Loading...
HomeMy WebLinkAboutSW6111101_HISTORICAL FILE_20111216STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT. NO. SW44�� DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD RE: SW6111101 - Wedgefield Subdivision Ph. II - Additional Information Request Patterson, Robert Sent:Friday, December 02, 2011 8:05 AM TO: Tom Goodwin [TGoodwin@hobbsupchurch.com] Cc: Frank Wanko [FWankn@hobbsupchurch.com] Tom - That is fine. Please send it by December 16, 2011. Thanks Robert From: Tom Goodwin [TGoodwin@hobbsupchurch.com] Sent: Friday, December 02, 2011 8:01 AM To: Patterson, Robert Cc: Frank Wanko Subject: RE: SW6111101 - Wedgefield Subdivision Ph. II - Additional Information Request Thanks Robert. I am out of town until Dec 12th. Can it wait until I return? If not I can make arrangements to have it shipped to me to sign. tom -----Original Message ----- From: Patterson, Robert [mailto:robert.patterson@ncdenr.gov] Sent: Fri 12/2/2011 7:51 AM To: Tom Goodwin Cc: Subject: SW6111101 - Wedgefield Subdivision Ph. II - Additional Information Request Tom, Everything you submitted with the revised offsite info looks good. However, the revised calculations need to be sealed, signed and dated. You can email that to me if its easier. Once I get that I'll be able to issue it. Thanks Robert D. Patterson, PE Environmental Engineer NCDENR I DWQ I Stormwater Permitting 1617 Mail Service Center, Raleigh, NC 27699-1617 (Mail) 1 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (Location & Parcels) (919) 807-6375 Phone 1 (919) 807-6494 Fax I Robert.Patterson@ncdenr.gov Email I http://portal.ncdenr.org/web/wq/ws/su Website Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulation. IURCH NJ C O CONSUL TINGFNGINEE S ASSOC/AYES CONSUL--/NG F.NC/NEERS P.O. BOX 1737 300 SOUTH WEST BROAD STREET SOUTHERN PINES, NORTH CAROLINA 28387 PHONE: I-(910)-692-5616 FAX: 1-(910)-692-7342 To: NCDENR -DWQ Stomtwater Permitting Unit 512 N. Salisbury St. Raleigh, NC 27604 The Following Itcm(s) : LETTER OF TRANSMITTAL Date: 12/13/201 I JJob No. HC101I Ann. Robert Patterson, PE Ref: Wed efield Phase II Stormwater We are sending you Attached O Under separate cover. VIA l� Shop Drawings O Prints O Samples O Copy of Letter 0 Change Order O O Specifications Copies Date Project No. Description 2 One Original and one copy of sealed revised calcs. These arc Transmitted as Checked Below : O For Approval O Approved as Submitted O For Your Use O Approved as Noted l� As Requested O Returned for Corrections 0 For Review and Comment O Remarks: O Resubmit for Approval O Submit for Distribution r-= Return Corrected Prints O Prints Returned After Loan to Us Copy To: Signed: \I — — `-' `C, Frank Wanko, Project Designer p@m0no DEC 1 4 2011 DENR -WATER QUALITY WETLANDS AND STORMWATER BRANCH Hobbs Upchurch Associates c+nglnnering I planning 1 surveying November 29, 2011 NCDENR — DWQ Stormwater Permitting Unit 512 N. Salisbury St. Raleigh, NC 27699-1617 Attn: Robert D. Patterson, PE Re: Wedgefield Phase II HUA Job #HC1011 Dear Mr. Patterson, In reference to your emailed comments from November 18, 2011, the following are the responses to those comments made by your office for the above named project and our responses are as follows: 1. The application and plans state that the BUA in the off -site DA's is zero. Added in the existing BUA on the impervious calculations on the plan and application. 2. Future build out must be estimated and BUA included for the currently undeveloped off -site area being routed to the pond. Added in the future BUA on the impervious calculations on the plan and application. If you should have any questions or concerns during your review, please do not hesitate to contact this office. Sincerely, HOBBSS,, UPCHURCH & ASSOCIATES, P.A Thomas K. Goodwin, P.E. Division Manager Transportation and Site Development Division T: 910,692,5616 1 F: 910.692.7342 1 300 SW BROAD STREET I SOUTHERN PINES, NO 28388 1 WWW.HOBBSUPCHURCH.COM SUPERIOR PERFORMANCE THROUGH INNOVATIVE DESIGN �� CONSUL UGENGINH&ASSOCIATES LETTER OFTRANSMITTAL No. C101I CONSULT/NG ENGINEERS Date: II/29/2011 Job No. HC1011 P.O. BOX 1737 Ann. Robert Patterson, PE 300 SOUTH WEST BROAD STREET Ref: Wedge eld Phase II SOUTHERN PINES, NORTH CAROLINA 28387 Stomtwater Permit PHONE: I-(910)-692-56I 6 FAX: 1-(910)-692-7342 To: NCDENR - DWQ We are sending you Stormwater Permitting Unit ® Attached 512 N. Salisbury St O Under separate cover VIA Raleigh, NC 27699-1617 The Following [tem(s) : O Shop Drawings O Prints r-----] Samples O Copy of Letter O Change Order t� NOV 3 0 2011 DENR-WATER QUALITY SpecifidAtiNUMSAND STORMWATER BRANCH Copies Date Project No. Description 2 Revised Ma 2 Revised Application 2 Revised Calculations These are Transmitted as Checked Below : O For Approval O Approved as Submitted O For Your Use o Approved as Noted t� As Requested O Returned for Corrections O For Review and Comment O Remarks: O Resubmit for Approval O Submit for Distribution O Return Corrected Prints O Prints Returned After Loan to Us Copy To: Signed: IJ Application Completeness Review tY First Submittal ❑ Re -Su Development/Project Name: Receiving stream name S• River Basin: CA „� r- Date Reviewed: 11 5 1 By Bill Diuguid For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HOW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW, and the Randleman Lake Water Supply Watershed Nutrient Management Strateay. T&E Species (Goose Creek, Waxhaw Creek Latitude and Longitude:36 O 2 O Project Address: 3 CAT 1I Engineer name and firm:^,,,, A K Geod. Is the project confirmed to be in the St ❑ Low Density (no curb and gutter) h(�p �401/404 impacts to surface waters f2- B U A 3/_327. Gr Check for $505.00 included R,' Original signature not ho Legal signature Corporation-VP/h Check GFeek Water Sheds): :e MSI StormMiater PernlR jurisdiction72'Yes or ❑ No ❑ Low Density with curb and gutter outlets 2'Agh Density . ❑ Other wetlands, and buffers (add language to cover letter and/or add info letter) ip-General Partner/higher, LLC-member/manager, Agent). If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. :or subdivided projects, a signed and notarized deed restriction statement � ealed, signed & dated calculations Correct supplement and O&M provided for each BMP,on site (check all that were provided & number of each) µy7, :i'. ❑ Bioretention ❑ Rooftop Runoff Management ❑ Dry Detention Basin ❑ Sand Filter ❑ Filter Strip ❑ Grass Swale ❑ Infiltration Basin ❑ Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Stormwater Wetland lH'Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road 5�o sets of sealed, signed & dated layout & finish grading plans with appropriate details rrative Description of stormwater management provided :Soils report provided Wetlands delineated or a note on the plan's:br;fnrthe accompanying documents that none exist on site and/or o/acent property a: etails for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; ai Oimensions & slopes provided Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density MP operation and maintenance agreements provided Application complete ❑ Application Incomplete Returned: (Dale) Comments May 5, 2011 Revision, Bill Diuguid NJ C O CONSULTING U G ENGINEERS &ASSOCIATES CONSULT/NG ENGINEERS P.O. BOX 1737 300 SOUTH WEST BROAD STREET SOUTHERN PINES, NORTH CAROLINA 28387 PHONE: 1-(910)-692-5616 FAX: 1-(910)-692-7342 To: NCDENRR -DWQ 2728 Capital Blvd. Raleigh, NC 27604 The Following Item(s) : LETTER OF TRANSMITTAL Date: II/3/2011 JJobNo. HC1011 Attn. Stormwater Permitting Section Ref.: Wed etield Subdivision Phase We are sending you ® Attached Under separate cover VIA O Shop Drawings O Prints Samples E-�— Copy of Letter O Change Order t� O Specifications Copies Date Project No. Description I Stormwater Permit Check 2 Original and copy of Permit Application 2 Original and copy of O&M Agreement 2 Original and copy of Deed Restricitons 2 Original and copy booklet of Permit Information 2 Original and copy booklet of Calculations 2 Sets of Plans These are Transmitted as Checked Below : O For Approval O Approved as Submitted =---I Resubmit for Approval 0 For Your Use O Approved as Noted O Submit for Distribution O As Requested O Returned for Corrections O Return Corrected Prints 0 For Review and Comment O O Prints Returned After Loan to Us Remarks: we^ ANDS 'An ST61pmolgpp 2RAQ1611 Copy To: Signed: �I Frank Wanko, Project Designer Sc✓6illl0/ REVISED Wet Detention Basin Computations For Wedgefield Subdivision Phase 2 Hoke County, North Carolina �N 4f 12075 � INS K. C'O� Prepared by: Hobbs, Upchurch & Associates, P.A. 300 S.W. Broad Street Southern Pines, NC 28387 December, 2011 Wet Pond Supporting Calculations Peak Inflow Calculations Pre"development'Im"eivious Perdenta a 2.39% Post de%elo�ment lin' ervious Percenta e. 540,356 SF Post develo ment%Iff eivious Percenta e 30.82% m Pre-develo ent:Run-off Coefficient C> 0.31 Post=develo ment'Rdh-off Coefficient C') 0.48 Rainfall Depth Rd 1.0 in 1 r, 24 hrrainfall intensity" I 0.13 in/hr Pre -development t-yr, 24-hr peak flow (Q) 0 = C*ItA„ ;, Q = 1.64 ft3/sec Post -development 1-yr, 24-hr peak flow (0) Q = 6'-1 A Q - 2.54 ft3/sec Storage Volumes: Non SR Waters Calculations Rv ,:05+.9'(impervious,.(ac)/DA (ac)): Rv = 0.327 Volume required = 3630' Rd ` Rv' A v = 47831.80 ft Draina e.Area •A'. v 1,753,223 SF 40.25 Acres Pre develo �riientlm eiyiousArea 41,880 SF 0.96 Acres Estunat'e`drFuture(Irn` ervious'Area 25,000 SF 0.57 Acres Post;de""veto inept m' ervious,Area 473,476 SF 10.87 Acres WEDGEFIELD—PHASE II BUILT -UPON AREA COMPUTATIONS: August 11, 2011 (rev Nov. 21, 2011) Sidewalks: 27,697 sq. ft Streets/Curb& Gutter: 160,179 sq. ft Estimate Building/Lot: 2,800 sq. ft/lot x 102 lots = 285,600 sq. ft. Total Estimated Project Built -Upon Area: 473,476 sq. ft = 10.88 acres Total Project Area: 36.27 acres Proposed Project BUA Estimate: 30.00 % (Within Property/Project Area) Total Drainage Area: 1,753,223 sf : 40.25 acres On -Site Drainage Area: 1,529,221 sf : 35.11 acres Off -Site Drainage Area: 224,002 sf : 5.15 acres Existing Impervious Areas: 41,880 sf = 0.97 acres Estimated Future Impervious Areas: 25,000 sf = 0.57 acres Estimated Proposed Impervious Areas: 473,476 sf = 10.88 acres Total Impervious Within Drainage Area: 540,356 sf : 12.42 acres Total Impervious Area Percentage of Drainage Area: 30.82 % Project's Impervious Area Within Drainage Area: 27.03% STORMWATER BMP. ale „- ,4 w aN1 �4 F, � r.� rkr >i ,r^ �t r �± it a + m° rn'.' 2' LJ 3 m o U, 711C RMWATERBMP - �) WEDGEFIELD -WET DETENION BASIN # 1 VOLUME COMPUTATIONS MINIMUM VOLUME REQUIRED. USE SIMPLE METHOD, COMPARE TO DISCRETE SCS METHOD Treatment Volume: Control and treat the first 1.0 Inches of rein Additional Requirements: No additional requirements Watershed Size: 40.26 acres ' Percent Impervious Area: 30.82 % Total Composite CN 66.87 Impervious Area: 12.405 acres Pervious Area: 27.845 acres 'Percent impervious from built upon area calculations within drainage area Water Quality Storm: 1.0 inch Hydrologic Soil Group: Mostly A (Varies, See Composite HSG Computations) Pervious Land Use CN: 53 (See Pre -Developed Composite CN Computations) Impervious Land Use CN: 98 URUNOFF�DETERMINATION: NCDENR Stormwater BMP Manual Section 3.3 h Discrete SCS Method PRECIPITATION (P): 1.00 inches (Water Qualify Storm) BREAKDOWN OF SOIL STORAGE (S): Formula: 5=1000/CN-10 Impervious (S): 0.204 inches Pervious (S): 8.868 inches BREAKDOWN OF RUNOFF (R/O): Formula: R/0=(P-0.2'S)` /(P+0.8`S) Impervious (R/0): 0.791 inches Pervious (R/O): 0.074 inches I BREAKDOWN OF'FIRST FLUSH' (V): Formula: V=Area`Runolf Depth Impervious (V): 9.811 acre -inches Pervious (V): 2.069 acre -inches TREATMENT VOL. REQUIRED (VTasAT): Formula: VTREAT, Impervious V +Pervious V (Vra�,T): 11.870 acre -inches (Vraewr): 43,088 fts Simple Method la: 0.3082 (Impervious traction) Ro: 1.0 in (Water Qualify Storm) A: 40.26 acres (Watershed Area) RUNOFF COEFFICIENT (Rv): Formula: R v=0.05+0.9`I a R,: 0.32738 TREATMENT VOL. REQUIRED (VTREAT): Formula: V sear=Ro `Rv `A (VTIIEAT): 47,633 fts (VTa�T): 13.177 acre -inches USE: (VTREAT�� 13.177 acre -inches