Loading...
HomeMy WebLinkAboutSW6121107_APPROVED PLANS_20130118STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW� `6D DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE Ilk YYYYM M D D N t O) r T 0 0 U 0 31 J r a c 3 O c U E tC I LO I P r N N cri O rn Q I 3 v O U rn i v 0 0 � I ti m C a N E E 0 U 0 3 rn --- 0 V m L U r J 50 25 0 50 100 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This information is not to be relied upon as being exact or complete. The contractor must call North Carolina 811 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed improvements shown on the plans. 2. Owner The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 Ph. 865-457-3601 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street Lumberton, NC 28359 Ph. 910-738-6875 4. Lot = 17.69 acres 5. Property is located in Robeson County and is Zoned Heavy Industrial. 6. Utilities: Water. City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear. 30 Feet Side: 15 Feet 8. Total Parking: Accessible spaces 2 = spaces 10'x20' spaces 39 = spaces Total 41 = spaces I Layout Notes I 1. All dimensions to curb reference face of curb. 2. See Architectural drawings for building dimensions. All dimension shown to building on this sheet are approximate. 3. See Utility Plan for new and existing utility line locations. 4. See Grading Plan and Drainage Plan for new and existing,storm system locations. Legend Property Une Existing Curb Line Oa Existing Light Pole 77_ 770= a New Building Edge New Sidewalk New Curb New Concrete Site Notes New Heavy Duty Asphalt Paving Future Building and Parking Expansion \OI 1. Landscaped Area - Seed and Mulch 2. Medium Duty Asphalt Paving (See Detail 2/C501) 6" mineral aggregate base course 1 1/2" bituminous concrete binder course 1 1/2" bituminous concrete surface course 3. 6" machine formed concrete curb. See Detail 5/C501. 4. Heavy Duty Asphalt Paving (See Detail 3/C501) 8" mineral aggregate base course 21/2" bituminous concrete binder course 1 1/2" bituminous concrete surface course 5. 8" concrete paving with 6 x 6 w2.9 x w2.9 welded wire mesh on 6" crusher run stone base. Provide control joints at 29-V max. See Detail 7/C501. 6. Curb Cut- See Detail 6/C503. 7. Painted Handicap symbol - See Detail 9/C501. 8. Transformer pad (Approximate location), Coordinate location and size with power company. 9. Location typical parking stall 10'x2V. 4" wide painted stripes, color to be white. Stop stripes 16'-0" from curb - See Detail 10/C501. 10. Striped handicapped access aisle 4" painted stripes, color to be blue. See Detail 9/C501. 11. Concrete wheel stop - See Detail 4/C501. V. 6" dia, pipe bollard 2' -0" from wall centered on jamb, typ. - see Architectural Plans for detail. 13. 5" concrete sidewalk - See Detail 1/C501. 14. Handicap parking signs on 2" sq. tube post - See Detail I VC501. 15. Curb wipe down - See Detail 8/C501. 1S. Align paving and curbs with roadway as required. 2_ APPROVED BY PURCHASER / TENANT DATE APPROVED BY DEVELOPER / SELLER DATE CD _W "C CL E v zLO V E U' � 0 W U o = CA 0)U C C 4)C z _ "� i o - U IX o 10 F- W U 4) •o F-- a CO N \ 6LIJ n C M W W W U Z O � J tit �WV zJP 00 rrO^^ C - N Q vJ QO� �Zc(D r Y to Y 0 W 5 U E� CL Z 00 > 2 0 � �Cl) J CO) C ICU CU J 0 c (1)U N /� VJ 0 c 3 N 0 0 rr: m 0 L Drawn By CDB Checked EJB Approved EJB . Job No. 212031 1 "=50' 8-3-12 r Scale Date C 101 Sheet No. 4 4 N 0 N L m CL 0 U V) J C O .o U E LO Lo M th O N 0 c as 3 v O U '30 c 0 0 wo ao LL y c1 'c to n E 0 U L 0 0 3 y m C 0 2 v m L U I , 1iI - �i I, � Lij � ; !Y I H r l I I �I Note: Sediment Trap Sheet C301 U m i {!; shown on Ld I = °c i t�, shall be cleaned out and converted to U I Ili \ this Water Quality Basin after site is j I o + l i > stabilized and temporary sediment trap is no longer needed 0 l r, 21 Line H m i It c0 O i I Hw1'- �- I OS1 I I r I r 1 ( Top of Be i �. Y',l = 158.5 ++' I i I,iill I I CIDr r Storm Structure Schedule General Notes Structure # Type Top Invert Northing, Easting 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This information is not to be relied upon as being exact or complete. The contractor must call North Carolina 811 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed improvements shown on the plans. 2, Owner. The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 0S1 Outlet Structure 158.50 155.50 N 325525.67, E 1948879.97 OS2 Outlet Structure 159.00 156.00 N 325113.66, E 1948571.43 HW1 Outlet Headwall 155.35 N 325554.55,E 1948876.17 HW2 Outlet Headwall - 155.35 N 325554.55, E 1948876.17 HW3 Outlet Headwall - 155.65 N 325375.86, E 1948753.18 HW4 Inlet Headwall - 156.32 N 325367.84, E 1948594.29 HW5 Outlet Headwall - 155.98 N 325319.76, E 1948524.19 - . _DITCH. - _ _ _ _ _ Storm Piping Schedule Ph.865-457-3601 - - - .. .= .. ' Pipe Size/Mat. Length US Inv. DS Inv. Slope 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street A 8' HPDE 30.0' 160.50 159.93 1.90%Lumberton, NC 28359 Ph. 910-738-6875 B 8" HPDE 30.0' 159.93 159.36 1.90% C 10" HDPE 30.0' 159.36 158.79 1.9m D 10" HDPE 30.0' 158.79 158.22 1.90% E 12" HDPE 30.0' 158.22 157.65 1.90% F 12" HDPE 30.0' 157.65 157.00 1 2.15% i G 15" HDPE 142.5' 157.00 155.65 0.95% H 17 HDPE 25.0' 155.50 155.35 0.60% % \ I 8" HDPE 30.0' 160.50 158.40 7.00% J 15" RCP 85.0' 156.98 155.98 0.40% K 12" HDPE 20.0' 156.00 159.90 0.50% ( Pipe Slope matches slope of existing ditch l Site Notes O 1. Water Quality Basin Emergency Spillway (See Detail 1/C504) 2. Curb Cut (See Detail 6/C503). 3. Outlet Protection (See Detail 4/C503) 4. Downspouts to Grade (See Detail 5/C503) 5. Forebay Outlet (See Detail 3/1 6. Water Quality Basin Layout (See Detail 5/C504) 7. Emergency Spillway (See Detail C505) 158 157 � -160 159 ` ` 8. Bioretention Basin Layout (See Detail C505) Line A Note: Roof Downspouts. Refer to Line B Architectural plans for exact location Line C I I l k I I CID I 62.00 I i Line-D � i I Emergency ��I,il I I i" 17.69 Aeresf j ° o I Spillwa y � I I' ; I � \� I � 770,576 Square Feetf , 6 I �� �� Line E % 62.4652.46 I Ill_ Line G HWLn Line F ' If i I I ! I °' �! I I'r' 3 , 3/4°k .i. 3/4% Note: All downspouts in loading FFE = 162.50 Tt { dock area shall spill to grade and include downspout guard. °D See Detail 11/C502 LO 5 Y. -- �. I 1 l I I Line I spills through Static 64 psi Lt; {; I curb in loading dock Residual 36 psi 9' I j goy �' I�i I 1• area. See Row 625 GPM ;v ' -1 ! \ _� 57 95 .:. I • ' ' .50 10b/C 02 Detail X - v, �� s2.46 -1 i -- ess s615 0 � 5FL5 2 160 q 61. -r, 60.5 F ? HW4 I r i OS2 �- p HW5_ l�l Emergency Lme K Spillway 7 _ . bottom/roadside ditch ' -��+R 1 U `f 7d, TC�2.0 TC=BC 5, =61.1 ,9 /\ /BC�1.5 I 2 r b 60.2 :o -, 159 4 P BRANCH ROAD bottom/roadside ditch I I r R w Approx. Location 8" PVC Water 0 f i' 1 1 O J Note: See Detail 5/C503 Ofor all downspouts on this 4 side of building Appr v d ".?.TSr f-'i:IT.?it ❑Ci c.1! ,.. ,`» Ccrs :h , ,� -a 76 re 1 Note: Material cut from this 9h ett site may only be used for fill in grass areas \ , r J -ohp,- ---0h --0hp- ------- ohpo-- asphalt -pavement 50 25 0 a1 100 4. Lot = 17.69 acres 5. Property is located in Robeson County and is Zoned Heavy Industrial. 6. Utilities: Water: City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear: 30 Feet Side: 15 Feet Grading Notes 1. The grades shown are finished grades. Contractor shall determine subgrade elevations by examining typical pavement sections, the building drawings and the landscape drawings. 2. All disturbed areas not scheduled to be paved shall have a minimum of 3 inches of topsoil placed on them and shall be seeded as specified. 3. All grading construction practices shall conform to all NCDENR standards. 4. Maximum topsoil thickness for slopes steeper than 3:1 shall be 3". 5. Lot = 17.69 acres 6. No slopes shall exceed 2:1 7. Temporary seeding is required when grading operations are temporarily hatted for over 14 days, and on soil stockpiles. Permanent seeding is required when grading operations are completed and/or construction operations will not impact the disturbed area. Seed areas that show signs of excessive erosion. 8. Contractor shall provide an As -built Survey of the building location, finished grades, pavement limits, storm drainage, and utilities conducted by a licensed land surveyor. Drainage Notes 1. All storm lines on this sheet shall be HDPE'S' corrugated pipe with smooth interior, unless otherwise noted. 2. All storm lines in paved areas shall be backfilled to pavement subgrade with #57 stone. 3. All trenching and shoring shall comply with OSHA standards. 4. Storm lines and structures shall be constructed as soon as possible. Inlet Protection shall be used around structures as needed to minimize the sift entering into drainage system. Inlet Protection shall be removed after permanent vegetation or other ground cover is established or constructed. All silt shall be removed from structures and lines. 5. Pipe lengths and slope are measured from center of structure to center of structure. Earthwork Quantities General Earth Cut: 12,400 c.y. (Bank Quantity) General Earth Fill: 36,600 c.y. (Compacted Quantity) Assuming shrinkage of 15%, the total material required for the compacted fill quantity of 36,600 c.y. = 42,100 c.y. (Import Fill) Legend Existing Curb Line PC - 300 Existing Contours - EID Existing Catch Basin - Existing Storm Line ---OH Existing Overhead Power Lines 61 Existing Power Pole New Building Edge New Curb and Gutter rR D'ENRf O New Curb f New Storm Sewer IDg New Catch Basin 0WO ST New Junction Box --- 900 901 New Contours 80•55+ New Spot Elevation TC=92.35 New Top & Bottom Of Curb Elevations BC--91.65 APPROVED BY PURCHASER/TENANT APPROVED BY DEVELOPER / SELLER DATE DATE CIO 06 E L O lJ7 � � U Z U � E 0 Z 2 U O W O V 0 r co)V 6- r CC 0 a C Z .O o - 0 w O CIO U N -C O li-- a h Mr- Z M V �n �t W W OP J JW Z J J O fnot• =Yc0 ILD yYto OWE � 2 ova fn E F3 _O m 0 a'� Co co _CC ICU c V 0 CL 'C U }� 0 VJ CD c s` K F Z Z o Z 0 > N y of > m N 0 0 N Vil C7 Drawn By CDB Checked EJB Approved EJB Job No. 212031 1 "=50' Scale 8-3-12 Date C201 Ill Sheet No. , Cl) N O N L O a U U 0 J , 0 0 E d 0) N 0 N r; 0 0 Z 3 v v U 3 0 U 0 N N w a� 'c m n E 0 U L 0 3 rn c 0 x v m L U W INSTALL NORTH AMERICAN GREEN 6" PVC SCREW .E C-350 EROSION CONTROL TYPE PLUG ICU 06 BLANKET FROM EDGE OF BASIN Q L SPILLWAY TO RIP -RAP AT OUTLET TOP OF STRUCTURE cc CD HEADWALL FOR ENTIRE WIDTH OF ELEV. = 158.0. C i U SPILLWAY AS INDICATED. FOLLOW j /j /j�/j \ 0 Lr) Z MANUFACTURERS INSTALLATION `J' j��//��//��//�//�//\ U Q, 5 INSTRUCTIONS.//// \ L E V c 3:1 SLOPE FROM TOP OF \\'��j/\� 2 E 0 BERM TO BOTTOM OF \ O W 0 0 BASIN c a.. 12" HDPE \ \ a V 0 p INVERT 155.5 \ CO) C C N BASIN SIDE " a \ \ a Z .� �p DOWNSTREAM SIDE /\�/r /\ d 4 Mom' \ V BURY END \'��///\//r//i//�/��/��% \ 1' DEEP INVERT= 155.5 \ r 1: (0 f- \ 6" PVC 6" PVC TEE _ ' 1 /\ - INSTALL NORTH AMERICAN GREEN C-350 EROSION CONTROL BLANKET FROM EDGE OF BASIN SPILLWAY TO RIP -RAP AT OUTLET a 1" 0 BAR \% co N HEADWALL FOR ENTIRE WIDTH OF \ " co rn SPILLWAY AS INDICATED. FOLLOW a 1 T "" %\/j\/j\//\//\//\//\//\// /\//\//\//\// // // // // ////% 6 PVC CAP m � \ \ \ \ \ \ \ \ \ \ \ \\ \\ \\ \j \/ \j\\/ WITH 2.8" HOLE U MANUFACTURERS INSTALLATION DRILLED W w INSTRUCTIONS. INVERT 154.5 N (0 4"MAX. i\\//\\//\\//�\//\\//\\//\\////\\//\\//\\//\\//\\//\\//\\//\\//\\//\\//\\//\\//\\ n� Z W TOP OF BERM /\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\/\\ `� Z ELEV = 158.5 2, o a d c a\\ O J Z Q: a \/\/\/\/\ W 3 n 4" LAYER OF #57 STONE %/\\%\\%\\j/\\j\ POND W J Z WEIR CREST / / / UNDER STRUCTURE //\\//\\//\\//\\//\\ \\ \ Q ,LIJ ELEV. 157.5 Section '%/ice/i\/i\/i\/i\/i\/i�i\/i /i / / qZ _ � \///\//\\//\\//\\//\\/\\//\\//\\//\\//\\//\\//\\//\\//\\/ < OC � Plan\\/\\/\\/\\/\�/\\/\\/\/\\/\\/\/\\/\\ 7) Z (D TOPSOIL &SEED PRIOR,\�\ Y 20' TO INSTALLING THE ELEVATIONS SHOWN ARE CRITICAL TO THE EROSION CONTROL PROPER FUNCTION OF THE WATER QUALITY BASIN. \ /\/\//\//i///�//, c Y W BLANKET CONTRACTOR SHALL ENSURE THAT THE ELEVATIONS 0 W ARE CORRECT. I- _ - Emergency Spillway 0 U) ♦. o_ '< � o E aN ° o 2 Water Quality Basin - Emergency Spillway Outlet Structure for Water Quality Basin N.T.S. N.T.S. M;' o co � O J cM 16 Outlet .' 'Structure //' Top of Berm F� J `'� �� ,17' l Elev 158.5 / q4 / J // 18 - N Emergency Rip -rap �• J Spillway ' / f�xz 5' a . P y Top Elevation 157.0 Elevation 155.0 Elevation 154.8 0 I a 4 / "C 7-7 AV'r / /40 CD Install Geotextile Under Rip -rap TOP OF POST ELEV. 157.0 / -� % �J� t J �/ �� ►� / / J / SECTION VIEW 2" DIAMETER ` � 7 �� r 15 - // - STEEL POST %` Forebay �� PAINTED WHITE / Outlet /, g / 12 CD 3" RED PAINTED i Forebay MARK TO INDICATE // Marker SEDIMENT CLEANOUT LEVEL IN FOREBAY AT0� o ELEV. 156.0 j / / / 10 110 / / 1 m 1 / J� / / � ' e `- 3" RED PAINTED MARK Q r FORBOTTOM O55 OF FOREBAY j% / 1 ' \ / o °e. ' ° +�{OQ / // ` lei Top Elevation 157.0 E 20' 2 5 / Compacted Earth Berm °D (j� ♦ Z 1 - 30 \ BURY POST MIN. 2DEEP Rip -rap Downstream Elevation 154.8 Upstream Elevation 155.0 ELEVATION VIEW Note: co d , This basin will be used for sediment and erosion control during the construction phase of the project. correct elevations and convertedt too wet detention basin once the site is shall be cleaned out and regraded to the 61;1 OAK I stabilized. Adequate drainage, erosion and sediment control measures, best ` management practices, and/or other stormwater management facilities shall 1�,j3 be provided and maintained at all times during construction. Damages to t adjacent and/or the construction site caused by the contractor's or property : 7�28 Drawn By CDB owner's failure to provide and maintain adequate drainage and Checked EJB erosion/sediment control for the construction area shall be the responsibility of the property owner and/or contractor. el4vkg R��,�Rt,.r Approved EJB Job No. 212031 1mma N.T.S. 8-3-12 MM Scale Date APPROVED BY PURCHASER/TENANT DATE 3 Sediment Forebay Berm & Rock Outlet 4 Sediment Forebay Marker Detail 5 Water Quality Basin Layout Plan APPROVED BY DEVELOPER/SELLER DATE C504 N.T.S. N.T.S. Sheet No. Basin Layout Point Location Point Location 1 N 325356.50, E 1948615.55 10 N 325373.08, E 1948743.44 2 N 325351.51, E 1948635.75 11 N 325418.22, E 1948736.54 3 N 325329.34, E 1948638.33 12 N 325411.74, E 1948749.38 4 N 325323.36, E 1948645.55 13 N 325397.41, E 1948750.58 5 N 325313.82, E 1948655.63 14 N 325462.89, E 1948756.96 6 N 325309.57, E 1948655.21 1 15 N 325413.80, E 1948839.71 7 N 325389.72, E 1948726.28 16 N 325550.07, E 1948889.69 8 N 325381.26, E 1948725.61 17 N 325508.37, E 1948887.79 9 N 325369.24, E 1948734.69 18 N 325500.17, E 1948919.56 v Lr, 0 N t Q O lk c 0 a 0 #4's ® 12" O.C. E VERTICAL a m 0 v ce 0 N 6" ORIFICE AT ELEVATION 158.0 0 c -3 BOTTOM 3 OF POND vvvvvvvvvvvvvv vvvov00000vvvv vvvvvvvvvvvvvv vvvvvvvvvvvvvv U 7#4's ® 6" O.C.v v 3 °HORIZONTAL. _ , ' o 'gyp vvvvvvovvv v vv vvv v v o v v v vv vv C vvvvvvvvvvvvvv vvvvvvvvvvvvv o vvvvvvvvvvvvvv vvvvvvvvvvvvv ii vvvvvvvvvvvvvv C vvvvvvvvvvvvv y N 0 6" PERFORATED PIPE ® INV 156.0 ca N U o 3 y rn c INSTALL NORTH AMERICAN GREEN C-350 EROSION CONTROL BLANKET FROM EDGE OF BASIN SPILLWAY TO RIP -RAP AT OUTLET HEADWALL FOR ENTIRE WIDTH OF SPILLWAY AS INDICATED. FOLLOW MANUFACTURERS INSTALLATION INSTRUCTIONS. TOP OF BERM ELEV = 160.0 3 WEIR CREST 11 ELEV. = 159.0 Plan INSTALL NORTH AMERICAN GREEN C-350 EROSION CONTROL BLANKET FROM EDGE OF BASIN SPILLWAY TO RIP -RAP AT OUTLET HEADWALL FOR ENTIRE WIDTH OF SPILLWAY AS INDICATED. FOLLOW MANUFACTURERS INSTALLATION —'I INSTRUCTIONS. BASIN SIDE BURY END 1' DEEP — 3:1 SLOPE FROM TOP OF BERM TO BOTTOM OF BASIN 2' TOPSOIL & SEED PRIOR TO INSTALLING EROSION CONTROL BLANKET Emergency Spillway TOP OF STRUCTURE ELEV. = 159.0. SEE PLAN VIEW FOR GRATE a n 12" STORM LINE 6x6-W2.9X2.9 W.W.F. 4" LAYER OF #57 STONE UNDER t STRUCTURE Section U_ X Grass Bioretention Basin Detail N.T.S. SPECIFICATIONS Soil Media - The soil mix should be uniform and free of stones, stumps, roots or other similar material greater than 2 inches, It should be a homogenous soil mix of 85-88 percent by volume sand (USDA Soil Textural Classification), 8-12 percent fines (silt and clay), and 3-5 percent organic matter (such as peat moss) shall be used. Additionally, the phosphorus content of the spoil mix should be low. Soil media should be sent to NC Department of Agriculture (NCDA) labs to be analyzed. The P-Index for bioretention soil media should always range between 10 and 30, regardless of the target pollutant. The media should be tested to determine an actual drainage rate after placement. The permeability should fall between 1 and 6 inches per hour, and 1-2 inches per hour is preferred. As a rule of thumb, using the above -specified media, the infiltration rates should be approximately tin/hr. Maintenance - Bioretention facilities require soil and under -drain maintenance to ensure optimal infiltration, storage and pollutant removal capabilities. 1. Watering: Watering should not be required after establishment, however it may be required during prolonged dry periods. 2. Erosion Control: Inspect flow entrances, ponding area and surface overflow areas periodically. Erosion problems should not occur with proper design except during extreme weather events. If sediment is deposited in the bioretention facility, immediately determine the source, remove excess deposits, and correct the problem. 3. Soil Media: Soils mixes for bioretention facilities are designed to maintain long-term fertility and pollutant processing capability. Estimates form metal attenuation research indicates that metal accumulation should not present toxicity concern for at least 20 years in bioretention facilities. If in question, have soil analyzed for fertility and pollutant levels. 4. Underdrain Pipes - Annual flushing through the pipe cleanouts is recommended to facilitate unclogging of the pipes without disturbing the bioretention areas. REINFORCEMENT SHOWN THROUGH PIPE AND ORIFICE FOR CLARITY ONLY fTOP OF STRUCTURE ELEV. =159.0 a d d I . d d d dt� I d d a I dl v I. I . v.. d d I Al v c vvvv ovvvvovovvvvvovvvovovvvv vv�vvvo vvvdvvvvvvvvvvvvvvvvvvvvvvvvvvmvvvv vvvvpvvvvvvvvvvvvvvvvvvvvvvvvvvlvvvv vvvdvvvvvvvvvvvvvvvvvvvvvovvvv vvvv VvvvbVVVVVVVVVVVVVVVVVVVVVVVVVVVVVV vvvgqvvvvvvvvvvvvvvvvvvvvvvvvvvt vvvv vvvv bvvvvvvvvvvvvvvvvvvvvvv°vvvvvvv vvvdddvvvvvvvvvvvvvvvvvvvvvvvvvvbvvvv vvvvpvvvvvvvvvvvovvvvvvvvvvvvvvlvvvv vvvvbvvvvvvvvvvvvvvvvvvvvvvvvvvp vvvv vvvv vvvvvvvvvvvvvvvvvvvvvvvvvvvvvv vvvvlvvvvvvvvvvvvvvvvvovvvvvvvv*vvvv vvvvpvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv vvvvvvvvvvvvvvvvvvvvvvvvvvvvvv vvvv vvvvbvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv, vvvvqvvv vvvvvvvvvvvvvvvvvvvvvvv'vvvv v vvvbvvvv v v v v v v v v v v v v v v v v v v v v v v v v vv ovvvvllvvvvvvvvvvvvvvvvvvvvvvvvvv�vvvv vvvvpvvvvvvvvvvvvvvvvv v v v v v v v vo v v vv vvv vvvvvvvvvvvvvvvvovvovvovvv vvvv 6" PERFORATED PIPE AT ELEVATION 156.0 6" ORIFICE AT INVERT ELEVATION 158.0 -� 7 V v V vvvv 7vvv vvvv 7vvv vvvv 7 V v V vvvv 7vvv vvvv 7vvv vvvv 7vvv vvvv 7vvv vvvv 7vvv vvvV 7vvv vvvv Elevation o"c v v v vc IV vc v vc v vc v vc 'v vc v vc " vc 'v vc Plan View Pvvvvvvvvvvvvv°vvvvvvvvvvvvv vvvvvvvvvvvv7v7v7vvvvvv77vv1 1v7v7vvvvvvvvvvvvv7vvvvvvvvv vvvvvvvvvvvoovvovvvv vvvvvvv vvvvovvvvvvvoovvvvvvvv vvvv vvvvvvvvvvvvvvvvvvvovvvvov o vvvvvvvvvvvvvovvvvvvvvvvv vvvvvvvvvvvvvvvvvvvovvvvov .vvvvvvvvvvvvvvvvvvvvvvvvvv vvvvvvvvvvvvvvvvvvvvvvvvv V v v v v v v v v v v v v o v v v v v v v v v vv vvvvvvvovovovvvvvvvvvvvvv _ V v v v v v v v v v v v o v v v v v v v v v vv o v v v v v v v v v v v v v v v v v v v v v v vv ovovvvvvv0000vvoovvvvvvv �TYP. SLOPE = 1% SECTION A -A ti •• r. ►c, vvvvvvvvv vvvvvvv v1 vvvvvvvvv vvvvvvvv1 vvvvvvvvv vovvvvvoI 2' FILL SOIL MEDIA vvvvvvvvv MIX: 85-88% Sand v°v°vvvvvv o 8-12% Fines vvvvvvvvI vvvvvvvvv 3-5% Organic vvvvvvvv o V v v O v V V V I 6" PREFORATED PIPE IN 8" GRAVEL JACKET CD ICU 06 0 Lo L_ Z s 5 E U ` 0 ca c C Z �0 L o sw& 116 7- - 0 0 F 0� O COLLECTION SYSTEM tl CAPPED CLEAN OUT PIPE lvvvvvvvvv vvovvv v vv vvvvvvvvv vvvvvvvvv, 1vvvvvvvvv vvvvvvvvv vvvvvvvvv vvvvvvvvv vvvvvvvvv vvvvvvvvv vvvvvvvvv vvvvvvvvv FILTER vvvvvvvvv vvvvvvvvv FABRIC r ' TYP. SLOPE = 1 % SECTION B-B �g0 2 �` 1 3 �v Clean Out (Typ) \ r� Per NCDENR 760 ; Bioretention BMP T6.7 ti`♦ . ` 7S9 5 p 7Outlet 5g Structure 4 �`♦ 7 �\ ♦ \ �X i �� ♦ N ` \\; �\ ♦ Al \. _ ♦ \ 'A Emergency `�:`♦ Spillway yV �♦ 1�♦ `♦ J \ % Top of Berm \ ♦ 11 12 1' ♦♦♦ �9 Elev 158.5~♦�♦ rn i 9�� 8 13 % 7sQ � / 0 \ ,14 PP Basin Layout Point Location Point Location 1 N 325237.08, E 1948533.21 8 N 325101.99, E 1948607.74 2 N 325243.45, E 1948510.56 9 N 325069.37, E 1948593.62 3 N 325225.63, E 1948493.21 10 N 325073.31, E 1948597.47 4 N 325200.02, E 1948498.56 11 N 324996.71, E 1948650.29 5 N 325150.65, E 1948542.16 12 N 325000.04, E 1948655.01 6 N 325146.51, E 1948537.35 13 N 324913.82, E 1948719.84 7 N 325127.64, E 1948605.38 14 N 324868.51, E 1948752.45 1"=30' Note: This basin will be used for sediment and erosion control during the construction phase of the project. It shall be cleaned out and regraded to the correct elevations and converted to a bioretention basin once the site is stabilized. Adequate drainage, erosion and sediment control measures, best management practices, and/or other storrnwater management facilities shall be provided and mairtained at all times during construction. Damages to adjacent and/or the Wnstruction site caused by the contractor's or property owner's failure to provide and maintain adequate drainage and erosion/sediment control for the construction area shall be the responsibility of the property owner and/or contractor. APPROVED BY PURCHASER / TENANT APPROVED BY DEVELOPER / SELLER CO N V) C14 UC) � M f'n ) W Z �z O J pWj ZLU Q O V N C — N -4p� v<0 J Y CD LO YCD O00 H ova U) c p N � E o O >g N 2 J co M Q s c d W z a � o p N �N d > N N 6 N Drawn By CDB Checked EJB Approved EJB .lob No. 212031 N.T.S. Scale 8-3-12 Date DATE DATE C505 Sheet No. X CAROLINA COMMERCE AND TECHNOLOGY CENTER DEED BOOK 1723 PAGE 432 Zoning— Heavy Industrial :13 7.3812 yyy 7- ryy as 0 ._.._ 538 L .. _ .. �`2 ,hy.�`' hy' 6ry — 7 j— — Ducts ,y— _ _ — yy_ —�y6 yet eo ^ye, .� }' "a y� ^y6 ^yr0' ,yy ^ye' }^yb• �9 \ yy ^y \ o �� 60 v; y U E } ^y1 ! yery ,y + +^ +^ye }lye } } W o �. o;m I IitIl! O O ^yam + + CO O I A-,y y"6 ry° ^yea ^yy , + M +,y ^yy ye } } I o o A ` ( +^ a*, 1 A- o a n N I I ! 1 III I �! ' 8 I y °'vy f o no o 1� IIII�I!III ;I ► ` _ ' ,WTgINVERT- f50 yryzCJ eh ^o v tTt ye ^y I / Ilil►jl(I( ; \ ^y�y \ A- �F— — — ' 156.50 i l / I j IIl�II((�` / 17.69 Acres± A? / 770,576 Square Feet± \ 1 O e Lq lot 1� ORI • + + I 70 I �I 0 � 0 ye'0�^bb he'? Static 64 psi i I .� I ^y1 ery ^,� ,0'7 \ ,ye. } 4 ^y`°. / } +, Residual 36 Psi y f N I ( ( \ A, i y ye� ,ye ^ye \•• + + t Flow 625 GPM ( ! ^`'� - I\� 1 + +off } 0 / }e I I SSMH 70P-157. 5' INVERT-15 .15' (3 l) III y�. e /ye ! N 16.z I } a ! E 1 750.9048 M1ryy. ,yy }, + / 3 I ^.,e'o° 1 ®.69/ °°�Nc* ! III I °�RlPRI I � J 3 70P wv 46.50 LF OF 12" 1 SSW ® 0.53% 11 II it °�NSI \ -� u) � _ oEE�\c j _ _ v i 1311 e. :• Ncoo 1 =�'c � 40' setback SIR(tX> 00 Al 104SM-0584 e� /E 19 53.881 �. 158.7S3R �, 15650 UT —oh --ohp—---ohp�-----ohp�-N36 T-149.67'.\ -1hp- hp— — 11Y2Y:+3'(0"0RB)�'�PA7-- 0 8:6-111 7.3` � .`_ e ����'�� z 759.00 z 158.85 ` 'x158.55 z 758.2t 58.05 SSMH x 157.74 x 157.49 bottom/roadside ditch 758.50 70P-156.88' bottom/roadside ditch " ��' SR 1�339 DEEP RANCH ROAD 5278.1513 ` INVERT-150.45' Approx. Location 8' PVC water w °hp'� _ahp— ®—ohp'�(-- -=—�-5.5 t57.05 i. _ .2T-' — x157.34 x157.33157.31z -w ww _ w I I Location Map General Notes 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This information is not to be relied upon as being exact or complete. The contractor must call North Carolina t311 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed improvements shown on the plans. 2.Owner. The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 Ph. 865-457-3601 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street Lumberton, NC 28359 Ph. 910-738-6875 4. Lot = 17.69 acres 5. Property is located in Robeson County and is Zoned Heavy Industrial. 6. Utilities: Water. City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear. 30 Feet Side: 15 Feet APPROVED BY PURCHASER / TENANT APPROVED BY DEVELOPER / SELLER GRAPHIC SCALE ( IN FEET ) 1 inch = 60 ft. DATE DATE CAI a� ICU 06 0 O U-) Cz U EU o W V o C V CIO C m C Z .O _Cs Nop o U N O a M n 6 co W >� W ` W vZ O \ �Z �W� zW� N O DY(0 I t6 `1 oH10 ova co N 0 E� aco oZ N � 00) J M 0 a 0 0 0 0 4 m 0 ri Drawn By Checked Approved Job 1 "=60' Scale DA EJB -E B 212031 8 Date cool Sheet No. V w T Y ,. ,. ,. 4 N O N L .0 0 U rn 1] J c 0 U E a 00 N N Ct N a 0) U 3 N O U 3 C 0 O U 0 0 N N a 0 W co m C C a E 0 U 0 3 w 0 'v m L U N 3 E 1 j 50 25 0 50 100 yenerai Notes 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This information is not to be relied upon as being exact or complete. The contractor must call North Carolina 811 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed Improvements shown on the plans. 2. Owner The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 Ph.865-457-3601 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street Lumberton, NC 28359 Ph. 910-738-6875 4. Lot =17.69 acres 5. Property is located in Robeson County and is Zoned Heavy industrial. 6. Utilities: Water. City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear. 30 Feet Side: 15 Feet 8. Total Parking: Accessible spaces 2 = spaces 10'x20' spaces 39 = spaces Total 41 = spaces I Layout Notes I 1. All dimensions to curb reference face of curb. 2. See Architectural drawings for building dimensions. All dimension shown to building on this sheet are approximate. 3. See Utility Plan for new and existing utility line locations. 4. See Grading Plan and Drainage Plan for new and existing storm system locations. Legend — — Property Line Existing Curb Line oc Existing Light Pole 76777'777 -ti�� � a New Building Edge New Sidewalk New Curb New Concrete New Heavy Duty Asphalt Paving Future Building and Parking Expansion APPROVED BY PURCHASER / TENANT APPROVED BY DEVELOPER / SELLER Cn a) .0 Q- L- O LO L c Z EU p r W O U 0U O p) a U CIO C O � Z �0 o U IX O U o (— D- <O N \ CID co C co W (,� W 2 UJ Z J W ZWJ zW Q O C J N Q21) O� Z CO Y ♦n Y C CD 0 LLI oCa N � E� 0. co OZ 0 dui M o2 -0 0) J M Drawn By CDB Checked EJB Approved EJB Job No. 212031 DATE DATE 1"=50' Scale 8-3-12 Date C 102 Sheet No. N N 13 rn 0 U U CL c 0 LO 4 N N 00 CV a c) to 3 17 U a c 0 U c y 0 f0 a E 0 U r 3 v, rn c O x m t U jl�Ij 1�P I I�� Iilll I I Structure # Type Top Invert Northing, Easting OSt Outlet Structure 158.50 155.50 N 325525.67, E 1948879.97 OS2 Outlet Structure 158.50 156.10 N 325113.66,E 1948571.43 HW1 Outlet Headwall - 155.35 N 325554.55, E 1948876.17 HW2 Outlet Headwall - 155.65 N 325375.86, E 1948753.18 HW3 Outlet Headwall - 156.05 N 325356.t39, E 1948578.02 HW4 Intel Headwall 156.25 N 325331,05, E 1948540.38 HW5I Outlet Headwall 1 1 156.00 IN 325093.07. F 1946565 46 I ! II 5�r II _ DITCH._ .. _ .. - .. - .. _ _ Storm Piping Schedule �m n Pipe Size/Mat. Length US Inv. DS Inv. Slope ° A 8" HPDE 30.0' 160.50 159.93 1.90% 1 I I B 8" HPDE 30.0' 159.93 159.36 1.90% C 10" HDPE 30.0' 159.36 158.79 1.90% D 10" HDPE 30.0' 158.79 158.22 1.90% I E 12' HDPE 30.0' 158.22 157.65 1.90% F 12'HDPE 30.W 157.65 157.00 2.15% ' H 12" HDPE 25.W 155.50 155.35 0.60% I I \ I 8" HDPE 30.W 160.50 158.40 7.00% J 12" RCP 45.6 156.25 156.05 0.409% K 12" HDPE 20.0' 156.10 156.00 0.50% 11 I Pipe Slope matches slope of existing ditch O ( o l I t \ I 60 Site Notes O 1. Water Quality Basin Emergency Spillway (See Detail 1/C504) o �, �� I lllil IIII l I \ I _ I I'o l 11� Jill �I� Note: Trap Sheet C301 Sediment shown on W U 1 0 \ shall be cleaned out and converted to this Water Quality Basin after site is �I! _j I o I I11I ! 0 Nis stabilized and temporary sediment trap m t o I II Line HLn no longer needed 0 I l 0 I l 11 I Il 3 C , 14D rp C) I HW1 1 i l iIIQ OS1 I I 1 IIIIIIII�I i ` l I (S Toof t ,Ii,11 Be Illlll j I I I I l rn I l S � Ili � I l 1 I I I1) 6100 n Note: Roof Downspouts. Refer to Line B Architectural plans for exact location Line C Line e I I EmergencyI !II l� ll I i I 17.69 Acres± 2 1 SplilwaY jIllll� J I I 1 \ / 770,576 Square Feet. 6 I \� 1Line E / 62.46 I iIII) I I a � a-1 1 l I _ j \ Line G I J, HW2 � Line F ` / 1 I II' I i 62.461 1 0 c I i t Iuu)� 1 ��K'3'5 . `. .50 i , III i I i I N 3 ; 3/4% . " ' 3/4% * Note: All downspouts in loading FFE=162.50 dock area shall spill to grade f and include downspout guard. See Detail 1 C502 - - - - Line I spills through Static 64 psi cI I I III I ( '' ' curb In loading dock Residual 36 psi e I I ( area. See Detail Flow 625 GPM I 1 I 5is5 • .50 10bl0502 � g ! 6" Single wall HPDE. / 3Ar 77,Leaders iyp. at office entry. $2'46 I Maintain 1% Min. slope to / B 161 Line I I Headwall i HW3 162 n C ti - >tl V 159 I; 62.00 62.00 62A ; 4 62.25 -1 *62 ; '. £ 62.00 i r 11 d+ Line JS1i CID161161 �5�.1 �1 (o HW4 2 I ---- 80.5 � I 160 .. I 61.5 612 I IIIpIl1 7SBS I'll o��s2 MIT j 1 0\ TC-BC S), �6' TC�2.0 I) 6'� \ 7 7 \ �1.1 �9 7 BCm6l.5 57Ji� 585 s`9 -- �00 /602 2 Jill I . '00®L I I I 1\ I I1111AZ1 \ I �100f\\1160.111111 (,� 2 f\ o Opp 1% 7-s---��_ -- _ _ Hw55�mFf7_ Emergency S�� \ Spillway 7 _ bottom/roadside ditch �O-158.50qR 1 K I -.7 _ =- ZME�: 58. Do-- .1 4 I I e9 bottom/roadside ditch Approx. Location 8" PVC Water i \ ® ' O s \� I \ Note: See Detail 5/C503 I 4 \ for all downspouts on this I side of building 1 .\ I ® I 2. Curb Cut (See Detail 6/C503). 3. Outlet Protection (See Detail 4/C503) 4. Downspouts to Grade'(See Detail 5/C503) 5. Forebay Outlet (See Detail 3/C504) 6. Water Quality Basin Layout (See Detail 5/0504) 7. Dry Basin Emergency Spillway (See Detail 1/C505) 8. Dry Basin Layout (See Detail 5/C505) r ® , I ® / I / � I Note: Material cut from this t ® site may only be used for fill in grass areas \ i -onP-_ _onp-. -ohp- aspholt-povement so 25 0 50 100 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This information is not to be relied upon as being exact or complete. The contractor must call North Carolina 811 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed Improvements shown on the plans. 2. Owner The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 Ph.865-457-3601 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street Lumberton, NC 28359 Ph. 910-738-6875 4. Lot =17.69 acres 5. Property is located in Robeson County and is Zoned Heavy Industrial. 6. Utilities: Water. City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear. 30 Feet Side: 15 Feet Grading Notes 1. The grades shown are finished grades. Contractor shall determine subgrade elevations by examining typical pavement sections, the building drawings and the landscape drawings. 2. All disturbed areas not scheduled to be paved shall have a minimum of 3 inches of topsoil placed on them and shall be seeded as specified. 3. All grading construction practices shall conform to all NCDENR standards. 4. Maximum topsoil thickness for slopes steeper than 3:1 shall be 3". 5. Lot =17.69 acres 6. No slopes shall exceed 2:1 7. Temporary seeding Is required when grading operations are temporarily halted for over 14 days, and on soil stockpiles. Permanent seeding is required when grading operations are completed and/or construction operations will not impact the disturbed area. Seed areas that show signs of excessive erosion. 8. Contractor shall provide an As -built Survey of the building location, finished grades, pavement limits, storm drainage, and utilities conducted by a licensed land surveyor. Drainage Notes 1. All storm lines on this sheet shall be HDPE 'S' corrugated pipe with smooth interior, unless otherwise noted. 2. All storm lines in paved areas shall be backfilled to pavement subgrade with #57 stone. 3. All trenching and shoring shall comply with OSHA standards. 4. Storm lines and structures shall be constructed as soon as possible. Inlet Protection shall be used around structures as needed to minimize the slit entering into drainage system. Inlet Protection shall be removed after permanent vegetation or other ground cover is established or constructed. All silt shall be removed from structures and lines. 5. Pipe lengths and slope are measured from center of structure to center of structure. Earthwork Quantities General Earth Cut: 12,400 c.y. (Bank Quantity) General Earth Fill: 36,600 c.y. (Compacted Quantity) Assuming shrinkage of 15%, the total material required for the compacted fill quantity of 36,600 c.y. = 42,100 Fill) Legend Existing Curb Line - 900 -9G / - Existing Contours ® Existing Catch Basin - = Existing Storm Line OH Existing Overhead Power Lines q Existing Power Pole New Building Edge New Curb and Gutter New Curb New Storm Sewer ® New Catch Basin ST New Junction Box - - 900 901 New Contours 80,55 + New Spot Elevation Lq 1-3 New Top & Bottom Of Curb Elevations Bp91.85 APPROVED BY PURCHASER / TENANT DATE APPROVED BY DEVELOPER / SELLER DATE V! ca W 0 LO v Z U o E U, O W U o N n' ca O Z "C U _0) "O I0 � U O D. ^ (0 0) Z �M W W >� c W vZ O _, z *-4 ZLU C =JN 4 �o =YCO to Y O W ova N 6 E� O O >2 d 0 J CAM ^^ICU 1..1� CU CD V Drawn By CDB Checked EJB Approved EJB Job No. 212031 1 "=50' 8-3-12 Scale Date C201 IIII Sheet No. . . , N O N L D) 'C n U J 3 a E co CO) N NN O O Z 3 U 3 v c 0 0 U C w a v1 ro o. E U 0 3 N m C_ 0 m s U ;14 'fill) ti�lillll I I�l _ �. ' 'Lr1 1 llill ii� - I III.II Ills � I( IIII IIII, I II }I(I II I Approx. Limits 1 I of Disturbance 2 �I is I IIII Jill I N 325504.02 } U I L I I III {\ E 1948901.48 -1 I c N 325522.57 o N 325499.09 `0 m IE 188.46 P ..� ..o i I IIII IIII 'As_ is is CL ---r-- coo Note: Sediment Trap is not to be I I { (I I I I I I I I removed until approval has been ectioen n inspector. Land Quality S Sediment Trap Rock Dam and Spillway l II l (s I N 325468.63 . I j I Porous Baffles per North \ I I II I Carolina Erosion and Sediment E 1948807.78 1 lalControl Manual Detail 6.65 f 1 i l l l ` LO 111 1 N 325447.41 j I L j E 1948823.66 ( I l lllgl U) I I IIIllilt ;� �� I 1 1 N 325416.47 1 1 j E 1948744.79 \ I E 1948722.77 ' u7 u-) I ( ( •r Note. Sediment Trap shall o t. I I be constructed at the onset Sediment Trap ; o I� ' ( l III } IIII p of the project + c (N 32536@e3 ( Silt Fence ' I { E 194 27.61 '' ( I I N 325309.44 1 { ) E 1948655.30 N 325317.89 E 1948655.15 Construction Entrance/Exit a ,S \. 8 � i Illlll ( '61RICK \ COL NS � 1y0 G� I I 1 I I(I� ■1 SNCD 1 15fkNCE �00 All Temporary Diversions Shall be 2' wide with 3:1 side slopes and grass line with straw net (typ) � SiltFence TD �� TD �� TD ♦♦♦ � TD � TD m TD 4- TD ♦� TD �.�4�„�ks .... ...?�a ykc., .:C'.ai51.,+,...:. LY1.' z *t;ax ,-Fm',°ea3'w.iro`'• v 4€'t2x.G.�'; xt:" ?.',F.#:zr :x.,=.3w.i* ar+"s:€zf '.. ..rAedc.�z.+b":Z..,.n,.�l ,.%R4�''$ye s..Y.,sws& 3 n" Note:` Temporary Diversions Shall be constructed and maintained as fill is w. being placed for building pad. 3 A I / 50 a: / 17.69 Acres± 1/770,576 Square Feetf Elf l FFE-162.50 E 1 �\ ` - ,ps-�h`Pl--- 1-_- =`�` _ �-��_= _ -158.00- - -158 5SR 1339 DEEP BRANCH ROAD 90' PUBLIC R/W to LD ec Silt Fence �1 \ O O. r I i � I LD I 1 Silt Fencel 1 ( I I Approx. Limits of Disturbance / I SIR(Cb/NTROL) N ,,i24577.27$7 ,iE 1948953.6618 i 156.58 onp-A----ohpO- - on so 26 0 so 100 r.sa 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This Information is not to be relied upon as being exact or complete. The contractor must call North Carolina 811 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed improvements shown on the plans. 2. Owner The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 Ph. 865-457-3601 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street Lumberton, NC 28359 Ph.910-738-6875 4. Lot = 17.69 acres 5. Property is located in Robeson County and is Zoned Heavy Industrial. 6. Utilities: Water. City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear. 30 Feet Side: 15 Feet 8. Site drains to the Lumber River Basin 9. Contact Person: Tom Wortham Phone:865-414-7061 Erosion Control Maintenance 1. All erosion and sediment control practices will be inspected at least once every week and after every rain. Inspections should also be performed prior to any anticipated rain. All necessary repairs will be made immediately. 2. The sediment trap will be cleaned out when the sediment level reaches one-half the design depth. The gravel outlet structure will be cleaned and/or reconstructed with new gravel when the trap no longer drains properly. 3. Sediment will be removed from behind the sediment fence to provide adequate storage volume for the next rain and to reduce pressure on the fence. 4. All seeded areas will be fertilized, reseeded as necessary and mulched per the vegetative plan. 5. Follow maintenance instructions on plans and details. Construction Schedule 1. Obtain plan approval and all site development permits. 2. Stake and flag work limits. 3. Schedule Pre -construction Conference prior to beginning construction activities. 4. Construct construction entrance off of Comtech Drive per plans. 5. Construct sediment trap. 6. Install sift fence. 7. Complete site clearing. Dispose of clearing waste at approved site and obtain all required permits. 8. Strip topsoil from remainder of construction area. Spread topsoil and protect with silt fence as needed. Rough grade remainder of site. Install storm drains and outlet protection and all other utilities. 9. Fine grade parking and drive area and stabilize with stone. 10. Complete final grading and vegetate all disturbed areas. 11. Follow maintenance plan after final grading is complete. 12. Remove all sediment control practices after site is stabilized. 13. Estimated time required for construction =12 months. APPROVED BY PURCHASER / TENANT APPROVED BY DEVELOPER / SELLER Legend "IMMUMOMM Property Una Existing Curb Une Existing Light Pale New Sidewalk New Building Edge New Curb New Curb and Gutter New Concrete New Heavy Duty Asphalt Paving Future Building and Parking Expansion Sediment Trap with Rode Dam Silt Fence Construction Exit Temporary Diversion Grass -lined Channel Temporary Inlet Protection Rock Pipe Inlet Protection Outlet Protection CD .0 CU _x W E CD U c z E V s 0 ° W Cjo� a ) 75 C 0 a C Z C �� -C 0 ° U IY a F� o 0 0- (a N Cl) 04 Z C?M W UJ W 0 LU Z J O W J ZW� CND O =_ Qo� nZtfl - to CO Y O W OD 0 D- co Cl) N � lY a0)• .2 Z (D 0 J M C C 0 CU cn - W 0 L t° o cU - 0 s m 0 Z° Drawn By CDB Checked EJB Approved EJB Job No. 212031 1 "=50' 8-3-12 Scale Date DATE DATE C301 Sheet No. N O N .c a U J c 0 U n CID N N N N U 3 'O 0 co U v c 0 U c a> a 0: m C a E U t 0 3 rn c O 2 m L U �, Ifi Iiil1 �II I ! / I I Ill li ill!! � �\ • 1111 { l l ll j I�� l i i Ill Note: \ i E l ll� I j Sediment Trap to be converted to All Temporary Diversions Shall be 2' o i ' I II Irl I` Water Quality Basin after site is j wide with 3:1 side slopes and grass U (w jI II stabilized and temporary sediment line with straw net (typ) U , °c I iI l iI! j trap is no longer needed — — Imo-- J I o 0 �. p Slit Fence O I I i 0 U I a I m j III! II Il ds A ds is To r es es A 6 160 159 —As ds--in / o ; ! II►I'll I, Note. Sediment Trap is not to be I Jill,l i ` ( removed until approval has been given by a NCDENR Land Quality j l l Section inspector. Sediment Trap Rock Dam and Spillway I III Il m , 1plI I Porous Baffles per North l I ! I Carolina Erosion and Sediment u Control Manual Detail 6.65 Co lilill , I I I l illli�;Ili r a I C-0 I I' 11lIIiIII �� � JAI i l lllll;l `O W i�l ` 1LCI DdIII ` 31a I l `lllllll I Note: Sediment Trap shall All( j be constructed at the onset o Ioj I I I I (I Sediment Trap of the project I I 1(I ll Silt Fence t� i I 161 1 l7 t_ t m Q 159 i N j ill iI — �I (,ii,►il� Aso I , t 160 I I I Ili Construction Entrance/Exit 1 j 11 co S 19Z �� s +� _aG j i I I liilII :. T,5> \\ 00 I — 161 \ a,�+#;i..�"3.r.mi%..:.a3'u.;x::tv++�aFv r..c?.:Ki� .m. aiy',s`a#. 433�s'k `iliu's`•'��.�";h'z '^' `;-. ,rMfw �.h�kiGs##�a r.:u>4%,�5a"?n.'��i.*1�KuC..4z::« ., k..,+ §�$'.ipA-.X `:E,i Note: (� `o Temporary Diversions Shall be ( S constructed and maintained as fill is ( o being placed for building pad. 6 \ u7 i 1550 fl \ \ 17.69 Acres± 00 \ I 770,576 Square Feet- \ w Silt Fence Z .%t;. AW", __j161 ape \ i , v, \ \ iLo 1-57 —ohp-— ---chip --—�n�\". —onp—--onpg— _ —158.00— Silt Fence --- — -- ` > _ 158.5_ SR 1339 DEEP BRANCH ROAD 90' PUBLIC R/W Sift Fence — — 50 25 o so 100 yenerai Notes 1. The contractor is specifically cautioned that the location and/or elevation of existing utilities as shown on these plans is based on records and where possible measurements taken in the field. This information is not to be relied upon as being exact or complete. The contractor must call North Carolina 811 and any utility that does not subscribe to North Carolina 811 at least 72 hours before any excavation, to request exact field location of the utilities. It shall be the responsibility of the contractor to relocate all existing utilities which conflict with the proposed Improvements shown on the plans. 2. Owner The Hollingsworth Companies Two Centre Plaza Clinton, Tennessee 37716 Ph. 865-457-3601 3. Topographic Survey by: Johnny Nobles & Associates 416 N. Chestnut Street Lumberton, NC 28359 Ph.910-738-6875 4. Lot =17.69 acres 5. Property is located in Robeson County and is Zoned Heavy Industrial. ??????? 6. Utilities: Water. City of Pembroke Sanitary: City of Pembroke Electric: Progress Energy Gas: Piedmont Natural Gas 7. Setbacks: Front: 40 Feet Rear. 30 Feet Side: 15 Feet Erosion Control Maintenance 1. All erosion and sediment control practices will be inspected at least once every week and after every rain. Inspections should also be performed prior to any anticipated rain. All necessary repairs will be made immediately. 2. The sediment trap will be cleaned out when the sediment level reaches one-half the design depth. The gravel outlet structure will be cleaned and/or reconstructed with new gravel when the trap no longer drains properly. 3. Sediment will be removed from behind the sediment fence to provide adequate storage volume for the next rain and to reduce pressure on the fence. 4. All seeded areas will be fertilized, reseeded as necessary and mulched per the vegetative plan. 5. Follow maintenance instructions on plans and details. Construction Schedule 1. Obtain plan approval and all site development permits. 2. Stake and flag work limits. 3. Schedule Pre -construction Conference prior to beginning construction activities. 4. Construct construction entrance off of Comtech Drive per plans. 5. Construct sediment trap. 6. Install sift fence. 7. Complete site clearing. Dispose of clearing waste at approved site and obtain all required permits. 8. Strip topsoil from remainder of construction area. Spread topsoil and protect with silt fence as needed. Rough grade remainder of site. Install stone drains and outlet protection and all other utilities. 9. Fine grade parking and drive area and stabilize with stone. 10. Complete final grading and vegetate all disturbed areas. 11. Follow maintenance plan after final grading is complete. 12. Remove all sediment control practices after site is stabilized. 13. Estimated time required for construction =12 months. APPROVED BY PURCHASER / TENANT APPROVED BY DEVELOPER / SELLER Legend Property Line Existing Curb Line oa Existing Light Pole New Sidewalk M,777 747_. r ;: r7 New Building Edge New Curb New Curb and Gutter New Concrete z New Heavy Duty Asphalt Paving Future Building and Parking Expansion Sediment Trap with Rock Dam NSF Silt Fence Construction Exit 4� TO ♦m Temporary Diversion 1 GL Grass4ined Channel Temporary Inlet Protection 13 In Rock Pipe Inlet Protection Outlet Protection DATE DATE to m 06 E O to v c Z U o 5 E U f .c r 0 O W O U MU O a COd r CIO o Z 0 .O V C C U O D- (D0) U co W W co O O �z J �WV ZW� =Y� to Y CID oF1� oco va N o E co a N J M C O CU O n- L W QCU �ULL 0 N m m l$tJ C a 0 m c N O N Z Drawn By CDB ChockedEJB Approved EJB Job No. 212031 1 "=50' Scale 8-3-12 Date C302 Sheet No. V V