Loading...
HomeMy WebLinkAboutSW7061211_COMPLIANCE_20090205STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE 41COMPLIANCE EVALUATION INSPECTION DOC DATE�� YYYYMMDD At MC®ENR North Carolina Department of Environment and Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director February 5, 2009 CERTIFIED MAIL 7007 3020 0001 8861 8841 RETURN RECEIPT REQUESTED Ross Beebe Rivershore Properties, LLC. 240 Craven Street New Bern, NC 28560 Dear Sirs: Natural Resources Subject: Stormwater Inspection Rivershore PUD SW7061211 Dee Freeman — — Neuse River [NSW, SB, Sw] On January 28, 2009 Amy Adams and Anthony Scarbraugh of the Division of Water Quality (DWQ) inspected a residential subdivision located to the southeast of the intersection of Beach Street and Sandy Point Road in Craven County. This proiect was inspected for compliance with the Stormwater Permit S W706121 I issued to you on July 6, 2007 for the construction and operation of a wet detention pond to serve Rivershore PUD. The inspection revealed that the project has not yet been completed. As such, you will be rescheduled for an inspection at a later date. This office would like to remind you that you are limited to the impacts proposed in your application and you must comply with all operation and maintenance requirements of this permit. As a reminder, if you change your project you must notify us and you may be required to send us a new application. If the property is sold, the permit must be formally transferred by submitting a request to the DWQ with appropriate documentation. North Carolina Division of Witter Quality Internet: �e�.nGyyatcrt ua d.nre 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 PAX 252-946-9215 N `orth Carofiifn�a An Equal Opportunity/Affinnative Action Empbyer-50%Recycled110% Postmd Consumer Paper atulul y Page 2 of 2 Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by DWQ in accordance with North Carolina General Statue 143-215.6(a) to 143-215.6(c). Should you have any questions regarding these matters, please contact me at (252) 948- 3963. Sincerely, aea � Amy Adams Environmental Senior Specialist Surface Water Protection Section Washington Regional Office Enclosures: SW7061211 CC: John Hennessy-NPSACOU DWQ Central Files ,-,;W�Ct Files North Carolina Division of Water Quality Internet: www.newaleroualm.ore 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal OpportunitylAffinnaEve Action Employer - 50% Recycled110% Post Consumer Paper O NorthCarolina Naturally STATE STORMWATER INSPECTION CORE QUESTIONS Project Name:'R'w P 'NAO Permit No: SW1 CAP 1211 Expiration date: I Contact Person:"R- ss _3ee bey Phone No: US'3 -o2oS9 County: C o m e.n Center of Project GPS: Lat: 5S otv at "N Long: -1-1 00 4S "W � Facility Address: S Ci zip: �O \ (If multiple basins exist, s ecify basin(s): Date: Entry time: am ❑ pm ❑ Exit time: am ❑ pm ❑ �U Method of Treatment: (check types) ❑ High Density ❑ Low Density ® Wet Detention ❑ Dry Detention ❑ Bioretention ❑ Infiltration Basin/Trench ❑ Wetland ❑ Sandfilter ❑ Permeable Pavement ❑ Level Spreader ❑ Swale ❑ Other: Receiving Waters: Classification: River Basin: GENERAL QUESTIONS FILE REVIEW YES NO NA NE 1. A signed copy of the Engineer's certification is in the files: ❑ ® ❑ ❑ 2. A signed copy of the Operation & Maintenance Agreement is in the files: ® ❑ ❑ ❑ 3. A copy of the recorded deed restrictions is in the files: (check permit for requirements) ❑ ® ❑ ❑ SITE VISIT 1. Drainage area is consistent with the permit and approved plans: ❑ ❑ ❑ ❑ 2. Built -upon area to drainage area is consistent with the permit and approved plans: ❑ ❑ ❑ ❑ 3. All built -upon area (as permitted -if high density) is graded such that the runoff drains to the system: ❑ ❑ ❑ ❑ 4. No (unpermitted) offsite drainage is entering the BMP: ❑ ❑ ❑ ❑ 5. Access points to site are clear and well maintained: ❑ ❑ ❑ ❑ 6. Trash has been removed as needed: ❑ ❑ ❑ ❑ 7. Invasive vegetation species/tree control is provided as needed: ❑ ❑ ❑ ❑ 8. Excessive landscape debris (grass clippings, leaves, & sediment) are controlled: ❑ ❑ ❑ ❑ 9. All required parts of the system are provided: ❑ ❑ ❑ ❑ 10. Maintenance records are available for inspection: ❑ ❑ ❑ ❑ Version 1 11/18/08 COMMENTS: (each NO answer should have a comment) 1. Provide pictures of site (insert here): YES NO Compliant ❑ Non -Compliant ❑ NOV sent ❑ ❑ Date sent NOW Inspectors name& signature: Date: WET DETENTION O & M Supplemental Inspection Report YES NO NA NE 1. The inlets are located per the approved plans and do not cause short-circuiting of the system: ❑ ❑ ❑ ❑ 2. The inlet device is in good working order and undamaged: ❑ ❑ ❑ ❑ 3. Forebay is free of excessive sediment: ❑ ❑ ❑ ❑ 4. The forebay berm is in the correct location, in good working order, undamaged, and without erosion: ❑ ❑ ❑ ❑ 5. Banks are stable with no erosion present: ❑ ❑ ❑ ❑ 6. Vegetated slopes are no greater than 3:1: ❑ ❑ ❑ ❑ 7. Grass is mowed (not scalped) as required: ❑ ❑ ❑ ❑ 8. Vegetated shelf is 6:1 or 10:1 as permitted and properly vegetated: ❑ ❑ ❑ ❑ 9. Sediment has not accumulated in the main treatment area in excess of design storage depth: ❑ ❑ ❑ ❑ 10. Algal growth does not cover more than 50% of the area: ❑ ❑ ❑ ❑ 11. Cattails, phragmites or other invasive plants do not cover more than 50% of the basin surface: ❑ ❑ ❑ ❑ 12. The embankment is free of shrubs or trees: ❑ ❑ ❑ ❑ 13. There is no evidence of muskrats or beaver activity present: ❑ ❑ ❑ ❑ 14. The swale or emergency outlet bypass is in the correct place and is in good condition: ❑ ❑ ❑ ❑ 15. JS" Drawdown device is correctly sized and fully functional per the approved plans: ❑ ❑ ❑ ❑ 16. Erosion or other signs of damage have not occurred at the outlet: ❑ ❑ ❑ ❑ 17. The vegetated filter and level spreader for 85% design removal is in place and operating properly: ❑ ❑ ❑ ❑ 18. The wet pond is located and has the correct dimensions as on the approved plans: ❑ ❑ ❑ ❑ 19. Baffles are located per the approved plans and in good working order: ❑ ❑ ❑ ❑ 20. If permitted, the fountain pump is less than or equal to the maximum allowable size: ❑ ❑ ❑ ❑ v2.12_o8