 DEVELOPER/OWNER: 2001 SE 10TH STREET BENTONVILLE, AR 72716- 5570 479-204-1195 SITE OPERATOR/GENERAL CONTRACTOR IMPORTANT; GC MUST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. V:\13\P13019G\_CAP\LD PLANS"REV - 5\P13O190 DETAILS-5----- xAYOUF: 08- ES DETAILS Revision Date: October 28, 20T3 r■rl REVISIONS }3Y PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER. NGDENR COMMENTS GWS PER WATER REVISIONS CWSpet F.1 LL Y 6r pZ ,Y, t. E. A ♦.vow• j {e w x ipt v y l J tj/� h '{jilt J I � DRAWN H.L.H, CHECKED J.R.H.. DATE 09 09 13 SCALE AS NOTED JLT ' No NCC138113 SHEET 8 OF 24 SHEETS 2 3 4 5 12 13 i C E F G H WIRE MIRAFI GEOTEXTILE MIRAFI 140 N GEOTEXTILE FABRIC X d RUNOFF °o- INLET/OUTLET PROTECTION GUTTER WIRE ET MIRAFI 140 N GEOTEXTILE PLAN MESH MAINTAIN ACCESS TO COVER FOR INSPECTION C)NCRETE BLOCK FFI�CURB INLET -LTTERED WATER •s AGGREGATE y CONCRETE GUTTER SUB -GRADE. SECTION A -A NOTES. 1. PLACE CONCRETE BLOCKS IN A SINGLE ROW AROUND PERIMETER OF CURB INLET ON THEIR SIDES, WITH ENDS OF ADJACENT BLOCKS ABUTTING. 2. HEIGHT OF BARRIER VARIES. USE STACKS OF 4", 8", OR 12" BLOCKS, TOP OF BARRIER MUST BE LOWER THAN TOP OF CURB ELEVATIONS ADJACENT TO INLET, MAX. HEIGHT SHALL BE 24". 3. PLACE HARDWARE CLOTH/WIRE MESH W/ MAX. 1/2" OPENINGS OVER VERTICAL FACE OF CONCRETE BLOCKS. 4. THE AGGREGATE SHALL BE 3/4" 2" ANGULAR CLEAN STONE WHICH WILL SLOW THE FLOW OF WATER AND ALLOW IT TO FILTER THROUGH AND OVER THE MATERIAL BEFORE ENTERINGTHE INLET- S. IF ROAD OR PARKING AREA IS OPEN TO PUBLIC, VERIFY SUITABILITY OF BMP WITH AGENCIES HAVING JURISDICTION AND WITH CEC. MAINTENANCE NOTES: 1, INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN (IF USING INSERT -TYPE DEVICE) OR UPGRADIENT OF THE INLET. 2. REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. 3. INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW -RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4: CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES- ENSURE. THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5. INLET PROTECTION DEVICES AND BARRIERS SHALL. HE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. r� BLOCK AND AGGREGATE CURB INLET PROTECTION LAST REVISED: WAL-MART STANDARD OCTOE3ER 2012 DETAIL 3/4` WASHED N. T. S. MIRAFI 140 N GEOTEXTILE FABRIC WIRE MESH RUNOFF NO CONCRETE \-TRUCK WELL WALL -TRUCK WELL INLET A PLAN ICRETE BLOCKS TRUCK WELL WALL (REFER TO ARCH. PLANS) TRUCK WELL INLET (REFER TO ARCH. PLANS) FILTERED WATER NOTES: 1 PLACE CONCRETE BLOCKS IN A SINGLE ROW AROUND PERIMETER OF TRUCK WELL INLET ON THEIR SIDES, WITH ENDS OF ADJACENT BLOCKS ABUTTING, 2. HEIGHT OF BARRIER VARIES. USE STACKS OF 4", 8", OR 12" BLOCKS. TOP OF BARRIER MUST BE LOWER THAN TOP OF CURB ELEVATIONS ADJACENT TO THE INLET. MAX HEIGHTSHALL L BE 24". L 3. PLACE HARDWARE CLOTH/WIRE MESH W/ MAX. 1/2" OPENINGS OVER VERTICAL FACE OF CONCRETE BLOCKS. 4. THE AGGREGATE SHALL BE -3/4" - 2" ANGULAR CLEAN STONE WHICH WILL SLOW THE FLOW OF WATER AND ALLOW IT TO FILTER THROUGH AND OVER THE MATERIAL BEFORE ENTERING THE INLET. MAINTENANCE NOTES: 1, INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BA51N (IF USING INSERT -TYPE DEVICE) OR UPGRADIENT OF THE INLET. 2. REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY; WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS, DAY. 3, INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW -RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4. CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO .UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5- INLET PROTECTION DEVICES AND BARRIERS. SHALL_ BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. iP2 TRUCK WELL INLET PROTECTION N. T.S. SOURCE SM LAST RE7SEDWAL-MART STANDARD OCTOBERDETAIL 014 A 114 fAl I � / 1 1 : a f , , , a .as • •`• • •' a s' TS. visits � PLAN SECTION S'ER ICvL E T PRO TL -C TIL7 (NET TO SCALE) - LAST REVISED: BQHLER DETAIL 1. PREPARE SOIL BEFORE. INSTALLING BLANKETS, INCLUDKG AMYL NECESSARY APPLICATION OF LNE, FERTIMER AND SEED. 2 BEGIN AT THE TOP OF THE SLOPE BY MNtlLbMNb BLANtET 04 A.6" DEEP X 6' WIDE TRENCH NTH APPROXIMATELY W OF BLANKET EXTENDED BEYOND THE UP-NLOPE PORTOR DF THE TRENCH AS 4WNN IN DETAIL 2. ANCHOR THE BLANKET VAIN A ROW OF STAPLES/STAKES APPRAXIMAW 1.Y 12' APART NTHE BOTTOM OF TIE TRENCH BACkRLL AND COMPACT TIE: TRD" AFTER STAPLING: APPLY'SEEO TO COMPACTED 661L AND FOLD REMAIN IO T2' PORTION OF BLANKET BARK OVER 5EEb AND COMPACTED SOL SEINE BLANKET OVER. COMPACTED SOIL MOH A ROW OF STAPlE6/STNKES SPACED APPRDIATELY 12' APART ACN055 THE MOTH OF THE BLANKET. 3. ROLL TIE. BLANKETS (A) B OR (B..) HQMZONTATAY ACROSS THE SLOPE. BLANKETS WILL U40QU. MM APPROPRIATE SDE AGARNST TTB SOL "FACE, ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPES/STAKES IN APPROPRIATE LOCATIONS AS PER MANUFACTURES RECOMMENDATION. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED TMTH MINIMUM 6' OVERt". TO, ENSURE PROPER SEAM ALSCINMENT. PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING NSTAUED ON TOP) EVEN MATH THE SEAM STITCH ON THE PREMOUSLV INSTALLED BANKET. S CONSECUAVE BLANKETS SPLICED DOWN THE %C E MUST BE MACED END CM END (SF@NB.E STYLE) ITH AN APPROXDTATE. a' OVERLAP: STAPLE NIROJGH, OVERLAPPED AREA, APPROXIATELY T2' APART ACROSS ENURE BLANKET WIDTH. 6. PUCE STAPES/STAKES PER MANUFACTUREAS RECOWENDAAON FOR THE APPROPRIATE SLDM BUNG APPITFO. NOTLS: T BN LOOSE SQL CONMNONS,. DIE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO PROPERLY SECURE THE BL.tN m I FOLLOW EROSION CONTROL TECHNOLOGY COUNCIL SPECIMA71ON FOR PRODUCT SELECTION. EROSION CONTROL BLANKET SLOPE INSTALLATION 3Ls N.T.S. CONTACT: J.W.FAIRCLOTH 8: SON (919) 732-1244 (PHONE/FAX) PATENT If 5,820,75t NOTE: SKIMMER MAY VARY SLIGHTLY FROM ILLUSTRATION PVC END CAPS OUTLET END; k 5 TQ. A 40 PV SCHEDULE 44 PVC PIPE; WH!CH SHALL BE CONNECTED TO TEMPORARY ORIFICE PLATE IN OUTLET STRUCTURE VENT PIPE iFQR DEWATERiNG} TO DEWA : _ TO _ D'SS INLET END ORIFICE INSIDE SCREEN AND ACCESSIBLE ,¢ THROUGH. DOOR WATER ENTRY UNIT PVC ELBOW (TYP.) 'k FLOAT - "C' ENCLOSURE BARREL PIPE LONGER THAN SHOWN NOT INCLUDED WITH SKIMMER, SUPPLIED BY USER. FLEXIBLE HOSE PERSPECTIVE VIEW VENT PPE (FOR DEWATERING) SCHEDULE 40 PVC PIPE WATER SURFACE ELEVATION rl ` ORIFICE PLATE �y (ryG FLEXIBLE HOSE 50 PVC TEE 270' PLYWOOD P GUIDE ROD (2 TYP) CUSS B STONE PAD 4'X4AX1'MIN. FRONT VIEW HEAD SPILLWAY BASIN FLOAT ON ORIFICE LBMATM ARM ROCK BASK! VOLUME. SIZE ORIFICIERADIUS MINUSCO LENGTH BOTTOM NO. (CF) (IN) (W) (IN) ELEV. (FT) ELEVATION 1 53;075 1 5 . 5 3 1.0' _- 14.00 NOTES: 1.) "A' SHOULD BE 4F OR LESS WHEN THE WATER SURFACE IS AT THE MAXIMUM POOL. ELEVATION - THE ELEVATION OF THE 2 CES/ACRE DISCHARGEE, 2.) GUIDE ROPE AND STAKES SHALL BE INSTALLED FROM SKIMMER HEAD TO TOP' OF BASIN BERM. GUIDE ROPE SHALE BE OF SUFFICIENT LENGTH TO ALLOW SKIMMER HEAD FREE MOVEMENT FROM CLEAN OUT ELEVATION, TO TOP OF THE 2 CFS/AC DISCHARGE ELEVATION. FAIRCLOTH SK.IlyDAER DETAIL sK NIS SOURCE13OX LAST REVISED: BQHLER DETAIL ►� 1� S .e. * j* ,�, �I� •. a :.a,a , ��i691iaTJ1 9aaa -. r -MAINTAIN STOCK PILE SURFACE IN ACCORDANCE WITH TEMPORARY'. STABILIZATION NOTES 2:1 MAX. SIDE. SLOPES CONSTRUCT SILT DIKE AROUND DOWNHILL SIDE OF STOCKPILE TEMPORARY STOCKPILE DETAIL SP N.T.S. SOURCE BOX LAST REVISED: :DE QHLER [_ TAIL FIGURE 6.61 d Sediment Basin (with Riser Barrel Pipe) ` f TOP OF TRASH RACK _._. EMBANKMENT ELEVATION (ETE) CLASS 8 STONE PAD (4' X 4' X V MIN.) WIN BOTTOMJ FLEXISLE3 ELEVATION (BE) HOSE' TEMP. STUB ANTI-FLOATT BLOCK EXISTING - STRUCTURE LAST REVISED BQHLER DETAIL MARCH 2O13 LAST REVISED: BQHLER DETAIL MARCH 2413 COLLAR 9 j BIE Jt CUTI)FF 1 BARREL TRENCH EXISTIN OUTLET Z DEEP OUTLET PIPE (BOE) BASIN { NO. 21 (FT) Z2 (FT) TOP PROP. STRIUCT. ELEV. TES (PT) CLEAN OUT BOTTOM ELEV ELEV CITE Be (FT) (FT) --- TOP ELEV ETE (FT) I -3-3 76.50 18.00 15,00 . 14,00 SKIMMER T --- --- OUTLET.. DU\ LENGTH DU INLET i LENGTH ELEV or SAI ad ELEV SIE BI SIDE (IN) (FT) MArL (IN) (FT) MATT. (FT) (FT) 6 6 1 PVC 15 15.00 RCP 15 14.92 NOTES: 1. SEE AND PLACE MATTING FOR EROSION CONTROL ON INTERIOR AND EXTERIOR SIDESLOPES. 2. INSTALL A MINIMUM OF 3 COIR FIVER BAFFLES IN ACCORDANCE WITH PRACTICE STANDARD 6.65. 3: INSTALL SKIMMER AND COUPLING TO RISER STRUCTURE OR DIRECTLY INTO EMBANKMENT T FT. FROM BOTTOM OF BASIN. 4. THE ARM PIPE SHALL HAVE A MINIMUM LENGTH OF 6 FT. BETWEEN THE SKIMMER AND COUPLING. Figure 6.65b Coir Fiber Baffle Detail B Cross section of a porous bait#e in a sediment basin. DEVELOPER f OWNER: 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-1195 SITE OPERATOR/GENERAL CONTRACTOR: NT, IMPORTANT! GC MIDST SIGN ALL PLAN SHEETS AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. REVISIONS ; BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CWS PER WATER REVISIONS CWS :4` SIAL o CD I � 00 f U ` CV Q- LLJ J o � Cn co LLJCY Q } LJ LLJ LLJ N Q LLJ 0 O Q O Mw 'LLJI (n _- W SJ(n _ 0/L �`- L-d LOLJ CCS .LL_< m2O? (D IQ E) LLJ CD 2f SIR AM DRAWN H.LH. CHECKED J.R,H. DATE 09 09f13 SCALE --- AS NOTED JOB No_ -- - NCC138113 SHEET SW-7 9 OF 24 SHEETS V:\13\P130150\_CAD\LD PLANS\REV - 5\P130190 DETAILS-5----- >L:AYOU.T: 09- ES JETALS Pi NSVISIOn UatB ()CtobB 2B3 2013 2 3 51 5 6 7 E� fr A C F W CONSTRUCTION AREA FLOW DIKE PLAN VEIW I J 4 �1 ;161 4V�mlm Zk I iLi I :I NOTES NOTES: 1. VERIFY WITH CEO WHICH DISCHARGES FROM DEWATERING ACTIVITIES ARE ALLOWED OR ARE NOT ALLOWED 1. ALL ON -SITE TOPSOIL MUST BE PRESERVED FOR REUSE ON THE SITE DURING REVEGETATION, UNLESS IT IS NON-STOR WATER DISCHARGES UNDER E. GENERAL PERMIT M THE GENE. P RM .AND OTHER REGULATIONS, OBTAIN ALL INFEASIBLE OR UNREASONABLE 70 O0 SO. (NOTE: TOPSOIL STOCKPILING ON -SITE MAY BE INFEASIBLE 1F SPACE STATE AND LOCALREGULATIONS- SEE THE. REQUIRED DEWATERING PERMITS AND AUTHORIZATIONS REQUIRED W. IS NOT AVAILABLE ON -SITE. FOR TOPSOIL STOCKPILING. OR IF LITTLE TO NO VEGETATION IS TO REMAIN UNDER DEWATERING PERMITS AND AUTHORlZAD0.NS. TABLE BELOW. E GC COLUMNS 3 3 AND 4. POST -CONSTRUCTION CONDITIONS, STOCKPILING OF TOPSOIL AT AN OFF SITE LOCATION OR TRANSFER OF TOPSOIL TO OTHER LOCATIONS MAY ALSO BE ACCEPTABLE BUT MUST BE AUTHORIZED BY THE DEC). 2. GC MUST WAIT TO HAVE WRITTEN COPY OF ALL REQUIRED DEWATERING PERMITS AND AUTHORIZATIONS BEFORE PERFORMING DEWATERING ACTIVITIES. 2. ALL SOIL STOCKPILES MUST BE STABILIZED TO PREVENT EROSION AND FUGITIVE DUST. THE SURFACE OF THE OPERATIONS MUST BE DIRECTED THROUGH AN APPROPRIATE POLLUTION 3. DISCHARGES FROM DEWATET STOCKPILE MUST BE PROPERLY PROTECTED TO ELIMINATE THE RISK OF EROSION. SEE TEMPORARY SEEDING OR STABILIZATION DETAIL. SUITABLE ALTERNATIVE MEANS OF STABILIZATION CAN BE USED, SUCH AS PROPERLY EM PREVENTION/TREATMENT SYSTEM OF CONTROL MEASURES, SUCH AS A SEDIMENT/FILTER BAG. SEDIMENT TRAP OR ANCHORED PLASTIC TARPS. SEDIMENT BASIN, AND OTHERS, AS NEEDED, PRIOR: TO BEING DISCHARGED FROM THE SITE OR INTO A WATER BODY OF THE STATE. UNDER NO CIRCUMSTANCES ARE DISCHARGES FRO,A DEWATERNG OPERATIONS TO BE: 3. PERIMETER SEDIMENT CONTROLS ALSO MUST BE INSTALLED AT STOCKPILE LOCATIONS TO PREVENT CONTACT WITH DISCHARGED DIRECTLY INTO SANITARY SEWER SYSTEMS, STREAMS, RIVERS, LAKES OR OTHER AREAS BEYOND THE STORMWATER, INCLUDING RUN-ON. PERMITTED PROJECT AREA. LIKEWISE, DISCHARGES INTO STORM .SEWER SYSTEMS THAT DO NOT DRAIN TO A SUITABLE ON -SITE TREATMENT FACIUTY, SUCH AS A BASIN, ARE ALSO PROHIBITED. DISCHARGES FROM 4. STOCKPILES MUST BE LOCATED OUTSIDE OF ANY VEGETATED BUFFER AREAS AND SHOULD BE LOCATED AS FAR DEWATERING OPERATIONS MUST ALSO BE CONDUCTED IN A MANNER SUFFICIENT TO PREVENT EROSION FROM THE AS PRACTICABLE FROM STORMWATER CONVEYANCES AND. IMPOUNDMENTS AND WATER BODIES. DISCHARGE RUNOFF. 5. STOCKPILE LOCATIONS SHALL BE NOTED ON THE SITE MAPS. 4. IN SEDIMENT TRAP OR BASIN OR POND DEWATERING OPERATIONS, WATER MUST ONLY BE REMOVED FROM THE SURFACE OF THE CONTAINED. WATER. A SKIMMER OR SIMILAR FLOATING DEVICE MUST BE USED, TO ONLY REMOVE THE WATER AT THE SURFACE. SOURCESOX 5, DO NOT DISCHARGE ON A SLOPE GREATER THAN THREE. PERCENT NOR WITHIN 2D FEET OF A SURFACE WATER _ -CAST REVISED: WAL-MART STOCKPILES BODY, Sp STANDARD 8. DEWATERING SHALL NOT OCCUR DURING OR IMMEDIATELY AFTER PRECIPITATION EVENTS, BUT EXCEPTIONS SHALL JUNE BE EVALUATED ON CASE BY CASE BASIS. CONTACT THE CEC. AND RECEIVE WRITTEN APPROVAL 2012 DETAIL 7. DEWATERING ACTIVITIES IN THIS PROJECT ARE RESTRICTED UNDER THE NPTES AUTHORIZATION AND THE CONDITIONS OF THE CONSTRUCTTON GENERAL PERMIT. REQUIRED DEWATERING PERMITS AND AUTHORIZATIONS -� 1 2 3 4 GOVERNING AGENCY PERMIT NAME/TYPE. PERMIT NO, (GO TO COMPLETE) DATE PERMIT WAS NC I ISSUED BY AGENCY (GC TO COMPLETE) DEWATERING pw SOUR LAST REVISED: WAL-MART STANDARD JUNE 2012 DETAIL NOTES: 1. INSTALLED SILT DIKE UNiT SHALL HAVE CONTINUOUS AND FIRM CONTACT WITH PAVEMENT. 2. ADHESIVES SHALL BE LIQUID NAIL OR APPROVED EQUAL FOR CONCRETE PAVEMENT APPLICATIONS AND EMULSIFIED ASPHALT FOR ASPHALT APPLICATIONS. ADHESIVE SHALL BE PLACED WHERE THE UNITS OVERLAP AND A 20" STRIP ALONG BOTH EDGES. 3. CONTRACTOR SHALL INSPECT ALL DIKES AFTER EACH RAINFALL EVENT OF AT LEAST 0.5 INCHES. ANY DEFICIENCIES OR DAMAGE SHALL BE REPAIRED BY THE CONTRACTOR, AND IF NECESSARY, SiLT DIKE SHALL BE REPLACED. ACCUMULATED SILT OR DEBRIS SHALL BE REMOVED AS NECESSARY, IF THE DIKES ARE DAMAGED OR INADVERTENTLY MOVED DURING THE SILT REMOVAL PROCESS, THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE AS NECESSARY. ADHESIVE FLOW SECTION A -A ADHESIVE SILT DIKE _(ON EXISTING PAVEMENT) N,Ts. SDP V:\13\P130190\ CAD\LD PLANS\REV - 5\P,30190 DETAILS-5--->LAYOUT: 10-- ES DETAILS (STING CONCRETE OR PHALT PAVEMENT NOTES ,, 1. LARGE AREAS OF SOIL THAT ARE DENUDED OF VEGETATION AND HAVE NO PROTECTION FROM PARTICLES BEING PICKED UP AND CARRIED BY WIND SHOULD BE PROTECTED WITH A TEMPORARY COVER OR KEPT UNDER CONTROL WITH WATER OR OTHER SOIL ADHERING. PRODUCTS TO PREVENT SOIL PARTICLES FROM BECOMING AIRBORNE„ AND FROM EXITING THE SITE PERIMETER. 2. WATER TRUCKS OR OTHER DUST CONTROL AGENTS SHALL BE USED AS NEEDED DURING CONSTRUCTION TO MINIMIZE DUST GENERATED ON THE SITE. TACKIFIERS MAY BE USED TO HOLD SOIL IN PLACE AND PREVENT DUST. MANUFACTURER RECOMMENDATIONS FOR APPLICATION LOCATIONS AND RATES MUST BE USED FOR DUST CONTROL APPLICATIONS, ONLY SWPPP SPECIFIED TACKIFIERS MAY BE USED ON THE PROJECT SITE; ANY CHEMICAL APPLICATION NOT INCLUDED IN THE SWPPP MUST BE APPROVED, IN WRITING, BY THE DEC, 3. DUST CONTROL MUST BE PROVIDED BY THE GC TO A DEGREE THAT IS. IN COMPLIANCE WITH APPUCA13LE FEDERAL, LOCAL AND STATE DUST CONTROL REGULATIONS, 4. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. S. IN ADDITION TO BMPS, GC SHALT. PERFORM PER PRACTICES AND PROCEDURES WHICH MINIMIZE AND PREVENT AIRBORNE DUST OR OTHER PARTICLES FROM OCCURRING. _ SOURCE SOX LAST REVISED: WAL MART OUST CONTROL STANDARD DC -- JUNE 2012' DETAIL _ NOTES: i. MATERIAL STORAGE AREAS SHOULD BE LOCATED, WHEN POSSIBLE, TO MINIMIZE EXPOSURE TO WEATHER. INSPECTIONS SHALL EVALUATE DISTURBED AREAS AND AREAS USED FOR STORING MATERIALS THAT ARE EXPOSED TO RAINFALL FOR EVIDENCE OF, OR THE POTENTIAL FOR, POLLUTANTS ENTERING THE DRAINAGE SYSTEM OR DISCHARGING FROM THE SITE IF NECESSARY, THE MATERIALS MUST BE COVERED OR ORIGINAL COVERS. MUST BE REPAIRED OR SUPPLEMENTED. ALSO, PROTECTIVE BERMS MUST BE CONSTRUCTED, IF O RUNOFF FROM MATERIAL STORAGE AREAS. GC SHALL ADHERE TO ALL STATE ANDNE£bEO, TO CONTAIN LOCAL REGULATIONS PERTAINING TO MATERIAL STORAGE AREAS. 2. CHEMICALS PAINTS, SOLVENTS, FERTILIZERS, AND OTHER TOXIC MATERIALS MUST BE STORED IN WATERPROOF CONTAINERS, EXCEPT DURING APPLICATION, THE CONTAINERS AND THE CONTENTS MUST BE KEPT IN TRUCKS OR. INSIDE OF STORAGE FACILITIES. RUNOFF CONTAINING SUCH MATERIAL MUST BE COLLECTED, REMOVED FROM THE SITE, TREATED, AND DISPOSED OF AT AN APPROVED SOLID WASTE AND CHEMICAL DISPOSAL FACILITY. MATERIAL LAYDOWN AND STORAGE AREA Ls LAST REVISED: 1 WAL-MART STANDARD JUNE 2013 1 DETAIL NOTES: 1. CONCRETE WASTE MANAGEMENT PERTAINS TO WASTE FROM CONCRETE READY -MIX TRUCKS, MASONRY OPERATIONS. AND SIMILAR WASTE. 2, CONCRETE MATERIALS ONSITE, INCLUDING EXCESS CONCRETE MUST BE CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, 'WETLANDS, AND BUFFERS. NO CONCRETE OR CEMENT SLURRY SHALL BE DISCHARGED FROM THE SITE. 3. DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS IS ALLOWED AT THE CONSTRUCTION SITE, ONLY COMMERCIALLY AVAILABLE ABOVE GROUND PORTABLE CONCRETE WASHOUT CONTAINERS ARE ALLOWED AND MUST BE PROTECTED FROM VEHICLE TRAFFIC AND CLEARLY IDENTIFIED BY LEGIBLE SIGNAGE, AND MUST BE LOCATED OUTSIDE OF VEGETATED BUFFERS AND AS FAR AS PRACTICABLE FROM STORMWATER CONVEYANCES AND IMPOUNDMENTS AND WATER BODIES. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL CONTAIN AND/OR ACTIVELY MANAGE BOTH, SOLID AND FLUID, COMPONENTS OF THE MIX CONCRETE WASHOUT CONTAINERS MUST BE CLEANED OR .EXCHANGED WHEN THE REMAINING VOLUME IS REDUCED BY 85% TO PREVENT ANY POTENTIAL OVERFLOW IN A STORM EVENT. 4. ALTERNATIVELY, WASTE CONCRETE CAN BE PLACED INTO FORMS TO MAKE RIP RAP AND/OR OTHER USEFUL CONCRETE PRODUCTS. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL BE DISPOSED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS, THE GC IS RESPONSIBLE FOR ASSURING THAT THESE PROCEDURES, APPLICABLE LAWS, AND ENVIRONMENTAL REGULATIONS ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT CONTAINERS. SHALL BE SHOWN ON THE SITE MAPS. cw CEMENT AND CONCRETE WASHOUT Q LAST REVISED: WAL-MART STANDARD JUNE 2013 DETAIL NOTES: 1. PROVIDE WASH. STATION IN A LOCATION PROTECTED FROM WEATHER ELEMENTS. 2. COLLECT ALL USED WASH WATER AND DISPOSE OF IT PROPERLY. 3. PROVIDE ADEQUATE SUPPLY OF WATER AND ANY OTHER SUPPLIES TO ENSURE PROPER OPERATION OF WASH ,STATION WHEN NEEDED. PAINT AND STUCCO WASHOUT LAST REVISED: WAL-MART STANDARD JUNE 2013 DETAIL NOTES: I. SUBSTANCES THAT HAVE THE POTENTIAL FOR POLLUTING SURFACE AND/OR GROUNDWATER MUST BE CONTROLLED BY ANY MEANS NECESSARY TO ENSURE THAT THOSE DO. NOT DISCHARGE FROM. THE SITE. IN THIS REGARD, POTENTIALLY POLLUTING SUBSTANCES SHALL BE STORED AND HANDLED IN A MANNER CONSISTENT WITH THE RISK OF IMPACT THOSE REPRESENT, AND ACCORDING WITH THE REGULATIONS. 2. NO SOLID MATERIALS; INCLUDING. BUILDING MATERIALS, ARE ALLOWED TO BE DISCHARGED FROM THE SITE WITH STORMWATER. ALL SOLID WASTE, INCLUDING DISPOSABLE MATERIALS INCIDENTAL TO THE CONSTRUCTION ACTIVITIES, MUST BE COLLECTED AND PLACED IN CONTAINERS. RUBBISH, TRASH, GARBAGE, UTTER; OR OTHER SUCH MATERIALS .SHALL BE DEPOSITED INTO SEALED CONTAINERS. MATERIALS SHALL BE PREVENTED. FROM LEAVING THE PREMISES THROUGH THE ACTION OF WIND OR STORMWATER DISCHARGE INTO DRAINAGE DITCHES OR WATERS OF THE STATE. THE CONTAINERS SHALL BE HAULED AWAY FROM THE SITE AND EMPTIED WHEN THOSE BECOME 95% FULL, OR AS NECESSARY, BY A CERTIFIED TRASH DISPOSAL SERVICE. LIDS DR COVERS FOR THE CONTAINERS SHALL BE PROVIDED FOR USE DURING RAIN EVENTS TO PREVENT WASTE CONTACT WITH STORMWATER. WASTES THAT CANNOT BE STORED IN A CONTAINER MUST BE STORED UNDER COVER OR INDOORS. THE LOCATION OF SOLID WASTE RECEPTACLES SHALL BE SHOWN ON THE SITE MAPS. SOLID WASTE DISPOSAL LAST REVISED: WAL-MART STANDARD JUNE 2013 DETAIL NOTES: 1. USING WATER FROM BA SINS, TRAPS TANKS OR WATER CONTAINMENTA A F 5, .OTHER W AREAS (R IRRIGATION SUCHMINIMIZES E DISCHARGES FROM THE SITE, AND SIT MAY SATISFY OTHER NEEDS OF THE CONSTRUCTION PROJECT, SUCH AS DUST CONTROL, VEGETATIVE ESTABLISHMENT. ETC, 2, CARE -SHOULD BE TAKEN THAT WATER. UTILIZED FROM CONTAINMENT AREAS ON -SITE FOR CONSTRUCTION PURPOSES DOES NOT DISCHARGE OFF -SITE, IF DISCHARGE IS ANTICIPATED OR OBSERVED. DEWATERING PROCEDURES STATED IN THE DEWATERING DETAIL MUST BE FOLLOWED. - 3. GC SHALL IMPLEMENT IRRIGATION OR DISPERSION AS PRACTICABLE TO REDUCE WATER' VOLUME IN IMPOUNDMENTS AND TO FOSTER VEGETATION GROWTH. ID IRRIGATION OR DISPERSION LAST REVISED_ WAL-MART STANDARD JUNE 2012 DETAIL NOTES: 1. STORM DRAIN INLET PROTECTION MEASURES SHALL PREVENT SOIL. AND DEBRIS FROM ENTERING. STORM DRAIN INLETS 2. TEMPORARY CONTROLS SHALL BE CONSTRUCTED BEFORE THE SURROUNDING AREA. IS DISTURBED. 3. TO PREVENT CLOGGING, STORM DRAIN CONTROL. STRUCTURES MUST BE MAINTAINED FREQUENTLY, 4. CHECK ALL TEMPORARY CONTROL MEASURES DAILY. AND AFTER EACH STORM EVENT. S. CONTROL MEASURES MUST BE BUILT PER DETAIL AND PLANS, AND MUST BE IN GOOD WORKING CONDITION AT ALL TIMES. P INLET PROTECTION LAST REVISED: I WAL-MART STANDARD JUNE 2013 DETAIL NOTES; 1. THE GC :SHALL IDENTIFY MASONS' AREA WITH LEGIBLE SIGNAGE ON THE SITE. TO THE EXTENT PRACTICAL, ALL MASONRY TOOLS, MATERIAL, INCLUDING SAND AND SACKED CEMENT AND/OR MORTAR MATERIALS, MIX, AND EQUIPMENT SHALL BE LOCATED WITHIN THE AREA IDENTIFIED. MATERIALS VULNERABLE. TO WEATHER ELEMENTS SHALL BE STORED IN CONTAINERS AT THE END OF EACH WORK DAY; SUCH MATERIALS SHALL REMAIN STORED IN CONTAINERS WHEN NOT IN USE. 2. RUNOFF CONTROL, SUCH AS DIVERSION BERMS, SILT FENCE, SILT DIKE,. OR OTHER MEANS OF CONTAINMENT SHALL BE PROVIDED TO PREVENT THE. MIGRATION OF STORMWATER POLLUTANTS FROM THE MASONS' AREA. COVERED RECEPTACLES. FOR DEBRIS AND TRASH DISPOSAL SHALL ALSO BE PROVIDED, 3, THE MASONS' AREA SHALL MEET OSHA AND OTHER REGULATORY REQUIREMENTS .FOR PERSONAL PROTECTIVE EQUIPMENT (PPE), FIRE EXTINGUISHERS, ETC, GC SHALL PROVIDE SCREENING OR OTHER TECHNOLOGIES FOR MASONS' AREA TO PREVENT AIRBORNE TRANSPORT OF CEMENT DUST AND OTHER PARTICULATES: DUE TO HIGH SPEED WIND OR OTHER CONDITIONS. THE LOCATION OF THE MASONS' AREA SHALL BE SHOWN ON THE SITE MAPS. MA MASONS' AREA SOURCE BOX LAST REVISED: WAL-MART STANDARD JUNE 2013 DETAIL NOTES 1. THE GC SHALL IDENTIFY FUELING AREAS WITH LEGIBLE SIGNAGE ON THE SITE. TEMPORARY ON -SITE FUEL TANKS FOR CONSTRUCTION VEHICLES SHALL MEET ALL LOCAL, STATE AND FEDERAL REGULATIONS. ALL TANKS, SINGLE AND DOUBLE WALLED, SHALL BE PROVIDED WITH SECONDARY CONTAINMENT (THAT IS CONTAINMENT EXTERNAL TO AND SEPARATE FROM PRIMARY CONTAINMENT). TANKS SHALL HAVE APPROVED SPILL CONTAINMENT WITH THE CAPACITY REQUIRED BY THE APPLICABLE REGULATIONS. SECONDARY CONTAINMENT SHALL BE CONSTRUCTED OF MATERIALS OF SUFFICIENT THICKNESS, DENSITY, AND COMPOSITION SO AS NOT TO BE STRUCTURALLY WEAKENED AS A RESULT OF CONTACT WITH THE FUEL. STORED AND CAPABLE OF CONTAINING DISCHARGED FUEL FOR A PERIOD OF TIME EQUAL TO OR LONGER THAN THE MAXIMUM ANTICIPATED TIME SUFFICIENT TO ALLOW RECOVERY OF DISCHARGED FUEL, IT SHALL BE CAPABLE OF CONTAINING 110% OF THE VOLUME OF THE PRIMARY TANK IF A SINGLE TANK IS USED, OR IN THE CASE OF MULTIPLE TANKS, 150% OF THE LARGEST TANK OR 110%. OF THE AGGREGATE, WHICHEVER. IS LARGER. 2. THE TANKS SHALL BE IN SOUND CONDITION, FREE OF RUST OR OTHER DAMAGE WHICH MIGHT COMPROMISE CONTAINMENT. FUEL STORAGE AREAS SHALL MEET ALL EPA, OSHA AND OTHER REGULATORY REQUIREMENTS FOR SIGNAGE, FIRE EXTINGUISHERS, ETC. HOSES, VALVES, FITTINGS, CAPS. FILLER NOZZLES, AND ASSOCIATED HARDWARE SHALL BE MAINTAINED IN PROPER WORKING CONDITION AT ALL TIMES. TANKS SHALL BE LOCATED TO MINIMIZE EXPOSURE. TO WEATHER AND SURFACE WATER DRAINAGE FEATURES THE LOCATION OF FUEL TANKS SHALL BE SHOWN ON THE SITE MAPS. 3, A SPILL PREVENTION, CONTROL AND COUNTERMEASURE (SPCC) PLAN MUST BE DEVELOPED IF ABOVEGROUND OIL STORAGE CAPACITY AT THE CONSTRUCTION SITE EXCEEDS 1.320 GALLONS OR AS SPECIFIED BY STATE. 4, CONTAINERS. WITH A STORAGE CAPACITY OF 55-GALLONS OR LESS ARE NOT INCLUDED WHEN CALCULATING SITE STORAGE CAPACITY, THE DO SHALL WORK WITH THE CEC TO DEVELOP AND IMPLEMENT A SPCC PLAN IN ACCORDANCE WITH THE OIL POLLUTION PREVENTION REGULATION AT TITLE 40 OF THE CODE OF FEDERAL REGULATIONS, PART 112, (40 CFR 112), FUEL AND PETROLEUM �, STORAGE AND. USE �X LAST REVISED: ( WAL-MART STANDARD JUNE 2013 DETAIL NOTES: 1. THE GC SHALL DESIGNATE AREAS ON THE SITE MAPS: FOR EQUIPMENT CLEANING, MAINTENANCE, AND REPAIR- THE GC AND SUBCONTRACTORS SHALL UTILIZE SUCH DESIGNATED AREAS. CLEANING, MAINTENANCE, AND REPAIR AREAS SHALL BE PROTECTED BY A TEMPORARY PERIMETER BERM, SHALL. NOT OCCUR WITHIN 15D FEET OF ANY WATERWAY, WATER. BODY OR WETLAND, AND SHALL OCCUR IN AREAS LOCATED AS FAR AS PRACTICAL FROM STORM SEWER INLETS. DRIP PANS SHALL BE USED FOR VEHICLE MAINTENANCE ACTIVITIES AND RESULTANT WASTES SHALL BE DISPOSED OF IN ACCORDANCE NTH THE HAZARDOUS MATERIAL MANAGEMENT AND SPILL REPORTING PLAN NOTES INCLUDED ON THIS PLAN SHEET, 2. USE OF DETERGENTS FOR LARGE SCALE WASHING IS PROHIBITED (FOR EXAMPLE; WASHING VEHICLES, BUILDINGS, PAVEMENT SURFACES, ETC.). ALL WASH WATER SHALL BE DETAINED AND PROPERLY TREATED OR DISPOSED. EQUIPMENT AND VEHICLE CLEANING AND MAINTENANCE AREAS M LAST REVISED: I WAL-MART STANDARD JUNE 2013 DETAIL NOTES: 1. IMPORTANT: GC SHALL NOT APPLY FLOCCULANTS WITHOUT PREVIOUS REVIEW AND WRITTEN CONFIRMATION BY CEO. FLOCCULANTS MUST BE USED ONLY IN LOCATIONS SHOWN ON THE SWPPP MAPS, AT RATES AND METHODS SPECIFIED AND AS APPROVED BY CEC. DEC SHALL CONFIRM WHETHER TO FOLLOW MANUFACTURER DIRECTION, OR MODIFY MANUFACTURER'S DIRECTION, 2. FLOCCULANTS. SHALL BE USED AS FAR UPSTREAM OF BASINS, TRAPS, TANKS, OR OTHER. WATER CONTAINMENT AREAS AS POSSIBLE, THE EFFECTIVENESS OF FLOCCULANTS DEPENDS ON THE TRAVEL TIME AND AGITATION OF THE WATER, FOR PROPER MIXING. 3. ALL SEDIMENTATION/SETTLING MUST OCCUR WITHIN THE LOD. THAT IS. VELOCITY OF FLOW IN WATER CONTAINMENT SHOULD BE NEAR ZERO, AND THE TIME OF RESIDENCE AS LONG AS POSSIBLE. 4. FLOC BLOCKS, FLOCCULAN.T-IMPREGNATED WATTLES, AND ANY OTHER CONTROL MEASURES WHICH SUPPLY FLOCCULANTS MUST BE REGULARLY INSPECTED AND MAINTAINED, AS ARE ALL OTHER CONTROL MEASURES. 5. STANDARD EROSION AND SEDIMENT CONTROLS ARE. REQUIRED BOTH PRIOR TO AND AFTER CHEMICAL TREATMENT IN ACCORDANCE WITH THE SWPPP PLANS. CHEMICALLY -ENHANCED SETTLEING PASSIVE. TREATMENT SYSTEMS CES North Carolina DVVCi APProved PAMS/ Flocculants List UPdOW 2122/2013 (Listed in a"abeticai order) convarly Product Msu m Reeomrnanded CtxrcentratlaM Appked Porymer APB 712 59 3 ppm APB 730 5.6 APB 740 5.2 " .APB 709d « APB 703d#3 APS 706b L.M.G. Magnet 163 Powder 0.5 BP-2100 28.125 - APB 705 37. to AmlarnarK, Inc AQ100 Land surface application only at 39.7 awn Aquamark. Im A0109 Land surface appticabon at 0.1 Ashland Herctaes Wad Trail AsNand Oterge Pao 55 10 AsMand Hercules Wat6fTec b Ashlarul Latta MC 95M 10 rr19IL Fear Conwltillg PAX-CFC36A 5 ppm Cape Fear C.GIRe " CFC-4330 4.5 PPM Carodna HYDROLOC PAM Land surface application e13.0 Green " es Sod Defender Land surface a at 0.D08% HaloSGWCe,. Inc. GefFldO 2.55 HaloBource InG. LBP-2101 5m Mertes Geo prularlW TerreGuard Granular PAM 3 25ng9_ InndvatNe Turf SoluSans- IsrmroPam 200 MWL Irmo a0ve Turf Solutions Erosion Guard Powder, Erasion Guard. LogstEraskIn. Guard Fleft 2W MWL Inntrvative 7Laf: Soluaals Fl.QC 6W mgIL Leaner Meaner Greener, Inc L.M.G. Dust Magnet 281 Soluaon O;IAS% Nebo Nalco 8187 100 ppm NTU GeoScrub 10. 13, 20. 23, 34 tU ffv& NTU G*oScrub Bubbles 1 Pascirei Associates Sales. PFR P251 2S Boutlteastem Lafooretcries. SR FLOC 6026 7:S aWn Slom: Klear i 3% L' q u _Rm 9.4 mWL Terra NM I EarfMivard 000W5 HIUL 771 LAST REVISED: I WAL-MART REVISED JUNE 2012 DETAIL NOTES: 1, ALL PERSONNEL INVOLVED 'NTH CONSTRUCTION ACTIVITIES MUST COMPLY WITH STATE AND LOCAL SANITARY OR SEPTIC SYSTEM REGULATIONS, PORTABLE TOILETS MUST BE LOCATED AT LEAST 30 FEET FROM INLETS, CHANNELS, SWALES, OR .PERMITTED LIMITS OF DISTURBANCE, AND MUST BE LOCATED AT LEAST 50. FEET FROM WATERS OF THE STATE, OR WATERS OF THE U.S. PORTABLE TOILETS MUST BE SECURELY ANCHORED AND/OR TIED DOWN, SECONDARY CONTAINMENT SHALL BE PROVIDED AND FULL CAPACITY SHALL BE RESTORED IMMEDIATELY UPON DISCOVERY OF ITS DIMINISHMENT, THE LOCATION OF SANITARY FACILITIES SHALL BF SHOWN ON THE SITE MAPS. Q SANIT_ARY FACILITIES LAST REVISED: I WAL--MART STANDARD I JUNE 2013 DETAIL NOTES: 1, THE TEMPORARY PARKING AND STORAGE AREA SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE PERIODIC TOP DRESSING OF THE TEMPORARY PARKING AREA AS CONDITIONS DEMAND, TP TEMPORARY PARKING __ 8<NdRCE Box_--� LAST REVISED: WAL-MART STANDARD JUNE 2013 DETAIL NOTES: 1. CONTRACTOR SHALL PROVIDE DESIGNATED LOCATION FOR SORTING AND SEPARATING HAZARDOUS. WASTES 2. HAZARDOUS WASTE STORAGE MUST BE PROTECTED FROM WEATHER ELEMENTS AND HAVE RESTRICTED ACCESS. 3. HAZARDOUS WASTE STORAGE MUST COMPLY WIN LOCAL, STATE, AND FEDERAL REGULATIONS. 4. HAZARDOUS WASTE STORAGE MUST COMPLY WITH CONTRACT DOCUMENTS. HAZARDOUS WASTE DISPOSAL LAST REVISED: ANAL -MART STANDARD JUNE 2013 DETAIL DEVELOPER/OWNER: 2001 SE 10TH STREET BENTONVILLE, AR 72716-5570 479-204-1195 SITE OPERATOR/GENERAL CON Is IM PMTANT. GC MUST SIGN ALL PLAN SEEM AND ANY NEW PLAN SHEETS ISSUED BY THE CEC. REVISIONS BY PER CITY COMMENTS CWS PER OLIT TO BID CWS PER ARCH. COORDINATION CWS` PER NCDENR COMMENTS CWS PER WATER A REVISIONS CWS w gg >0 9 z s W� og PIla 0 g y a� a x...... Fir01 0 is x t W e9.. r a 0 x V + sfes+�ik �Q4tie �o<.iy gEdl IN / t Z CD O � 00 O U cl� CL 1\ __J W W < Q w w" Q LLB z V) < J l� L' Iy) ( mT_ 3:(n i-- LL3 Q LLJ W Q z _ C) LLI LL_ Q LLj m z 0 =2: (.7 Ln >- I I- LL1 `"� CD0) W z v cat m AM Ah DRAWN H.LH. CHECKED J.R.H. DATE as/Ds %13 SCALE AS NOTED JOB NO. NCC138113 SHEET S W 10 OF 24 SKEETS i Kevision Uote: UCtober 28, ZU16 a a 3 4 ( 5 6 7 8 9 13 a w c 1 E F G n I i I PHONE 90TT0M OF WIRE — IRE UP HFJGHT 122 I S4N Mil 1 FRAEff S54'17'1B'E 0.75' SfE77 _i \_ _ f� RIM 16 T3 INV A:=10. 11 BUILDING TO RCMA' FOUNDINV B=9.B8 .. E INV C=983 rg kt a !s CONG CURB W/1.J' GUTTER fiw 6 ... i RIM t675 15. IRON PIPE F01JND� INV 9=10,75 FIBER OPnc M4Wj t CITY OF NUP �/— GRAM- INLET ' i M EW B£RN f>E/GWT=70" i �. � � '� UTltf7Y EASEMDVT R/M=1682 0.8. 2746 PC 284 STREET bVHrj A WITHOUT EXPRESSNG A LEGAL 0PNlON AS TO THE OWNERSHIP OR 26GIL ry. I N41VRE OF THE POW&C GAP, THIS SURWMR MS OBSERVED A POSSIBLE CAP OF AOJOINER TO SURWY PARCEL AS SKJNW HEREON 1-STORY BRICK ED BGNLDLNG AC UNIT (TYP) . .ANT Pl'- ` • FOUND i 1,Pl sP4 .. ELEV=16, q��D £LEY=17.07 I v.. I REV=1d22 GoA ' B2 93 x , H£ADW.t i i > S 21 " RCP ELEV-1825 ' ELEY=t766 ff4/--11.36 i BOTTOM OF WIRE ( O #T R HEIGHT=.i l9, I W�i7fR WV 448KfR - if i !t L, UP 160J- HEIGHf126' :Ik , FIBER OPTIC _ Spi $ ELEV=18.45 J �I'" PROX LOG. UG. WATER •, G. , ,. 'BlIT70M C)FWJRE I I I I 1 �� ~ HEtGHl't27 ` I * 95 oi 86 . < ..? . ?..... ; ;. >'; •+::' °'�P2 HEADWALL- , fO t ELEY 17,18 ELEY--16.82 ' EIEY=76 /4 ma 21 J6 .INV=! L11. 36 lNK P£NGE 84 115 L,F 24' RCP 01.9XI i I t.Fl � s �i Fl li 1 I ELEV=tT.39N.,� UP ,IP6 .7 6 HEG11T=.i70 1 I r r ... " RJSE7 �, ` ` `` ` •r _ r "'' ' ` L HEIGHT=32 us 12" II ySW floo-\ ji � � Ra � HIGH WATER S/CN� per- ) I A'RPX LOG. UG 30 B7 WATER i BENCHMMr'X ii j ELEV-J774 &9 BOX CUT I k� ,• "`� _ ,} AF £LEU=16.55 ETEV 2020 t j.. �. ...- .. €lv=172s l TIONAL GLARD SIGN - I r { U20' G" UTKIYY E4SEWAT !f I P \ 0 115 01 1-sr51 r BRICK ♦ � ELEV1709 EL ==V-1637 ET ElL 16.00 BUILDING E _ � 1P f6 5 IR PIPE F D AC UNIT ,.t w,5yIN M I,. APPROX.LOG. U.G 6' WATER-� r„� - JO' DlE4JNAGE & UFlEITY £fiSEMENT . '•-� t P /52-7 R} -i5. 9 PC D PG 661 DRAT£ IMET s� . PINCH PIPE FOUND ` RIM-16.92 UP 1---- 171. 1 CO R (FILLED W/OEBRIS) 1E16Wi p I 18' RC RM! SB.12 .�,=."s A 14TER64nV d4R#fR —� o ORHEAOWALL Tg j INV-14.80 wu /W=10 ♦+.`... - --'W W _ N---__W�-- 8(fTTO{t OF WIRE 21' RCP \ ---W._-----M--'� W.� r- ..+� -,Mi- (W-r— W W.�,w'`.�." �.N P HEXYT=118' 1NV=1290 W--�---��W W -^-' PNON£ BOX. � N£IGNT=i-43' _ UP W/TRANS 401 HEIGHT, - 22' Rl, 1G8J .. 1 _ .. Bo cur =17_65 APPROX. LOG. ((G. WATER VrV',•3\P130190\ CAD\LD PLANS\REV - 5\P130190 5TE-5----- >LAYOUT: 11- DEMO !W=14'.W ATE IAKET < r - .... ..._ { 0 I Mf=rz02 1 {f7LL£D W/OEHRS) lO I r . I I r , NAT1f1NAL CEMETERY UP AXmd-� HEIGHT t39' 1 II I � Ii a �Ii wit I I I UP m0/ w I I I HEIGHT=128' Ii STREET LIGHT . I �i _ l lifICHT .t18 it Z:p II { cxi ` i tCOD it GRATE INLET I RW=16.02 I t� ;! INV=11.07 !' X J � 598 it L it it ,r�ICBOx o it Er �iI t n I III m . ll r it � 11 SREED LAIT SIGN B (35 MPH) pp 7E' INLET RhV-1647 r, 1W A=1258 IW 8=1226 SI23p c f14 LF 18 I' RCP i II BOTTOM OF OF WE L o ( J to STREET LIGHT (EIGHT=t30" STOP SIGX' V jF 1 1 BEFORE YOU DIG! GALL 1-800-632-4949 N.C. ONE —CALL. CENTER IT'S THE LAWI DEMOLITION LEGEND �A EXISTING TO DE REMOVED ® EXISTING TO REMAIN (1 EXISTING TO BE RELOCATED (SEE ASSOCIATED PLANS FOR POINT iJ OF RELOCATION PROTECT EXISTING STRUCTURES, UTILITIES AND/OR TREES DURING WORK. CONTRACTOR TO REPAIR/REPLACE IF DAMAGED OREMOVE SECTION OF CURB FOR INSTALLATION OF TEMPORARY SEDIMENT TRAP O LIMITS OF SAWCUT AND PAVEMENT REMOVAL ©EXISTING LIGHT POLE AND BASE SHALL REMAIN. CONTRACTOR SHALL REPLACE LIGHTING FIXTURE AS WELL AS REMOVE THE PAINT ON THE EXISTING BASE AND RE PAINT THE EXISTING BASE TRAFFIC YELLOW PAVEMENT REMOVAL Q LINE LEGEND EXISTING PROPERTY BOUNDARY EXISTING LEGAL. ROW EXISTING ADJACENT PROPERTY LINE EXISTING TREE LINE - - EXISTING CURB TO BE REMOVED EXISTING STORM SEWER LINE EXISTING SANITARY SEWER LINE T T T EXISTING TELEPHONE - ---m{-..- .. OH __---Ot'--- EXISTING OVERHEAD ELECTRIC EXISTING CONTOUR W/ELEVATION ---- - - - - - - - - - - - - - - - - PROPOSED SAWCUT UNE Q SYMBOL LEGEND ,or EXISTING HYDRANT 0 EXISTING WATER VALVE 0 EXISTING TREE EXISTING TREE TO BE REMOVED 0 EXISTING SANITARY MANHOLE ® EXISTING STORMWATER INLET 0 EXISTING STORMWATER MANHOLE SEE NOTES SHEET FOR DEMOLITION NOTES DEfVIOLMOA PLAN GRAPHIC SCALE ( IN FEET ) 1 inch _ 40 ft. a REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CWS PER WATER REVISIONS ! CWS i 4 SEAL ' CD CD 2 I 00 0 u CN d W J W Q tip F— i W LLJ N LV Z U) LJ f� LLJ 0 m m 0 F— < _ O w (� Lj Z uI � Z F-- EK m O : O t --I CD Lil z m' c'j ~ c < � GO LA' C.I m DRAWN CHECKED J.R.H. DATE D9 09/13 SCALE AS NOTED J 8 No, NCC138113 SHEET DM-1 11 OF 24 SHEEIS Kewsion Uate: Uctobe 28, 2013 1 2 I 3 I 4 I I�,1.. . . n, .l,:,. • '_'J 5 I 6 I 7 1 8 I 9 10 12 13 Im v-sraRr m M4ME BU11W G WTHOUT EXPRESVW A LEGAL aPTNLOx C AS TO THE OWNERSHIP 0 LEGAL �& NATUR£ OF THE POSSHE GAP THS SURVEYOR MS ORSERWO A POS57ME OAP OF AALWR TO SURVEY PARCEL AS SHOWN MCFrOM I-SroRY BMW BULLOlNG E A G u 1� I g r ft 1 wu � 1 , SHED _ _ _ p W ti I "X X X X )( X — ono z n— _.------------- 7 -------- IIII x IIII-- iPARKING k4 RESERVE -.. 11 I x" f6 �5) UK�III D.B. 2746 PG 284FITITID: — : - I lit, _ (� 7U I e , r 1. t f. v .c x _ s !? y m if Cif- Y l '.� ... } i +.. s.. .. sit,; , .+ + + .� + ., _ .t + ♦ z. + i ... ri y n r t + . I a*, I x� C t +,� 4 « t § v. + a 4�. +.:.,} + T 4 + i t't 4 , l tr , S i'••i rv.,: I t r s x + X - f + . c t + { _ +m a + r�i _ -. + + } } I FN I J i V V �CPOSED PYLON 9K9N 8 .;. „ ` „' :.-«M _«--.:.=af. . , z " + (SEE. ARCH. PLMIS) x - u. Orr/ , ,. ' a GIN i + LANDSCAPE �- . } { ; + .;,3"x ` : ,«:. i.;. zx z., ;,,F- , «-''s: s• ,- ' +FR T YARD BU R 3'C '>.sl. ,_ - rq _ , - .,. ;,: • ,'-31 s , ' r : 3 . + y SETBACK. x 1 I% III I 17 *x f F + a+ I 1' x s _ }AR SETBACK ~ , I X +«, SEE PLANS PROVIDED y - BY RAMEY KEMP .TM � «`� „• ,� �,w,; _ ,., � �. � w ASSOCIATES FOR ALL • - _.: N-�, ,,, n -*<;.: ,,,, , _ „ s, .q OFF —SITE IMPROVEMENT' 10 .. { ,. u I � 7C � k C yz a`. _._-_. .. .}. . .. ... SSA { r rx _ Iar 1inga u -r " ss .=, �„ .c.«-,»L�•:� ...4�x��,s-`,;: } 6 1 20' UTItITI' Ex t z F — _ Y ♦ — 1. ? 1,. , } + s1 F +- x •�' ,. .,- . + ). 1 -r4 , t t + /. + i f .r Y /,. I. x }< r � . ' 30' 0%ff4GE & UTKT7Y -ENT x / P.C. D 6ff1 �// /) "�,_ X + ` m� PARKING IN RESERVE / / • �f _tn:�.'a. 'F yTsc' 0 `� -mod m (14 SPACES) _OH + I + +y �—X X X XOH , c� 0 LINE LEGEND I EXISTING PROPERTY BOUNDARY EXISTING LEGAL ROW - - - - EXISTING ADJACENT PROPERTY UNE — — - - - — EXISTING EASEMENT — — - - - — PROPOSED EASEMENT EXISTING TREE LINE EXISTING TREE LINE TO: BE REMOVED — — — — — — — — — — — — — PROPOSED SETBACK PROPOSED CURB - PROPOSED FLUSH CURB ---.==: X X X PROPOSED 6' CHAIN LINK FENCE PROPOSED GUIDE RAIL -- .... .. ...._.. __._ EXISTING CURB TO BE REMOVED C: ' s 0 SYMBOL LEGEND 'Cr EXISTING HYDRANT 0 PROPOSED CLEAN -OUT CO PROPOSED MANHOLE PROPOSED TYPE 'C' INLET ® PROPOSED TYPE 'M' INLET PROPOSED A.D.A. RAMP E3'0 PROPOSED LIGHT FIXTURE(S) PROPOSED STOP BAR PROPOSED SIGN PROPOSED PIPE BOLLARD ® PROPOSED CONCRETE WHEEL STOP 1 rj PROPOSED PARKING SPACES PROPOSED CROSSWALK PROPOSED HANDICAP PARKING SPACE PROPOSED HEAVY DUTY CONCRETE PAVEMENT - • - PROPOSED HEAVY DUTY ASPHALT . .. PAVEMENT PROPOSED FULL DEPTH STANDARD DUTY ASPHALT PAVEMENT BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAWI F� 6 SITE LOCATION MAP SCALE: I"=2000` SITE / RECORD PLAN Is 1. THIS PLAN REFERENCES DOCUMENTS AND . INFORMATION BY: a. BOHLER ENGINEERING.INC, - 22638 DAVIS DRIVE, SUITE 250 STERLING, VIRGINIA 20164 ENTITLED' BOUNDARY & TOPOGRAPHIC SURVEY' PREPARED FOR, WALMART STORES. INC. FILE NO. SNCC138113 DATED: 8/15/13 2. ALL ELEVATIONS SHOWN ARE IN ACCORDANCE NTH THE REFERENCED SURVEYOR'S BENCHMARK AND .MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUNDBREAK. 3. OWNERS: JAMES 0. MORTON, JR. AND WIFE; REBECCA P. MORTON APPUCANT: WAL-MART STORES EAST, L.P. 2001 S.E. LOTH STREET, BENTONVILLE, ARKANSAS, 72716--0550 4. PARCEL DATA. D.B. 1648 PG, 0608 PIC. 8-240035-A S. THE PROPERTY IS LOCATED IN OTHER AREAS ZONE X (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN), 6, BASED ON THE DRAFT PHASE I ENVIRONMENTAL SITE ASSESSMENT, PREPARED BY SME, DATED 8/6/2013, A DRAINAGE DITCH LOCATED ALONG THE SOUTHWESTERN PROPERTY BOUNDARY LINE WAS NOTED TO HAVE CONDITIONS CHARACTERISTIC OF A JURISDICTIONAL WETLAND, HOWEVER THIS WALL NOT BE IMPACTED AS A RESULT OF THE PROPOSED DEVELOPMENT, 7,. THE SITE IS LOCATED IN THE NEUSE BOULEVARD CORRIDOR AND SHALL MEET THE REQUIREMENTS OF SECTION 15-465 OF THE LAND USE ORDINANCE. 8. PROPOSED CROSS -ACCESS EASEMENT IS PENDING EXECUTION OF AGREEMENT WITH ADJACENT PROPERTY OWNER. 9. THE ESTIMATED TRIPS PER DAY IS 5,830 TRIPS, SITE DESIGN REQUIREMENTS ZONED: C-3 COMMERCIAL DISTRICT GROSS SITE AREA (TO TITLE UNES): REQUIRED PROVIDED MIN, CONTIGUOUS SITE AREA:. 5,000 SF 320,647 SF .MIN. LOT WIOTH 100.0' 436.7' MIN. FRONT YARD SETBACK: 25,0' 50,7' MIN. SIDE YARD SETBACK: 10.0' 106.0 MIN. REAR YARD SETBACK: 100 139.8' MIN. GREEN SPACE (PERVIOUS): 1510% 42.3% MAX. BUILDING HEIGHT; 35.0' t35.0' PARKING REQUIRED = 1 SPACE PER 200 SF OF GROSS FLOOR AREA (41.117/200 = 2G5.6 = 206) (PARKING BASED ON USE 2.110 HIGH —VOLUME tRAFFIC GENERA 7701V (NC'DOT STANDARD) PROVIDED - 165 (VARIANCE REQUIRED) LOADING REQUIRED = GROSS LEASABLE AREA OF BUILDING: 20,000 - 79.999 SF = 2 SPACES PROVIDED = 2 SPACES (GLA = 41,117 SF) < SEE NOTES SHEET ` FOR SITE NOTES [ ZONING PLAN GRAPHIC SCALE 40 8a ( IN FEET ) I inch = 40 ft. REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH, COORDINATION CWS PER NCDENP, COMMENTS CWS PER WATER REVISIONS CWS � P4 gg -00 > Y 4�2 Egg ii M �z. 'Z fi G1 Wig `47 zir++r♦ 44 Mn( 0 0 Y4 A Y ,zz i z m Jil ow Z 0 Z `�, *1 C s, (� I I t•It.mw r, E3,3t Ot 01 �4. TEAL - 036309 �. �.l�V�ilV �e Y,��t�xS,•y, C) O � CD ;7 co O _} Lid LzLJ n Nf LLJ V C ) VJ t1— > w W Q� J orLLJ VO I_ 'Q 0 o m m o 1— ~ O w 3 Z V) Z (J-) LLJ F a L1J LL Of Q w Cn m Z 0 0 I Ln >_ — I -- f — J CD < CD z (N mAlm DRAWN H.L.H. CHECKED J.R.H. — DATE 09/09 13 SCALE AS NOTED JOB NO, NCC138113 SHEET C - 1 12 OF 24 SHEETS V;A13\P130190\-CAD\LD PLANS\REV - 5\P130193 SI !:-5---->LAYOUT: 12- 70 SITE .. 1 r Kevision Date:. October 28, 2013 I 1 i-S7tb4Y fRAM€ BUtLDtAtG fx�rCt.'s f yC ei tr1X �ZE '. . — hWON- N9THOUT IXPRES5lArC A LEGAL OP AS TO THE OMERSHTP OR 1£GAl F THEE POSSME GAP THI k4TURf. U S SURVEYOR HAS OBSERVED A P0550F GAP OF AOJWR TO SURVEY PARCEL AS SHM HEREON, 7-STORY K BRIG BUaDrvc r -STRr BRIOx BUIU N6 ��k l R 1 SHED- ------------- x - X--------- 68?09 X--'—'—!--,---__-----_--- --___� a I' _ PARKING IN RESERVE vf I u ulr ubN ®_ (6 AGES) III 49.6 2746 PC. Z84 > . - -� _ TMiIEEOLP� UTE _ I + + 1DP IYP. i Y a t e y PROP. GUIDE+ RAIL++ . < , - . iF Y= vk d i Pd . + y t + + F } f k t ? x O + t . µ + , , . e +,. e •� +, 9r d. 4 10 - _ { , , } 19 a gg X gpig 18 - (SEE N PROP 6 CHAIN LINK :k, , ....,, t �,;: , z^-LL rYARD � sFENCE &GATEG dsy « _ 7APE ..- ,LAND .. : BUT SE H ACK ,,, ,, � = _ 19 , , a . I I I I p *I psi .. wt rm 1 - e 'rns i�i( 3 M (� D EAR YAR #t . + 1 a r , • + {. + X 1390 " q 4 } I M T p s x w� o A �y h lip � ct . p V t. . , .., . .. '' _ �`2` s'•.'s r r s,s -1w � ire . r ; ;' ...�L.-.*. , f O _ G G �_ - _ 9)ci } - i A ?G' urnlTY Ens IrEN Ft v y d +,. ... r } I - , PROP. GUIDERAIL ��.......-L.L.)•G� I J0' DRAWAGE & VN11Y NT / ••_ r>m _ .. *o PARKING IN RESERVE - Sweix -•'E}- v'i I X .. o two pop OH PAINTING STRIPING LEGEND SWSL/4" SINGLE WHITE SOLID LINE / 4" WIDE SYSL/4" - SINGLE YELLOW SOLID LINE / 4" WIDE EACH DYSL/4" - DOUBLE YELLOW SOLID LINE 4 WIDE EACH SYSL/1D" - SINGLE YELLOW SOLID LINE / TO- WIDE SWDL/4" SINGLE WHITE DASHED. LINE / 4" WIDE - SBYL/4" - SINGLE BROKEN YELLOW LINE. / 4" WIDE SWSL/24" - SINGLE WHITE SOLID LINE / 24` WIDE 0 SYMBOL LEGEND t7 EXISTING HYDRANT PROPOSED CLEAN -OUT t PROPOSED MANHOLE PROPOSED TYPE 'C' INLET PROPOSED TYPE INLET PROPOSED A.D.A. RAMP PROPOSED LIGHT FIXTURE(S) PROPOSED STOP BAR PROPOSED SIGN • PROPOSED PIPE BOLLARD ® PROPOSED CONCRETE WHEEL STOP PROPOSED PARKING SPACES PROPOSED CROSSWALK PROPOSED HANDICAP y9� PARKING SPACE PROPOSED HEAVY DUTY CONCRETE. PAVEMENT > • PROPOSED HEAVY DUTY ASPHALT PAVEMENT PROPOSED FULL DEPTH STANDARD DUTY ASPHALT PAVEMENT 0 LINE LEGEND EXISTING PROPERTY BOUNDARY EXISTING .LEGAL ROW - - - - EXISTING ADJACENT PROPERTY LINE — — - - - — EXISTING EASEMENT — — - - - - PROPOSED EASEMENT EXISTING. TREE LINE -.,„.. .. .... _: EXISTING. TREE LINE TO BE REMOVED - - - - - - - - - - - - - PROPOSED SETBACK PROPOSED CURB ---- PROPOSED FLUSH CURB —X—X—X— - PROPOSED 6' CHAIN LINK FENCE PROPOSED GUIDE RAIL. EXISTING CURB TO BE REMOVED 1 «« ... BEFORE YOU DIGI CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE L Awl SEE PLANS PROVIDED BY RAMEY KEMP do ASSOCIATES FOR ALL OFF -SITE IMPROVEMENTS I 2 I j U SITE LEGEND ®6" WIDE FIRE LANE STRIPING PAINTED TRAFFIC RED W/ "NO PARKING FIRE LANE" PAINTED WITH 4" HIGH WHITE LETTERING AT 25' O.C, SEE DETAIL SHEET, �. AREA STRIPED AT SYSL/e AT 45- 0 2'-0" D.C. PEDESTRIAN CROSSWALK WITH 6" WIDE PAINTED WHITE STRIPING PARALLEL TO DIRECTION OF �J TRAFFIC AT 2'-0' O.C. AND (1)-8- WHITE STRIPE PERPENDICULAR ON BOTH ENDS UNLESS NOTED OTHERWISE- SEE SITE PLAN FOR DIMENSIONS. PEDESTRIAN CROSSING SIGN (TYPICAL) AT PEDESTRIAN CROSSWALKS AS NOTED ON PLANS. "YIELD" PAINTED WHITE ON PAVEMENT; TYPICAL. SEE DETAIL SHEET. Yrl CONCRETE JOINTING AND FILLERS TO BE COMPLETED PER DETAIL (TYPICAL OF ALL EXTERIOR CONCRETE EXCLUSIVE OF ARCHITECTURAL CONCRETE). ©EXIT PORCH. SEE ARCHITECTURAL PLANS FOR EXACT :SIZE, LOCATION FOR STOOPS, STAIRS AND/OR RAMPS THAT MAY BE REQUIRED. RAMP PAVEMENT FLUSH WITH THE TOP OF STOOP. 6"0 PIPE BOLLARD TYPICAL UNLESS NOTED OTHERWISE. SEE DETAIL SHEET. OAT GRADE OVERHEAD DOOR LOCATION. SEE ARCHITECTURAL PLANS FOR EXACT SIZE AND LOCATION FOR. COORDINATION WITH CIVIL PLANS. J 4" WIDE x 130' LONG YELLOW PAINTED TRUCK ALIGNMENT STRIPES TYPICAL, O 16' X 42' CONCRETE COMPACTOR PAD AND 16' X 42' HEAVY DUTY PAD (ORIENT FOR L"J TRUCK LOADING. REFER TO ARCHITECTURAL PLAN FOR EXACT LOCATION AND SLOPE. ©CONCRETE TRANSFORMER PAD. CONTRACTOR TO COORDINATE WITH LOCAL POWER COMPANY FOR DETAILS. ® ACCESSIBLE PARKING SPACE TYPICAL. SEE DETAIL SHEET FOR ACCESSIBLE PARKING SPACE SIZE SIGN AND SYMBOL "VAN" -INDICATES VA ACCESSIBLE SPACE. ( N) PAINTED ISLAND TYPICAL UNLESS NOTED OTHERWISE. STRIPES SHALL BE PANTED SYSL4" � P /"1 AT 2'-0" O.C. PERPENDICULARS TO THE PARKING SPACE.. SEE DETAIL SHEET. E E O " ' O 8-GWIDE PEDESTRIAN CROSSWALK, SEE DETAIL SHEET. EE . CART CORRAL TYPICAL SEE DETAIL SHEET FOR CART CORRAL DETAIL. (SAM'S CART CORRAL LOCATIONS ARE FIXED AND MUST BE CONFIRMED WITH SAM'S MANAGEMENT). 10' X 15' STRIPED AREA PAINTED SYSL/4" AT 45- 0 V-.0" O.C- AT JIB CRANE LOCATION. SEE ARCH, PLANS. 3' BUFFER - REFERENCE CONCRETE SIDEWALK DETAIL. SEE DETAIL SHEET. - NOT USED S 18" CONCRETE CURB 6" RE VEAL TYPICF.L. SEE DETAIL SHEET, Q ( ) Ll ARROW PAVEMENT MARKINGS TYPICAL. SEE PLAN FOR TYPE, SEE DETAIL SHEET. BUILDING SETBACK LINE PER ZONING ORDINANCE. "NO PARKING FIRE LANE" SIGN. SEE PLAN FOR LOCATION, 3' HD CONCRETE BUFFER. SEE DETAIL SHEET. - NOT USED TLE STRIPING. SEE DETAIL SHEET. - NOT USED Y "NO TRUCKS" SIG N. GN. SEE DETAIL SHEET_ -NOT USED "TRUCK ROUTE" SIGN. SEE PLAN FOR LOCATION. "STOP" SIGN. TYPICAL. SEE DETAIL SHEET. ADA STALL, LANDSCAPE ISLAND WALKWAY, & CART CROSSOVER. SEE. DETAIL SHEET. HIGH TRAFFIC AREA END CAP ISLAND. SEE DETAIL SHEET. - NOT USED �d INTERIOR LANDSCAPE ISLAND, SEE DETAIL SHEET. STOP BAR. TYPICAL. SEE DETAIL SHEET. OPTIONAL MOVEMENT LANE CONTROL SIGN. SEE DIRECTION INDICATED AT SYMBOL. SEE DETAIL SHEET. - NOT USED ISOLATION JOINT TYPICAL AT FIXED STRUCTURES (BUILDINGS, RETAINING WALLS/DOCK WALLS, DROP INLETS, MANHOLES, LIGHT POLE BASES AND BOLLARDS). SEE DETAIL SHEET, 0ADVANCED INTERSECTION LANE CONTROL SIGN. SEE DIRECTION INDICATED AT SYMBOL. SEE DETAIL SHEET. NOT USED \ l ACCESSIBLE "SITE ARRIVAL POINT". SEE PLAN FOR LOCATION AND LIMITS. - NOT USED �J 6' LONG STRIPE WITH 18 GAPS - TYPICAL. 6'x6' PAINTED STRIPED AREA CENTERED ON SIPHONIC BREAK STORM MANHOLE. 4' PAINTED J SOLID TRAFFIC YELLOW STRIPES 18" O.C. ®. 45'. SEE DETAIL SHEET.. O PROPOSED CONCRETE SIDEWALK. SEE DETAIL SHEET. Q RETAINING WALL WITH GUIDERAIL. SEE DETAIL SHEET SITE ANALYSIS TABLE NEIGHBORHOOD MARKET 41,117 S.F. PARKING (ASSOCIATE AND CUSTOMER) 159 SPACES ACCESSIBLE 6 SPACES TOTAL PARKING 165 SPACES RATIO 4.01 /11000 S.F. *CART CORRALS 6 CORRALS /6 SPACES *PARKING SPACES OBSTRUCTED BY CART CORRALS ARE NOT INCLUDED IN OVERALL PARKING RATIO. SEE NOTES SHEET FOR SITE NOTES SITE PLAN, GRAPHIC SCALE ( IN FEET ) I inch = 40 ft. REVISIONS i BY PER CfT'f COMMENTS CWS. PER OUT TO BID CWS I PER ARCH. COORDINATION i CWS PER NODENR COMMENTS t GINS PER WATER. REVISIONS CWS J LL M DRAWN H.LH. CHECKED. J.R,N. DATE os os 13 SCALE AS NOTED JOB No, NCCT V:\13\P'30190\-CAD\LD PLANS\REV - 5\P13D190 SiTE-5----- >LA.YOUT: 3- SlT KEVf510Xf UOte` {7CC05Er 2$, 2013 l_i. . ]. _ I e_. a_a�i.l_ _�..__ W : ,.. ,. -..i: `.'. "-•: L! .-e8 ]L e::'. ii i.:-1 , L�...L �-.�n I I 1-srrRr � Ek4dlE S54'17'J8£ ✓ tF` SHED \_ _ /'•! ,4tlrLDJNC TO REgAR FOUND -17 SEE UTILITY 18 r r , NOTE #35 -i( X X )( )( r PROP. EW03. 18 15 11 IF 24 HOPE ® 1.0% ^ INV.QUT=14.93 -:15. 1.8 , `r} 2 PROP. EW05 13 LF 15S' HOPE 4 0.5% 70 �' INVOUT=14.89 PROP. OUTLET , PROP. E1N04 ` PROP. HEADWALL STRUCTURE IN40UT=1t.70 INY.IN=15.00 7NVOUT=15.00 yy GRATE INLET SEE DETAIL RIM-1S82 PROP PERMANENT BAFFLE TOP ELEV. SET AT 16.00 - - ------„�"".,° 0 SEE WIFE FIBER BAFFLE DETAIL 33 L 15" HDPE 1.0% A 20 BC 15.8 08,30 - .. f X-PROP, MHOI 66 LF 15' HOPE A 10% " RIM=19.0D - 177 LF 8" PVC INV.IN(A)=12,10 - 01.0X MIN. INV DUT=12.0Q A � PROP. MQ2 • H X . RIM=19.50 INY.NN. /2.86 : A 1. r s ^r, Y 9 i t x 133 LF $" PVC BC 19.16 BC 19.1 x yJ m 7.0%. MIN. CX1T 6 50 , .a. 4 ROOF DRAIN olilill; Oil x SEE ARCH 7 x, _ { } @ 1,0% MIN.. J ST7TR)' -�x I 1 _ X E j I s `= FNVOUT=79.20 BRCK 1 BU{LDiNG I i. e.'«.'' - ., :�,-,..:";7. (SEE ARCH-} BC 21.00 I I T s I 20 r` 4 r+ X b ec 21.00 t62 LF 75" HOPE 4,0%• 1' 6 DUCK DRAIN ,» -.»» ,_,, , . -,., 4.,-«.. „x„�x< n- n,*r BC 202? BC, 20.2e ... I 80 „.:.m 0%MIN I 4 �iNV.OUT 1668- I Bc zo,67 .� (SEE AFRCH- - I. 8 FOUNDATION0.0% DR _.•• ' Ain @ 1 0% MR�I -� :, : �"'" ; '�„✓ .INV.OUF 1455 ,` 1'.v -+ ,. ,:v. ,,.,.:. 6`1.OR IN. _ __ 'ram • " xa : INVOUT=19:20- --l.�..�-m-..•..__." __21--•E©�, (SEE ARCH.) ;. ±- e SEE ARCH. • r ( ) A w- PRDP. „' �-- ". �.. r ^ BC 20,85 '. _ ., 6' ROOF DRAIN: - `r ,,.,.., .. _-,:-<:: RIM 19.25 r IN 1.0% MIN. "'BC 20.88 INV.OUT 7553 .®. - ,x,. ......, 41NV.OUT-14.50 . �{ (SEE ARCH.) «. ,,.., gr.� ' PROP. ..., _ B98 RIM_t .86 BC 0-17 wKOUT-t48a6 6 FOUNDATION DAnON DRAIN w I G • � � x -.8 ROOF E1RAN•1 =--= ".. w =' «-- ..,„ (CONNECT TO ARCH.) a,. I 11INV.OUT=15»7 r ,a.. i < - , :...<- SEE �.,-... ,,,.�.«x"., t7 `r OH xx 1{ 41 r- -w, 36 LF 15 HOPE @ 0 5% ^-N : -«®.. i X � 1 I I I � "�' � Bt LF 6" PVC 00.5% _.. ,. K , N x i 141 _ , I 1 19.2 BC MH 0 5 - PROP. MH06 2 RIM-19.8BO 20..48 .RIM=19,00 INV.INS=16.55 INVtN=15.35 :6 ROOF DRAIN ';;i: BC 27.24. ,Z '-•°" ......,,.....,:z, "' BENC.YMARK i 1 , . _ 7 `r" .. ..._,,.,..„m. --.«, : -, ,- t .3 INY:OUT t5.25 ,* -.0 1.0% MfN•---`=?_ -s:`„- -sm a' I INV.OUT=16.45 "- .<.....;1 ..~w- _ -„ate, ». ..,, F BOX G J - T 1 . 5 ,. , -.. INV.W 5. .»x - •8C 2096.". D , ; pie® ELEV 23.20 ARCH,: SEE �'7-�`� ��-2I.2� r , -s W xz. F a Ma SG:. r sic 20.70 1 T 2 .37 �� 98 LF 15'• NUPE 0,5% .,, _BC8C - 7� B2U.b - 1-STORY X... BC 21.17 ( 97 LF 8" PVC @ 0.5% BRICK , � '� 20 »1 I 7 ------ ------ ------._ - 8llLOrN6 PROP, EL I RIM- EL 'X�. I { _ 51. LF 24" HDPE Ot.Q$ 1 iNV.IN,A} 74.77 _- 18 INV.IN(B)=74.49 A ( 17 t6 PROP. EW01 I i w INVOUT-14.39 ..,=�s� l ;.� INVN=15.96 B OP HE ADWALL E ADl ^ 18 r -..I }.. PROP. EW02. < `.. INV.IN-_ 15:Oo _ INV.OUT=14.24 15 LF 24" HOPE ®1.0%011 - .JI� `�• -.J -. --- r M ravfl LOIN » NV- 14.94 I - RATE INLET 1 'C f7LLf EBRI -'. S D W i o I r � i 80* T Fri N r� I M i I BC. t8.50 in i II { I I 3 3 { 1 li { m { U HEA I L DNkt L 3 j 21" P 1 lNVPROPOSED PYLON SIGN I II I - 1. �> ARCH. PLANS -1 ) by m I Ua I l 4f � Il 4 BG 19� ..00 j � i � I �Q I I I h IN 'f 1 TE 1N 7- I HEADWALL LNV=11107 21" RCP ... h"W=1136 6 L.f 2 t4f 24" "RCP 8r:9X i RC 4X DO I. 1 I 4" ROOF DRAIN TYP•) ® 1.0% MIN. ( ox I IN V.(XJT=17.50 FFE 20,25 (SEE ARCH.) I I I 1 27 LF 6' PVC MI 1.0X MIN. N I , W I •. d � II ii -.. �... 6" ROOF DRAIN I ® 1.0% MIN. INV.OUT=17.80 SEE ARCH. 4 CO ( ) I+c U 1 I I 3 I_� ll I n it PIPE -- R1M=16.47 - C INV A 12.58 HEADWAU o i INV 8=1226 21' RCP : 114 LF 18' INV=1290 I RCP III t i { SYMBOL LEGEND 1r EXISTING HYDRANT Q PROPOSED FIRE HYDRANT -a- PROPOSED UTILITY POLE Q EXISTING TREE CO o PROPOSED CLEAN -OUT + PROPOSED SIGN p"Iy v L1 PROPOSED MANHOLE A A /EyW PROPOSED A.D.A.RCMP PROPOSED PIPE BOLLARD i I ® PROPOSED TYPE 'C'INLET aa. t :PROPOSED LIGHT FIXTURES) PROPOSED HANDICAP PARKING SPACE ® PROPOSED TYPE 'M' INLET BC 632.10 PROPOSED SPOT ELEVATION k�I I/T DIAx 10 SMOOTH RGJND DOWIS AT 24' OC CENTERED ON JWL DOWELS Wig RE LEVEL AND SQUARE WITH JONT (REWRED ONLY AT CHIC PAHFE)--- PAW7G REF ARCH -PIEJ.AND SEALMET REF ARCH M Susi 8 l:D ON THREE f6 R•� ASTM C-33 119 GRADED (WISHED STOW OR -:a v A• a r e � u OPENING STOOP -T/2• DIA x Id SMOOTH WORD DOWELS. AT 24' OC (3 MIN} (ENTERED OR JCRJT WITH CREASE ON ORE END, LOCATE DM C FROM FACE OF CWJ AT EACH END -ROF SIR PLAN FOR SCAN REIMF` - (3H' 6 DOWELS AT -IS' a� 2-1 W (3 IMI} I - (I) 15 al LAP Will ROW III HORD BEITIW) ((g J5 CONT AT W REF FM PLAT MUST HE LEVEL AM SUTARE WITH JON1. 1/2' RA x 10. 901H MORE, DOWELS AT'2C OC CENTERED ON JONT. ODORS. MOST BE LEVEL AND SHARE WITH JONi (REOONT ON.Y AT W PAI PAVITG wft ZIP REF ARGI FOR IENGiN (F SR%IP PMEJ AND SHIM DOOR ROF ARCH SDI'ANT REF ARCH di AT 16" OC El N � 9APE SEAD IM 0911E ON THREE -- SIESTYPi I 3' (2) 14 alff 'MIN CORNER SASS OLR i � AS7M C-33 /57 GRADW gOR E(R1H FCIROAIATN. DRAM SEE PLANS PROVIDED BY RAMEY KEMP & ASSOCIATES FOR ALL OFF -SITE IMPROVEMENTS t I I j1 0 LINE LEGEND -T1Y DIA a IT SMOOTH ROAD) DOWELS AT 2C OC (3 MM) CORDED ON JOT MAIN GREASE EXISTING PROPERTY BOUNDARY RN ONE IND. LOCATE DOWEL M' FROM FACE of ow Ar EAai EMIT EXISTING LEGAL ROW `REF SLAB RAN FOR SLID RDF _ _ - EXISTING ADJACENT PROPERTY LINE EXISTING TREE LINE = EXISTING CONTOUR W/ELEVATION - W - DDOWILS AT FG' b� is PROPOSED CONTOUR W/ELEVATION PROPOSED RETAINING WALL cour LAP WTH tE1F M -(KAU REVORD PROPOSED CURB - EXISTING CURB TO BE REMOVED - _ - - - - - - - - - EXISTING STORM SEWER LINE - - - - - - - - - - ram: I MTdEts MUST FE LEVEL#A EXISTING SANITARY SEWER LINE SWFRE WIN JOINT. PROPOSED STORM SEWER PROPOSED SANITARY LINE SITE SUBSURFACE PREPARATION FOR WALMART WM #7218 00. NEW BERN (NEUSE BOULEVARD), NORTH CAROLINA SEPTEMBER 17 2013 THE SUBSURFACE EXPLORATION INDICATES THE SITE CONSISTS OF LOW CONSISTENCY NEAR SURFACE CLAYEY SANDS AND SANDY CLAYS. BECAUSE NEAR SURFACE SOILS ARE MOISTURE SENSITIVE, SITE PREPARATION AND GRADING WILL BE SIGNIFICANTLY INFLUENCED BY WEATHER CONDITIONS AT TIME OF CONSTRUCTION. SITE GRADING SHALL BE PERFORMED DURING THE TYPICALLY DRIER SUMMER MONTHS: IF PRACTICAL. REMOVE TREES, GRUB STUMPS, AND STRIP TOPSOIL. LIME STABILIZE TOP 12 INCHES OF EXPOSED SUBGRADE BENEATH THE TOPSOIL. INCORPORATE 5 PERCENT QUICKLIME BY DRY WEIGHT INTO THE UPPER SOILS TO PRODUCE A MINIMUM 12 INCH THICK LIME STABILIZED LAYER. LIME STABILIZATION METHODS SHALL BE PERFORMED IN ACCORDANCE WITH THE 2012 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCDOT) 'STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES," SECTION 501. COMPACT THE FULL DEPTH OF THE MIXTURE TO A DENSITY EQUAL TO AT LEAST 979 OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) OBTAINED BY A SAMPLE OF THE SAME SOIL -LIME MIXTURE. MOISTURE CONTENT SHALL BE MAINTAINED WITHIN THE SOIL -LIME MIXTURE'S OPTIMUM MOISTURE CONTENT TO 2 PERCENT WET OF ITS OPTIMUM MOISTURE CONTENT. ALLOW COMPACTED LIME STABILIZED LAYER TO CURE TO SUFFICIENT STRENGTH TO ALLOW EQUIPMENT TO PLACE AND COMPACT SUBSEQUENT FILL LIFTS WITHOUT UNDUE. INSTABILITY. MAINTAIN LIME TREATED LAYER NEAR ITS OPTIMUM MOISTURE CONTENT DURING THE CURING PROCESS. PLACE AND COMPACT 12-INCH L F OFF -SITE LIFT 0 SELECT OFF SITE BORROW. SUBSEQUENT LIFTS SHALL BE PLACED 1N MAXIMUM 10 INCH LOOSE LIFTS. ALL STRUCTURAL FILL SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) EXCEPT FOR THE FINAL 12 INCHES WHICH SHOULD BE INCREASED TO 98 PERCENT. FILL MOISTURE SHALL BE MAINTAINED WITHIN 3 PERCENT OF OPTIMUM MOISTURE. DURING COMPACTION, SELECT OFF -SITE BORROW SHALL CONTAIN LESS. THAN 3 PERCENT ORGANIC MATERIA L, BE FREE OF OTHER DELETERIOUS MATERIALS CONTAIN LESS THAN 15 PERCENT FINES HAVE A STANDARD PROCTOR T R OR DRY DENSITY OF AT LEAST 100 PCF, AND HAVE A MAXIMUM PARTICLE SIZE OF 2 INCHES IN ANY DIMENSION. BORROW USED FOR THE REMAINING LIFTS SHALL MEET THE REQUIREMENTS ABOVE EXCEPT SHALL CONTAIN 20 TO 50 PERC ENT FINES. PROOFROLL FINAL SUBGRA E WITH LOADED D TH LO D R LIBBER -TIRE EQUIPMENT (MINIMUM LOADED WEIGHT OF 0 TONS R NI L 2 P OOFROWNG SHALL CONSIST OF TWO COMPLETE PERPENDICULAR PASSES OF THE EQUIPMENT OVER THE SUBGRADE. REPAIR UNSUITABLE OR UNSTABLE AREAS BY REMOVING AN REPLACING D R (ACING WITH SUITABLE SOILS f DSCiNG TIRING AND RECOMPACTING OR PARTIAL UNDERCUTTINGAND PLACEMENT F O . 0 AGE TEXTILE FABRIC AND CRUSHED STONE, EXCAVATIONS WILL EXTEND THROUGH LOW TO N MODERATE CONSISTENCY SOILS. UNDERGROUND UTILITIES OUNSHOULD BE DESIGNED AND INSTALLED IN A WAY SO THEY ARE NOT E N PRESENT WITHIN THE TOP 12 INCHES OF EXISTING SUBGRA IS NG DE BELOW THE TOPSOIL DURING LIME STABILIZATION, WE RECOMMEND THAT UTILITIES BE INSTALLED AFTER THE SITE HAS BEEN RAISED TO ITS DESIGN. SUBGRADE ELEVATION IN ORDER TO AVOID RUTTING THE NEAR SURFACE LOW CO NSISTENCY SOILS. EXCAVATIONS MAY EXTEND BELOW THE WATER TABLE. TEMPORARY DEWATERING MEASURES SUCH AS INSTALLATION OF WELL -POINTS OR USE OF INTERNAL T TER AL SUMPS AND PUMPING WILL LIKELY BE REQUIR:ED, THE CONTRACT OR SHALL EXERCISE CARE IN LOWERING OF GROUNDWATER LEVELS ADJACENT TO BEARING SURFACES. THIS SITE SUBSURFACE PREPARATION ARAl70N DOES NOT S TE A CON T1TU COMPLETE SITE WORK SPECIFICATION. IN CASE OF CONFLICT, T , INFORMATION COVERED IN THIS P' T PREPARATION SHALL TAKE PRECEDENCEOVER SPECIFICATIONS. ER THE WALMART SP CI CATIONS REFER TO THE E SPECIFICATIONS FOR SPECIFIC INFORMATION NOT COVERED IN THIS PREPARATION, INFORMATION AS TAKEN F THIS W 7 ROM'. AN INITIAL GEOTECHNICAL EXPLORATION REPORT PREPARED BY SA ME, INC., DATED AUGUST 6, 2013 (GEOTECHNICAL EXPLORATION REPORT IS FOR INFORMATION ONLY AND IS NOT A CONSTRUCTION SPECIFICATION). FOUNDATION SUBSURFACE PREPARATION FOR WALMART WM # 7218, NEW BERN (NEUSE BLVD)., NORTH. CAROLINA SEPTEMBER 17. 2013 UNLESS SPECIFICALLY £ L INDICATED OTHERWISE 1. WI N THE DRAWINGS AND/OR SPECIFICATIONS, THE LIMITS OF TH IS SUBSURFAC £ PREPARATION ARE CONSIDERED E ED TO BE THAT PORTION OF THE SITE DIRECTLY BENEATH AND 5 FEET BEYOND THE BUILDING AND APPURTENANCES. APP URTENANCES PURTENANCES ARE THOSE S AT E ITEM ATTACHED TO THE BUILDING PROPER (REFER TO DRAWING SHEET SP1), TYPICALLY INCLUDING BUT NOT LIMITED TO THE BUILDINGSIDEWALKS, GARDEN CENTER, PORCHES, RAMPS, STOOPS. TRUCK WELLS/DOCKS, CONCRETE APRONS AT THE AUTOMOTIVE CENTER, COMPACTOR PAD, ETC. THE BASE DOES NOT EXTEND BEYOND THE LIMITS OF THE ACTUAL BUILDING AND THE APPURTENANCES. ESTABLISH THE. FINAL SUBGRADE ELEVATION TO ALLOW FOR THE CONCRETE SLAB AND BASE. REFERENCE ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR D REQUIRED SLAB THICKNESS. THE MINIMUM 6-I NCH MATERIAL SHALL THICK BASE H AL H LL CONFORM TO NORTH CAROLINA DOT R STANDARD FOR ROADS SPECIFICATIONS AND STRUCTURES SECTION 1010, AGGREGATE BASE COURSE" ABC - THE BASE SHALL BE OVERLAIN Y I AP ( ): L N B A 10 MILS VAPOR BARRIER CONFORMING T AS E 17 B N 0 TM 45 GLASS A. THE CONTRACTOR SHALL BE SPON RE .BIBLE FOR OBTAINING ACCURATE MEASUREMENTS FOR ALL CUT AND FILL DEPTHS REQUIRED. ANY PROPOSED EQUIVALENT ALTERNATIVE BASE MATERIAL MUST BE SUBMITTED FOR APPROVAL WITHIN 30 DAYS AFTER AWARD OF CONTRACT. ANY UI EQ VALENT ALTERNATIVEH SHALL ONLY BE USED IF APPROVED IN WRITING BY THE CEC AND AOR. REMOVE TREES, GRUB STUMPS AND STRIP TOPSOIL. I - LIME STABILIZE TOP 12 INCHES OF EXPOSEDSUBGRADE BENEATH THE TOPSOIL. INCORPORATE 5 PERCENT QUICKLIME BY DRY WEIGHT INTO THE UPPER SOILS TO PRODUCE A MINIMUM 12 INCH THICK UME. STABILIZED LAYER. LIME STABILIZATION METHODS SHALL BE PERFORMED IN ACCORDANCE WITH THE 2012 NORTH CAROLINA DEPARTMENT OF TRANSPORTATION (NCOOT) `STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES," SECTION 501. COMPACT THE FULL DEPTH OF THE MIXTURE TO A DENSITY EQUAL TO AT LEAST 97%OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) OBTAINED BY A SAMPLE OF THE SAME. SOIL -LIME MIXTURE, MOISTURE CONTENT SHALL BE MAINTAINED WITHIN THE SOIL-UME MIXTURE'S OPTIMUM MOISTURE CONTENT TO 2 PERCENT WET OF ITS .OPTIMUM MOISTURE CONTENT. ALLOW COMPACTED LIME STABILIZED LAYER TO CURE TO SUFFICIENT STRENGTH TO ALLOW EQUIPMENT TO PLACE AND COMPACT SUBSEQUENT FILL LIFTS WITHOUT UNDUE INSTABILITY. MAINTAIN LIME TREATED LAYER NEAR ITS OPTIMUM MOISTURE CONTENT DURING THE CURING PROCESS. PLACE AND COMPACT 12-I F T NCH LIFT O SELECT OFF -SITE BORROW. SUBSEQUENT LIFTS OR BSE UENT Q SHALL BE PLACED IN MAXIMUM tO-INCH LOOSE LIFTS. ALL STRUCTURAL FILL SHALL BE COMPACTED TO AT LEAST 95 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D 698) EXCEPT FOR THE FINAL 12 INCHES WHICH SHOULD BE INCREASED TO 98 PERCENT. FILL MOISTURE SHALL BE MAINTAINED WITHIN 3 PERCENT OF OPTIMUM MOISTURE DURING COMPACTION, SELECT OFF -SITE BORROW SHALL CONTAIN LESS THAN 3 PERCENT ORGANIC MATERIAL, BE FREE OF OTHER DELETERIOUS MATERIALS, CONTAIN LESS THAN 15 PERCENT FINES, HAVE A STANDARD PROCTOR DRY DENSITY OF AT LEAST 100 PCF, AND HAVE A MAXIMUM PARTICLE SIZE OF 2 INCHES IN ANY DIMENSION BORROW USED FOR THE REMAINING LIFTS SHALL MEET THE REQUIREMENTS ABOVE EXCEPT SHALL CONTAIN 20 TO 50 PERCENT FINES, PROOFROLL FINAL SUBGRADE WITH LOADED RUBBER TIRE EQUIPMENT (MINIMUM LOADED WEIGHT OF 20 TONS). PROOFROLUNG SHALL CONSIST OF TWO COMPLETE PERPENDICULAR PASSES OF THE EQUIPMENT OVER THE SUBGRADE. REPAIR UNSUITABLE OR UNSTABLE AREAS BY REMOVING AND REPLACING WITH SUITABLE SOILS,DISCING/DRYING AND RECOMPACTING, OR PARTIAL UNDERCUTTING AND PLACEMENT OF A GEOTEXTILE FABRIC AND CRUSHED STONE.. excavationS will extend through LOW TO MODERA TE consistency cy sons. Underground utilities should be designed and installed in a way so they are not present within the top 12 inches of existing subgrade below the topsoil during lime stabilization. We. recommend that utilities be installed after the site has been raised to its design subgrade elevation in order to avoid rutting. the near surface low consistency soils. EXCAVATIONS MAY EXTEND BELOW THE WATER TABLE. TEMPORARY DEWATERWG MEASURES SUCH AS INSTALLATION OF WELL -POINTS OR USE OF INTERNAL SUMPS AND PUMPING WILL LIKELY BE REQUIRED, THE CONTRACTOR SHALL EXERCISE CARE. IN LOWERING OF GROUNDWATER LEVELS ADJACENT TO BEARING SURFACES. THREE SETTLEMENT HUBS SHALL BE INSTALLED IN AREAS RECEIVING GREATER 2 FEET OF FILL, THE HUBS SHALL BE INSTALLED WITHIN TWO DAYS OF BRINGING AREAS TO FINISHED SUBGRADE ELEVATION. ELEVATIONS AT THE HUBS SHALL. BE MEASURED BY A. LICENSED SURVEYOR IN THE STATE OF NORTH CAROLINA AT THE TIME OF INSTALLATION AND THREE TIMES A WEEK THEREAFTER. THE DATE OF MEASUREMENT AND ELEVATION AT EACH HUB SHALL BE PROVIDED BY THE CONTRACTOR TO THE OWNER'S GEOTECHNICAL ENGINEER AFTER EACH MEASUREMENT FOR REVIEW. FOUNDATION CONSTRUCTION SHALL NOT PROCEED UNTIL THE OWNER'S GEOTECHNICAL REPRESENTATIVE IS SATISFIED THAT SETTLEMENTS WILL BE WITHIN THE OWNER'S TOLERANCES OR 45 DAYS AFTER FILL PLACEMENT OPERATIONS ARE COMPLETED, WHICHEVER IS LONGER THE GEOTECHNICAL ENGINEER SHALL ISSUE A LETTER TO THE OWNER AND CEC STATING THAT POTENTIAL SETTLEMENT WILL BE: WITHIN THE OWFI TOLERANCES AND THAT CRUB PLACEMENT AND ASPHALT PAVING ACTIVITIES MAY COMMENCE. THE FOUNDATION. SYSTEM SHALL BE ISOLATED SPREAD FOOTINGS AT COLUMNS AND CONTINUOUS SPREAD FOOTINGS AT WALLS: THIS FOUNDATION SUBSURFACE PREPARATION DOES NOT CONSTITUTE A COMPLETE SITE WORK SPECIFICATION. IN CASE OF CONFLICT, INFORMATION COVERED IN THIS PREPARATION SHALL TAKE PRECEDENCE OVER THE WALMART SPECIFICATIONS. REFER TO THE SPECIFICATIONS FOR SPECIFIC INFORMATION NOT COVERED IN THIS PREPARATION, THIS INFORMATION WAS TAKEN FROM AN INITIAL GEOTECHNICAL EXPLORATION REPORT PREPARED BY S&ME, INC„ DATED AUGUST 6,. 2013 (INITIAL GEOTECHNICAL EXPLORATION REPORT IS FOR INFORMATION ONLY AND IS NOT A CONSTRUCTION SPECIFICATION). GRADING A DRAINAGE BEFORE YOU DIG! CALL T-80t'�-632-4944 N.C. ONE -CALL CENTER IT'S THE LAW! a� SEE NOTES SHEET FOR GRADING NOTES PLAN GRAPHIC .SCALE ( IN FEET ) I inch = 40 ft. REVISIONS BY CiTY COMMENTS CWS OUT TO BID CWS ARCH, COORDINATION GINS NCDENR COMMENTS I CWS WATER REVISIONS CWS `i £r fall 026 ♦ a yi, i i R�4 0 R I s{ ttom�' 1 a [,. Ir•1 PQ Z M 6 RI 2 W 1 '4 "a rEAI r O w• � � 4 ✓ \ �rf�lrffli �tt,-ytyf'x�,_ F-. CD z O � O L ^ d QLLJ Cfi CCD Y Q t< W LLJ W (n ftLA M 0:� O Q M O 1-- LEI WCD Z U) J Elf - O LLJ L MZ Q U? O v T) ~ CD I- J CD Z Q LLJ 61 z N c5 O W 'S J M MW WIN am to DRAWN H.L,H. CHECKED J.R.H- DATE 09/U9 13 SCALE AS NOTED _ JOB No. NCC138113 SHEET C - 3 14 OF 24 SHEETS V:\T,5\I11,SU1yV\_4.AU\LU I•LANJ\HIV - ^_\.H1.hJ 1`!L) Nft-n----- ->L_ATlJUI: i4- QllIA1_I!Nix , I. � r1 is I"i. •C.f y; ( I'a,i,:� .. .. ,. .'..�'. .. .':It: IIAI J1ilr R'�fdl !A ` ., .., Revision Date: October 28, 2013 1 2 3 5 6 7 0 E 10 13 A pm C C? m I W WUT EXPR£SSW AS TO THE 01 NAAR£ OF 7X£ I SURVEYOR HAS 08! CAP OF AOJOIN£R It Il__-- 6" SANITARY SEWER LATERAL AT MINIMUM 1A7 SLOPE. COORDINATE WITH ARCHITECTURAL PLANS, (3 GAS ENTRY WITH GAS METER. CONTRACTOR RESPONSIBLE FOR INSTALLING PIPE BOLLARD PROTECTION AT METER, CONTRACTOR SHALL COORDINATE WITH GAS COMPANY FOR TYING OF INDIVIDUAL METER. ('„1 CONTRACTOR IS RESPONSIBLE FOR COORDINATION WITH GAS COMPANY WD REGARDING THE SIZE AND INSTALLATION OF GAS SERVICE LINE. I" PVC CONDUIT FOR TAMPER SWITCH. — NOT USED E PROPOSED LOCATION OF TRANSFORMER PAD CONTRACTOR TO VERIFY EXACT LOCATION AND SIZE WITH POWER COMPANY PRIOR TO INSTALLATION. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF CONCRETE. PAD, CONDUIT AND PIPE BOLLARDS AS REQUIRED BY THE ELECTRIC COMPANY. CONTRACTOR SHALL COORDINATE SAID WORK KITH THE ELECTRIC COMPANY. FINAL LOCATION OF TRANSFORMER AND BOLLARD CANNOT CONFLICT WITH. TRUCK ACCESS TO DOCK DOOR.. UNDERGROUND ELECTRIC AND TELEPHONE FROM POLE TO BUILDING TO BE EXTENDED BY TELEPHONE COMPANY. G CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH THE TELEPHONE COMPANY FOR THE INSTALLATION OF OVERHEAD TELEPHONE LINES. CONTRACTOR SHALL COORDINATE THE TYING OF INDIVIDUAL METERS WITH THE ELECTRIC COMPANY. CONTRACTOR TO COORDINATE WITH 'TELEPHONE COMPANY TO INSURE PROPER SEPARATION. BETWEEN OVERHEAD LINES AND LIGHT POLES. - NOT USED H 3" DOMESTIC WATER LINE ENTRY WITH METER PER ANY TOWN PUBLIC WORKS REQUIREMENTS.CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ANY APPURTENANCES ON THE DOMESTIC LINE SUCH AS BACKFLOW PREVENTION DEVICES; GATE VALVES, ETC.,. WHICH MAY BE REQUIRED. CONTRACTOR TO COORDINATE WITH CITY OF ANY TOWN PUBLIC WORKS DEPARTMENT, 8" SPRINKLER LINE ENTRY. CONTRACTOR SHALL BE REQUIRED TO INSTALL ANY APPURTENANCES. ON THE SPRINKLER LINE SUCH AS, BUT NOT LIMITED TO, A DOUBLE DETECTOR CHECK BACKFLOW PREVENTION DEVICE, IN SERIES WITH A CHECK VALVE, GATE VALVES, ETC., MEETING WATER COMPANY SPECIFICATIONS. OPROPOSED FIRE HYDRANT AND ASSEMBLY, TYPICAL AS INDICATED. SEE DETAIL SHEET. QREMOTE GARDEN CENTER UTILITIES PIPE BOLLARD. - NOT USED ALL LP CAMERA PULL BOXES LOCATED IN PAVED AREAS SUBJECT TO TRUCK TRAFFIC SHALL BE "H-20" LOAD RATED, THE TYPICAL PULL BOX SIZE WILL BE. 17" X. 30" X 28" "QUAZITE PG173OBA28 BOX WITH PG173OHH00 LID, OR APPROVED EQUAL. DEEPER BOXES MAY BE REQUIRED WHEN THECONDUIT ALIGNMENT IS AFFECTED BY OTHER UTILITIES. THE PULL BOX SHALL BE INSTALLED PER THE MANUFACTURER'S SPECIFICATION WITH A CONCRETE COLLAR AND A MINIMUM OF 8' OF GRAVEL. COMPACTED PER PROJECT SPECIFICATIONS. (� ONE 3" DIAMETER CARLON TYPE "DB" DIRECT BURIAL TELEPHONE DUCT OR 3" SCHEDULE 40 PVC, INSTALL GALVANIZED PULL 'IRE OR PURPLE PROPYLPOLYETHYLENE ROPE WITH A MINIMUM PULLING TENSION OF 100 POUNDS. THE MINIMUM BURIAL DEPTH SHALL BE 24". INSTALL AN ORANGE DETECTABLE HAZARD TAPE WITH INTEGRAL "BURIED CABLE WORDING, 12" ABOVE CONDUIT. N ONE 2" CONDUIT SHALL BE CARLON TYPE "DB" DIRECT BURIAL TELEPHONE DUCT OR SCHEDULE 40 PVC. INSTALL GALVANIZED PULL WIRE OR PURPLE PROPYLPOLYETHYLENE ROPE NTH A MINIMUM PULLING TENSION OF 100 POUNDS. THE MINIMUM BURIAL DEPTH SHALL BE 24". INSTALL AN ORANGE DETECTABLE HAZARD TAPE WITH INTEGRAL "BURIED CABLE" WORDING, 12" ABOVE CONDUIT. THE 2" LP CAMERA CONDUIT SHALL BE SEPARATED FROM THE 480VAC LIGHT FIXTURE POWER BY A DIVIDER PLACED IN THE LIGHT POLE BASE JUNCTION BOX. INDEPENDENT 4" CONDUIT FOR ELECTRIC, 3/4' WATER LINE, AND 4" SANITARY SEWER STUB OUT TO THE PROPOSED KIOSK FOR SAM'S GAS OR AS NECESSARY. COORDINATE WITH DESIGN MANAGER (CEC TO TO PROVIDE DEDICATED POWER AND WATER FOR SAM'S GAS FOR CARWASH) OREMOTE FIRE DEPARTMENT CONNECTION PER. CITY OF NEW BERN REQUIREMENTS. CONNECT TO BUILDING WITH 6" FDC LINE, SEE ARCH. PLANS. FIRE HYDRANT SHALL BE LOCATED WITHIN 10' OF FDC. LINE LEGEND EXISTING PROPERTY BOUNDARY EXISTING LEGAL ROW — — — — EXISTING ADJACENT PROPERTY LINE. EXISTING TREE LINE PROPOSED TREE LINE -_--- X EXISTING FENCE - - - _ - — - - EXISTING CURB TO BE REMOVED EXISTING STORM SEWER LINE EXISTING SANITARY SEWER LINE T T T EXISTING TELEPHONE -- ON--9X ON--- EXISTING OVERHEAD ELECTRIC EXISTING STORM SEWER LINE (TBR) EXISTING SANITARY SEWER LINE PROPOSED RETAINING WALL PROPOSED CURB ---- -- - - - PROPOSED FLUSH CURB - - .»< .-........ ..,..s,,.. ..-. — PROPOSED STORM SEWER PROPOSED ELECTRIC LINE PROPOSED TELEPHONE LINE PROPOSED GAS LINE ----------------------------------- PROPOSED SANITARY LINE PROPOSED WATER LINE --UGE&T UGE&T. PROPOSED UNDERGROUND ELECTRIC & TELEPHONE LINE BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE —CALL. CENTER 11'S THE LAW] SEE NOTES SHEET 1 FOR UTILITY NOTES 0 SYMBOL LEGEND v EXISTING HYDRANT Q EXISTING TREE a EXISTING SANITARY MANHOLE ® EXISTING STOR•MWATER INLET 0 EXISTING STORMWATER MANHOLE Ib 0 PROPOSED CLEAN -OUT PROPOSED TYPE 'C' INLET ®. PROPOSED TYPE 'M' INLET 13 PROPOSED PULL BOX /Q PROPOSED A.D.A. RAMP go+. 0-0 PROPOSED LIGHT FIXTURE(S) e ♦— PROPOSED UTILITY POLE Q PROPOSED FIRE HYDRANT I PROPOSED SIGN • PROPOSED PIPE BOLLARD PROPOSED MANHOLE UTILITY PLAN GRAPHIC SCALE ( IN FEET ) 1 inch = 40 ft. REVISIONS BY PER CITY COMMENTS CW5 PER OUT FQ BID CWS PER ARCH, COORDINATION CW5 PER NCDENR COMMENTS CWS PER WATERw REVISIONS CWS P4 z co zf�.♦rl..•♦ � 0*0 *0 �s z t9 � (! F x t; m 4 g U 4k, o m �. 0 .�`' Z r- O I— C) Z I O • N WJ C- > CL Ld < cD � > Q LLI Z W u/ LLI N r" a m Ctf C7 U) < OCG Lil � U— C/J S V w t Z Z F__ 0 L.LJ l m Z O Z CD CD >— ~ J < CD I-- CD z O ED DRAWN N.L.H. CHECKED J.R.H. DATE — 09/U9/13 SCALE AS NOTED JOB No. NCC138113 SHEET C-4 15 OF 24 SHEETS V:\13\PT3019D\_CAD\LD PLANS\REV- 5\P130190 SITE-5 ----- 7LAYCUT. '..5- UTILITY -- McWi oO uate. uctcoer Z5, 'Z013 2 3 4 5 i 6 7 8 9 12 S 13 A 1-STORY a# fRAME hbwwLaw fft?, C I-S70Rr 6wK MOING I A I -STORY BRICK 9111MIX F H AW*33• -- — — — — — — — — — X—X — — — — — --- — — — — — — — — •------- --- -X—x— x X l7Y Of Yff RERN 0%7Y FASEAffW ------- Q8. 2746 Pb^, &4 x X X . . ... PR T I I ............ x 011 X X �742�EE� Lrf i mgmg, - - gmv, F '_g X... ... - ----- 7�g,,4 X 0 M 010 x 0 Z� X 0 OM x T-4- x x W —5 TRUCK FL coo 4- ";,7 '1 Xnow ----------------�} - - - - - - - - - - - - - - - i � � 3O' ORA/NAGE �E UTKITY EAS£M£NT ✓ ! � PC 9 PG 661 x x OH om Nm OH WOW -A 4 105 605 A iEc' 'j Q EE PLANS PROVIDED BY RAMEY KEMP & ASSOCIATES FOR ALL OFF -SITE IMPROVLMENTS ) BEFORE YOU DIGI CALL 1-800-632-4949 N.C. ONE -CALL CENTER IT'S THE LAVVI VEH'I CLE CIRCS EAT ON PLAN GRAPHIC SCALE 40 0 20 40 80 ( IN FEET ) I inch = 40 ft 160 REVISIONS BY PER CITY COMMENTS PER OUT TO BID CWS CWS PER ARCH. COORDINATION CWS S C PER NCDENR COMMENTS CWS PER WATER REVISIONS CWS u C:) C:) r­ 00 (D U < C/') CD < C) LIJ F__ — r ' Ld af < LLI __j Qr Ljj LL] L 0 m m 0 I-- < 0 0 LLI 3: V) f- Lj U) Lij CD _j , I 0 Lij LL_ < Ld > m 0 :�E Cn Ln >_ I CD m C) LLJ CN C-.,I m DRAWN HlIH. CHECKED J.R.H. DATE 09 J9 13 SCALE AS NOTED JOB No. NCC138113 SHEET C-5 16 OF 24 SHEETS Hevision Date: October 2IB. 2013 k .h` r : POND AREADi h i zi `I 4I9 ;: sI � T Ifi y � r..t-r.. t: r 1 T I •.', 2m j}y1 UMTI LINErA Yet � EFi i w POND AREA' ... d^ MCK J AREA TO BE SEEDED WiTH ERNMX-127 I� (SEE ....SPECIFICATION) y r^ fA LAWN AREA TYP, 6FI — giq E®Li r2 AM ImoM CUP ji AR51,1�•I U �.3 Ll 2 TDB- 3.: A5tZ1fmR Y ILt ;SEc :, 1 nRsiA-' q i ,4- t AB 2 AB "► 4-. 3 AFtLa I ARWf 3 LPL i Y I e 1, ! I.Q!4k S I I 1 WET DETENTION BASIN HERBACEOUS PLANT SCHEDULE MW SW PIANM; 9.75D So11ARE FEE d9481L1 ffi BUFAICAea Comm.NYE 9tlLT Btlm.R6A1 408 C.6EN TOM OAL SEDW Y PUG P' at 20% 293 OFAIR+DOPHIS F6 UM JOE PRE WEED 2' FLUID 2' = 1DI 244 LOBFUA CARDKNUS CNERNL FLOW 2' RIG Y O,C )a 203 LOBELIA ELDWOAR L.RIKM LOMA 2' KING 2' OL in 390 S: DIARN BA DW Wow PummRISS 2' RUG 2' RC, 1la 244 0 NRO00 1A FIND IBS Y FEW 2' OF. 101 469- AWCLS DTUSUS W. SOLLTUS SOFT Rai Y PUG 2' D.G. 206 ZIR TRIES 4PLYRWG RAT@ 6 BASED AI THE AEA NOT RE RIGS O"TRY OF THE PLANK THE OmyMRY OF W ROAD 6 OEIWWED BY IDEA RADD AM TIE 9PAM W MCH THUAE m BE PINKED. 2) %ARTI G OF BSSM 6 NOY W BE MOM UMIL TFE AMJAL UM LFhL OF TIE 00 AND ALL SiAMRE N A" WE SIABIU . PROM TO MAW, , OONKNCTOR TO YWY THE IAAIER DEPDF TO BE WAAFSE 00. PLAK G 40 VAT NO TO BE RIEMED AND PLANT QUWMIS RJR= BkS ON FIELD OOHUWOBS I, i i W I, Fl�71 e PYLON SIIXi �r i r � SEE PLANS PROVIDED BY RAMEY KEMP & a r^ ASSOCIATES FOR ALL K OFF -SITE IMPROVEMENT' 1 `4 Is t I 3 1 # ( i I i s I r I >S � ;I 7. 04. I 1 i I i i k T BEFORE YOU DIG! CALL 1-800-632-4949 N.C. ONE —CALL CENTER IT'S THE LAWI AUTOMATIC IRRIGATION iS NOT REQUIRED ON THIS PROJECT DUE TO ENVIRONMENTAL CONDITIONS THAT DO NOT WARRANT THE INSTALLATION OF A WATERING SYSTEM FOR P T ESTABLISHMENT AND SURVDVAL F ;o No 158 >: 3�d�4<<c: r LANDSCAPE ARCHITECT IGNATURE/ SEAL LANDSCAPE COMPLIANCE CHART 39:IDR. RFDUIREIEIT CA1LUtA1011S. COWLARM 15-365: TABLE OF 15-765: TABLE OF SCREE" REQURflQOi SUFIER TO THE NOR9MLSY; Mi LF. COUPLES CpM DOTAL BLNDW 4PAWK REQUIRED IYPE'C': 692 / IW = 6.82 RONIf E10"s 25-50' FROM RON-RESWFHRiI: TYPE t' 632 x 5 - XI OR 35 TREES 5V+ FROM DENTAL USE TYPE W PROe4E0: 6 ARSK 5 TO, 9 WF. 15 U (M SHADE OR MWIEHRAL TRES) SEM-OFAQUE TYPE V BUFFER TO THE. HORREASi: 307t LF. CIWPI.ES I CAIGF7 KEES PER IOQ LF. UDES Y.TQI A S9ER ROM OPAQUE FEWE 91 FAW 10 REQUIRED TYPE / ,00 = 3O7 PROVIDE AN 64A9mE 9:RDI 3 W KW Wf1RN TWO YEPAS 3.07 x 2 - B14 OR 7 CANOPY OR DF01AWMAL TRUS SIFTER ARSk 3.179 x 0.20=6356 09 636 3F DRUM L IYK '(' BUFFER: PROVIDED: 7 ON (7 CANOPY OR ORNWi0L RCS) I,D77 SF OF WA CMR46E WITIM BUFFER (2) QW)PY OR Om UDGAL TREES PER tOD LF. PLUS $IWIUERY m WAR 20% OF TFE 61111IR TO THE SWTR" 517t LF. COWLES BUFFER AREA RE.OUIED TYPE V: 517 / 100 = 5T7 OR (5) 00W OR 01WAETETAL TREES 5,17 x 2 = 10.34 it SLAOE TREES PLUS AN OPAQUE M CE PRWIDEr. 6 QK 5 TO (11 SWE TROS) BUFFER TO THE SDR,IEAST: 68M LF. COUPLES REOUR✓ED TYPE V; 660 / 100 - 6.6 6.6 x5=33 TREES PRONADEk 5 OIL 5 AREAL 12 LL 11 WRS (33 SPACE DR OMAWAL TREES) 15 3B9: PIANRG (c)(3)((V1 OF DE1flW1E)ITS OF 3 ACRES OR MORE REDUMD: OR 15M RAIDED AREA WWPUES REQU REIM 15DE THE TOTAL AREA S IA L BE PLNIEA PRUMM 42.3X (dXI) FOR EVERY t6 SPARES POW, BRIE PLWWNO PRONGED WHIM OF SPACE4 165 SPADES OO PULC. AREA OF NOT LESS TINE 9Y16' 9NtL BE MUMD. REOURD. US 11k16.5 OR 17 Vx16' PLNK9G A" PROBER 17 FUMING AREAS (d)(2) 7HM 511WL BE INE TREE NO LESS DO Y W TOTAL PARKM S*M- 17 RMD6 CD PUSS NM FOR 90 9'116' P AYRIC NEA (19ANDS U M9G TWJ-84YS DEEP ARE COIArtm AS IRO UAW) REWIRED: t7 TREES RRN£ED:. 13 AB, 4R15, (17 9BDETREES) LANDSCAPE SCHEDULX SIM ARSM 5 i1NR 1111BIdN1 ' FED SUNSET RED 515NEY IUPtE Z , J2-r CAL BWL ON 18 OIl ms RKDdUI am 2 1/2-r CN_ DA ID m AYONMI 015 LfW N CYPRESS &10 B B ?3 tNWW1WNrn R ! e 13 ACE1 BUERtN7tAtEW 1PolET2f &tO'. B+B CRP 9 cmm GYYDQS FOREST PR155' FOREST. NO RED" 2-2 i/2' UL. D+B U 27 PW LV�51ROEIM WDNY (Roma T.$WEIEBTLE B+EI An 11 HADN" N SOULA14 Y SAUCER W alk DEB. BO SEE ➢ 7 d01170 5 27 AEAPERVS 57UINE)WG RED CEDAR 17' mGC (� 58 REA tAAPACN DOW WIRBER@Y MIT - COMA"3 lN11E: EF4 .POLCIES.00gW AMOURS SHOWN.THE PUNAim ME PRAML0, TIE PLAN SWAiL PERMANENT GRASS CHART SYMBOL ACREA4E VARIETY SEEDWNG-RATE SEED '.. 180 k TURF TYPE TALL FESCUE (REND). F,76 FFSGE i150 WAILDA p OMPEDE 2.W LOS / ACRE 6 0, / 10DO'SOL ET. Sm ODBk MUM *WO' 419. MEADOW so ' 0.5E k tMil B0.9lI WB -127 (SEE SPEBLN%RROIfj LANDSCAPE LEGEND NIA TO W 10100 - t ffin" PER SECIFN'AMNS .. - ...... AREA TO BE SEEM LAWN (SE PMUY NT WAZ GNRT) OMB AREA TO BE SODDED LAWN (SEE PEWWBiF GRASS CHART) IRA TO BE SEEDED WIN SM RASH SEED ICI • (EWWA-127. SEE S'ECIFrfflW - NSA 99d1 MIT BE • .'.' WOULD REQUARLY, VD;EWED 2W %AIRY'& (REi•ER TO NET DE,OM . BASW RTWWEOUS STAEBAE) WOW LMMT LME - MOWN 9WL I$ W0W mm a ow KmnwmEm .S�PECIRGTWW WR#IEWICE F NOTE TO CONTRACTOR: 18" WIDE SOD STRIP IS REQUIRED BEHIND ALL CONCRETE CURBS/BUFFERS. WHERE TURF GRASS WILL BE ESTABLISHED ADJACENT TO CONCRETE CURBS/BUFFERS, EITHER A 16" OR 24" (DEPENDENT ON AVAILABILITY) WiDE SOD STRIP IS REQUIRED. ALERT TO CONTRACTOR: I. THE SITEWORK FOR THE WAL-MART PORTION OF THIS PROJECT SHALL MEET OR EXCEED THE "WAL-MART STANDARD SITEWORK SPECIFICATIONS." 2. ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO ANNOUNCED BUILDING POSSESSION AND THE FINAL CONNECTION OF SERVICES. 3, WHEN PROPOSED SPECIES ARE UNAVAILABLE, PLANT SUBSTITUTIONS MAY BE CONSIDERED WITH APPROVAL BY THE OWNER AND/OR LANDSCAPE ARCHITECT AS LONG AS PROPOSED MATERIAL IS TRUE TO PLANTING INTENT AND MEETS CODE REQUIREMENTS. LANDSCAPE PEAS GRAPHIC SCALE 40 0 20 40 e0 160 ( IN FEET ) 1 ine11 = 40 it. REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER NCOENR COMMENTS CWS PER WATER REVISIONS CWS aLL l z nj �.T. 9N; z a �. 8i. 4H �M0 sE E�1 m a yF pq LpEy! 4Ri u < ��Alili,!!fl//AlyA ///AimA 1111N�" z CD I � Q CV LEJ Ir— L LL t Q — 1— LLJ LLJ L,J N V) [� - I L a m WLLI — 0 <t m O LJ O= F-- LLJ Z [If � o LLJ I-- I _J Of < m O /L/L�J =lJ ). 0 LijQ (D z � �A AN �I�I�11 DRAWN H.L.H. CHECKED J.R.H. DATE 09 09/13 _ SCALE AS NOTED JW No. NCC138113 SHEET C-6 17 OF 24 SHEETS v:\13\P13019C\_CAD\LD PLANS\REV - 5\P130190 LSCP 5-----i(.AY6U': 17- LANDSCAhE T — 1 15evislon Date: October 28, 2013 1. TREE WRAP 1. ALL LANDSCAPED AREAS ARE TO RECEIVE A MINIMUM OF C OF TOPSOIL. SEE 2900 SPECIFICATION. MULCH/ TOPSOIL BACKFILL 2. 4" MINIMUM OF HARDWOOD BARK 2 MULCH COMPACTED OR AS ALL PUNT MATERIAL SHALLBE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. MULCH/ TOPSOIL. BACKFILL SPECIFIED. 1 TREE WRAP ROOTBALL AND TRUNK. 3. ALL PLANT MATERIAL SHALL BE CONTAINER GROWN OR BAI167 AND BUR LAPPED AS INDICATED IN THE PLANT LOT, ROOTBALL AND TRUNK 3. 3" HIGH SOIL BERM TO HOLD WATER. 2, 4" MINIMUM OF HARDWOOD BARK TREE STABILIZATION AND 4. All TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD AND MEET ALL REQUIREMENTS SPECIFIED, MULCH COMPACTED OR AS TREE STABILIZATION AND SPECIFIED. 4. STAKE SIZE SHALL B£ ONE SIZE FERTILIZATION SYSTEM HIGHER THAN REQUIRED FOR SIZE OF i. FINISH GRADE 5. ALL MATERIALS ARE SUEE:£CT TO THE APPROVAL OF THE LANDSCAPE NCHfTECT BEFORE, DURING, AND AFTER INSTALLATION. FERTILZATION SYSTEM TREE, REFER TO SITEWORK 2. BACKFILL WITH PREPARED 3. STAKE SIZE SHALL BE ONE SIZE HIGHER THAN REQUIRED FOR SIZE OF SPECIFICATIONS FOR APPROVED PLANTING SOIL MIX AS 6, ALL TREES MUST BE GUYED OR STAKED AS SHOWN IN THE DETAILS. MATERIALS AND INSTALLATION TWICE ROOTBALL SPECIFIED. TREE. REFER TO SITEWORK SPECIFICATIONS FOR APPROVED REQUIREMENTS. DIAMETER 1 3. 12"*CLEAN SAND, COMPACTED. 7. ALL PLANTING AREAS SHALL BE COMPLETELY MULCHED AS SPECIFIED. MATERIALS AND INSTALLATION REQUIREMENTS. 5. FINISHED GRADE (SEE GRADING ADJUST LAYER THICKNESS SO B. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL PLAN) TOP OF ROOTBALL IS AT EAST AVOID DAMAGE TO ALL UUUUES DURING THE COARSE OF THE WORK. LOCATIONS OF EXISTING BURIED UTILITY UNES SHOWN ON 4. 3" HIGH SOIL .BERM TO HOLD WATER, 1" ABOVE FINISHED GRADE.. THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE IT SHALL BE THE PLAN 6. TOP OF ROOTBALL MIN. 1" ABOVE 4. FILTER CLOTH RESPONSIBILITY OF THE CONTRACTOR 1) TO VERIFY THE LOCATIONS OF UTILITY UNES AND ADJACENT TO THE WORK AREA 2) TO 5. FINISHED GRADE (SEE GRADING PAN) FINISHED GRADE PROTECT OF ALL UTILITY UNES DURING THE CONSTRUCTION PERIOD 3) TO REPAIR ANY AND ALL DAMAGE 10 UTILITIES, PAN 5. SLOPE BOTTOM TO DRAIN - STRUCTURES, SITE APPURTENANCES, ETC, WHICH OCCURS AS A RESULT OF THE CONSTRUCTION. 6 TOP OF ROOTBALL MIN. t' ABOVE 7. B & B OR CONTAINERIZED (SEE - f 2 FINISHED GRADE SPECIFICATIONS FOR ROOT BALL _ _ 6. 18": AUGERED HOLE UGH 9. THE lXR•IfRACTOR SFi4i1. BE RESPONSIBLE FOR VERIFYING: ALL CUANTtiIES SFKWM ON THESE PLANS BEFORE PRICING THE WORK. 7. B & FI OR CONTAINERIZED (SEE REQUIREMENTS). 8. PREPARED PANTING SOIL AS - I ICI I `.. ` , ,, I i I I 3 OCCLUDING LAPENETRATE YER TO n ., y _ =� � � WATER TABLE OR 10. CONTRACTOR .SHALL BE RESPONSIBLE FOR DDRVtiY SCHEDULE AND PROTECTION BETWEEN DELIVERY AND PLANTING PER OOT SPECIFICATIONS FOR ROOT BALL SPECIFIED. _III- ., �, _ - TO A SPECIFICATIONS TO MAINTAIN HEALTHY PLANT CONDITIONS. REQUIREMENTS}. - 4 TO ASSURE I� DEPTH OF B. PREPARED PLANTING SOIL AS 9. ROOTBALLS GREATER THAN 24" R PROPER PERCOLATION, ,T ,_ _I � II 1O. THE CONTRACTOR SFMALL BE RESPONSIBLE FOR FULLY MAINTAINING (NNCLU)iNG BUT NOT LIMITED T0: WATERING, SPRAYING, SPECIFIED DIAMETER SHALL BE PLACED ON /�j '4 MOUND OF UNDISTURBED SOIL 70 j - 7. ,BACKFILL WITH t/2" - 3f4" - (I 1-1 + , - - 5 GRAVEL. MULCHING, FERTILIZING, ETC.) ALL OF THE PLANT' MATERIALS AND LAWN FOR THE PERIOD OF TIME SHOWN IN THE 02900 SPED p - GREATER THAN 24" 9. DIAMETER RIAMETER SHALL BE PLACED ON PREVENT SETTLING ROOTBALLS THAN `� 1=1 I I B. WATER TABLE 12, ANY PLANT MATERIAL: WHICH IS DISEASED, DISTRESSED, DEAD OR REECTED (PRIOR TO SUBSTANTIAL COMPLETIIN) SHALL BE MOUND OF UNDISTURBED SOIL TO SMALLER 24" IN DIA. MAY SIT ON COMPACTED EARTH. +H _ _ �� 6 III I I PROMPTLY REMOVED FROM THE SITE AND REPiACED WITH MATERIAL OF THE SAME SPECIES, OUANT", AND SIZE AND MEETING PREVENT SETTLING ROOTBALLS' 1 = - - FOR A PARKING ISLAND All PUNT LIST SPECIFKARONS. SMALLER THAN 24" IN DIA. MAY t .. 10. UNDISTURBED SUBSOIL Q 7 PLANTING SITUATION, - I IT - III- CONTRACTOR TO BACKFILL I 13. THE CONTRACTOR STALL COMPLETELY GUARANTEE ALL PLANT MATERIAL FOR A PERIOD DEFINED IN THE 02900 SPEC. THE SIT ON COMPACTED EARTH: '��U �. -) - I � ENTIRE LENGTH OF PLANTING CONTRACTOR SHALE PROMPTLY MAKE ALL. REPLACEMENTS: DURING THE NORMAL PLANTING SEASON. 1 1p. UNDISTURBED SUBSOIL 8 AREA TO WITHIN 8" OF BACK • 3 OF CURB OR EDGE OF 14, AFTER BEING DUG AT THE NURSERY SOURCE, ALL TREES IN LEAF %AU, BE ACCLIMATED FOR TWO (2) WEEKS UNDER A MIST PAVEMENT. SECTION SYSTEM PRIOR TO INSTALLATION. 2 4 NOTES. 15, STANDARDS SET FORTH IN AMERICAN STAND FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MRMAUM DUALITY REQUIREMENTS FOR PLANT MATERIAL 3 . 5 A. FINAL TREESTAKING DETAILS TES AND PLACEMENT TO BE POOR DRAINAGE CONDITION 16. WHERE SHOWN ON THE PLANS AND DETAILS, PLANTING BEDS ARE TO BE COMPLETELY COVERED WiTH A KARDWOOD MULCH FROM APPROVED BY OWNER. A LOCAL SOURCE HARVESTED IN A SUSTAINABLE MANNER TO A MINIMUM DEPTH OF FOUR INCHES. 4. A, FINAL TREE STAKING DETAILS B. REMOVE BURLAP, WIRE AND N.T.S: 17. REFER TO WALMART SPECIFICATIONS FOR INFORMATION NEEDED FOR IMPLEMENTATION OF PLANTING PLANS. AND PLACEMENT TO BE STRAPS (ANYTHING THAT APPROVED BY OWNER. COULD GIRDLE TREE OR I& WEED MAT IS REQUIRED IN LANDSCAPED 1RANUS AS SPECIFIED. 5 RESTRICT ROOT GROWTH) ON -I- B. REMOVE BURLAP, WIRE AND STRAPS (ANYTHING THAT I I- UPPER 1/3 OF ROOTBALL. 19.. ALL PLANT MATERIAL. QUANTITIES SHOWN ARE APPROXIMATE, CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF COULD GIRDLE TREE OR _ I (I- 5. C. SEE LANDSCAPE NOTES FOR osJ3o/os PR oRNc ALL PLANTING BEDS AT SPACING SHOWN. RESTRICT ROOT GROWTH ON 6 ) �`--: �• -�L I" = �= THE TYPE OF MULCH MATERIAL 20, THIS PUN IS TO BE IMPLEMENTED COOPERATIVELY WITH SWPPP PLAN, AS NEEDED, TO MAXIMIZE THE EFFECTIVENESS OF THE - UPPER 1/3 OF ROOTBALL --I 7 TO USE. SWPPP PLAN FOR THIS WE, k I --( r , ,:; %, " •" 7 C. SEE LANDSCAPE NOTES FOR ( - D, PRUNE TREE AS DIRECTED BY I I I II 8. 21. THE COFID 70R IS ENCOURAGED TO COMPLETE TEMPORARY 4R PERMANENT SEEDING OR SODDING IN STAGES FOR SOIL DIE YPE OF MULCH MATERIAL 12" LANDSCAPE ARCHITECT. I STABILIZATION AS AREAS ARE COMPLETED AFTER GRADING. TO USE, I ' 8 9 E. BRANCHING HEIGHT TO A.A.N. 22, TENS PLAN DOES NOT PRESENT ANY TEMPORARY STABIUZATKIH REQUIRED AS PART OF SWPPP FLAN. I D. PRUNE TREE AS DIRECTED BY STANDARDS, I t I I r 9 LANDSCAPE ARCHITECT. 1 5C-GTKXJ t0. BEST FACE OF SHRUB/ ' E BRANCHING HEIGHT TO A.A.N. 10 GROUNDCOVER TO FACE 1. TOP OF SHRUB ROOTBALLS TO BE FRONT OF PANTING BED. { 1 PLANTED 1" - 2" HIGH WITH SOIL STANDARDS. MOUNDING UP TO THE TOP OF 1/2 DIAMETER OF ROOT BALL REFER TO PLANT + -H ROOTBALL. T SCHEDULE FOR SPACING + + + + 2, WHEN USED IN MASSES- PRUNE ALL TYP. SMALL TREE PLANTING SHRUBS TO ACHIEVE A UNIFORM SECTION (14' OR LESS PLAN MASS/HEIGHT LARGE TREE PLANTING N.T.S. 3. 4" MINIMUM OF HARDWOOD BARK MULCH COMPACTED OR AS SPECIFIED. 14' OR GREATER) 0---1 2 3 4 5 4, EXCAVATE ENTIRE BED SPECIFIED FOR N.r.s ' GROUNDCOVER BED, 5. 4" MINIMUM OF TOPSOIL TO BRING TO FINISHED GRADE (SEE GRADING PAN). oa/o7/io LG TR PLNNG 06/07/10 1 1 SM TR PUNTG ERNST SEED CO. BASIN FLOOR SEED MIX 6. PREPARED PANTING SOIL AS SPECIFIED. NOTE: WHEN GROUND- SPECIFICATIONS (ERNMX-127): 1. BASE OF TREE SHALL BE PLANTED COVERS AND SHRUBS USED IN MASSES ENTIRE BED TO BE. AMENDED .SLIGHTLY ABOVE (1" MIN.) _ i , ,.W,N r'� j •' WITH PLANTING: SOIL MIX AS SPECIFIED. ELYMUS ViRGRNIGI% 1ARCNNW WILD RYE 25% ADJACENT FINISH GRADE. REMOVE I I-; x^.' :` rr '`•`T' I= I CMV VULPINODFA FOX SEDGE 25% ALL TWINE &STRAPS &CUT 1. 4" MINIMUM OF HARDWOOD BARK 1= I ' 7. SCARIFY ROOTBALL SIDES AND PDA PAUISTRIS FOWL BLUEGRASS 25% MULCH/ TOPSOIL BACKFILL BURLAP FROM TOP 1/3 OF MULCH/ TOPSOIL BACKFILL MULCH COMPACTED OR AS y - I ( ,•' BOTTOM. ARMS SCA.BRA DCKLEGRASS (ROUGH BENTGRASS 69 ROOTBALL. NO SYNTHETIC BURLAP SPECIFIED. - I SPARr,4lIUM EURYCARPUM GIANT BM -REED 3% ROOTBALL AND TRUNK WILL BE ACCEPTED. ROOTBALL AND TRUNK 2. STAKE SIZE SHALL BE ONE SIZE _I (-III-I ( VERB HASU7A BLUE VERVAIN 3% 2. 4" SHREDDED HARDWOOD BARK HIGHER THAN REQUIRED FOR SIZE OF TREE STABIUZATIO14 TREE. REFER TO SITEWORK 7 6 � � JUNCLS EFTUSUS SOFT RUSH 2% SCIRPuS ATROWIE NS GREEN BURUSH 2% TREE STABILIZATION AND MULCH OR APPROVED EQUAL :AND SPECIFICATIONS FOR APPROVED 12' SCRRFIUS CYPERNNUS WOOL GRASS 2% FERTILIZATION SYSTEM SCIRPUS FERTILIZATION SYSTEM MATERIALS AND INSTALLATION POLYPHYLLUS MAW -LEAVED BULRUSH 2% 3, DIAMETER OF TREE PIT TO BE TWICE REQUIREMENTS. TYP. MIIULUS RINGERS SQUARE STEM MOFIMOWER i% THE DIAMETER OF • CARER SCO'ARN BLUNT URODMSEDGE 1% IS ROOTBALL-ROUGHEN SIDES OF TREE 3. 4" MINIMUM OF TOPSOIL TO BRING TO H BBIUSICOTW COMMON PIT. FINISHED GRADE (SEE GRADING PAN). SECTION UE> 1% JUNCUS TENUIS PATH RUSH 1% 4. 3" HIGH SOIL BERM TO HOLD WATER. 4. TOP OF ROOTBALL MIN. i" ABOVE SEEDING RATE: 15 LBS PER ACRE OF THE ERNST MX MM AN ADDITIONAL FINISHED GRADE PLANTING 30 LBS PER ACRE OF GRAN RYE (AS A NURSE CROP) THE 5, TOPSOIL MIX BACKFILL 5. B&B OR CONTAINERIZED (SEE PLANSPECIFICATIONS -SHRUB/GROUNDCOVER TEMPORARY SUDI G SPECIFICATION AS NOTE} ON THE SOIL EROSION PLAN 6. TREE WRAP FOR ROOT BALL N.T.S. AND SEDIMENT CONTROL PLAN SHALL APPLY TO THIS AREA. 7. 4" MIN. OF TOPSOIL TO BRING TO REQUIREMENTS). 1.) THE FORMULATION NOTED ABOVE IS REPRESENTATIVE OF THE ERNST FINISHED GRADE (SEE GRADING PLAN) 6. PREPARE PANTING SOIL AS SPECIFIED. SEED SPECIFICATION. THE MOST CURRENT FORMAATION AS SPECIFIED BY THE ERNST COMPANY AT THE TIME OF PUNTING SHALL BE USED. 8. ROOTBALLS GREATER THAN 24" DIAMETER SHALL PLACED ON 7. S GREATER THAN o6/3a/oa "B PwiG. TU MOUND OF UNDISTURBED SOIL 70 DiAME?ER SHALL BE PLACED ON DIAMETER ON 2.) SEED SHOULD BE APPLIED USING DRILL SEEDING OR BROADCAST S IEIING METHODS ONLY. THIS SEED MIX WILL NOT GERMINATE WELL WITH PREVENT SETTLING ROOTBALLS MOUND OF UNDISTURBED SOIL TO t TOP OF SHRUB ROOTBALLS TO BE PLANTED 1" - 2' HYDROSEEDING METHODS, SMALLER THAN 24" IN DIA, MAY PREVENT SETTLING ROOTBALLS HIGH WITH SOIL MOUNDING UP TO THE TOP OF ROOTBALL. SIT ON COMPACTED EARTH. 9. UNDISTURBED SUBSOIL SMALLER THAN 24" IN DIA, MAY SIT ON COMPACTED EARTH, 2. WHEN USED IN MASSES- PRUNE ALL SHRUBS TO ACHIEVE A UNIFORM MASS/HEIGHT 3) THE ENURE FACILITY SHALL BE STUZ� WRIT A NORTH AMERICAN GREEN SEN50 STRAW k COCONUT BLANKET (OR H A NOR EQUAL. THE ) 10. PREPARE PLANTING SOIL AS �!' 8. UNDISTURBED SUBSOIL BLMlKEi SHOULD BE INSTALLED ON TOP OF THE SEED IN ACCORDANCE WITH THE MANUFACTURER SPECIFICATIONS. SPECIFIED. 9. 3" HIGH SOIL BERM TO HOLD WATER. 3, 4" MINIMUM OF HARDWOOD BARK MULCH COMPACTED OR 11. STAKE SIZE SHALL BE ONE: SIZE: 10. TREE WRAP BEST FACE OF SHRUB/ AS SPECIFIED, 4,) TtIE. SEED MIX WILL NEED DAILY SUPPUMENTAL WATERING UNTO. IT HAS NIGHER THAN REQUIRED FOR SIZE nnnNNN <5 OF TREE. REFER TO SITEWORK 1 GROUNDCOVER TO FACE 4.. EXCAVATE ENTIRE BED SPECIFIED FOR GROUNDCOVER FRONT BED. GERMINATED AND REACHED AN AVERAGE HEIGHT OF AT 12-i9'. 11. CUT BACK SLOPE TO PROVIDE A FLAT OF PLANTING + +BED. F SPECIFICATIONS FOR APPROVED x MATERIALS AND INSTALLATION \s5C1r� SURFACE FOR PLANTING. REFER TO PANT + + T 5. 4" MINIMUM OF TOPSOIL TO $RING TO FINISHED GRADE 5) THE SEEDING AREA SHALL BE MQYO ONCE AFTER THE FIRST GROWING IE SEASON, EARLY IN TSPRING, AND DO SHAU BE MOWED NO MORE REQUIREMENTS. T ARN 3 SCHEDULE FOR SPACING + + + + (SEE GRADING PLAN). ONCE EVERY THREE YEARS 11HEREPfTER EARLY IN SPRING ONLY. 10 tt _ NOTES: 6. PREPARED PLANTING SOIL AS SPECIFIED. NOTE WHEN 1 NO PLAN N GROUND- COVERS AND SHRUBS USED IN MASSES ENTIRf yo U A. FINAL TREE STAKING DETAILS -I I (� A, FINAL TREE STAKING DETAILS BED TO BE AMENDED WITH PLANTING SOIL MIX AS 2 AND PLACEMENT TO BE APPROVED 4 _ AND PLACEMENT TO BE I i SPECIFIED. r BY OWNER. _- -I APPROVED BY OWNER. j 6 9 _I I i` 7. SCARIFY ROOTBALL SIDES AND BOTTOM. 0 3 B. SET TREE AT ORIGINAL DEPTH.. -LL B REMOVE BURLAP. WIRE AND REMOVE BURLAP, WIRE AND STRAPS -III" STRAPS (ANYTHING THAT 8. CUT BACK SLOPE TO PROVIDE A FLAT SURFACE FOR a 4 (ANYTHING THAT COULD GiRDLE TREE - 5 COULD GIRDLE TREE OR PLANTING. 7 OR RESTRICT ROOT GROWTH) ONRESTR ROOT GROWTH) = ? I 5 UPPER 1/3 OF ROOTBALL. UPPERCT i 3 OF ROOTBALL.ON r D / - C. SEE LANDSCAPE NOTES FOR THE J-F- ' a'^`-'d•' -1 C. SEE LANDSCAPE NOTES FOR 1 2 3 4 5 TYPE OF MULCH MATERIAL TO USE. THE TYPE OF MULCH MATERIAL TO USE. BEFORE YOU DIGIT . I PRUNE TREE AS / a CALL 1-800-B32-4949 D. DIRECTED BY 1O - iII- i -I11 LANDSCAPE ARCHITECT f"" t D. PRUNE TREE AS DIRECTED BY _ 111^_ N.C. ONE -CALL. CENTER IT`S THE LAW! -� - -I t2•• 8: LANDSCAPE ARCHITECT. -III-I E. BRANCHING HEIGHT TO A.A.N. 11 STANDARDS TYP, E. BRANCHING HEIGHT TO A.A,N_ I_'I - 8 STANDARDS. 12` _ SECTION TYP, SECTION LANDSCAPE DETAILS SECTION -1 I Ill=III= 7 6 a 12" TREE PLANTING ON SLOPE TYP, MULTI -TRUNK TREE PLANTING "-TS. SHRUB JGROUNMOVER PLANTING ON SLOPE N.T.S. N.TS 106/07/101 JMLT TRNK PLNT 06/07/10 1 F-TR. PLNTG SLP OS HRB. PLNTG SL V: N[ imS\RCV - DAYIJUf�U 0 LRNVt L -L ilCl{AIL.^. III REVISIONS BY PER CITY COMMENTS CWS PER OUT TO BID CWS PER ARCH. COORDINATION CWS PER NCDENR COMMENTS CWS PER WATER REVISIONS CWS j �al Zi IV ai +� 8 9 '3 z,�& ; t+l ' 0 AI N A%Y � No. t c.J z CD F- z iD 00 0 <- U W J F- L:l L/1 cD Cr Cif Q LLj Qf > W W W z M 0 m O �< O t ILd - 0 W CD -i O W 1L d W C Lo >- J Q W z C) [V ED Ah AN AV IF DRAWN H.L.H. CHECKED J,R,H. DATE 09 O9 13 SCALE AS NOTED JOB No, NCC139113 SHEET C-7 18 OF 24 SHEETS KOM= Uate::October 28, 2013