HomeMy WebLinkAboutSW7130717_CURRENT PERMIT_20160518STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW:;ZZ5 7/ 7
DOGTYPE
CURRENT PERMIT
APPROVED PLANS
❑ HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
�i�fr�Il. �oILQ�IB'
YYYYMM D D
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
PAT MCCRORY
Governor
DONALD R. VAN DER VAART
Secretary
TRACY DAVIS
Director
May 18, 2016
y (eat.
Diamond Resorts GK Development, LLC .
Attn: Ms. Jackie Smullen
10600 West Charleston Blvd'
Las Vegas, NV 89135
Subject: Stormwater Permit No. SW7130717
Beachwoods — Residential PUD
High Density Stormwater Project
Dare County
Dear Ms. Smullen:
The Washington Regional Office received your request for a name/ownership change for
the Beachwoods development (formerly Barrier Island Station) located at Cypress Knee
Trail, in Kitty Hawk, NC on April 14, 2016. Staff review of the plans and specifications
has determined that the project, as proposed, will comply with the Stormwater
Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No.
SW7130717 dated May 18, 2016 for the subject project.
This permit replaces all previous stormwater permits issued for Barrier Island Station at
Kitty Hawk, NC and shall be effective from the date of issuance until December 12,
2021, and shall be subject to the conditions and limitations as specified therein. Please
pay special attention to the Operation and Maintenance requirements in this permit and
in the submitted application. Failure to establish an adequate system for operation and
maintenance of the stormwater management system will result in future compliance
problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you
have the right to request an adjudicatory hearing upon written request within thirty (30)
days following receipt of this permit. This request must be in the form of a written
petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed
with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-
7447. Unless such demands are made this permit shall be final and binding.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
943 Washington Square Mall.. I. Washington, NC 27889
252-946-6481 T
Page 2 of 9
Diamond Resorts GK Development, LLC
May 18, 2016
Page Two
If you have any questions, or need additional information concerning this matter,
please contact a staff member in the stormwater group, or me at (252) 946-6481.
Sincerely,
Samir Dumpor, PE
Regional Supervisor
cc: Bissell Professional Group
Town of Kitty Hawk Planning/Inspections
, 4Nashington Regional Office
Page 3 of 9
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes
of North Carolina as amended, and other applicable Laws, Rules, and
Regulations
PERMISSION IS HEREBY GRANTED TO
Diamond Resorts GK Development, LLC
Beachwoods
Dare County
FOR THE
construction, operation and maintenance of stormwater BMPs consisting of a wet
retention pond, infiltration basins and swales in compliance with the provisions of
15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Energy, Mineral
and Land Resources and considered a part of this permit for Beachwoods
development located at Kitty Hawk, NC.
This permit replaces all previous stormwater permits issued for Barrier Island
Station — Kitty Hawk, and shall be effective from the date of issuance until
December 12, 2021, and shall be subject to the following specified conditions
and limitations: .
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of
stormwater described in the application and other supporting data.
2. This stormwater system has been approved for the management of
stormwater runoff as described in Section 1.6 on page 4 of this permit.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such required easements, in
accordance with the approved plans and permit.
Page 4 of 9
4. Beachwoods is a residential condominium planned unit development with
multiple phases. The project area is approximately 96 acres, and consist
of 55 acres of uplands and 41 acres of isolated natural wetlands. This
permit covers (5) phases of development as listed in the attached
"Stormwater Management Phase Summary" dated 11/26/2013.
5. Stormwater approval for the current phases of development include the
following built -upon areas:
Buildings
7.6 acres
Roads
3.0 acres
Parking/Drives
6.2 acres
Hiking Trails
1.2 acres
Miscellaneous
1.1 acres
Totals
19.1 acres
6. A list of approved BMPs are listed in the attachment by phase number,
type, size, quantity, and construction status. Details and specifications are
shown on the approved plans. All BMPs are designed to meet, or exceed
storage requirements for the 2-inch storm event, and ultimately discharge
to isolated natural wetlands onsite, where additional treatment and storage
are provided.
7. The runoff from all built -upon area within the permitted drainage areas of
this project must be directed into the permitted stormwater control system.
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of
any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded
areas of the system will be repaired immediately.
The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at
optimum efficiency. The approved Operation and Maintenance Plans
must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowiny and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, filter media,
flow.spreader, catch basins, piping, and vegetated filter.
g. A clear access path to the bypass structure must be available at all
times.
Page 5 of 9
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DEMLR. The records will indicate the
date, activity, name of person performing the work and what actions were
taken.
5. The facilities shall be constructed as shown on the approved plans. This
permit shall become voidable unless the facilities are constructed in
accordance with the conditions of this permit, -the approved. plans -and'
specifications, and other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of
Occupancy, and prior to operation of this permitted facility, a certification
must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with
this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be
required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must
be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
The permittee shall submit to the Director and shall have received
approval for revised plans, specifications, and calculations prior to
construction, for any modification to the approved plans, including, but not
limited to, those listed below:
a. Any revision to any item shown on the approved plans, including
the stormwater management measures, built -upon area, details,
etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or
to the drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the
project area. The project area is defined as all property owned by
the permittee, for which Sedimentation and Erosion Control Plan
approval or a CAMA Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on
the approved plan.
10. The permittee shall submit final site layout and grading plans for any
permitted future areas shown on the approved plans, prior to construction.
11. The Permittee shall maintain a copy of the approved plans and
specifications on file at all times.
Page 6 of 9
12. The Director may notify the permittee when the permitted site does not
meet one or more, of the minimum requirements of the permit. Within the
time frame.specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet the minimum
requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
13. This permit shall be effective from the date of issuance until December 12,
2021. Application for permit renewal shall be submitted 180 days prior to
the expiration date of this permit and must be accompanied by the
processing fee.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the
Director. In the event of a change of ownership, or a name change, the
permittee must submit a formal permit transfer request to the Division of
Energy, Mineral and Land Resources, accompanied by a completed
name/ownership change form, documentation from the parties involved,
and other supporting materials as may be appropriate. The approval of
this request will be considered on its merits and may or may not be
approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit
may subject the Permittee to enforcement action by the Division of
Energy, Mineral and Land Resources, in accordance with North Carolina
General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances,
which may be imposed by other government agencies (local, state, and
federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate
corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management
systems.
The permittee grants DEQ Staff permission to enter the property during
normal business hours for the purpose of inspecting all components of the
permitted stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and
reissuance or termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the
stormwater control must follow the guidelines established in the North
Carolina Erosion and Sediment Control Planning and Design Manual.
Page 7 of 9 V
8. Approved plans and specifications for this project are incorporated by
reference and are enforceable parts of the permit. A copy of the approved
plans and specifications shall be maintained on file by the Permittee for
the life of the project.
9. The permittee shall notify the Division of any name, ownership or mailing
address changes within 30 days.
Permit issued this the 18 the day of May, 2016.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
for
Tracy E. Davis, PE, Director
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7130717
Page 8 of 9
Stormwater Permit No. SW7130717
Beachwoods — Kitty Hawk, NC
Wet Retention Pond, Infiltration Basins & Swales
Dare County
Designer's Certification
I, as a duly registered
in the State of North Carolina, having been
authorized to observe (periodically/ weekly/ full time) the construction of the
project,
(Project)
for (Project Owner) hereby state that,
to the best of my abilities, due care and diligence was used in the observation of
the project construction such that the construction was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Note: The checklist on the following page must be included with this
Certification. Any changes or deviations from the approved plans and
specifications must be explained in detail, and may require a permit modification.
The certification forms should be submitted to the Division of Energy, Mineral and
Land Resources at the appropriate Regional office.
SEAL
Signature
Registration Number
Date
Page 9 of 9
Complete this checklist for each system and include with
Certification:
1. The drainage area to the system contains approximately the
permitted acreage.
2. The drainage area to the system contains no more than the
permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such
that the runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the
system.
5. The bypass structure elevations are per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause
short-circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved
plans.
Stormwater Management Permit SW7130717
Barrier Island Station - Kitty Hawk
Stonnwater Management Phase Summary
Status 11262013
Total Arei
BUA
BMP
Ouanti
Ac
Acre
BMP
linearfl
cubic fly other
Status
Phase I and I -A ref: SW7940710
Phase I residential
"
20.6
3.57
Roof dripline infilration wales
Wet pond (lake)
1000
130660
Construction complete
Certification pending
Phase I -A roadway
2.3
1.31
Local infiltration wales and depressions
76 %
Construction complete
Flume to non -connected wetlands
18 %
Certification pending
Flume to connected wetlands
6 %
,
22.9
4.88
Total
Phase II North 8 South ref: SW7961209
North Phase
2.8
1.08
Infiltration basins -
7308
Stunnwater mgt modifications pending
Roof dripline infiltration males
200
Certification pending
South Phase
2.9
0.69
Infiltration basins
9291
Certified 12/11/09
Vegetated wales
535
Roof dnpline infiltration males
230
5.7
1.77
Total
Phase II-B ref: none
1.9
0.72
Infiltration basins
80871
Construction complete
Infiltration 8 wet pond (lake)
200320
Certification pending
Upland Infiltration
3566
Phase III N 8 North-Central ref: SW7011103
3.7
0.73
Infiltration basins
8240
Stonnwater mgt modifications pending
Roof dripline infiltration wales
80
Certificafion pending
Phase III South -Central ref: SW7060114
0.5
0.14
Infiltration basin
1871
Codified 7/15113
Vegetated males
160
Phase III South ref: none
3
0.36
Infiltration basins
5809
Stonnwater mgt modifications pending
Vegetated males
60
Certification pending
Roof dripline infiltration males
530
Phase IV ref: SW7060510
North Phase
2.6
0.78
Infiltration basins
34676
Certified 5114/08
South Phase
Total
2.6
0.86
Infiltration basin
13915
No development except permitted fill
5.2
1.64
Phase V ref: SW7970613
7
1.89
Infiltration basins
102860
No development except permitted fill
�.'c _ ;,•� r<:. �-'ram/
Energy, Mineral
and Land Resources
ENVIRONMENTAL QUALITY
May 18, 2016
Diamond Resorts GK Development, LLC
Attn: Ms. Jackie Smullen
10600 West Charleston Blvd
Las Vegas, NV 89135
W d
PAT MCCRORY
Gownnor
DONALD R. VAN DER VAART
Secretory
TRACY DAVIS
Director
Subject: Stormwater Permit No. SW7941023
Beachwoods — Planned Commercial Development
Low Density Project
Dare County
Dear Ms. Smullen:
The Washington Regional Office received your request for a name/ownership
change for the Beachwoods PCD (formerly Barrier Island Station) located at Cypress
Knee Trail, Kitty Hawk, NC on April 14, 2016. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the
Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding
Permit No. SW7941023 dated May 18, 2016, for the construction and maintenance of
the subject project.
This permit replaces all previous state stormwater permits for this site, and shall
be effective from the date of issuance until rescinded, and shall be subject to the
conditions and limitations as specified therein, and does not supersede any other
agency permit that may be required.
If any parts, requirements, or limitations contained in this permit are
unacceptable, you have the right to request an adjudicatory hearing upon written
request within thirty (30) days following receipt of this permit. This request must be in
the form of a written petition, conforming to Chapter 150E of the North Carolina General
Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center,
Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and
binding.
If you have any questions, or need additional information concerning this matter,
please a staff member in the stormwater group, or me at (252) 946-6481.
Sincerely,\J
Samir Dumpor, PE
Regional Engineer
cc: Bissell Professional Group
Town of Kitty Hawk Planning/Inspections
,/(Nashington Regional Office
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
947 Washington Square Mall. I Washington, NC 27889
252-946-6481 T
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
STATE STORMWATER MANAGEMENT PERMIT
LOW DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules and Regulations
PERMISSION IS HEREBY GRANTED TO
Diamond Resorts GK Development, LLC
Beachwood, PCD - Kitty Hawk, NC
Dare County
FOR THE
construction, operation and maintenance of a 30% low density commercial site in
compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the
"stormwater rules') and the approved stormwater management plans and
specifications, and other supporting data as attached and on file with and approved by
the Division of Energy, Mineral, and Land Resources (DEMLR) and considered a part of
this permit.
The permit replaces all previous state stormwater permits for this site, and shall be
effective from the date of issuance until rescinded and shall be subject to the following
specific conditions and limitations:
I. DESIGN STANDARDS
1. This project is a 22.04 acre commercial site located at Cypress Knee Trail in
Kitty Hawk, NC. Total built -upon area, including existing and proposed
modifications, is 2.84 acres.
2. The overall tract built -upon area percentage for this protect must be maintained
at, or below 30%, per the requirements of Section .1005 of the stormwater rules.
4. No piping shall be allowed except those minimum amounts necessary to direct
runoff beneath an impervious surface such as a road or under driveways to
provide access to lots.
5. Runoff conveyances, such as roadside swales and perimeter ditches, must be
vegetated with side slopes no steeper than 3:1 (H:V).
6. Approved plans and specifications for projects covered by this permit are
incorporated by reference and are enforceable parts of the permit.
Page 2 of 5
II. SCHEDULE OF COMPLIANCE
Roadside swales, vegetated areas and other vegetated conveyances shall be
constructed in their entirety, vegetated, and be operational for their intended use
prior to the construction of any built -upon surface, per the approved plans.
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the swales or other vegetated conveyances will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to operate the permitted stormwater management systems at
optimum efficiency to include:
a. Inspections
b. Sediment removal.
C. Mowin.9, and revegetating of the side slopes.
d. Immediate repair of eroded areas.
e. Maintenance of side slopes in accordance with approved plans and
specifications.
f. Cleaning and repair of catch basin grates, flumes, piping, and the flow
spreader mechanism.
4. The permittee shall submit to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to the approved plans, regardless of size.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition or sale of the project area. The project
area is defined as all property owned by the permittee, for which
Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, piping, or altering any vegetative conveyance shown on the
approved plan.
5. The Director may determine that other revisions to the project should require a
modification to the permit.
6. The permittee is responsible for verifying that the proposed built -upon area does
not exceed the allowable built -upon area. Once the lot transfer is complete, the
built -upon area may not be revised without approval from the Division, and
responsibility for meeting the built -upon area limit is transferred to the individual
property owner, provided that the permittee has complied with the requirements
of Section 11.12 of this permit.
7. The permittee must certify in writing that the project's stormwater controls, and
impervious surfaces have been constructed within substantial intent of the
approved plans and specifications. Any deviation from the approved plans must
be noted on the Certification. The permittee shall submit the Certification to the
Division within 30 days of completion of the project.
8. The permittee shall submit all information requested by the Director or his
representative within the time frame specified in the written information request.
9. All roof drains must terminate at least 30' from the Mean High Water mark.
Page 3 of 5
10. Recorded deed restrictions must include, at a minimum, the following
statements related to stormwater management:
a. The following covenants are intended to ensure ongoing compliance with
State Stormwater Management Permit Number SW7941023, as modified,
and issued by the Division of Energy, Mineral, and Land Resources under
NCAC 2H.1000.
b. The State of North Carolina is made a beneficiary of these covenants to
the extent necessary to maintain compliance with the Stormwater
Management Permit.
C. These covenants are to run with the land and be binding on all persons
and parties claiming under them.
d. The covenants pertaining to stormwater may not be altered or rescinded
without the express written consent of the State of North Carolina,
Division of Energy, Mineral, and Land Resources.
e. Alteration of the drainage as shown on the approved plans may not take
place without the concurrence of the Division of Energy, Mineral, and
Land Resources.
The allowable built -upon area shall not exceed 30%. This allotted amount
includes any built -upon area constructed within the property boundaries,
and that portion of the right-of-way between the front lot line and the edge
of the pavement. Built upon area includes, but is not limited to, structures,
asphalt, concrete, gravel, brick, stone, slate, coquina, driveways, and
parking areas, but does not include raised, open wood decking, or the
water surface of swimming pools.
g. Filling in, piping or altering any 3:1 vegetated conveyances (ditches,
swales, etc.) associated with the development except for average
driveway crossings, is prohibited by any persons.
h. Filling in, piping or altering any vegetated area associated with the
development is prohibited by any persons.
i. A 30' vegetated buffer must be maintained between all built -upon area
and the Mean High Water line of surface waters.
j. All roof drains shall terminate at least 30' from the Mean High Water
Mark.
11. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
12. Prior to transfer of ownership, the swales must be inspected and determined to
be in compliance with the permit. Any deficiencies will be repaired or replaced
prior to the transfer.
13. The final plats for the project will be recorded showing all required swale
easements and common areas, in accordance with the approved plans.
Page 4 of 5
III. GENERAL CONDITIONS
Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to an enforcement action by the Division of Energy,
Mineral, and Land Resources, in accordance with North Carolina General
Statutes 143-215.6A to 143-215.6C.
2. The permit issued shall continue in force and effect until revoked or terminated.
3. The permit may be modified, revoked and reissued or terminated for cause. The
filing of a request for a permit modification, revocation and reissuance, or
termination does not stay any permit condition.
4. The issuance of this permit does not prohibit the Director from reopening and
modifying the permit, revoking and reissuing the permit, or terminating the permit
as allowed by the laws, rules, and regulations contained in Title 15A of the North
Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General
Statute 143-215.1 et. al.
The permit is not transferable to any person or entity except after notice to and
approval by the Director. The Director may require modification or revocation and
reissuance of the permit to change the name and incorporate such other
requirements as may be necessary. A formal permit transfer request must be
submitted to the Division of Energy, Mineral, and Land Resources accompanied
by the appropriate fee, documentation from both parties involved, and other
supporting materials as may be appropriate. The approval of this request will be
considered on its merits, and may or may not be approved. The permittee is
responsible for compliance with all the terms and conditions of this permit until
the Division approves the permit transfer.
The issuance of this permit does not preclude the Permittee from complying with
any and all statutes, rules, regulations, or ordinances imposed by other
government agencies (local, state and federal) which have jurisdiction. If any of
those permits or approvals result in revisions to the plans, a permit modification
must be submitted.
7. The permittee grants permission to DEMLR staff to enter the property during
business hours for the purposes of inspecting the stormwater control system and
it's components.
8. The permittee shall notify the Division of Energy, Mineral, and Land Resources
of any name, ownership or mailing address changes within 30 days.
Permit issued this the 18 th day of May, 2016.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
\ _
--------------------------------------------------------------------
for
Tracy E. Davis, PE, CPM
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Permit No. SW7941023
Page 5 of 5
A� wawa
a
w
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Energy, Mineral, and Land Resources
Land Quality Section
Tracy E. Davis, PE, CPM Pat McCrory, Governor
Director John E. Skvada, III, Secretary
December 12, 2013
Barrier Island Station, Inc.
Attn: Ms. Julia P. Lee
1 Cypress Knee Trail
Kitty Hawk, NC 27949
Subject: Stormwater Permit No. SW7130717
Barrier Island Station
Combined Multiple Phases
High Density Stormwater Project
Dare County
Dear Ms. Lee:
The Washington Regional Office received your request to modify and combine all current phases
of the existing development located at Barrier Island Station - Kitty Hawk, on July 25, 2013.
Additional information, along with revised plans and supporting information, was provided by
your engineer on November 15, 2013. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth
in Title 15A NCAC 2H.1000. We are forwarding Permit No. S W7130717 dated December 12,
2013 for the subject project. .
This permit replaces all previous stormwater permits issued for Barrier Island Station — Kitty
Hawk, and shall be effective from the date of issuance until December 12, 2021, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to the
Operation and Maintenance requirements in this permit and in the submitted application. Failure
to establish an adequate system for operation and maintenance of the stormwater management
system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following
receipt of this permit. This request must be in the form of a written petition, conforming to
Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this
permit shall be final and binding.
Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-6481 / FAX: 252-975-3716
Internet: http://www.portal,nedenr.org/web/Ir/land-quality
An Equal Opportunity / Affirmative Action Employer - 50%Recycled/10% Post Consumer Paper
Page 2 of 9
Barrier Island Station, Inc
December 12, 2013
Page Two
If you have any questions, or need additional information concerning this matter,
please contact a staff member in the stormwater group, or me at (252) 946-6481.
Sincerely,
Bill Moore, Environmental Engineer
DEMLR, WARO
cc: Calfee Engineering
Town of Kitty Hawk Planning/Inspections
,/Washington Regional Office
Page 3 of 9
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes
of North Carolina as amended, and other applicable Laws, Rules, and
Regulations
PERMISSION IS HEREBY GRANTED TO
Barrier Island Station, Inc.
Ms. Julia P. Lee
Dare County
FOR THE
construction, operation and maintenance of stormwater BMPs consisting of a wet
retention pond, infiltration basins and swales in compliance with the provisions of
15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the
approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit for Barrier Island Station, located at Kitty
Hawk, NC.
This permit replaces all previous stormwater permits issued for Barrier Island
Station — Kitty Hawk, and shall be effective from the date of issuance until
December 12, 2021, and shall be subject to the following specified conditions
and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of
stormwater described in the application and other supporting data.
2. This stormwater system has been approved for the management of
stormwater runoff as described in Section 1.6 on page 4 of this permit.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such required easements, in
accordance with the approved plans and permit.
Page 4 of 9
Barrier Island Station — Kitty Hawk, is a residential condominium planned
unit development with multiple phases. The project area is approximately
96 acres, and consist of 55 acres of uplands and 41 acres of isolated
natural wetlands. This permit covers (5) phases of development as listed
in the attached "Stormwater Management Phase Summary" dated
11 /26/2013.
5. Stormwater approval for the current phases of development include the
following built -upon areas:
Buildings
7.6 acres
Roads
3.0 acres
Parking/Drives
6.2 acres
Hiking Trails
1.2 acres
Miscellaneous
1.1 acres
Totals
19.1 acres
6. A list of approved BMPs are listed in the attachment by phase number,
type, size, quantity, and construction status. Details and specifications are
shown on the approved plans. All BMPs are designed to meet, or exceed
storage requirements for the 2-inch storm event, and ultimately discharge
to isolated natural wetlands onsite, where additional treatment and storage
are provided.
7. The runoff from all built -upon area within the permitted drainage areas of
this project must be directed into the permitted stormwater control system.
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of
any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded
areas of the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at
optimum efficiency. The approved Operation and Maintenance Plans
must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, filter media,
flow spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all
times.
Page 5 of 9
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the
date, activity, name of person performing the work and what actions were
taken.
5. The facilities shall be constructed as shown on the approved plans. This
permit shall become voidable unless the facilities are constructed in
accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of
Occupancy, and prior to operation of this permitted facility, a certification
must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with
this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be
required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must
be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
9. The permittee shall submit to the Director and shall have received
approval for revised plans, specifications, and calculations prior to
construction, for any modification to the approved plans, including, but not
limited to, those listed below:
a. Any revision to any item shown on the approved plans, including
the stormwater management measures, built -upon area, details,
etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or
to the drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the
project area. The project area is defined as all property owned by
the permittee, for which Sedimentation and Erosion Control Plan
approval or a CAMA Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on
the approved plan.
10. The permittee shall submit final site layout and grading plans for any
permitted future areas shown on the approved plans, prior to construction.
11. The Permittee shall maintain a copy of the approved plans and
specifications on file at all times.
Page 6 of 9
12. The Director may notify the permittee when the permitted site does not
meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet minimum
requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
13. This permit shall be effective from the date of issuance until December 12,
2021. Application for permit renewal shall be submitted 180 days prior to
the expiration date of this permit and must be accompanied by the
processing fee.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the
Director. In the event of a change of ownership, or a name change, the
permittee must submit a formal permit transfer request to the Division of
Water Quality, accompanied by a completed name/ownership change
form, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be
considered on its merits and may or may not be approved. The permittee
is responsible for compliance with all permit conditions until such time as
the Division approves the transfer request.
Failure to abide by the conditions and limitations contained in this permit
may subject the Permittee to enforcement action by the Division of Water
Quality, in accordance with North Carolina General Statute 143-215.6A to
143-215.6C.
The issuance of this permit does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances,
which may be imposed by other government agencies (local, state, and
federal) having jurisdiction.
In the event that the facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate
corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management
systems.
5. The permittee grants DENR Staff permission to enter the property during
normal business hours for the purpose of inspecting all components of the
permitted stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and
reissuance or termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the
stormwater control must follow the guidelines established in the North
Carolina Erosion and Sediment Control Planning and Design Manual.
Page 7 of 9
Approved plans and specifications for this project are incorporated by
reference and are enforceable parts of the permit. A copy of the approved
plans and specifications shall be maintained on file by the Permittee for
the life of the project.
9. The permittee shall notify the Division of any name, ownership or mailing
address changes within 30 days.
Permit issued this the 12 th day of December, 2013.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
//LreO� `` ,(�l�o-- for
Tracy E. Davis, E, Director
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Permit Number SW7130717
Page 8 of 9
Stormwater Permit No. SW7130717
Barrier Island Station — Kitty Hawk
Wet Retention Pond, Infiltration Basins & Swales
Dare County
Designer's Certification
I, as a duly registered
in the State of North Carolina, having been
authorized to observe (periodically/ weekly/ full time) the construction of the
project,
(Project)
for (Project Owner) hereby state that,
to the best of my abilities, due care and diligence was used in the observation of
the project construction such that the construction was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Note: The checklist on the following page must be included with this
Certification. Any changes or deviations from the approved plans and
specifications must be explained in detail, and may require a permit modification.
The certification forms should be submitted to the Division of Water Quality at the
appropriate Regional office.
SEAL
Signature
Registration Number
Date
Page 9 of 9
Complete this checklist for each system and include with
Certification:
1. The drainage area to the system contains approximately the
permitted acreage.
2. The drainage area to the system contains no more than the
permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such
that the runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the
system.
5. The bypass structure elevations are per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause
short-circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved
plans.
V, v
—`"A
NCDENR
North Carolina Department of Environment and Natural Resources
Dlvislon of Energy, Mineral, and Land Resources
Land Quality Section
Tracy E. Davis, PE, CPM Pat McCrory, Governor
Director John E. Skvaria, III, Secretary
December 12, 2013
Barrier Island Station, Inc.
Attn: Ms. Julia P. Lee
1 Cypress Knee Trail
Kitty Hawk, NC 27949
Subject: Stormwater Permit No. SW7130717 ,
Barrier Island Station
Combined Multiple Phases.
High Density Stormwater Project
Dare County
Dear Ms. Lee:
The Washington Regional Office received your request to modify and combine all current phases
of the existing development located at Barrier Island Station - Kitty Hawk, on July 25, 2013.
Additional information, along with revised plans and supporting information, was provided by
your engineer on November 15, 2013. Staff review of the plans and specifications has
determined that the project, as proposed, will comply with the Stormwater Regulations set forth
in Title 15A NCAC 2H.1000. We are forwarding Permit No. S W7130717 dated December 12,
2013 for the subject project.
This permit replaces all previous stormwater permits issued for Barrier Island Station — Kitty
Hawk, and shall be effective from the date of issuance until December 12, 2021, and shall be
subject to the conditions and limitations as specified therein. Please pay special attention to the
Operation and Maintenance requirements in this permit and in the submitted application. Failure
to establish an adequate system for operation and maintenance of the stormwater management
system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the
right to request an adjudicatory hearing upon written request within thirty (30) days following
receipt of this permit. This request must be in the form of a written petition, conforming to
Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative
Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this
permit shall be final and binding.
Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-94G6481 I FAX 252-975-3716
Internet http:Ilwww.portal.ncdenr.oWnbHrAand-quality
An Equal Opportunity I Affirmative Action Employer - 50%RecycW10% Post Consumer Paper
Page 2 of 9
Barrier Island Station, Inc
December 12, 2013
Page Two
J
If you have any questions, or need additional information concerningg this matter
please contact a staff member in the stormwater group, or me at (252) 94e-648i.
Sincerely,
Bill Moore, Environmental Engineer
DEMLR, WARO
cc: Calfee Engineering
Town of Kitty Hawk Planning/Inspections
Washington Regional Office
Page 3 of 9
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes
of North Carolina as amended, and other applicable Laws, Rules, and
Regulations
PERMISSION IS HEREBY GRANTED TO
Barrier Island Station, Inc.
Ms. Julia P. Lee
Dare County
FOR THE
construction, operation and maintenance of stormwater BMPs consisting of a wet
retention Rnd, infiltration basins and swales in compliance with the rovisions of
15A NCAC 2H . 1000 erea er re erredfo—as the "storrnwater rules I and the
approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Water Quality
and considered a part of this permit for Barrier Island Station, located at Kitty
Hawk, NC.
This permit replaces all previous stormwater permits issued for Barrier Island
Station — Kitty Hawk, and shall be effective from the date of issuance until
December 12, 2021, and shall be subject to the following specified conditions
and limitations: .
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of
stormwater described in the application and other supporting data.
2. This stormwater system has been approved for the management of
stormwater runoff as described in Section 1.6 on page 4 of this permit.
3. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the
project will be recorded showing all such required easements, in
accordance with the approved plans and permit.
Page 4 of 9
4. Barrier Island Station — Kitty Hawk, is a residential condominium planned
unit development with multiple phases. The project area is approximately
96 acres, and consist of 55 acres of uplands and 41 acres of isolated
natural wetlands. This permit covers (5) phases of development as listed
in the attached "Stormwater Management Phase Summary" dated
11/26/2013.
5. Stormwater approval for the current phases of development include the
following built -upon areas:
Buildings
7.6 acres
Roads
3.0 acres
Parking/Drives
6.2 acres
Hiking Trails
1.2 acres
Miscellaneous
1.1 acres
Totals ,
1�cres
6. A list of approved BMPs are listed in the attachment by phase number,
type, size, quantity, and construction status. Details and specifications are
shown on the approved plans. All BMPs are designed to meet, or exceed
storage requirements for the 2-inch storm event, and ultimately discharge
to isolated natural wetlands onsite, where additional treatment and storage
are provided.
The runoff from all built -upon area within the permitted drainage areas of
this project must be directed into the permitted stormwater control system.
II. SCHEDULE OF COMPLIANCE
The stormwater management system shall be constructed in its entirety,
vegetated and operational for its Intended use prior to the construction of
any built -upon surface.
2. During construction, erosion shall be kept to a minimum and any eroded
areas of the system will be repaired immediately.
3. The permittee shall at all times provide the operation and maintenance
necessary to assure the permitted stormwater system functions at
optimum efficiency. The approved Operation and Maintenance Plans
must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, filter media,
flow spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all
times.
Page 5 of 9
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the
date, activity, name of person performing the work and what actions were
taken.
5. The facilities shall be constructed as shown on the approved plans. This
permit shall become voidable unless the facilities are constructed in
accordance with the conditions of this permit, the approved plans and
specifications, and other supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of
Occupancy, and prior to operation of this permitted facility, a certification
must be received from an appropriate designer for the system installed
certifying that the permitted facility has been installed in accordance with
this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and
specifications must be noted on the Certification. A modification may be
required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must
be restored to design condition prior to operation as a stormwater
treatment device, and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
9. The permittee shall submit to the Director and shall have received
approval for revised plans, specifications, and calculations prior to
.construction, for any modification to the approved plans, including, but not
limited to, those listed below:
a. Any revision to any item shown on the approved plans, including
the stormwater management measures, built -upon area, details,
etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or
to the drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the
project area. The project area is defined as all property owned by
the permittee, for which Sedimentation and Erosion Control Plan
approval or a CAMA Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on
the approved plan.
10. The permittee shall submit final site layout and grading plans for any
permitted future areas shown on the approved plans, prior to construction.
11. The Permittee shall maintain a copy of the approved plans and
specifications on file at all times.
Page 6 of 9
12. The Director may notify the permittee when the permitted site does not
meet one or more of the minimum requirements of the permit. Within the
time frame specified in the notice, the permittee shall submit a written time
schedule to the Director for modifying the site to meet minimum
requirements. The permittee shall provide copies of revised plans and
certification in writing to the Director that the changes have been made.
13, This permit shall be effective from the date of issuance until December 12,
2021. Application for permit renewal shall be submitted 180 days prior to
the expiration date of this permit and must be accompanied by the
processing fee.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the
Director. In the event of a change of ownership, or a name change, the
permittee must submit a formal permit transfer request to the Division of
Water Quality, accompanied by a completed name/ownership change
form, documentation from the parties involved, and other supporting
materials as may be appropriate. The approval of this request will be
considered on its merits and may or may not be approved. The permittee
is responsible for compliance with all permit conditions until such time as
the Division approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this Permit
may subject the Permittee to enforcement action by the Division of Water
Quality, in accordance with North Carolina General Statute 143-215.6A to
143-215.6C.
3. The issuance of this permit does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances,
which may be imposed by other government agencies (local, state, and
federal) having jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the
creation of nuisance conditions, the Permittee shall take immediate
corrective action, including those as may be required by this Division, such
as the construction of additional or replacement stormwater management
systems.
5. The permittee grants DENR Staff permission to enter the property during
normal business hours for the purpose of inspecting all components of the
permitted stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for
cause. The filing of a request for a permit modification, revocation and
reissuance or termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the
stormwater control must follow the guidelines established in the North
Carolina Erosion and Sediment Control Planning and Design Manual.
Page 7 of 9
S. Approved plans and specifications for this project are incorporated by
reference and are enforceable parts of the permit. A copy of the approved
plans and specifications shall be maintained on file by the Pennittee for
the life of the project.
9. The permittee shall notify the Division of any name, ownership or mailing
address changes within 30 days.
I
Permit issued this the 12 th day of December, 2013.
NORTH C LINA ENVIRON 4FENTAL MANAGEMENT COMMISSION
for
rac avis, PE, Director
Division of Energy, Mineral, and Land Resources
By Authority of the Environmental Management Commission
Permit Number SVV7130717
Page 8 of 9
i Stormwater Permit No. SV 7130717
Barrier Island Station — Kitty Hawk
Wet Retention Pond, Infiltration Basins & Swales
Dare County
Designer's Certification
i, as a duly registered
in the State of North Carolina, having been
authorized to observe (periodically/ weekly/ full time) the construction of the
project,
(Project)
for (Project Owner) hereby state that,
to the best of my abilities, due care and diligence was used in the observation of
the project construction such that the construction was observed to be built within
substantial compliance and intent of the approved plans and specifications.
Note: The checklist on the following page must be included with this
Certification. Any changes or deviations from the approved plans and
specifications must be explained in detail, and may require a permit modification.
The certification forms should be submitted to the Division of Water Quality at the
appropriate Regional office.
SEAL
Signature
Registration Number
Date
Page 9 of 9
Complete this checklist for each system and include with
Certification:
1. The drainage area to the system contains approximately the
permitted acreage.
2. The drainage area to the system contains no more than the
permitted amount of built -upon area.
3. All the built -upon area associated with the project is graded such
that the runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the
system.
5. The bypass structure elevations are per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the outlet/bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1.
10. The inlets are located per the approved plans and do not cause
short-circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved
plans.
Stormwater Mane9emont Perron SW7130717
Barrier Island Station - K* File"
SOomtwater Management Phew Summery
Status 11/282013
TotWAM
BMPQtan
Phase 1 and 1-A ref SW71M0710
AMCArue
BMP
FmW fI
pfiie fl
omen
Status
Phase I esidnn5al
20.8
3.57
Roof driplbe Infiltration swabs
1000
Construction cample s
Wet pond (10m)
130880
CeMkabon pending
Phase [-A roadway
23
1.31
local Infiltration $wales and depressions
76 %
Conshuctim mmpleb
Rom to romoorm$cbci wwlbnds
18 %
Ca4Tralion pending
Firms to connected wetlands
6 %
22.0
438
Told
Phase 11 North 6 South ref SW7961209
North Phase
2.8
1.08
Indltradw basins
7308
Sturnmaler mgt mo lifi s0oas pendng
Roof dripline hrdltraft $wales
200
Certification pending
South Phase
2.9
0.69
Infiltration boahs
9291
Certified 12/11A9
Vegetated $wales
535
Roofdnpfine Infiltration swabs
230
5.7
1.77
Tod
Phase 11.8 ref none
1.9
0.72
Infiltration basis
80871
Construction mnpleb
Infiltration 8 wat pond (bke)
200320
CeMcatlon pending
uplarid IMtltratlon
3588
Phase III N 8 North-Central rat67MI1103
3.7
0.73
Infiltration basins
8240
Slmnavaler mgt ndCN§Cab n$ pending
Roof drlpline adittredon sweles
W
Certification pending
Phase III SoutltGentrel ref: SW7080114
0.5
0.14
IdOtraaon basin
1971
Certified 7/15113
Vegetated ewalms
160
Phase III South rot. none
3
0.38
Inflbilorbasins
5808
Stotmwater mgl modifications pending
Vegetated sweles
Certification Panding
Rnof r41p6a mfl' lotion ewafes
5 p
Phase lV net. SW7080510
North Phasa
2.6
0.7a
IMBtratlon bests
34676
CeMed 5/140M
South Phase
2.6
0.85
1 i lbefica basin
13915
No deuelopmmR etozpt pemYlted fin
52
1.64
Total
Phase V ref SW7970813
7
1.89
Infiltration basins
102880
No ems fl8
v_Tv
State of North Carolina
Department of Environment,
Health and Natural Resources AT4YA
Washington Regional Office
James B, Hunt, Jr., Governor Ad
Jonathan B. Howes, Secretary p E H N F1
Nancy W, Smith, Regional Manager
DIVISION OF ENVIRONMENTAL MANAGEMENT '
22 December 1994
Messrs.14
Barrier
Shayer & Lancaster �\�
Barririer Island Station
1245 Duck Road
Kitty Hawk, North Carolina 27949
SUBJECT: Stormwater Approval
Barrier Island Station
!Phase I
Dare County
Dear Messrs. Shayer & Lancaster:
The Washington Regional Office received your Erosion Control Plan
(or stormwater Management Plan) for the subject project on 26 October 1994.
Based upon our review, this project is approved as a low density project as
met forth in title 15 NCAC 2H .1000. The proposed etormwater control measures
must be constructed properly and maintained for the life of the project.
If you have any questions concerning this matter, please contact
Mr. Bill Moore at (919) 946-6481.
Sincerely,
Rog r K. ' Thorpe, PE
Water Quality Regional Supervisor
Cc: Bradley Bennett
Calfee Engineering
1424 Carolina Avenue, Washington, North Carolina 27889 Telephone 919-946.6481 FAX 919-975.3716
An Equal opportunity Affirmative Action Employer 60% recycled/10%post-consumer paper
STORNWATER REVIEW FORM
PROJECT NAME: Sf /A_ -ph. Z ;
CPn.ne�:oe DA
PROJECT NO. 51,J 7 Z3
RECEIVED:
INFO REQ: �� 3_/p�s•i� .s;�
INFO RCD:
COUNTY: 0'a�-e_RETURNED:
LOCATION: X-6 1�4A ISSUED:
uT _
Se- REVIEWED BY:
DO OWNER:
/lfr sr< 5 Zl*"'CONTACT: -. �' _ Cc
ADDRESS: _ . �..; /s 4 f ADDRESS: & _/ed
/Z49 DvaL feel 114`k A272
k,,Yfv/A4.k. AIC a799�4
PONE: PHONE: 7-6 /• 30zs-
PROJECT DESCRIPTION: P%cwz -r •F / / s
//.Y �uovE dfe y� ��yuxii COav� ( �im AlNwAi
IMPERVIOUS AREA: R 64`Re: TOTAL AREA: 24;47 % IMPER. AREA. I_ /b 4 °4
CONTROL MEASURES: Z 8'I °L �T� .„,, e = ZG•4'��
EXEMPT INFILTRATION SYSTEM
'SLOW DENSITY OTHER
WET POND SYSTEM
P.E. CERT. REQ.: RECEIVED:
INSPECTIONS/COMMENTS:
,JaJc A�cc .•�� 1 S �e%pJ nu� "a a wo ]/a� e�c✓ 4 S U 4� we /"/c roes '� Mej4 7ii f+jwy �3. Na.fJcto�ge/ 8.0 Ff
n. e✓
Uaw;.� 7
DIVISION OF ENVIRONMENTAL MAxAOENENT
Submittal Form for Projects Using Density Limits for Storowater Control
PROJECT DATE
Project Name
Location (County, Tornship/Nunicipslity, Address, state Road)
Phone Number 949 ZGl 4ip /a Submittal Date
Brief Description (include map and appropriate drawings)
Same of later Body Receiving Stormnater Runoff /VIA f / e(ZPTA - I/ r(T1/�
Classification of water Body
State/Federal Permits/App//rovals Required (Check appropriate blanks)
CANA Major / SedimentatloNErosion Control rq•rr. d (i17•t /V�tt✓re
404 Permit 4 p-BEbDNS Saweso Disposal -/
Other (epee Y) _
CALCULATION OF BUILT UPON AREA
Built upon area means that portion of a development that to covered by impervious or partially pervious cover
Including buildings, pavement, recreation facilities, gravel, etc.,-WL nx inelufine good deckfns. If the
project Includes areas draining to different motor ctsmifieatiwre, planes rote them separately below.
Subwatershed
Classification
BuiltUpon Area
Total Proset. Arne
% Built Upon Area
Atlowable BN Area
Ia the Project BN Area s the Allowable BN Arco? YfS (If no, an engineered system is required.)
% Built Upon area a (built upon area / total project arm) a 100 '
Built upon arm limits for projects to meet density: SA waters -- 811, other •- 30%
STORNNAM CONTROL MEASURES (Grassed -line swates shouldside slopes
have sidslope.of 3:1/1(11M ,o/r lees)
Describe how the runoff will be treated _GYhsstSwaJ1 I/P)U(.0 Asrml, Q.C:r%te .
Qy4�s 15N •TI /C!!- ' o)
Is the built upon arm ggt�FFeast 30 �set f(�'pmm min high water of at f cc mat raT If no, places
Provide a description LUNfvC+ jMA fCo. 3B' Y((He �v%e��•� • ak as
/.i., .% /_ - // ..ri 1 A/ P l
a
=SIB
fi 1; 0 x
is ff
w
$ ZIAh C
• Eft '`���
Fijii
till k
am 11
s
3
�r
3
$
P
o
MECHANICAL • CIVIL • STRUCTURAL • CONSTRUCTION MANAGEMENT .
August 12, 2019 p_.`. u' J,'• , rs /
Mr'. Scott Vinson,' PE
NC DENR/DEMLR
943 Washington Square Mall
Washington, NC 27889 .
Attention: Bill Moore
n
A 11 ? � 104
Re: Stormwater Management .Permit SW7130717: Barrier
Island Station - Kitty Hawk, Phase II North (North)
and Phase II North (South)' 'De'signer's
Certification;
Dear Scott: .
Barrier Island Station - Kitty Hawk, Phase II North (North) and
(South) is construction complete in substantial conformity with permit
SW7130717' Phase II North (North) and .(South) as revised.by Drawings
C-122, Rev 6, and C-123, Rev 2, copy attached.
Attached.please find executed copy of the Designer's Certification
and Certification Requirements check sheet.
Revisions depicted on Drawing C-122, Rev 6 include:
1. Deletion of pavement' regrading :as set out in my letter to Scott
Vinson August 12, 2014.
and other minor field revisions:
2. Revision of the fabrication and installation details of the drop
inlet north of the 1600 Building (DI#1) and shift of the culvert
alignment at BASS to allow the culvert discharge to.miss a large
tree and roots.
3. Addition of a drip -line swale at the southern corner of the 1500
Building leading,to infiltration basin BAS10.
4. Addition of a berm running northeast from the retaining wall
south of the 1600 Building to provide separation between conveyed
runoff and wetlands, and between infiltration basin BASS and
wetlands, and addition of a berm running southeast from the
retaining wall to provide separation between conveyed runoff and
wetlands.
3048 MARTIN'S POINT RD., KITTY HAWK, NC 27949-3816
(252) 261-3025 VOICE, 261-4025 FAX
calfeeengineering@charter.net
r
Scott Vinson
August 12, 2014
Revisions depicted on Drawing C-123,.Rev 2 include:
1. Deletion of Laundry Building gutters and downspouts as set out in
my letter to Scott Vinson August 12, 2014.
and other minor field revisions:
2. The retaining wall at the northwestern corner of the Laundry
Building was constructed with an impermeable facing and the
western end of wall was extended west with a return to the south
to allow the transfer swale from the pavement to infiltration'
basin BAS2 to be moved to immediately adjacent 'to the retaining
wall, the nature trail to be shifted south, and the elevated.
walkway northwest of the building to be eliminated.
3. A stone apron was added at the drip edge of the shed roof at the
south end of the Laundry Building to stabilize the drip area.
4. Stone slopeprotection and wheel stops were added along the BASS
slope receiving pavement runoff or occasional vehicle wheel
incursions to stabilize and protect the slope against erosion or
rutting.
5. The swale, infiltration basin BAS4 and the wooden walkways were
slightly reconfigured to accommodate the basketball court
southern gate location.
Please email me at calf eeengineering@charter.net or call me at (252)
202-4025 if you have any questions or if you require additional
information.
Sincerely
ll
Ralph`D. Calfee, P.E
cc:. Ms. Julia P. Lee
2
r
v.c..v v,vn nvv a,c, wlallagemeli Jysrems
Permit No, SW7_/30:�17
Barrier Island Station, Ph. H
Stormwater Permit No. SWiz/8ow*
Designer 's'Certification
I G� !7 (.46Q:—�_ .as a duly registered Mae 1c 6 al2mye
h the State of'North Carolina, having been authorized to. observe (periodicallyl*eaklyl-
fttil-t m&) the construction of the project,
Bd9?wCT ja_
(Project)
for 4tiTw—Z_""' !SC Oep /NL (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation 'of the, project
construction such that the construction was,observed to be built withinsubstantial
compliance and Intent of thypproved plans and specifications.
r�vrS'exf
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations• from approved plans and specification:
7Z, C41-FE'> 76
Signature
Registration Number %7�ZS10
Date
Page 6 of 7
SEAL
`llll{lllillll"
CAR71
SC AL
1228r;
Mate wormwater management oystems "
Permit No S��
Certification Requirements:
'�Xi. The drainage area to the system contains approximately .the permitted
acreage.
1-12. The drainage area to the system contains, no more than the permitted
/ amount of built -upon area.
r/ 3. All the built -upon area associated with the project.is graded such that the
runoff drains to the system.
+Z4. All roof drains are.located'such that the runoff is directed into the system.
1The bypass structure weir elevation is,per°the approved plan,
y�5.
�6. The bypass structure is located per the approved plans.
ffA7: A Trash Rack is provided on the bypass structure•
VX8. All slopes are grassed with permanent vegetation.
!X 9. Vegetated slopes are no steeper than 3:1. exc e�-r` Cu g4aCnr+f
+"10. The inlets are located per the approved plans and do not cause short-
circuiting of the system. /LVQ-J,('?Q
/11. The permitted amounts of.surface area and/or volume have been .
provided.
v1"12. All required design depths are provided.
11"113. All required parts of the system are provided.
✓14. The required system dimensions are provided per the approved plans.
cc: IVCDMMIDUVQ Washington Regional Office
Dare County Building Inspections
Page 7 of 7
MECHANICAL • CIVIL • STRUCTURAL • CONSTRUCTION MANAGEMENT
qa
August 21, 2014
r 2GIv.
Mr. .Scott Vinson, PE g
NC D'ENR/DEMLR X Ju o A'gi�
943 Washington Square Mall `
Washington, NC 27889
Attention: Bill Moore
Re: Stormwater Management Permit SW7130717:
Barrier Island Station -: Kitty Hawk,
Phase I-A,Cypress.-Knee Trail: Des gneY''9
Certification
Dear Scott:.
Barrier*Island.Station - Kitty Hawk,,Phase I -A Cypress Knee Trail is'
construction complete in substantial conformity with permit SW7130717,
Phase I -A Drawing C-2S,)Revision.1 (mark-up), 8-20-14, copy attached,'..
which shows observed as -built conditions. .
Attached please find executed copy of the Designer's Certification
and Certification Requirements, check sheet. .
Please email me at calfeeengineering@charter.net or call me At (252)'
202-4025 if you.have.any questions or if you require additional
information..
Sincerely',
71
Ralph D. Calfee, P.E. ?r,a
cc: Ms. Julia P. Lee%
9{,,J
3048 MARTIN'S POINT RD., KITTY HAWK, NC 27949-3816
(252) 261-3025 VOICE, 261-4025 FAX
calfeeengineering@charter.net
:7
•. ••-•....wn ... r. a., ,v,gngyClllCIl[ oyI terns
Permit No. SW7I•�O7-f7 `
Barrier Island Station, Ph. II
Stormwater Permit No. SV\913091;4
17esigner's'Certification
I, Gt<G/� �. Cr4Gic6�& ,..as a duly registered M�-C ?dN 6 C- ?rd
in' the State of North Carolina, having been authorized to observe (periodically/awaeklyl
tug4i n) the construction of the project,
&W7 6e OUMO
(Project)
for J"elC-�, aCZ! AIL (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was,observed to be built withinsubstantial
compliance and intent of theAapproved plans and specifications.
Pee
The checklist of items on page 2 of this form Is included in the Certification.
Noted deviations. from approved plans and specification: }
Signature
Registration Number
Date
Page 6 of 7
SEAL
C A Pot�i
`.t
AN��ESSYp�'��'� �.
S.YAL 3
1228ti L
1
QLarG owm water management oystems
Permit No, SW7-l3D;LlF
Certification Requirements:
r/ 1. The drainage area to the system contains approximately the. permitted
acreage.
✓2. The drainage area to the system contains no more than the permitted
/ amount of built -upon area.
r/ 3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
+�4. All roof drains are.located`such that the runoff is directed into the system.
IJIA- 5. The bypass structure weir elevation is,perthe approved'plan.
�6. The bypass structure is located per the approved plans.
ffA7, A Trash Rack is provided on the bypass structure.
V/8. All slopes are grassed with permanent vegetation.
[� 9, Vegetated slopes are no steeper than 3:1.
+/'10. The inlets are located per the apffrerd plans and do not cause short
circoitingofthesystem. M rced_"f
/11. The permitted amounts of.surface area and/or volume have been
provided. .
/'/12. All required design depths are provided.
13. All required parts of the system are provided.
r 14. The required system dimensions are provided per theappfeyed- fans.
40a..L4sc1 uP
cc: NGDRNR=DWQ Washington Regional'0'ffice
Dare County Building Inspections
Page 7 of 7
CALMS ZKORK3321me
MECHANICAL • CIVIL • STRUCTURAL • CONSTRUCTION MANAGEMENT
August.20, 2014
qr t'
.Mr. Scott Vinson, PE
NC DENR/DEMLR ?.Ov
943 Washington Square Mall
Washington, NC 27889
Attention: 'Bill Moore y,z
Re: Stormwater Management Permit SW7130717:
Barrier Island Station - Kitty Hawk,
Phase I: JDesigner`3 Certification
Dear Scott:
Barrier 'Island Station - Kitty Hawk, Phase I is construction complete
in substantial conformity with permit SW7130717, PhaselI Drawing C-12',
Revision 3 (mark-up), 4-15-94, copy attached.
Building' dripline swales are not excavated but are naturally formed
configuration and.are non -eroding.
Attached please find executed copy of the Designer's Certification
and Certification Requirements check sheet.
Please email me at calfeeengineering@charter.net or call me..at (252)
202-4025 if you have any questions or if you require'.additional
information.
Sincerely,
Ralph D. Calfee, P.E. ;' a, t a<t = c ,•
cc: Ms. Julia P. Lee ✓°'W rk, '
3048 MARTIN'S POINT RD., KITTY HAWK, NC 27949-3816
(252) 261-3025 VOICE, 261-4025 FAX
calfeeengineering@charter. net
Onto OtuJi„wato1 malICUU11 Ilt vy;;tciiio
Permit No. SWf/z?07/
Barrier Island Station, Ph. IL
Stormwater Permit No. SWfl30-7/ f . .
Designer's Certification
I,� l7 (Gt'LG as'a duly registered-C7/J,�9G 6�1d
in"the State of North Carolina, having been aothoriaed to observe (periodically/.aueekLy/-
444+me) the construction of the project,
(Project)
for i (Project Owner) hereby state that, to the
best of my abilities, duecare an diligence was used in the observation of the project
construction such that the construction was observed to be built withinsubstantial
compliance and intent of th5epproyed glans and specifications.
The checklist of it on page 2 of this form Is Included in the Certification.
Noted deviations. from approved plans and specification:
SEAL
•`•`•`R�n A rpm
01
C-' r �.��pWES§Jp'�
Signature A
qe
Registration Number /2,2i `�S'o .. r S t n L
Date 8%?�//�� 1228e ,
�, CBI! � CP�,•c.
Page 6 of 7
z.
state stormwater ivwanagemem Systems
Permit No. SWR/ D*Iq
Certification Requirements:
r/ 1, The drainage area to the system contains approximately the permitted
acreage.
✓2, The drainage.area to the system contains no more than the permitted
amount of built -upon area.
!/ 3. All the built -upon area associated with the prcject.is graded such that the
runoff drains to the system.
�4. All roof drains are.located'such that the runoff is directed into the system.
ly�D_5. The bypass structure weir elevation is,per the approved plan.
6. The bypass structure is located per the approved plans.
7: A Trash Rack is provided on the bypass structure.
4,,/8. All slopes are grassed with permanent vegetation.
Z9, Vegetated slopes are no steeper than 3:1.
t/'10. The inlets are located per the approved plans and do not cause short-
circtliting of the system. At 7.gc k_,q
�11. The permitted amounts of surface area and/or volume have been .
provided.
V/12. All required design depths are provided.
d 13. All required parts of the system are provided.
✓ 14. The required system dimensions are provided per the approved plans.
. /L YKQ.rrC- u-P
cc' NGDENR;DWQ Washington Regional Office
Dare County Building Inspections
Page 7 of 7
14-
MECHANICAL • CIVIL • STRUCTURAL • CONSTRUCTION MANAGEMENT
August 12, 2014
V
Mr. Scott Vinson, PE
nn .{
NC DENR/DEMLR
943 Washington Square Mall
Washington, NC 27889
Attention: Bill Moore „ r a k
Re: Stormwater Management Permit SW7130717:
Barrier Island Station -.Kitty Hawk, Phase
III North and North-Central: Designer's"
>'Certification^"
Dear Scott:
Barrier Island Station - Kitty Hawk, Phase III North and North-Central
is construction complete in substantial conformity with permit
SW7130717, Phase III N&N-C, revised Drawing'C-321'; Rev 5, copy
attached.
Attached please find executed copy of the Designer's Certification
and Certification Requirements check sheet.
Minor field revisions depicted on Drawing C-321, Rev 5 include:
1. The trench drain across the drive and parking area south, of the
2500 Building was replaced with a drop inlet in front of the
building and a culvert under/across the parking and drive area.
The tributary area served is slightly reconfigured, and the
tributary area itself is slightly revised.
2. Dry Infiltration basin BAS5 was reconfigured to avoid conflict
with an existing stormwater swale serving Phase II South.
Note: the tributary area affected by revisions #1 and #2 is unchanged.
3. A drop inlet was added at the east end of the culvert under the
drive east of .the 2600 Building to reduce the swale depth and
steep shoulder slopes adjacent to the drive. There was no change
in tributary area or culvert capacity.
4. Rock slope protection was added to the pavement runoff area along
the northern edge of infiltration basin BAS2.
3048 MARTIN'S POINT RD., KITTY HAWK, NC 27949-3816
(252) 261-3025--VOICE, 261-4025 FAX
calfeeengineering@charter.net
Scott Vinson
August 12, 2014
5. Dripline swales were modified slightly at the 2700 Building and
the 2800 Building to better coordinate with existing site
topography and stable local infiltration areas, with no
significant change of runoff capture or local infiltration.
6. Infiltration basin BAS3 (formerly about half -way between the 2600
and 2800 Buildings) was deleted because of the presence of
shallow underground electrical distribution lines and other
utilities. The 423 sf tributary area and 71 cf runoff to BAS3 is
now served by local infiltration in the same area or runoff to
the drop inlet leading to BAS4, which has substantially greater
capacity than the 11,000 sf and 2,425 cf runoff served. The
schedule is revised accordingly.
7. The parkway curb along the eastern edge of the drive from the
2500 Building to southeast of the 2600 Building was replaced by a
stabilized soil berm along the edge of pavement (observation of
the as -built berm indicates satisfactory performance and no berm
erosion).
8. The southern end of the retaining wall northwest of the 2800
Building was revised in the field from an approximately 90-degree
return to an approximately 45-degree return to minimize
transition grading (not shown on the drawing).
9. The southeastern corner of the parking lot pavement west of the
2800 Building was extended in the field slightly to the east,
resulting in an inconsequential increase in pavement area and an
inconsequential narrowing of the rock -lined transfer swale (which
probably will never see any actual water flow).
Please email me at calfeeengineering@charter.net or call me at (252)
202-4025 if you have any questions or if you require additional
information.
`.. 4 R "F
Sincerely,
1 L!lo i
Ralph D. Calfee, P.E.
^� o`•;,+,,',;.Q• t` `o�
cc: Ms. Julia P. Lee
2
:i
�.••+•� —i n--i rviarla ement z jygzems
Permit No. S1N�/�p�/ �
Barrier Island Station, Ph. II
Stohnwater Permit No. SWP/34�/4
Designer's' Certification .
CGC— ,..as 'a duly registered YllJl-P�7tT,G ark/x,
in the State of -North Carolina, having been authorized to observe (periodically/aaeekiy/-
44hr6) the construction of the project,
(Project)
for f,��WE /SG ** S r rZa%% /&C (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction waspbserved to be built within substantial
compliance and intent of the
(approved plans and specifications.
The checklist of items on page 2 of this form Is included in the Certification.
Noted deviations.from approved plans and specification:
Sign<
Reg!:
Date
Page 6 of 7
SEAL
`.x�tgrrnt°y�
r`C A
�rle
St4L
Mate wormwater iviahagemem aysiems
Permit No.
Certification Requirements:
rl 1. The drainage area to the system contains approximately .the permitted
acreage.
✓2. The drainage.area to the system contains, no more than the permitted
amount of built -upon area.
6,,- 3. All the built -upon area associated with the project.is graded such that the
runoff drains to the system.
�4. All roof drains are.located'such that the runoff is directed into the system.
1y�5. The bypass structure weir efevation is•perthe approved plan.
6. The bypass structure is located per the apprdVed plans.
ffA7: A Trash Rack is provided on the bypass structure.
t1_/8., All slopes are grassed with permanent vegetation.
z. Vegetated slopes are no steeper than 3:1. eKcga-E as s�owTu.
V'10. The inlets are located per the approved plans and do not cause short-
/ circuiting of the system. A �e V'Q 4
�/ 11. The permitted amounts of surface area and/or volume have been .
provided.
/
�112. All required design depths are provided.
d 13. All required parts of the system are provided.
v"�14. The required system dimensions are provided per the approved plans.
NCDE:NR=DWQ Washington regional Offioe
Dare County Building Inspections
Page 7 of 7
N
CALFEE ENGINEERING
MECHANICAL • CIVIL • STRUCTURAL • CONSTRUCTION MANAGEMENT
August 12, 2014
Mr. Scott Vinson,PE
NC DENR/DEMLR
943 Washington Square Mail
Washington, NC 27889 .
Attention: Bill Moore
Dear Scott:
RECEIVED
AUG 2 5 2014
DWQ-WARD
Re: Stormwater Management Permit SW7130117: Barrier
Island Station - Kitty Hawk, Phase II North (North)
and Phase II North (South) : (-Desd7gne'r'-s1
Ce'r'tification
Barrier Island Station - Kitty Hawk, Phase II North (North) and
(South) is construction complete in substantial conformity with permit
SW7130717, Phase II North (North) and (South) as revised by Drawings
C-122, Rev 6, and C-123, Rev 2, copy attached.
Attached please find executed copy of the Designer's Certification
and Certification Requirements check sheet.
Revisions depicted on Drawing C-122, Rev 6 include:
1. Deletion of pavement regrading as set out in my letter to Scott
Vinson August 12, 2014.
and other minor field revisions:
2. Revision of the fabrication and installation details of the drop
inlet north,of the 1600 Building (DI#1) and shift of the culvert
alignment at BAS9 to allow the culvert discharge to.miss a large
tree and roots.
3. Addition of a drip -line swale at the southern corner of the 1500
Building leading to infiltration basin BAS10.
4. Addition of a berm running northeast from the retaining wall
south of the 1600 Building to provide separation between conveyed
runoff and wetlands, and between infiltration basin BAS8 and
wetlands, and addition of a berm running southeast from the
retaining wall to provide separation between conveyed runoff and
wetlands.
3048 MARTIN'S POINT RD., KITTY HAWK, NC 27949-3816
(252) 261-3025 VOICE, 261-4025 FAX
calfeeengineering@charter.net
Scott Vinson
August 12, 2014
Revisions depicted on Drawing C-123,.Rev 2 include:
1. Deletion of Laundry Building gutters and downspouts as set out in
my letter to Scott Vinson August 12, 2014.
and other minor field revisions:
2. The retaining wall at the northwestern corner of the Laundry
Building was constructed with an impermeable facing and the
western end of wall was extended west with a return to the south
to allow the transfer swale from the pavement to infiltration
basin BAS2 to be moved to immediately adjacent to the retaining
wall, the nature trail to be shifted south, and the elevated.
walkway northwest of the building to be eliminated.
3. A stone apron was added at the drip edge of the shed roof at the
south end of the Laundry Building to stabilize the drip area.
4. Stone slope protection and wheel stops were added along the BAS3
slope receiving pavement runoff or occasional vehicle wheel
incursions to stabilize and protect the slope against erosion or
rutting.
5. The swale, infiltration basin BAS4 and the wooden walkways were
slightly reconfigured to accommodate the basketball court
southern gate location.
Please email me at calfeeengineering@charter.net or call me at (252)
202-4025 if you have any questions or if you require additional
information.
Sincerely,
4
Ralph D. Calfee, P.E.
cc: Ms. Julia P. Lee
N
2
Orate Owi mwarer rvianagemem Jygiems
Permit No. SW7-130-717
Barrier Island Station, Ph. II
Stormwatpr Permit No. SVV?-(3t)w.;
Designer's Certification
C�dGx&—&— .as a duly registered Mrj- / G 6�lChl�t '
in the State of North Carolina, having been authorized to observe (periodically/**akyr/-
444im) the construction of the project,
sotrW)
(Project)
for P4J&?r6Zf, /SC V;CO :SY-4 6(W lNC (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was,observed to be built within substantial
compliance and intent of thypproved plans and specifications.
✓G vrSe�
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations.from approved plans and specification:
C— r z3 7-7eV 7
G ; rir�zi; 7z, cAcFe't 776j s,
SEAL
Signature
Registration N
Date
/ZZRG
Page 6 of 7
'� CARpI
St4L Y
3
12296
++��b�WiAitA4w0.�M
Mate wormwater management oystems
Permit No SW 3P_7/_
Certification Requirements:
r/ 1. The drainage area to the system contains approximately the permitted
acreage.
c---2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
r/ 3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
&,"�4. All roof drains are.located'such that the runoff is directed into the system.
/yZA- 5. The bypass structure weir elevation isperthe approved plan.
�6. The bypass structure is located per the approved plans.
AAT A Trash Rack is provided on the bypass structure.
All slopes are grassed with permanent vegetation.
k 9. Vegetated slopes are no steeper than 3:1, axc eP-t =5. sGac
✓10. The inlets are located per the approved plans and do not cause short-
/ circuiting of the system. A-VQ �
+/ 11. The permitted amounts of surface area and/or volume have been .
provided.
�12. All required design depths are provided.
,V 13. All required parts of the system are provided.
✓14. The required system dimensions are provided per the approved plans.
cc' NCDEENR=UWQ Washington Regional O'fFce
Dare County Building Inspections
Page 7 of 7