Loading...
HomeMy WebLinkAboutSW6111005_APPROVED PLANS_20120228STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYM M D D N s 22- AZALEA (3. O.C.) 16- FATSIA (3' O.C.) 39- DWARF YAUPON HOLLY, (3' O.C.) 535- VARIEGATED URIOPE (12" O.C.) PLAY RUCTURE HUD IMPROVEMENTS NOTE: ALL IMPROVEMENTS SHOWN OUTSIDE OF LOT #1 ARE CONSIDERED OFFSITE IMPROVEMENTS, EXCEPT THE HIGHWAY 22 IMPROVEMENTS ASSOCIATED WITH TYLER'S RIDGE COURT, WHICH WILL BE PART OF THE HUD PROJECT, GRADING SPOILS FROM LOT #1 ARE ALSO TO BE SPREAD OUT ON ADJACENT LOTS RATHER THAN BE HAULED OFF AS PART OF THE HUD PROJECT. ALL WORK SHOWN IN THIS DETAIL (1fL-8) SHALL BE CONSIDERED ONSITE IMPROVEMENTS � LEASE OFFICE, CLUBHOUSE & POOL AREA PLANTING PLAN SCALE: 1" = 20'-0" 12- CREPE MYRTLE (15' O.C., OR AS SHOWN) 144- DWARF YAUPON HOLLY - (3' O.C.) 94- DAYLILY (3' O.C.) 360- VARIEGATED URIOPE (12" O.C.) 26- FATSIA (3' O.C.) 4- LIMELIGHT HYDRANGEA — (5' O.C.• OR AS SHOWN) 4- NELLIE STEVEN'S HOLLY — (7.5 O.C., OR AS SHOWN) NORTH OR WEST SIDE SOD i 8- DWARF BURFORD HOLLY '' �? (3' O.C.) _ f 24 PARSON'S JUNIPER c (3. O.C.)) SOD HUD IMPROVEMENTS NOTE: ALL IMPROVEMENTS SHOWN OUTSIDE OF LOT#1 ARE CONSIDERED OFFSITE IMPROVEMENTS, EXCEPTTHE HIGHWAY 22 IMPROVEMENTS ASSOCIATED WITH TYLER S RIDGE COURT, WHICH WILL BE PARTOF THE HUD PROJECT. GRADING SPOILS FROM LOT #1 ARE ALSO TO BE SPREAD OUT ON ADJACENT LOTS RATHER THAN BE HAULED OFF AS PART OF THE HUD PROJECT. ALL WORK SHOWN. IN THIS DETAIL (2JL-8) SHALLBE CONSIDERED ONSITEIMPROVEMENTS NORTH OR WEST SIDE r �. , SOD t• � SOD SOUTH OR EAST SIDE GROUND GUTTER 6 (TYPICAL SYMBOL) ki 1-1 SOD SOD 1- LAUREL OAK 4- AMERICAN HOLLY 3- RIVER BIRCH 750- JUNCUS (18" O.C.) 200- PURPLE CONE FLOWER (18" O.C.) 18- BEAUTYBERRY (5' O.C.) 100- SWITCHGRASS, (18" O.C.) 23- CLETHRA (5' O.C.) 5- LONG LEAF PINE 95- WOOL GRASS, (18" O.C.) HUD IMPROVEMENTS NOTE: ALL IMPROVEMENTS SHOWN OUTSIDE OF LOT #1 ARE CONSIDERED OFFSITE IMPROVEMENTS, EXCEPT THE HIGHWAY 22 IMPROVEMENTS ASSOCIATED WITH TYLER'S RIDGE COURT, WHICH WILL BE PART OF THE HUD PROJECT. GRADING SPOILS FROM LOT #1 ARE ALSO TO BE SPREAD OUT ON ADJACENT LOTS RATHER THAN BE HAULED OFF AS PART OF THE HUD PROJECT. ALL WORK SHOWN IN THIS DETAIL (2IL-10) SHALL BE CONSIDERED AN OFFSITE IMPROVEMENT. 2 BIO—RETENTION AREA #4 L-10 SCALE: 1" = 20'-0" " LAUREL OAK LONGLEAF PINE RED MAPLE PLANT LEGEND RIVER BIRCH AMERICAN HOLLY 4 + �/iwnC DOGWOOD CRAPE MYRTLE NELLIE STEVEN'S HOLLY eGREEN GIANT ARBORVITAE THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 P.O. Box 3083 Pinehurst, NC 28374 Telephone 910-295-2232 Fax 910-295-3420 CONSULTANT Tyler's Ridge at Sandhills Southern Pines North Carolina Developer - Owner Tyler's Ridge Phase 1, LLC. 6535 Seven Lakes Village West End, North Carolina, 27376 Phone #: 1-414573-0855 * ABEUA o DIN. YAUPON 0 GREENLUSTRE HOLLY o DAYULY o PROCUMBENS JUNIPER ® BURNING BUSH 0 SHORE JUNIPER NORTH 0 PARSONS JUNIPER 00 DW BURFORD m o w m 40 WOOL GRASS 0 AZALEA OAKLEAF HYDRANGEA ® VARIEGATED URIOPE SCALE 1•a 2O'-0' 0 LIMELIGHT HYDRANGEA F o o PURPLE CONE FLOWER A FATSIA DRAFTING WSTORY JUNCUS WORK DRAFTER DATE +i CLETHRA �J BEAUTY BERRY WEEPING LOVEGRASS SUBMITTAL DOCUMENTS WLS 10.6.11 REVISED PER 7SOP COMMENTS WLS 12-15-11 REVISED PER TSOPCOMMENTS WLS 2-1-12 SOUTH OR EAST SIDE tpprO r ,lac cerPermes Coumeremts bo tru !„c� i� P with the e do u .e^'s is tequired �, .._ �..�.er Permit.. . N.h Ca c:ina The recipient of this data is prohibited from using any design or drawing infamallon originally designed without the express written consent of The Hayter Finn contained within this document, in whole or part, for any other purposes than that for which it was designed. SEAL L-7 BUILDING PLANTING PLANS LARGE APARTMENT BUILDING PLANTING PLAN PROJECT THF2010-01 DRAWING PATH SCALE: 1" 20'-0" T\THF12010-01 O'Malley Hwy22SOPt O'Mailay221 Dwg1TSP Submittal Plans ti T. _ t 1 TRANSPLANTING LONG LEAF PINES TIMING: THE IDEAL AND MOST ACCEPTABLE TIME BETWEEN DECEMBER 1-APRIL 15. TECHNIQUE: THE IDEAL TRANSPLANTING TECHNIQUE UTILIZES • A MINIMUM 40" TREE SPADE FOR TREES 3" CALIPER AND SMALLER • A MINIMUM 60' TREE SPADE FOR TREES 3 TO S CALIPER • LARGER THAN 60' TREE SPADE FOR TREES W CALIPER A 6" CALIPER IS THE MAXIMUM LIMIT FOR TRANSPLANTING LONG LEAF PINES. HEIGHT IS NOT A FACTOR. IT IS VITAL FOR SUCCESS THAT NO DAMAGE OCCURS TO THE TAPROOT OF THE TREE. ANY METHOD OF DIGGING AND TRANSPLANT THAT DAMAGES TAP ROOT IS LIKELY TO RESULT IN DEATH OF THE TREE. -BALLED AND BURLAP IS NOT RECOMMENDED, EXCEPT FOR VERY SMALL TREES, DUE TO THE LIMITED PLASTICITY OF THE LOCAL SANDY SOIL IT IS IMPORTANT TO NOTE THAT TREE SPADE METHOD UTILIZES THE TREE SPADE FOR THE PLANTING OPERATION. THE LONG LEAF PINE IS NOT PLACED IN BURLAP; RATHER, PLANTED DIRECTLY BY THE TREE SPADE. TREES SHOULD NOT BE PLANTED IF THE TERMINAL GROWTH BUD IS SWOLLEN, ELONGATED (CANDLE -LIKE STAGE) OR DURING MATURATION OF THE ANNUAL FLUSH OF NEEDLES. TO AVOID THESE CONDITIONS, ONLY TRANSPLANT LONG LEAF PINES BETWEEN DECEMBER 1 AND APRIL 15. A HIGH DEGREE OF SUCCESS IN LONG LEAF PINE TRANSPLANTING IS COMMON WHEN TECHNIQUES ARE FOLLOWED CLOSELY. LONGLEAF PINE AND TREE SPADE PLANTING DETAIL NOT TO SCALE PRUNE TREE AS DIRECTED BY tANDSCAPEARCMTECT NO GUYING, STAKING OR FERTILIZER REQUIRED SPECIFIED MULCH, 3' MIN. DEPTH BACKFILL UP TO ROOTBALL W/ 6" APPROVED SOIL ALL SURFACES OF HOLE TO BE SCARIFIED TO DEPTH OF 1 112' W/RAKE OR FORKED HOE BEFORE PLACING TREE IN HOLE STABLE OR COMPACTED SUBGRADE SETTREE AT ORIGINAL DEPTH. REMOVE BURLAP, WIRE & STRAPS (ANYTHING THAT COULD GRDLE TREE OR RESTRICTROOT GROWTH) ON UPPER 113 OF ROOTBALL TOMAHAWK TREE STABILIZER AND FERTILIZATION SYSTEM 24" TOMAHAWK TO 1-? CALIPER TREE 3r TOMAHAWK TO r CALIPER TREE 4r TOMAHAWK FOR 5" CALIPER TREE 3" DEPTH OF SPECIFIED MULCH tj_::_fANGUETOMAHAWK'M MATCH SLOPE r—APPROVED TOPSOIL MIXTURE OR NATIVE STABILIZER BAR DETAIL DEEP ROOT FERTILIZATION AND WATERING orooroaCted vftmde TREE PLANTING DETAIL NOT TO SCALE iF.�iSll,l! TOMAHAWK"' TREE STABILIZER SPECIFICATION Tomahawk (� ) topsoil MANUFACTURER: BORDER CONCEPTS. INC. �tbal and punk P. O. BOX 471185 CHARLOTTE, NORTH CAROLINA28247 TOLL FREE: 80OB453343 FAX: 704-5415610 W W W.BORDERCONCEPTS COM P VIEW INFO@BORDERCONCEPrS.COM DESCRIPTION: TOMAHAWKTM TREE STABILIZER AND FERTILIZATION SYSTEM TO BE PROVIDED BY BORDER CONCEPTS, INC. RECOMMENDED SIZES TO USE: 24" TSS - FOR USE ON TREES UP TO IS' CALIPER TREE 32" TSS - FOR USE ON TREES UP TOW CALIPER TREE 42"TSS - FOR USE ON TREES UP TO W CALPER TREE +ALWAYS USE DRIVING TOOL (INCLUDED IN EACH CASE) TO INSTALL +NOTCHED FOR GUYING IN EXTREME WINDS NOTE: IN CERTAIN CONDITIONS SUCH AS HEAVY WINDS, LOOSE SOIL CONDITIONS, HEAVY FOLIAGED TREES, OR LARGER DIAMETER TREES 3 OR 4 TOMAHAWK"' SHOULD BE INSTALLED. DETERMINE THE CORRECT SIZE TOMAHAWK^' BY MEASURING THE ROOT BALL SIZE THE OUTSIDE LONG SUPPORT SHOULD EXCEED AT LEAST 8" OF UNDISTURBED SOIL BELOW THE ROOT BALL. INSTALLATION: INSTALL PER PLANS OR DETAIL AND AS PER MANUFACTURER'S RECOMMENDATIONS 1W EXTERIOR DIA REINFORCED RUBBER HOSE AT 20 HEIGHT OF TREE SECURED WITH #12 GAUGE PLIABLE GALVANIZED WIRE STAKEALL TREES wRH 3 GUY WIRES. SET TREE AT ORIGINAL DEPTH. REMOVE BURLAP, WIRE & STRAPS (ANYTHING THAT COULD GIRDLE TREE OR RESTRICT ROOT GROWTH)ON UPPER 1/3 OF ROOTBALL SPECIFIED MATCH, r MIN. DEPTH DRIVE (3) 2'x4'k4r WOOD STAKES UNTIL FIRMLY EMBEDDED IN GROUND INSIDE MULCH RING. CUT EXCESS STAKE AS REOLARED. WIRE SHOULD BE LOOSE ENOUGH TO ALLOW TRUNK TO MOVE IN DIRECTION, REMOVE AFTER ONE GROWING SEASON. Approved topsoil mature or native baddill STABLE OR COMPACTED SU13GRADE � EVERGREEN TREE PLANTING DETAIL J,g NOTTOSCALE W 5 L-9 LAYER OF FIN. GROUND COVER PLANTING SOIL TO BE 1 PART MANURE, 5 PARTS ORGANIC SANDY LOAM TOPSOIL AND 4 PARTS DECOMPOSTED PINE BARK. TOTAL PLANTING SOIL MIX DEPTH, 6'. TILL IN FIRST Z' OF PLANTING SOIL MIX BEFORE PLACING LAST W OF PLANTING MIX A FULL LAYER (MIN. COMPACTED DEPTH) OF APPROVED BULK FIBROUS PEAT MOSS MAY BE USED IN LIEU OF PLANTING MIX. INCLUDE FERTILIZER AT APPROVED RATES. GROUNDCOVER PLANTING DETAIL NOT TO SCALE SET SHRUB AT ORIGINALDMYM SPECIFIED MULCH, r MIN. DEPTH MIXTURE OR NATIVE BACI(FILL )R COMPACTED SUBGRADE SHRUB PLANTING DETAIL NOT TO SCALE PRUNE TREE AS DIRECTED BY LANDSCAPE ARCHITECT SET TREE AT ORIGINAL DEPTH. REMOVE BURLAP, WIRE & STRAPS (ANYTHING THAT COULD GIRDLE TREE OR RESTRICT ROOT GROWTH) ON UPPER 1/3 OF ROOTBALL �—SPECIFIED MULCH, 2' MIN. DEPTH APPROVED TOPSOIL MIXTURE OR NATIVE BACKFILL �— STABLE OR COMPACTED SUBGRADE MULTI -TRUNK TREE PLANTING DETAIL L-9 / NOTTOSCALE QTY. I BOTANICAL NAME COMMON NAME SIZE COMMENTS TREES 34 ACER RUBRUM'OCTOSER GLORY' RED MAPLE 3- CAL,14'-16'HT. MIN. 24 BETULA NIGRA RIVER BIRCH 1Z-14' HT. MIN. MULTI -TRUNK, 3 STEMS MIN. 44 CORNUS FLORIDA DOGWOOD 2' CAL, 8'40' HT. MIN. 65 ILEX OPACA AMERICAN HOLLY 2" CAL., 8'-10' HT. MIN. 63 ILEX x NELLIE R STEVENS NELLIE STEVENS HOLLY 2" CAL, 6'-W HT. MIN. 101 LAGERSTROEMIA INDICE' MUSKOGEE' CREPE MYRTLE 12'-14' HT. MIN. MULTI TRUNK, 3 STEMS MIN. 75 PINUS PALUSTRIS LONG LEAF PINE 2" CAL MIN. PLANTED WITH TREE SPADE 154 PINUS PALUSTRIS LONG LEAF PINE 3 GAL. PLANTED ON &I SLOPES 29 QUERCUS LAUROCERASUS LAUREL OAK 3" CAL., IV-16'HT. MIN. 515 THUJA PLICATA'GREEN GIANT EVERGREEN GIANT ARBORVITE V-10' HT. MIN. SHRUBS 22 AZALEA x HYBRIDA AZALEA 24"-30' HT. 140 CALLICARPA AMERICANA BEAUTYBERRY 18'-24" HT. 142 CLETHRAALNIFOLIA CLETHRA 18"-24"HT. 324 FATSIA JAPONICA FATSIA 24"-30" HT. 1476 HEMEROCALLIS X HYPERION HYPERION DAYLILY 2 GAL 43 HYDRANGEA PANICULATA'LIMELIGHT' LIMELIGHT HYDRANGEA 30"36" HT. 285 ILEX CORNUTA 13URFORDII NANN DWARF BURFORD HOLLY 24"30" HT. 3 ILEX CRENATA'GREENLUSTRIF GREENLUSTRE HOLLY 24'30" HT. 1165 ILEX VOMITORIA WANK DWRAF YAUPON HOLLY 18" 24" HT. 34 JUNIPERUS CONFERTA SHORE JUNIPER 18'-24" SPR. 167 JUNIPERUS SQUAMATA EXPANSA'PARSONII' PARSON'S JUNIPER 18"--24" HT. GROUNDCOVERS & GRASSES 1955 ECHINACEA PURPUREA PURPLE CONEFLOWER PLUGS 143.475 SF ERAGROSIS CURVULA WEEPING LOVEGRASS SEED 6450 JUNGUS EFFUSUS JUNCUS PLUGS 2695 URIOPE MUSCARI'VARIEGATA' VARIEGATED LIRIOPE 6 BIB CLUMPS 1095 PANICUM VIRGATUM SWITCHGRASS PLUGS 730 SCRIPUS CYPERINUS WOOLGRASS PLUGS TURF GRASS 105,700 SF CYNODON DACTYLON BERMUDAGRASS SOD 210,000 SF CYNODON DACTYLON BERMUDAGRASS SEED PLANT LIST j, 7 l NOTTOSCALE Approved F'_crmt'L'ater Permit Cocuments Constn:c^, with these dccumerts i=_ required by t�a per mil?. NoCn Cz:n['..-a rules r _ G Sheet ;# THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 P.O. Box 3083 Pinehurst, NC28374 Telephone 910-295-2232 Fax 910-295-3420 CONSULTANT Tyler's Ridge at Sandhills Southern Pines North Carolina Developer - Owner Tyler's Ridge Phase 1, LLC. 6535 Seven Lakes Village West End, North Carolina, 27376 Phone #: 1-414573-0855 V7C"TZY11 20 0 10 20 40 SCALE 1"= 29-V DRAFTING HISTORY WORK DRAFTER DATE SUBMITTAL DOCUMENTS WLS 10511 REVISED PER TSOP COMMENTS WLS 12-1rr11 REVISEDPERTSOPCOMMENTS WLS 2-1-12 The recipient of this data Is prohibited from using any design or drawing Information originally designed without the express written consent of The Hayter Firm contained within thus document, in whole or part, for any other purposes than that for which it was designed. SEAL .�UtaRlNtq�. L-9 PLANTING DETAILS PROJECT THE 2010-01 DRAWING PATH TTTHF12010-01 O'Malley Hwy22SOP1 O'Malley2Z Dwg\TSP Submittal Plans 1 V Y r Y Y Y Y \ ( \ `• \ \ ` ,� '\BIO-RETENT BASIN#4 ?} \� t\ \\.'` INV=421.00 :If ,lr 1 �:+,,,� -�.._..�� ,-._\ �' _r _ _. `� _ f , _ \ \ \ \i""'CLASS B `' `" •.�.,,�\ '="�.. ? t1 \..,,,.• \ 1 ` F Legend N , \ ' t 1 RIPRAP APRON j JJflr �� \ '- �- 1\ _ _ ,�; \` \ ' \ �� �'; F \ t \ \ \ N \ Existing Property Boundary Limits of Disturbance i %J \_ o, \ t\\\L�'. W=T TH=18' t i \ •`. 54 LF 15' RCP 0.93% ' j ; " •JJ; ,' �'-`""•- .� " -+ •� _ �.a '�--�--`\ \� \ i� \ ♦ \ 1 \ Proposed Private Road Easement Proposed Watermain •OPEN THROAT Ca48 >\ �. 1-Ar•• \ .\\�c• \ \ \ w W '.RIM-431.00 �\ ' ;J. J �� ` ` `-' •� `" c-- \\ , `t \ 1 , Building Setback --------- Proposed Sanitary Sewer �. ,1lNOUY-421.50/JAB i� \ ��� ""•••� \ � .. `� \ `' \ ` \ -SS-SS- Paving Setback &Landscape Buffer Permanent Drainage Swale \ \ FES$ \ , • \ \\ f; ; " f , J, `i \ ..`'•,ti.� '-•• `" •` \ \ �•\�\ \ :\\ L 1 - - - - - - - - - - y__ ... a 'INV=428.78\\ \\ii •\ /.• r '."j \ \ _,•n.� `�� �'� \ \ \ �. \ '\••� \\ Curb and Gutter ExistingStorm Drainage Pi e `. \ \�, \ Future Constnlction Proposed Storm Drainage Pipe \ ` ,\i • \\\\\\ \ /'\ :, �, \ \ \�\ EXISTING `�-- --_ `-_`�� _ '�---------- _ Drainage & Utility Easement Procosed Dro0 Inlet _ \ �. \ _ _-� �T •'\. \ CB-32 ' ` y \\ \ \ � \ \ \ 1 � 1 .. \ y L 1 \ WET LANDS � r \ •'� •� ti.` _ `-_�1`\�.�`�` �� :�\ } q mot\ WETLANDS ;i ` •� _ \ yO}0..� ,� ::`, \•`••• ` 1' � � `" CB33 \ �n�t C&31 � y4 t \ \ \ - \ \ \\ \ \ \, 1 i i \ \ 1 ! � +•. ` y� "'�• �. � l ~` 5WALE5` ; \\< \ t \ \\\\ �4 \ \ \��_t'1' \�` `\'`�`- `�t \1`�•pyili\\ \\\ •� . \ s _ \ •.� \�J � � { \ +r `, ♦ - •-_ - - ^�^.^....' -- - -ti . ,� = ` ` = ` � �`• � -�\ � i; 11 � \ � � \ \ \ •\ � .•.. _ l•, •`• ♦♦♦t\VV�2,y�• � � \,.�� \ `; ` ♦ \ `ids-9 00-='k j - !� ' \ _= �"----�� - _ ••�,,���. _ = = ,` �. 1 (' Y A\ \ \ ^` \... - �. ` \n \i '�.t` " \ \\ \ \ \ ' \♦\\,\ `` \ `` • _�__-a,__ _ � IN=\.\�� 4 \ 1 \ ( 1� .. _ \ ` � ��_ _- �. -_.._ __ .- -- _� _ _` +� �'�.,` � �. ` � mot' ,=. \�\� `. \ \ \ '\ �,\ \ YY•+ \ '` ^� \ \ \ �' � , \. \\\�♦ f1iNAGE EASEMENT \ \ • \ \ \ \ ♦ \ ` , SS 1 \, i \ " I \ 4?0 �` �- - _..._ - „ s �, �'``v,\` 1 ` 1 \ \\ \\\II\'`.� �\\` \ \ \ r \ \ ` \ ` �� \ \ ` �` ! ' t E t \\\�\\\ .,. AROUND SWALE \ \\', `IQkIAL 50'. BUILDIN(a`SETBAGK ` .� \ \ \ \ \ \ ti \ \ \ \ \ s - _ - _PE e .��`\ \ ♦ \ \ \ \ \ STREAM 8ET13AL"Y�� \ j "\ \ \\ \ ��\ \\\ \ \ ` '�•\_ \ `.�� "FUTURE C 28 � -•., \ \ \ \t � � -��� � \ 1. \ \ 1 .,� -•. .... •� ..... -.. \ \ 5= ; n ti \ \ ♦ \ \ \ \ • \ . � \ \ _. __� ..� _ _ •.. �. '.� ` �♦ �. \ \ \ ' \ \ I \ \ �. _ `� ,` \ _ � .� � •\ .. .... _ .. ._.. - _ \ � � \ � \ \CONSTRUCTION\ \ \ \\ \ \ \ \ `. \Wz ` \ \ \ �' \ \ ♦ , \ \ \ \\ \ \',_ LIMITS (TYP GRADING AND EROSION CONTROL NOTES: \ I \� \ \ �` \ i . !. f \ ` ` \' `' •'. '-• -- -• -_ \ \ \ \ \ �\ \ \ \ \ \ \ \ \ i \ \. \`, •` \ \ \ \\ �`�, { \ \„\_.�, ` / '' 'r r .••..- \ 1. CONTRACTOR SHALL SCHEDULE AND HOLD A PRECONSTRUCTION I .� \ J \ \------"" ,` \ \� \ \ \ \ \ \ \ \ \\ � \ \ 'i \ \ �\ � t �,.•• ti, ^' QO MEETING WITH THE OWNER OR OWNERS REPRESENTATIVE AND THE \ '}� \ \ �. •`t' \ \ �` �_` + - y _ ,-. - _._, �'�.� \ \ \ \\ \\ `l\ \\ \ .-- \ '♦ \ \t J\^\ \ \ , `\ \ V VO TOWN OF SOUTHERN PINES PERSONNEL (EROSION CONTROL DIVISION) \ �' ^ \, \ \ j y(� 1" ��\\ ., - - - \ \ \ i \ \ \ \ \ \ \ \\ \ \ , t \ 1 \ \ \\ \ : '-` •XO ,•- PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. \ ` `♦? \ \, I v ! •� \ ` ' - _ _ - -. �• - „ \ \ 1 , . t i• \ \ - '- . wl -�" . 2. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM THE i `•\1 \ \ \ \ I ! `\ `` \ - L ^ `" - \ �. ♦ \ \ \ \ \ \ \ \ \\ \ ` : t } r '- \ \ 1 \ \ \ V v -•r BUILDING AND RETENTION WA PREVENT BIRDBATHS- IN PAVED AREAS,`. r`�'" \ \, \i'•-� ` \. 1 `�.r-r- 9 `� \ \ \ \ a \ , a , ,t , { \ \ �.,, - \ \\ \ \ n\.\ t ,,•- ^" CURB AND GUTTER AND LANDSCAPED AREAS SPILL CURE SHALL BE \ \ \ • '� \ �\ - L _f+ '\• -1 \ ♦ t \ + \ \ _.. L J r-- ^'L-- --- \ \ ! \ \ `OPEN THROAT C&47.. INSTALLED IN CERTAIN AREAS THROUGHOUT THE SITE TO DIRECT • - \L 1� \ \ �\ v +n � \ � ,' \L _ � - - -1 � - � -^ \ \ \ \ \ RIM . RUN-OFF TO STORM STRUCTURES. THESE AREAS SHALL BE IDENTIFIED 1� \. \ \ \ \(} t �� ` \ \ \ 1 ` \ ` \ \\\ \ \ \ \ \ ` INV OUT= 410.38 .n\ \• \ t 1 \\ `_� PRIOR TO POURING THE CURB AND GUTTER. �.) \ `•I .� �. \ - URE DRAINAGE PIPES - - \ \ \ \ \ + t t 1 { . 3. ALL EROSION CONTROL MEASURES AND STORM DRAINAGE \ `` \ `` } \ '`- AND STRUCTURES - NOT TO _ _ - T _ " " -- •� _- •x \ \ .� •� \ \ \ \ , ',38 LF 15' RCP @ 1.00% CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF -� ! .)• \ BE CONSTRUCTED (TYP.) \ \ ` - FES-15 SOUTHERN PINES AND/OR NCDENR STANDARDS AND SPECIFICATIONS,„_ - -Lei LATEST VERSION. I ` \ ` • y �1_ _ zt .� \ \ \ \ 1 , l NV - 410.00 4. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING UTILITIES ! \ \ F \ :,•• 1 L_ 1 - --� �- - - J \ \ r \ ' 1 ' ` LASS B PRIOR TO BEGINNING CONSTRUCTION. \ 1` •` '� \ -�•---..._ ^`. _ \ { { i IPRAPAPRON t\ \\ \ (3: 5. ADDITIONAL MEASURES FOR EROSION CONTROL MAYBE REQUIRED DURING THE CONSTRUCTION PHASE PER THE DIRECTION OF THE TOWN 1 ,1� +ti•i t ; i " \ \. ` r� OF SOUTHERN PINES AND/OR NCDENR. ` ` II � \ \ Ii ( ' - - ::.. '` ` .. : ' - - - i 1 t I ' i , TOP•8ER!t�. \ \ \ \ , 1 \; i \1 \ i' \ \ S T • f f \ \ \ \< , )j-''k"--`" ....1. ' ' \ \ \r \ ♦ i 8. CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL EROSION CONTROL MEASURES AS PERMITTED BY THE TOWN OF SOUTHERN PINES. I \ Zo 1(7 \ a ; �'• `\ �k 7. ALL DISTURBED AREAS SHALL BE STABILIZED WITH VEGETATION AND/OR ♦ \ - \ i __ �`� -...r r \ t J , j ( t } i \\\ \\ \, \ ♦ \�\ 1 \ •\ ,� \ ' r ! : \` PERMANENT GROUND COVER WITHIN 21 DAYS OF COMPLETION OF ANY \ \ \ \ ` 1 I\ i � a., �_ PuLIPTR GRADING WORK - \ \ { \ 'C -_' \ cs ,;"'; ! I \ \ ♦ \ ; S \ t }t '\. \ •\y,':. ! I ♦ ` \ \ Ssss5 SS\S -- ss•`� s « /. , , j ( \ \ \ \ \ \ \ k a 1: 1�' t 8. CONTRACTOR SHALL INSPECT ALL E.C. MEASURES AND MAINTAIN THEM A . • ' , \ ` ` - \ , -"'C- - MINIMUM OF ONCE A WEEK AND AFTER EACH SIGNIFICANT RAIN EVENT. \ •'\ ` ♦ .: \ �A= \d>Qi�„-�'�' """ \ , ` f i ' I ,, \ , \ \ t \ \ \ y t i 1 �,a ` \+ t ` ' \: `,` t 9. CONTRACTOR SHALL PROVIDE PROVISIONS FOR GROUNDCOVER ON `\\ \\ \:• \ ! t ��• -\ \ ! { i 1 ; I• :. '� '' J { s t j 'i 1 \ '9VERFLOV INI£IFt\\ \\\ a t ( �1 \ jy`��' ) \\`�yt \\ \ \, •� j EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION t -• I ( i, I I EL..,4'78.50 \ \ \ \ 1 I `\ } N OF ANY PHASE OF GRADING; PERMANENT GROUNDCOVER FOR ALL \\ DISTURBED AREAS WITHIN 15 WORKING DAYS OR 80 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION \ \ \ ' \ ll i t = \ \ ! / ` = ; }` ; B10RETENT•ION ; \ \ \ \ \ \ \k \ \, \ ` t + "" ' • t , i } OR DEVELOPMENT. P . \ GARAGE GAR�F�GE ! y 10.OR SITE IS WITHIN THE CAPE FEAR RIVER BASIN. , t \ \ \ - \ ! \ •GARAGE FFE:\,t ( { i a \ \ \ i ` \ \ ` �;', i t . ,C`.•i•' %�i' + 1 \ \ ' FFE: 43t2S 434 zr3 ) t BEL 4151 t \\ \\ \\.\ 11.DISTURBED AREA WITHIN PROPERTY: 19.13ACRES.�_439.50 \ ' v. i \ i t l \ \1\ \,\ `\ 1 �••-''' \ } \•` 12. PERSON RESPONSIBLE FOR EROSION CONTROL MAINTENANCE/ISSUES: \ ti' . g T- _ W \ \ \ \ 1 s FINAL ROAD GRADES NEED TO BE INSPECTED AND APPROVED BY TOWN 9\-••'•, \ \ , W W W W W - t. o;L \ \ \ t ` \ \ ' 1 ' ?• i OF SOUTHERN PINES FIRE MARSHALL PRIOR TO INSTALLATION OF 1 \ \,n �= t w W w _ ! - 'p ! `a a ♦ \ t \ \ \ \\ \ k ;''• \l. SUBGRADE AND FINAL COURSE. \ \ V Q f'�- Lil 1� e- ; 5 \CB-15 \ I&ALL STORMWATER MANAGEMENT STRUCTURESTREATMENT/DETENTION FACIUTIEs SHALL BE PRIVATE AND MAINTAINED 3\e) ' \ Fbm ? ! i i -- 't / \ t 1 , \ \ \ \ \ \\ aaBY THE PROPERTY OWNER ` a I m N74 tV , \ •-: \ 1i I• \ IR,,L�IVE `• for , � 1 \.i � \\ r . \ 'R a i \ \ \ t \,' \ ` \ \ \ WITH-CLASSit \ ✓ `" \ \ .. a 3 .: f t\ \ \kIP TiPiP EROSION CONTROL SEQUENCE: \ , • \ \ s 2> ! 8-11 C&13 I \ \ \ t \ \ \ \ \ \ \♦ \ \ 1. OBTAIN LAND DISTURBING PERMIT. ,\ 1 W: ! t� aria !' I \\ \ \ \ \ \ \ \ \\ \ ♦ \ \\ '�' �/\ ... \ \ �/. • ' '' l \ '} i / ' �.! J ♦ BORET$NTION \ / / 1J3 2 SCHEDULE AND HOLD PRECONSTRUCTION MEETING AT SITE. \ \ � ` •`'t. • t } I t Z CB-8 s f , , • I \ \ tt\ \,` \ ` �•yl.. )�1 � \ \ \ \ 1/ j 3-•.,, \ � \ 3.INSTALLAPLANBOXATACONVENIENTLOCATIONWITHINTHESITETO \ 1 L.`t iI .� # FFE: r , k \ l` \ ENV=414.12: FES-6 �• \ � \ ;; KEEP A COPY OF THE APPROVED E.C. PLAN, N.P.D.E.S. REPORTS, ETC. r \ t t ( { 441.00 +' k. i FFE' FEE: - \ \ \ \ _ \ \ t \ ! = 4 4. INSTALL ONLY EROSION CONTROL DEVICES NECESSARY FOR INITIAL , '\ 0ff t ' ;` . ,.��� CLEARING OF SITE, SUCH AS GRAVEL CONSTRUCTION ENTRANCE/EXITI. 43725 .3 S RY 435.25 \\ \ \ ♦♦ '\ ' ` \ \ \ \` ` \ =\'\� \\ \ / \ t \ AND TREE PROTECTION FENCE. BEGIN CLEARING. r e _ - •, \ ,, t t �. _ ( � � 2,4 U ��'S \ b \ \ 1 \ t 1\ \ \ \ `` _ - \ �'"i-•� � \ 5. INSTALL SILT FENCE, SILT FENCE OUTLETS, TEMPORARY DIVERSIONS, & 2 SEDIMENT TRAPS PRIOR TO GRUBBING AND EARTHWORK AFTER ANY t t l ! a + r f^� \ \ ` 1 ` �' T 1 • -�' �- r PHASE OF CLEARING OR GRADING IS COMPLETE, THE CONTRACTOR • r \ m8 �� t � � I- , f '• . •.`•. \ � ♦ ? `�� , \ CB-18 ' �c �\� .r, ` FES-5 FES-18 •.` .` � �`. r \ \ �` + SHALL STABILIZE THE AREA AS SOON AS POSSIBLE AND WITHIN 21 DAYS. ' t) \ ! ! 1 1, .' '�` \ \ \ i lY _ '�: -ENV - 417.00 6.ONCE ALL SITE WORK IS COMPLETE AND STABILIZED, THE CONTRACTOR { \ ` © Z t ��` :! SHALL CONTACT THE E.C. OFFICE FOR FINAL INSPECTION. IF APPROVED, i \ , \ \ \, t ❑ ~ _ ! ' - '' "' - •'' , _ ! I ` ' -• - - Rf • "(/� �• •` RI AFRO \ .__ - '+ CONTRACTOR SHALL REMOVE ALL E.C. MEASURES. , \ , i`, \• \ �t, t J 'd' _ , 8-17 \ ���• %\ L L ', W=4', TH=1 �1 \ ` t1d •' i • \ 7. ALL BORROW OR FILL USED FOR THE PROJECT SHALL COME FROM OR BE \ \ \ \ \ \ it i tt l m M N / ` •{ i .r ' ] + • i \♦♦ \ \ "iR \ �•� "� \ J r- J,- t , DISPOSED OF IN AN APPROVED LOCATION. \ \ ` J'' j ,' 1 , t •\ \ \.♦ �, ! .• �.. / t/• �,\ , . _a t S. THE SPREADING OF GRADING SPOILS FROM LOT#1 ONTO ADJACENT LOT IS 4sa t ` ` { ; J ♦ \ r a i + ;. DEPENDENT UPON APPROVAL OF TYLER'S RIDGE AT SANDHILL3 \ 1 .' / YBALL .. ..; a; •' EASE f \ \ ` _ / ,� i , / i \� �, \It / / ) ( { ;J i FEE: ; .:. - - RIM--433.40 •, i t \ \\ ♦ { / \r + CB-20 - ^ - \ \ • _.. \ CONVERTING SEDIMENT TRAP TO SIORETENTION BASIN: W 1 FEE 1. PRIOR TO REMOVING SEDIMENT BASIN(% ALLAREAS DRAINING TO \, t, I �' j i s " 1, '`? ; 1 ! ; , .,. ' - t POq)=` ' ;j 433.60 THE AREA MUST BE FULLY STABILIZED AND APPROVAL TO REMOVE R1NY'34 THE TRAP MUST BE GRANTED FROM THE TOWN OF SOUTHERN PINES. I ALL SEDIMENT DEPOSITED IN THE SEDIMENT TRAP DURING J V! d \ \ \ \ } t \ .-' e ' r • r t '\ " `'; \\\ t i \ CONSTRUCTION MUST BE COMPLETELY REMOVED. t1 \ m\ C"3\N \ \ Ii i t ! ` ' i>m ; I� PLAY `� `- AIiBOF; .ram~" ' _ i •`". 3. THE VEGETATIVE SHELF, FOREBAY, AND OUTLET STRUCTURES MUST _ \ I + (+ \ ( ( ! / {� t• BE IN PLACE BEFORE OPERATION AS A STORMWATER BMP BEGINS. r ; a44OF 25 AA i ' }'- 1 ::� - { / \ -•.^^' / RINF�27.40 V \ SITE DATA n II ; I + ( • !� �� ,� i I { I ` \ / / SITE ACREAGE: 33.02 AC. \ ' .� { y'. il} y CB-7 ! j l + ) �~ GARAGE WATERSHED: WS Ill - LITTLE RIVER INTAKE#2 t - i } ) GARAGE 1 GARAGE Fri: CRITICAL INTAKE: WA 430.00 (. FEE:: I i FFE 100 YEAR FLOOD ZONE: N/A t tj ! / 43e.50 _ -•- +++"'"' 3W @ 0.50% 1 iP ma i ®i t , I -T J _ EXCELSIOR -LINED + f JB44. i� i r,�` t-� ,•- W Nr HUD Improvements Limits Note: All r FE 1 ! { ; 1 ; -'' a i �w r �'-� W f - w w W improvements shown outside of Lot #1 are to' I ENV - 435.85 ! :! S-?--r-+ 5s �--4- SSON r-ttANE' considered offsite improvements, except for the .�1 a { (.. ) _ / :-- / - r - -(' n - - .! ! CB-1 \ Highway 22 improvements associated with Fen Court, which will be part of the HUD project iiRE IAY Grading spoils from Lot #1 are also to be spread20 out on adjacent lots rather than be hauled off as t ! ! �' B$ { i ` , I jj part of the HUD project. i i ! f / j �` ! ! I, { S i ti •t \ \ p �� . • i ,.••• P_ -_ CONSTRUCTION - LIMITS (TYP.) •.0 SWALE DRAINAGE EASEMENT 415' @ 1.79% AROUND SWALE (TYP.) j EXCELSIOR LINED REMOVE •qW���� Y \ ♦ j . \ THROAT CB48 `y _..- \ RIM -422.50 INVOUT-418.00 rr" v Y -- \ FES•4 t PRbPOSED \ ENV • 424.00 .•" .. / PROPOSED WAVR LINE' /J CLASSB OV:0i oW / ; \ i \ BEINERLINE- SEEUT4I: 1\ FRAPAPRON W=r. TH=18' EL 1421.50 T SWALE 1 \ \ SEE 0RLITY \ PLAN ( 324' @ 6.00% \ \ PLAN .,,_EXCEL'SIQR•UNFP \ ;• BIORETENTIN - ` - .A � BASIN #2\Q\ t , 25' BUILDING SETBACK ---------------------=------%- t = - ---[ -� '' i \' t y \ ----__ �� \ \ 1 ��� ApprovQd C`- �rtV'at..r.PeIt Docure rmn+'3 \ \ 1 C..,1strJ c? nit -,.. ,ce with these documents is req u'•='! ` ^e; ma. _rih Carolina r S zier wth \ F i✓-!//oOS� _ : 1 ��' YOU DIGI NTACT ONE -CALL CENTER E r,re:� S=_-;,=.•.?f t�1 ice- 1-000832i949 ALL CONsraucrION MUST CONFORM TO THE UNDERGROUND UTLITY PROTECTION ACT THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 P.O. Box 3083 Pinehurst, NC 28374 Telephone 910-295-2232 Fax 910-295-3420 MICHAEL A NEAL & ASSOCIATES, PLLO ENGINEERS. SURVEYORS, Ind PLANNERS FIRM: P-0898 105 WEST CORBIN ST. SUITE 201 HILLSBOROUGH, NC 27278 (919)644.1277 (919)944.1347FAx mn•alt#manwNInesra.e Tyler's Ridge at Sandhills Southern Pines North Carolina Developer - Owner. Tylees Ridge Phase 1, LLC 6535 Seven Lakes Village West End, North Carolina 27376 Phone #: 1-414-573-0855 NORTH 50 0 25 50, 100 SCALE 1•= 50'-r DRAFTING HISTORY WORK DRAFTER DATE REV. PER NEW LAYOUT BWM 05-20-11 CONSTRUCTION PRICING PLANS BWM 06-14-11 CONSTRUCTION PRICING PLANS BRL 07-08-11 TECHNICAL REVIEW PLANS BRL 1041.11 REVIEW COMMENT REVISIONS I MHL 1 12-15-11 REVIEW COMMENT REVISIONS I MHL MICHAELA.NEAL., PE 028396 C-5 GRADING & DRAINAGE PLAN 1 i , ` 1 < gh,Dq h \ w,.� ��\ �• \�\�.�"�+ ! 1 it , ii / / t/ `mow` \ •+ & I IN lit dd Ar oe dd �t`� �'\..,'• ; \`,��'`.\`.,`\,"•... mil, \ T�.""�i -�i �L��\ � \ ��;,.../,�,,,, `�,r�� ..� �"`'q• did If ei ellqx`�� 1. Mf .r ,,,.. •' � .r' .rx•' .�••'r'..- ••'•^"..•�ts.*'N ✓'• ~•,A' .•'• '' •• ..• / •"' ' it yr r+ .r•.•^�....r•^^ •�,,.w+,....^•"•rr• , ���•rr" ♦ N^ ••N ,... ,.A' u��,,�.xr• NA i+'y _ .;.++ .%'. "i��w,r .A .!•! .,' ,, • .!' '•' ..,, 'x' /X1\2 .V '" ..A. •"ice,•, �'.r" r.•" Ni•• " er- A.,• ,,♦ t...' r. ��G 5 v�, !•' .^ r-" _.....•• .,,,,-.,..-,. . / i (/�)T jry� r ! r , s•-•• ` �. " 1\ \` t - / ♦�,Ar" \. 'w� • ,'' • n f„ • , i /�(�••�'� .O`••^i"'•' „ „•, ...-• �,,,"..,.,". •1 V I MN'• / l by 1 ......I ' / I '/.A - ! � g M' , \ 11 " N el, •,,. •✓ ,•„ �.•.' •'' ,,•• � � �'••,..•• V" eT[''•1'N 4"•" N�<JI ..^ - --. ^, ee" ♦• F1" ,/r/ „ l •,N "" i � ' ' J / � / �" / ' ' ' / / / % Hi , .! •� �^^l i A'' "' •,.. •'" ^.�" �.N•'•' N'� I• •'/A' r� N•' .N•• �n+�.••"••'N".• 92,8566E • ,/ % 1 `�� r/ / / j -�. / / �. �. .. !_ /.-._.- f / A'-�,, M .N' Nf}(/ , r,�� �O��C`�\i pfw r r•""`.✓ �.,•• Off 7 /1- ,,,,, 0....�:�.i : ='�z: _� + ♦ _ �" 1 ....� i t () ..,,, . N,,,. ..r "•• p,, •'• r;•. ,,r'' •'• .;;,",,,,,....... ! J /j�// i i r / I '• J � � '"y�.-•tj..._..._.�r. ''-� 'f�.- � ' l) ( il'I '/1 �'.r^" ...._�.�.;N,'•�•• ^.pr• •A rf r,.. N.'",••"•,...�.,,..~�:... \ ' !! ' /j % , f i %• f f -;'-r'••`...,' ) ' i*"�'/ / / f/ r I I I I , •�,w..yil6'�� .r ''• A" .p' • ,•''. •�. ell, ,�'� ' r,•rx^" 1"._/.e.... ��'', �` / � / / �. , ". i. _I•_•. T � + i�, �+ ....� 5 „i.1:•.. � ,' �••'+ ,N",,...� • ." 1 ,,..i , i ,'." A,,.•"',!� 'I J • �) �� R !t �/.�� J / w- / "• i " -ram - •i-�./_.,s.. d� .' '/ /♦' ___ •- �''•'•.�I 1'i (Itlsl / ,- w,Jr.r•' ,,,, ^' "". "''..N' •S • • , / ,',,' IA ♦,,' / I < ♦ / / , LE .'1 1� 'A/,Fj, - ( t J �.F.^.. .. r {• 'j l ( I' I I! /!/ P• ,, ., '! /''/ ,' , "i de didr• ) Y t ��t 7 / \ t1, f / ,J' '• r / ✓.• •' / / r r� r +1+ 1ell Jill!t ♦//.� �,� �r"�,� ,/ ,✓' .% 1 _ LL'' \ ..t�''nn�� R - / i/ : �r. it>ti `t( hjl4j,.l ;' - ' A ,rr' r' .r.---- /;� 4 7� ; i ' /� f) ' S li,il t' .1, / dor!• /,`' ~ \`e-• \ i )\ . % r / 1r/ ,,'' / t ' p I ) \\ \ \ { j t • , r ,f •' V f'' !/ ,jj t� / I C \ did ' l ,r♦ N J' i r� rf'' \\ ' 1 ! /\\ \ r I ! /I J // iJ 1/ 1!�``�Q )1 J f ( l ( t ' I ( ) 1' ' !' i r ` -A/+ - IN,\\ / 1 tl i ; I I J r 1.' r• i ' t t , ? ,' f ' ay5 I ' l ;1'` tS'�tl ��,, �\ \\ \ ?� ••..tom,. ,,.'j�\\\!!! \ J, ,\ % / , i i /'. 1 1 ) r CJ ) ) ;t , ✓✓ l J, j i t + i ••,,� /••gsa �,,. .;,t i+1 ``V\�\ \ \'a'.,q!_ '^, -,,. _.-. .� , k\�\ I !f ��� „♦ ••, � • ,` f I 1 i •', `�. f i J! ) , i l , � •� %`a,2s� » ��;1,� 1 \ \ \ •. � �•. ""'-'•-•• _;,,',_-�„�„"'.._'_' �„ � . "`' o� `-, %OFr„..•' i /' J' ,/ ' ' ` / ` ) 1 ! 1 ! � ) r'f i'eJ "� �,.. .%� ' "+-'"_'is::.'I� �'..'�'y w...-....�.'„ - �'.'�'`•w -".�\ tJ J t' li � )) J) ) it ) I ' � 1 i li �.. '\ -... "�!^•,` -�`7 I' ." V•'• 1�^. �"� .��'-.�•�,^.�-./'.l x� �.-Y `� .,�•\\\� / ` \ � " Jf e , ' J f � / ' /• f f • / J 1 1 � � ) 1 t ( 1/ I i \ Y —r'.'" �..""` t "\.,i ''. ' : ~::r' "."�,.,\'�,�,,..,_-,,.. A.' -.. � ..,. "'" •.� \ \\ \\ \ %% ' , 3 \ \ ( r _ > Via. \ J. \\ % /f / i / r 1 //, t 1 f 1 1 \ C. 7 ' \ \ FES 18 �' \ `, f / { / / /r i J r f" r 1��- 3`?.. - \ i14au t R2A•SO -. '� RIP AP W=TPTH= B" `. J�' � , . 18 •z ` X J` \ i \`\ J % t / ! ' �' l ! J I r 1 ' 1 ) ) I \ r - - w' -� ' -i _" "^ ^ f1VEE;�Bi'AC4�) `✓ �sl LF IV RCP 00.93%-,-z zz.. V. _ j \ / / ,� l J ( x i ! ,r ,,,," - `••..,,�`"..jt ":.•'- ..4? OPEN TbB \ ""•,,,r.. .- \\ 1. f'de / t••,�:r� - \ `•,t0 •,' ,INV OUT!427.5•"'"" " „T / ' , J ,fJ 1 1 l I 1 I 1 I �"" 1"'- ' -" r" _"�'"�� '�' \\� \ 1 \. �` '`' �• `` ti' „' '` ^•r / / I / f l 1' ....-•-� + f- --....,. Z''iS`'•...�'^' .�- 1 ", � .FE8.8 \ `, \\" .. •� 428.78 '• ;" j / 1 ! 7 w•+•�y�."., .+ •- m ."„ „ a� •�~ M1gAL `\ \ \ r ' / / \`, 1 , r ' J J ♦ J = !r I V � .... r.. n Td1"•" ",'. N ^' 1 ' 1 f .� 1....,- i �-..».." --^-.. "Y4'�`^.'�.. ,may.••• *+.._.� _' -. ,...... '� � EL 430\10 \ , J ! \ r l , J ` f f / x r•, '-"' "-. , ......, 1 - 1 - ",. i"' •.•w...-. _�• .�,f' �,.T:-'.".-"1 \ 1 ~ \ 1 1-0 If If i _ �_ file "•" r "" \ / 7 J ~`'•,, r- \ ,� CB-32 "'�,"� /'\ i � rr ) •• :f , �� 1 f �,n � '_' y ...� .......... ...w� � r t' _ � ' �" -' - •-. " �' \ \ l /! if f J \ � \\- T TT 11AYTER....... FIB IAN�SCAPE ARCHITF-C'� U AND PJ AMINQ 30 Parker Lane, Suite 3 P.O. ,Fax Jon Pinehurst, NC 28474 Telephone 91"93-2232 Fax 910-295-3420 MICHAEL A. NEAL Ik ASSOOIATES,PLLO RNOIKERS, SURVEYORS. and PLANNERS IRN: Reacts Jos (DEBT CORBIN ST• SMITE 201 HII.LSROROUGH, NO 27278 LB18)84e•12T7 (010) 044.1347 PAX 1nne41Qm4nae glneers csR, Tyler's Ridge at Sandhills Sou$em Pines Nor* Carolina Developer - Owner. Tyler's Ridge Phase 1, LLC 6535 SCvee Lakes Village Wert MA North Carollm 27376 Phase III* 414-573-USS \ `• l; ' ♦ I \ \, j ', I '�. __ �' �_ _�, r_ __ .,..,- .,.,..... I • I �� \ \ / / L \ 1 , . r cBat • / 1 f i � ,,P - - �i11 v. ; �'rt 1 I 1 1 w„y. 1 �\h // oll Ns `, \/ / ,t f i \ \ ,' \j '`\` \\ \ , \ _ N mw i I?, j i 2 / I �` 1 ` \ \ \ \ w J• / j� / JB \ - NORTH GRADING AND EROSION CONTROL NOTES. _ •\ / , '\\ , 1 \ •^ - -- • -^ ' "^ ! ( ) , \ \ J I ,{ ( `^ _ 1. CONTRACTOR SHALL SCHEDULE 40AI"RECONSTRUCjION , ` , rl ,`\\:t i\ \ .T ; �J!(, I I d r• \ \ \ ,J ;� i Irk \ \ 11 r' Oa ( \ \ / \ SS = a° sD 28 68 too MEETING WITH THE OWNER (OR OWNERS REPRESENTATIVE) MP THE t ( 11 ER"' � ► TOWN OF SOUTHERN PINES PERSONNEL (EROSION CONTROL PIVISION) \ \ N� * \ a r / ) ` O G DISTURBING ACTIVITIES, ,`` \ `\ - i PRIOR TO BEGINNING LAND`^ " - 2. CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE AWAY FROM THE OS O 0 8 C \ ,` t' 4 !t SM1 i sT _..p a=:. ary „ , .,/ ° " ._ R1„I I Ea_S P R I ►4'' r 1 1 .; $� 1 5�-v BUILDING AND RETENTION WALL, PREVENT "BIttOBATHS" IN PAVSP AREAS, 1.OB•rAIN LAND DISTURBING PERMIT. ` \ , C 1 _ r 1 i ( / 1 '•' / /- OURS AND GUTTER AND LANDSCAPED AREAS. SPILL CURB SHALL. BE 2. SCHEDULE AND HOLD PRECONSTRUCTION MEETING AT SITS. ! , 1 A ♦• ! ` - _I !' • - ) 1 ✓ INV 432.00. INSTALLED IN CERTAIN AREAS THROUGHOUT THE SITE TO DIRECT 3.INSTAI.L A PLAN BOX AT A CONVENIENT LOCATION WITHIN THE SITE TQ \ �+ ` , MI F �" , % L rr-''r RUNOFF TO STORM STRUCTURES. THESE AREAS SHALL BE IDENTIFIED \ \ F"= �• ' ' i �`"" - �' �r -Wi 1 ice! - — - c% PRAFTING HISTORY PRIOR TO POURING THE CURS AND GUTTER KEEP A COPY OF THE APPROVED E.C. PLAN, N P p.E.$. REPORTS, ETC \ \ ,` _ \ t I / - C _ .. 4• INSTALL ONLY EROSION CONTROL DEVICES NECESSARY FOR INITIAL \ ! i l + - �•••----•----W.'% ✓ Y, r- \ _ N, f - WORK DRAFTER DATE S. ALL EROSION CONTROL MEASURES AND STORM DRAINAGE \ ( ; • ' _.,._ _ - ..".� _•.-. / „! � .. "! -_- -- _ �� CLEARING OF SITE, SUCH AS GRAVEL CONSTRUCTION ENTRANCE/EXIT \ � j / 1 CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF AND TREE PROTECTION FENCE. BEGIN CLEARING, •- SOUTHERN PINES AND/OR NCDPNR STANDARDS AND SPECIFICATIONS, O.INSTALL SILT FENCE, SILT FENCE OUrikTS, TEMPORARY DIVERSIONS, i \ \ ,,7. • Lr R �.-. # _ Nx yf M T ~ -R REV. W LAYO W W20. 1 t.ATESTVERSION, SEDIMENT TRAPS PRIOR TOGRUBBING AND EARTHWORK• AFTERANY, \ `� j I •j 4. CONTRACTOR SHALL VERIFY LOCATIONS OF AL.I. EXISTING UTILITIES PHASE OF CLEARING OR GRADING IS COMPLETE, THE CONTRACTOR `" \ \�y� `- ' "' '�-- SS S ".. \+ �• ` T �� �- '^ O ST UC O R C 3 0fi-1 -11 PRIOR TO BEGINNING CONSTRUCTION. SHALL STABILIZE THE AREA AS SOON AS POSSIBLE AND WITHIN 21 PAYS. \ \T(} ,•\ i / / / ' d' t eg , ' ` d„ /� --- "" -L 0• ADDITIONAL MEASURES FOR EROSION CONTROL MAY BE REQUIRED 0.ONCE ALL SITE WORK IS COMPLETE AND STABILIZED, THE CONTRACTOR \ \ 1 `?�, / \ i I - s- -^ " ;• DURING THE CONSTRUCTION PHASE PER THE L7IRECTION OF THE TOWN , r OHALL CONTACT THE E,G• OFFICE FOR FINAL INSPECTION• IF APPROVED, j sil \ .. \ ,! -' ' - QF SOUTHERN PINES AND/OR NCCENR. \ \Qp \ tip k �- REVIEW 0-8-11 CONTRACTOR SHALL REMOVE 4L E.C. MEASURE$. " \F ,\(R -•- ' Q• CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL EROSION 7. ALL BORROW OR FILL U$FP FOR THE PROJECT 8 1 \ / ) t ' \ �"- - r _. CONTROL MEASURES AS PERMITTED BY THE TOWN OF SOUTHERN PINES. HA4L COME FROM pR L1R \ \ ` 1 I ! \ \ - -- V Q R VI ION 15 1 7. ALL DISTURBED AREAS SHALL BE STABILIZED WITH VEGETATION ANPlOR DISPOSED OF IN AN APPROVED LOCATION `% ��� I \ \ ,� , ! \ \ "^� ,,/• .� ,A ! �. •' gyp, ..•' ••"' ApPreved " rmYJater Permit Documents / �� B• THE SPREADING OFGRADING SPOILS FROM LOTNIONTO ADJACENT M14 1 (f rI 1 ( ) \ \ "ti '�/ r"construC nina.ccrdarcewith these documentsis M R VI 10 L •1-2 PERMANENT GROUND COVER WITHIN 21 PAYS OF COMPLETION OF ANY DEPF•NDENT UPON APPROVAL OF I T LER'S RIDGE AT 4LANPH146 f \�� `\ 11 GRADING WORK. \ \\ ) ` \ \ / \ \ r 6. CONTRACTOR $HALL INSPECT ALL E.C. MEASURES AND MAINTAIN THEM A O TI G SEDIMENT O SIORETENTION BAS MINIMUM OF ONCE A WEEK AND AFTER EACH SIGNIFICANT RAIN EVENT. L1� N E21MF Tti"1' L SIN Q. CONTRACTOR SHALL PROVIDE PROVISIONS FOR GROUNOCOVER ON 1• PRIOR TO REMOVING 8t pIMENT BASIN(S), ALL AREAS DRAINING Tq 1 \ ', EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION THE AREA MUST BE FUL4LY STABILIZED D APPROVAL TO REMOVE t +r \ \ \ 1, ) t \ \ \ \ \\ \ ' OF ANY PHASE OF GRADING; PERMANENT GRQUNDCOVER FOR ALL �I OT # p. " ISTURSEp AREAS WITHIN 15 WORKING DAYS DR 80 CALENDAR PAYS THE TRAP MUST BE GRANTED FROM E TOWN OF SOUTHERN PINES, \ \` \ \ \ 1, r ,r / (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION S' ALL SEDIMENT DEPO6ITEP IN THE SEDIMENT TRAP DURING \ \ \ \ 21,807 SIFr OR DEVELOPMENT. CONSTRUCTION MUST RE COMPLETELY REMQVEp. \ \ to. THIS SITE 1$ WITHIN THE CAPE FEAR RIVER BASIN. ,• THE VEGETATIVE SHELF, FORESAY, AND OUTLET STRUCTURES MUST \ \\ \ \ � 5 \ rr�\ \ \ - did / ' 11 •PISTURBEO AREA WITHIN PROPERTY: 18.13 ACRES. ¢S IN PLACE BEFORE OPERATION AS A STORMWATER 8MP pEGINS, _\ \w , \ 12-FERSON RESPONSIBLE FOR EROSION CONTROL MAINTENANCF)16SU94: \\ \ ` 1 --•_ \ ` 1 ' elf, ' FINAL ROAD GRADES NEED TO BE INSPECTED AND APPROVED SY TOWN DATA . � � \, ~` "•• •,,, ,• • l i \ -.,► / ! / OF SOUTHERN PINES FIRE MARSHALL PRIOR TO INSTALLATION OF SU13GMDE AND FINAL COURSE. SITE ACREAGE: 33.02 AC. !" - 13• ALL STORMWATER MANAGEMENT STRUCTURES i WATERSHED: WS III - NT" RIVER INTAKE 93'!{ ) 1 TREATMEryTIDETENTION FACILITIES SHALL BE PRIVATE AND MAINTM(lEP CRITICAL INTAKE: WA BY THE PROPERTY OWNER. 100YEARFLOOD ZONS:NIA ` \ \� \\ / / // 'rrrde ca HUD Improvements L{mits Note: Ail Improvements shown outsida of L of 01 are considered offsite improvements, except for the Highway 22 Improvements associated with Fen Court. which will be part of the HUD project, Grading spoils from Lot #1 are also to be spread out on adjacent lots rather than be hauled off as Part of the HUD project. t. a ,, , I w, �I led— X dill, ' /� / r ...- 4F required ti fre stomrsr permit No" Carolina I rx rules r ;n r sy'eT •' •r=r +. . 1' the � a ...,.tn the per- csGLroo.T .n c - cr 1• a'.,1 -,..del _04 r ••(/ ,F rI' ' Sheet 4--Favi-ionDa:. BW49 a •� 376' 0 2.4% (:XCELSIOR•LJNF-11 NNllr IeN� IS • 39 �q,n ut►ta $WALE 6 C. 482' ®1.2% F,XCELSIOR.LINED 1 1-800.8324e48 ALLCONSTRUCTION MUST CONFORM TOTW UNDERGROUND UTOM PROTEOTION ACT NI10tLAEL A• NEAL. PE 026880 PATE: C-6 GRADING DRAINAGE PLAN 2 a Y V TOP BERM EL. 404.00 ���EL 403.00 4' �_ 1 PRIMARY OUTLET STRUCTURE BI0RETEN11QN BASIN !!5 STQRMpRAIN FMAY , 4" washed 2" #8 wgshB4 choking stgnq-' 2:1 MAX 4" Mulch F11 MAX 3' Planting Soil (see specs. below) SEE LANDSCAPE PLANS & DETAILS FOR PLANT SPECIES AND LOCATIONS PRIMMY OUTLET 6TRUCTURB (OPEN THROAT CATCH BA61% SEE DE1'AJOTH136HEETANP 6TREBT DETAILS MEET, TOP OF BFRM OVERFLOW WHIR -LINED WITH EXCELSIOR MATTING EXTENDED TO EX. GRADE ON DOWNSLOPE. I 2"I - Tie Underdrein collection system to cgtch basin �qk All - IN —SITU SOIL (TILLED AND NOT,---' S" #57 washed stone COMPACTED) DIORETENTION AREA SECTION VIEW 1. Free of weef seed�R�l, roots, tt other material that Is not bole a brgpch wpod or bark. , 2. Commercially ovatable double or Ulpie-�redded Plantins Soq SpeClflCationS hardwood I should be used. 3 Mulch depth should be r after spt.tling. ExcesioNe TI.Wm1 eroy loom a Molly pad (USDA application of ip4ch fan result in q siimollon where the �FlaSal6cak4 with d day Coll of b9twam 10 to plants are grog in the mulch & pot the sot. 4. Mulch can ke op led any time pf ,tsar. 5. Mulch shall be ggot 6 month# OIL Well sell* Matter 6 Mulch foyer shall be renewed oy needed to mafntalp q 2-47 depth; 00 preYipudy mulched areas, apply a oni 1pcjl layer of new mOterial• Added 1-2 (im Is per year lm4 aN PANNE WO.614-.NOq completely rem0vpd/replaced awe #wry two years MAGNMW14 as fHOSPHMUS-P20$ 10Q1114110011111 ' " c Pow % � 500 ppm PigWHOROUB OiDEII - 10-30 1. HASTE TIONLATIO BASIN IJOTOE� �• NISTAuanox •%MOOFTHE EXCAVATEDAROS SHALL BEVERHCAL.THRPOITONSWURE014. Leeaetation Specifications: • O)NSTRUCTENOHENBERMORTHE 04MEDGEOFTHERI0R1EN00NBASINTOflRUNES,wD Lam,------�-�-- G VIDES SHOWN ONTHE PLAN% THE SI MSHALL BE CONjnICffp IN UFTSOFTANDOOMPA$JED 1 Treeg Shall be " WRHMAMWALEWIPMWW)AKWAYOFIW%ASBNr013t THEBERNIMATERIAESN4L BE g minimum of 2.5 caliper. FIEEOFALLUNSIATAMEMATWNALRW-%ANDAUVEGRFATIMMA7UFL BEFF,RTOPANS. 2i Shrubs shall be q minimum of 3-5 in height RTAIMNGWALLMAYTAKEPIAEEOFEWME3NOEAMASWW40NPLAN. ■ PACE PLANTINGSOILTO SPECILICATICpS H LIFTS OF id'% use AND LIGHILYCOMPVillf Df 18" to 24" 1.. s reQA• TMFINGWOHAD07ERORSAQapEWCKET. WHEN USING HEAWEQWPMENT, Oaq CARE SHALL N 3)Plant & tree specites �to be from the NCDENR BMP BETAIaNro NOTOVER�OMPy:TTHEiGAND OR S01L UY11R manu4. 2 PLANTING N_ ONGRASSG IDCOL 4) Fnglneer to approve Planting Soil (sandy loom) • HIE GROUND COVEN PLANTII#, HMO SHALL BE OUQ THIKAIGH THE MULCH N41H OW OF Prior to placement. III FOLLOWING s" HAND 1R01ML• VEL RUIB PLANitR, OR HOE (THIS DOES ROT AMPLY Ti GRASSES OR IFGI)l . gyp' - • B YORE PLANTING BIW LF PQ1S SHALL BE SPLIT, ,LAD NON- BIODEGRA#LE PCIS TRF III: SHRUB SPACING 9LALL BE REMOVED. RDOT�j 370AN OF ALL POTTED PLANTS SHALL BE $PUT OR CIUMBLED. True (fL) shrub (ft.) • 111E GROUND COYER SHALL PUILITED $0 THAT 7W R)OTS ARE SURROILN BY THE & IL BELOW THE MULCH. TIED PLANTS SHALL BE SE! SO THAT THE TOPD��F1 THE POT t10KlEE1Nm l0 12 Is EVEN Lntx THE EIaSRNG BADE THE FOOTS OF FAR- NOT "Is sRALL BE D )VERE 70 THE CROWN, AYOrQ9e 17 8 r 6 O RE L COVER A PRE-EVERGENT MOCR)E ID THE MULCHD Are "TEO Min4n4ln 11 7 AEi� GROUND COVEN LIED 014L BE THORGNGLY LJKUNTENANCE • e SPECT THE GORETENTION BAi IN DURING 00ISLRUCTID4 TO SEE IF THE WIN HAS OR IDAMAGED B rEQWPMENT,GRADING, ETC. I IAKE/1lfYREQUIRED REPA`MIMMEDIATELY. • O SPECT AFTER EACH RAINFALLi if RUNOFF ISBYPASSING jR I IONETWON BASIN, MANE .. N iCESSARY REPAIRS AND OM.ES AII1EGA7ELY. 9 N UNTAIN DRAINAGE TO THEBIQLETENOON BASIN SOTHATRG OFFOW NOT BYPASS IT. FAMAJN AL DNERSIONSAND SILTFE"IPIREM NG RUNOFF TOTnEF MR. 0— ING RCPI S171F AND SL PE VARIES PER BASIN NPLnANNnNSG SQL A BE IF UNIFORM C011POSITION, FIEF OF ETCHES, MPS, RD07S SIMILAR OBdEOTS LARGER THAN ONE B ICH, BRAD OR ANY OTHEI I MATERIAL OR SUBSTANCE WHIQI PAY BE 0 1 ANT GRO"ION& OR HINDRANCE TO PLANTU40 C: T11 PLW 6oN SHALL BE (BEE OF PUNTS OR PLANT PARTS OF FERMT U %PASS, QUOHN ACK CRISS, JSQV QUA MUC'YORT, aSON IVY, CANiDIAN THEM THE PUNII1Pf 54 SHALL NOT CONTAIN TOAC SUBSTANCE HARMFUL ro HUMAN, "TIL, OR ANIMAL 1 THE NUMBER AND SPECIES (r PLANTS SHOWN ON im PLANE SHALL TE PLANTED AT LOCATTON(Sj INDICATED ON THE PLANS OR AT 4P ATIOW PIRIFCTED BY TIE ENGINEER 70 THE FOLLOIWVG / F.DOT STQCN W THE PLANT MATERIAL SHALL BE KEPT HOIST DURING iJANWRT FROM THE SDuR TO IRE JOB SIZE AND UNTIL IRANTE. F YWLLS W PLANT PR SHALL BE DUG SO THAT THEY ARI: Vff0QAL 1 Iiif WA4W OF THE PLANING PIT MUST BE A MINIMUM OFF SDI (61) LARON IHAN THE DIANEIETN OF THE BALL OF THE TREE: t THE PLANTING RT SHALL Elf DEEP ENOUGH TO ALLOW ti OF I E BALL 1 D BE ABOVE iNE POS iNq GRADE LOOSE SOIL AT THE BOTTOV OF 19 PIT MALL BE TAMPED I w HAND. 1 THE APPNOPRIATE AMOUNT IF FERTILIZER IS TO BE PLACED AT THE I OTTOM QF THE PIT (SEE PE RTIUIFR RAZES BELOW). 1 THE KAW SHALL BE REMQI ED FROM THE CONTAINER AND PLACED IN THE PLANTING PIT BY UF711ht AND CARRYING THE PLAN( BY'PIE BALL (NEVER LIFT BY BRANCHES IR TRUNK). ' I ET THE PLMLT UPRIGHT AN) IN THE CENTER OF THE FIT Sq THAT T RE TOP Or 1HE BALL IS 41 PROXIMATELY 9 ABOVE 7HI: FINAL GRADE • E ACKFlLL PLANTING PIT WI PLANTING SOIL • 1 AKE SURE PLANT RFMAM STRAIGHT DURING BACKFIILNG . I EVER CM THE TOP OF 1 HE BALL WIN SOIL MOUND SON. ) ROUND PW OPOSED 84 TREE5H1U�PE BRACE BY OG 201 20WHITE OAK STAKES. STAKES SHALL Bq PLACE FAR& TO WALKWAYS AND BUILDINGS STAKES IRE TO IF EQUALLY SPACEI+ ON THE OUTSIDE OF THE TREE PALL LTIUZNG W AND WIRE, III THE TREE To THE STAKES. TOP PERM TOPRERM BERM F.I.• 41740 TOP BERM EL 432.- FL.422.00 2 ' ' 1W IAkX L. • 416.6a o t L. 421.50 h■F^ 20' PIP' see 2W, 1 EMERGENCY OVERFLOW WEIR EMERGENCY OVIRFLOW WEIR EMERGENCY OVERFLOW WEIR MOUNT MANHOLE PlL19L ry0 (6'BgpM ND COVEIL AONO AND C r 11101111111 ERIMARY OUTLET STRUCTURE PRIMARY OUTLET STRUOLIRE PRIMA OUTLET STRUCTURE BIOREIENTiON BASIN #1 RIQi ETEN-1QN BASIN #: BIORETENTIQN BASIN Lt4 NOTESI 1• EMERGENCY OVERFLOW WEIRS SHALL BE LINED WITH VIDPLSIOR MATTING AND EXTEND TO EXISTING GRADE. 3. SEE OPEN THROAT CATCH BASIN DETAIL FOR ADDITIONAL PRIMARY OUTLET STRUCTURE DETAILS. t SIORETENTION BASIN #3 GOES NOT HAVE AN EMERGENCY OVERFLOW WEIR. QUILFIS PER Q& 1 RIORETENTION BASiN Not to scale 4 Top BERM EL. 440.09 FL. 39. 1Q' L. 0 PRIMARY OUTLET STRUCTURE Noll 1. STORMWATER BASIN #3 IS A DRY DETENTION BASIN, NOT A BIORETENTION BASIN. P. BASIN SHALL BE GRASS LINED, ATER BASIN #3 Approved ormWaterPermit Documents Construe icn in accord rce with these documents is required ty' rm permit North Carolina rules rE, t the designer y crmlTy with - t C P rcewith t,e �.fq� aJl,ty 4 R2VI5 } F� HF4 I A'YTER FIB �ANPSCAPI; ARCHITECTi� ANT) PI ANNIN4 ' 30 Parker I ane, Suite 3 P.O. BOX 3083 Pinehurst, NO28374 Telephone 910-2954232 Fox 940-295-3420 p11OHAFE. A. HEAL 4 ASSOCIATES, P40 ISH MFIEERB, 4URVWORS, "nd PLANNEM PIRA: P439e 10 WEST CORBIN ST. surry 2o'I HILLSBOROUGH, No 27270 pit) 61 (914) 64 AS47 PAX mnoslLlOm9nwenelneero.aam Tyler's Ridge - at Sattdhills Southern Pine North carouse ]Developer - Owner, Tylves IU4V Phase. LLC 6535 $even Lakes Villaga Wen End, North Carolinia 27374 Phone #: 1414-573-0595 GRAFTING HISTORY I WORK DRAFTER HATE - •L •, MM"MR°� 1![i 91MISM I �I E[ld 11 •I'IL �ML i �,aVV/VU11111HIq,,V4 39 ,4�tA17�1� 1aNA@LA.NEM. PE A28888 ATP; F! N, N W1 N \ 'A 0 j F s x 4- LOT #3 LOT - #5 ---- 24% IMPERVIOUS _j &jqLOTS #3,#4j&#5 L N: 4 N rpr l­_ 20 4"Wrj a757 BENCHMARK FCM 3X3" 2* ABOVE GROUND RNATION-431LI1' • STORM WATER MANAGEMENT J SCALE: 1" 60' Approved Storrri Permit Documents Construction in accordance with these documents is requirecl by the storri permit No" Ca.lxa rules r-q�jre t,zt thvvater syan &s ­er hrg 3t 0'a Maas L�al' y Z CM 1\ N A 10 �N 11 NNI .......... . 0 EXISTING /71 WETLANDS N, \ \ G' \ \ \�\\\\\ /// =.. w\\ �.'`- \ \„ fir—�� � �,� - \ \ \ \ \ `` VN 0 4 N\ OV EXISTING 1WETLANDS \ \ \\N\ a�' 1 7��, �' N IN' V, 400 A x 1_=1z N\ t — — N V N Of N INA I NN '0 0 IF k7� N, Nib -,C W x L I -#�`"XlzNZtgv I - ss SS k N V \\ BASIN 1 D.A.\\A 0-4W IN 77 01I Zz ­z- FIR: FM 3 S lky 43&0 24 11-§ I \ .l \ N 1 � I I I — V` \ OA I F NO ss SS SS K AM -1rax 4, 'NXI Mig X ar Ingg Ir W& ralp Va. UW'W'W M AW W� win limmbwAmp�t %gin 0 WWR % BLD � / / NA FFE* m 43425 gy� 3 ST SO 24 U1 RITS in ­Z Val 4 4 7 .. 0 2988 \ W UTLITY EASEMENT DRIVEWAY"C \ P� In _ - - \ Ca&faFOR DETAMS) All 2V � � ♦ \ DRO A09 EASEMENTSURPOUN\ !\ \ \ \ \ BA9NN8 (TVP. ( SINALESsNEET8 04 a 04 FOR oETAfLsi ------------ 50' BUILDING SETBACK ------------- 628.95 BENCHMARK FGA 3"X3" 2" ABOVE GROUND GENERAL NOTES ELEVATION-438.11' ' J L 1. STREET TURNOUTS OFF OF NC 22 ARE DESIGNED BY OTHERS. I SEE PLANS BY OTHERS FOR SPECIFICS. I I L L 2. GUARDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ADJUSTED DURING CONSTRUCTION AS DIRECTED BY I I ( J Fi i I THE ENGINEER. THE CONTRACTOR SHALL CONSULT WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL MATERIALS. I I 3. NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. I I THE CONTRACTOR SHALL MAKE HIS OM INVESTIGATION AS TO THE SUBSURFACE CONDITIONS. I I 4. UTILITY OWNERS ON THIS PROJECT ARE FEDERAL AVIATION ' L7 ADMINISTRATION (FAA), MOORE COUNTY AIRPORT, PROGRESS ENERGY, SPRINT, TIME WARNER, SOUTHERN PINES PUBLIC rj I r WATER AND SEINER unt rn S: rj 5. PUBLIC ROADWAYS SHALL BE CONSTRUCTED TO THE ROADWAY STANDARDS PER'ROADWAY STANDARD 1 II I L I DRAWINGS' HIGNNYAY DESIGN BRANCH -NC DEPARTMENT OF I TRANSPORTATION- RALEIGH, NC, DATED JULY 1s, 2009 AND BY r L - - -I I REFERENCE HEREBY ARE CONSIDERED A PART OF THESE i I LOT #2 NaVmsrs PLANS. 6. WATER AND SEINER SWILL BE CONSTRUCTED TO THE TOWN LOT #1 191as OF SOUTHERN PIES WATER DISTRIBUTION AND SEAM I SPECIFICATIONS, LATEST VERSION AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS. ,11 7. ANY WORK OR LAND DISTURBANCE WITI-NN THE LIMITS OF I I I I WETLANDS SHOWN ON THESE PLANS SHALL BE ACCOMPLISHED BY HAND WITH HAND TOOLS ONLY. i S. ALL DIIE'NSIONS SHOWN ARE TO BACK OF CURB. i I I 9. ALL DRNES SHALL BE PRIVATELY OWNS AND MAINTAINED. 10. THERE IS NO PUBLIC RIGHT-0E-11011AY PROPOSED IN THE I I H DEVELOPMENT. 1 11. FINAL ROAD GRADES NEED TO BE INSPECTED AND APPROVED I 0 BY TOWN OF SOUTHERN PINES FIRE MARSHAL PRIOR TO 1 I I I INSTALLATION OF SUBGRADE AND FINAL COURSE. 12. DEVELOPER WILL BE REQUIRED TO PROVIDE A CERTIFICATION. BY AN W43EEPENDENT QUALIFIED I PROFESSIONAL, THAT THE PAVEDIGRAVE-AREAS MEET FIRE Z DEPAR'TIENIT LOADING REQUIREMENTS g , 13. CONTRACTOR SHALL BE REQUIRED TO INSTALLALL-WEATHER ACCESS ROAD, APPROVED BY TOWN FIRE MARSHALL, PRIOR O° TO STORING OR BUILDING WITH ANY COMBUSTIBLE co I ' MATERIALS ON SITE (CONTACT JOHN STONE, FIRE MARSHALL). 'E 14. CONTRACTOR SHALL CONTACT NC ONE -CALL CENTER PRIOR TOANYCONSTRUCTIONACTIVITY. 15. FEN COURT AND WALLEY COURT SHALL BE PRIVATE STREETS CONFORMING TO TOWN OF SOUTHERN PINES AND i NCDOT ROADWWY STANDARDS. 1 I 16. ALL VEHICULAR AND PEDESTRIAN SIGNS AND PAVEMENT I I I 5 CONQ MARKHA MARKINGS, SHALL BE IN ACCORDANCE WITH THE UNIFORM J SIDEMIALK MANUAL FOR TRAFFIC CONTROL DEVICES (MUTCD) ANDIOR (FUTURE) NCDOT. IF CONFLICTS OR DIFFERENCES EXIST THE MORE I SIRINGE IT WILL APPLY. 17. OWALLEY COURT TO BE BUILT IN CONJUNCTION WITH THE TYLPR'S RIDGE AT SANDHILLS PROJECT. MUST BE COMPLETE I �I I � } N PRIOR TO ANY BUILDING C.O. cc F- R4.5 I I Ur b ? PP.)mmls Sondhils Cetity College DB 905 Pg 541 I I ICU co N I I I 24' I N� 1 1 ff 8 ��8yy I \I I /I \ I 1 TYPICAL PARKING SPACE DETAIL Not to Scale I I I BASIN #3 I }fig LOT #2 \\ +3 '�b•\ �,\ VehicularplNldng e j /\ ``.` \ \ ��i• \ Regular Spaces 248 \ \ \ \ \ T 259 \ EXISTING WETLANDS \ '� 418,301 SF \`• \ ` W PERENIML WRIAM s SAN Ic 18" CURB a GUILE( DRIVEWAYS INTERIOR�DRIVEWAYS(1YP.) y_ 49,�R)2. APPROPEN SPACE oTO R \ \ \1 \ '1 EMAIN PRIVATELY 0110M 4�FUTURE CURB & GUTTER (TYP). v+ coT, LOT #1 t0 961.582 SF0 IDS \ \ o \ Q I FUTURE BUILDING (TYP). ram, -L_s r�� L II J J I \ Hwr22Raw I I I L �--� J L s-r 1 Z r zL J �.' �`.. \ \ O , " \ + 'b� C' OTHERS. tENrs er I OTHERS- fREFERTO I L L -r - _L r L J J� '�� \. \ s ; TE is \ , PLAN68YOTFIEftS - I L J ; Z , / d \ �\ l \ _--i \ \ \\ va . FOR SPEf�ICFICS -----------` -f \ _ II J� Land Area Distnbution: SF Aces Tod Land Mae 1,438,195 33.02 Lot t SRI= 22.07 Lot 2 418,301 9.00 Lot 3 21,8U7 0.50 Lot4 17,M2 0.40 Ld 5 18,993 0.44 AM OMIAN OF N* Sb to 38,964 0.92 Net Land Arse 1,=Zl Sill) Arne of Pft to Road EAMMt 51.614 1.18 Land Disturbance SF Aces Awe of Lard DisturbUM 833.436 19.13 Land M*dwaa paraaMege (of Not Lend Area) 59.6% Impervious Surface SF Arras E rg Im wvwA swbm 078 0.11 E m to be Removed 4678 0.11 Pmpmed Ynpervious Surface (To" 316,904 7.51 Plopoaed Impervious - Bridngs 74,197 1.71 Proposed lmpwAous-Reeds 67,649 1.32 Pmpawd Impervious - �9 W339 1.84 PrgweedW"rvious-S-idWdm 22,135 0.51 Pmpand Impervious - IAeC 14,935 0.34 Propoeedlmpervbus -Fueae 77,638 1.78 Prapoeed Impervious Percentage (of RajedAma) 22.70% - - - - - - - - - FUTURE DRIVEWAY "E" I I I toll - - 25 B-B I I FUTURE GARAGE m P) I I - - - - - - - �` BC a ` \ 30 PERBiNYLL ` \ �► TJ '•) - - LOTS2 )- --T18ft'2T57f- - - - -� �_ - \ \ STREAM SETBACK LOT #1 79PACEs 1 ec \ \ \\ \+ SPACM 3 1YANACC. 3 w,ls.a ` \ \ � n a. 11400 124M R4.5=�IpR)VEWAYY -5 - t 1 L> '' O Z 0 N . m Cf) t \` BASIN*I \ .�..a-40'34"N - ec 4 : BC e `er\ TP (TYFIK �` \ ` E 63.2r ; L B STORY e \�' \`• \ '� SIGHTTMANG eYPJ IrMOUIRABLECURS 24 UNITS ITYP-) MEDUM In MATCH 1 NETO NAIY22 ROAD & ENTRANCE IMPROVEMENTS \ BY OTHERS REFER TOPLANS \ 7+04 BY OTHERS FOR SPECIFICS •� `�`�` ^ ------ ---- 1 \ \\ •,, �? BID R LEASE , - _A� N - _ _ �� • � 1 i \ STa is m / SIC 5' Cl)ftB / TRANSITION 7 SPACES GA GE 78 PNCES / /PT'�(YP.) Ur CURB & GUTTER --------' ` F CONC. \` \401 .S 1VANACC 66 $SPACES 1VANACC. tNl. 5gpACES � x / / / ON FEN COURT ONLY SIDEWALK - - - 3 S - - - 4---I mpa \\ \ 13400 �14+00 r +I00 cr I W CURB & GUTTER 11+00 _ 1? --�--�-- - �- -�_T- - �- P.C. / ON INTERIOR / DRAINAGE & UTILITY EASEMENT DRIVEWAY "A / / DRIVEWAYS (7YP.Y / SURROUNDING ALL PROPOSED \ srrrrrrrn R4 5' BC / UTILITIES (TYP) (SEE SHEETS hip fl-111 "I HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lave, Suik 3 P.O. Boar 3083 Pinehlost, NC 28374 Tekplane 910-295-2232 Far 910-295-3420 B n W I � I MAINT. OFFICE I _ I - ---------------- 33.15' - BENCH MARK FCM 3'X3' 2" ABOVE GROUND ELEVATION-448.93' 25 B-B (TYP.) I I I t ragBAZEALAA9e0CIATEB,MAA E1161NEE� MXMEVCM WW PtAW4ft FM Ptlee 105 WEST CORBIN ST. SUITE 2N H LLSBOROUGH. NC 27278 PM e44-1217 W"644.1347FAx Tyle>'s Ridge 1t Sandhills • SsulmPinea Nam Clrafms Developer- Oweee T}leh ffidw pbm I. LLc S200 Cesare Bsed G CRWTFifa•sin531W Phif 14144564M NORTH 3D e 25 s9 IN SCALE 1-= SV4r DRAFTING HISTORY 1NORK DRAFTER DATE REV. PER MM LAYOUT BOAM 0520.11 CONSTRUCTION PRICING PLANS HM81 08-14-11 C NISTRUCI10N PRICING PLANS BRL 0740-11 TECHNNrJLL RENEW PLANS BILL 10418.11 faE111lIOFIS MRNL t2.01-11 1 -itVA 11 SPACES R,�) / / C-7 & C-8 FOR DETAILS) `,1 \ ' 9 ACES \ �yi 1 VAN ACC. BASIN #2 OPEN SPACE 11 L \ 1�P j / / APPROX. 2.1 AC TURN -DOWN SI ALK / / TO REMAIN 1 \ \ g WHERE SIDEABUTS PRIVATELY OWNS) \ \ 1 B BLDG #1 PARKINGM VEMENT / 'I \\ N ` qEL BLDG #2 �fill 3 STORY 3 STORY 24 UNITS A 1 24 UNITS \\ �. ` DATE:I2-II-tt PROPERTY 1 NEW 5' CONC. SIDEWALK TO ---CpRRER ('rye � / 25' BUILDING SETBACK ------------------------------------------------ ' \ - PROPERIYkANE- -' -_____---------------- -^------------------------------------------ -- - \ TT ____________ i `- ___________ 20993 - - - 352.77' ^ - - _ S88'25'12"W 659.87' - - - - - - - S88.25'120W - S88'24'35"W - HUD Improvement Limits Note: All SITE PLAN I PROPERTY LINE improvements shown outside of Lot #1 are SANDHILLS COMM. Sondhiils Community College BEARING & considered otTsite improvements, except for the COLLEGE PATH DB 270 Pg 375 DISTANCE Highway 22 improvements associated with Tyler's Ridge Court, which will be part of the HUD project. BEFORE YOU DIGI Grading spoils from Lot #1 are also to be spread CONTACT ONE -CALL CENTER out on adjacent lots rather than be hauled off as 1.800-M-4949 TO THE part of the HUD project UNDERGROUND UTILITY PROTECTION ACT "it a COOK s IM BOUNDARY TIE POINT N 53MM43 (SEE DETAIL AT LEFT) ,.a,r,msa / / ►ice \ \ \ Or \ \ \\ thin I-naaoeasn 9OFegC �NZ \ �\ FQ k ch?79o3•W S 60 � TBE HAYTER - M 40, / 472,47' LOTss Re 89d,ax LOT #8 _ BOUNDARY TIE DETAIL ' ' INTO scwq j / 92,856 SF ; - S ONT TRUNDLE MATCH --. � 22ROAD- ` LINE TOHWY -- 3 ENTRANCE NAPROY9EMS . ! BY OTHERS- REFER 7T) PLANS ! BY OTHERS FOR SPECMS LOT #7 165,035 SF ' / O \ \ IBDIj i I I \ \` "TYLER'S RIDGEIF \ \\\ BUSINESS PARK" 1 PROJECT p \ LOT #6 I -. 31Z974 SF i C.) I- \ \ cl-b 1. STREET TURNOUTS OFF OF NC 22 ARE DESIGNED BY OTHERS 10 le \ i SEE PLANS BY OTHERS FOR SPECIFICS. 'o UA\ I 2. GRDRAIL LOCATIONS SHOWN ON THE PLANS MAY BE ~ ADJUSTED DURING CONSTRUCTION AS DIRECTED BY THE ENGINEER. THE CONTRACTOR SHALL CONSULT \ WITH THE ENGINEER PRIOR TO ORDERING GUARDRAIL HID hnpowavmb UMM Nob: AN \ MATERIALS, improvements shown oulsde or Lot #1 are 3. NO SUBSURFACE PLANS ARE AVAILABLE ON THIS PROJECT. oorr'in red oRsie improvements, eiaoept for the THE CONTRACTOR SHALL MAKE HIS OWNS NVESTleAT10N AS � Court associabd 1We IONS \ TO THE SUBSURFACE CONDR 4. UTILITY OWNERS ON THIS PROJECT ARE FEDEtl1l AVNTION Gratig spoil fiam Lot #1 we also to be spread ADIe1NISTRATION (FAA), MOORE COUNTY AIRPORT, PROGRESS out on at;aoertt lots elm Im be hauled elf as I 1 ENERGY. SPRINT. TIME WARNER. SOUTHERN PIES PUBLIC part of the HUD project loll loll WATER AND SEWER UTILITIES; 5. PUBLIC ROADWAYS SHALL BE CONSTRUCTED 70 THE I ROADWAY STANDARDS PER 'ROADNIAY STANDARD DRAWINGS• HIGHWAY DESIGN BRANCH- NC DEPARTMENT OF TRANSPORTATION- RALEIGH, NC, DATED JULY 18, 2009 AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS. 6. WATER AND SEWER SHALL BE CONSTRUCTED TO THE TOWN OF SOUTHERN PINES WATER DISTRIBUTION AND SEWER SPECIFICATIONS, LATEST VERSION AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS. 7. ANY WORK OR LAND DISTURBANCE WITHIN THE LIMITS OF WETLANDS SHOWN ON THESE PLANS SHALL BE ACCOMPLISHED BY HAND WITH HAND TOOLS ONLY. 8. ALL DIMENSIONS SHOWN ARE TO BACK OF CURB. 9. ALL DRIVES SHALL BE PRIVATELY OWNED AND MAINTAINED. 10. THERE IS NO PUBLIC RIGHT-OF-WAY PROPOSED IN THE DEVELOPMENT. 11. FINAL ROAD GRADES NEED TO BE INSPECTED AND APPROVED BY TOWN OF SOUTHERN PINES FIRE MARSHALL PRIOR TO INSTALLATION OF SUBGRADE AND FINAL COURSE. 12. DEVELOPER WILL BE REQUIRED TO PROVIDE A RTTFI T Y A CE CA ION, B N INDEPENDENT QUALIFIED PROFESSIONAL, THAT THE PAVED/GRAVEL AREAS MEET FIRE DEPARTMENT LOADING REQUIREMENTS. a� 13. CONTRACTOR SHALL BE REQUIRED TO INSTALL ALL-WEATHER SHEET INDEX ACCESS ROAD, APPROVED BY TOWN FIRE MARSHALL, PRIOR S,S, o m o ° y TO STORING OR BUILDING WITH ANY COMBUSTIBLE F,(. MATERIALS ON SITE (CONTACT JOHN STONE, FIRE MARSHALL). �! C 14. CONTRACTOR SHALL CONTACT NC ONE -CALL CENTER PRIOR •? 9 o b TO ANY CONSTRUCTION ACTIVITY. S8 \ 15. FEN COURT AND O'MALLEY COURT SHALL BE PRIVATE CT STREETS CONFORMING TO TOWN OF SOUTHERN PINES AND BOUNDARY NCDOT ROADWAY STANDARDS. 16. ALL VEHICULAR AND PEDESTRIAN SIGNS AND PAVEMENT MARKINGS, SHALL BE IN ACCORDANCE WITH THE UNIFORM '`'1HE-E-rG1, , 5, 7 MANUAL FOR TRAFFIC CONTROL DEVICES (MUTCD) AND/OR NCDOT. IF CONFLICTS OR DIFFERENCES MST THE MORE STRINGENT WILL APPLY. 17. O'MALLEY COURT TO BE BUILT IN CONJUNCTION WITH THE TYLER'S RIDGE AT SANDHILLS PROJECT. MUST BE COMPLETE 0 PRIOR TO ANY BUILDING C.O. 17 Land Area Distribution: SF Acres Total Land Area 1,438,195 33.02 Lot 1 961,562 22.07 Lot 2 418,301 9.00 Lot 21,807 0.50 Lot 17,532 0.40 Lots 18,993 0.44 Area of Waters of the State 39,964 0.92 Net Lsnd Area 1,398,231 32.10 Area of Private Road Easement 51.614 1.18 Land Disturbance SF Acres Area of Land Disturbance 833,436 19.13 Land Disturbance percentage (of Net Land Area) Impervious Surface SF Acres Ends" Impervious Surface 4678 0.11 ExbtingImpervious tobe Removed 4678 0.11 Proposed Impervious Surfaos (Totaq 325,994 7.51 Proposed Impervious - Buildings 74,297 1.71 Proposed Impervious - Roads 57,649 1.32 Proposed Impervious - Parking 00,339 1.84 Proposed Impervious -Sidewaro 22,136 0.51 Proposed Impervious - Miss. 14,935 0.34 Proposed Impervious - Future 77.638 1.78 Proposed Impervious Percentage (of Project Area) 22.70% 1 1 1 \ 1 1 \ 1 LOT # oy \ / \ 18,993 SF CBS Me 4aa,98' _ 5 ------------ 1 / �S48.InVE / \ / / 8� Q BIISIN/5 R I� DRANAGE EASEMENT A { A BASNIs \II 1 FUTURE CURB 3 GUI7Et (lYP =1 } 4 A _ T/SAII, / ]C W 2Q 11ILITY E/►SEAEItr IOU ON OrTERIM DRntEMr►Ys fnPa- C4I.rrY E/�SB18tT _ a R / / / / 20 tm s- LI i /�1pT / 1 DRADW., E EASP,W\ (TYP.)/924111 ; 1 - / J / e LOT #3 21,807 SF I� ' I„ W �ti�9 LOT #4 I ' 17,532 SFXO 5 \ to / I / Sondhills Community College DB 905 Pg 541 / I ,o``� BEFORE YOU DIGI / I CONTACT 0ONE-CALL0-62494 CENTER 1-000-092�949 ALL CONSTRUCTION MUSTCONCONd TO THE UNDERGROUND UTLI TY PROTECTION ACT' FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parber Lane, S'witrt 3 P.O. Boor 3083 PinehoW, M 28374 Tekpkaw 910-293-2232 Fax 910-293-3420 to OMMO. NM A AWW4ATEa, PLLC EMMAM !, saRVETCRe, ens PLANERS FMM P M 108 WEST COR&N ST. SUITE 201 H LLSBOROUGK NC 27'T7a (Mq 6UMt77 (M" W43aFAa Tyler's Ridge at Sandlulls �� Norm Cwore Developer - Owns .'r a Ridp1� L LLC S20 LOO=i, Red ommo gYTEosssio53129 PI #.-1d144t56-9222 so o a so No SCALE 1-. W4r DRAFTN ry HISTORY MIORK DRAFTER DATE REV. PER NEINIAYOUr BY1M 05-00.11 CONS7RUCT10NPRICNCPLANS BIM 9�14.11 CONSTRUCTION PRICNRt PLANS BRL 07-0611 TECHNWALREVEMrPUM 111 104411 NBMVCMNMWIWWEMM Ual 1IM41 MICHAEL A. NEAL. PE 026M DATE: I-L-I1 - II C-2 SITE PLAN 2 Y A v y EL 430 v ca3i- RBLRAP APRON 10 INV-42792CLASS B _ ! i lam, \_ ,, _ � \ >�cc�BIDR yea - - __ \ \ \ \ \ - \ \ _- - �'DRtAINAGEEAS®BlT `\ AROUND m11ALE (TYP ],. , " -PERENNIAL 9C G SETBACK __--------------------- srnEMi�aticK� - r - v \ \ . LIMITS (TYP.) CHV A V �A \ v '� v v w �_�� v `� \ •: � �h\'' - � v iw BENMARK FCM 3"X3" 2" \ �� \ \ \ �a1�\ \ _ _ ABOVE GROUND\��� \ \ GRADING AND EROSION CONTROL NOTES ELEVATION-438.11' A J \ - - - -- \� \ \ N Q \I __ -.- \ \ \ \ \ 1\1 \ 1. CONTRACTOR SHALL SCHEDULE AND HOLD A PRECONSTRUCTION \ \ \ \ \ ' . \ •� - \\ \ \ - \ _,,� 'wOO ? •. \r' MEETING WITH THE CHIMER (OR OWNERS REPRESENTATIVE) AND THE \ \ . - - - - �`� , `� ` \ � \ •\ � -- � _A� A�Q� / TOWN OF SOUTHERN PINES PERSONNEL (EROSION CONTROL DMS `` \ \ \ , - _ _ - - - - - - - - - - - _ - - - \ \ \ \ \ \ \. \ \ \\ \, \ \'', , -- _� •� - \ 1 \ NIP T'` - KIN) \� \ \ \ �\ \ 1 ' , \ � _ =, __ \ \ \ \ \ \ \ \ , \ \ \ �'� \ \ � _ �_ \ `. l PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. \ 41 \ \�� \ I III ` 2. CONTRACTOR SHALL INSURE POSITIVE DRAINAGE AWAY FROM THE ` BUILDING AND RETENTION WALL, PREVENT'BIRDBATHS' IN PAVED ARFAS,\ __ - L- v 1 T L F v `v \. v A, v CURB AND GUTTER AND LANDSCAPED AREAS. SPILL CURB SHALL BE v _ - J - - 1! % vJ v - �- -- --�- - _ OhN THROAT CB-47 �C INSTALLED IN CERTAIN AREAS TiROUGHOUTTHE SITE TO DIRECT v � I v �- - - - v� J m � � A RM•41e.00 RUN-OFF TO STORM STRUCTURES. THESE AREAS SWLLL BE IDENTIFIED \ I \ \ PRIOR TO POURING THE CURB AND GlT17EIt \ - \ ' \ I A . _ - - RE DRAINAGE PIPES -- - - _ -- _ \ \ \ 3 MUFIV ALL EROSION CONTROL MEAD MID STORM DRAINAGE `\� ANO STRUCTURES- NOT TO - - �1 CONSTRUCTION SHALL BE N ACooaolwcEtMetHH THE T17MNR of,, �I �I BE CON87RUCTEID MP.) _f - - C - - - _ _ ' - - - - - � � \ \ \ \ \ � FES-te LSOUTHERN PINES ATEST VERSION. MIDIOR NCOENR STANDARDS AND SPECFICATK . \ I \ \ \ 1 \ ,� _ \ - - - - r- - - - - L r - - I - i % ` \ \ \ \ 1 BN- 410.00 \ \\\ \ \ \ 4. CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING UTILITIES _ _ RPRAP APRON PRIOR TO BEGINNING COfB7RUCT10N \ C - - -_ - % ` L=T, VNM', TH"1S \ \ S. ADDITIONAL MEASURES FOR EROSION CONTROL MAY BE REQUIRED DURING THE OONSTRUCT10N PHASE PER THE DIRECTION OF THE TOWN OF SOUTHER! PIESMDIOR NCDBBi. \ J I -'\ - - - - - _ L \. • . 1 ` EL k 417.00 \ \ \ 1 6. CONTRACTOR SWILL BE RESPONSIBLE FOR REMOVING ALL EROSION CONTROL MEASURES As PERMITTED BY THE TOM OF SOUTHERN PIES \ 1c I �` C jI \ � ` = � \ \ 1 \ \ � �\ 11 �\ \• �� 7. ALL DISTURBED AREAS SHALL BE STABIL® WITH VEGETATION A►DIOR PERMANENT GROUND COVER WTITEI21 DAYS OF COMPLETION OF ANY \ \ \ - A �-SS 0. CONTRACTOR SHALL INSPECT ALL EC. MEASURES AND ItES AMAINTAIN THH1A SS SS -- SS �------�"--- _� / \ ,\\ \ \ \ \ `' �?'' •Qy \ \ MINI I UM OF ONCE A WEEK AND AFTER EACH SIGNIFICANT RAIN EVENT. \ L-� f� - - - �--mac - - - - - I - N \ \ Oyy. \ 11 \ . '• \ 9" CONTRACTOR SHALL PROVOE PROVISIONS FOR GROUMX'ONBRON V I ! I EXPOSED SLOPES YNTHN 21 CALENDAR DAYS FOLLWYNG COMPLETION OF ANY PHASE OF GRADING PERMANENT GROUNDOOVER FOR ALL - J - - _ - .•� �i , 1 jy ' , {J'� DISTURBED AREAS WITHIN 15 WORKING; DAYS OR 90 CALENDAR DAYS(VII 6 FOLLOVYIIGC'E \ , \� OR DEVELOPMENT. SHORTER) COMPLETION OF CONSTRUCTION FFe _ E i \ \ II&THIS SITE THE CAPE FEAR RIVER BA►SN. FFE: 437M 4" 11.dSTJRSEDAREAIMTHII PROPERTY: 18.16AORES v \ 4N"P' -'J `c _� \ ;1 `` i � 1\o•a c .1 12-PERSON RESPONSIBLE FOR EROSION CONTROL MMBIIBNM 1Es - F7MLROAD GRAOESN®II TOBESPECT®MDAPPROVRDBYTOM � .� > F W W W W W W W W W - � W 5 �c \ t�.a` �•�•T � 1 ,�I��\ •i huh. OF SOUTHERN PINES FIRE MARFIAI_SPBORTO NST/LL1A710N OF SS ' SRSGRADEAND FNCD V O Z = 1 EWAY "B' - ' 13.ALL STORYNNTER MANAGEM11311T STRUCTURES 6 � F � � � � � �� \ � • : \ srT:EPROPERRYOVMEtFACBJTESSWLLLBEPRIVATEADYADMI6� co EROSIONFFE- CONTROL SEOUBICE 44 1. OBTAIN LAD DISITURBIN PEEK i t v 1� A THE SITE SCHEDULE MID HOLD PRE(ONSTRUCTION MAING TAT SRE o I \ , �\ \ �. �' PBi7 \ \ \ \ \ r ` y\ 3.INSTALL A PLAN BOX AT CONVENIENT RT LOCATION WE SITE TO v F BLD\;8 IMP A COPY OF THE APPROVED EC. PLAN NPAES REPORTS, ETC. o f 441.00 i FFE: FM 4.INSTALL ONLY EROSION CONTROL DEVICES NECESSARY FOR IQY1L r 435.25 TTT ,\ \ .,•` - _TrORIlE.� CxEA M OF snr_ SUCH AS GRAVEL CONSTRUCTION E TR NCEIEW 1E 43725 3 S ,r% 11 AND TTff PROTECTIDM PENCE. �` 1 CLEA INM � RT , � 24 1 I .T � \\' \ •� �` �1 5. INSTALL MT PENCE, MT FENCE OUTLETS, TB/+pIWRY DIVERSIONS, 3 �, C \ `� � _ \ � - �_PIA*a • \ . SEDMENTTRAPS PRIOR TOGRUBBIIGAMEARTHV ORK. AFTER ANY � I � } :.� \ \�\ \ ` \ `� S CB-18 _ - -�_. � � MW=4o1.3e PHASE OF CLEARING OR GRADING IS COMPLETE, THE CONTRACTOR ME � F" \ �� � y `z NV-417-00 CLASS e - \ SHALLSTABIL2ETEAREAASSOONASPOSSBLEADWRFE121DAYS. ! O Z 9%. ` CLASS RIFRAPAPRON y S. ONCE ALL SITE MMORK IS COMPLETE AND STABLED. THE CONTRACTOR Q F- - Q �` - _ _ RIPIW APRON L=r. w�0', TiM16•'�. SWILL CONTACT THE EC. OFFICE FO R FWIL I SPECTON. FAPPROV®, � , iA ♦ 17 \ - � - �, L•T. WIN'. TH=1Ir CONTRACTOR SWILL REMOVE ALL EC.MEASURES, "� Cr3 N ' `. - _ - �R% ------------------ `• _ e 7.A OOFMWORRIUSEDFORTEPROJWTSHAMCOMEPROMORBE LU V DISPOSEDOF INAN APPROVED LOCATION .. K 0. THE SPREADING GF GRADING sl+Gas FROMI LOTTM oNTDAxwcelr LOT s •.; \ - - � . - - LEA$E DEPENDENT UPON APPROVAL OFTVUWSREM ATSANDFEAS 6 ROE i RIMM3S40 CONVERTING SEDR6iT TRAP TO EOIETE TION RAW � } U) 441-11d 1 _ ..A - - FFE � 1. PRIOR TO REPO LING SEDIMENT BASINM AlAREAS ORAIRIG TO r O Z ! - i '� THEARE®ND AMUSTLEFULLYSTAB0.AAPPROVW ALTOREIE f '\ R'MA:�.94A0 -�' •- \ \` \ \ THE TRAP MUST BEGRANTED FROM THE TOM CFSOUTHERN PINES. - 2 ALL SEGMENT DEPOSIT® N THE SEDIMENTTR P DURING • . CONSTRUCTION MUST BE COK94EMY REMOVED \N\ 3. THE VEGETATIVE SHELF, FOREBAY. AND OUTLET STRUCTURES MUST BE IN PLACE BEFORE OPERATION AS A STORM INATER BMP BLiiiS E: - RMH2'7A0 141.25 SITE DATA- SITE ACREAGE: 33.51 AC. 7 WATERSHED: WS Ill - LITTLE RIVER INTAKE R2 I i 1 I '� I GARAGE CRITICAL INTAKE: WA SWALE I I' ,OM•Nj - 490.60 - 100 YEAR FLOOD ZONE: N/A 385' Q 0.50%\-. EXCELSIOR -LINED A I JBM li I I W W W W _ \ SS SS HUD Improvements Llmits Note: All K�.s-u I I I W fi W - - ss s ss ss improvements shown outside of Lot #1 are t0 I1 IN\ = as5.6s s ss Si considered offsite improvements, except for the Highway 22 improvements associated with Tyler's i Ridge Court, which will be part of the HUD project bRt:MAY Grading spoils from Lot #1 are also to be spread 7 I / CS-3 / out on adjacent lots rather than be hauled off as / part of the HUD project. I I _� HEAVY•DUTY / e BLD # 1 4f IN 03 n EIS 437.00/ O C4 \ z \ L _ 3�\ -- M N\ 10 .r Y -'41.54"W CONSTR TION 3.15' LIMITS (7.) MARK BENCH FCM 3"X3" 2" ABOVE GROUND ELEVATION-448.93' "TRENCH DRAIN I Y T FE: \ BLD #2 FFE: / FFE: FM / 41e.25 1 RY 438. 3 S RY 432.25 S i I 24 U ITS g 24 U ITS 1 to FES-2 / P .•. INV-435.80 CLASS B \ \ FES-1 RIPRAP APRON _ -7 - 435.11 Lae, W-4', TH-18"- _ 1 �s5' � / I 9.94 _ � ' / i _ - - - % / $8827'14 W / SWALE DRAINAGE EASEMENT 415' ® 1.79% AROUND SWALE (TYP.) EXCELSIOR -LINED x \ OPQI TH ROAT - - MA 122.60 -- INVOUT-418.00 FES4 INV-424.00 oPo D 1 / RIPRAP APRON RIFILOW / SWINE 1 A \\ \ LI SEWER T % IR y L-W, W-r, TH-Ir 421.50 / \ / - - EXCELSIOR -LINED \ PLAN vONRETENTKJN - - - - BASIN 02 \ V A 11 l v EL. 420.00 vv 435- -�1v vv vv 1 I olv Iv �� Iv o vvv \ .S II r �\ // 1 - \\�\; Imo= 0---25' BUWNG SETBACK __ -----------------------/ -- ----\--��----7 209. / v 58827'54"W\ SBB27'49"W� \ \ " BEFORE YOU DIOI CONTACT ONE -CALL CENTER 1.000-=49411 ALL CONSTRWTION ruMT CONwre4 TO 7HE UNDeRDROWD UTaRY PROTECTON ACT TFM HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Pw*er Low; SWk 3 P.O. Bmr 300 Pinehair3f, NC 29374 Telephone 910-295-2232 Fxr 910-295-3420 BM OIMn A HEµ 6 AMOCMT�. /LLD MNaI®14 wMV640M,.nd 1L111/B16 1061AI�T 0� IN ST. tRJTfLl01 HILLBBDROUOM, NO 2727B lMQ6M 41 " HngHIW1MITFAx Tyler's Ridge at Sandhills SWAMIS1111M PbM 01101110 Developer -OOwne r 1, LLC 5200L40mil1N"d UNCE e,TPe000531" PI f Id142164M 0 75 E w0 IIIIIIIIm- SCALE 1-- 50'4r DRAFTING HISTORY WORK DRAFTER DATE REV PER NEINL MOLT BNM 0520.11 CONSTRUCTION PRICING PLANS BMM I 08.1411 CONSTRUCTION PRICING PUW5 BRIL W 0811 TECHNICAL REVMPLANS BRL 104-11 MNL 120/41 eeee MICHAEL A. NEAL, PE 026396 DATE:IZ-)1 �l I C-5 GRADING & DRAINAGE PLAN 1 , , , V Ile 1F` \IP" �341 Or SLOT #892056 SF 40 06 If 312. NSF GRADING AND EROSION CONTROL NOTES: \ , / \ \�� \ \ \ - - - 1. CONTRACTOR SHNJ_ SCHEDULE ATO HOLDA PRECONSTRl1CT10N \ z 9 `�� \ \ \ - MEETING WITH THE OWNER (OR OWNERS REPRESEWFATPM AND THE TOM OF SOUTHERN PINES PERSONNEL (EROSION CONTROL DIVISION) PRIOR TO BEGINNING LAND DISTURBING ACTIVITIES. 2. CONTRACTOR SHALL INSURE POSITIVE DRAINAGE AWAY FROM TTE BUILDING AND RETENTION WALL, PREVENT 13RD13AT W N PAVED AREAS, CURB AND GUT IIM AND LANDSCAPED AREAS, SPILL CURB SHALL BE NSTALLED IN CERTAIN AREAS THROUGHOUT THE SITE TO DIRECT RUN-OFF TO STORM STRUCTURES. THESE AREAS SWILL BE mwnFIED PRIOR TO POURING THE CURB AND GUTTER. & ALL EROSION CONTROL MEASURES AND STORM DRAINAGE CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE TOWN OF SOUTHERN PINES AND/OR NCDENR STANDARDS AND SPECIFICATIONS, LATEST VERSION. 4. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. 5. ADDITIONAL MEASURES FOR EROSION CONTROL MAY BE REQUIRED DURING THE CONSTRUCTION PHASE PER THE DIRECTION OF THE TOWN OF SOUTHERN PINES AND/OR NCDETNRL S. CONTRACTOR SHALL BE RESPONSIBLE FOR REMO'VRK' ALL EROSION CONTROL MEASURES AS PERMITTED BY THE TOWN OF SOUTHERN PIES, 7. ALL DISTURBED AREAS SHALL BE STABILIZED NTH VEGETATION AND/OR PERMANENT GROUND COVER WITHIN 21 DAYS OF COMPLETION OF ANY GRADING WORK 8. CONTRACTOR SHALL INSPECT ALL E.C. MEASURES AND MAINTAIN THEM A MINIMUM OF ONCE A WEEK AND AFTER EACH SIGNIFICANT RAIN EVENT. 9. CONTRACTOR SHALL PROVIDE PROVISIONS FOR GROUNDCOVER ON EXPOSED SLOPES WITHIN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING; PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 10.THIS SITE IS WITHIN THE CAPE FEAR RIVER BASIN. I I.DISTURBED AREA WITHIN PROPERTY: 18.16 ACRES. 12.PERSON RESPONSIBLE FOR EROSION CONTROL MAINTENANCERSSUES: FINAL ROAD GRADES NEED TO BE INSPECTED AND APPROVED BY TOWN OF SOUTHERN PINES FIRE MARSHALL PRIOR TO INSTALLATION OF SUBGRADE AND FINAL COURSE. 13.ALL STORMWATER MANAGEMENT STRUCTURES & TREATMENTIDETENTION FACILITIES SHALL BE PRIVATE AND MAINTAINED BY THE PROPERTY OWNER. EROSION CONTROL SEQUENCE U 1. OBTAIN LAND DISTURBING PERM. 2. SCHEDULE AND HOLD ;RECONSTRUCTION AT SITE & INSTALL A PLAN BOX AT A CONVENIENT LOCATION WITHIN THE SITE TO KEEP A COPY OF THE APPROVED E.C. PLAN, N.P.D.ES. REPORTS, ETC, 4.INSTALL ONLY EROSION CONTROL DEVICES NECESSARY FOR INITIAL CLEARING OF SITE, SUCH AS GRAVEL CONSTRUCTION ENTRANCEM= AND TREE PROTECTION FENCE. BEGIN CLEARING. S.INSTALL SILT FENCE, SILT FENCE OUTLETS, TEMPORARY DINERSIOFIS, & SEDIMENT TRAPS PRIOR TO GRUBBING AND EARTHWORK AFTERNNY PHASE OF CLEARING OR GRADING IS COMPLETE, THE CONTRACTOR SHALL STABILIZE THE AREA AS SOON AS POSSIBLE AND W ITFIIN 21 DAYS. S. ONCE ALL SITE WORK IS COMPLETE AND STABIL®, THE CONTRACTOR SHALL CONTACT THE EC. OFFICE FOR FINAL INSPECTION. F APPRWED, CONTRACTOR SHALL REMOVE ALL E.C. MFASUIRES. 7. ALL BORROW OR FILL USED FOR THE PROJECT SHALL COME FROM OR BE DISPOSED OF IN AN APPROVED LOCATION. 8. THE SPREADING OF GRADING SPOILS FROM LOTEH ONTO ADJACENT LOT IS DEPENDENT UPON APPROVAL OF TYLERS RIDGE AT SANDHE.LS CONVERTING SEDIMENT TRAP TO BIORIETENTION BASIN: 1. PRIOR TO REMOVING SEDIMENT BASIN(S), ALL AREAS DRAINING TO THE AREA MUST BE FULLY STABILIZED AND APPROVAL TO REMOVE THE TRAP MUST BE GRANTED FROM THE TOWN OF SOUTHERN PINES. 2. ALL SEDIMENT DEPOSITED IN THE SEDIMENT TRAP DURING CONSTRUCTION MUST BE COMPLETELY REMOVED. 3. THE VEGETATIVE SHELF, FOREBAY, AND OUTLET STRUCTURES MUST BE IN PLACE BEFORE OPERATION AS A STORMWATER BMP BEGINS. SITE DATA: SITE ACREAGE: 33.51 AC. WATERSHED: WS III - LITTLE RIVER INTAKE 02 CRITICAL INTAKE: WA 100 YEAR FLOOD ZONE: N/A Existing Property Boundary Proposed Private Road Easement Building Setback -------------------- Paving Setback & Landscape B Curb and Gutter Future Construction Drainage & Utility Easement Concrete_ Concrete Existing Contour --400----- Proposed Contour �10 Legend Limits of Disturbance Proposed Waterrnain w W Proposed Sanitary Sewer — SS SS altar Permanent Drainage Swale Existing Storm Drainage Pipe ). Proposed Storm Drainage Pipe Proposed Drop Inlet ■ Proposed Catch Basin - Proposed Flared End Sect. Proposed Junction Box 0 HUD ImprovementA Limits Note: All improvements shown outside of Lot #1 are considered offsite improvements, except for the Highway 22 improvements associated with Tyler's Ridge Court, which will be part of the HUD project. Grading spoils from Lot #1 are also to be spread out on adjacent lots rather than be hauled off as part of the HUD project. /17,532 SF r A M. Kai III III _ Jill 11 III III ,, �/ �- �� 5 �A �Q II I I I �, 17. FES-16 IN V a 421.00 �\ MRP(�!D-S.S- _ �. � `RPRAPAPRON \L-.W=r,TH=18'- z z, � �54 LF 15'RCP A 0.as% - - - - OPEN TFIIt011TCB48 \ 10 ._ RIM s491.00 ENV=427.82 1 vaur-4z180 CLASS RpwIP APRON tez - r / SWALE 5 375- 0 2.4% EXCELSIOR -LINED HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parkr Lawn, Suite 3 A, 0. $eat 3083 AfN IAwrst, NC28374 211kpik ur 910-295-2232 Fax 910-295-3420 M ONAEL A. ZEAL &ASSO.IATES, PLLn OIBINEEM, SURVEYORS, WO MANNERS FMM: POEM 1105 WEST CORBIN ST. SUITE 201 HILLSBORIDUGHI, NC 27276 PM dM-12" 1I0NNe44.1347FAX Tyler's Ridge at Sandhills Smrham Picas NNanh Cadma DMIOW - O"W. Tyleh Ridg Phw I, LLC S200I.0011111e Mad (ioarLlgWsoD®53IN Phm k 1.4144015-7 82 90 0 25 80 NS SCALE r- w-(r REV. PER NEW LAYOUT BWIN 0520-11 CONSTRUCTION PRICING PLANS BWM W14-11 CONSTRUCT10t/ PRICING PLANS BRL 07-Mill TECHNICALREVIEWPIANS BRL 10811 REN910NS MH1L Im 11 nmNnln" MICHAEL A. NEAL, PE 028M DATE: 11 — N I - j N C-6 GRADING & 09 DRAINAGE PLAN 2 BEFORE YOU DIGI CONTACT ONE -CALL CENTER 1-800$324949 ALL CONSTRUCTION MUSTCONFORIA TO THE UNDERGROUND UTLrIY PROTECTION ACT Y S; 8• #A7 SEE LANDSCAPE PLANS & fDETAILS FOR PLANT SPECIES AND LOCATIONS 9 �'Ny � �r�mramersTTuctuE II SEEDIE AILSIMTHEEI AN►. k I� 3$OETAlS7NISSHBcTA10 1_1_I!11 � r7 y° a S71rff1DEDILS9Hfff. GNERFLUNWEIR_LRIED HAYT 7 EX GRADE OYE EXCELSIOR YMMOPF G EXTENDED TO DO GRADE ON 1 MAX I TOP OF FIRM 4' Mtalch G, BERM —\ LANDSCAPE ARCHITECTURfi Lay f—& 1 MAX I LAND PLANNING Planting Soil Specifications Tubas: Body bon or homy SRN (asDl1 .. 11-allee) aM a day eatead of behoove 10 b PSIL e5-am seed 8.429 Few 3-0 Oyath Yallr IN RANGE ORGANIC MATTER 1.5-1111 t"mee/* POFASSUE•Iao aft/am SW9E SALTS FA to oaeed NO Plan PIIOOMMM6 INDEX W-30 Veaetation SDecifications: 3' Planting Soil (3" Ve b�) Tie Underdrain .collection system to catch basin IN -SITU SOIL (TILLED AND NOTE BIONETETITION BASIN NOTM t. M{dLATlall . VOMOFTlEECKVAlMM MS LLIEVBW-14LUEeOTMMMLLiELEYH. . C MRLLTE nBNN MIMOUIM1DrEOFTENOF&M M BA=101ELAEAM aaMMM MIMRAL 1E®NMMLLEQaMNLIMNLMOFrMCOWWM 1 Trees shall be a minimum Of 25• Call ��IN WJP N'�aADOMMOFMINEdNa1L,EIB. mosmamm IpCf F1�ffNLMMM�NEMDBM.InCw$ADALLYBETAl1YEMa1Bt RBBITORAIL 2) Shrubs shah be a minimum of S-5' in height PUAMID"MSOL aEE=CUMOFWCRw' AMU . wAmRAnFCMLTo:IPea+aaoMNLFrsaFtrmLENswrauGmraorMaer or 18' to 24' In spread. TAMINOWTHAOMERORBACINIEaCKIET WMUBSWANM lw Bf.GWATONEsr11 3)Plant At tree species to be from the NCDENR BMP BEVMIONDFWBaOO�W.ITESWMMLLOM manual. t: VL a MMaweMDIMNAeBI 4) Engineer to approve Planting Sol (sandy loam) • TIRE GMEo CORER PLAN NMUS MU E Due 4MMIM THE MLOS WIN ONE OF Prior to placement THE� OR 9°ra B"'e RABBL a NE (THIS nos NOT MnY • UEGUNIV DOWE RANIM& OMMMME POTS SN ALL E SR10 AM NM- OMMME PUTS IRE & SHRUB SPA= SNAIL E RE11°M ROOT SY5196 OF ALL POTTED RANG MNL E spur OR aIRMED. Tree (tL) gob (R) • I E GROUND COVER SNNL E RANTED so TWAT THE Rams NE SNMMEM aY THE SOIL BMW THE WAM POTS RAMS SPILL E SLT m THAT TIE Tees OF THE POT YMYMNL 19 12 arm tIN L1CIo�TK ONE TIRE ROOTS W BIE WE rules SNARL E AWW 12 8 • BMW KMMr, APR.Y A RE-BERMBIr HUNK tO TE MApO ND PUNEW Q U OOVM am I(ili1RN1N 11 7 INEINUDn GRIND DOER Elm SNALL E RMMMY a IIMNMIARa . IMH:I iFE tPOFETBNTION eIL71 aIMIG OO W TNICIMN m>ff FTIE BI1W I IFM lEl MIN® IYtMM�BIr.GMpIB. E1C YAIENII'RB1U®1@MIE IM�IATgY. • IM9:rAFIBtEAOILMPFNL.FRRIOE6RYPASSRMi11EMOfE1B11MIRIMILMNE IH�NtYIBMMNDGWRiY®IOFiY. . MIMOMMINIIETOTEt�E1M1MINSNeOTINTRIRM'fO013310rtRRIMIf. rM101R TOP BERM EL. 417.00 �t 23' EL. 41s.. Ian 20' II EMERGENCY OVERFLOW WEIR COMPACTED) BIORETENTION AREA SECTION VIEW Muldl Lnvar SnedRcaeae 1. free of Hrod seeds, soi, root, R otlHa material Rat is not bale a bralcll Mood a Pak 2 Cormmercidy sealable double ample-•ahreaaae hadlod muldl should be used 1 IOdch depth ellatdd De 4• after aettRllg. EXceeeiva appticatton of mlddl con result n a sihlotial there the plants am yoehg in the mulch R not 0la Sol. 4. iNldch cal be applied any time of year, 5. YRrdl ehd be atbast s rnanDls old. 6. tdldcll layer shd be renNnd as needed to mailtdn a 2-4• depth; an preriaNrely muldNd areas, apply sane -inch layer of rase material. Added 1-2 times per year ad �PNt�Y /mP�d one. e�Isr two years. TOP BERM EL 422.00U&M on 18' EL 421.50 hNow 5' No EMERGENCY OVERFLOW WEIR O—RING RCP, SIZE AND SLOPE VARIES PER BASIN PIJWING SOL NO1ES: 111E PlAl1I1G 591E SHML 9E OF WORN COIPOSIMN. FREE OF STONES. SOAPS, ROOTS OR SONAR OSEC15 LARGER MAN ME NDL OW OR ANY OIM NATURAL Oft SUMT NME WNW MAY RE HAMM 10 KA T GRORNK OR IMBANIE TO P1ANIIIG OR MNNRNANM OPERATIONS TIE"MG SOL SIVLL E FREE OF PLANTS M PLAIT PARTS OF BrTLADA GRASS, OMACN GRASS, JOINSON GRASS, MOM KnSEDLL PO9011 W. CANA" 1111111 1E RAISING SOL SHALE NOT CMIAN 1MC S WMW xwaR L 10 u1NNL RA1T5 NN NO" • It ROMR AND SPEARS W RAMS SH M ON THE BANS SIM E RAN® AT LOOA=" IMCATED Of TIE MM M AT tWA1 GRIMM BY 11E DOW 70 1NE FMUMN ' SITMIM • ROOT SS000 OF THE PLANT MATERIAL SHINE E NtPT IMST Mm46 WAUMT FROM THE SO NCE 10 1E JOB SEE me MIL RATED. • MILS OF RANT PIT SHALL E BIG SO TWAT 1NEV ARE 1ER11CM. • THE t RWU OF THE PLAMMG PR MUST E A MMRN OF SO (40 LAIIMt NM THE MIINEIER OF 1NE BALL W THE THE • I E RNFMG m SIVIL E OW BMW 10 A10M I OF 11E BML 10 E IWE THE RISING GUM. LOOSE SOL AT TIE DOT= OF TIE m SBALL E T 01FED BY NAND. • THE AM MIME AIUW OF FBt1I129t 6 10 E RACED AT TIE Wr:ON OF THE Pit (SEE 1111111M RATES MOM • TE RIIR SNAIL E 581ME PRON 1E OWANS AND RACED N THE RANMG RF m IFING MO CMWM I E PINK BY THE BALL WT BY MOM • S"T THE KKTT tPNW NO LA N INE M OF THE PIT SO HART I E IW OF THE BALL 6 MFOM MIELY I ABOVE THE FINAL CRIME • RAOELL PLANTING Rr WN RARING Sal. • 11K SIRIE RANT NBLNIS SIRRI9a MMW BAC ORM PFACEO . • NEIR CON Ili THE 10P OF THE BALL Will SOL NOEW SOIL AM= 1E EXPO® BILL TIES SNNL E BRKM BY U911C 20t 2UMM OM SPIES SINES SNARL E RA EB PMAUEL 10 UVXWM No MLDIR.S SINES ME A E EMINLY SPACED ON THE GNSE OF THE TREE BALL UXM NOSE NW WE MOM THE WE 10 1E SOLES TOP BERM EL 432.00 23' EL 431.60 No MEW am 20' N EMERGENCY OVERFLOW WEIR FLUSH MOMT MAI ME FLUSH MOM MAMME r Mal Nw q TOP BERM FLUSH NOVAE KNOW F Mat OpeningRINGING RING AC CM RAND COVER. q_ ) EL. 440.00 MA NO Cam' aqRR 2U 4,Ao TOP BERM EL. 404.00 EL. 439.00 10' 8' ( B e, EL. 438.00 tom_ �1 EL 403.00 NV. 416.a0 DUI . . s"4Ib�T �T .� 4 Doh m PRIMARY OUTLET STRUCTURE Batton of Bub B. 41000 PRIMARY OUTLET STRUCTURE PRIMARY OUTLET STRUCTURE BIORETENTION BASIN #1 BIORETENTION BASIN #2 BIORETENTION BASIN #3 NOTES: 1. EMERGENCY OVERFLOW WEIRS SHALL BE LINED WITH EXCELSIOR MATTING AND EXTEND TO EXISTING GRADE. 2. SEE OPEN THROAT CATCH BASIN DETAIL FOR ADDITIONAL PRIMARY OUTLET STRUCTURE DETAILS. 3. BIORETENTION BASIN #3 DOES NOT HAVE AN EMERGENCY OVERFLOW WEIR. OUTLETS PER BASIN BIORETENTION BASIN Not to scale Behan of Beep EL 43MW PRIMARY OUTLET STRUCTURE PRIMARY OUTLET STRUCTURE BIORETENTION BASIN fi 30,PanterLom SNttf 3 AO Bas 3083 MwhuM NC 28374 Tekphwm 910-293-2232 Fax 910-293-3420 ML9MEA. WAL• ASOO MnS. PLLC EMaMMR4 NARIEYORA etta PLAreeees Fmc P-0Daa 105 WEST CORBIN ST. SURE 201 "LWWMMH, NO 272-M twgeu-tzn tMne44-1347FAN Tyler's Ridge at Sandhills SoaPoela Pores Narlh corolme Developer - Owner: T7Yks% RWgc Phm 1, LLC 52DO Lean sRed Gmcoddt, Wbo® 53129 Pboack 1_414456J ffi REV. PER NEW IAYCUr am 0520-11 CONSTRUCTION! PRICING PLANS BWM 08-14-11 TECHNICAL FEVIEW PUM FIRL 10$11 TBCHM IIEW NPUM BRL 1241-11 MICHAEL A. NEAL, PE 02e396 DATE: z—Al--11 D-7 STORMWATER BASIN DETAILS Y Y Y \\\\\\\ 1\\\\\\\ /!!! l I/!!7/ \''-_ �� � O� \-- 1 \� \\ ` \\\ `\\ \ \ EL 'SOS \ \ \ \ \ 4211, WETLANDS �\ - ,Uk \\�\__ IIVRgPo \\\\ \\\\\\\\ \\ 1\1 \ \\ WETLANDS --- _ -' - - - - - swA s \ \ \ \ / ! r \ \ \� \ \ \\\—-___=---- `��—\ �2.4'h \\ \ \ \ \ / \ \ \ \\\ �_ -- ---` \ _ _`\-.\ ' I 1 \ \\ \ ` O\ \\ \\ \ \ \ \ \ 11 \\\ \5'\\`RIM 75 1\ \ \ _ i..• _ _ _—_—__1 - \ 1\0 \ \INV� 4.50 - - - -_ - - \ \\ \ \ \ \\ \ - \ `�� \ \ \ \ 1 J \\\ \ \\ \ 1-7 118 LF 15 RCP 3.17.6 1\ � _ _ \ \ \ \ \ \ \ --- ---'._ �'\ \\ \\ \ INVT,IR litT4•416:00\ �._— \ \ I-\ \ \ \(-� �I \ \ -� - =i- \ �-1 -1_ r=_ - \\`. 4,\ LFIa I ,•y11t III II \ \ `FUTUREIMI GE PIPEsaND— \ \ \ \ 1 \ 1 \ 1 I I I I I I �Il 1\ 1 ` \ . \ I \°I' Ir ® — \ \ \ \ \ \ \ STROCFURES • QI TO BE (TYP.) — — — \\ -,_---F -A_____ z � __ \\I\` \\\ \ \ \ �/ETLAND Legend \\ \ �— \ \ \ \ \ FUTURE DRI AY "E" Existing Contour 'ss SS --e--- s •�--}- ss s�� s -�->-$ Proposed Contour =\ _ , \ \-/ \\ \ \ \ -- �- \ -- 1 _ _ --,_ I I Ilul I IN / I I I 1 1 \\ \ \ \\ \ \ \ \ \\S\\\\I \ \`I 1 11� \ 1�i \ ✓ Existing Property Line \ \ \ ' \ 1 q \ I _ `_ - ` ( _ \\ i --- ---- \ I--- -_� _�- I j 11 / r / I � f � 11 \ \\ '.4'+��\\O�\\\\\`i\\ \I\I \ , TIU Existing Storm Drainage Pepe GE ProposadStorm DrainagePipe \ \ \\ \\ \\ \\ \ GE 1 \ 43725 \ i I I I/ J ( \ j I E4 41's 1 Proposed Drop Inlet ■ \ \ \ \ W— W— —W W — _yy I I \ \\ \ \ \ \ \\\V. Proposed Catch Basin "B7 Prop. Flared End Section Proposed Junction Box OFES FFE: \ = FFE: \ !. ; \ \ \ \ \` IW-41f.00 \ \\ \ \ \ \ OREBAY \INK=\ 4� \ \ FFE: ! BLD I \ \ \ \ \\ \ \ \ 14 \ \ \\\ �\ \ / / \ �, \ \ 1 1 441.00 FFE: FFE 437.25 3 S [ky 435.25 Fft \\\ \ \ \ SHALE 1 I 1 1 \ Nv4n:oo\ s — \ \ \ \\\= \ \\ 1 1 \ \\ \ \ \ \ n`\ 1 \ \ \ \ \i• 1 �j cd N HUD Improvements Limfts Note. All improvements shown outside of Lot#1 are \ /� / ! - COnSideted offaite improvements, except for the _ ! / I r / `r . FFE: tt Highway 22 improvements associated with Tyler's \ N \ \ 44 .00 \ \ FFE: 7 Ridge Court, which will be part of the HUD project \ 1 1 ` i / 1 I 1 Gradingspoils from lot #1 are also to be \ 000 I { I / • PAL 433.50 \ t i po Spread � I I / I I � RIM: 434 00 •.:: \ \ \ / I / \ � — — — \ W on adjacent lots rather than be hauled off as part of the HUD project I I I • J -,. ; ': 1 ) FE$ / INVI= 43985 1 I 1 1 I ARAGE GARAGE GAF�GE 1 I I I 1 \ FFE I I 438.E9 434.25 I I I I w W r W W W W —W FES /r _ \ )POSED \ SS ---� SS SS INV - 422.00 OVERFLovy- \ \ \ \ SE R LINE SS i 1 S SS SS SS S --j—}- / p� I WE13- / \ \ \ SEE UTIL ! I DR EWAY "A" 1h J / \ B10 ETENTION W. c 421.50 / I \ \ \ PLAN A a / _ ASINg2 r / 32f06ao%\\ \\ \\ \ \ I i FWM=d T I I I E ---- — 1 OPEN THROAT CB-1 15^ IP ToktM RASN \ / / -Ira HHggQAT = 421. �.5' \ ! I I I I I I H DUTY p — / \\ INV�U#�+4tM DPAIri I \ \ \ / \ \ \ \ \ I 1 \ 1\ 1IN N/ / / / ►i I I - I•. Ii 1 I \I #1 �FE: D FFE: BLD FFE;, 0 L#2 714825I Y436� RY 432.25 S R\ \ \\ \ \\ \ \ FES \ \ 1 \ \ \ \ EL1.437.0 j I I I / 24 U ITS / INV=427.00 I 24 U ITS 11 / \ \ \ \ I / FORE OFFICE i s I / CA I \.,,. \ ,.•.1 J I FES I FES / I - - — — -- — — INV=435.16 INV=435.90 SWALE SCALE 415' @ 1.790A 17V @ 1.79% 16 LF lW RCP O 1.79% I THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 P.O. Box 3083 Pinehurst, NC 28374 Telephone 910-295-2232 Fax 910-295-3420 MICHAEL A. NEAL & ASSOCIATES, PLLO ENGINEERS, SURVEYORS, s W PLANNERS FIRM: P•0988 106 WEST CORBIN ST. SUITE 201 HILLSBOROUGH, NC 27278 (919)"4.1277 (919)844.1347 FAX mneal@maneanglneera.00m - __- Tyler's Ridge at Sandhills SoudiernPines x«1n corolma Developer - Owner. TytetsRicip Phase L uc 52M Loomis Pow Gn wdole, Wisconsin 53129 Phone 0-14144564M NORTH 0 2s eo tog SCALE 1"= W4r DRAFTING HISTORY VKM DRAFTER DATE REV. PER NEW LAYOUT BYVM 05-20.11 CONSTRUCTION PRICING PLANS BWM 0S-1411 CONSTRUCTION PRICING PLANS BRL 07-08.11 TECHNICALRE1AEyVPLANS BRL 104-11 PE 028385 DATE: GS GRADING & DRAINAGE PLAN 1 i �q1� / (i/ .- / ` \ / / / // l �/ / // / / J�./ / / /... / ,/ f / / / /' •„ \ I _Il, / l 4111 /L /Rj © ill / II j'k \ , \ 1 \ \ I / / I / / i / / ,. b'/ \ \I ill I ► I ' / ' / — �'-= / s` lil,il Iiil/_- \ az5—`_•^--- / ♦ II \ / / / / / / / / , / / / / ♦ \ / / / / / / / \t\TR\P — ♦•PyDE =a�oso\\ - - - - - - - - _ \ \ — ---- ---- `\ / ! / i CRAURNSTO OB / ♦ \ \ \� 1 / 1 �\ {\ t \ — — \ t t i I i i i \\ OwuNEo� — — — — — — — — — i Q d E 1 11 i\ \\ It HUD Improvements Llmifs Note: All ♦ \ \ l \ J \ \ \ \ \ / / !/ Improvements shown outside of Lot #1 are considered offsite improvements, except for the ` \ \ \ \ ` _ n E RtTS L��JG \ ` 1 Highway 22 Improvements associated with Tyler's \ \ \ — — — ` I 1 O Ridge Court, which will be part of the HUD project ♦ \ II / / / \ ��_BUST E-- P RK Grading spoils from Lot #1 are also to be spread � \ / / / / / ' / I I / � out on adjacent bts ratlrerthan be hauled off as � \ \ \ '- — ' _ — — — '- — \ \ / / � , oyry � / / / / / / I I '— - •- '�` — \,, J / / part of the HUD project \�4 \ \ P J ECT \\ I W � 14 — / — — IIII \ \ J , Legend Existing Contour °° — — — — — ♦ ♦ \"c,° Proposed Contour / 55 / / / / , / / / i / Existing Property line Existing Storm Drainage Pipe sa—e sow--so-3-- ♦ \[ _, / / Y Proposed Storm Drainage Pipe \/ \ \ i Proposed Drop Inset II \i / / / / / l Proposed Catch Basin Prop. Flared End Section n �, Proposed Junction Box O $WALE 5 375• 0 2.4% 3 W THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker lane, Suite 3 P.O. Box 3083 Pinehurst, NC 28374 Telephone 910-295-2232 Fax 910-29S-3420 MICHAEL A. NEAL$ ASSOCIATES, PLLC ENGINEERS, SURVEYORS, said PLANNERS FIRM: P4)398 105 WEST CORBIN ST. SUITE 201 HILLSSOROUGH, NO 27278 (919)644.1277 ISIS) 6444347 FAX mlrealemnaengineemoom Tyler's Ridge at Sandhills SoWhem Pines NOA Camlina Developer -Owner: Tykes Ridge Phase 1, LLC S200Loomis Road Gr CDWWboonsin53129 Pbonc A:1.414,Ss6A282 NORTH SO a 28 SG tab SCALE T= W.W DRAFTING HISTORY WORK DRAFTER DATE REV. PER NEW LAYOUT BUM 0520-11 CONSTRUCTION PRICING PLANS BM OS.14-11 CONSTRUCTION PRICING PLANS BRL 07-08-11 TECHNICAL REVEW PLANS BRL 10-&11 0 MICHAEL A.NEAL, PE 026M DATE: 10-08-2011 C-6 GRADING & DRAINAGE PLAN 2 \ BASIN#4 lk w _ w � w SSMH 14 ,. ��. SBMH 11�k\ .. \ W SS (TYP.)-" �\ yS _ — — 50' BUILDING SETBACK — — CMF r L-I i I UTILITY NOTES 1. ALL WATER AND SEWER CONSTRUCTION SHALL BE IN ACCORDANCE I I WITH L L 1 TH THE LATEST ORANGE WATER AND SEWER AUTHORITY -I STANDARDS, SPECIFICATIONS AND DETAILS. I r J I 2. THE CONTRACTOR SHALL CONTACT N.C. ONE CALL CENTER 1-800.832.4949) AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION TO HAVE ALL EXISTING UTILITIES LOCATED. HE SHALL I __ ALSO CONTACT ANY INDIVIDUAL UTILITY COMPANY THAT DOES NOT SUBSCRIBE TO N.C. ONE CALL TO HAVE THEM LOCATE THEIR UTILITIES. CONTRACTOR SHALL COORDINATE ANY REQUIRED RELOCATION OF EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY. 3. ALL NECESSARY PERMITS SHALL BE OBTAINED PRIOR TO I J J CONSTRUCTION. I Jr r 4. CONTRACTOR SHALL HOLD A PRECONSTRUCTION CONFERENCE AT 1 THE SITE PRIOR TO BEGINNING CONSTRUCTION WITH THE f OWNERIOWNERSREPRESENTATIVE, OWASANOWNOFCHAPEL ( I L r J HILL,ORANGE COUNTY SOLID WASTE AND EROSION CONTROL AND NC DOT. 5. ANY AND ALL ROADS,DRIVEWAYS OR DEDICATED FIRE LANES USED _ FOR FIRE DEPARTMENT ACCESS SHALL BE ALL WEATHER AND — — DESIGNED TO SUPPORT AND CARRY THE IMPOSED FIRE APPARATUS _ WEIGHING 75.000 POUNDS. FIRE ACCESS ROADS SHALL HAVE A SSMH 10 MINIMUM WIDTH OF 20 FEET WITH OVERHANG CLEARANCE OF 13 FEET I 6INCHES. 8. FIRE ACCESS MUST PROVIDE A MINIMUM WIDTH OF 20 FEET TO I I WITHIN 150 FEET OF ALL EXTERIOR PORTIONS OF ALL BUILDINGS. 7. FIRE LANE STRIPING AND SIGNAGE SHALL BE COORDINATED I THROUGH AND APPROVED BY THE CHAPEL HILL FIRE DEPARTMENT. 8. F1RE HYDRANT LOCATIONS AND SPACING MUST MEET I t— REQUIREMENTS OF APPENDIX C OF 2009 N.C. FIRE CODE AND BE WITHIN 150 FEET OF ALL FOC BUILDING OONNECIONIL i 0 0 ? - 9. ANY AND ALL GREASE TRAPS REQUIRED FOR THIS SITE SHALL BE I I J ACCESSIBLE BY GREASE COLLECTION TRUCKS I m co N 10. CONTRACTOR SHALL COORDINATE RELOCATION OF EXISTING a OVERHEAD POWER LINES & POLES, ABANDONMENT OF EXISTING I SERVICES. ETC. WITH DUKE ENERGY. CONTACT PERSON: SIEVE SMALL OFFICE 91"183138. I I HUD Imarovements'Umits Note, All ' improvements shown outside of Lot #1 are considered oifsfte improvements, except for the I Highway 92 improvements associated with Tyler's Hm Ridge Court, which will be part of the HUD project. I I Grading spoils from Lot #1 are also to be spread out on adjacent lots rather than be hauled off as 1 part of the HUD project, I I 1 I� cr) >- co 0 z ISR MH m M N SS 1m I Iro D i I0 I I II SS HIJU I BASI1IItt #3 - CMF II �— 0 CE CAR WASH CMF C M F OIL WATER- SEPARATOR 8'k2" REDUCER, r M F BLOW -OFF ASSEMBLY i\ , W \ WETLANDS \ \ 30' PERENNW.�,\ STREAM SETBACK \ \ \ ! Lill \ ` \ 9tio \ \ • 9g2U. s _ VC\ �� \ Nil r I - ram. r�---r-) r L, J �J L� I-J LJ � 'lop L I-J L� r �' \ ` WETLAND \ \ \ I << J FUTURE DRIVEWAYS" _ ss ss S ssss ss — -e — — --�- - —�- H a SIT 9 SS S S1 _ r - \` \ _ i--_-------_-i I ------_ - - - - GAGE GARAGE GARAGE AR \ \ d 5S 10 1\ \ ^ 5 N \ BASIN#1 \ \ \ \ \ 5S 1 W W W W \ ` \ 1 -Z W —W w W W - - SS N7 \ SSIEQI22 SS SSS SS SS \ \ A .DRIVEWAY "B" VV • � ` , 1 BLDG 3 STORY �\\ q" \ 24 UNITS yt• i � �r V ' us \ VOLL ss - PLAY Lt b t h L Pb4L ARBOiI 1�1� �FEN COURT THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, b'alte 3 FaBox 3083 Pfnehurst, NC28374 Telephone 910-295-2232 Fax 910-295-3420 `\ MICHAEL A. NEAL& ASSOCIATES, PLLO \ ENGINEERS, SURVEYORS, w4KANNERs FIRM: P44M \ \ 105 WEST COR13IN ST. SUITE 201 HILLSBOROUGH, NC 27278 \\ (919) 844-1277 (919) S44s1847 FAX m0eai@menaen0inaereoom 1 \ Tyler's Ridge at Sandhills EX. 8" SNMARY Southem )tines SEWER UNE Nm& Carolina d Developer - Owner. RVV udd I1 C lyl\ 0L*o R GmwAmk, W,sm 53129 PLone* 1.410.8569282 —s "V Ii TIE NEW SANITARY SEWER TO EXISTING MANHOLE & NEW WATER MAIN TO EXISTING WATER MAIN 1E DROP) (NORTH eo _ 0 25 e9 we NSCALE 10= IiOW4r \ / FIRE �„(J ...... ,: \ EX.`" WATER LINE ` \` 8" WL (TYP.) v ASSEMBLY (TYP-) / ♦1� a" SS (TYP.) 1 GARAGE GARAGE GARAGE w w W w W W w W - -' SSMH 17 / W _ _ SS SS ` 3• SS -- SS SS S ----�- SS SSMH 19 S --ASS SSMH 18 DRIVEWAY "A" \ \ BASIN #2 r SS (TYP.) 1 e� IWATER SERVO HOSE BIBB AT BLDG #2 BLDG #1 4" SS SERVICE FOR 3 STORY 3 STORY I DUMPSTERDRAl 24 UNITS 24 UNITS 1 \ 4" SS SERVICE LATERAL WM.) — — — — — - — ' — — 25 BUILDING SETBACK IPF __ IRSL_— DRAFTING HESTORY WORK DRAFTER DATE REV. PERNEAILAYOUT - am 0540-1 CONSTRUCTION PRICING PLANS BWM M14-11 CONSTRUCTION ING PLANS BRL 07.0a-11 TECHNICAL REVIEW PLANS I BRL 10dr11 - --f— C-7 UTILITY PLAN I • IIN`\ '° � 1 1 I- \ \ ' \ \\ \\�i.\`\`� `\-\ \ \ /`\` - � \\``�____— --_ _`` - `` __ �-_ __ `- �- -___ `` \� _` \ � \ ` \\ \ \ ♦ _vim-/�q� \ y` i \�� WETLANDS ------------- - 1` ' . ---__ Y A s / I , ! \ `\ - \ \ 1 1 \ \ 1 4 1 1 Ir / I , ! - _ _ � .,_ �-_ -__ __ --\— � \ _ -----w \\ C--_ •O a , :, ` � ` — , IK- ------------- • \ !. \ - _ Y/ ; 1 '\ i ' \ \` \ '\ 11 1 I 1 1 1 1 I � i p/I/ i _ \ _ _ _i\ - __ \ \ `\ � -__� g � \ \ \_____ WETLANDS / = \ ` \ -_- ` \ _ ` \\ / 1 1 \ \ r��-�. J'� __________________ ��- -�- 111 1 / � \ �A / .`p _ _ \\ \ \ \`\ - - - - - 0� \ 1 � I 1 , ` , 1 \\ ram,. if i I\\I` �� �` BdItNING SUB ' __----------- \ ,cur V,a\ \ - \ \ \\ \ 1 I 1 +' _ T'��Y��.�.�.�q-� �l-` ` \ \ \\ � 1 `` _ __\ _ - _ _ _ _ 7• \`�� \ AVi `1` D/i.}�� `\ ..\ I \ VIK V, \ `•1 `\ _ \\ \ \ 1 \\\\ \\ \ _ �T���.c ♦ \ \ \ \ . _ \ IS `\ \`\ `\ \ ` \ \ 1 I\ \\\\ �t��r 1 w.l � ice/ �,��� � '� _` \`.` � \ � `� `\ `I\ ♦ � \` i \_ __�`\ -`__ - _ __ `` �` �\`. \ \`♦ `\ \ `♦ ` \\\\ `\ _ `\\` \`\` \�-__ ``\ ` ` \ \ ' \\ \ ` \\` k 1 / `\ \ \ `\ "r'L l•`� \. '— \ `` �\' _ — _ — _ `\ _ \\`� �NY17\ ` 166 ,446 \\\\ `` ` ` ` � ` \ _ `\ ` ` \ \ �\ I 1 1 ♦ \ \\ \ ` •- BASIN 4 D.A. `\ \ \\\\\`\\\`\ ` ` \\ ` `_ _ `` \\ \ ___ - _ - )GRi\ V V\ \ IMP 50777 I _ - - --- - - - --------------- --- - — `♦ \`� I \ '.-� `\ \ \\ ``� �\\... �\` F E // \ i'�� _ I _--_- ----_ \\`\9�1 V\ \\\\ `\`\ \\ \\\\ 11 1 / ��\\`\ ` '� \ ` `\ `\ \ ` �\ \ \\ .*•. '`W OO / GR. 62133�\----- --- ------ - - - - - - ` \ \ . . . r { \• - ```\ --------- ``\ \ ```y_ \`-_ _ I \ \ 1 TOT. 112910 , `: \ � � �';�` '��� , �- ' �.1\--- _ _ _ ------ ` `\ \\ \ ` \\ \ ,\;'\ \ \�\1 ------ 7 \\\�\, .\ \ `\♦ \` \ 1 1 \ 1'1' II 11 III;�1 1 I \` �.\\`♦\ \ 1 ` `\`\ `\\ \ '\\`` • 1 ``__` ___ ___J __ _-___-___- __ y\ `\` ` �\` `\ \ ` \ \ 1 11 \ I \II I I I I I I11; \ \I \ \ \ \ I- \--------- IA/ETLANDQ \ \ \ ' ( }` \ ``i 1 - TYL 4 \ \ 1 1 1 , , 1 1 \ \ \ \ \ \ \ \ \ \\ \ \1 1 , \ 1 \ a M // / �'\\ ER S RIDGE AT 1 \ \ `•` \ ` ` `\` \ , < p `- `. �i`\ \ �_;� \_ c �. `\ \ 1 1 1 1 " 1 1 1 1 1 1 \ \ \ \ \ \ \ \ \ \ \\ \ rl \ 1 ' ; \/` S1 11 \ E[ LL \ •` \` �\ \ \` \ g .`` \\ 1 \ \ \ - \ Y / I A / e 1 1 1 \ ` \\ ` ` `. ` \� \ \ ` �`'A 1 ``_-\-ss \ \ 1 ` DRAINAGE AREA _ \ ♦ ♦ \ E r/'/\ 1•' 1 1 1 1 1 \\ \ \ \ \\ ♦ \ \. 1w�wJ•.L/A11 ■ir' ` `` \ `\ 1 A \ {, __` r I\ ♦_____ ' s 1 / / 1 1 1 `\ \ \ \ \ \ \`-\ ,._.1. \ \ I \, \ \\ \ \ \ \ , \ \ 1 , 1 1 / \ \ \ \ \ \ \ 1 ` \ \ \ \ \ `\ \ • w—w •---i----_w—_(w—w —._r_w 1 -ti—M �-1 1 � a j , `\ `\ \ ` ` \ \ \ \ \ \ \ \ \ _ � ` \ 1 ' FFE: / % BLD 1 \\ \ . \\ `, \ \\ .\ , \\ ♦` ,. �� _� ` \ .` ``\:�` _`\� \�" --a_`_�ii FFE FFE: \ `\` `\\ ` `: ` '�-' 437.25 3 S F�tY 43525 \ ` \ \\ ` \` \ +� \\ 24 U 1te . _ \ 1 \ \ \ \ \ \ \I E \ 1 , 1 i\ 1 / 1 1 I 1 \ � _ ___ i `- \\' •\\ / 1`1 \ `� q\ 1 co1\\ \\ \`\ \` \\\ \\\ 1 \I \ 1 a1 N 1 \ /- 1 \\)i i I 1 i 1 \ \ \ ♦ ` \ \� �`_� , r/ �\ ``\ ``I \\i 1 / 1` \\ \_i. l \\ - - _ r L ALL ;`•-'.\•l.., �GA1SE /' ' • FFE I , I � , 1 � ' '• ; I 'I .. ••�� \.• 1 1 \ \ \ • _ � 1~ass / -- -- - _- - ',y-100`-\ , • `n y FFE: \\ \ \\ , ' /' ' ' \ - ` \I 1 \ W Q'1 \ I \ I I I I / / , , : .. , \ •' RlM 434.Off \ \ \ � , I / 4 • W � . \ 1 BASIN 3 D.A. �\ ( IMP 40687 \ m,m C%j GR 684024411 1 25 I I 1 I I• I I r ` I •\ `\ r TOT. 109089 1 ; �1' liltE I GARAGE GAS GE :, FFE: w_—w----w w—w ' ' \ thwIl —w—w w w-- w—w -- -�f7ss a ss ss ss ss—ss � 1\ 1 1 I I 1 ffi—J-•ss J--1-A �T�T / / � ' ' \ \ ` ` l It E I I BLD #1 �---- BASIN 2 D p� \\ U, \ 1 \ ` i //`\\ , i % .ZS •I { I I� I FFE: \I BLD #2 FFE/ FIFE: FFFE:/' \\ 448.26 1 QQ 436/ 5 434.25 3SI Y 43Y.25 \ \ \\ \ FFI r 24 U ITs GR. 10139 c M F , �ARf 1 ry — _ T--OT.-167565 ' '/ a' tH / / • ' I I I 1 1 \\ I - - �' ! l .'.. . ,ice �'!' I r — — — — — — — — — — 1_ CMS ., �. _ -- — —----------- ----- \ 1 \ ,' I I 1, I I P - — - - — - - -- � �• - -�—.----- ""1�2 Ste`. - — r , s n / Y , e _ u --- q - 441 �� v �� --- ---ice ,p ,t } e � _ /�it I ik --- _—_ ` NN NN / It T t --- / • n r' —`y.. `, _._ sir --- Ik IAL, ____ A __-- `v v \V v ��— ` •` �- — _ --- — I �_ 1 / — \ `� ` `V :� 1 A A / `;�•� ���� I_ — 7_'C,,_ r 445- _ ---- - - - - -- - -_ __-------- UILD+NG SEIBACK i- -- -- _- A1;9 v. y SIN 4 _ BA D.A. 3 \ IMP _ 77 a r� ��------------ ---- --------------------- --- T.,9`1v ;`�` v — - �� �� GR. -_----------- ---------- - - - .� � _ ,_ _ �� v," 62133 _ � v v , v'��' ,kk- TOT. 112910------ �� ♦ 0 A A V A A V` V\ __--______ _ _ —__—__—___—�Q ` 1 — — — ___ _V A A V — A� — 9 \ v \ y \ i TYLER S RID r.= ._ �r r .r4 ::.�._ _ GE :.. �. ,A , Nk DRAINASANDFULLS - GE \ ee �� ��'' j 1 \------- Ilk t ` n GJIRAk FFE: GE e 9 I AWY o r _ q 1 b '\...� — FFE: ✓ �� e v. v v t ` ,.,_ao; BLDG i FFE: FFE: 437 3 S F;tY 4w25 24 U 41% • t �r� \ _ - ,` - -♦ . II, . e. +44 \ --_ -- __ lam. \\\\ 1 N LEASE'-- ''FFE:; _ r , V 0 bb\ i' 1 / _ �. 433.50 vv RAM. ,434,00 _ .. y `- - \ - - - - - _ -- - _ • - - - , �, . ,v M� BASIN ©� - - - -__-- 3 D.A. --� -� __ ' _ - - PLAY IMP. 40687 s FFE: I ' . � � 6 GR. 68402�' _ °� �I 44`It.25 � TOT. 109089 -. - --- -- -_ - I I I I GARAGE GARAGE GARAGE FFE: FFE ,, 1 I v OOI / 436.50 43425 — i — — ------ 0 ,{ WD 'AA ` vvv v�\ I I I i I I 12 I I wr II I w _ v� y I FF FFE: BLD #2 BLD #1 BASIN 2 D.A. 41025 i i � r. � I i I FFE:, FFE: — ---, --� __ _ — 48,25 S RY 4385 434.25 3 S DRY 43Y25 —R C7V169 \ - FFc 24 U ITS @ 24 U ITS GR. 1 CAR CVF yy 0139E — i Tf�T.16�565 - A i - I -p II , L_ v I =�- - EL\i3(� \ \ \ \ \\ \ \\ \ \\ -\42h.� k0Llk \\ 3W,@2.40.E \\ \ \ \ JB58 `RIM=434.05I_ -- _ _ ``` \"`• I \ \ \ \ \ \ \ \ \ \ I \\� \ \ INV 428.75 1 \ \ -� \ \ _--==-6��� _-� \ \ \ __-- -`�.— � \ \ \ � �- \— -�- �•C- 'r—\ \ \� \ \ \Y\\ \ \ \ = "- ��0 YEREN�1 IAt ti \ ` \ ` \ , U_ \ �C \� \ � �� \ \\ . \ \\ \ \ \ \ \ � Q \� I \\ \\ \ \ 01 118LF15'RCP@3.17°h \ \ INVTr3R Tb416:00\ I ` \ \�� ------ --- — — — \\\ 4 \ \ \NV OUT=d12.00 \' \\ \ \\\ III \ \ I -\ h \ \ \ \ \ -���► \�- \ \ \ 4� \ \ \ \ \ \ \-- \ \ W r-I_�T _ �� '— (` \ \ \ \ \ \ \ `FUTURE-DRAI c1E PIPESAND-- — _ — — \ \ \ \ \ STRDCTURES L: TO .J C-ONSTRUCIE J _ ( 1 , \ 1 \ \ 2 V \ \ �11\\ \\\ \\\\ \ \ \ 1 1\ FUTUR \ \Legend srs // \\ \ \� \\\ I Existingcontour —/ 11 I 1\ _ — — — S$ Proposed Contour \ \ J I V11 Existing Property une � — \/~\\ I -- / I, lExsStorm D Pip — I / I GARAGE \ \ \ \ \\ \ \ 1 \ Proposed Storm Drainage Pipe Proposed Drop Inlet N \ \ \ \ \ w r W W Proposed Catch Basin " 1 MAY Bi Prof- Flared End Section \ \ \ \� \ \ \ Proposed Junction Box O I \ 1� N \ \ \ 1 \ / \ \a+ \ \ \ \ \ \ \ 1 \ \ \\ �\ ` \ \FFE: \ \ \ \\ \ \ \ \ \ N\t\ 1f�00 \\\ \\ \\\\\\ \ "1 �lNb.=41420. 13LD#6 441.001 / : ® / FFE: .�, FFE: 1 3 S [Y 435.25 \\ \\ \� \\ \\ 1 \ \ \ \ \ \\\\`\\\\ — \ \ ��\ _ r•`= j^ \ \ L24 \ \ SWALETROIPOSO � � 1 \ � \ \ � \ \• :: � � � � \ \ \ \ \ \ \ . • s _ _ _ _ Nv�4lzao �\� \ � � = ; � � = _, 1 \ �\ \\ \ c*1 \ \ \ \ \ \ \\ \ 1 `/ \ \ ► !rod I I ► _ �-" R `� / ' �- HUD Improvements Llmifs Note_ All 3 \ \ \ \ \ \ E improvements shown outside of Lot #1 are I \ \ / _ v S/ / I \16 considered offsite improvements, exoaptfor the ! / t \ / t FFE \ \ \ \ SS W Highway 22 improvements associated with Tyier s 1 FFE: Ridge Court, which will be part of the HUD project — Grading spoils from Lot #1 are also to be spread out on adjacent lots rather than be hauled off as i i \ \ t \ ���jjj part of the HUD project \\ \\N \ \ \ \ \� PLAY ry�t •: .... - / INVI=43965 I I I 1 1 (: I ARArGE GARAGE G FF�EGE \ 1 I { I \ FFE i / �E'50 0 \ SS - W W W IN _ W — — — W W FES / / \ oPOSED / `\ INV=422.00 SE RLINE- 1 ss ss / 1 1 \ \ / \ i S SS / vVel�.' UTIL / i s-j - SS SS SS -�—�- o DR EWAY"A" ash // '° \ /EL'=a215o // SW41E1 \ \ \\ \\ \\ /� #2 ( 321 6.00% F�RE<IIAY I I. I ... /EL. 4 DO � .� u,� II I OPEN THROAT 6" IP rohpRA; NV QT;4C2B1.(5) 1 1INVO41W 4ND Oi�AIN ryq \ \ � \ t� / BLD #1 26 I 1 PFE: LD #2 FFE: FfE: FFEi ) 1 I 48.25 I 436/.5 434.25 3 S RY a iNV=a27.00 \ EL) 43�.00 01 {{ I I 24 U ITS / ® 24 U ITS / / 1 / 4FFIcd / o H / I °GNPs E': I i \.•'. /' -` I \\�\ \\\-_------''�///��/�� ( t I mil- FES FES INV=436.16 INV=435.90 SWALE SWALE 415' @ 1.790A - 17V@1.79% 15LFIS- RCP @ 1.790A 1.5 _Jt 3 THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 P.O. Box 3083 Pinehurst, NC 28374 Telephone 910-295-2232 Fax 910-295-3420 NWHAEL A. NEAL & ASSOCIATES, PLLC ENGINEERS, SURVEYORS, aWa PLANNERS FIRM: P-OM 106 WEST CORBIN ST. SUITE 201 HILLSBOROUGH, NO 27278 (919)644.1277 (919)544.1847FAX mneatemanaenghtwo cem Tyler's Ridge at Sandhills Souttlan £nxs North Cmv ma Developer - Owner. Tykft Ridge Phase L LLC 5200 Loomis Road GNxmd9 %Vonsm53129 Phones: 1 414-856-9282 NIT 50 a 215 80 too SCALE 1" a 60'4 r DRAFTING HISTORY WORK DRAFTER DATE REV. PER NEW LAYOUT am o&20A1 CONSTRUCTION PRICING PLANS BWM 06.14-11 CONSTRUCTION PRICING PLANS BRL 07-08-11 TECHNICAL REVIEW PLANS BRL [. MICHAEL A. NEAL, PE028M DATE: 104s-2011 C-5 GRADING & DRAINAGE PLAN 1 : V< ''Zz _ 01 Lf,• /R�— o I T111i l////'%'I I i1l G� /\�� / / , / I \ \ (`j i I 1 / / / // / /1 // .:. / aim I \\ I II11�► III, / __ � ,. /— / I I , \ _ / I �� ` Bt?�OAfiVIRP // l( // // // / l/ � // / /lJ l l / 1 � � I 1 \i i\ \\ Il— — _— ��_ / � �p=-•.._ —_�_aZ�_°' �\\\�\\\ \\ NO 0.5 RCR Et_430\\ \� \ /y — -�--�'� \ _ \ i \\--_.�Irt,RE-sno�r \ \ \ I / I - \ 1 I t ( — -•- — — _ — — — — — — — / \ DRAIN NOT TO BED — — I� CoNs,R`%�-� ; Y / — — — — — — — — — — I O d I I 11 LLI HUD Improvements UmNs Noss: All 1 1 \ \ \ \ \ � _ , - \ \ \ \ \ / m, improveents shown outside of Lot #1 are \ \ \ 1 \ rr — T — _ Q consideredoffsiteimprovernents,exceptforthe ` \ \ \ _ ER S rlG \ 2 Hghway 22 improvements associated with Tylel's \ \ \ — — — ' \ 1 O Ridge Court, which will be part of the HUD project Grading spoils from Lot #1 are also to be spread \��. \\ \_BUST- ESS P—RKrt pout art n the centHUD lotsratherer than be hauled off as P J ECT IN ss s ,v. , 1 Leaend Existing Contour— — — — — Proposed Contour Existing Property Una Existing Storm Drainage Pip— Proposed Storm Drainage Pipe \\, i j \/ Proposed Drop Inlet /� / \ / / `— Proposed Catch Basin W Prop. Flared End Section (a Proposed Junction Box O ,' 1 / / /< /. ' / SWALE 5 375- O 2.4% it 3 THE WTI - -- _t FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 A Box 3083 Pinehurst, NC 28374 Telephone 910-295-2232 Fax 910-295-3420 MICHAEL A. NEAL 6 ASSOCIATES, PLLC ENGINEERS, SURVEYORS, and PLANNERS FIRM: P4898 105 WEST CORBIN ST. SUITE 201 HILLSBOROUGH, NO 27278 (619)644-IVI (S19) 844.1847 FAX —_ - mlresI&MIlentrineemoom Tyler's Ridge at Sandhills southern Pines Noah Carolina Developer -Owner. Tykes Ridge Phase I, LLC 5200 Loomis Road Graodale, Wisconsin53129 Phone N:1414.RS5A282 6o a 25 LID to SCALE IN= W- REV. PER NEW LAYOUT BVYI4t 05.20.11 CONSTRUCTION PRICING PLANS BWM M14-11 CONSTRUCTION PPICING PLANS BRL 07-MI1 TECHNICAL. REVIEW PLANS BRI 104411 A. MICHAELA.NEAL, PE 028M DATE: 10-06-Mi C4110116 e � �► DRAINAGE PLAN 2 I �_I 1�1 ,I { h ', it �,i'•. i i , I IIII�t.;l�,11 r ;I i Ay 1 BASIN 04 \ t Wes_W—W SSMH 14 AY SS / SBMH 13 / 88MH 12 , 30' PERENNUU. STREAM SETBACK \ 9�0 ' 1 kk 1 ---� \""�'"'• �...i ram,"„ � ':, � ` 4s \ B" ss (TYPa ll Ss . - \ '�. „i 9� •� . 50' BUILDING SETBACK — — — — _ — \ `� ` ` \ ` s� --- — CMF '`� _ it \ 0 i I r J L 1 SSMH 11 tI \ \ \ UTILITY NOTES: I a", 1. ALL WATER AND SEWER CONSTRUCTION SHALL BE IN ACCORDANCE I L L _--_--_— WITH THE LATEST ORANGE WATER AND SEWER AUTHORITY "I V'1 STANDARDS, SPECIFICATIONS AND DETAILS. I'l — I_J _I I � L J J THE HAYTER FIRM LANDSCAPE ARCHITECTURE LAND PLANNING 30 Parker Lane, Suite 3 P.O. Box 3083 Plnehurst, NC28374 Telephone 910-295-2232 Fax 910-295-3420 2. THE CONTRACTOR SHALL CONTACT N.C.ONE CALL CENTER J FL 1.800.832.4049) AT LEAST 48 HOURS PRIOR TO BEGINNING " N CONSTRUCTION TO HAVE ALL EXISTING UTILITIES LOCATED. HE SHALL ALSO CONTACT ANY INDIVIDUAL UTILITY COMPANY THAT DOES NOT _ ` S� \ \ - SUBSCRIBE TON.C. ONE CALL TO HAVE THEM LOCATE THEIR UTILITIES. - tL, J \ ` \ IINHNEL A. EAL&ASSOCIATES, SS CIATE ,PILL CONTRACTOR SHALL COORDINATE ANY REQUIRED RELOCATION OF ( I (� 1 I I r J L — ` 1 \ EXISTING UTILITIES WITH THE APPROPRIATE UTILITY COMPANY. \ \ - - 3. ALL NECESSARY PERMITS SHALL BE OBTAINED PRIOR TO \ J L L y' 1 J- - L �"'- �1 -r �- r \ M \ CONSTRUCTION. I r r- L f -L J -`l-• J L J i \ \ \ \ •`\ \\ 106 WEST C RBIN 8T. SUITE 201 HILLSBOROUGH, NO 27278 4. CONTRACTOR SHALL HOLD A PRECONSTRUCTION CONFERENCE AT .� I 1 f i - I \ \ •� �i \\ \ (919) 844.1277 THE SITE PRIOR TO BEGINNING CONSTRUCTION WITH THE I _ I ` \ - (919)84MIs47FAX \\ �� mneal�manaenglneare.com OWNER/OWNER'S REPRESENTATIVE. OWASATOWN JTOWN OF CHAPEL I I L _.. HILL,ORANGE COUNTY SOLID WASTE AND EROSION CONTROL AND NC 1 I [)Or. i i-- — — —� I \��� it ��)) FUTURE DRIVEWAY -WE" _ _ \ t - 1 d FOREDEPARTMEM'ACCESSSNALLBEALLWEAIHERANDSUSED I - - - - _ SS -- H8 I� Tykes SS SS j-- 5S - - 9 SS —� SS SS SS - --� SS DESIGNED TO SUPPORT AND CARRY THE IMPOSED FIRE APPARATUS SS i^-\ 1 8 � r ,7L, t WEIGHING 75A00 POUNDS. FIRE ACCESS ROADS SHALL HAVE A // - - - _ , - - ' ^ I I = _ �- - II j I J I N �•' \ \ , Sandh111S MINIMUM WIDTH OF 20 FEET WITH OVERHANG CLEARANCE OF 13 FEET SSMH 10 ` I I-��� N ;`, B INCHES. I I I "— — J I I I \ \ i� 1 EX. 8" SANRARYsoudlem MGM I I---------J L'-'--- _ J - - --- _ --I � `1 . NorthCarotina 1 SEWER uNE S.FIREACCESSMUSrPROVIDEAMINIMUMWIDTH OF20FEETTO - - - - - - - WITHIN 150FEET OFALL EXTERIOR PORTIONS OF ALL BUiLDWGS. I I GARAGE GARAGE GARAGE \ \ \ d \S d 7.FlRELANE SiWPINGAND S(GNAGESHALL BECOORDOJATEO •\ lot \ ` r ^ 1 SSS �•�DCVC)Op PbaseIICi: THROUGH AND APPROVED BY THE CHAPEL HILL FIRE DEPARTMENT. I52200LoRoad � 8. FIRE HYDRANT LOCATIONS AND SPACING MUST MEET I H w W w _ W 11 W W — w — W w SS SS H 7 \ \ { ` & 141 29 REQUIREMENTS OF APPENDIX COF2W9N.C.FIRE CODE AND BE — SSINt122 SS SS \ - wrrwN 159 FEET OF ALL FOC BUILDING ooNNECrroNs I Q O ? DRIVEWAY "Q" \ �> \ 9. ANYAND ALL GREASE TRAPS REQUIRED FOR THIS SITE SHALL BE I I d• S� ' \ �� TIE NEW SANR'ARY ACCESSIBLE BY GREASE COLLECTION TRUCKS m M N � ' - _ � - \ � r ` � `\ SEWERTOEXISTING MANHOLE�_ TER 10. CONTRACTOR SHALL COORDINATE RELOCATION OF EXISTING >, , -... • .. \ \ - \ MAIN TO EXISTING OVERHEAD POWER LINES & POLFA ABANDONMENT OF EXISTING vWATERMAR4 SERVICES. ETC. WITH DUKE ENERGY. CONTACT PERSON: SIEVE I - ` ® SMALL OFFICE919.8183138. I 1 3E HUD Imarovenmr1s'Umits Note: All I improvements shown outside of Lot #1 are considered offsite improvements except for the I O L } Highway 22 improvements associated with Tyler s ® ® t F Ridge Court, which will be part of the HUD project. I (} O Z Grading spoils from lot #1 are also to be spread I fit P— out on adjacent lots rather than be hauled off as ( I D part of the HUD project. > m coN C; 1 co I IUD o z ® BLDG #6 3 STORY 24 UNITS R voLL L � p' t O�L SSMHS " \ O. 9 DROP) NORTH \ A% \ \ v • N 1 1 80 0 28 89 tm ss Ay 8"VIOL(TYP•) •\ FEN COURT ON Z I� N v SSMfi21 cZi m M N I ® Qa !'LAY /ARB©i> FIR\ EX.`" WATER LINE � rn ASSEMBLY (TYPJ s" SS m'P•) ID 8"W"-�) O GARAGE GARAGE k GARAGE my rn w W I^1 w w I W W W W _ SSMH 17 _ W - ISS SS SS SS S SS SSMH 19 S ---ASS SS SS SSMH 18 Legend I DRIVEWAY "A" \ I C / BASLN02 SS H 20 , 3 Existing Property Ling I 8" SS (TYP.) Existing Water Una W W-- Propos w Water Una w I I ,L/WATER BLDG #2 BLDG #1 Existing Sewer Una I I ARASOR 3 STORY — SS _SS__ - C SS SERVICE FOR 3 STORY \ ProposeSd 24UNITS SSewerUna SS_ I BASIt�03 MAINT. DUMPSTERDRAIN 24 UNITS 1 Existing Power Pole $ CMF I \_ OFFICE oG I CAR 4" SS SERVICE Fire Hydrant 1r 1 WASH m LATERAL (fYP.) Fire Department Connection ® Sewer Manhole ® CMF _ — — — — — — — — — — — — — — — — SS Cieanout . — — — — 25' BUILDING SETBACK I P F _ _ _ _ _ _ IRS — - �- CMF SEPARATOR 8-xr REDUCER, 2" WATER SERVI E FOR MF BLOW -OFF ASSEMBLY HOSE BIBBAT MPSTER „ REV. PER NEW tAY0l1i BYMN 05.20.11 CONSTRUCTION PRICING PLANS BYIAN W14-11 CONSTRUCTION PRICING PLANS BRL 07-08-11 - TECHNICAL REVIEW PLANS BRL 10.8-11 MICHAEL A. NEAL, PE 028998 DATE:- 10-06.2011 -- - C-7 UTILITY PLAN I V V Y Y Y -- - - - tNV=l 7-1 X, X X� , R NO _NZ VE7,L k -,wA - NA\ V\7 ICI BROWN 4 IFY r 11FAMIN E , 1; 1. ag: 0 NO WOMW", II III %! ® /jj/j/; it '�/%° V, I 7/777/7 r-MMOO.I WAR 7 MORE PN; /X��, AMM X ------------------ — ------- A EWE wr ///// //� �,/� , , 1, III 7q W07001A ill 0 X A o/,/� 4 5// MWE