Loading...
HomeMy WebLinkAboutSW7060626_HISTORICAL FILE_20070622STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�(p(p DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS ISTORICAL FILE COMPLIANCE EVALUATION INSPECTION DOC DATEJj ��( ✓� YYYYMMDD AVOLIS ENGINEERING, P.A. —L� P.O. Box 15564 • New Bern, North Carolina 28561 • (252) 633-0068 Junc 5, 2007 /C;!F� -D Mr. At Hodge Environmental Engineer Water Quality Section NCDENR 943 Washington Square Mall Washington, NC 27889 RE: Zack Taylor Commercial Complex McCarthy Boulevard, New Bern, North Carolina AE Project No. 07054 Dcar Amy: JUN 2 2 2007 ®WQ-WARO Enclosed please find our Stormwater permit submittal for the above-refercnced project consisting of the following: • Stormwater Permit Application including Narrative (Original and One Copy) • Project Plans (Two Sets) • Calculations including Soils Report, Page 28 (Two Copies) • $420 Application Fee It is requested that the enclosed application be reviewed and approved at your earliest convenience. Should you have any questions or need any additional information, please do not hesitate to call. Sincerely, Aeolis, P.E. resident RECF,wry STORMWATER NARRATIVE JUN 2 2 2007 ZACK TAYLOR COMMERCIAL COMPLEX McCARTHY BOULEVARD DWQ-WAR® NEW BERN, NORTH CAROLINA This project entails the development of a commercial office facility on 2.13 acres of land located off of McCarthy Boulevard in New Bern, Craven County, North Carolina. It is proposed that a building covering a total area of approximately 20,933 square feet be constructed on the site. Associated parking and traffic circulation areas and sidewalks will also be developed as part of the proposed development. It is proposed that a total of 55,974 square feet of impermeable surfaces be created on the site. The total development represents impermeable coverage on the subject property of 59.8%. Since the built -upon area for the project exceeds 30.0%, an engineered stormwater system is proposed for the site in order to comply with the Coastal Stormwater Permitting Requirements and the City of New Bern Stormwater Program. It is proposed that a stormwater retention pond be constructed on the eastern side of the subject property. All runoff from the subject property will be directed through a stormwater collection system and through surface flow to the forebay area of the stormwater retention pond. The stormwater retention pond will discharge in a easterly direction to an existing ditch located along the northeastern properly line. The stormwater retention pond is sized to fully contain the one -inch design storm volume. Additionally, the stormwater retention pond is oversized to attenuate post development runoff conditions to levels not exceeding 10% of pre -development runoff conditions. The stormwater retention pond is sized for 90% TSS removal. As designed, the stormwater retention pond compfies with the Coastal Stormwater Regulations for stormwater treatment and dispersal and complies with the City of New Bern Stormwater Permitting Requirements for post development runoff attenuation and nitrogen removal. OioSS� Eck T (a" O16'�T wD%G TD l9L S-� A5 J 0,1213 A� 0I la,�46 - aa,R33 5 F Prrk'y,o6- 33 � o I SF S'D9vvr,4S - 11(04bs�- SS5,' '� 4 5F) ),. 2 8 5. &rrcS REGE OVED JUN 2 2 2007 ®WQ-kiVARO S-Sj�-17� -SX9 5/ C, -'? S- S �-- =- -5-5. - 0 �t) c,ae 70?0 j ss G J C=' - STORMWATER POND COASTAL STORMWATER DESIGN ZACK TAYLOR COMMERCIAL CENTER MCCARTHY BOULEVARD . - NEW BERN, NORTH CAROLINA AE PROJECT i107054 SIZE POND AND ORIFICE: SITE DATA TOTAL SITE WATERSHEAD AREA = 93625 SF Mlmmo 2.15 BUILDING AREA = 20933 SF 0.48 SIDEWALK AREA = 1640 SF 0.04 PARKING/DRIVE AREA = 33401 SF 0.77 GRASS AREA/POND AREA = 37651 SF 0.86 TOTAL BUILT - UPON AREA = 55974 SF 1.28 % BUA = 59.8 % DETERMINE POND SURFACE AREA REQUIREMENT AT PERMANENT POOL DCCCDCAV`C CAIMA TAQI C �J " "._.. _ .._.....___ YES NO r85%SS REMOVAL WITH 30' VEGATATIVE FILLER T 90% 'SS REMOVAL FOR WET DETENTION WITHOUT VEGETATIVE FILTER X X SET PERMANENT POOL DEPTH = 6 FT�— SA/DA LOW (50%)= 2.7 SA/DA HIGH (60%) = 3.4 % IMPER(ACTUAL%) = 59.8 % % IMPERVIOUS LOW = 50 % TT INTERPOLATED SAIDA VALUE = 3.38 S Il % /' REQUIRED SURFACE AREA = 3,164 SF APPROXIMATE POND WIDTH = 32 FT APPROXIMATE POND DIMENSIONS = 32 FT X 96 FT PERM POOL Pe4v it) a"�) S� � 3� S � ? 31 *CALCULATE 1" STORM RUNOFF VOLUME 3 BUILDING AREA = - 20933 SF C= 0.90 SIDEWALK AREA = 1640 SF C= 0.90 PARKING/DRIVE AREA = 33401 SF C= 0.90 GRASS AREA = - 50738 SF C= 0.30 POND AREA = 5,236 SF C= 1.00 1-INCH VOLUME = Y 5,903 FT3 �\ �� DS SET PERMANENT POOL LEVEL AT: 0' STAGE = 94.5 FT ELEVATION DETERMINE POND STAGE RISE ASSOCIATED WITH 1" STORM STAGE FT SURFACE AREA FTZ NCREMENTAL VOL FT3' CUMM. VOL(FT3) STORM VOL. FT3 -10 0 ERR ERR -9 0 0 0 -8 0 0 0 -7 0 0 0 -6 1277 0 0 -5 1611 1,444 1,444 -4 1988 1,780 3,224 -3 2410 2,199 5,423 -2 2880 2,645 8,068 -1 3399 3,140 11,20 0 6236 4,318 5, 6 0 1 6324 5,780 , 06 5,780 2 7503 6,914 28,219 12,694 3 8787 8,145 36,364 20,839 4 9455 9,121 45,485 29,960 5 0 0 0 6 0 0 0 7 0 0 0 8 0 0 0 9 0 0 0 10 0 0 0 CALCULATE 1" STORM RISE BETWEEN: 94.5 FT & 95.5 FT REMAINING VOLUME TO BE STORED f BETWEEN: 95.5 FT & 96.5 FT THE STORED RUNOFF = INCREMENTAL VOLUME = 5780 FT3 123 FT3 6914 FT3 RISE ABOVE 95.5 FT CONTOUR = 0.020 FT THEREFORE 1" STORM ELEVATION = FT SAY' n /� STORM S 95.6 FT axt V^ Ca,d/ DETERMINE ORIFICE SIZE TO DRAW DOWN THE 1" STORM AVERAGE AVAILABLE ORIFICE HEAD = 0.55 FT SIZE ORIFICE FOR 3-DAY DRAWDOWN AVERAGE Q REQUIRED = 0.023 FT3/S (3 DAY DRAW DOWN) FROM P. 111-11 OF HRM Q = DISCHARGE(CFS) CD = COEFFICIENT (USE 0.6) A = ORIFICE AREA (SF) g = GRAVITY (32.2 FT/Sz) h = DRIVING HEAD FT SOLVE FOR AREA REQUIRED: A=Q/(CD*sgrt(2gh)= 0.00638 SF ORIFICE DIAMETER (D = 0.0901 FT APPROXIMATELY= 1.08 INCHES TRY A 1.25 :1N)DIAMETER ORIFIC =Do CHECK ORIFICE SIZE BY ROUTING THE DRAWDOWN OF THE 1"STORM RUNOFF DISCHARGE TABLE h(FT) Q(CFS) 1.1 0.043 1 0.041 0.9 0.039 0.8 0.037 0.7 0.034 0.6 0.032 0.5 0.029 0.4 0.026 0.3 0.022 0.2 0.018 0.1 0.013 0.05 0.009 0.03 0.007 0.02 0.006 0.01 0.004 0 0.000 NOTE: h MEASURED TO CENTER OF ORIFICE Q=(0.6)(PI/4)(Do/12)2sgrt(2*32.2*h) INITIAL HEAD = 1.10 FT APPROXIMATE 1" STORM DRAWDOWN USING 6 HOUR INCREMENTS REQUIRED VOLUME = 5,903 FT3 POND HAS 1" STORM VOLUME AT t=0 TIME ELAPSED HR h FT Q CFS Q/6 HRS Qcumm VOL. REMAINING FT3 0 1.10 5,903 6 1.10 0.043 930 930 4,973 12 0.93 0.040 853 1,783 4,120 18 0.77 0.036 777 2,559 3,344 24 0.62 0.032 700 3,259 2,644 30 0.49 0.029 622 3,881 2,022 36 0.38 0.025 544 4,425 1,478 42 0.28 0.022 465 4,890 1,013 48 0.19 0.018 385 5,275 628 54 0.12 0.014 303 5,578 325 60 0.06 0.010 218 5,796 107 66 0.02 0.006 125 5,921 18 72 (0.00) R ER.. ~R ERR 78 ERR ERR ERR ERR ERR 84 ERR ERR ERR ERR ERR 90 ERR ERR ERR ERR ERR 96 ERR ERR ERR ERR ERR 102 ERR ERR ERR ERR ERR 108 ERR ERR ERR ERR ERR 114 ERR ERR ERR ERR ERR 120 ERR ERR ERR ERR ERR "NOTE: (ERR) INDICATES THAT THE STORM WATER HAS DRAINED NEARLY LEVEL WITH THE ORIFICE HEIGH' WHICH WILL BE THE HEIGHT OF THE PERMANENT POOL. THERFORE THE 1" STORM WATER HAS DRAINED WITHIN THE TIME PERIOD OF 2 - 5 DAYS, AND THE RUNOFF CONTROL FOR THE POND IS SATISFACTORY. ����tJD��� occu�5 ►`^ a �r-o�C,�Y�� Q C.P CD_ cs— at-? D 0 S n i SA/DA - 85% TSS REMOVAL WITH 30' VEGETATIVE FILTER �� 6 IMPER.% 3.OFT 3.5FT 4-OFT 4.5FT 5.OFT 5.5FT 6. OFT 6.5FT 7. OFT 7.5FT 10% .9 .8 .7 .6 .5 20% 1.7 1.3 1.2- 1.1 1.0 .9 .8 .7 .6 .5 --30% 2.5 2.2 1.9 1.8 1. 1.5 1.3 1.2 1.0 9 - "-40% 3.4 3.0 2.6s 2. 2. 1.9 1.6 1.4 1.1 1.0 50% 4,2 3.7 �3:3 3 0 .7 2.4 2.1 1.8 1.5 1.3 60% 5.0 4.5 3.8 3.5 3.2 2.9 2.6 2.3 2.0 1.6 70% A 5.2 4.5 4.1 3-Z 3.1 2.9 2.5 2.1 1.8 's$0 % __ 8 6.0 5.2 4.7 4.2 3.7 3.2 2.7 22 2.0_____ A 7.5 -6."5 ...5.8 ...- 5.3 4.8 _ 4.3 - 3.8 3.3 --....,2.. 8 2.3 . 100% 8.2 7.4 6.8 6.2 5.6 5.0- 4.4 3.8 3.2 2.6 SA/DA - > 90$ TSS REMOVAL FOR WET DETENTION WITHOUT VEGETAT FILTER IMPER.$ 3.OFT 3:5FT 4.0FT 4.5FT SOFT 5.5FT 6.0 T 6.5FT 7.OFT 7.5FT 10% 1.3 1.0 .8 .7 .6 .5 .4 .3 .2 .1, . 20% 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 9 6-:. 30% 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 .8' ! 40% 4.5 4.0 3.5 3.1 2.8 2.5 2. 1.8 1.4 1.1 50% 5.6 5.0 4.3 3.9 3.5 3.1 7 2.3 1.9 1.5 60% 7.0 6.0 5.3 4.8 4.3 3.9 2.9 2.4 1.9 j 70% 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 2.3, 80% 9.4 8.0 7--0 6.4 5.7 5.2 4.6 4.0 3.4 2.8:. j 90% 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6...-3..9 -..3.3 - 100%-- 12.0- 10.0 8.8- 8.1 7.3 '-6.6 5.8 5.1 4.3 3.6:,..':... s -4 Qi � -ugI 5,61 Hydrograph Summary -Report Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time Interval (min) Time to peak (min) Volume _ (cam) Return period (ym) Inflow hyd(s) Maximum elevation (ft) Maximum storage (cult) Hydrograph description 1 SCS Run 5.00 1 723 - 14,461 1 — Pre Dev. 1 Year St 2 SCS Ru 11.48 2 724 34,830 10 — Pre Dev. 10 Yr. St 3 SCS R nalf 6.27 1 725 19,530 1 — POST Dev. 1 Year S 4 SCS R noff 17.05 2 724 - 53,527 10 — POST Dev. 10 Yr. S 5 Res r 1.83 1 745 12,843 1 3 96.01 9,277 Post Dev. 1-Yr. St 6 Res 'r 12.30 2 728 47,056 10 4 96.74 14,684 Post Dev. 10-Yr. S Pb T vD c� P� J 1 VgC s 10b�-', Proj. file: 07054_TAYLOR.GPW IDF file. NEW BERN.IDF Run date: 06-05-2007 6 - Reservoir -10 Yr - Qp = 12.38 0 5 10 15 20 25 Time (hrs) / Hyd. 4 / Hyd. 6 Iv 6 - Reservoir -10 Yr - Max. - 97. 96. m W 95. 95. 94.5 L 0 10 Time (hrs) iP = 96.74 ft 20 25 Hydrograph Report Page 1 13 - English - Hyd. No. 1 Pre Dev. 1 Year Storm Hydrograph type = SCS Runoff Peak discharge = 5.00 cfs Storm frequency = 1 yrs Time interval = 1 min - Drainage area = 2.13 ac Curve number = 81 Basin Slope = 0.4 % Hydraulic length = 580 ft Tc method = TR55 Time of conc. (Tc) = 4.1 min Total precip. = 3.70 in Distribution = Type III .Storm duration = 24 hrs Shape factor -.. = 484 Tdal Volume = 14,461 cult Hydrograph Discharge Table Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) 9.78 0.05 16.18 0.16 22.58 0.07 9.98 0.06 16.38 0.15 22.78 0.06 10.18 0.08 16.58 0.15 22.98 0.06 10.38 0.10 16.78 0.14 23.18 0.06 10.58 0.12 16.98 0.14 23.38 0.06 10.78 0.14 17.18 0.13 23.58 0.06 10.98 0.16 17.38 0.12 23.78 0.06 11.18 0.21 17.58 0.12 23.98 0.06 11.38 0.29 17.78 0.11 11.58 0.45 17.98 0.10 11.78 1.16 18.18 0.10 ...End 11.98 3.12 18.38 0.10 12.18 2.44 18.58 0.10 12.38 1.51 18.78 0.10 12.58 0.68 18.98 0.09 12.78 0.57 19.18 0.09 12.98 0.47 19.38 0.09 13.18 0.42 19.58 0.09 13.38 0.39 19.78 0.09 13.58 0.36 19.98 0.08 13.78 0.34 20.18 0.08 13.98 0.31 20.38 0.08 14.18 0.29 20.58 0.08 14.38 0.28 20.78 0.08 14.58 0.26 20.98 0.08 14.78 0.25 21.18 0.07 14.98 0.24 21.38 0.07 15.18 0.22 21.58 0.07 . 15.38 0.21 21.78 0.07 15.58 0.20 - 21.98 0.07 15.78 0.18 22.18 0.07 15.98 0.17 22.38 0.07 TR55 Tc Worksheet Page , Hyd. No. 1 Pre Dev. 1 Year Storm Storm frequency = 1 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 200.0 ft Two-year 24-hr precip. = 3.70 in Land slope = 0.5 % Travel Time ........................................ = 3.4 min Shallow Concentrated Flow Flow length = 50 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 ft/s Travel Time ........................................ = 0.7 min Channel Flow Cross section flow area = 6.0 sqft Wetted perimeter = 12.6 ft Channel slope = 1.0 % Manning's n-value = 0.030 Velocity = 3.02 ft/s Flow length = 0.0 ft Travel Time ........................................ = 0.0 min Total Travel Time, Tc ........................ = 4.1 min 9iydrograph Report Hyd. No. 2 . - Pre Dev. 10 Yr. Storm Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration - =_SCS Runoff = 10 yrs = 2.13 ac = 0.0 % = TR55 = 7.00 in = 24 hrs Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 8:43 0.12 21.23 0.15 8.83 0.16 21.63 0.14 9.23 0.20 22.03 0.19 9.63 0.26 22.43 0.14 10.03 0.32 2-2.83 0.13 10.43 0.41 23.23 0.12 10.83 0.53 23.63 0.12 11.23 0.76 11.63 1.71 12.03 10.73 ... End 12.43 2.85 12.83 1.18 13.23 0.87 13.63 0.75 14.03 0.63 14.43 0.57 14.83 0.51 15.23 0.46 15.63 0.40 16.03 0.34 16.43 0.31 16.83 0.29 17.23 0.26 17.63 0.24 18.03 0.21 18.43 0.20 18.83 0.19 19.23 0.19 19.63 0.18 20.03 0.17 20.43 0.16 20.83 0.15 English Peak discharge = 11.48 cfs Time interval = 2 min Curve number = 81 Hydraulic length - = 0 ft Time of conc. (Tc) = 3.2 min Distribution = Type III Shape factor = 484 Taal volume = 34,890 cA TR55 Tc Worksheet Hyd. No. 2 Pre Dev. 10 Yr. Storm Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 200.0 ft Two-year 24-hr precip. = 7.00 in Land slope = 0.5 % - Travel Time ........................................ = 2.5 min Shallow Concentrated Flow Flow length = 50 ft Watercourse slope = 0.5 % Surface description = Unpaved Average velocity = 1.14 f Is Travel Time ........................................ = 0.7 min Channel Flow Cross section flow area = 6.0 sqft Wetted perimeter = 12.6 ft Channel slope = 1;0 % Manning's n-value = 0.030 Velocity = 3.02 ft/s Flow length = 0.0 ft Travel Time ........................................ = 0.0 min Total Travel Time, Tc ........................ = 3.2 min Hydrograph- Report - Pa" 1 7 - English Hyd. No. 3 POST Dev. 1 Year Storm Hydrograph type = SCS Runoff Peak discharge = 6.27 cfs Storm frequency = 1 yrs Time interval = 1 min Drainage area = 2.13 ac Curve number = 88 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 5.157361 min Total precip. = 3.70 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Taal volume = 19,5M can Hydrograph Discharge Table Time -- Outflow Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) (hrs cfs) 8.58 0.06 14.98 - 0.28 21.38 0.08 8.78 0.07 15.18 0.27 21.58 0.08 8.98 0.09 15.38 0.25 21.78 0.08 9.18 0.10 15.58 0.23 21.98 0.08 9.38 0.11 15.78 0.22 22.18 0.08 9.58 0.13 15.98 0.20 22.38 0.08 9.78 0.14 16.18 0.19 22.58 0.08 9.98 0.16 16.38 0.18 22.78 0.07 10.18 0.18 16.58 0.17 22.98 0.07 10.38 0.21 16.78 0.17 23.18 0.07 10.58 0.24 16.98 0.16 23.38 0.07 10.78 0.27 17.18 0.15 23.58 0.07 10.98 0.31 17.38 0.14 23.78 0.07 11.18 0.38 17.58 0.14 23.98 0.06 11.38 0.49 17.78 0.13 11.58 0.69 17.98 0.12 11.78 1.65 18.18 0.12 ... End 11.98 3.70 18.38 0.12 12.18 3.64 18.58 0.11 12.38 2.01 18.78 0.11 12.58 0.90 18.98 0.11 12.78 0.71 19.18 0.11 12.98 0.58 19.38 0.10 13.18 0.51 19.58 0.10 13.38 0.47 19.78 0.10 13.58 0.44 19.98 0.10 13.78 0.41 20.18 0.10 13.98 0.37 20.38 0.09 14.18 0.35 20.58 0.09 14.38 0.33 20.78 0.09 14.58 0.32 20.98 0.09 14.78 0.30 21.18 0.09 TR55 Tc Worksheet ftge , I Y Hyd. No. 3 POST Dev. 1 Year Storm Storm frequency = 1 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 150.0 It Two-year 24-hr precip. = 3.70 in Land slope = 0.3 % Travel Time ........................................ = 3.3 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.5 % Surface description = Paved Average velocity = 1.44 ft/s Travel Time ........................................ = 0.0 min Channel Flow Cross section flow area = 1.8 sqft Wetted perimeter = 4.7 ft Channel slope = 0.5 % Manning's n-value = 0.030 Velocity = 1.82 ft/s Flow length = 200.0 ft Travel Time ........................................ =1.8 min Total Travel Time, Tc ........................ = 5.2 min Hydrograph Report Page 1 ' 1 Hyd. No. 4 POST Dev. 10 Yr. Storm Hydrograph type Storm frequency Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 10 yrs = 2.81 ac = 0.0 % = TR55 = 7.00 in = 24 hrs Hydrograph Discharge Table Time -- Outflow Time -- Outflow (hrs cfs) (hrs cfs) 7.37 0.17 20.17 0.23 7.77 0.20 20.57 0.22 8.17 0.25 20.97 0.21 8.57 0.31 21.37 0.20 8.97 0.39 21.77 0.19 9.37 0.47 22.17 0.19 9.77 0.55 22.57 0.18 10.17 0.66 22.97 0.18 10.57 0.83 10.97 1.00 11.37 1.50 ...End 11.77 4.73 12.17 9.31 12.57 2.25 12.97 1.45 13.37 1.17 13.77 1.00 14.17 0.85 14.57 0.77 14.97 0.69 15.37 0.61 15.77 0.53 16.17 0.46 16.57 0.42 16.97 0.39 17.37 0.35 17.77 0.31 18.17 0.29 18.57 0.27 18.97 0.26 19.37 0.25 19.77 0.24 English Peak discharge = 17.05 cfs Time interval = 2 'min Curve number = 88 Hydraulic length = Oft Time of conc. (Tc) = 4.225649 min Distribution = Type III Shape factor = 484 r Total volume = 53,527 cult TR55 Tc Worksheet page Hyd. No. 4 POST Dev. 10 Yr. Storm Storm frequency = 10 yrs Sheet Flow Manning's n-value = 0.011 Flow length = 150.0 ft Two-year 24-hr precip. = 7.00 in Land slope = 0.3 % Travel Time ........................................ = 2.4 min Shallow Concentrated Flow Flow length = 0 ft Watercourse slope = 0.5 % Surface description = Paved Average velocity = 1.44 ft/s Travel Time ........................:............... = 0.0 min Channel Flow Cross section flow area = 1.8 sqft Wetted perimeter = 4.7 ft Channel slope = 0.5 % Manning's n-value = 0.030 Velocity = 1.85 ft/s Flow length = 200.0 ft Travel Time ........................................ = 1.8 min Total Travel Time, Tc ........................ = 4.2 min Nydrograph Report a� English Hyd. No. 5 Post Dev. 1-Yr. Storm Hydrograph type =. Reservoir Peak discharge = 1.83 cfs Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 3 Reservoir name = TAYLOR COMMERCI Max. Elevation = 96.01 ft Max. Storage = 9,277 tuft Stamps hdwbon met uses. Total Volume = 12,W CUR Nydrograph Discharge Table Time Inflow- Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs lit cfs efs efs efs de cfs eh; cfs cfs 12.20 3.33 95.92 0.05 0.04 - - 1.26 - - - 1.30 12.40 1.91 96.01 0.05 0.00 - - 1.83 - - - 1.83 12.60 0.86 95.96 0.05 0.02 - - 1.55 - - - 1.57 12.80 0.70 95.90 0.05 0.05 - - 1.16 - - - 1.20 13.00 0.57 95.85 0.05 0.04 - - 0.92 - - - 0.95 13.20 0.50 95.82 0.05 0.03 - - 0.74 - - - 0.77 13.40 0.47 95.80 ' 0.05 0.03 - - 0.62 - - - 0.65 13.60 0.44 95.78 0.05 0.02 - - 0.55 - - - 0.58 13.80 0.40 95.77 0.05 0.02 - - 0.50 - - - 0.52 14.00 0.37 95.76 0.05 , 0.02 - - 0.45 - - - 0.47 14.20 0.35 95.75 0.04 0.01 - - 0.42 - - - 0.43 14.40 0.33 95.74 0.04 0.01 - - 0.38 - - - 0.40 14.60 0.31 95.73 0.04 0.01 - - 0.36 - - - 0.37 14.80 0.30 95.73 0.04 0.01 - - 0.34 - - - 0.35 15.00 0.28 95.72 0.04 0.01 - - 0.32 - - - 0.33 15.20 0.27 95.72 0.04 0.01 - - 0.30 - - - 0.31 15.40 0.25 95.71 0.04 0.01 - - 0.28 - - - 0.29 15.60 0.23 95.71 0.04 0.01 - - 0.27 - - - 0.27 15.80 0.22 95.71 0.04 0.00 - - 0.25 - - - 0.25 16.00 0.20 95.70 0.04 0.00 - - 0.23 - - - 0.24 16.20 0.19 95.70 0.04 0.00 - - 0.22 - - - 0.22 16.40 0.18 95.69 0.04 0.00 - - 0.21 - - - 0.21 16.60 0.17 95.69 0.04 0.00 - - 0.20 - - - 0.21 16.80 0.17 95.69 0.04 0.00 - - 0.20 - - - 0.20 17.00 0.16 95.68 0.04 0.00 - - 0.19 - - - 0.19 17.20 0.15 95.68 0.04 0.00 - - 0.18 - - - 0.18 17.40 0.14 95.68 0.04 0.00 - - 0.17 - - - 0.18 17.60 0.14 95.67 0.04 0.00 - - 0.17 - - - 0.17 17.80 0.13 95.67 0.04 0.00 - - 0.16 - - - 0.16 18.00 0.12 95.67 0.04 0.00 - - 0.15 - - - 0.15 18.20 0.12 95.66 0.04 0.00 - - 0.14 - - - 0.15 18.40 0.12 95.66 0.04 0.00 - - 0.14 - - - 0.14 18.60 0.11 95.66 0.04 0.00 - - 0.13 - - - 0.13 18.80 0.11 '95.66 0.04 0.00 - - 0.13 - - - 0.13 19.00 0.11 95.66 0.04 � 0.00 - - 0.12 - - - 0.13 19.20 0.11 95.65 0.04 0.00 - - 0.12 - - - 0.12 Continues on next page... Post Dev. 1-Yr. Storm Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Outflow (hrs) cfs ft cis cfs cfs cfs cfs cfs cfs cis cfs 19.40 0.10 - 95.65 0.04 0.00 - - . 0.12 - - - 0.12 19.60 0.10 95.65 0.04 0.00 - - 0.11 - - - 0.12 19.80 0.10 95.65 0.04 0.00 - - 0.11 - - - 0.11 20.00 0.10 95.65 0.04 0.00 - - 0.11 - - - 0.11 20.20 0.10 95.65 0.04 0.00 - - 0.11 - - - 0.11 20.40 0.09 95.65 0.04 0.00 - - 0.10 - - - 0.10 20.60 0.09 95.64 0.04 0.00 - - 0.10 - - - 0.10 20.80 0.09 95.64 0.04 0.00 - - 0.10 - - - - 0.10 21.00 0.09 95.64 0.04 0.00 - - 0.10 - - - 0.10 21.20 0.08 95.64 0.04 0.00 - - 0.09 - - - 0.09 21.40 0.08 95.64 0.04 0.00 - - 0.09 - - - 0.09 21.60 0.08 95.64 0.04 _ 0.00 - - 0.09 - - - 0.09 21.80 0.08 95.64 0.04 0.00 - - 0.09 - - - 0.09 22.00 0.08 95.64 0.04 0.00 - - 0.08 - - - 0.09 22.20 0.08 95.64 0.04 0.00 - - 0.09 - - - 0.09 22.40 0.08 95.64 0.04 0.00 - - 0.09 - - - 0.09 22.60 0.08 95.64 0.04 0.00 - - 0.08 - - - 0.09 22.80 0.07 95.64 0.04 0.00 - - 0.08 - - - 0.08 23.00 0.07 95.64 0.04 0.00 - - 0.08 - - - 0.08 23.20 0.07 95.64 0.04 0.00 - - 0.08 - - - 0.08 23.40 0.07 95.63 0.04 0.00 - - 0.08 - - - 0.08 23.60 0.07 95.63 0.04 0.00 - - 0.07 - - - 0.08 23.80 0.07 95.63 0.04 0.00 - - 0.07 - - - 0.07 24.00 0.00 95.63 0.04 0.00 - - 0.07 - - - 0.07 End Reservoir Report pasp , English Reservoir No. 1 - TAYLOR COMMERCIAL CENTER Pond Data Pond storage is based on known contour areas Stage / Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sgft cuft cult 0.00 94.50 5,236 0 0 1.00 95.50 6,324 5,780 5,780 2.00 96.50 7,503 6,914 12,694 3.00 97.50 8,787 8,145 20,839 4.00 98.00 9,455 9,121 29,960 Culvert / Orifice Structures Weir Structures IA] [B] [C] [D] [A] [B] [Cl ID] Rise in = 1.3 2.0 0.0 0.0 Crest Len ft = 4.7 2.4 0.0 0.0 Span in = 1.3 2.0 0.0 0.0 Crest El. ft = 95.60 96.10 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.00 3.00 0.00 0.00 Invert El. ft = 94.50 95.60 0.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 0.00 Length ft = 0.1 0.1 0.0 0.0 Multistage = No No No No Slope % = 0.50 1.00 0.00 0.00 N-Value = .013 .013 .000 .000 Drif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Tailwater Elevation = 0.00 ft Note: An m1f1me have teen analyzed under inlet and outlet rontol. Stage / Storage I Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 94.50 0.00 0.00 - - 0.00 0.00 - - 0.00 1.00 5,780 95.50 0.04 0.00 - - 0.00 0.00 - - 0.00 2.00 12,694 96.50 0.06 0.09 - - 6.05 1.79 - - 7.89 3.00 20,839 97.50 0.07 0.14 - - 18.54 11.73 - - 30.34 4.00 29,960 98.00 0.08 0.16 - - 26.32 18.54 - - 44.94 a3 Hydrograph Report -c2 Page , - - English Hyd. No. 6 Post Dev. 10-Yr. Storm Hydrograph type = Reservoir Peak discharge = 12.38 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 4 Reservoir name = TAYLOR COMMERCI Max. Elevation = 96.74 ft Max. Storage = 14,684 cuft Stmga NCiCaWn meMW usW. Hydrograph Discharge Table Total Vdume = 47,056 cult Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C _ Wr D Outflow (hm) cfs ft Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs Cfs 11.20 1.25 95.77 0.05 0.02 - - 0.49 - - - 0.51 11.60 2.37 95.91 0.05 0.04 - - 1.25 - - - 1.30 12.00 12.89 96.44 0.06 0.04 - - 5.49 1.44 - - 6.96 12.40 4.58 96.43 0.06 0.03 - - 5.38 1.37 - - 6.76 12.80 1.72 96.10 0.05 0.07 - - 2.49 - - - 2.53 13.20 1.24 95.97 0.05 0.01 - - 1.63 - - - 1.64 13.60 1.07 95.91 0.05 0.04 - - 1.25 - - - 1.29 14.00 0.90 95.87 0.05 0.04 - - 1.03 - - - 1.07 14.40 0.81 95.85 0.05 0.04 - - 0.88 - - - 0.91 14.80 0.73 95.83 0.05 0.03 - - 0.78 - - - 0.81 15.20 0.64 95.81 0.05 0.03 - - 0.69 - - - 0.72 15.60 0.56 95.80 0.05 0.03 - - 0.61 - - - 0.64 16.00 0.48 95.78 0.05 0.02 - - 0.54 - - - 0.56 16.40 0.44 95.76 0.05 0.02 - - 0.48 - - - 0.50 16.80 0.40 95.75 0.04 0.01 - - 0.43 - - - 0.45 17.20 0.37 95.74 0.04 0.01 - - 0.40 - - - 0.41 17.60 0.33 95.73 0.04 0.01 - - 0.36 - - - 0.37 18.00 0.29 95.72 0.04 0.01 - - 0.33 - - - 0.33 18.40 0.28 95.72 0.04 0.01 - - 0.30 - - - 0.30 18.80 0.27 95.71 0.04 0.01 - - 0.28 - - - 0.29 19.20 0.26 95.71 0.04 0.01 - - 0.27 - - - 0.27 19.60 0.25 95.71 0.04 0.00 - - 0.25 - - - 0.26 20.00 0.24 95.70 0.04 0.00 - - 0.24 - - - 0.25 20.40 0.23 95.70 0.04 0.00 - - 0.23 - - - 0.24 20.80 0.21 95.70 0.04 0.00 - - 0.22 - - - 0.23 21.20 0.20 95.70 0.04 0.00 - - 0.22 - - - 0.22 21.60 0.19 95.69 0.04 0.00 - - 0.21 - - - 0.21 22.00 0.18 95.69 0.04 0.00 - - 0.20 - - - 0.20 22.40 0.19 95.69 0.04 0.00 - - 0.21 - - - 0.21 22.80 0.18 95.69 0.04 0.00 - - 0.20 - - - 0.20 23.20 0.17 95.68 0.04 0.00 - - 0.19 - - - 0.19 23.60 0.16 95.68 0.04 0.00 - - 0.18 - - - 0.18 24.00 0.15 95.68 0.04 0.00 - - 0.17 - - - 0.17 ... End Reservoir Report Reservoir No. 1 - TAYLOR COMMERCIAL CENTER Pond Data Pond storage is based on known contour areas Stage I Storage Table Stage Elevation Contour area Incr. Storage Total storage ft ft sqft cult cuft 0.00 94.50 5,236 0 0 1.00 95.50 6,324 5,780 5,780 2.00 96.50 7,503 6,914 12,694 3.00 97.50 8,787 8,145 20,839 4.00 98.00 9,455 9,121 29,960 _ Culvert / Orifice Structures [A] [B] [C] [D] Rise in = 1.3 2.0 0.0 0.0 Span in = 1.3 2.0 0.0 0.0 No. Barrels = 1 1 0 0 Invert El. ft = 94.50 95.60 0.00 0.00 Length ft = 0.1 0.1 0.0 0.0 Slope % = 0.50 1.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multistage = - Yes No No Weir Structures [A] [B] [C] Crest Len ft = 4.7 2.4 0.0 Crest El. ft = 95.60 96.10 0.00 Weir Coeff. = 3.00 3.00 0.00 Eqn. Exp. = 1.50 1.50 0.00 Multi -Stage = No No No Tailwater Elevation = 0.00 ft Page 1 English [D] 0.0 0.00 0.00 0.00 No Note: All outllows have Goan analyzed under inlet and oullat wheal. Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Discharge ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 94.50 0.00 0.00 - - 0.00 0.00 - - 0.00 1.00 5,780 95.50 0.04 0.00 - - 0.00 0.00 - - 0.00 2.00 12,694 96.50 0.06 0.09 - - 6.05 1.79 - - 7.89 3.00 20,839 97.50 0.07 0.14 - - 18.54 11.73 - - 30.34 4.00 29,960 98.00 0.08 0.16 - - 26.32 18.54 - _ - 44.94 D,50, Table 8.03b - RunoH Curve Numbers (CN) Hydrologic Soil Group A B -C D Land Use/Cover Cultivated land without conservation 72 . with conservation 62 Pasture land Poor condition 68 Lair condition 49 good condition 39 Meadow good condition 30 Wood or forest land Thin stand - poor cover, no mulch 45 Good stand - good cover 25 Open spaces, lawns, parks, golf courses, cemeteries, etc. good condition: grass cover on 75% or more of the area 39 fair condition: grass cover on 50 to 75% of the area 49 Commercial and business areas (85%impervious) 89 Industrial districts j720% impervious) 81 Residential:' Development completed and vegetation established Average lot size Average % Impervious 1/8 acre or less 65 77 1/4 acre 38 61 113 acre 30 57 12 acre 25 54 1 acre 20 51 2 acre 15 47 Paved parking lots, roofs, driveways, etc. 98 Streets and roads paved with curbs and storm sewers 98 gravel 76 dirt 72 Newly graded area 81 Residential: Development underway and no vegetation Lot sizes of 1/4 acre 88 Lot sizes of 12 acre 85 Lot sizes of 1 acre' 82 Lot sizes of 2 acres 81 81 88 91 71 78 81 79 86 89 69 79 84 61 74 80 58 71 78 66 77 83 55 70 77 61 74 80 69 79 84 92 94 95 88 91 93 85 90 92 75 63 87 72 81 86 70 80 85 68 79 84 66 77 81 98 0 98 98 98 98 85 89 91 62 87 89 89 93 95 93 95 97 91 94 96 90 93 95 89 92 94 'Curve numbers are computed assuming the runoff from the house and driveway is directed toward the street. source: USDA-SCS . 8.03 10 Rcr. 12193 y Q �hbyl,zz,sI • � �8 G (�s Ise L�' _ '�/(� a/c�`^�•.a� -z�oL -2yS8 Z '/ ?S%Lb SS id/" v-A`--dv Z 2b-tG'L m �aJ xk'('.vh L61 FINANCIAL RESPONSIBILITY/OWNERSHIP FORM SEDIMENTATION POLLUTION CONTROL ACT 00 107 No person may initiate any land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and a rov Land Quality Section, N.C. Department of Environment and Natural Resources. (Pleas e�driint=ar��tf the question is not applicable or the e-mail and/or fax information unavailable, place N/A t blbrnk'.) `� Part A. 1. Project Name Zack Taylor Commercial Complex JUN 2 3 2H7 2. Location of land -disturbing activity: County Craven City or Township NewLABDIiy SECTI:;;v WASHING OFFICE Highway/Street McCarthy Blvd Latitude N35° 5.850' Longitude 3. Approximate date land -disturbing activity will commence: July 2007 4. Purpose of development (residential, commercial, industrial, institutional, etc.): Commercial 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 2.13 6. Amount of fee enclosed: $ 150.00 The application fee of $50.00 per acre (rounded up to the next acre) is assessed without a ceiling amount (Example: a 9-acre application fee is $450). 7. Has an erosion and sediment control plan been filed? Yes X No Enclosed X 8. Person to contact should erosion and sediment control issues arise during land -disturbing activity: Name_ Zack Taylor E-mail Telephone 252-633-5106 Cell # Fax # 9. Landowner(s) of Record (attach accompanied page to list additional owners): Zack..Taylor 252-633-5106 Name Telephone Fax Number P.O. Box 12006 Current Mailing Address 1440 McCarthy Boulevard Current Street Address New Bern NC 28561 New Bern NC 28562 Clty State Zip City State Zip 10. Deed Book No. 1101 Page No. 305 Provide a copy of the most current deed. No. 11 No._T5T_ PartB. No. 1176 No. 770 Person(s) or firm(s) who are financially responsible for the land -disturbing activity (Provide .a comprehensive list of all responsible parties on an attached sheet): Zack Taylor Name t-mail Address P.O. Box 12006 1440 McCarthy Boulevard Current Mailing Address Current Street Address New Bern NC 28561 New Bern, NC 2B562 City State Zip City State Zip Telephone 252-633-5106 Fax Number 2. (a) If the Financially Responsible Party is not a resident of North Carolina, give name and street address of the designated North Carolina Agent: Name Current Mailing Address E-mail Address Current Street Address City State Zip City State Zip Telephone. Fax Number (b) If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the Certificate of Assumed Name. If the Financially Responsible Party is a Corporation, give name and street address of the Registered Agent: Name of Registered Agent Current Mailing Address E-mail Address Current Street Address State Zip City State Zip Telephone Fax The above information is true and correct to the best of my knowledge and belief and was provided by me under oath (This form must be signed by the Financially Responsible Person if an individual or his attorney -in -fact, or if not an individual, by an officer, director, partner, or registered agent with the authority to execute instruments for the Financially Responsible Person). I agree to provide corrected information should there by any change in the information provided herein. Zack Taylor Owner Type or print n Title or Authority 3= -/3-117 Signat re Date 1, Beth Simmons a Notary Public of the County of Craven State of North Carolina, hereby certify that Zack Taylor appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. l WitnessllYiy ha���ntllt rlrial seal, this day of 20 �N SIMIyO�i���� NOTARY c Notary SePIUBLIC April 22, 200y 6!� My commission expires