Loading...
HomeMy WebLinkAboutSW6110507_APPROVED PLANS_20130610STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW1��<Ci DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE��P�f% YYYYM M D D Q DEMOLITION NOTES: 1. CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL PERMITS REQUIRED FOR THE / I DEMOLITION AND REMOVAL OF THE STRUCTURES LOCATED ON THIS SITE. / I III 2. CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THE LOCAL UTILITIES THE REMOVAL OF LIGHT POLES, POWER POLES, WATER LINES, AND SEWER LINES. a — I RIM 2 MANHOLE > — -- ,\ RIM - 250N r SANITARY MANHOLE DROP INN IN = - (MO' (FROM FAST) RIM - zsass' /' `\ aI ® iWN Dui P 234.50- (TO LIFT WATON) 3. CONTRACTOR TO SAW -CUT EXISTING PAVEMENT AS REQUIRED TO REMOVE INV IN = 237.13' SS SS Liss -- ss ss ss Ss ss ss ss ss ss ss SS —� SS ss ss SS SS ss ss ss ss —�— ss ss ss ss ss SS ss SS s5 SS — ss S$ �SS ss ss ss ss ss PAVEMENT AS REQUIRED. INN OUT - 237.13' /� ILi`W' 55 Ss SS SS Ss —® ss j SS -� Y' \a IL1Rr MANHOLE — -- — _._ _. WIRARY MANHOLE .. sANRARY MANHOLE ._...... _....... ____ ___. ___. ____ _... _ __..... _.. _. U RIM = 249 05' RIM - 249:9s' -- - - - — - - — - - -- - - - - — - - _- — - - = 235.• 4. INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM ��= 235.75�....- - �' INV O 223 -_ -- - - - INV O . 235.09' -- - - - .— - �- ----- srry OUT - zse 6s• �-- INv our - z35ss' _ INv.our. - 2343I9' AVAILABLE RECORDS AND FIELD LOCATIONS WHEN POSSIBLE, BUT THE CONTRACTOR -- - a � __... _ MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES _- - _ _ __ - - - �y�ay Nryyro BY DIGGING TEST PITS BY HAND AT ALL CROSSINGS WELL IN ADVANCE OF D INLU63-- __ �:.. - _ - -' ye��eoi � TRENCHING. IF CLEARANCES ARE LESS THAN SPECIFIED ON THE PLAN OR TWELVE / y � IW OUT - 242.63 1 WHICHEVER IS LESS, CONTACT THE DESIGN ENGINEER AND THE OWNER PRIOR _ -- - -.---- - -- - -- _ ���� TO PROCEEDING WITH CONSTRUCTION. C o — FAYETTEVILLE ROAD ((US HWY. 40I ) EXISTING 15- RCP 5. THE CONTRACTOR SHALL REMOVE ALL EXISTING STORM DRAIN LINES, ASPHALT _ a VARIABLE WIDTH PUBLIC R/W TO REMAIN _ PAVEMENT, CONCRETE CURB, AND ANY OTHER EXISTING CONDITIONS WHICH WILL i _ _ ____ -------_----- _-" UT J INTERFERE WITH THE WORK AS PROPOSED ON THESE PLANS UT UT UT UT UT UT UT UT —.col — LT;. lli ,,, >L IIT ^UT — UT -- UT — UT UT -- UT UT UT JT UT — UT UT UT,_— UT ,_,_ UT UT.— UT Ul UT UT —._UT IT UT JT UT UT U 9T 11T UT UT UT UT UT 2 -- __ 250 -- - _- 249 ---..._ _ -.. ._... _. __ - -__ U U' Uf—iii-__-�.-_ "., _... _249 --E 1S• R - 'ag6..arau.�,a , T SpOCttaNl �: "-.a. - a 25O'248 `49 - . 100 - - _____ -- _ _ _ -- _ uT ur ltr--. uT-- ur --- uT i— _ �,__ uT _ -... �dr -__ - - - - - - OY -. 6. DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE, .. *JN30 '� V_. - - .i-i JAi -'-- ur _.:ur= LT u�-- - - - - - _._ - - - - - - - - - - - - - _-_ __.._.. __._.. r -' - - - w �',u a ur-ti t?--_ u — _ uy. �„� �r ��F7... B9'26'17 E -I AND LOCAL REQUIREMENTS. V UT UT Ui UT _�. U —=r � UT IP\ I � EX. B �241.60 � _. CT �f1' I - 241.76. —� SV..t.9./ UT UT - -t I SEE DETAIL CTION FENCE �4a " % �� zas 5C' SETBACK-- --� — —{ ----.... J— - LOT 15 297-1 JOSE L. MARTINEZ DB 527 Pg 710 494660001107 LOT 16 297-1 MELVIN McQUIRTER DB 383 Pg 602 494660001108 LOT 17 297-1 ROBYN L. YOUNG DB 792 Pg 833 494660001109 �j 7. ALL DEBRIS SHALL BE REMOVED FROM THE SITE AND DELIVERED 10 A LICENSED TRANSFER STATION OR LANDFILL. B. THE TRENCHES WHERE EXISTING UTILITIES HAVE BEEN REMOVED OR RELOCATE SHALL BE RECOMPACTED TO 95% STANDARD PROCTOR. 9. THE CONTRACTOR SHALL NOTIFY ALL PERTINENT UTILITY COMPANIES 48 HOURS PRIOR TO ANY DEMOLITION WORK SHALL BE COORDINATED WITH LOCAL UTILITY COMPANIES TO MINIMIZE IMPACTS ON UTILITY DOWN TIME. 10. IF ANY ASBESTOS IS FOUND ON SITE IT SHALL BE REMOVED AND DISPOSED OF IN ACCORDANCE WITH ALL FEDERAL STATE, AND LOCAL REGULATIONS. 11. REMOVE ALL DEMOLISHED ASPHALT FROM SITE. 12. SEE SHEET C2.1 FOR EROSION CONTROL MEASURES. SITE o 1 VICINITY MAP — NTS SURVEYED PROPERTY LINE X X FENCE LINE -- RIGHT OF WAY LINE LINE NOT SURVEYED ---- DITCH LINE — E UNDERGROUND ELECTRIC LINE — T UNDERGROUND TELEPHONE LINE P OVERHEAD POWER SS - SANITARY SEWER LINE -- - CTV - CABLE TV LINE -- SD STORM DRAIN LINE R/W RIGHT--OF-WAY BC BACK OF CURB EP EDGE OF PAVEMENT ® SANITARY SEWER MANHOLE (Dl STORM DRAINAGE MANHOLE (Tj TELEPHONE MANHOLE CURD INLE"r ua WATER VALVE GAS METER LIGHT POLE J.� POWER POLE L GUY WIRE 0 DROP INLET 60@ CLEANOUT 0 WELL 0 NIP NEW IRON PIN (SET) EXISTING IRON PIN (FOUND) RIGHT OF WAY MONUMENT (FOUND) COMPUTED POINT 60 0 30 60 120 240 SCALE: 1" = 60' Cape Fear Valley m Health System Architect of Record ,. p 5960 Fairview Road Suite 500 Charlotte, NC 28210 704 887.3500 887.3507 fax Consultants MECHANICALIELECTRICAUPLUMBING/FIRE PROTECTION: Leach Wallace Associates, Inc. 1200 East Morehead, Suite 280 Charlotte, North Carolina 28204 Phone:704-335-0485 Fax:T04-335-0482 STRUCTURAL: Mabry Engineering Associates, Inc. hI HR) 840 Shull Street, Suite 100 ENCINEE,RING west Columbia, South Cal 29169 �tSJfITES, [fir Phone:803-926-0000 Fax:803-926-7600 EflSCIENCE GeoScience Group G GROUP 500-K Clanton Road „ Charlotte, NC 28217 Phone:704-525-2003 Fax:704-525-2051 Project Hoke Campus Lawn City, State Hoke county, NC Project Number CH10.0011.GE Issued For For Construction Item Date Description 2. 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWQ J BCi LUf I, U 1 .p , t ty WIC re n r,.Sp/6/ 0 017 m Il e (Q�i a//3 Ar eea..�OSi4 "4f of Water J atfl Drawn By - JLR Checked By - KSC Seal / Signature Sheet Title EXISTING CONDITIONS A DEMOLITION PLAN Date 10.5.12 Sheet Number O I ms occurrent is me property or KFA Uesign ano HrA Uesign retains all ngnts tnerein, incluamg copyngnts. It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, ano compensation to, RPA Design. 1 LOT 5297-1 I ROBERTS. GOODWIN & wf. JENNIFER A. GOODWIN I �. DB 525 Pg 627 494660001097 w I QI L WI. EI I 1 LOT 6 297-1 I ROBERT H. SCHEEL & wf. I JENNIF"ER J. SCHEEL DB 675 Pg 935 494660001098 I f I E I LOT 7 297-1 I ROBERT JONES & wf. I , GLADYS S. JONES DB 339 Pg 212 1 494660001099 I LOT 8 297-1 SAMUEL C. WRIGH1 DB 292 P 565 ----50' SETBACK-- ------------- \ NC GRID STREAM FEATURE) WETLANDS DO 662 161 69 9 49466000110C --. - i r •, 56 I '. I e - -' ''S� ,,' LOT 9 297-1 I .. L .,.,Ny*•" JASON W. MYERS _ •- 5! DB 530 Pg 166 •: 494660001101 W VI wM^ i i LOT 10 297-1 ' -'• BLAIN M. WAY & wf. 0 ANNIE M. WAY •• `T; t'"P DB 396 Pg 095 I'1 s `- 494660001102us 1 { 1 7 I • I ' .., �' LOT 11 297-1 '=- ` .,- REUBEN G. SMITH & wf. •,,. r DEBORAH M SMITH DB 634 Pg 702 494680007103 [ 1 t y W '.r. Wv. WvyM .....pM_ 11 LOT 12 297-1 SERGIO A. RIDDLE & wf. ULRIKE M. RIDDLE DB 296 Pg 016 • �_.., 494660001104 i[il ,. ,- -- -•W - 3. ••-- �,. e s _ ,�»Qgg J e R� 4 f n LOT 13 297-1 TERRY D. SHAW Z DB 441 Pg 519 494660001105 / 2 IP l � F`. ( t ,.y LOT 14 297-1 SHANDRICK R. GLENN & wf. • LASHONDA N. GLENN -. -� .. - "" •� ~ r• Be 527 Pg 778 I 494660001106 EIP LOT 15 297-1 I .. JOSE L. MARTINEZ .....�..,. jii .. -'•^ DB 527 Pg 710 I ""- �_- / • i' •'' 494660001107 ❑ LOT 16 297-1 MELVIN MCQUIRTER DB 383 Pg 602 494660001108 LOT 17 297-1 Pool. ROBYN L. YOUNG o DB 792 Pg 833 494660001109 STREAM FEATURE 73 74 75 4 76 \53 77 51 I 50 78 79 80 WETLANDS DO NOT DISTURB 444 \43 42 84 41 1,40 86 ON OT DISTURB / THM: TOP OF HYDRAI 'Ile / / / �O ELEVATION 245.06' y / SITE VICINITY MAP — NTS 60 0 30 60 120 240 SCALE: 1" = 60' Cape Fear Valley Health System Architect of Record f rpa »k 5960 Fairview Road Suite 500 Charlotte, NC 28210 704 887.3500 887.3507 fax Consultants MECHANICALIELECTRICAIJPLUMBINGIFIRE PROTECTION: Leach Wallace Associates, Inc. 1200 East Morehead, Suite 280 Char CharloCe, North Carolina 2820404 Phone: 704335-0485 Fax: 704-335-0482 STRUCTURAL: Mabry Engineering Associates, Inc. 840 Shull Street, Suite 100 West Columbia, South Carolina 29169 Phone: 803-926-0000 Fax: 803-926.7600 GEgSCIENCE GeoScience Group GROUP 500-K Clanton Road G �roR � Charlotte, NC 28217 Phone:704-525-2003 Fax:704-525-2051 ARCHITECTURAL CONSULTANT: TSP 1112 N. West Ave. Sioux Falls, SD 57104-1333 Phone 605336-1160 Fax 605-336-7926 Project Hoke Campus Lawn City, State Hoke county, NC Project Number CH 10.0011.GE Issued For For Construction Item Date Description 2, 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWO is 1 Wltr-:. Witt) I V' vrt4 :'Lr ,+ ` q, LL��rr,,DDSW�! 0..5p'7 MaD ,r Drawn By - JLR Checked By - KSC Seal / Signature A$ Sheet Title OVERALL SITE PLAN Date 10.5.12 Sheet Number 1.1 o v�wm,y o es,yn cmyn nyin ing cowrignis. t may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto. t may not be used for any other purpose except with the express written agreement of, and compensation to, RPA Design. _4NC GRID SITE VICINITY MAP — NTS FAYETTEVILLE ROAD- _ (US HWY 401) - - VARIABLE WIDTH PUBLIC R W _ - - s:, -_ -_ - -- — — — ---- T UT UT U T — _— UT UT - UT U I ----- UT -- UT -- - lJl -- UT --- UT -- - UT -- T --- U" - UT UT -- UT — UT --- U, --- UT --- UT - UT — UT UT U! — UT -- UT - UT ----- UT - U r - - U T --- ;, I r IT __—_ u l - ;l - U1 UT _ _ U i �/ -- u�� - UT --- - UT UT -- - JT - - ur - ur Ur - uT - - Ur UT uT - - UT — UT - - uT ur -- l l -- N� 89°26'17' Ur - UT - --,UT - UT - UT - Ur - Ui - C UT - (I l IJT Ul -- l Tl --- Jl & — — — - — _ - E 1563.97 pr „— '�] - uT -- UT — 100 A_� GENERAL SITE NOTES A. TOPOGRAPHIC SURVEY DATA PROVIDED BY: GEOSCIENCE GROUP, INC 704.525.2003 B. OWNER/DEVELOPER: HOKE HEALTHCARFE, LLC c/o CRITERION HEALTHCARE, LLC PO BOX 207 CONCORD, NORTH CAROLINA 28026 704-307-3343 C. ARCHITECT RPA DESIGN 5960 FAIRVIEW ROAD, SUITE 500 CHARLOTTE, NORTH CAROLINA 28210 704-887-3500 D. ALL CONCRETE SIDEWALKS SHALL BE FULL 4" THICK 3600 PSI CONCRETE WITH 1" DEEP GROOVE CONTROL JOINTS AT INTERVALS INDICATED ON ARCHITECTURAL PLAN. PROVIDE EXPANSION JOINTS ADJACENT TO ALL RIGID STRUCTURES. EXPANSION JOINT SPACING SHALL NOT EXCEED 30'. E. ALL DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. F. CONTRACTOR SHALL COORDINATE NTH THE PROPER UTILITY COMPANIES AND GOVERNMENT AGENCIES PRIOR TO COMMENCEMENT OF WORK. G. ALL DISTANCES AND DATA SHALL BE CHECKED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION, IN CASE OF CONFLICT, THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY SO THAT CLARIFICATIONS MAY BE MADE PRIOR TO THE START OF CONSTRUCTION. H. THE PROPOSED GRADES AS SHOWN ARE THE FINISH GRADES UNLESS OTHERWISE SHOWN. I. THE CONTRACTOR SHALL SUPPLY AND ESTABLISH SURVEY CONTROL, INCLUDING THE HORIZONTAL AND VERTICAL CONTROL POINTS. THE CONTRACTOR SHALL MAINTAIN THIS CONTROL AND PROVIDE ALL BENCHMARKS, STAKES, GRADES, LEVELS, AND LINES NECESSARY FOR CONSTRUCTION. J. ALL EXISTING PAVEMENT AND CONCRETE TO BE JOINED SHALL BE SAWCUT. K. HANDICAP REGULATIONS: a. A HANDICAP PARKING SPACE SHALL HAVE NO GREATER SLOPE THAN 2% ACROSS THE SPACE. b. HANDRAILS ARE TO BE PROVIDED ON HANDICAP RAMPS WITH A DROP OF TWO INCHES OR MORE. MAXIMUM RAMP SLOPE = 8.33% c. ALL HANDICAP RAMPS AND SPACES WILL COMPLY WITH THE LATEST ADA STANDARDS. MAXIMUM ACCESSIBLE ROUTE SLOPE = 5% d. ALL CROSS SLOPES ALONC AN ACCESSIBLE ROUTE SHALL NOT EXCEED 2% SLOPE. L. SEE PLUMBING PLANS FOR EXAC ^^ATION AND SIZE OF WATER, SEWER, AND ROOF DOWNSPOUTS. M. SEE ARCHITECTURAL PLAN FOR BUILDING DIMENSIONS, FEATURES, STAIRS AND HANDRAILS, ETC. N. CONTRACTOR TO CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE APPLICANT. 0. SITE SIGNAGE, IF ANY, WILL BE PERMITTED SEPARATELY. P. ALL DRIVING SURFACES SHALL BE CAPABLE OF SUPPORTING 80,000 LB FIRE APPARATUS. O. BEFORE YOU DIG STOP. CALL THE NC ONE —CALL CENTER AT 1-800-632-4949. IT'S TER LAW. STREAM FEATURE WETLANDS DO \ NOT DISTURB TREE PROTECTION FENCE SEE DETAIL PLAZA MATERIALS LEGEND 1 NC GRID TREE PROTECTION FENCE SEE DETAIL TREE PROTECTION FENCE SEE DETAIL TREE PROTECTION FENCE SEE DETAIL APPROX. SH WT= 242.00 62 IM 67 F I WETLANDS DO NOT DISTURB I/ WETLANDS DO NOT DISTURB STREAM FEATURE Cape Fear Valley Health System Architect of Record rmdedign 5960 Fairview Road Suite 500 704 arlotte, NC 28210 887,3500 887,3507 fax Consultants MECHANICAUELECTRICALIPLUMBINGIFIRE PROTECTION: AWLeach Wallace Associates, Inc. 1200 East Morehead, Suite 280 Charlutte. North Carolina 28204 Phone:704-335-0485 Fax: 704-335.0482 STRUCTURAL: Mabry Engineering Associates, !nc. 840 Shull Street, Suite 100 EN';I�EIiRI;NG West Columbia, South Carolina29169 5' Ot I TT!'J. INC Phone: 803-926-0000 Fax:803-926-7600 CI GEaSC[ENCE GeoScience Group 500-K Clanton Road GROUP Charlotte, NC 28217 Phone:704-525-2003 Fax:704-5255-2051 ARCHITECTURAL CONSULTANT: rm�lbTSP 1112 N. West Ave. Sioux Falls, SD 57104-1333 Phone 605-336-1160 Fax 605-336-7926 Project Hoke Campus Lawn City, State HoKe county, NC Project Number CH 10.0011.GE Issued For For Construction Item Date Description 2, 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWQ 4. 2-1-13 Revisions per NCDENR/DWQ Ov ,- osN6i/oso� rnan : � 6�is�[3 Drawn By - JLR Checked By - KSC \\ i 101 Seal / Signature 69 61 xacC SEAL <% 10725 AL eo Sheet Title PHASE 2 SITE PLAN Date 10.5.12 Sheet Number C1 document is the property or FWA uesgn and RYA Design retains all rights therein, including eepynghts. It may only be used in a manner consistent with RPA Design§ rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto. it may not be used for any other purpose except with the express written agreement of, and compensation to, RPA Design. 30 0 15 30 60 120 SCALE: 1" = 30' L E G E N D 0 SURVEYED PROPERTY LINE x X FENCE LINE m RIGHT OF WAY LINE OG/� MITnE LN c LINE NOT SURVEYED DITCH LINE O P E UNDERGROUND ELECTRIC LINE - T UNDERGROUND TELEPHONE LINE 000 I P OVERHEAD POWER C'O SS SANITARY SEWER LINE CTV - CABLE TV LINE 401 I SD - STORM DRAIN LINE SITE R/W RIGHT-OF-WAY BC BACK OF CURB STONEY EP EDGE OF PAVEMENT Gy oDy SANITARY SEWER MANHOLE !.I STORM DRAINAGE MANHOLE 8 TELEPHONE MANHOLE g"y Will CURB INLET O2 \ I 25 ►� WATER VALVE © GAS METER \ LIGHT POLE YL ® POWER POLE P .L GUY WIRE Oc ❑ DROP INLET CPQo CLEANOUT Z 0 ® WELL O NIP NEW IRON PIN (SET) EXISTING IRON PIN (FOUND) _.._ _ _... .- -..._. _....... __... __- RIGHT OF WAY MONUMENT (FOUND) VICINITY MAP - NTS COMPUTED POINT „ x - - Y,'RD INLET 44W .-247--63= NV OUT = 242.63' a- LIMIT OF CONSTRUCTION - -- --_ - -__ _-------- - - - - ----_---------_--_----__- -__ -- --------__----------- -- --- ADD RIPRAP APRON--- -- -- - -- -- vnmm`T71TTT T V TD(1 A n (TTC T4WV do 1 1 TO EX. RCP �� _ - - - - --��-'245 TEMP. SILT FENCE 2qg ` EE DETAIL -.. - . TEMP LT . FE 1 2 /' 50.6 SEE DE. GENERAL GRADING & SITE NOTES: % 48.9 43 ,6 1. THE UTILITIES AND THE LOCATIONS THEREOF, SHOWN ON THE DRAWING, REPRESENT THE DESIGNERS O i 48.2 2 UNDERSTANDING OF EXISTING UTILITIES IN THE CONSTRUCTION AREA. THE CONTRACTOR SHALL VERIFY THE LOCATION, DEPTH AND EXISTENCE OF ALL UTILITIES (ELECTRICAL, MECHANICAL, WATER, TELEPHONE, GAS, ETC.) WITHIN THE CONSTRUCTION AREA WITH THE OWNER AND/OR THE APPROPRIATE UTILITY COMPANY PRIOR TO BEGINNING ANY EXCAVATION. THE OMISSION OF, OR THE INCLUSION OF UTILITY LOCATIONS ON PLANS IS NOT TO BE CONSIDERED AS THE NONEXISTENCE OF, OR A DEFINITE LOCATION OF EXISTING UNDERGROUND UTILITIES. ANY DAMAGE TO EXISTING UTILITIES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE. CONTACT U-LOCO (800-632-4949). 2. ALL CONSTRUCTION AND CONSTRUCTION MATERIALS WITHIN STREET RIGHT-OF-WAY SHALL CONFORM TO THE STANDARD SPECIFICATIONS OF NCDOT. 3. ALL HANDICAP RAMPS, PARKING SPACES, ETC. TO MEET ALL ADA AND NC ACCESSIBILITY CODES. 4. THE CONTRACTOR SHALL REFER TO ARCHITECTURAL PLANS FOR THE LOCATION AND DIMENSIONS OF BUILDING AND SURROUNDING AREAS. 5. DEWATERING: THE CONTRACTOR SHALL AT ALL TIMES PROVIDE AND MAINTAIN AMPLE MEANS AND EQUIPMENT WITH WHICH TO REMOVE AND PROPERLY DISPOSE OF ANY AND ALL WATER ENTERING THE EXCAVATION OR OTHER PARTS OF THE WORK AND KEEP ALL EXCAVATION DRY UNTIL SUCH TIME AS PIPE LAYING AND GRADING IS COMPLETE. NO WATER SHALL BE ALLOWED TO RISE AROUND THE PIPE IN UNBACKFILLED TRENCHES NOR SHALL IT BE ALLOWED TO RISE OVER MASONRY UNTIL THE CONCRETE HAS SET (MIN. 24 HRS). ALL WATER PUMPED OR DRAINED FROM THE WORK SHALL BE DISPOSED IN SUCH A MANNER AS TO PREVENT SILTATION AND EROSION OUTSIDE DENUDED LIMIT. EROSION CONTROL NOTES 1. ON -SITE BURIAL PITS REQUIRE AN ON -SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 2. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE LOCAL EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3. AN APPROVED EROSION CONTROL PLAN IS REQUIRED FOR: A) ANY LAND DISTURBING ACTIVITY WHICH UNCOVERS ONE OR MORE ACRES OF LAND. B) ANY LAND DISTURBING ACTIVITY WHICH UNCOVERS ONE-HALF (1/2) ACRE OR MORE OF LAND WITH AN AVERAGE SLOPE OF 16 PERCENT TO 25 PERCENT IN ITS NATURAL STATE. THE AVERAGE SLOPE SHALL BE CALCULATED ONLY FOR THE DISTURBED AREA. C) ANY LAND DISTURBING ACTIVITY WHICH UNCOVERS ONE -QUARTER (1/4) ACRE OR MORE OF LAND WITH AN AVERAGE SLOPE OVER 25 PERCENT IN ITS NATURAL STATE. THE AVERAGE SLOPE SHALL BE CALCULATED ONLY FOR THE DISTURBED AREA. 4. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. ALL EXPOSED SLOPES MUST BE SEEDED AND MULCHED (TEMPORARY GROUNDCOVER) WITHIN 15 WORKING DAYS, BUT NO MORE THAN 21 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING. PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS MUST BE ESTABLISHED WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDAR DAYS FOLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 5. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE EROSION CONTROL INSPECTOR DUE TO FIELD CONDITIONS. CONSTRUCTION & EROSION CONTROL SEQUENCE 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDENR. 2. SET UP AN ON -SITE PRECONSTRUCTION CONFERENCE WITH NCDENR EROSION CONTROL INSPECTOR TO DISCUSS EROSION CONTROL MEASURES. 3. INSTALL TEMPORARY CONSTRUCTION ENTRANCE, SILT FENCE AS SHOWN ON C2.1. CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 4. CALL FOR ON -SITE INSPECTION BY EROSION CONTROL INSPECTOR. UPON INSPECTOR APPROVAL OF INSTALLED EROSION CONTROL MEASURES, CLEARING AND GRUBBING MAY BEGIN. 4A. CUT DIVERSION DITCH AT HIGH SIDE OF PAVEMENT TO DIVERT SEDIMENT FROM PERMEABLE PAVEMENT AREA. SOIL SUBGRADE SHALL BE SCARIFIED IMMEDIATELY PRIOR TO INSTALLING AGGREGATE BASE 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 7. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 8. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPART. OF AGRICULTURE, U.S. SOIL CONSERVATION SERVICE. 9. THE CONTRACTOR SHALL FOLLOW ALL NPDES RULES AND REGULATIONS AND SHALL CHECK, MAINTAIN AND REPAIR ALL EROSION CONTROL DEVICES ON A WEEKLY BASIS OR AFTER 1/2" OR MORE RAINFALL. CONTRACTOR SHALL KEEP A RAIN GAUGE ON -SITE AT ALL TIMES, AND SHALL ALSO KEEP A DETAILED LOG OR JOURNAL OF RAIN GAUGE MEASUREMENTS AND MAINTENANCE PROCEDURES UTILIZED. NOTES: SURVEY BY GeoScience Group Inc., 704-525-2003 Before you dig STOP. Call the INC One -call Center at 1-800-632-4949. IT'S THE LAW. LEGEND NFGt Sor at 1­hlr,Penmf Ah (NCGOI) COEnR/D s nd'i1se,0iaty • te e\ 4 Z, y \ LIMIT OF CONSTRUCTION - - - - - \ t t r 1 ° r, ! \/// L •• ., ~ dt TEMPORARY SILT FENCE Q - -a-o- s �. , L i 3 TREE PROTECTION FENCE SITE AREA DESCRIPTION STABILIZATION TIMEPRAME EXCEPTIONS STABILIZATION IN 7 DAYSmom O Perimeter dikes, swales, ditches slopes ]days None High Quality Water [HOW) Zones 7 days iNone ._.._.._.... .._......___ ._ Slopes steeper than 3:1 -• .._Y...... ....._- r da s - -_. __. ........ H slopes are liter less in length and are than 2:1, 14 days notsteeper are allowed. - L_ Slopes 3:1 or flatter 14 data ''i 7 days for slopes greater than 50' jn Iottgth- All other areas with slopes flatter than 4:1 14 days None, except for perimeters and HOW Zones. DENUDED AREA: 1.4AC 30 D 15 30 60 120 SOIL TYPE: NORFOLK SCALE: 1" = 30' Cape Fear Valley Health System Architect of Record r s i 5960 Fairview Road Suite 500 Charlotte, NC 28210 704 887.3500 887.3507 fax Consultants MECHANICAUELECTRICAIJPLUMBINGIFIRE PROTECTION: Leach Wallace Associates, Inc. 1200 East Morehead, Suite 280 Charlotte, North Carolina 2B204 Phone:704-335-0485 Fax:704-335-0482 TRUCTURAL: "+IABf} EVI NELRING l�solltTiS', i`ic ..r Mabry Engineering Associates, Inc. 840 Shull Street, Suite 100 West Columbia, South Carolina 29169 Phone: 803-926-0000 Fax:803-926-7600 GEoSCIENCE GeoScience Group G500-K Clanton Road GROUP n, a Charlotte, NC 28217 Phone:704-525-2003 Fax:704-525-2051 ARCHITECTURAL CONSULTANT: TSP 1112 N. West Ave. Sioux Falls, So 57104-1333 Phone 605-336-1160 Fax 605-336-7926 Project Hoke Campus Lawn City, State moKe county, NC Project Number CH 10.0011.GE Issued For For Construction Item Date Description 2. 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWO 4. 1-25-13 Revisions per NCDENR/DWO _ lh Iha. -SfJ>�l/05d'7'/�'Job :�4(ior/3 4.20A a� L Drawn By - JLR Checked By - KSC Seal / Signature Sheet Title GRADING & EROSION CONTROL PLAN Date 10.5.12 Sheet Number C2A s document Is the property of RPA Design and RPA Design retains all rights therein, including copyrights. It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, RPA Design. I � I ► u TREE PROTECTION FENCE SEE DETAIL \\ 50' SETBACK STREAM FEATURE WETLANDS DO:::::! NOT DISTURB TREE PROTECTION FENCE - SEE DETAIL .i1" NC GRID 3/431 METER & -3/4" ABOVE GRADE REDUCED PRESSURE ASSEMBLY PER HOKE COUNTY STANDARDS SITE o u�TyiriY 11'���a►Y 1�` UT --- UT --- — 'UT — — U T --- UT UT — UT i — — UT UT — — li �T _ UT — _ UT NC GRID TREE PROTECTION FENCE SEE DETAIL TREE PROTECTION FENCE SEE DETAIL rocs nonTCvTION FENCE 'PROX.SHWT=242.00 UT -- UT I/ WETLANDS DO NOT DISTURB STREAM FEATURE Cape Fear Valley Health System Architect of Record a rpladesign 5960 Fairview Road Suite 500 704 arlotte, NC 28210 887.3500 887,3507 fdx Consultants MECHANICAUELECTRICAUPLUMBINGIFIRE PROTECTION: AVLeach Wallace Associates, Inc. 1200 East Morehead, Suite 280 Charlotte, North Carolina 28204 Phone: 704-335-0485 Fax:704-335-0482 STRUCTURAL: h91}iliT E�Gliti`F,F,R[NT; :I Mabry Engineering Associates, Inc. B40 Shull Street, Suite 100 West Columbia, South Carolina 29169 Phone:803-926-0000 Fax: 803-926-7600 E�SCIENCE GeoScience Group G500-K Clanton Road GROUP Charlotte, NC 28217 Phone:704-525.2003 Fax:704-525-2051 ARCHITECTURAL CONSULTANT: TSP 1112 N. West Ave. Sioux Falls, SD 57104-1333 Phone 605-336-1160 Fax 605-336-7926 Project Hoke Campus Lawn City, State Hoke county, NC Project Number CH 10.0011.GE Issued For For Construction Item Date Description 2, 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWQ SN�Io So /r/oD (i�i a/i3 Drawn By - JLR Checked By - KSC Seal / Signature Sheet Title PHASE 2 SITE PLAN Date 10.5.12 document,e the property dt KHA Uee,gn and NYA Ues,gn retains an rights tnerem, including copyrights. It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein or extensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, RPA Design. 30 0 15 30 50 120 SCALE: 1" = 30' Sheet Number C1 m2 t 4max---_19- uage hardware cloth ' .._.__.-_ 9 _____________ {x mesh openinos) 3' NCDO1#5 or #57 2: washed stone it--------r--- �"s L_w .... V 16" 2' NCDOT #5 or #57 filtered washed stone Nvatev Figure 6.51a F{arzAmare clots• and gravel inlet prelectior, Construction L t ni£onnty grade a shallow depression approaching the inlet. Soeciricat}ons 2 DiIi,e 5 out steel posts 2 feel, into life around wirounding the i t:et `r_ee pos ts evenly around the pfirali te, of the i:rlei_ iti,anm il l 4 sect zpiIT I 3. Surround the IT, is vilith wire mesh hardware 6,rh. Secure Lie vire mesh to the iacol posts ',I[ the top :piddle. and bons I r Placing a ?-fifer lsr4n of the wire mesh under the graver Tyrant hornig is recommended. 4. Place clean Snivel INC DOT.I'i5 or P57 stone) on a 2: t slope with a Ineight of } 6 inches around the wire, .arid ssnooth an es -en grade. $. Once the uaniribuiirz dtantage area has beer stabilized, rerlove ac,clailifittled serf rnerd, and establish fin a] r_rlaing by/loos, G Compact file arcs porneriv and stand ed it will greundcever_ Maintenance hs1r cii;es ill as ws+k]Yan t ati i act vt❑ih f ur ti a Sle1' ) rainfall event (let,; the n sh w�,e of am deb is of ilbei object provide adequate Flo H for uihseq ient rains. lake ..de not In dairI or and( a,,: the w: -, .mesh drat imp sedunent rCanocal. Replace clan • ss r. eecied. -i-EMPORARY INLET PROTECTION R' MAX Jlt WOVEN FILTER FABRIC 0 I N GENERAL NOTES: 1. FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 2. WOVEN FILTER FABRIC BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 3. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF -FASTENER ANGLE STEEL TYPE. 4. TURN SILT FENCE UP SLOPE AT ENDS, 5. ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN GRADING IS ADJACENT TO SWIM BUFFERS, STREAMS OR WETLANDS REFER TO SWIM BUFFER GUIDELINES THE COLOR ORANGE IS R ( ) ESEVED FOR VISUAL IDFNTIFICAIION Uf ENVIHONMf NIALLY SENSITIVL AREAS. 6. DRAIN AGE AREA CAN NOT BE GREATER E THAN 1/4 ACRE PER iDOFT OF FENCE. 7 SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6 szA MAINTENANCE NOTES: NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. DO NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS OR 1. FILTER BARRIERS SHALL BE INSPECTED BY THE FINANCIALLY OTHER AREAS OF CONCENTRATED FLOW. RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH SEE APPROVE[ PRESERVATION REQUIRED RAO OF TREE BARF GENTLE SLOPES STEEP SLOPES SEEDING MIXTURE BO Ibs/acre of tall Issue 100 Ibs/acre tall fescue 30 Ibs/acre Sericea lespedeza (unscarified after August 15) 10 Ibs/acre Kobe lespedeza FALL: August 25 - October 15 FALL: August 25 - October 15 Late winter: February 15 - April 15 Late winter: February 15 - April 15 SEEDING To extend spring seeding into June, add To extend spring seeding into June, add DATES 15 Ibs/acre hulled Bermudagrass 15 Its/acre hulled Bermudagrass Overseeding of Kobe lespedeza over fall -seeded Overseeding. of Kobe lespedeza over fall -seeded tall fescue is very effective. tall fescue is very effective. SEEDING Apply lime and fertilizer per soil tests, or 4000 Apply lime and fertilizer per soil tests, or 4000 AMENDMENTS Ibs/acre limestone and 1000 Ibs/acre 10-10-10 Ibs/acre limestone and 1000 Ibs/acre 10-10-10 fertilizer. fertilizer. NOTE 1 Ground Cover-- Protective cover must be established on all disturbed areas within 21 calendar days after land disturbing activity is completed or has temporarily ceased. NOTE 2 Graded slopes and fills --Protective cover must be established on all graded slopes and fills within 21 calendar days after a phase of grading is completed or has temporarily ceased. Maintenance Generally, a stand of vegetation cannot be determined to he fully established until soil cover has been maintained for one full year from planting. Inspect see ded ed areas yeas for failur e and make necessary ecessar re pairs a rrs and resaedin s within 'i the Sarre season, if possible. Reseeding -If a stand has inadequate cover, re-evaluate choice of plant materials a lime quantities of sine and ienilizer. Re-estatrlis}Y the stand after seedbed preparation or over -seed the stand. Consider seeding temporary, annual species if the time of year is not appropriate for permanent seeding (practice 6.10, Temporary Seeding). li'vegetalion t fa ils to grow, •u tl Most he te sted ed to deter mine Tf, �i tc do nutr ient v or u1t i en t imbalance is responsible. Fertilization --on the typical diSIUrbed site, full establishment usually requires refeltilization in the second growing season. Fine turf requires annual maintenance fertilization (Table li tise soil tests if possible or follow the guidelines given for the specific seeding mixture. (Tables 6,1 Is, through 6.1 IV). PERMANENT SEEDING SCHEDULE Pipe Outlet to Flat Area-. - STEEL Posr No Well-defined Channel FILTER FABRIC =do A SKIRT 6" MINIMUM - STEEL POST FILTER FABRIC 15 WASHED STONE FLOW QF' IN LIEU OF BURYING SKIRT, 6" OF 5 WASHED STONE MAY BE USED OVER TURNDOWN. RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. SHOULD THE FABRIC DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL IS NECESSARY, THE FABRIC SHALL BF REPLACED PROMPTIY. 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH APPROX. HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. Maintenance Inspect sediment fences at least once aweek and doer each rainfall. Make ally required repairs immediately. Should the fabric of a sediment fence collapse, tear, decompose ar become ineffective. replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next rain and to reduce pressure on the fence. Take care to avoid undermining the fence during cleanout. Remove all fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after tale contributing drainage area has been properly stabilized. TEMPORARY SILT FENCE NOTES: 1. REMOVE ALL BARRIERS UPON COMPLETION OF PROJECT, 2. SEE PLANS FOR LOCATION OF ALL TREE PROTECTION FENCES. 3. REFER TO CITY OF CHARLOTTE LANDSCAPE CONSTRUCTION STANDARDS MANUAL FOR GENERAL SPECIFICATION REGARDING TREE PROTECTION. PLAN VIEW OF ROOT ZONE FOR PRUNING SEE ONE F NATIONAL ARBORIST INCH ( ASSOCIATION SPECS. OR 1/ WHICHI DEAD TREES AND SCRUB OR UNDER GROWTH SHALL BE CUT FLUSH WITH ADJACENT GRADE. NO GRUBBING ALLOWED UNDER DRIP LINE. 2x4" STANDARDS + lx4" RAILS OR ORANGE SAFETY FENCING MAY BE USED. TREE PROTECTION DETAIL Fite W1 ►� wr r IN •M+}r• ,teat, r ••: 4040010I � ry:�f!♦1 ♦- �. !I• 10-0 Ol r�•f• 4. l 1f6rliI.,l. itipjL► 17•},♦/R♦. t�i •.I•I+II ;+it 11I1III lIlII .,I I i . �)��M. _ cif... •si �. area • ♦ I f • � I R ♦ .. I k �� •*/I45%. dlr��•+I�/y �+0+ 1♦��� �•, oaf s+'I •�• „ ��: Wit:+ftt�r�2:����1►�2f Filter blanket Figure fi4tc Riprep Outlet proiecNon (morfifiad from Va SWCG)_ 9" min rarer darn Plan View 15'min. Cross -Section View Figure 6.83b Stone, check clam stone should be, placed over the channel banks )o keep water from Cutting around the dam. Construction I. Place Stone to the lines and dimensions shown in the plan On a filter fabric Specifications foundation. 2. Keep the center stone section at least 9 inches below natural ground level where the dam abuts tile channel banks. 3. Extend stone at least 1.5 feet beyond the ditch bank (Figure 6.83b) to keep water from cutting around the ends of the check darn. 4 Set spacing between dams to (assure that the elevation at the top (if the lower dam is the stone as the toe elevation of fhc upper dam, 5. Protect the channel after the lowest check dam from heavy flow that could cause erosion. 6. Make sure that the channel reach above the most upstream dam is stable. 7. Ensure that other areas of the channel, such as culvert entrances below the check dams, are not subject to damage or blockage from displaced stones. Maintenance Inspect check dams andchatwels at least weekly and after each significant (112 inch or greatel) rainfall event and repair immediately. Clean out sediment„ straw, limbs, or other debris that could clog the channel when needed Anticipate submergence and deposition above the check dam and erosion from high flows around the edges of the dam. Correct all damage immediately. if sin ificant erosion occurs between dams, additional measures can be taken such as, installing a protective riprap liner in that portion of the channel (Practice 6.31, Ripr^ap-line and Paved Channels). Remove sediment accumulated behind the dams as needed to prevent damage to channel vegetation, allow the channel to drain through the stone check dam, and prevent large flows from carrying sediment over the dam. Add stones to dams as needed to maintain design height and cross section. CHECK DAM Table 6,101 Temporary Seeain, Recommendations to Summe. .. .._........__....- Seeding mixture Species Rate (ibracre) German I itiial 40 Irr the Piedmont end Mauntatns, a small -stemmed Sudangril maybe j ' substituted at It rate of Sg lbtacsa. Seeding dates MoutNains-May 15 - Aug, 15 r'iadmant Mll Aug, 16 I Coastal Plain ­Apr16 Aug 15 Soil amendments Fnlirw it (ommencah re of sol it,iiiii or apply 2,000 ItHacfe ground iera agf tmflara. limestone and 750 ibtacre 0 ' 1) "i ..zer ir. j Mulch Applynn')bIt if'tsitiAw.AniOlrisrstrawbylolanq N'1€h 04(ahiil, anti era match anchoring toot. A disk with blades let, nl,et3y straight cafi On, I (:fatal as a mWch anchont. _ `Dr:. Maintenance Refeniise IT, . riot AJ:y adoq l i c_ rtv,,:.e roe i tli;ze and atill, is rnen aiety totto"i tg e a>;:.,n or fits.,( ispl,go. Tattle 6,1 g1 Temporary Seadmt Recommendations for Est Seeding mixture Species Rate oblacre) Five (t,: a:n: tIft seeding tlafns i t aun:alns-A,,g 15 ?x:_is, t <aSI a: Pia€n ina Piedmont A, i Soil ameadnaaote 'ntiaw So, lest& Or apply 2,100 a.eue pima d ,:, chit i+ ,. ., fatal rviee£txta ,a :: t S)0ti ib a„re ;: J- 5 fain :rzea Mulch (Apply 4 IXTO a csl 9a. Anvf x s r m h,to Aing ste- pio nc ding i Of am, ha IhxmT het. A dmi, wrt,Lradra.I3.nre,. y ltra:phi iirm be, ;;SIKI. si t Ala t>nP h tM g R.I MdintepanG e au i a,. r F ei iliXe let - h r ':,e , ens a n'eo a n y t ir,lmcs mu, oc I R t N.+;rn-lent a;1 t <n^,;s dry (elan' c r aL' rye La)I nd Zi is, ovv'.,5ae w h 60 lbviltirc Kb& Plainctl, tlac oasta, alaiul ,, K.rrr•an .Mo. n.a ,_ <.SprG aza in fail, "brow, as , tv;ach.. 1 Table 6.10; Temporary Saddle Recommendations for Leh Winter and Early Spr€m Seeding mixture Species Rate (lblacm) ay< loran) 20 Ahevai €espanrea IK,:be€rr piedmont anal Cc ostai Pia" Kotulais, tdaunia. as) .10 I On•A annual lespeceza whe=: itry>pn ai !amp.vary ; rm, i; Rol €n' 'A find ,eywc c c seeding dawn Mnunt,a.'. il--Fib Above _ . * feat: r fib. 35 - MaY t5 Below 2500 fact Fah.' May 'I Pledmwl.._Jim 1 - May I Ccama PAM,-Dec.1 At,,, t5 Soil arnendments Dif iw roNmms 9 ior3y of SD9 fist n a> fig 1. ' !b.acre: g«;.: id i aynr_tnf,M and toady- F'.bibsc.c 10 o too rblize; Mulch a ) < tXTO slittIll. shavy, f.'.ch., w £ Y Mt long' h aspnafl ,vki u rs+r�ss auto^ Matntenami RF tY ze itfront, fit n Tf if,atOO catF L-cud E?.r 3-�c dad n.:.Y! lr i ly k'.:ya 4Si :n nr tlar s&e. f �.._..... TEMPORARY SEEDING SCHEDULE •ws•a♦str����wt Construction I. Clear the entrance and exit area of all vegetation, roots, and other abjec6onible material and properly grade it. Specifications 2. Place the gravel to the specific grade and dimensions shown on the plans, and siavoth it. 3. provide drainage to carry water to a sediment trap or other Suitable Dulled. 4. Use geotextile fabrics because they improve stability of tile foundation in locations ,, ti Des subject to see. a 1 c o. high ware 7 r table. p .� b hlanitatn the Fravel pad In a condition tO prevent mud co -sediment from Maintenance cavink ale, construction site This may require periodic lopdressing with 2- inch stone. After each rainia,l, inspect any structure used to trap sediment and clean it out as necessary`. hnmediatejy remove all objectionable materials s}ailled, i,t:,he<l, or it-it(ked onto p tlbhc roadv:a, , TEMPORARY C0NSTUCTiON ENTRANCE Construction 1• tinusethattlie subgradeforthe fi]let and ripraptiaikawsthcrcall, red PTies and grades shown Ili the plan Compact win tilt icqumcd in life st b t Ida to that Specifications densityofthesurruundingwadisturbedmatcflal, i.ow areas in the abg,adeon Tmdisturbcd soil Inay also he filled by Increasing the riprap thickness. 2. 1 riprap and gravel filter must conform fo the specified grading joints shown on the plans COMPACTED BERM 3. Filter cloth, when used, must meet design icqu lenenls and he properly c�tovsrg the ripa'gr and pleatng any hcrnpi tt, f.li'hiaa r r ih over tn� dT mag d NATURAL GROUND are( All exmne ITIal joints should overlap so the top ;dyer rho<c the NOTE: downstream lays a minimum of i fool ltf"the drum) c is oxIon,, c. replace _ the entire filter cloth_ 1. DITCH SHOULD HAVE LONGITUDINAL SLOPE OF 1%. 4. R.iprap may be placed by equipment, but take care to avoid damaging the 2. SILT FENCE MAY BE REQUIRED BEHIND BERM filler, 5. The minirnum thickness of the riprap should be 1.5 dries the maximum WIDTH AND N.1; store diameter. DEPTH TO BE DESIGNED L G 6. Ripiap may be field stone or rough quarry stone. It should be hard, BY ENGINEER (1' MIN) ROU/VD angular, highly weather -resistant and well graded. 7. Construct the apron on zero grade with no Overfill at the end. Make the top of the riprap at the downstream end level with the receiving area or slightly _ SILT DITCH CHART T7T below ,i. TSD N0. LEFT RIGHT CHANNEL. 010 VELOCITY MATTING T nsunc thrl tilt apron is properly aligned with wise receiving stresn) SIDE SLOPE SIDE SLOPE SLOPE (CFS) FT. (FPS) r. and pretcl ably straight tltmuthout its Ion :h. [fit curse is needed to fit site 1 5:1 5:1 1.5� 1.23 0.33 0.43 SEED 7 DAYS AFTER Conditions, 1 uz rt in Il � to ill" u_u us c, r. son of t})c a sou ,I P 9, foloWdtnciv aherconsnuuion. stabihze.in] disturoedar.as with vegdatiat (Practices 6.10, 7f ntporarV S, rdmg, and U I i, Pcrmancnt Se(dtn)- Inspect riprap outlet structures weekly and after signiheant(1'l inch or greater) Maintenance rainfall everts to see if any erosion around or below, the riprap has taken place, or if stones have been dislodged_ Imrnediatcly make all needed repairs, to pre vane {Hither damage. OUTLET La w1 W2 d RIP -RAP EX FES t0 11.5 4.5 6' AVG.SIZE 3" 5"ORIFIC ON PVC CAP RIPRAP APRON AT PIPE OUTFALLS Construction 1. Remove all trees, brush, stumps, anti They objectionable material (torn the Specifications Yi;undati(m area, and dispose of pmperk 2. Excavate the Channel, and shape it to neat lines and dimensions shown on the plans plus a 0.2-foot overctd around the channel perimeter to allow for balking during seedbed preparations and sod buildup. 3. Remove and properly dispose of all excess soil so that cuI water may enter the channel freely. 4. fhe procedure used to establsh grass in the channel will depend upon the severity of the conditions and selection of species. Protect the channel with mulch or a temporary liner sufficient to withstand anticipated velocities during the establishment period (Appendi.r 8,l)i Maintenance Inspect channels at regular intervals as well as after major rains, and make repairs promptly. Give special attention to the outlet and inlet sections and other points where concentrated flow enters. Carefully check stability at road crossings, and look for indications of piping, scour holes, or bank failures. Make repairs immediately. Maintain all vegetation adjacent to the channel in a healthy, vigorous condition to protect the area from erosion and scour during out -of -bank flow. TEMPORARY SILT DITCH P RM EE"AB LE P A EMElmhu T x d e * c a a s B i a o r a e ifa 4,4 *NOTE w.. .... ALL HANDICAP SPECIFICATIONS SHALL BE ACTIVITIES PROHIBITED. INSTALLED AS PER A.D.A REQUIREMENTS. SANDING RE -SEALING ACCESSIBLE RAMP AT BUILDING SIDEWALK RE -SURFACING POWER WASHING NOT TO SCALE STORAGE OF MULCH OR SAIL STORAGE OF SNOW PILES to STORAGE OF HEAVY LOADS 4 PERVIOUS CONCRETE(PC) APPLICATION OF SALT OR DE-ICERS CHAMFER EDGE -SEE SHEET CIA Figure 1&-14. Example A n layout for permeable FOR COLORS pa ement sites P °000 0 O 00 00 0 .. . VARIES O O 10"#57 STONE BASKETWEAVE PATTERN 0 0 - a oo O rif 00 0 0 60� 00 WASHED AGGREGATE WITH 1 PAVER BORDER 6"PVC .••••••• ••••••.•••••••••••• // // //\\\//\ , \�\\��\%\\j�\j�\ j�\ jam\ j�\%\\ j�\ j�\ SOIL SUBGRADE SHALL BE SCARIFIED IMMEDIATELY PRIOR TO INSTALLING AGGREGATE BASE 1. COLORS TO BE DETEMINED BY ARCHITECT 4. MAINTAIN BE ADA CONDITIONS N (NO ASSPHALTD ON DIFFERENCE) S DE. 5. PLATE COMPACTER WITH HIGH FREQUENCY/LOW AMPLITUDE, EQUIPPED WITH A RUBBER MAT OR RUBBER ROLLER MECHANICAL VIBRATOR SHALL BE USED. PEDESTRIAN WALKWAYS PAVER SECTION NOT TO SCALE PEDESTRIAN WALKWAYS PLAN VIEW NOT TO SCALE Cape Fear Valley Health System r(/��j�� p g 5960 Fairview Road Suite 500 arlotte, NC 28210 704 887.3500 887.3507 fax Consultants MECHANICAL/ELECTRICAUPLUMBINGIFIRE PROTECTION: Leach Wallace a ace Associates, ssoc ales Inc. C Mr 1200 East Morehead ' Suite 280 Charlotte North Carolina28204 Phone:704-335-0485 Fax:704-335-0482 STRUCTURAL: Mabry Engineering Associates, Inc. tl:kllKl 840 Shull Street, Suite 100 ENr,INFEF,iN 6 West Columbia, South Carolina29169 IK)(IAIN N Phone:803-926-0000 Fax:803-926-7600 CI` GeoScience Group GEoSCIENCE GROUP � UI' 500-K Clanton Road Charlotte, NC 28217 Phone:704-525-2003 Fax: 704-525-2051 ARCHITECTURAL CONSULTANT: rolTSP 1112 N. West Ave. Sioux Falls, SD 57104-1333 Phone 605-336-1160 Fax 605-336-7926 Project Hoke Campus Lawn Development City, State Hoke County, NC Project Number CH10.0011.GE Issued For For Construction Item Date Description 2. 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWQ 4. 1-25-13 Revisions per NCDENR/DWQ "Tcl � �j5,. S6t��!/O�o9 Drawn By - JLR Checked By - KSC Seal / Signature Sheet Title Site Details Date 10.5.12 Sheet Number C4ml This document is the properly of RPA Design and RPA Design retains all rights therein, including copyrights. It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific cmiect identified or referred 0 herein or extensions thereto. ItmaVnrthe n,.d fix envnIho,mvine..... ,1 w16 iIt-n_nm­....a.,.___._____._,__.________.:_ ._... - . �- 7-5 A on� Zp WATER 5-71 Q C 7" SECTION "A -A" PLAN 5-1/4" DROP LID 9 7-5/8" 5-3/4" 7 6-3/8" I = N11 T min. =46" �X W a a s-u2' _ 9-1/2" TOP SECTION VALVE BOX N.T.S. -1. icl it TII I IIII l f` i- ELBOW T _J HORIZONTAL BEND SIDE EXCAVATIONS(TYP.) BOTTOM A NOTES: 1. VALVE BOX SHALL BE 3 PART SLIP -TYPE MANUFACTURED BY ALABAMA PIPE CO., CHAPMAN VALVE CO., COLOMBIAN IRON WORKS, R.D. WOOD CO. OR APPROVED EQUAL. VALVE BOX SHALL BE 3-PIECE CLOSE GRAINED CAST IRON SLIP -TYPE VALVE BOX WITH A MINIMUM THICKNESS OF 3116". 3. VALVE BOX SHALL HAVE RAISED LETTERS "WATER" CAST INTO COVER. 4. VALVE BOX SHALL HAVE 3/8" HOLE DRILLED IN TOP SECTION THRU WHICH A 1/4"xi-1/2" GALVANIZED BOLT SHALL BE USED TO SECURE A MINIMUM 12 GAUGE, SINGLE STRAND, COATED COPPER TRACER WIRE DROP LID FOR NON-FERROUS PIPE. A1/2"WASHER SHALL BE USED BETWEEN NUT AND INSIDE OF BOX. TIGHTEN HAND TIGHT. 5. SCREW TYPE VALVE BOXES ARE NOT ACCEPTABLE. 6. DIMENSIONS SHOWN ARE FOR INFORMATION ONLY AND VARY BASED UPON THE MANUFACTURER. 7, VALVE BOX SECTIONS ARE REQUIRED. THE USE OF PIPE IN LIEU OF VALVE BOX TOP SECTIONS SHALL NOT BE PERMITTED. SECTION 8. TRACING WIRE SHALL BE INSTALLED OUTSIDE OF BOX BOTTOMSECTION MIN. BEARING AREA EACH DIRECTION OF THRUST IN SQUARE FEET (based on soil supporting value of 2000 esf@ 200 esig test pressure) PIPE - r I TEE58 _ 9074 ELBOW 5 ° - 22-1/2° SIZE I DEADENDS I_E�BOWS I BCROSSES ELBOWS i 6 6"' 4 0 1 3 2 3 �1 I 2 I 15 21 11 6 M.J.PWG CONCRETE 1 THRUST BLOCK (TYP ) II III �.G=.1, II SEE BLOW -OFF DETAIL FOR CLARIFICATION OF CONSTRUCTION REQUIRED AT DEAD ENDS THRUST BLOCK - DEAD END ALL GEARING SURFACES SHALL BE AGAINST UNDISTURBED TEE GROUND(TYP) CONCRETE THRUST BLOCK DETAIL N.T.S. ':.• \T-f/ .'�IiIL ELBOW y CONCRETE -r• SHALL BE KEPT .I CLEAR OF PIPE a JOINTB(TYP ) CROSS NOTES PLAN N.T.S. SECTION A -A N.T.S. VALVE BOX PROTECTOR RING 1.) THRUST BLOCKS SHALL BE INSTALLED ON PVC WATER DISTRIBUTION LINES 6" THRU 12" DIA. IN THE MANNER SHOWN. SEE PWCSTANDARD ALT. RESTRAINING DETAIL W.18 FOR ACCEPTABLE ALTERNATE RESTRAINING SYSTEMS. AS REQUIRED BELL OD + 8 MIN. " 2. PIPE GREATER THAN 12 INCH BELL OD 24" MAX. DIAMETER SHALL REQUIRE RESTRAINT JOINT PIPE FOR THE PROPER LENGTH. 3.) COMPACT FIT FINGS ARE NOT ACCEPTABLE. STANDARD FITTINGS SHALL BE USED WITH CONCRETE j- ICI -III THRUST BLOCKING. .__III 4.) THRUST BLOCKS SHALL BE r INSTALLED ON SEWER FORCE - MAIN IN THE MANNER SHOWN. -III 5. IF SAC-CRETE IS USED MIXING N - -=I MUST BE ON SITE UTILIZING A 1 MECHANICAL MIXER.I IIII = =III UNDISTURBED 6.) NO CONCRETE SHALL BE 1 _ SOIL PLACED ON BOLTS. WRAP _I AREA OF JOINT FITTINGS WITH PLASTIC. - BEARING 7.) CONCRETE SHALL BE III_ 'lull A MINIMUM 3,000 psi. i 8.) ALL BEARING SURFACES SHALL BE AGAINST UNDISTURBED SOIL AND III SHALL BE APPROVED BY PWC PROJ. COORDINATOR PRIOR TO PLACEMENT OF CONCRETE. 9.) USE OF RESTRAINED JOINT DUCTILE -III ! IRON WILL BE REQUIRED T SOIL CONDITIONS DO NOT ALLOW THE USE OF THRUST BLOCKS CONTINUOUS 12 GA. 10.)ALL VERTICAL BENDS SHALL BE THEN TRACER WIRE RESTRAINED USING RESTRAINED REQUIRED FOR JOINT DUCTILE IRON PIPE. ALL NON-FERROUS PIPE (FROM VALVE BOX TO VALVE BOX) 7. WATER OUTAGES: THE CONTRACTOR SHALL SCHEDULE A COORDINATION MEETING THE CONTRACTOR SHALL COMPLETE THE REQUIRED WORK AND RESTORE WATER WITH THE PWC PROJFCT CnnrrnNATINI ANDF'Rt)3rCT r Nr;INr FH A MIrunlur,+ nr oFrO(i WITIUNnIFererNnn4EFu+IODrnRTHEuurAGF `,HOtAD-I:F THREE (3) WORKING DAYS PRIOR TO ANY FLANNED WATER OUTAGE THE CONTRACTOR FAIL TO COMPLETE THE WORK WITHIN THE ALLOTTED TIME, THE COORDINATION MEETING SHALL BE CONDUCTED PRIOR TO ANY NOTICES BEING PUBLIC WORKS COMMISSION SHALL ASSESS A PENALTY OF $500 PER 15-MINUTE ISSUED. ADDITIONALLY, THE CONTRACTOR SHALL LOCATE (VERTICALLY AND INTERVAL OR ANY PORTION THEREOF UNTIL WATER SERVICE IS RESTORED. THIS HORIZONTALLY) ANY UTILITIES WITHIN THE WORK AREA, IN ACCORDANCE WITH PENALTY WILL BE DEDUCTED FROM T'HE CONTRACTOR'S PAY APPLICATION OR BE THESE CONTRACT DOCUMENTS. THE LOCATIONS OF ALL UTILITIES WITHIN THE BILLED DIRECTLY TO THE CONTRACTOR. THE PENALTY MAY BE WAIVED FOR WORK AREA SHALL BE DETERMINED PRIOR TO THE COORDINATION MEETING. ANY CIRCUMSTANCES BEYOND THE CONTRACTOR'S CONTROL, AS DEEMED BY THE CONFLICTS WITH THE PENDING WORK AND THE EXISTING UTILITIES SHALL BE PUBLIC WORKS COMMISSION. THE PWC PROJECT COORDINATOR AND/OR PROJECT IDENTIFIED, AND A PLAN FOR RESOLVING ANY CONFLICTS SHALL BE PRESENTED. THE ENGINEER RESERVE THE RIGHT TO CANCEL OR POSTPONE THE OUTAGE AT ANY PURPOSE OF THIS COORDINATION MEETING IS TO ENSURE THAT THE CONTRACTOR GIVEN TIME, IF DEEMED NECESSARY. HAS A GOOD UNDERSTANDING OF THE REQUIREMENTS RELATED TO THE PENDING OUTAGE, VERIFY THAT THERE ARE NO UTILITY CONFLICTS THAT WILL PREVENT THE WORK FROM BEING COMPLETED, ALL EQUIPMENT IS IN GOOD WORKING ORDER, ALL EQUIPMENT IS FUNCTIONAL, ALL MATERIALS ARE ON SITE, ALL NECESSARY TOOLS ARE ON SITE, DISCUSS ANY NECESSARY CONTINGENCY PLANS, AND ANY OTHER ITEMS NECESSARY TO ENSURE THAT THE PUBLIC WORKS COMMISSION HAS CONFIDENCE THAT THE WORK CAN BE ACCOMPLISHED WITHIN THE GIVEN TIME PERIOD. SHOULD, FOR ANY REASON, THE PUBLIC WORKS COMMISSION DEEM THAT THE CONTRACTOR IS NOT PREPARED FOR THE PROPOSED OUTAGE, THE OUTAGE NOTIFICATIONS WILL NOT BE DISTRIBUTED AND THE OUTAGE SHALL BE POSTPONED A MINIMUM OF TWO (2) WEEKS. THE PUBLIC WORKS COMMISSION WILL PROVIDE WRITTEN NOTIFICATION TO THE CONTRACTOR OF THIS DECISION. NO ADDITIONAL CONTRACT TIME WILL BE GRANTED FOR THIS DELAY. SHOULD THE CONTRACT TIME EXPIRE WITHIN THAT TWO (2) WEEK PERIOD, THE PUBLIC WORKS COMMISSION RESERVES THE RIGHT TO ASSESS LIQUIDATED DAMAGES, AS OUTLINED IN THESE CONTRACT DOCUMENTS. ONCE THE WATER OUTAGE NOTIFICATIONS HAVE BEEN ISSUED, A FOLLOW-UP COORDINATION MEETING WITH THE PWC PROJECT COORDINATOR AND PROJECT ENGINEER SHALL BE HELD A MINIMUM OF 24 HOURS PRIOR TO THE SCHEDULED OUTAGE. THE PURPOSE OF THIS MEETING IS TO VERIFY THAT THE CONTRACTOR IS PREPARED TO PROCEED WITH THE OUTAGE, AND THAT ALL EQUIPMENT, MATERIALS, TOOLS, AND ALL OTHER INCIDENTALS ARE ON THE PROJECT SITE AND FUNCTIONING. IF FOR ANY REASON THE PUBLIC WORKS COMMISSION DEEMS THAT THE CONTRACTOR IS NOT PREPARED, THE OUTAGE SHALL BE POSTPONED AND ALL CUSTOMERS IMMEDIATELY NOTIFIED OF THE CANCELLATION. THE OUTAGE SHALL BE POSTPONED A MINIMUM OF TWO (2) WEEKS. NO ADDITIONAL CONTRACT TIME WILL BE GRANTED FOR THIS DELAY. SHOULD THE CONTRACT TIME EXPIRE WITHIN THAT TWO (2) WEEK PERIOD, THE PUBLIC WORKS COMMISSION RESERVES THE RIGHT TO ASSESS LIQUIDATED DAMAGES, AS OUTLINED IN THESE CONTRACT DOCUMENTS. WATER UTILITY NOTES TYPE 3 TRENCH WATER MAIN BEDDING DETAIL " RINGS OF #3 REINFORCING EFORMED BAR AS SHOWN DIED PORTION OF - 3 IS EXPOSED REMAINDER IS BURIED NOTES NOTES: 1. CONCRETE PROTECTOR RING SHALL BE S 2500 P. .I. PRECAST REINFORCED CONCRETE 2. VALVE BOX SHALL BE AT GRADE W/PROTECTOR RING EXTENDING 1/2" ABOVE GRADE 3. SEE GATE VALVE AND BOX DETAIL 4. VALVE BOX PROTECTOR RINGS SHALL BE INSTALLED AROUND VALVE BOX IN UNPAVED NON -TRAFFIC AREAS. AND SHALL NOT CREATE A HINDERANCE TO MOWING OPERATIONS. REINFORCED CONCRETE CUT AWAY VIEW N.T.S. 1. ALL EXCAVATIONSHALL COMPLY WITH THE TERMS AND S CONDITIONS OF THE CONSTRUCTION STANDARDS FOR TO TOPSOILRESTOREDGINAL EXCAVATIONS NOS OSHA "SAFETY AND HEALTH REGULATIONS ORI ORIGINAL. GRADE AND SEEDED OR FOR CONSTRUCTION", CHAPTER XV11 OF TITLE 29, CFR, PART /SODDED AS INDICATED ON ON S THE CONTRACTOR SHALL HAVE A COMPETENT PERSON ON SITE AT ALL TIMES DURING EXCAVATION AND BACKFILLING. DRAWINGS. 2, CONTRACTOR SHALL USE TRENCH BOX SHORING IN ALL OPEN C CUTS IN PAVED AREAS. TRENCH WIDTH SHALL BE MAINTAINED AT THE MINIMUM PRACTICAL WIDTH. r-I-T�f 3. TYPE 3 TRENCH CONDITIONS AND A MINIMUM OF 4' -1 - - j-- OF COVER MUST BE MAINTAINED WHERE RESTRAINT JOINT" u PIPE IS SPECIFIED AND 3.5' OF COVER IN ALL OTHER LOCATIONS UNLESS SHOWN OTHERWISE ON THE PLAN PROFILE. `-IJRBED SOIL SOIL 4. LOOSE SOIL OR SELECT MATERIAL IS DEFINED AS "NATIVE" SOIL EXCAVATED FROM THE TRENCH, _ TRENCH BA KFILL REMAINING ENC C FREE F ROCKS FOREIGN MATERIAL AND O , - COMPACTED T095%MAX. DENSITY FROZEN EARTH. '- IN MAX. 12" LIFTS FOR NON -PAVED AREAS. SEE APPLICABLE PAVEMENT 5 BEDDING MATERIAL SHALL. EXTEND TO UNDISTURBED TRENCH PATCH DETAIL FOR PAVED AREAS. WALLS AND TRENCH BOTTOM. BEDDING MATERIAL WILL NOT BE PAID FOR UNLESS SPECIFICALLY APPROVED BY -- THE PROJECT REPRESENTATIVE AND ONLY BACKFILL LIGHTLY TO 12" FOR THE AUTHORIZED QUANTITY. ��ABOVE PIPE IN 6" LIFTS (95% 6. BEDDING MATERIAL SHALL BE PROPERLY ROBBED j MAX DENSITY COHESIONLESS SOILS AND COMPACTED AROUND THE PIPE HAUNCHES. u 90% MAX DENSITY COHESIVE SOILS) T TEST FOR DENSITY OF COMPACTION MAY BE MADE AT THE OPTION OF THE ENGINEER AND DEFICIENCIES SHALL BE WATER MAIN MATERIAL SHALL CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST III BE AS SPECIFIED AND SHOWN TO THE OWNER. THE ENGINEER MAY HAVE COMPACTION _ -i ON THE DRAWINGS. TEST PERFORMED AFTER THE BACKFILL IS COMPLETE. CONTRACTOR SHALL BE REQUIRED TO EXCAVATE TO 4" MIN SUITABLE LOOSE VARIOUS ELEVATIONS FOR DENSITY TESTING EXCAVATION, SOIL BEDDING FROM TRENCH BACKFILL AND RECOMPACTION SHALL BE PERFORMED AT NO EXCAVATION (SEE NOTES 485) ADDITIONAL COSTS TO THE OWNER. UNDISTURBED SOIL TOP TO BE FLUSH WITH - FINIS H GRADE AND LEFT EXPOSED PAVEMENT 3000 PSI POURED IN PLACE CONCRETE COLLAR VALVE BOX PROTECTOR - RING SHALL BE PLACED WHERE VALVE IS LOCATED IN NON - TRAFFIC AREAS. SEE VALVE BOX PROTECTOR RING DETAIL. 4" min. TURF 6" max 1 TRACER WIRE T 2" min. @ - 1 FINAL GRADE , A-1 -111 AI A a 4 IT CONCRETE COLLARSHALL BE PLACED -_III-_III_ W ERE VALVE IS IN A -III- _I `NCDOT CONCRETE BRICK (4 REQUIRED III- @ EACH SECTION.) MIN. 12 GAUGE, SINGLE STRAND, COATED COPPER TRACER WIRE (SHALL BE III- INSTALLED BETWEEN VALVES AND SHALL BE 7-771- INSTALLED ON ALL NON METALLIC PIPELINES.) WATER SPLICES SHALL BE MAIN PPROVED BY THE PWC / ROJECT COORDINATOR. =III 1IIIlIIIIIIIII I1 VALVE IN TRAFFIC AREA GATE VALVE WATER MAIN III I I I -I I VALVE IN NON -TRAFFIC AREA NOTES: 1. ALL MATERIALS SHALL BE IN ACCORDANCE WITH PWC STANDARDS. 2. RESILIENT WEDGE GATE VALVE SHALL BE AS MANUFACTURED BY MUELLER CORP., AMERICAN DARLING OR CLOW CORP. 3. ALL VALVES SHALL HAVE 2" SQUARE OPERATING NUT AND SHALL OPEN COUNTERCLOCKWISE. 4. VALVE BODY, BONNET AND GATE SHALL BE IN ACCORDANCE WITH AWWA C-509/C-515 AND NSF61. 5. VALVE BODY AND BONNET SHALL BE COATED ON ALL INTERIOR AND EXTERIOR SURFACES WITH A FUSION BONDED EPDXY IN ACCORDANCE WITH AW WA C-550-90. 6. ALL VALVES 24" AND SMALLER SHALL HAVE A SAFE WORKING PRESSURE OF 250 PSI. 7. SEE VALVE BOX DETAIL FOR ADDITIONAL INFORMATION. 8. SEE VALVE BOX PROTECTOR RING DETAIL FOR ADDITIONAL INFORMATION. 9. VALVE BOX SECTIONS ARE REQUIRED. THE USE OF PIPE IN LIEU OF VALVE BOX SECTIONS SHALL NOT BE PERMITTED, 1. CONTRACTOR SHALL REPAIR ALL WATER LATERALS AND MAINS DAMAGED DURING 3. CROSSING A WATER MAIN OVER A SEWER: WHENEVER IT IS NECESSARY FOR A CONSTRUCTION. THE CONTRACTOR SHALL REPORT IMMEDIATELY ALL WATER MAIN WATER MAIN TO CROSS OVER A SEWER MAIN/LATERAL, THE WATER MAIN SHALL I T R. THE CONTRACTOR NA O AND LATERAL BREAKS THE PWC PROJECTCOORDINATOR ' T M F THE WATER MAINS AT BE LAID AT SUCH AN ELEVATION THAT HE BOTTOM O SHALL INITIATE IMMEDIATE REPAIRS IN ACCORDANCE WITH PWC STANDARDS IA ACCORDANCE I r SEWER MAINILATERAL UNLESS LOCAL _EAST 181NCHE5 ABOVE THE OP OF THE .,E CONTRACTOR SHALL NOT OPERATE PWC WATER MAIN VALVES WITHOUT PWC - CONDnIONS OR BARRIERS PREVENT AN 18 INCH VERTICAL SEPARATION - IN APPROVAL AND SHALL COORDINATE ALL VALVE CLOSINGS WITH PWC. T IN WHICH CASE BOTH THE WATER MA AND SEWER MAINILATERAL SHALL BE ACCORDANCE WITH PW'C REQUIREMENTS DUCTILE IRON N ACCO CE Q 2. HOUSE HOSE BIBBS OR ANY OTHER METHOD OF THE CONTRACTOR SHALL NOT USE OW WHICHT CONTAINING SEDIMENTS OR HIGH BLOW OFF ALLOWS DOMESTIC WATER I_ RA^EWER: WHENEVER IT IS NECESSARY FORA C. GROSSING WATER MAIN UNDER CHLORINE TO PAS° THRU RESIDENT'S METERS. THE N R T R HALL TACO S LEVELS O L FIBLEFOR T BOTH THE WATER MAIN WATER MAIN TO CROSS UNDER A SEWER MAINILATERAL, O G ' BE RESPONSIBLE FOR ALL DAMAGES RESULTING FROM ALLOWING "DIRTY"vVATER TO AND THE SEWER MAINILATERAL SHALL BE DUCTILE IRON IN ACCORDANCE WITH ENTER RESIDENT'S PLUMBING SYSTEM, SUCH AS WATER HEATERS, STAINED PWC REQUIREMENTS. A FULL JOINT OF DUCTILE IRON PIPE SHALL BE INSTALLED CLOTHING, CLOGGED SCREENS, ETC. ON THE WATER MAIN CENTERED AT THE POINT OF CROSSING. 3. WATER MAINS AND LATERALS SHALL BE INSTALLED UTILIZING A PWC APPROVED D. CROSSING STORM DRAINAGE LINES: A MINIMUM OF 12-INCHES OF VERTICAL CUT -SHEET INDICATING INSTALLATION DEPTH. CLEARANCET LINE CROSSING OVER A SHALL BE MAINTAINED BETWEEN A WATER O STORM DRAINAGE LINE UNLESS DUCTILE IRON PIPE IS USED. IN ADDITION, STORM 4. TRANSFER OF WATER SERVICES SHALL BE ACCOMPLISHED AS FOLLOWS: THREE AND A HALF (3.5) FEET OF COVER MUST BE MAINTAINED OVER THE A. INSTALL, TEST AND STERILIZE NEW MAIN AND LATERALS. LATERALS SHALL BE WATER MAIN OR IT SHALL BE DUCTILE IRON. IF DUCTILE IRON PIPE IS USED INSTALLED 18" INSIDE RAN UNLESS OTHERWISE DIRECTED BY PWC. THEN TWO AN A HALF (2. 5) FEET OF COVER MUST BE MAINTAINED OVER THE - T BOXAND TIE NEW WATER LATERAL B. TRANSFER EXISTING METER TO NEW METER BO 4- F VERTICAL CLEARANCE SHALL BE WATER MAIN AND A MINIMUM OF MCHES O C TO EXISTING DOMESTIC SERVICE UTILIZING BRASS FITTINGS. SAME METER MAINTAINED BETWEEN THE WATER MAIN AND THE STORM DRAINAGE LINE. NUMBER SHALL BE INSTALLED ON SA AI2 ADDRESS AND/OR CUSTOMER. BLOW WHERE A WATER MAW GROSSES UNDER A STORM DRAINAGE LINE THE MINIMUM OFF SERVICE AT HOSE BIBB ON HOUSE ONLY AFTER METER HAS BEEN OF TWELVE INCHES OF VERTICAL SEPARATION SHALL BE MAINTAINED AND TRANSFERRED. THE WATER N SHALL BE DUCTILE IRON FOR A DISTANCE OF 10-FEET ON MAIN C. AFTER ALL SERVICES ARE TRANSFERRED TO THE NEW SYSTEM, SHUT OFF VALVE EACH SIDE OF THE CROSSING. ON EXISTING SYSTEM AND ABANDON EXISTING MAINS IN ACCORDANCE WITH PWC DETAILS. D. CONTRACTOR SHALL SUPPLY NEW METER BOXES AND DISPOSE OF EXISTING METER BOXES. 5. WHEN MAIN 15 NOT TO BE ABANDONED, CONTRACTOR SHALL UNCOVER OLD CORPORATION AT MAIN, CLOSE AND PLUG CORPORATION TO ABANDON OLD SERVICE. 6. SEPARATION REQUIREMENTS: A. LATERAL SEPARATION OF SEWERS AND WATER MAINS: WATER MAINS SHALL BE LAID AT LEAST 10 FEET LATERALLY FROM EXISTING OR PROPOSED SEWER MAIN/LATERAL, UNLESS LOCAL CONDITIONS OR BARRIERS PREVENT A 10-FOOT LATERAL SEPARATION - IN WHICH CASE: i. THE WATER MAIN IS LAID IN A SEPARATE TRENCH, WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER MAIN/LATERAL; OR iT THE WATER MAIN IS LAID IN THE SAME TRENCH AS THE SEWER MAIN/LATERAL WITH THE WATER MAIN LOCATED AT ONE SIDE ON A BENCH OF UNDISTURBED EARTH AND WITH THE ELEVATION OF THE BOTTOM OF THE WATER MAIN AT LEAST 18 INCHES ABOVE THE TOP OF THE SEWER MAIN/LATERAL. WATER UTILITY NOTES Quality of sod -Use onlyhigh-quality sod of known genetic origin, free of J Lay sad in a staggered noxious weeds, disease, and insect problems. It should appear healthy and -� j. 1- _,-� . r �. pattern with Strips blotted vigorous, and conform to the following specifirauons: - - p •-� .. tightly against each other- A • Sod should be machine cut at a uniform depth of 1'? -2 inches (excluding # *- .- sharpened mason's trowel can shoot growth and thatch). in _ . , S '''' -� and trim pieces. be used to tuck down the ends rt ^ . F ... t " Sod should not have been cut excessively wet or dry weather. r, ., , • Sections of sod should be a standard size as determined by the supplier, _ ! Specifications Choosing appropriate types of sod - The type of sod selected should be uniform, and untorn. composed of plants adapted to both the site and the intended purpose. In . Sections of sod should be strong enough to support their own weight, and NLIW Correct Butting -ang(ed ends caused by the automatic North Carolina these are limited to Kentucky bluegrass, tall fescue, bluegrass- retain their size and shape when. lifted by one end. sod Cutting must be matched correctly. tall fescue blends, fine -turf (hybrid) Bernudagrass, Si Augustinegrass, Incorrect centipedegrass. and zoysiagrass. Species selection is primarily determined " Harvest, delivery, and installation of sod 9heuld take place within a period by region, availability, and intended use (Table 6.12a). Availability varies of 36 hours. acrossthe state and from year to year. New varieties are Continually being Soil re aration---Test,soil to determine the exact re uirements for time and developed and tested. A complete and current listing of sod recommendations p p q can be obtained from suppliers or the State Agricultural) Xtension office. Sod fertilizer. $Oil tests may be conducted by the State soil testing tabor a reputable I j composed of a mixture of varieties may be preferred becuase of its broader comme trial laboratory. Information on free sort testing is available from the range of adaptability. Agronomic Division of the North Carolina Department of Agriculture or the Agricultural Extension Service, Where sodding must be planned without soil I tests the following soil amendments may be sufficient:I j I Table 6.12a Types of sod Available in North Carolina 1 • Pulverized agricultural limestone at a rate of 2 tons/acre (100 Illl ". A .- • Fertilizer at a rate of 1,000 lb/acre (25 Ib/1,000 W) of 10 -10-10 in fall or --•: -=' :.,. 5-10-) 0 in spring- Roil sod immediately to Water to a depth of 4" Mow when the sod is es - Equivalent nutrients may he applied with other fertilizer fom Ulations, -These achieve firm contact as soon as the sod is tabGShed (2-3 wks). Set amendments should be spread evenly over the area, and incorporated; into the with the soil, laid, and continue the mower high (2-3"), top 4-8 inches of soil by disking, harrowing, or other effective means, if watering as needed. topsoil is applied, follow specifications given in Practice 6.04, Topsailing• H7gure5.12a Proper instalauorrvtyrass sod (modified from Va SWGC). Prior to laying sod, clear the soil surface of trash, debris, roots, branches, stones, and clods larger titan 2 inches in diameter. Fill or level low spots in order to avoid standing water, Rake or harrow the site to achieve a smooth 3. Do not sod on gravel, frozen soils, or soils that have been treated recently and level final grade. with sterilants or herbicides, Complete soil preparation by rolling or eultipacking to firm the soil, Avoid C Lay the first row of sod in a straight line with subsequent rows placed using heavy equipment on the area, particularly when the soil is wet, as this may cause excessive compaction, and make it difficult for the sod to take paralled to and butting tightly against each other, Stagger strips in a brick -like root, pat:tem. Be sure that the sod is not sr. _.._3 or Overlapped and that all joints are butted: Tightly to prevent voids. Use a knife or sharp spade to trim and flt irregularly shaped areas. Sod lastailation A step-by-step procedure for installing sod is illustrated in Figure 6.12a and described below. 5. Install strips of sod with their longest dimension perpendicular to the slope. On slopes 3:1 or greater, or wherever erosion may be a problem, secure 1. Moistening the sod after it is unrolled helps maintain its viability. Store it sod with pegs or staples, in the shade during installation. 6. As sodding of clearly defined areas is completed, roll sod to provide firrit 2. ,Rake the soil surface to break the crust just before laying sod During the Contact between roots and soil. summer, lightly irrigate the soil, immediately before laying the sod to cool the soil, reduce root burning, and dieback. 7• After rolling, irrigate until the soil is wet 4 inches below the sod. SODDING INSTALLATION FOR TWO (2) INCH FIRE LINES AND DOMESTIC SERVICE K X 2" TAPPING SADDLE W/ 2" BALL VALVE IY w WATER METER X 2" TAPPING SADDLE W/ 2" BALL VALVE FOR GREATER THAN TWO (2) INCH FIRE LINES AND DOMESTIC SERVICE 8. Keep sodded areas moist to a depth of 4 inches until the grass takes root, this can be determined by gently tugging on the sod -resistance indicates that rooting has occurred. 9. Mowing should not be attempted until the sod is firmly roofed, usually 2-3 weeks. Sodded waterways --Sod provides a resilient channel lining, providing immediate protection from concentrated runoff and eliminating the need for installing mats or mulch. The following points apply to the; use of sod in waterways: 1. Prepare the soil as described in Practice 6.30, Grass -lined Channels. The sod type. must be able to withstand the velocity of flow specified in the channel design (,9p+flendix 8.05), 2. Lay sod strips perpendicular to the direction of flow, with the lateral joints staggered in a brick -like pattern. Edges should butt tightly together (Figure 6.12b). Flow Lay sod across the \,,. '}mow•.' e^, H, . �. �- direction of flow, T Use pegs or stables to fasten sod firmly at the 6-10 " ends of strips and in the center, or every 3-4' if the strips are long. When ready to mow, _ drive pegs or staples flush with the ground. , . ........._,.,Peg or y„ M ystaple O. in critical areas, secure J. sod with netting and staples. ....w.,.. .AoA::� Figure 6-12b installation of sod in waterways (modified from Va SWCC). X 2" TAPPING SADDLE W/ 2" BALL VALVE L X TAPPING SLEEVE AND VALVE OR X TEE WITH GATE VALVE NOTES: 1. DOMESTIC BACKFLOW MAY BE LOCATED INSIDE THE BUILDING. 2. THE FIRE LINE SHALL HAVE BACKFLOW DEVICE WITHIN 100 FEET OF THE MAIN. 3. REFER TO THE CROSS CONNECTION CONTROL ORDINANCE FOR ADDITIONAL I NFORMA ION ON BACKFLOW REQUIREMENTS. STANDARD TAPS Tablc 6,12b Characteristics of the Principal Lawn Grasses Grown as Sod in North Carolina Species or Mixture Adaptation Maintenance Annual Mowing Mowing Shade Heat Cold Drought Wear Fertilizer Height Frequency 2 (lb N/1000 ft') (in.) Kentucky bluegrass good fair good good good 2.5-4 2 med. Kentucky bluegrass/ good good good good good 2.5-3 3 high Tall fescue Tail fescue good good good good good 2.5-3.5 3 high Hybrid Bermudagrass poor good poor excel, excel. 5-6 1 high Centipedegrass fair good poor good poor 0,5 1 low u ustine St A g grass good g d good o poor good r poor 2:5 2-3 med. Zoysiagrass fair good fair excel: good 1.5 1 high Adapted from Carolina Lawns, NCAES Bulletin no. AG-69, 1 Mier rolling nr tarnping to create a firm contact, peg or staple individual sod strips to resist washout during establishment. Jute or other netting material may be pegged over the sod for extra protection on critical areas. Maintenance After the first week, water as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sal. Do not remove more than one-third of the shoot in any mowing. Grass height should be maintained between 2 and 3 inches unless otherwise specified. After the first growing season, established sod requires fertilization, and may also require lime. Follow soil test recommendations when possible, or use the rates in Table 6,12b. Cape Fear Valley Health System Architect of Hecord rpa �a r 5960 Fairview Road Suite 500 Charlotte, NC 28210 704 887.3500 887,3507 fax Consultants MECHANICALIELECTRICALIPLUMBINGIFIRE PROTECTION: AVLeach Wallace Associates, Inc. 1200 East Morehead, Suite 280 Charlotte, North Carolina 28204 Phone:704-335-0485 Fax: 704-335-0482 'RUCTURAL: Mabry Engineering Associates, Inc. 940 Shull Street Suite 100 West Columbia South Carolina 29169 Phone: 803-926-0000 Fax:803-926.7600 Project Hoke Community Medical Center City, State HOKe county, NC Project Number CH10.0011.GE Issued For For Construction Item Date Description 2. 12-12-12 Revisions per NCDENR 3. 1-10-13 Revisions per NCDENR/DWQ *3b�61/oS°71ho� ��ie Drawn By - JLR Checked By - KSC Seal / Signature Sheet Title Site Details Date 09.12.12 Sheet Number C4m2 document is the property of RPA Design and RPA Design retains all rights therein, including copyrights. It may only be used in a manner consistent with RPA Design's rights while RPA Design is providing services for the specific project identified or referred to herein orextensions thereto. It may not be used for any other purpose except with the express written agreement of, and compensation to, RPA Design, TREE PROTECTION FENCE 55 SEE DETAIL 3 50' SETBACK SOD -UP TO PROPOERTY LINE 44 QVC 5646 \ r- SEED LL1 I 4 QVC LL SODJ SO jj�� � TOP T&A �A KF<A TU R E QVC s WETLANDS DO \ NOT DISTURB '` ' `•` QVC L i is L' N U SURVEYED PROPERTY LINE X X FENCE LINE RIGHT OF WAY LINE LINE NOT SURVEYED DITCH LINE - E UNDERGROUND ELECTRIC LINE - T UNDERGROUND TELEPHONE LINE P OVERHEAD POWER SS SANITARY SEWER LINE CTV CABLE TV LINE SO STORM DRAIN LINE R/W RIGHT-OF-WAY BC BACK OF CURB EP EDGE OF PAVEMENT SANITARY SEWER MANHOLE STORM DRAINAGE MANHOLE 8 TELEPHONE MANHOLE Will CURB INLET N WATER VALVE © GAS METER Jx LIGHT POLE JJ POWER POLE y GUY WIRE ❑ DROP INLET CFO@ CLEANOUT ® WELL 0NIP NEW IRON PIN (SET) 0 EIP EXISTING IRON PIN (FOUND) EI= RIGHT OF WAY MONUMENT (FOUND) • COMPUTED POINT TREE LINE QVC • Q 1 NC GRID TREE PROTECTION FENCE SEE DETAIL QVIC 1 r / APPROX. SHWT=242.00 SOD I I PLANTING NOTES: 1. ALL PLANTS SHALL MEET OR EXCEED THE MINIMUM STANDARDS SET FOR THE-AMERICAN STANDARDS FOR NURSERY STOCK" BY THE AMERICAN ASSOCIATION OF NURSERYMEN, INC., WASHINGTON. D.C. 2. ALL PLANTS SHALL BE COMPACT, UNIFORM, AND WELL GROWN. PLANTS SHALL NOT BE LOOSE, OPEN PLANTS. THE OWNER'S LANDSCAPE ARCHITECT RESERVES THE RIGHT TO REJECT ANY AND ALL MATERIALS WHICH DO NOT MEET THESE REQUIREMENTS. 3. ALL PLANTING BEDS SHALL BE MULCHED WITH 3" THICK COMPOSTED/MILLED PINE BARK. 4. ALL PLANTS SHALL BE FREE FROM DISEASE, INSECT INFESTATIONS, AND INJURIES. 5. ALL PLANT BEDS SHALL HAVE A 4" V—CUT TRENCH INSTALLED AT THE PERIMETER OF THE BED. 6. CONTRACTOR MUST PROVIDE A ONE YEAR WRITTEN GUARANTEE FOR ALL PLANT MATERIALS FROM THE DATE OF FINAL ACCEPTANCE BY THE OWNER AND THE LANDSCAPE ARCHITECT. 7. THE SPECIES, VARIETIES, CULTIVAR AND SIZE LISTED SHALL BE PROVIDED AS SPECIFIED WITHOUT EXCEPTION. SUBSTITUTIONS WILL BE PERMITTED ONLY UPON WRITTEN APPLICATION BY THE CONTRACTOR TO THE LANDSCAPE ARCHITECT, AND WHEN APPROVAL BY LANDSCAPE ARCHITECT IS IN WRITING. 8. SYMBOLS: B&B = BALLED AND BURLAPPED; O.C. = ON CENTER; GAL. = GALLON CONTAINER, M.S. = MULTI —STEM; HT. = HEIGHT, CAL = CALIPER. 9. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL PLANTS ILLUSTRATED ON THE PLANTING PLAN. IF ANY DISCREPANCIES EXIST BETWEEN THE QUANTITIES LISTED ON THE PLANT LIST AND THE QUANTITIES SHOWN ON THE PLAN, THE CONTRACTOR SHALL PROVIDE ALL QUANTITIES ILLUSTRATED ON THE PLAN. IF ANY PLANTS ARE SHOWN NOT LABELED, THE CONTRACTOR SHALL VERIFY THE PLANT IDENTITY WITH THE LANDSCAPE ARCHITECT AND THESE PLANTINGS SHALL BE INCLUDED IN THE CONTRACTOR'S INITIAL BID. 10. SOIL AMENDMENTS SHALL BE UNIFORMLY SPREAD AND CULTIVATED THOROUGHLY BY A MECHANICAL TILLER INTO THE TOP 8" OF SOIL THROUGHOUT SHRUB BEDS. 11. THE LANDSCAPE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT AND THE OWNER IN WRITING OF ALL SOIL CONDITIONS THE CONTRACTOR CONSIDERS DETRIMENTAL TO THE GROWTH OF PLANT MATERIALS. PROPER DRAINAGE MUST BE ASSURED. 12. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB —BASE AND CONSTRUCTION DEBRIS BEFORE PREPARING SOIL AND PLANTING TREES. 13. FOR AREAS TO RECEIVE TREES, REMOVE COMPACTED SOIL AND ADD 24" NEW TOPSOIL/PLANTING MIX —OR— UNCOMPACT AND AMEND TOP 24" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES (WITHIN ENTIRE MINIMUM AREA OF 274 SQ. Fr. PER TREE). ALL TREES WILL BE PLANTED IN AMENDED SOILS IF EXISTING SUITABLE TOPSOIL HAS BEEN REMOVED. 14. ALL STRAPPING AND TOP 2/3 OF WIRE BASKET MUST BE REMOVED FROM ROOT BALL PRIOR TO BACKFILUNG PLANTING PIT. REMOVE TOP 1/3 OF BURLAP FROM ROOT BALL. 15. NO TREE SHALL BE PLANTED ON A SLOPE GREATER THAN 3:1. 16. PROVIDE AND INSTALL PREPARED PLANTING BED FOR ALL AREAS SHOWN TO RECEIVE PLANTING. TOP 8" SHALL BE 25X WELL DIARY COMPOSTED COW MANURE AND 75X NATIVE TOPSOIL, THOROUGHLY MIXED (2" LAYER OF COMPOSTED DAIRY COW MANURE ROROTILLED TO 8" DEEP). PREPARED SOIL SHALL BE FINE TEXTURED AND FRIABLE AND RAKED TO CREATE A SMOOTH SURFACE. MULCH COMPLETED PLANTING BED W/ 3" THICK LAYER OF MILLED, COMPOSTED PINE BARK MULCH. 17. FOR TREE PLANTING DETAIL, SEE SHEET C4.3. 18. SITE LIGHTING POLES SHALL NOT BE LOCATED WITHIN PARKING LOT ISLANDS CONTAINING TREES. SITE LIGHTING MUST NOT INTERFERE WITH TREE PLACEMENT. 19. CONTRACTOR SHALL PROVIDE A SUBMITTAL OF DOCUMENTATION FROM THE NURSERIES WHERE TREES/SHRUBS/PLANTS ARE PURCHASED CERTIFYING THAT TREES/SHRUBS/PLANTS SUPPLIED FOR THIS SPECIFIC PROJECT ARE TRUE W SPECIES AND CULTIVAR SPECIFIED ON THE LANDSCAPE PLAN.THIS REQUIRED SUBMITTAL MUST BE APPROVED BY THE LANDSCAPE ARCHTECI PRIOR TO DELIVERY AND PUNTING. PERMANENT GROUNDCOVER NOTES: 1. UNLESS OTHERWISE NOTED AS AN AREA OF EXCEPTION, ALL DISTURBED AREAS, INCLUDING PARKING LOT ISLANDS AND LAWNS, SHALL RECEIVE 'EMPIRE' ZOYSIA SOD OR APPROVED EQUIVALENT. SOIL SURFACE SHALL BE PROPERLY PREPARED TO RECEIVE SOD, INCLUDING RAKED SMOOTH AND FREE OF STONES AND OTHER DELETERIOUS MATERIAL UPON ACCEPTANCE BY THE OWNER AND THE LANDSCAPE ARCHITECT, CONTRACTOR SHALL PROVIDE A 1—YEAR WRITTEN WARRANTY FOR SOD. SODDED AREAS WILL BE ACCEPTABLE WHEN A DENSE HEALTHY TURF IS ATTAILED, FREE OF BARE OR DEAD SPOTS. IRRIGATION NOTES: 1. PROVIDE AND INSTALL A MULTI —ZONE UNDERGROUND IRRIGATION SYSTEM WITH ELECTRONIC PROGRAMMABLE CONTROLLER FOR ALL AREAS TO RECEIVE SOD AND PLANTINGS. TREE, SHRUB AND GROUNDCOVER PLANTINGS SHALL RECEIVE DRIP IRRIGATION AND SOD AREAS SHALL RECEIVE A COMBINATION OF SHORT THROW AND LONG THROW HEADS BASED ON AREA TO BE IRRIGATED (PREVENT OVERWATERING ONTO PEDESTRIAN AND VEHICULAR AREAS). A SHOP DRAWING SUBMITTAL FOR THE IRRIGATION SYSTEM IS REQUIRED FOR APPROVAL PRIOR TO CONSTRUCTION. IRRIGATION SHOP DRAWING SHALL BE PREPARED BY AN IRRIGATION ASSOCIATION CERTIFIED DESIGNER. IRRIGATION DESIGN AND CONSTRUCTION SHALL INCLUDE ALL NECESSARY ELECTRICAL AND PLUMBING, INCLUDING IRRIGATION METER AND BACKFLOW PREVENTER. This document is the property of RPA Design and RPA Design retains all rights therein, including copyrights. PLANTING SCHEDULE ANIIIIES AIR hOrl CONVENIENCE ONLY CONTRACTOR 15 NESPONSIBLE FOR ACTUAL PLANT MATERIAL SHOWN ON PLANS SYM. QTY. BOTANICAL NAME COMMON NAME ROOT/CONTAINER HEIGHT/SIZE COMMENTS QVC 11 IXIERCUS VIRGINIANA 'CATHEDRAL! 'CATHEDRAL' SOUTHERN LIVE OAK B & B e CAL, WELL BRANCHED MATCHED SPECIMENS SOD 12 68 1 01 14 69 70 59 t / r 103 67 71 CO SITE o Il VICINITY MAP — NTS 22 TREE PR SEE DE1 1 '2 0 / WETLANDS DO NOT DISTURB WETLANDS DO NOT DISTURB STREAM FEATURE 30 0 15 3D 60 120 SCALE: 1" = 30' Cape Fear Valley Health System Architect of Record rpaJ (sC n l� 5960 Fairview Road Suite 500 704 arlotte, NC 28210 887.3500 887.3507 fax Consultants MECHANICALIELECTRICALIPLUMBINGIFIRE PROTECTION: Wallace Associates, Inc. imrLeach 1200 East Morehead, Suite 280 Charlotte, North Carolina 28204 Phone:704-335-0485 Fax:704-335-0482 STRUCTURAL: Mabry Engineering Associates, Inc. Df r Ei} 1' 840 Shull Street, Suite 100 West Columbia, South Carolina29169 Phone:803-926-0000 Fax:803-926-7600 cl GeoScience Group E�SCI GENCE GEQSCI ROUP 500-K Clanton Road Charlotte, NC 28217 Phone:704-525-2003 Fax:704-525-2051 ARCHITECTURAL CONSULTANT: TSP 1112 N. West Ave. rk, Sioux Falls, SD 57104-1333 Phone 605-336-1160 Fax 605-336-7926 Project Hoke Campus Lawn City, State Hoke county, NC Project Number CH10.0011.GE Issued For For Construction Item Date Description 1 10-22-12 ADDENDUM #1 3. 1-10-13 Revisions per NCDENR/DWQ -3W4/��0,��•7M0o 6�.6 /1 Drawn By - JLR Checked By - KSC Sheet Title LANDSCAPE PLAN Date 10.5.12 Sheet Number L I A 11 vnp .._ wu I'll mm ram nynu venue ,rM VeSign IS provlmng sane es t0! the speOmO project dentltled or referred to herein or extensions thereto. ay not be used for any other purpose except with the express written agreement of, and compensation to, RPA Design