Loading...
HomeMy WebLinkAboutSW6101105_HISTORICAL FILE_20200205STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE ❑ COMPLIANCE EVALUATION INSPECTION DOC DATE YYYYMMDD DEPARTMENT OF THE ARMY US ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, FORT BRAGG I_ I 2175 ROAD, STOP A FORT BRAGAGG NORTH CAROLINA 28010-5000 February 4, 2020 RECEIVED Department of Environmental Quality FEB -5 2020 Division of Energy, Mineral and Land Resources Stormwater Permitting Program DEO-FAYETTEVILLE REMNAL OFFICE 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Subject: SW6101105, Fort Bragg Range 37 Training Annex Permit Modification Dear Sir/Madam: In lieu of Form SW401-O&M, Ft Bragg will comply with NPDES Phase II Permit # NCS000331. Fort Bragg NPDES Phase II Permit # NCS000331 Part II.F.1.b&c requires development and implementation of strategies which include a combination of structural and /or non-structural best management practices (BMPs) and ensure long-term operation and maintenance of BMPs. Additionally, Part II.G.2.h requires Ft Bragg to maintain and implement an 0&M program for structural stormwater controls. The O&M program shall specify the frequency of inspection and routine maintenance requirements. Ft Bragg shall inspect and maintain all structural stormwater controls in accordance with the schedule developed by Ft Bragg. Ft Bragg's Stormwater Control Measures Inspection and Maintenance Manual fulfills these requirements of the NPDES Phase II permit. Fort Bragg military installation is, committed to maintaining compliant environmental programs while ensuring full mission support. If you have any questions on the information provided please contact Mr. Lee Ward, Chief, Water Management Section, Environmental Division at (910)308-2686 or lee.o.ward.civ@mail.mil. Sincerely, J-4111a1z, David A. Heins Chief, Environmental Division Directorate of Public Works STORM DRAINAGE CALCULATIONS qoy VA�I11111}1111t/�'/�/ i, r/llll}Vl�AVA}�IIIIlk ���Ill �l� I/ // /jl%i//////ll lll1 l llll / t I /Il } IIJJ/%�/% III 1 ► I I }}`l��\�� ����� / llllll/ 11 /I Fort Bragg — Range 37 Annex Infiltration Trench Modification Design Original AE#2009-100, Modification AE#2019-238 Existing Permit SW6101105 Stormwater Treatment Design: Curb Inlet 3 and Manhole 4 are connected by 175' of a 60" diameter retention basin. The 60' pipe is perforated and surrounded by gravel to allow water to escape the pipe and infiltrate into the ground. The exit from the pipe at Manhole 4 is through a 15" pipe whose invert is aligned with the crest of the 60" pipe; therefore, all of the 60" pipe can be considered to capture stormwater for infiltration. In addition, 2.5' of gravel on the sides of the pipe and below the pipe will capture stormwater in its 40% void space. The site requires the first 1" of rainwater be captured and treated for removal of 85% of the Total Suspended Solids (TSS). The captured water must be released at no more than the pre - development runoff rate. The captured water will be infiltrated into the ground, which qualifies for 100% removal of TSS and reduces the post -development discharge for this volume to 0 efs. Simple Method for Volume Required Rv 0.05+0.9*IA=0.05+0.9*0.87=0.83 V = 3630 * Ro * Rv * A = 3630 * 1.0" * 0.83 * 1.10ac = 3314 cf Volume in pipe = (2.5')' a x 1757 = 3436 cf. Volume in gravel = 0.40(175'x 10'xT5' — 3436 cf) = 3876 cf Volume in CI = 2.5' x 10.33' x 5' = 129 cf Volume in MH = (4.01)2 a x 5' = 251 cf. Total Volume = 3436 cf'+ 3876 ef+ 129 cf + 251 cf= 7692 cf. > 3314 cf. OK Infiltration rate in area is 1.75 in/hr. Drawdown = depth/rate = 7.5' x (12 in/ft) / 1.75 in/hr = 51.4 hrs. < 72 hrs. OK. AJr NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Mr. Craig Lantz Fort Bragg DPW-WMB 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 Coleen H. Sullins Director January 13, 2011 Subject: Stormwater Permit No. SW6101105 Fort Bragg Range 37 Training Annex High Density Infiltration Trench Project Cumberland County Dear Mr. Lantz: Dee Freeman Secretary DENR-FRO FEB 15 2011 M The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Fort Bragg Range 37 Training Anne on November 30, 2010; and additional information received on January 5, 2011 and January 12, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 211.1000 and Session Law 2006-246. We are forwarding Permit No. SW6101105, dated January 13, 2011, for the construction, operation and maintenance of the subject project and the stormwater BMPs. The infiltration trench is designed to provide treatment for 2.5 times the minimum required treatment volume in order to waive the bypass and vegetated filter strip requirements. This permit shall be effective from the date of issuance until January 13, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, INC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375; or robert.patterson@ncdenr.gov. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, Nodh Carolina 27604 Phone: 919-807-63001 FAX: 919-807-64941 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity t Afirmatve Acton Employer NorthCarolina Naturally Mr. Craig Lantz SW6101105 — Fort Bragg Range 37 Training Annex January 13, 2011 Sincerely, forC I��SullinsC`�'""�"/ cc: Fayetteville Regional Office — Mike Lawyer SW6101105 File ec: Cromwell Architects Engineers — John Peterson, PE Page 2 of 2 State Stormwater Permit Permit No. SW6101105 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Fort Bragg Directorate of Public Works Fort Bragg Range 37 Training Annex South side of Longstreet Rd. (-700' east of Lamont Rd.), Fort Bragg, Cumberland. -County FOR THE construction, operation and maintenance of one underground infiltration trench in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 13, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater control has been designed to handle the runoff from 34,848 square feet of impervious area. 3. The infiltration trench is designed to provide treatment for 2.5 times the minimum required treatment volume in order to waive the bypass and vegetated filter strip requirements. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 of this permit, and per approved plans. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent streams. Page 1 of 6 State Stormwater Permit Permit No. SW6101105 7. The following design criteria have been provided in the infiltration trench and must be maintained at design condition: a. Drainage Area, acres: 1.03 Onsite, ft : 44,867 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 34,848 Onsite, ft : 34,848 Offsite, ft2: 0 G. Design Storm, inches: 1.0 d. Trench Length ft: 175 e. Trench Width, ft: 10.0 f. Trench Height, ft: 7.75 g. Perforated Pipe Diameter / Length: 60 inches / 175 feet h. Bottom Elevation, FMSL: 327.00 i. Overflow Elevation, FMSL: 334.50 j. Permitted Storage Volume, ft3: 7,312 k. Predevelopment 1 year 24 hour: 0.12 cfs I. Post development 1 year 4 hour: 0.00 cfs m. Type of Soil: Vaucluse Loamy Sand n. Expected Infiltration Rate, in/hr: 1.75 o. Seasonal High Water Table, FMSL: 320.00 P. Time to Draw Down, days: 2.14 q. Receiving Stream/River Basin: UT to Bones Creek / Cape Fear r. Stream Index Number: 18-31-24-2 S. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and vegetated areas. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass/overflow structure, filter media, catch basins, piping and drainage system. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Page 2 of 6 State Stormwater Permit Permit No. SW6101105 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d.. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification. in writing to the Director that the changes have been made. - • • , _ . - III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. Page 3 of 6 State Stormwater Permit Permit No. SW6101105 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 13t' day of January, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Loieen h. Sumns, uirector Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No. SW6101105 Fort Bragg Range 37 Training Annex Stormwater Permit No. SW6101105 . Cumberland County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No. SW6101105 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 �r NC®ENR North Carolina Department of Environment and Natural Resources Beverly Eaves Perdue Governor Mr. Craig Lantz Fort Bragg DPW-WMB 2175 Reilly Road Stop A Fort Bragg, NC 28310-5000 Division of Water Quality Coleen H. Sullins Director January 13, 2011 Subject: Stormwater Permit No. SW6101105 Fort Bragg Range 37 Training Annex High Density Infiltration Trench Project Cumberland County Dear Mr. Lantz: Dee Freeman Secretary i JAN 18 2011 LIME 11 The Stormwater Permitting Unit received a complete Stormwater Management Permit Application for Fort Bragg Range 37 Training Anne on November 30, 2010; and additional information received on January 5, 2011 and January 12, 2011. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 21-1.1000 and Session Law 2006-246. We are forwarding Permit No. SW6101105, dated January 13, 2011, for the construction, operation and maintenance of the subject project and the stormwater BMPs. The infiltration trench is designed to provide treatment for 2.5 times the minimum required treatment volume in order to waive the bypass and vegetated filter strip requirements. This permit shall be effective from the date of issuance until January 13, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for inspection and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need additional information concerning this matter, please contact Robert Patterson at (919) 807-6375; or robert.patterson@ncdenr.gov. Wetlands and Stormwater Branch 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-63001 FAX: 919.807-64941 Customer Service: 1-877-623-6748 Internet: w .ncwaterquality.otg An Equal CppoMnity \ Affirmative Action Employer No�rthCaroj i na ;Vaturally iwr. Craig t.amz SW6101 105 — fort Bragg Range 37 Training Annex January 13, 2011 f � J Sincerely, for C IS2ll cc: z'Fayetteville. Regional Office — Mike Lawyer SW6101105 File ec: Cromwell Architects Engineers — John Peterson, PE Page 2 of 2 State Stormwater Permit Permit No. SW6101105 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Fort Bragg Directorate of Public Works Fort Bragg Range 37 Training Annex South side of Longstreet Rd. (-700' east of Lamont Rd.), Fort Bragg, Cumberland County FOR THE construction, operation and maintenance of one underground infiltration trench in compliance with the provisions of Session Law 2006-246 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 13, 2021, and shall be subject to the followinq specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.8 of this permit. The stormwater control has been designed to handle the runoff from 34,848 square feet of impervious area. 3. The infiltration trench is designed to provide treatment for 2.5 times the minimum required treatment volume in order to waive the bypass and vegetated filter strip requirements. 4. The tract will be limited to the amount of built -upon area indicated in Section 1.8 of this permit, and per approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 30 feet landward of all perennial and intermittent streams. Page 1 of 6 State Stormwater Permit Pen -nit No. SW6101105 7. The following design criteria have been provided in the infiltration trench and must be maintained at design condition: a. Drainage Area, acres: 1.03 Onsite, ft : 44,867 Offsite, ft2: 0 b. Total Impervious Surfaces, ft2: 34,848 Onsite, ft : 34,848 Offsite, ft2: 0 C. Design Storm, inches: 1.0 d. Trench Length ft: 175 e. Trench Width, ft: 10.0 f. Trench Height, ft: 7.75 g. Perforated Pipe Diameter / Length: 60 inches / 175 feet h. Bottom Elevation, FMSL: 327.00 i. Overflow Elevation, FMSL: 334.50 j. Permitted Storage Volume, W: 7,312 k. Predevelopment 1 year 24 hour: 0.12 cfs I. Post development 1 year 4 hour: 0.00 cfs M. Type of Soil: Vaucluse Loamy Sand n. Expected Infiltration Rate, in/hr: 1.75 o. Seasonal High Water Table, FMSL: 320.00 p. Time to Draw Down, days: 2.14 q. Receiving Stream/River Basin: UT to Bones Creek / Cape Fear r. Stream Index Number: 18-31-24-2 S. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and vegetated areas. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass/overflow structure, filter media, catch basins, piping and drainage system. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. The permittee shall submit to the Division of Water Quality an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. Page 2 of 6 State Stormwater Permit Permit No. SW6101105 6. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 9. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. c. Transfer of ownership. A. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained,on file by the Permittee for a minimum of ten years from the date of the completion of construction. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the supporting documentation as listed on page 2 of the form: The approval of this request will be considered on its merits and may or may not be approved. Page 3 of 6 State Stormwater Permit Permit No. SW6101105 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2006- 246, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days. 12. The permittee shall submit a renewal request with all required forms and documentation at least 180 days prior to the expiration date of this permit. Permit issued this the 131h day of January, 2011. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 4 of 6 State Stormwater Permit Permit No. SW6101105 Fort Bragg Range 37 Training Annex Stormwater Permit No. SW6101105 Cumberland County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 5 of 6 State Stormwater Permit Permit No. SW6101105 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure elevations are per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. AII required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. Please submit this Designer's Certification to: Fayetteville Regional Office Surface Water Protection 225 Green Street Systel Building Suite 714 Fayetteville, NC 28301-5043 Page 6 of 6 CROMWELL AKHrrECTS FAMED6 TRANSMITTAL: ATTENTION: Robert D. Patterson, PE 512 N. Salisbury ST. Raleigh, NC 27604 9th Floor COMPANY: NCDENRIDWQI Stormwater Permitting PHONE: 919 807 6375 DATE: January 10, 2011 PROJECT: Ft Bragg-SOF Expl Training Fac AE Project No.: 2009-100 SUBJECT: Fort Bragg SOF Range 37 Trainin Annex - Stormwater Management Permit Application Revisions DOCUMENT: DATED: COPIES: REMARKS: Drawing CG301 Storm Drain Profiles Revised 01/07/2011 2 Full Size Drawing CG502 Site Details Revised 01/07/2011 2 Full Size Drawing CG601 Storm Drain Pipe & Structure Schedule Revised 01/07/2011 2 Full Size Drawing CG801 Drainage Area Delineation Plan Revised 01/07/2011 2 Full Size Calculations - Stormwater Drainage 01/07/2011 2 4 Sheets Each (81/2x11) CC: �P, 7. (F� IR9W �I ncua . wexcurv�et SENT VIA: BY: Lance Ballard 101 SOUTH SPRING STREET, LITTLE ROCK, ARKANSAS 72201 501-372-2900 FAX 501-372-0482 Pt DWQ USE ONLY DatV Received Fee Pa'd Permit Number Applicable Rul s: ❑ Coastal SW -1995 Coastal SW - 2008 &Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina VED RECEI Department of Environment and Natural Resources Division of Water Quality NOV 2 STORMWATER MANAGEMENT PERMIT APPLICATION FORM 3 2��� This form tuay be photocopied for use as at original Raleigh Regional Ott;Ce NC DEIVR I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): DENR—FRn Fort Bragg Range 37 Training Annex 2. Location of Project (street address): FES 15 2011 City:Fort Bragg County:Cumberland Zip:28316J ) 3. Directions to project (from nearest major intersection): ®1 � 4. Latitude:35° 08' 07.09" N Longitude:79* 03' 46.23" W of the main entrance 1I. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberN/A , its issue date (if known)N/A and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification 2. S ecify the type of propct (check one): 11�Low Density High„�e sity ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, N/A and the previous name of the project, if different than currently proposed, N/A 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: 3.92 ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:FB-SOP Range 37 Training Annex (PN74837) Project ID CUMBE-2011- 060, Letter of Approval September 20, 2010 for Express Review of Sedimentation/Erosion Control NPDES General Stormwater Permit NCGO1000 (Construction Activities) Form SWU-101 Version 07July2009 Page I of III. CONTACT INFORMATION I. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization: Fort Bragg Directorate of Public Works Signing Official & Title: Mr. Craig Lantz, Water Management Branch Chief b. Contact information for person listed in item la above: Street Address: 2175 Reilly Road Stop A City: Fort Bragg State: NC Zip: 28310-5000 Mailing Address (if applicable): 2175 Reilly Road Stop A City: Fort Bragg State: NC Zip: 28310-5000 Phone: ( 910 ) 396-2301 Fax: ( 910 ) 907-2420 Email: jennings.c.Iantz@us.army.mil c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Fort Bragg Directorate of Public Works Signing Official & Title: Mr. Craig Lantz, Water Management Branch Chief b.Contact information for person listed in item 2a above: Street Address: 2175 Reilly Road Stop A City: Fort Bragg State: NC Zip: 28310-5000 Mailing Address (if applicable): 2175 Reilly Road Stop A City: Fort Bragg State: NC Zip: 28310-5000 Phone: ( 910 ) 396-2301 Email: jennings.clantzQus.army.mil Fax: ( 910 ) 907-2420 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Mr. Lee Ward/Water Management Branch Signing Official & b.Contact information for person listed in item 3a above: Mailing Address: Building 0-9125 McKellars Road City: Fort Bragg State: NC Zip: 28310 Phone: ( 910 ) 396-2301 Email: lee.p.ward@us.army.mil 4. Local jurisdiction for building permits: Fax: ( 910 ) 907-2420 Point of Contact: Phone #: Form SWU-101 Version 07Ju1y2009 Page 2 of6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. ?1—+A! 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.Identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 3.92 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area*:3.92 acres Total project area shall be calculated to exclude the following the norual ool of impounded structures, the area between the batiks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward frorn the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Notn-coastal roetlauds landward of the NHW (or MHW) line stay be included in the total project area. y) ^ X 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 � / % 9. How many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet1y j�hthe information for each area provided in the same format as below?L [A/F. TIC/`.tCrf /�/ Basin Information Drainage Area 1 Drainage Area 2 Drainage Area : Drainage Area Receiving Stream Name Bones Creek Bones Creek Stream Class * C C Stream Index Number * 1 31-24-2 18-31-24-2 Total Drainage Area (so 1 755 44867 On -site Drainage Area (so 17 55 44867 Off -site Drainage Area (so 0 0 Proposed Impervious Area** (so 3484 34848 % Impervious Area** total 20.4 7.7 Impervious", Surface Area . D aina e Area 1 . Drainage Area 2 Drainage Area,_- Drainage Area On -site Buildings/Lots (so 6200 6200 On -site Streets (so 9600 9600 On -site Parking (so 5241 15241 On -site Sidewalks (so 807 3807 Other on -site (so 0 0 Future (so 0 Off -site (so 0 Existing BUA*** (so 0 0 Total (so: 34848 34848 Stream Class and Index Number can be determined at: http://It2o.enr.state.nc.us/biros/reportslreportsW6 )alai * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Report only that annount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. i Form SWU-101 Version 071uly2009 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Projects in Union County: Contact DWQ Central Ojjice staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded fromhttp://h2o.enr.state.nc.us/su/bmp forms.htn. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://h2o.enr.state.nc.us/su/bmp forms.htm. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at hqp://h2o.enr.state.nc.us/su/msi maps htm.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://h2o.enr.state.nc.us/su/bmp forms htm. In' 'als 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. _ 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envhelp.org/pages/onestopexpress hhul for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. 7 b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. I. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished Floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Version 07Ju1y2009 Pale 4 of 6 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: N/A Page No: N/A 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: / /www.secretaEy.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and'future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://h2o.enr.state.nc.us/su/bmp forms.htmkdeed restrictions. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer: Tohn Peterson, PE Consulting Firm: Cromwell Architects Engineers Mailing Address:101 South Spring Street City:Little Rock State:AR Zip:72201 Phone: (501 ) 372-2900 Email: jeterson©cromwell.com Fax: (501 ) 372-0482 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled ont, complete this section) I, (print or type name of person listed in Contact Information, item 2a) N/A , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) N/A with (print or type name of organization listed in Contact Information, item 1b) N/A to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07July2009 Page 5 of As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. a Notary Public for the State of . County of do hereby certify that before me this _ day of personally appeared . and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission X. APPLICANT'S CERTIFICATION I, (print or hjpe nanre of person listed in Contact Information, item 2) Craig Lantz certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 75Ad 000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Date: Date: (j 7 I, I - —'�a Notary Public for the State of County of do hereby certify that before me this _ day of personally appeared and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission Form SWU-101 Version 07July2009 Page 6 of CROMWELL ARGHTECTS E%INr.ERS TRANSMITTAL: ATTENTION: Bill Diuguid, AICP COMPANY: Wetlands and Stormwater Branch Division of Water Quality I NCDENR 512 N. Salisbury St., 9th Floor Raleigh, NC 27604, PHONE: 919-807-6369 DATE: January 4, 2011 PROJECT: Ft Bragg-SOF Expl Training Fac AE Project No.: 2009-100 SUBJECT: Fort Bragg Range 37 Training Annex - Stormwater Permit Application Check DOCUMENT: I DATED: I COPIES:IREMARKS: Check 1 01/04/2011 1 1 1 Replacement Check, previous check cancelled CC: SENT VIA: BY: Federal Express - Standard Overnight John T Peterson 101 SOUTH SPRING STREET, LITTLE ROCK, ARKANSAS 72201 501-372-2900 FAX 501-372-0482 Pi 7D F1)-1-r«0A- �/% C(' ` pplication Completeness Review rs tv rJ pny o`F�rc ,L I ❑ First Submittal ❑ Re -submittal Date Received: / �o to DateLviewed::7LI oo By Kilt ittrr Development/Project Name: r6e-F 82o%C RAJ -77 "%AAJ&il Receiving stream name Be'rg'e's Cel-rc c I classification: C For post -construction requirements, a program will be deemed compliant for the areas where it is implementing any of the following programs: WS-I, WS-II, WS-III, WS-IV, HQW, ORW, Neuse River Basin NSW, Tar -Pamlico River Basin NSW; and the Randleman Lake Water Supply Watershed Nutrient Management Strategy. I Hiqh Density Proiects that require a 401/404 within an NSW require 85% TSS, 30% TN and 30% TP removal. I T&E Species (Goose Creek, Waxhaw Creek or Six Mile Creek Water Sheds): "I f} Latitude and Longitude: OR Jurisdiction %—cFT„_4. Project Address: l� rr —+�r.� r r�J s'� o F _ g m �uu 'FoRT FrA *CkS Engineer name and firm. Vert s o cRo _L.,(� > Grcr jTJeicreS�(\� lRcy�J�.C��+ %UJ SOu Sp,e,ni- L; P° ❑ Low Density (no curb and gutter) ❑ Low Density with curb and gutter outlets �6 High Density ❑ Other 14/h, ,I< 401/404 impacts to surface waters, wetlands, and buffers (add language to cover letter and/or addinfo letter) 4EKSUA ecMg*naftre inclu a ngino p o ocopy) on application �AJ� CF-4/6 u�Legal signature (Corporation-VP/higher, Partnership -General �artner/higher, LLC-member/manager, Agent). Check spelling, capitalization, punctuation: htip://www.secretary.state.nc.us/corporations/thepage.aspx If an agent signs the application, a signed letter of authorization from the applicant must be provided which includes the name, title, mailing address and phone number of the person signing the letter. r subdivided projects, a signed and notarized deed restriction statement e Sealed, signed & dated calculations ❑ Correct supplement and O&M provided for each BMP on site (check all that were provided & number of each) ❑ Bioretention ❑ Dry Detention Basin ❑ Filter Strip ❑ Grass Swale V❑ /Infiltration Basin Infiltration Trench ❑ Level Spreader ❑ Permeable Pavement ❑ Restored Riparian Buffer ❑ Rooftop Runoff Management ❑ Sand Filter ❑ Stormwater Wetland ❑ Wet Detention Basin ❑ Low Density ❑ Curb Outlet ❑ Off -Site ❑ NCDOT Linear Road :✓Jlwo sets of sealed, signed & dated layout& finish grading plans with appropriate details q � arrative Description of stormwater management provided 4oils report provided -� /Wetlands delineated or a note on the plans that none exist on site and/or adjacent property F etails for the roads, parking area, cul-de-sac radii, sidewalk widths, curb and gutter; � Xiimensions & slopes provided LP/�,Drainage areas delineated ❑ Pervious and impervious reported for each ❑ Areas of high density 4/_Jpspection and maintenance agreements provided Application complete ❑ Application Incomplete Returned: (Date) Comments K, 4R �l?Yar February 9, 2009 Revision SL 2006-246 Section 9 Post Construction Requirements for Non -Coastal Counties Low-densitv oroiects ❑ No more than two dwelling units per acre or 24% built -upon area; ❑ Vegetated conveyances to the maximum extent practicable; ❑ Built -upon areas at least 30 feet landward of perennial and intermittent surface waters ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures. Hiah density oroiects ❑ Control and treat runoff from the first one -inch of rain. ❑ Runoff volume drawdown time must be a minimum of 48 hours, but not more than 120 hours; ❑ Discharge the storage volume at a rate equal to or less than the predevelopment discharge rate for the one-year, 24-hour storm. ❑ Achieve 85% average annual removal of total suspended solids. ❑ For BMPs that require a separation from the seasonal high-water table (S,HWT), the separation shall include at least 12 inches of naturally occurring soil above the SHWT. ❑ Stormwater management measures must comply with the General Engineering Design Criteria For All Projects requirements listed in 15A NCAC 2H .1008(c); ❑ All built -upon areas are at least 30 feet landward of perennial and intermittent surface waters; ❑ Deed restrictions, protective covenants, and/or other restrictive language/measures ❑ Provide a mechanism to require,long-term operation and maintenance of Best Management Practices Goose Creek, Six Mile Creek and Waxhaw Creek Watersheds Buffer Requirements ❑ Undisturbed riparian buffers within 200 feet of water bodies within the 100-Year Floodplain and within 100 feet of water bodies that are not within the 100-Year Floodplain. Exceptions to the undisturbed buffer requirements are set forth in 15A NCAC 02B .0607 Stormwater Controls as required by 15A NCAC 02B .0602 ❑ Control and treat the difference between the pre -development and post -development conditions for the one- year, 24-hour storm with structural controls. ❑ Development and redevelopment shall implement stormwater management measures that promote infiltration of flows and ground water recharge for the purpose of maintaining stream base flow. 85% average annual removal of total suspended solids. ❑ Draw down the treatment volume no faster than 48 hours, but no slower than 120 hours, for detention ponds. ❑ Discharge the storage volume at a rate equal or less than the pre -development discharge rate for the one- year, 24-hour storm. ❑ Meet design or stormwater management measures set forth in 15A NCAC 2H .1008. High Density Projects that require a 401/404 within an NSW ❑ 85% TSS ❑ 30% TN ❑ 30% TP February 9, 2009 Revision Permit No. W i 10 11 OS (to be provided by DWO) 04 Wp1EH 02 O� NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM INFILTRATION TRENCH SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I -PROJECT, INFORMATION, ,i'..� "revs-ur , (•..!` �� tr,t �, ,<e$� r �: .r d" Project name Fort Bragg Range 37 Training Annex Contact person John Peterson Phone number 501-372-2900 Date 1RI2011 Drainage area number 2 IL'DESIGN:INFORMATION .l Site Characteristics Drainage area 44,867,00 rye Impervious area 34,848.00 ft2 impervious 71.. in DEN R—FRO Design rainfall Design rainfall depth depth 0 1.00 in � > •'�*� Peak Flow Calculations FEB 1 5 2011 1-yr, 24-hr rainfall depth 3.00 in 1-yr, 24-hr intensity 0.13 inlhr w Pre -development 1-yr, 24-hr discharge 0.12 fflsec �� ��1�� Post -development 1-yr, 24-hr discharge 0.00 fl'/sec Pre/Post 1-yr, 24-hr peak flow control -0.12 ft'Isec Storage Volume: Non -SA Waters Minimum volume required 7,010.00 Its Volume provided 7,312.00 fl' OK for non -SR waters Storage Volume: SA Waters 1.5• runoff volume ff' Pre -development 1-yr, 24-hr runoff volume It, Post -development 1-yr, 24-hr runoff volume ff' Minimum volume required ff' Volume provided ff' Soils Report Summary Soil type Vaucluse Loamy Sand Infiltration rate 1.75 ini SHWT elevation 320.00 fmsl Trench Design Parameters Drawdown time 2.14 days OK Perforated pipe diameter 60.00 in Perforated pipe length 175.00 It Number of laterals 1 Stone type (if used) Gravel Stone void ratio 0.4 Stone is free of fines? Y (Y or N) OK Fonn SW401-Infiltration Trench-Rev.4 Parts I. & 11. Design Summary, Page 1 of 2 Permit No. (to be provided by DWO) Trench Elevations Bottom elevation 327.00 fmsl OK Storage/overflow elevation 334.50 fmsl Top elevation 334.75 fmsl Trench Dimensions Length (long dimension) 175.00 It Width (short dimension) 10.00 ft Height (depth) 7.75 ff OK Additional Information Maximum volume to each inlet into the trench? 0.24 ac-in OK Length of vegetative filler for overflow 70.00 ft OK Number of observation wells 1 OK Distance to structure 150.00 fit OK Distance from surface waters 500.00 ft OK Distance from water supply well(s) 5,000.00 fit OK Separation from impervious soil layer 10.00 it OK Depth of naturally occuring soil above SHWT 20.00 It OK Bottom covered with 4-in of clean sand? Y (Y or N) OK Proposed drainage easement provided? NA (Y or N) OK Capures all runoff at ultimate build -out? Y (Y or N) OK Bypass provided for larger storms? Y (Y or N) OK Trench wrapped with geotextile fabric? Y (Y or N) OK Pretreatment device provided NA Form SW401-Infiltration Trench-Rev.4 Parts I. & II. Design Summary, Page 2 of 2 Permit No (to be provided by DV✓Q) Ill. ;,REQUIRED ITEMS,CHECKLIST„ .' :,fix .: fib M. E:ii 'k :"_ fi. kS.,1 Aj 1,11 Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan In' ials Sheet No. 7/ CG801 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Trench dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and A _ � - Boundaries of drainage easement. CG sheets 2. Partial plan (1" = 30' or larger) and details for the infiltration trench showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cleanout, - Flow distribution detail for inflow, - Vegetated filter, and p Pretreatment device. I CG301/502 3. Section view of the infiltration trench (1" = 20' or larger) showing: - Pretreatment and treatment areas, and /1 -Inlet and outlet structures. CG801 4. A table of elevations, areas, incremental volumes &accumulated volumes to verify the volume provided. Soils Report 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The U results of the soils report must be verified in the field by DWQ, by completing & submitting the soils (� „n investigation request form. County soil maps are not an acceptable source of soils information. CG700-709 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the „ � n entire drainage area is stabilized. Calcs 7. The supporting calculations. 0&M 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. NA 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Trench-Rev.4 Part III. Required Items Checklist, Page 1 of 1 Permit Number: 51/6101(05_ (to be provided by DWQ) Drainage Area Number: 2- Infiltration Trench Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the infiltration trench will be carefully managed to reduce the sediment load to the sand filter. — The water level in the monitoring wells will be recorded once a month and after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). The infiltration trench will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How 1 will remediate theproblem: The entire BMP Trash debris is present. Remove the trash debris. , The grass filter strip or Areas of bare soil and/or Regrade the soil if necessary to other pretreatment area erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment has accumulated to Search for the source of the a depth of greater than six sediment and remedy the problem if inches. possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. The flow diversion The structure is clogged. Unclog the conveyance and dispose structure (if applicable) of any sediment off -site. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. FEB 15 2011 FIT, '(I1 Form SW401-Infiltration Trench O&M-Rev.3 Page 1 of 3 BMP element: Potentialproblem: How I will remediate theproblem: The trench Water is pending on the Remove the accumulated sediment surface for more than 24 from the infiltration system and hours after a storm. dispose in a location that will not impact a stream or the BMP. The depth in the trench is Remove the accumulated sediment reduced to 75% of the original from the infiltration system and design depth. dispose in a location that will not impact a stream or the BMP. Grass or other plants are Remove the plants, preferably by growing on the surface of the hand. If pesticide is used, wipe it on trench. the plants rather than spraying. The observation well(s) The water table is within one Contact the DWQ Stormwater Unit foot of the bottom of the immediately at 919-733-5083. system for a period of three consecutive months. The outflow pipe is clogged. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. The outflow pipe is damaged. Repair or replace the pipe. The emergency overflow Erosion or other signs of The emergency overflow berm will berm damage have occurred at the be repaired or replaced if beyond outlet. repair. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. Form SW401-Infiltration Trench O&M-Rev.3 ,Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Fort Bragg Range 37 Training Annex BMP drainage area number: Print name:Mr. Craig Lantz Title: Directorate of Public Works (DPW) /Water Management Branch (WMB) Address:2175 Reilly Road Stop A, Fort Bragg, NC 28310-5000 Note: The legally responsible parry should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of County of , do hereby certify that personally appeared before me this day of and acknowledge the due execution of the forgoing infiltration trench maintenance requirements. Witness my hand and official seal, SEAL My commission expires Form SW40 I -Infiltration Trench O&M-Rev.3 Page 3 of 3 CROMWELL ARMECTS DGNE.05 TRANSMITTAL: ATTENTION: Stormwater Management Permit Review RECEIVED COMPANY: Division of Water Quality, NCDENR Raleigh Regional Office 1628 Mail Service Center NOV 2 3 2010 Raleigh, NC 27699-1628 NCDENR PHONE: 919-791-4200 Raleigh Renianal office DATE: November 22, 2010 PROJECT: Ft Bragg-SOF Expl Training Fac AE Project No.: 2009-100 SUBJECT: Stormwater Mangement Permit Application DOCUMENT: DATED: COPIES: REMARKS: 001-034B (28 Drawings) 2 Stormwater Calculations 2 Stormwater Permit Application 2 Partial Erosion Control Calculations 2 Stormwater Narrative 2 Soils Reports 2 O&M Forms 2 Supplemental Forms 2 CC: SENT VIA: Federal Express - Standard Overnight BY: John Peterson � o �, x NOV 242010 DENR- WATER W1AIttY rts 3eoQ WEUMANDSTORIMATERSMON L W9 1 �A w' /24/ 1A A&LI 101 SOUTH SPRING S"FREET, LITTLE ROCK, ARKANSAS 72201 501-372-2900 FAX 501-372-0482 N Stormwater Management Report Bldg. 0-3570 Parking Lot Expansion Project No. TA-00034-18 Fort Bragg, NC Prepared For: Barnhill Contracting Company R'ec EiV E© FEB - 5 2G2 DEQ-FAyEj1cVILLE F,EGIONALOFrICE Prepared By: '. ......... GRADIENT , LAND WATER- INNOVATION SEAL 230 Donaldson St; Suite 500A 28421 Fayetteville, NC 28301 "',;yFq'H��••'�� Firm Lic. No. P-1875 Hydraulics Engineer: C. Heath Wadsworth, PE Lic. No. 28421 December. 2019 1. Introduction: The purpose of this Stormwater Report is to document the stormwater management plan for the Building 0-3570 Parking Lot Expansion project at Fort Bragg. The project stormwater control measure is a bio-retention basin. The Appendix of this report contains the stormwater hydraulic calculation outputs from Pond Pack, a pre -development map, a post - development map, and a soils inspection report. 2. Project Location: The project site is located east of the intersection of Longstreet Road and Lamont Road on Fort Bragg in Cumberland County, NC. 3. Existing Condition: The existing property is an undeveloped wooded area. The NRCS soil maps show that the site is Hydrologic Soil Group C soils. Soil Infiltration: The soils report performed by Hal Owen Associates, Inc. is included with this report. Even though the existing soils show some infiltration potential, the bio-retention system has been designed with an underdrain systems. Bldg. 0-3570 Fort Bragg Stormwater Management December, 2019 Pre -Development Landuse Land Cover Area (SF) Curve Number (CN) Woods, good 31,038 70 BUA 0 98 Total 31,038 4. Proposed Condition: The proposed condition will include a parking lot expansion (see plans produced by Gradient, PLLC for more detail). The stormwater control measure is a bio-retention basin with an underdrain system. Post -Development Landuse Land Cover Area (SF) Curve Number (CN) Into Basin BUA (new) 12,824 98 Open Space, Good 4,299 74 Sub -Total 17,123 75%BUA Not In to Basin BUA (new) 1,765 98 Open Space, Good 12,150 74 Sub -Total 13,915 Total 31,038 47%BUA 5. Proposed Stormwater Treatment and Quality Control: The proposed bio-retention provides water quality treatment. The water quality treatment volume is detained and will be drawndown slowly through the media and underdrain system. Water Quality Volume Provided in bio-basin = 1,504 cu. Ft. Water Quality Volume Required for contributing Drainage Area = 1,033 cu. Ft. Because the stormwater control measures are designed to attenuate the 1-year, 24-hour storm event, they provide more water quality volume than is required. Bldg. 0-3570 Fort Bragg Stormwater Management December, 2019 6. Proposed Stormwater Attenuation and Quantity Control: The pre- and post -development peak discharge attenuation requirement was assessed for the entire development site. The site peak discharge is reduced during the post - development condition for the 1-yr, 24-hr storm event. Site Pre -Development 1-yr, 24-hr Discharge = 0.8 cfs Site Post -Development 1-yr, 24-hr Discharge = 0.5 cfs Bio-retention Performance Breakdown Routing Breakdown Basin Minimum EL=356.5; Max EL=358.0; Top of Riser Spillway EL=357.4 Storm Event Max Flow in cfs Max Flow out cfs Max Basin WSEL Volume Stored ac-ft 1-yr 1.3 0.2 357.41 0.037 10-yr 2.6 2.4 357.54 0.043 100-yr 4.0 3.8 357.60 0.046 Supporting Documentation: - Pre- and Post -development Maps - Project Site on USGS Quad Map - Soils Report - Pond Pack Output Bldg, 0-3570 Fort Bragg Stormwater Management December, 2019 Pre- and Post -development Maps Project Site on Quad Map Bldg. 0-3570 Fort Bragg Stormwater Management December, 2019 'd P Project Area=31,038 SF Nit sit 00 -♦ bing ate,, r r OF r 10, Project Site � saw =osan • II )I J r 1 i O O o • V O �O / WA � O a 9 n r � 6 v Bones Creek USGS Quad Bidg. 0-3570 Parking Expansion 0 300 600 1,200 1,800 2,400 e Feet � VIA� G ���GRADIENT! J LAND WAINNOVATION 1 HAL OWEN & ASSOCIATES, INC. SOIL & ENVIRONMENTAL SCIENTISTS P.O. Box 400, Lillington NC 27546-0400 Phone (910) 893-8743 / Fax (910) 893-3594 www.halowensoil.com 8 November 2019 Mr. Gordon Rose Gradient, PLLC 230 Donaldson Street, Suite 500A Fayetteville, NC 28301 Reference: Soil Scientist Investigation Bldg 0-3570 Parking Lot Extension Dear Mr. Rose, A site investigation has been conducted for the above referenced site, located on the southern side of Longstreet Road in Cumberland County, North Carolina. The purpose of this investigation was to provide a general characterization of the soils in the area proposed for a stormwater infiltration device, including a determination of the depth to evidence of a seasonal high water table and estimation of the permeability of the various soil layers. In -situ hydraulic conductivity testing was not conducted. All soil characteristics were described in accordance with the USDA Field Book for Describing and Sampling Soils. This report represents my professional opinion as a Licensed Soil Scientist. Hand powered auger borings were advanced in the area proposed for the infiltration device (Figure 1). Soil morphological characteristics indicating a seasonal high water table (SHWT) were observed at 110 inches below surface. Infiltration rates (permeability) range from 1.5 in/hr in the sandy clay loam layer between 12 and 18 inches to as high as 10 in/hr in the loamy sand textured soils observed in the surface layers. A soil profile description was collected at location #1 and is attached to this report. I appreciate the opportunity to provide this service and trust that you will feel free to call on me again in the future. If you have any questions or need additional information, please contact me at your convenience. cnu _ N�zp NOR" Sincerely jww_r� Hal Owen Licensed Soil Scientist Soil Science Investigations • Wetland Delineations, Permitting, and Consulting HAI. OWEN & ASSOCIATES, INC. Soil Scientist Investigation For Stormwater Management Bldg 0-3570 Parking Lot Extension 8 November 2019 Figure I LONOSTREET ROAD .c ar ae o.e— at �'tio Soil Science Investigations • Wetland Delineations, Permitting, and Consulting 1-IAL OWEN & ASSOCIATES, INC. SOIL PROFILE DESCRIPTIONS FOR STORMWATER MANAGEMENT DEVICES PROJECT NAME: Bld, 0-3570 Parkin, Lot Extension PROPOSED FACILITY: LOCATION OF SITE: Lom,street Road COUNTY: Cumberland EVALUATED BY: Hal Owen, NC Licensed Soil Scientist DATE EVALUATED: 5 November?019 EVALUATION M6TFIOD: Auger Boring Z. Pit ❑ PROFILE: I HORIZON DI -I III (IN) MATRIX MO'PTLP.S 'I'IiX'l'URF, STRUC: IURI, CONSIS- . 'IENCE PI:RMF,AI311' I"IN(IN/1-Ilt) NOTES A 0-5 I OYR 3/3 LS 2 M GR 17R 10 E 5-12 IOYR 6/6 LS 2 M GR I7R 10 ntl 12-I8 7.5 YR 6/8 SCI. 2MSBK PI IS M2 I8-70 10YR 7/8 SL 2 M S13K 1:1 2.0 BG 70-82 IOYR 7/8 IOYR 8/3 t7 SL 2 M S13K PR 6.0 13t4 82-110 IOYR 5/6 SL I M S13K FR 6.0 RC 110+ 7.5YR 8/I 7.5YR 5/8 m2 SL AW'I MIW'I" I10inches SLWI' SLOPE DRAINAGE SOIL SERIES VEGE rAT ION Mixed pine -hardwoods COMMENTS: Complex soil patterns Soil Science Investigations • Wetland Delineations, Permitting, and Consulting FIAL OWEN & ASSOCIATES, INC. LEGEND OF ABBREVIATIONS FOR SOIL PROFILE DESCRIPTIONS TEXTURE S - Sand LS - Loamy Sand SL - Sandy Loam L - Loam SCL - Sandy Clay Loam CL - Clay Loam SiL - Silt Loam Si - Silt SiCL- Silt Clay Loam SC - Sandy Clay C - Clay SiC - Silty Clay O - Organic MOTTLES f — few c — common in — many STRUCTURE 0 - structureless 1 - weak 2 - moderate 3 - strong MOIST CONSISTENCE L, - Loose VFR - Very Friable FR - Friable FI - Firm VFI - Very Firm EFI - Extremely Firm AWT —Apparent Water'rable SFI WT —Seasonal Fligh Water Table SLWT— Seasonal Low Water Table I - fine F - Faint 2 - medium D - Distinct 3 - coarse P - Prominent VF -very fine G - Single Grain F - fine M - Massive M - medium CR - Crumb C - coarse GR - Granular VC - very coarse SBK - Subangular Blocky ABK - Angular Blocky PL - Platy PR - Prismatic Soil Science Investigations • Wetland Delineations, Permitting, and Consulting 3P 9IT N a 4CN Soil Map —Cumberland County, North Carolina 3 � y yM My F R MIT 5715M sm 5mm 67MM am= a M3pSob:1:591ipintedonApabal[(&5'x 11)91eec M & N Me0l5 0 5 N1 31 3D k0 75 8D IOD 1 Map RoJa2rN:Web MaaNr Comermordnates:W13586 Ed9ets:Url4Zme17NNKS84 USDA Natural Resources Web Soil Survey i Conservation Service National Cooperative Soil Survey 3Y BIPN 1 3T 66N 11 /22/2019 Page 1 of 3 Soil Map —Cumberland County, North Carolina Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI vau Totals for Area of Interest vaucrose loamy sane, o to io percent slopes .0 1 UU.0 %o _1_0100.0%'. USDA Natural Resources Web Soil Survey 11/2212019 Conservation Service National Cooperative Soil Survey Page 3 of 3 Project Summary Title Barnhill - Bldg. 0- 3570 Engineer C. Heath Wadsworth, PE Company Gradient, PLLC Date 11/22/2019 Notes Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center )08.11.o155) 12/5/2019 27 Siemon Company Drive Suite 200 W Page 1 of 50 Watertown, CT 06795 USA ,t-203-755-1666 Table of Contents Master Network Summary Time -Depth - 1 Time -Depth Curve, 100 years Time -Depth Curve, 10 years Time -Depth Curve, 1 years Unit Hydrograph Equations CM-1 Unit Hydrograph Summary, 1 years Unit Hydrograph (Hydrograph Table), 1 years CM-2 Unit Hydrograph Summary, 1 years Unit Hydrograph (Hydrograph Table), 1 years CM-3 Unit Hydrograph Summary, 1 years Unit Hydrograph (Hydrograph Table), 1 years 0-1 Addition Summary, 1 years Addition Summary, 1 years PO-1 (IN) Time vs. Elevation, 1 years PO-1 Time vs. Volume, 1 years PO-1 Elevation -Area Volume Curve, 1 years Volume Equations, 1 years Composite Outlet Structure - 1 Outlet Input Data, 1 years Individual Outlet Curves, 1 years Composite Rating Curve, 1 years Outlet-1 Diverted Hydrograph, 1 years PO-1 Elevation -Volume -Flow Table (Pond), 1 years PO-1 (IN) 4 6 8 10 12 14 16 18 20 22 24 24 26 29 32 33 34 38 40 41 42 PO-1 (INF) PO-1 (OUT) PO-1 (IN) Table of Contents Pond Infltration Calculations, 1 years 43 Level Pool Pond Routing Summary, 1 years 44 Pond Infiltration Hydrograph, 1 years 45 Pond Routed Hydrograph (total out), 1 years 47 Pond Inflow Summary, 1 years 48 Subsection: Master Network Summary Catchments Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (hours) (ft3/s) (years) (ac-ft) CM-1 Pre -Development 1 1 0.045 11.950 0.76 year CM-1 Pre -Development 10 10 0.140 11.950 2.54 year CM-1 Pre -Development 100 100 0.275 11,900 4.99 year CM-2 Post -Development 1 1 0.073 11.900 1.30 year CM-2 Post -Development 10 10 0.148 11.900 2.56 year CM-2 Post -Development 100 0.237 11.900 4.00 100 year CM-3 Post -Development 1 1 0.030 11.950 0.54 year CM-3 Post -Development 10 10 0.080 11.900 1.45 year CM-3 Post -Development 100 0.145 11.900 2.63 100 year Node Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Event Volume (hours) (ft3/s) (years) (ac-ft) 0-1 Pre -Development 1 1 0.045 11.950 0.76 year 0-1 Post -Development 1 1 0.034 11.950 0.54 year 0-1 Pre -Development 10 10 0.140 11.950 2.54 year 0-1 Post -Development 10 10 0.136 11.950 3.84 year 0-1 Pre -Development 100 100 0.275 11.900 4.99 year 0-1 Post -Development 100 0.270 11.950 6.35 100 year Pond Summary Label Scenario PO-1 (IN) Post - Development 1 year Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (hours) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) 1 0.073 11,900 1.30 (N/A) (N/A) Bentley Systems, Inc. Haestao Methods Solution Bentley Pond Pack V6i BAR, 1030Ppc Center [08.11.01,55) 12/5/2019 27 Siemon Company Dnve Suite 200 W Page 2 of 50 Watertown, CT 06795 USA .1-203-755-1666 Subsection: Master Network Summary Pond Summary Label Scenario Return Hydrograph Time to Peak Peak Flow Maximum Maximum Event Volume (hours) (ft3/s) Water Pond Storage (years) (ac-ft) Surface (ac-ft) Elevation (ft) PO-1 (OUT) Post- 1 0.004 12.150 0.18 357.41 0.037 Development 1 year PO-1 (IN) Post- 10 0.148 11.900 2.56 (N/A) (N/A) Development 10 year PO-1 (OUT) Post- 10 0.056 11.950 2.41 357.54 0.043 Development 10 year PO-1(IN) Post- 100 0.237 11.900 4.00 (N/A) (N/A) Development 100 year PO-1 (OUT) Post- 100 0.124 11.950 3.81 357.60 0.046 Development 100 year Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR.1030.ppc Center [08.11,01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 3 of 50 Watertown, CT 06795 USA *1-203-755-1666 Subsection: Time -Depth Curve Label: Time -Depth - 1 Time -Depth Curve: 100-yr, 24-hr Label 100-yr, 24-hr Start Time 0.000 hours Increment 0.100 hours End Time 24.000 hours Return Event 100 years Return Event: 100 years Storm Event: 100-yr, 24-hr CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (hours) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 0.500 0.0 0.1 0.1 0.1 0.1 1.000 0.1 0.1 0.1 0.1 0.1 1.500 0.1 0.1 0.2 0.2 0.2 2.000 0.2 0.2 0.2 0.2 0.2 2.500 0.2 0.2 0.3 0.3 0.3 3.000 0.3 0.3 0.3 0.3 0.3 3.500 0.3 0.3 0.4 0.4 0.4 4.000 0.4 0.4 0.4 0.4 0.4 4.500 0.5 0.5 0.5 0.5 0.5 5.000 0.5 0.5 0.5 0.6 0.6 5.500 0.6 0.6 0.6 0.6 0.6 6.000 0.7 0.7 0.7 0.7 0.7 6.500 0.7 0.7 0.8 0.8 0.8 7.000 0.8 0.8 0.8 0.9 0.9 7.500 0.9 0.9 0.9 0.9 1.0 8.000 1.0 1.0 1.0 1.0 1.1 8.500 1.1 1.1 1.1 1.2 1.2 9.000 1.2 1.2 1.3 1.3 1.3 9.500 1.3 1.4 1.4 1.4 1.5 10.000 1.5 1.5 1.6 1.6 1.6 10.500 1.7 1.7 1.8 1.8 1.9 11.000 1.9 2.0 2.1 2.1 2.2 11.500 2.3 2.5 2.9 3.5 4.7 12.000 5.4 5.6 5.7 5.8 5.9 12.500 6.0 6.1 6.2 6.2 6.3 13.000 6.3 6.4 6.4 6.5 6.5 13.500 6.6 6.6 6.6 6.7 6.7 14.000 6.7 6.8 6.8 6.8 6.8 14.500 6.9 6.9 6.9 6.9 7.0 15.000 7.0 7.0 7.0 7.1 7.1 15.500 7.1 7.1 7.2 7.2 7.2 16.000 7.2 7.2 7.3 7.3 7.3 16.500 7.3 7.3 7.3 7.4 7.4 17.000 7.4 7.4 7.4 7.4 7.5 17.500 7.5 7.5 7.5 7.5 7.5 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR. 1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 4 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Time -Depth Curve Label: Time -Depth -I CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Return Event: 100 years Storm Event: 100-yr, 24-hr Time Depth Depth Depth Depth Depth (hours) (in) (in) (in) (in) (in) 18.000 7.6 7.6 7.6 7.6 7.6 18.500 7.6 7.6 7.7 7.7 7.7 19.000 7.7 7.7 7.7 7.7 7.7 19.500 7.8 7.8 7.8 7.8 7.8 20.000 7.8 7.8 7.8 7.8 7.8 20.500 7.9 7.9 7.9 7.9 7.9 21.000 7.9 7.9 7.9 7.9 8.0 21.500 8.0 8.0 8.0 8.0 8.0 22.000 8.0 8.0 8.0 8.0 8.1 22.500 8.1 8.1 8.1 8.1 8.1 23.000 8.1 8.1 8.1 8.1 8.1 23.500 8.2 8.2 8.2 8.2 8.2 24.000 8.2 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BARA 030.ppc Center (08.11.01.561 12/52019 27 Siemon Company Drive Suite 200 W Page 5 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Time -Depth Curve Label: Time -Depth - 1 Time -Depth Curve: 10-yr, 24-hr Label 10-yr, 24-hr Start Time 0.000 hours Increment 0.100 hours End Time 24.000 hours Return Event 10 years Return Event: 10 years Storm Event: 10-yr, 24-hr CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (hours) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 0.500 0.0 0.0 0.0 0.0 0.1 1.000 0.1 0.1 0.1 0.1 0.1 1.500 0.1 0.1 0.1 0.1 0.1 2.000 0.1 0.1 0.1 0.1 0.1 2.500 0.2 0.2 0.2 0.2 0.2 3.000 0.2 0.2 0.2 0.2 0.2 3.500 0.2 0.2 0.2 0.2 0.3 4.000 0.3 0.3 0.3 0.3 0.3 4.500 0.3 0.3 0.3 0.3 0.3 5.000 0.3 0.4 0.4 0.4 0.4 5.500 0.4 0.4 0.4 0.4 0.4 6.000 0.4 0.4 0.5 0.5 0.5 6.500 0.5 0.5 0.5 0.5 0.5 7.000 0.5 0.5 0.6 0.6 0.6 7.500 0.6 0.6 0.6 0.6 0.6 8.000 0.7 0.7 0.7 0.7 0.7 8.500 0.7 0.7 0.7 0.8 0.8 9.000 0.8 0.8 0.8 0.9 0.9 9.500 0.9 0.9 0.9 0.9 1.0 10.000 1.0 1.0 1.0 1.1 1.1 10.500 1.1 1.1 1.2 1.2 1.2 11.000 1.3 1.3 1.4 1.4 1.5 11.500 1.5 1.7 1.9 2.3 3.1 12.000 3.6 3.7 3.8 3.9 3.9 12.500 4.0 4.0 4.1 4.1 4.2 13.000 4.2 4.2 4.3 4.3 4.3 13.500 4.3 4.4 4.4 4.4 4.4 14.000 4.5 4.5 4.5 4.5 4.5 14.500 4.6 4.6 4.6 4.6 4.6 15.000 4.6 4.7 4.7 4.7 4.7 15.500 4.7 4.7 4.7 4.8 4.8 16.000 4.8 4.8 4.8 4.8 4.8 16.500 4.8 4.9 4.9 4.9 4.9 17.000 4.9 4.9 4.9 4.9 4.9 17.500 5.0 5.0 5.0 5.0 5.0 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center (08,11.01,561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 6 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Time -Depth Curve Label: Time -Depth - 1 CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Return Event: 10 years Storm Event: 10-yr, 24-hr Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (hours) (in) (in) (in) (in) (in) 18.000 5.0 5.0 5.0 5.0 5.0 18.500 5.1 5.1 5.1 5.1 5.1 19.000 5.1 5.1 5.1 5.1 5.1 19.500 5.1 5.1 5.2 5.2 5.2 20.000 5.2 5.2 5.2 5.2 5.2 20.500 5.2 5.2 5.2 5.2 5.2 21.000 5.2 5.3 5.3 5.3 5.3 21.500 5.3 5.3 5.3 5.3 5.3 22,000 5.3 5.3 5.3 5.3 5.3 22.500 5.3 5.4 5.4 5.4 5.4 23.000 5.4 5.4 5.4 5.4 5.4 23.500 5.4 5.4 5.4 5.4 5.4 24.000 5.4 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BAR, 1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 7 of 50 Watertown, CT 06795 USA .1-203-755-1666 Subsection: Time -Depth Curve Label: Time -Depth - 1 Time -Depth Curve: 1-yr, 24-hr Label 1-yr, 24-hr Start Time 0.000 hours Increment 0.100 hours End Time 24.000 hours Return Event 1 years Return Event: 1 years Storm Event: 1-yr, 24-hr CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Time Depth Depth Depth Depth Depth (hours) (in) (in) (in) (in) (in) 0.000 0.0 0.0 0.0 0.0 0.0 0.500 0.0 0.0 0.0 0.0 0.0 1.000 0.0 0.0 0.0 0.0 0.0 1.500 0.0 0.1 0.1 0.1 0.1 2.000 0.1 0.1 0.1 0.1 0.1 2.500 0.1 0.1 0.1 0.1 0.1 3.000 0.1 0.1 0.1 0.1 0.1 3.500 0.1 0.1 0.1 0.1 0.1 4.000 0.1 0.2 0.2 0.2 0.2 4.500 0.2 0.2 0.2 0.2 0.2 5.000 0.2 0.2 0.2 0.2 0.2 5.500 0.2 0.2 0.2 0.2 0.2 6,000 0.2 0.3 0.3 0.3 0.3 6.500 0.3 0.3 0.3 0.3 0.3 7.000 0.3 0.3 0.3 0.3 0.3 7.500 0.3 0.3 0.3 0.4 0.4 8.000 0.4 0.4 0.4 0.4 0.4 8.500 0.4 0.4 0.4 0.4 0.4 9,000 0.5 0.5 0.5 0.5 0.5 9.500 0.5 0.5 0.5 0.5 0.5 10.000 0.6 0.6 0.6 0.6 0.6 10.500 0.6 0.6 0.7 0.7 0.7 11.000 0.7 0.7 0.8 0.8 0.8 11.500 0.9 0.9 1.1 1.3 1.7 12.000 2.0 2.1 2.1 2.2 2.2 12.500 2.3 2.3 2.3 2.3 2.4 13.000 2.4 2.4 2.4 2.4 2.4 13.500 2.5 2.5 2.5 2.5 2.5 14.000 2.5 2.5 2.5 2.6 2.6 14.500 2.6 2.6 2.6 2.6 2.6 15.000 2.6 2.6 2.6 2.6 2.7 15.500 2.7 2.7 2.7 2.7 2.7 16.000 2.7 2.7 2.7 2.7 2.7 16.500 2.7 2.7 2.7 2.8 2.8 17.000 2.8 2.8 2.8 2.8 2.8 17.500 2.8 2.8 2.8 2.8 2.8 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BARA 030.ppc Center (08.11.01,56) 12/5/2019 27 Siemon Company Drive Suite 200 W Page 8 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Time -Depth Curve Label: Time -Depth - 1 CUMULATIVE RAINFALL (in) Output Time Increment = 0.100 hours Time on left represents time for first value in each row. Return Event: 1 years Storm Event: 1-yr, 24-hr Time Depth Depth Depth Depth Depth (hours) (in) (in) (in) (in) (in) 18.000 2.8 2.8 2.8 2.8 2.8 18.500 2.9 2.9 2.9 2.9 2.9 19.000 2.9 2.9 2.9 2.9 2.9 19.500 2.9 2.9 2.9 2.9 2.9 20.000 2.9 2.9 2.9 2.9 2.9 20.500 2.9 2.9 3.0 3.0 3.0 21.000 3.0 3.0 3.0 3.0 3.0 21.500 3.0 3.0 3.0 3.0 3.0 22.000 3.0 3.0 3.0 3.0 3.0 22.500 3.0 3.0 3.0 3.0 3.0 23.000 3.0 3.0 3.0 3.0 3.0 23.500 3.1 3.1 3.1 3.1 3.1 24.000 3.1 (N/A) (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack v8i BAR.1030.ppc Center [08.11.01,561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 9 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Unit Hydrograph Equations Unit Hydrograph Method (Computational Notes) Definition of Terms At Total area (acres): At = Ai+Ap Ai Impervious area (acres) Ap Pervious area (acres) CNi Runoff curve number for impervious area CNp Runoff curve number for pervious area floss f loss constant infiltration (depth/time) gKs Saturated Hydraulic Conductivity (depth/time) Md Volumetric Moisture Deficit Psi Capillary Suction (length) hK Horton Infiltration Decay Rate (timeA-1) fo Initial Infiltration Rate (depth/time) fc Ultimate(capacity)Infiltration Rate (depth/time) la Initial Abstraction (length) dt Computational increment (duration of unit excess rainfall) Default dt is smallest value of 0.1333Tc, rtm, and th (Smallest dt is then adjusted to match up with Tp) UDdt User specified override computational main time increment (only used if UDdt is => .1333Tc) D(t) Point on distribution curve (fraction of P) for time step t K 2 / (1 + (Tr/Tp)): default K = 0.75: (for Tr/Tp = 1.67) Ks Hydrograph shape factor = Unit Conversions * K: = ((Ihr/3600sec) (lft/12in) * ((5280ft)**2/sq.nl * K Default Ks = 645.333 * 0.75 = 484 Lag Lag time from center of excess runoff (dt) to Tp: tag = 0.6Tc P Total precipitation depth, inches Pa(t) Accumulated rainfall at time step t Pi(t) Incremental rainfall at time step t qp Peak discharge (CIS) for lin. runoff, for lhr, for 1 sq.mi. = (Ks * A * Q) / Tp (where Q = In runoff, A=sq.mi.) QUM Unit hydrograph ordinate (cfs) at time step t Q(t) Final hydrograph ordinate (cfs) at time step t Rai(t) Accumulated runoff (inches) at time step t for impervious area Rap(t) Accumulated runoff (inches) at time step t for pervious area Rii(t) Incremental runoff (inches) at time step t for impervious area Rip(t) Incremental runoff (inches) at time step t for pervious area R(t) Incremental weighted total runoff (inches) Rtm Time increment for rainfall table Si S for impervious area: Si = (1000/CNi) - 10 Sp 5 for pervious area: Sp = (1000/CNp) - 10 t Time step (row) number Tc Time of concentration Tb Time (hrs) of entire unit hydrograph: Tb = Tp + Tr Tp Time (hrs) to peak of a unit hydrograph: Tp = (dt/2) + Lag Tr Time (hrs) of receding limb of unit hydrograph: Tr = ratio of Tp Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BARA 030.ppc Center [08.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 10 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Unit Hydrograph Equations Unit Hydrograph Method Computational Notes Precipitation Column (1) Time for time step t Column (2) D(t) = Point on distribution curve for time step t Column (3) Pi(t) = Pa(t) - Pa(t-1): Cot(4) - Preceding Col.(4) Column (4) Pa(t) = D(t) x P: Col.(2) x P Pervious Area Runoff (using SCS Runoff CN Method) Column (5) Rap(t) = Accumulated pervious runoff for time step t If (Pa(t) is <= 0.2Sp) then use: Rap(t) = 0.0 If (Pa(t) is > 0.2Sp) then use: Rap(t) _ (Col.(4)-0.2Sp)**2 / (Col.(4)+0.8Sp) Column (6) Rip(t) = Incremental pervious runoff for time step t Rip(t) = Rap(t) - Rap(t-1) Rip(t) = Col.(5) for current row - Col.(5) for preceding row. Impervious Area Runoff Column (7 & 8)... Did not specify to use impervious areas. Incremental Weighted Runoff Column (9) R(t) = (Ap/At) x Rip(t) + (Ai/At) x Rii(t) R(t) = (Ap/At) x Col.(6) + (Ai/At) x Col.(8) SCS Unit Hydrograph Method Column (10) Q(t) is computed with the SCS unit hydrograph method using R(t) and Qu(t). Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR. 1030.ppc Center [08.11,01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 11 of 50 Watertown, CT 06795 USA *i-203-755-1666 Subsection: Unit Hydrograph Summary Label: CM-1 BAR.1030.ppc 12/5/2019 Storm Event 1-yr, 24-hr Return Event 1 years Duration 24.000 hours Depth 3.1 in Time of Concentration 0.083 hours (Composite) Area (User Defined) 31,038.000 f12 Computational Time 0.011 hours Increment Time to Peak (Computed) 11.933 hours Flow (Peak, Computed) 0.77 ft3/s Output Increment 0.050 hours Time to Flow (Peak 11.950 hours Interpolated Output) Flow (Peak Interpolated 0.76 ft3/s Output) Drainage Area SCS CN (Composite) 70.000 Area (User Defined) 31,038.000 ft' Maximum Retention 4.3 in (Pervious) Maximum Retention 0.9 in (Pervious, 20 percent) Cumulative Runoff Cumulative Runoff Depth 0.8 in (Pervious) Runoff Volume (Pervious) 0.045 ac-ft Hydrograph Volume (Area under Hydrograph curve) Volume 0.045 ac-ft SCS Unit Hydrograph Parameters Time of Concentration 0.083 hours (Composite) Computational Time 0.011 hours Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Unit peak, qp 9.69 ft3/s Unit peak time, Tp 0.056 hours Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley PondPack V8i [08.11.01.561 Page 12 of 50 Subsection: Unit Hydrograph Summary Label: CM-1 SCS Unit Hydrograph Parameters Unit receding limb, Tr 0.222 hours Total unit time, Tb 0.278 hours Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haestao Methods Solution Bentley Pond Pack VBi BAR. 1030.ppc Center (08. 11,01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 13 of 50 Watertown, CT 06795 USA «1-203-755-1666 Subsection: Unit Hydrograph (Hydrograph Table) Label: CM-1 Storm Event 1-yr, 24-hr Return Event 1 years Duration 24.000 hours Depth 3.1 in Time of Concentration 0.083 hours (Composite) Area (User Defined) 31,038.000 ft2 Return Event: 1 years Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/s) (ft3/s) (ft3/s) (ft3/s) (ft3/s) 11.500 0.00 0.00 0.01 0.03 0.06 11.750 0.12 0.21 0.40 0.68 0.76 12.000 0.74 0.54 0.26 0.18 0.15 12.250 0.14 0.13 0.13 0.12 0.11 12.500 0.10 0.09 0.08 0.08 0.08 12.750 0.08 0.07 0.07 0.07 0.07 13.000 0.06 0.06 0.06 0.06 0.06 13.250 0.06 0.06 0.05 0.05 0.05 13.500 0.05 0.05 0.05 0.05 0.05 13.750 0.05 0.04 0.04 0.04 0.04 14.000 OAH 0.04 0.04 0.04 0.04 14.250 0.04 0.04 0.04 0.04 0.04 14.500 0.04 0.04 0.04 0.04 0.04 14.750 0.04 0.03 0.03 0.03 0.03 15.000 0.03 0.03 0.03 0.03 0.03 15.250 0.03 0.03 0.03 0.03 0.03 15.500 0.03 0.03 0.03 0.03 0.03 15.750 0.03 0.03 0.03 0.03 0.03 16.000 0.03 0.03 0.03 0.03 0.03 16.250 0.03 0.03 0.03 0.03 0.03 16.500 0.02 0.02 0.02 0.02 0.02 16.750 0.02 0.02 0.02 0.02 0.02 17.000 0.02 0.02 0.02 0.02 0.02 17.250 0.02 0.02 0.02 0.02 0.02 17.500 0.02 0.02 0.02 0.02 0.02 17.750 0.02 0.02 0.02 0.02 0.02 18.000 0.02 0.02 0.02 0.02 0.02 18.250 0.02 0.02 0.02 0.02 0.02 18.500 0.02 0.02 0.02 0.02 0.02 18.750 0.02 0.02 0.02 0.02 0.02 19.000 0.02 0.02 0.02 0.02 0.02 19.250 0.02 0.02 0.02 0.02 0.02 19.500 0.02 0.02 0.02 0.02 0.02 19.750 0.02 0.02 0.02 0.02 0.02 20.000 0.02 0.02 0.02 0.02 0.02 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR.1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 14 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Unit Hydrograph (Hydrograph Table) Label: CM-1 HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow (hours) (ft3/5) (f 3/5) (ft3/5) (ft3/5) 20.250 0.02 0.02 0.02 0.02 20.500 0.02 0.02 0.02 0.02 20.750 0.02 0.02 0.02 0.02 21.000 0.02 0.02 0.02 0.02 21.250 0.02 0.02 0.02 0.01 21.500 0.01 0.01 0.01 0.01 21.750 0.01 0.01 0.01 0.01 22.000 0.01 0.01 0.01 0.01 22.250 0.01 0.01 0.01 0.01 22.500 0.01 0.01 0.01 0.01 22.750 0.01 0.01 0.01 0.01 23.000 0.01 0.01 0.01 0.01 23.250 0.01 0.01 0.01 0.01 23.500 0.01 0.01 0.01 0.01 23.750 0.01 0.01 0.01 0.01 24.000 0.01 (N/A) (N/A) (N/A) Return Event: 1 years Storm Event: 1-yr, 24-hr Flow (ft3/5) 0.02 0.02 0.02 0.02 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Bentley Systems, Inc. Haeslad Methods Solution Bentley Pond Pack VBi BAR. 1030.ppc Center [08.11.01.561 12/5/2019 27 Stemon Company Drive Suite 200 W Page 15 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Unit Hydrograph Summary Label: CM-2 BAR, 1030.ppc 12/5/2019 Storm Event 1-yr, 24-hr Return Event 1 years Duration 24.000 hours Depth 3.1 in Time of Concentration 0.083 hours (Composite) Area (User Defined) 17,123.000 ft2 Computational Time 0.011 hours Increment Time to Peak (Computed) 11.922 hours Flow (Peak, Computed) 1.34 ft3/s Output Increment 0.050 hours Time to Flow (Peak 11.900 hours Interpolated Output) Flow (Peak Interpolated 1.30 ft3/s Output) Drainage Area SCS CN (Composite) 91.974 Area (User Defined) 17,123.000 ft2 Maximum Retention 0.9 in (Pervious) Maximum Retention 0.2 in (Pervious, 20 percent) Cumulative Runoff Cumulative Runoff Depth 2.2 in (Pervious) Runoff Volume (Pervious) 0.073 ac-ft Hydrograph Volume (Area under Hydrograph curve) Volume 0.073 ac-ft SCS Unit Hydrograph Parameters Time of Concentration 0.083 hours (Composite) Computational Time 0.011 hours Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Unit peak, qp 5.34 ft3/s Unit peak time, Tip 0.056 hours Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Drive Suite 200 W Watertown, CT 06795 USA .1-203-755-1665 Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley PondPack Vei [08.11.01.56] Page 16 of 50 Subsection: Unit Hydrograph Summary Label: CM-2 SCS Unit Hydrograph Parameters Unit receding limb, Tr 0.222 hours Total unit time, Tb 0.278 hours Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 17 of 50 Watertown, CT 06795 USA *1-203-755-1666 Subsection: Unit Hydrograph (Hydrograph Table) Label: CM-2 Storm Event 1-yr, 24-hr Return Event 1 years Duration 24.000 hours Depth 3.1 in Time of Concentration 0.083 hours (Composite) Area (User Defined) 17,123.000 ft2 Return Event: 1 years Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/s) (ft3/s) (ft3/S) (ft3/S) (ft3/5) 5.150 0.00 0.00 0.00 0.00 0.00 5.400 0.00 0.00 0.00 0.00 0.00 5.650 0.00 0.00 0.00 0.00 0.00 5.900 0.00 0.00 0.00 0.00 0.00 6.150 0.00 0.00 0.00 0.00 0.00 6.400 0.00 0.00 0.00 0.00 0.00 6.650 0.00 0.00 0.00 0.01 0.01 6.900 0.01 0.01 0.01 0.01 0.01 7.150 0.01 0.01 0.01 0.01 0.01 7.400 0.01 0.01 0.01 0.01 0.01 7.650 0.01 0.01 0.01 0.01 0.01 7.900 0.01 0.01 0.01 0.01 0.01 8.150 0.01 0.01 0.01 0.01 0.01 8.400 0.01 0.01 0.01 0.01 0.01 8.650 0.01 0.01 0.01 0.01 0.01 8.900 0.02 0.02 0.02 0.02 0.02 9.150 0.02 0.02 0.02 0.02 0.02 9.400 0.02 0.02 0.02 0.02 0.02 9.650 0.02 0.02 0.02 0.02 0.02 9.900 0.02 0.02 0.02 0.02 0.03 10.150 0.03 0.03 0.03 0.03 0.03 10.400 0.03 0.03 0.03 0.04 0.04 10,650 0.04 0.04 0.04 0.04 0.05 10.900 0.05 0.05 0.05 0.05 0.06 11.150 0.06 0.07 0.07 0.08 0.08 11.400 0.08 0.09 0.09 0.14 0.19 11.650 0.28 0.39 0.53 0.69 0.97 11.900 1.30 1.25 1.08 0.74 0.34 12.150 0.23 0.19 0.18 0.16 0.15 12.400 0.14 0.13 0.11 0.10 0.10 12.650 0.09 0.09 0.09 0.08 0.08 12.900 0.08 0.07 0.07 0.07 0.07 13.150 0.07 0.06 0.06 0.06 0.06 13.400 0.06 0.06 0.05 0.05 0.05 13.650 0.05 0.05 0.05 0.05 0.05 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR.1030.ppc Center [08.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 18 of 50 Watertown, CT 06795 USA F1-203-755-1666 Subsection: Unit Hydrograph (Hydrograph Table) Return Event: 1 years Label: CM-2 Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/S) (ft3/S) (fta/S) (f 3/S) (ft3/S) 13.900 0.05 0.04 0.04 0.04 0.04 14.150 0.04 0.04 0.04 0.04 0.04 14.400 0.04 0.04 0.04 0.04 0.04 14.650 0.04 0.04 0.04 0.04 0.04 14.900 0.04 0.03 0.03 0.03 0.03 15.150 0.03 0.03 0.03 0.03 0.03 15.400 0.03 0.03 0.03 0.03 0.03 15.650 0.03 0.03 0.03 0.03 0.03 15.900 0.03 0.03 0.03 0.03 0.03 16.150 0.03 0.03 0.03 0.03 0.03 16.400 0.03 0.03 0.02 0.02 0.02 16.650 0.02 0.02 0.02 0.02 0.02 16.900 0.02 0.02 0.02 0.02 0.02 17.150 0.02 0.02 0.02 0.02 0.02 17.400 0.02 0.02 0.02 0.02 0.02 17.650 0.02 0.02 0.02 0.02 0.02 17.900 0.02 0.02 0.02 0.02 0.02 18.150 0.02 0.02 0.02 0.02 0.02 18.400 0.02 0.02 0.02 0.02 0.02 18.650 0.02 0.02 0.02 0.02 0.02 18.900 0.02 0.02 0.02 0.02 0.02 19.150 0.02 0.02 0.02 0.02 0.02 19.400 0.02 0.02 0.02 0.02 0.02 19.650 0.02 0.02 0.02 0.02 0.02 19.900 0.02 0.02 0.02 0.01 0.01 20.150 0.01 0.01 0.01 0.01 0.01 20.400 0.01 0.01 0.01 0.01 0.01 20.650 0.01 0.01 0.01 0.01 0.01 20.900 0.01 0.01 0.01 0.01 0.01 21.150 0.01 0.01 0.01 0.01 0.01 21.400 0.01 0.01 0.01 0.01 0.01 21.650 0.01 0.01 0.01 0.01 0.01 21.900 0.01 0.01 0.01 0.01 0.01 22.150 0.01 0.01 0.01 0.01 0.01 22.400 0.01 0.01 0.01 0.01 0.01 22,650 0.01 0.01 0.01 0.01 0.01 22.900 0.01 0.01 0.01 0.01 0.01 23.150 0.01 0.01 0.01 0.01 0.01 23.400 0.01 0.01 0.01 0.01 0.01 23.650 0.01 0.01 0.01 0.01 0.01 23.900 0.01 0.01 0.01 (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack V8i BARA 030.ppc Center [08.11,01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 19 of 50 Watertown, CT 06795 USA t1-203-755-1666 Subsection: Unit Hydrograph Summary Label: CM-3 BAR.1030.ppc 12/5/2019 Storm Event 1-yr, 24-hr Return Event 1 years Duration 24.000 hours Depth 3.1 in Time of Concentration 0.083 hours (Composite) Area (User Defined) 13,915.000 ft2 Computational Time 0.011 hours Increment Time to Peak (Computed) 11.933 hours Flow (Peak, Computed) 0.55 ft3/s Output Increment 0.050 hours Time to Flow (Peak 11.950 hours Interpolated Output) Flow (Peak Interpolated 0.54 ft3/s Output) Drainage Area SCS CN (Composite) 77.044 Area (User Defined) 13,915.000 ft' Maximum Retention 3.0 in (Pervious) Maximum Retention 0.6 in (Pervious, 20 percent) Cumulative Runoff Cumulative Runoff Depth 1.1 in (Pervious) Runoff Volume (Pervious) 0.030 ac-ft Hydrograph Volume (Area under Hydrograph curve) Volume 0.030 ac-ft SCS Unit Hydrograph Parameters Time of Concentration 0.083 hours (Composite) Computational Time 0.011 hours Increment Unit Hydrograph Shape 483.432 Factor K Factor 0.749 Receding/Rising, Tr/Tp 1.670 Unit peak, qp 4.34 ft3/s Unit peak time, Tp 0.056 hours Bentley Systems, Inc. Haestad Methods Solution Center 27 Siemon Company Dnve Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Pond Pack VBi (08.11.01.561 Page 20 of 50 Subsection: Unit Hydrograph Summary Label: CM-3 SCS Unit Hydrograph Parameters Unit receding limb, Tr 0.222 hours Total unit time, Tb 0.278 hours Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR.1030.ppc Center [08.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 21 of 50 Watertown, CT 06795 USA .1-203-755-1665 Subsection: Unit Hydrograph (Hydrograph Table) Label: CM-3 Storm Event 1-yr, 24-hr Return Event 1 years Duration 24.000 hours Depth 3.1 in Time of Concentration 0.083 hours (Composite) Area (User Defined) 13,915.000 ft2 Return Event: 1 years Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/s) (ft3/s) (ft3/s) (ft3/s) (ft3/s) 10.550 0.00 0.00 0.00 0.00 0.00 10.800 0.00 0.00 0.00 0.00 0.00 11.050 0.01 0.01 0.01 0.01 0.01 11.300 0.01 0.01 0.01 0.02 0.02 11.550 0.03 0.04 0.06 0.10 0.15 11.800 0.21 0.34 0.51 0.54 0.50 12.050 0.35 0.16 0.11 0.10 0.09 12.300 0.08 0.08 0.07 0.07 0.06 12.550 0.05 0.05 0.05 0.05 0.05 12.800 0.04 0.04 0.04 0.04 0.04 13.050 0.04 0.04 0.04 0.03 0.03 13.300 0.03 0.03 0.03 0.03 0.03 13.550 0.03 0.03 0.03 0.03 0.03 13.800 0.03 0.03 0.03 0.02 0.02 14.050 0.02 0.02 0.02 0.02 0.02 14.300 0.02 0.02 0.02 0.02 0.02 14.550 0.02 0.02 0.02 0.02 0.02 14.800 0.02 0.02 0.02 0.02 0.02 15.050 0.02 0.02 0.02 0.02 0.02 15.300 0.02 0.02 0.02 0.02 0.02 15.550 0.02 0.02 0.02 0.02 0.02 15.800 0.02 0.02 0.02 0.02 0.02 16.050 0.02 0.01 0.01 0.01 0.01 16.300 0.01 0.01 0.01 0.01 0.01 16.550 0.01 0.01 0.01 0.01 0.01 16.800 0.01 0.01 0.01 0.01 0.01 17.050 0.01 0.01 0.01 0.01 0.01 17.300 0.01 0.01 0.01 0.01 0.01 17.550 0.01 0.01 0.01 0.01 0.01 17.800 0.01 0.01 0.01 0.01 0.01 18.050 0.01 0.01 0.01 0.01 0.01 18.300 0.01 0.01 0.01 0.01 0.01 18.550 0.01 0.01 0.01 0.01 0.01 18.800 0.01 0.01 0.01 0.01 0.01 19.050 0.01 0.01 0.01 0.01 0.01 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center (08.11.01.56] 12/5/2019 27 Siemon Company Ddve Suite 200 W Page 22 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Unit Hydrograph (Hydrograph Table) Label: CM-3 HYDROGRAPH ORDINATES (ft3/5) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow (hours) (ft3/5) (ft3/5) (ft3/5) (fI 19.300 0.01 0.01 0.01 0.01 19.550 0.01 0.01 0.01 0.01 19.800 0.01 0.01 0.01 0.01 20.050 0.01 0.01 0.01 0.01 20.300 0.01 0.01 0.01 0.01 20.550 0.01 0.01 0.01 0.01 20.800 0.01 0.01 0.01 0.01 21,050 0.01 0.01 0.01 0.01 21.300 0.01 0.01 0.01 0.01 21.550 0.01 0.01 0.01 0.01 21.800 0.01 0.01 0.01 0.01 22.050 0.01 0.01 0.01 0.01 22,300 0.01 0.01 0.01 0.01 22.550 0.01 0.01 0.01 0.01 22.800 0.01 0.01 0.01 0.01 23.050 0.01 0.01 0.01 0.01 23.300 0.01 0.01 0.01 0.01 23.550 0.01 0.01 0.01 0.01 23.800 0.01 0.01 0.01 0.01 Return Event: 1 years Storm Event: 1-yr, 24-hr Flow MYS) 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR.1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 23 of 50 Watertown, CT 06795 USA -1-203-755-1666 Subsection: Addition Summary Label: 0-1 Summary for Hydrograph Addition at'0-1' Upstream Link Upstream Node <Catchment to Outflow Node> CM-3 Outlet-1 PO-1 Node Inflows Inflow Type Element Volume Time to Peak Flow (Peak) (ac-ft) (hours) (ft3/s) Flow (From) CM-3 0.030 11.950 0.54 Flow (From) Outlet-1 0.004 12,150 0.18 Flow (In) 0-1 0.034 11.950 0.54 Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center [08.11.01.56] 12/5/2019 27 Semen Company Drive Suite 200 W Page 24 of 50 Watertown, CT 05795 USA +1-203-755-1666 Subsection: Addition Summary Label: 0-1 Summary for Hydrograph Addition at'0-1' Upstream Link Upstream Node <Catchment to Outflow Node> CM-1 Inflow Type Element Flow (From) CM-1 Flow (In) 0-1 Node Inflows Volume Time to Peak (ac-ft) (hours) 0.045 11.950 0.045 11.950 Flow (Peak) MIN 0.76 0.76 Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030opc Center [08.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 25 of 50 Watertown, CT 06795 USA-1-203-755-1666 Subsection: Time vs. Elevation Label: PO-1 (IN) Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Return Event: 1 years Storm Event: 1-yr, 24-hr Time Elevation Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) (ft) 0.000 356.50 356.50 356.50 356.50 356.50 0.250 356.50 356.50 356.50 356.50 356.50 0.500 356.50 356.50 356.50 356.50 356.50 0.750 356.50 356.50 356.50 356.50 356.50 1.000 356.50 356.50 356.50 356.50 356.50 1.250 356.50 356.50 356.50 356.50 356.50 1.500 356.50 356.50 356.50 356.50 356.50 1.750 356.50 356.50 356.50 356.50 356.50 2.000 356.50 356.50 356.50 356.50 356.50 2.250 356.50 356.50 356.50 356.50 356.50 2.500 356.50 356.50 356.50 356.50 356.50 2.750 356.50 356.50 356.50 356.50 356.50 3.000 356.50 356.50 356.50 356.50 356.50 3.250 356.50 356.50 356.50 356.50 356.50 3.500 356.50 356.50 356.50 356.50 356.50 3.750 356.50 356.50 356.50 356.50 356.50 4.000 356.50 356.50 356.50 356.50 356.50 4.250 356.50 356.50 356.50 356.50 356.50 4.500 356.50 356.50 356.50 356.50 356.50 4.750 356.50 356.50 356.50 356.50 356.50 5.000 356.50 356.50 356.50 356.50 356.50 5.250 356.50 356.50 356.50 356.50 356.50 5.500 356.50 356.50 356.50 356.50 356.50 5.750 356.50 356.50 356.50 356.50 356.50 6.000 356.50 356.50 356.50 356.50 356.50 6.250 356.51 356.51 356.51 356.51 356.51 6.500 356.51 356.51 356.51 356.51 356.51 6.750 356.51 356.51 356.51 356.51 356.51 7.000 356.51 356.51 356.51 356.51 356.51 7.250 356.51 356.51 356.51 356.52 356.52 7.500 356.52 356.52 356.52 356.52 356.52 7.750 356.52 356.52 356.52 356.52 356.52 8.000 356.52 356.52 356.52 356.52 356.53 8.250 356.53 356.53 356.53 356.53 356.53 8.500 356.53 356.53 356.53 356.53 356.53 8.750 356.53 356.54 356.54 356.54 356.54 9.000 356.54 356.54 356.54 356.54 356.55 9.250 356.55 356.55 356.55 356.55 356.55 9.500 356.55 356.55 356.56 356.56 356.56 9.750 356.56 356.56 356.56 356.56 356.57 10.000 356.57 356.57 356.57 356.57 356.57 10.250 356.58 356.58 356.58 356.58 356.59 10.500 356.59 356.59 356.59 356.60 356.60 Bentley Systems, Inc. Haestao Methods Solution Bentley PonoPack V6i BAR.1030.ppc Center (08,11,01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 26 of 50 Watertown, CT 06795 USA .1-203-755-1666 Subsection: Time vs. Elevation Return Event: 1 years Label: PO-1 (IN) Storm Event: 1-yr, 24-hr Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Elevation Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) (ft) 10.750 356.60 356.61 356.61 356.61 356.62 11.000 356.62 356.63 356.63 356.63 356.64 11.250 356.65 356.65 356.66 356.66 356.67 11.500 356.68 356.69 356.70 356.73 356.76 11.750 356.81 356.87 356.96 357.06 357.18 12.000 357.28 357.36 357.40 357.41 357.41 12.250 357.41 357.41 357.41 357.41 357.40 12.500 357.40 357.40 357.40 357.40 357.40 12.750 357.40 357.40 357.40 357.40 357.40 13.000 357.40 357.40 357.40 357.40 357.40 13.250 357.40 357.40 357.40 357.40 357.39 13.500 357.39 357.39 357.39 357.39 357.39 13.750 357.39 357.38 357.38 357.38 357.38 14.000 357.37 357.37 357.37 357.37 357.36 14.250 357.36 357.36 357.36 357.35 357.35 14.500 357.35 357.34 357.34 357.34 357.34 14.750 357.33 357.33 357.33 357.32 357.32 15.000 357.32 357.31 357.31 357.31 357.30 15.250 357.30 357.30 357.29 357.29 357.29 15.500 357.28 357.28 357.28 357.27 357.27 1S.750 357.27 357.26 357.26 357.26 357.25 16.000 357.25 357.24 357.24 357.24 357.23 16.250 357.23 357.22 357.22 357.22 357.21 16.500 357.21 357.20 357.20 357.20 357.19 16.750 357.19 357.19 357.18 357.18 357.17 17.000 357.17 357.17 357.16 357.16 357.15 17.250 357.15 357.15 357.14 357.14 357.13 17.500 357.13 357.12 357.12 357.12 357.11 17.750 357.11 357.10 357.10 357.10 357.09 18.000 357.09 357.08 357.08 357.08 357.07 18.250 357.07 357.06 357.06 357.05 357.05 18.500 357.05 357.04 357.04 357.03 357.03 18.750 357.02 357.02 357.02 357.01 357.01 19.000 357.00 357.00 356.99 356.99 356.98 19.250 356.98 356.97 356.97 356.96 356.96 19.500 356.96 356.95 356.95 356.94 356.94 19.750 356.93 356.93 356.92 356.92 356.92 20.000 356.91 356.91 356.90 356.90 356.90 20.250 356.89 356.89 356.88 356.88 356.88 20.500 356.87 356.87 356.87 356.86 356.86 20.750 356.86 356.85 356.85 356.85 356.84 21.000 356.84 356.84 356.83 356.83 356.83 21.250 356.82 356.82 356.82 356.81 356.81 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V6i BAR.1030opc Center [08,11.01,56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 27 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Time vs. Elevation Label: PO-1 (IN) Time vs. Elevation (ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Elevation Elevation Elevation Elevation (hours) (ft) (ft) (ft) (ft) 21.500 356.81 356.81 356.80 356.80 21.750 356.80 356.79 356.79 356.79 22.000 356.78 356.78 356.78 356.78 22.250 356.77 356.77 356.77 356.76 22.500 356.76 356.76 356.76 356.75 22.750 356.75 356.75 356.75 356.74 23.000 356.74 356.74 356.74 356.73 23.250 356.73 356.73 356.73 356.73 23.500 356.72 356.72 356.72 356.72 23.750 356.71 356.71 356.71 356.71 24.000 356.71 (N/A) (N/A) (N/A) Return Event: 1 years Storm Event: 1-yr, 24-hr Elevation (ft) 356.80 356.79 356.77 356.76 356.75 356.74 356.73 356.72 356.72 356.71 Bentley Systems, Inc. Haeslad Methods Solution Bentley PondPack V81 BAR.1030.ppc Center [08. 11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 28 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Time vs. Volume Label: PO-1 Time vs. Volume (ac-ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Return Event: 1 years Storm Event: 1-yr, 24-hr Time Volume Volume Volume Volume Volume (hours) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) 0.000 0.000 0.000 0.000 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0.000 0.500 0.000 0.000 0.000 0.000 0.000 0,750 0.000 0.000 0.000 0.000 0.000 1.000 0.000 0.000 0,000 0.000 0.000 1.250 0.000 0.000 0.000 0.000 0.000 1.500 0.000 0.000 0.000 0.000 0,000 1.750 0.000 0.000 0.000 0.000 0.000 2,000 0.000 0.000 0.000 0.000 0.000 2.250 0.000 0.000 0.000 0.000 0.000 2.500 0.000 0.000 0.000 0.000 0.000 2.750 0.000 0.000 0.000 0.000 0.000 3.000 0.000 0.000 0.000 0.000 0.000 3.250 0.000 0.000 0.000 0.000 0.000 3.500 0.000 0.000 0.000 0.000 0.000 3.750 0.000 0.000 0.000 0.000 0.000 4.000 0.000 0.000 0.000 0.000 0.000 4.250 0.000 0.000 0.000 0.000 0.000 4.500 0.000 0.000 0.000 0.000 0.000 4.750 0.000 0.000 0.000 0.000 0.000 5.000 0.000 0.000 0.000 0.000 0.000 5.250 0.000 0.000 0.000 0.000 0.000 5.500 0.000 0.000 0.000 0.000 0.000 5,750 0.000 0.000 0.000 0.000 0.000 6.000 0.000 0.000 0.000 0.000 0.000 6.250 0.000 0.000 0.000 0.000 0.000 6.500 0.000 0.000 0,000 0.000 0.000 6.750 0.000 0.000 0.000 0.000 0.000 7,000 0.000 0.000 0.000 0.000 0,000 7.250 0.000 0.000 0.000 0.001 0.001 7.500 0.001 0.001 0.001 0.001 0.001 7.750 0.001 0.001 0.001 0.001 0.001 8.000 0.001 0.001 0.001 0.001 0.001 8.250 0.001 0.001 0.001 0.001 0.001 8.500 0.001 0.001 0.001 0.001 0.001 8.750 0.001 0.001 0.001 0.001 0.001 9.000 0.001 0.001 0.001 0.001 0.001 9.250 0.002 0.002 0.002 0.002 0.002 9.500 0.002 0.002 0.002 0.002 0.002 9.750 0.002 0.002 0.002 0.002 0.002 10.000 0.002 0.002 0.002 0.002 0.003 10.250 0.003 0.003 0.003 0.003 0.003 10.500 0.003 0.003 0.003 0.003 0.003 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR.1030.ppc Center [08. 11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 29 of 50 Watertown, CT 05795 USA i1-203-755-1666 Subsection: Time vs. Volume Return Event: 1 years Label: PO-1 Storm Event: 1-yr, 24-hr Time vs. Volume (ac-ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume Volume (hours) (ac-ft) (ac-ft) (ac-ft) (ac-ft) (ac-ft) 10.750 0.003 0.004 0.004 0.004 0.004 11.000 0.004 0.004 0.004 0.005 0.005 11.250 0.005 0.005 0.005 0.006 0.006 11.500 0.006 0.007 0.007 0.008 0.009 11.750 0.011 0.013 0.017 0.021 0.026 12.000 0.031 0.034 0.036 0.037 0.037 12.250 0.037 0.037 0.037 0.036 0.036 12.500 0.036 0.036 0.036 0.036 0.036 12.750 0.036 0.036 0.036 0.036 0.036 13.000 0.036 0.036 0.036 0.036 0.036 13.250 0.036 0.036 0.036 0.036 0.036 13.500 0.036 0.036 0.036 0.036 0.036 13.750 0.036 0.035 0.035 0.035 0.035 14.000 0.035 0.035 0.035 0.035 0.035 14.250 0.034 0.034 0.034 0.034 0.034 14.500 0.034 0.034 0.034 0.033 0.033 14.750 0.033 0.033 0.033 0.033 0.033 15.000 0.032 0.032 0.032 0.032 0.032 15.250 0.032 0.032 0.031 0.031 0.031 15.500 0.031 0.031 0.031 0.031 0.030 15.750 0.030 0.030 0.030 0.030 0.030 16.000 0.029 0.029 0.029 0.029 0.029 16.250 0.028 0.028 0.028 0.028 0.028 16.500 0.028 0.027 0.027 0.027 0.027 16.750 0.027 0.027 0.026 0.026 0.026 17.000 0.026 0.026 0.026 0.025 0.025 17.250 0.025 0.025 0.025 0.024 0.024 17.500 0.024 0.024 0.024 0.024 0.023 17.750 0.023 0.023 0.023 0.023 0.023 18.000 0.022 0.022 0.022 0.022 0.022 18.250 0.021 0.021 0.021 0.021 0.021 18,500 0.021 0.020 0,020 0.020 0.020 18.750 0.020 0.020 0.019 0.019 0.019 19.000 0.019 0.019 0.018 0.018 0.018 19.250 0.018 0.018 0.017 0.017 0.017 19.500 0.017 0.017 0.016 0.016 0.016 19.750 0.016 0.016 0.016 0.015 0.015 20.000 0.015 0.015 0.015 0.015 0.014 20.250 0.014 0.014 0.014 0.014 0.014 20.500 0.013 0.013 0.013 0.013 0.013 20.750 0.013 0.013 0.013 0.012 0.012 21.000 0.012 0.012 0.012 0.012 0.012 21.250 0.012 0.011 0.011 0.011 0.011 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR.1030.ppc Center [08.11.01.56l 12/5/2019 27 Siemon Company Drive Suite 200 W Page 30 of 50 Watertown, CT 06795 USA -1-203-755-1666 Subsection: Time vs. Volume Label: PO-1 Time vs. Volume (ac-ft) Output Time increment = 0.050 hours Time on left represents time for first value in each row. Time Volume Volume Volume Volume (hours) (ac-ft) (ac-ft) (ac-ft) (ac-ft) 21.500 0.011 0.011 0.011 0.011 21.750 0.010 0.010 0.010 0.010 22.000 0.010 0.010 0.010 0.010 ' 22.250 0.010 0.009 0.009 0.009 22.500 0.009 0,009 0.009 0.009 22.750 0.009 0.009 0.009 0.008 23.000 0.008 0.008 0.008 0.008 23.250 0.008 0.008 0.008 0.008 23.500 0.008 0.008 0.008 0.008 23.750 0.007 0.007 0,007 0.007 24.000 0.007 (N/A) (N/A) (N/A) Return Event: 1 years Storm Event: 1-yr, 24-hr Volume (ac-ft) 0.011 0.010 0.010 0.009 0.009 0.008 0.008 0.008 0.007 0.007 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center [08, 11.01_561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 31 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Elevation -Area Volume Curve Label: PO-1 Return Event: 1 years Storm Event: 1-yr, 24-hr Elevation Planimeter Area Al+A2+sqr Volume Volume (Total) (ft) (ft2) (ft2) (AS*A2) (ac-ft) (ac-ft) (ft2) 356.50 0.0 1,426.000 0.000 0.000 0.000 357.00 0.0 1,831.000 4,872.861 0.019 0.019 358.00 0.0 2,272.000 6,142.616 0.047 0.066 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR.1030.ppc Center [08. 11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 32 of 50 Watertown, CT 05795 USA +1-203-755-1656 Subsection: Volume Equations Return Event: 1 years Label: PO-1 Storm Event: 1-yr, 24-hr Pond Volume Equations * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2 - Ell) * (Areal + Area2 + sgr(Areal * Area2)) where: ELI, EL2 Lower and upper elevations of the increment Areal, Area2 Areas computed for ELI, EL2, respectively Volume Incremental volume between ELI and EL2 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack Vei BAR.1030.ppc Center 108.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 33 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Outlet Input Data Label: Composite Outlet Structure - 1 Requested Pond Water Surface Elevations Minimum (Headwater) 356.50 It Increment (Headwater) 0.50 ft Maximum (Headwater) 358.00 It Return Event: 1 years Storm Event: 1-yr, 24-hr Outlet Connectivity Structure Type Outlet ID Direction Outfall El E2 (ft) (ft) Inlet Box I Riser - 1 Forward Culvert - 1 357.40 358.00 Culvert -Circular Culvert - 1 Forward TW 353.50 358.00 Tailwater Settings Tailwater (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V6i BAR.1030.ppc Center (08,11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 34 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Outlet Input Data Return Event: 1 years Label: Composite Outlet Structure - 1 Storm Event: 1-yr, 24-hr Structure ID: Riser- 1 Structure Type: Inlet Box Number of Openings 1 Elevation 357.40 ft Orifice Area 16.0 ft2 Orifice Coefficient 0.600 Weir Length 16.00 ft Weir Coefficient 3.00 (ft^0.5)/s K Reverse 1.000 Manning's In 0.000 Key, Charged Riser 0.000 Weir Submergence False Orifice H to crest False Structure ID: Culvert - 1 Structure Type: Culvert -Circular Number of Barrels 1 Diameter 15.0 in Length 24.00 ft Length (Computed Barrel) 24.00 ft Slope (Computed) 0.010 R/ft Outlet Control Data Manning's n 0.013 Ke 0.200 Kb 0.023 Kr 0.000 Convergence Tolerance 0.00 ft Inlet Control Data Equation Form Form 1 K 0.0045 M 2.0000 C 0.0317 Y 0.6900 T1 ratio (HW/D) 0.000 T2 ratio (HW/D) 1.192 Slope Correction Factor -0.500 Bentley Systems, Inc. Haestad Methods Solution Bentley PonoPack VBi BAR.1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 35 of 50 Watertown, CT 06795 USA ♦1-203-755-1666 Subsection: Outlet Input Data Label: Composite Outlet Structure - Use unsubmerged inlet control 0 equation below T1 elevation. Use submerged inlet control 0 equation above T2 elevation In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... Return Event: 1 years Storm Event: 1-yr, 24-hr T1 Elevation 353.50 ft T1 Flow 4.80 ft3/s T2 Elevation 354.99 ft T2 Flow 5.49 ft3/s Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR.1030.ppc Center 108.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 36 of 50 Watertown, CT 06795 USA 1-203-755-1666 Subsection: Outlet Input Data Label: Composite Outlet Structure - 1 Structure ID: TW Structure Type: TW Setup, DS Channel Tailwater Type Free Outfall Convergence Tolerances Maximum Iterations 30 Tailwater Tolerance 0.01 ft (Minimum) Tailwater Tolerance 0.50 ft (Maximum) Headwater Tolerance 0.01 ft (Minimum) Headwater Tolerance 0.50 ft (Maximum) Flow Tolerance (Minimum) 0.001 ft3/s Flow Tolerance (Maximum) 10.000 ft3/s Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haeslao Methods Solution Bentley PonoPack V8i BAR.1030.ppc Center 108m.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 37 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Individual Outlet Curves Label: Composite Outlet Structure - 1 RATING TABLE FOR ONE OUTLET TYPE Structure ID = Riser - 1 (Inlet Box) Upstream ID = (Pond Water Surface) Downstream ID = Culvert - 1 (Culvert -Circular) Return Event: 1 years Storm Event: 1-yr, 24-hr Water Device (into) Converge Next Downstream Convergence Downstream Tailwater Surface Flow Headwater Downstream Downstream Hydraulic Error Channel Error Elevation (ft3/s) Hydraulic Hydraulic Hydraulic Grade Line (ft3/s) Tailwater (ft) (ft) Grade Line Grade Line Grade Line Error (ft) (ft) (ft) (ft) (ft) 356.50 0.00 0.00 0.00 0.00 0.00 0.00 (N/A) 0.00 357.00 0.00 0.00 0.00 0.00 0.00 0.00 (N/A) 0.00 357.40 0.00 0.00 0.00 0.00 0.00 0.00 (N/A) 0.00 357.50 1.52 357.50 Free Outfall 354.21 0.00 0.00 (N/A) 0.00 358.00 22.31 358.00 358.00 358.00 0.00 0.00 (N/A) 0.00 Message WS below an invert; no flow. WS below an invert; no flow. WS below an invert; no Flow. Weir: H =0.1ft FULLY CHARGED RISER: ADJUSTED TO WEIR: H =0.6ft Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR. 1030.ppc Center [08. 11,01.561 12/512019 27 Siemon Company Drive Suite 200 W Page 38 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Individual Outlet Curves Label: Composite Outlet Structure - 1 RATING TABLE FOR ONE OUTLET TYPE Structure ID = Culvert - 1 (Culvert -Circular) Mannings open channel maximum capacity: 7.09 ft3/s Upstream Ib = Riser - 1 (Inlet Box) Downstream ID = Tailwater (Pond Outfall) Return Event: 1 years Storm Event: 1-yr, 24-hr Water Device (into) Converge Next Downstream Convergence Downstream Tailwater Surface Flow Headwater Downstream Downstream Hydraulic Error Channel Error Elevation (ft3/s) Hydraulic Hydraulic Hydraulic Grade Line (ft3/s) Tailwater (ft) (ft) Grade Line Grade Line Grade Line Error (ft) (ft) (ft) (ft) (ft) 356.50 0.00 0.00 0.00 Free Outfall 0.00 0.00 (N/A) 0.00 357.00 0.00 0.00 0.00 Free Outfall 0.00 0.00 (N/A) 0.00 357.40 0.00 0.00 0.00 Free Outfall 0.00 0.00 (N/A) 0.00 357.50 1.52 354.21 Free Outfall Free Outfall 0.00 0.00 (N/A) 0.00 358.00 13.15 358.00 Free Outfall Free Outfall 0.00 9.15 (N/A) 0.00 WS below an invert; no flow. WS below an invert; no Flow. WS below an invert; no flow. FLOW PRECEDENCE SET TO UPSTREAM CONTROLLING STRUCTURE INLET CONTROL... Submerged: HW =4.50 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR.1030.ppc Center [08. 11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 39 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Composite Rating Curve Label: Composite Outlet Structure - 1 Composite Outflow Summary Water Surface Flow Elevation (ft3/s) (ft) Return Event: 1 years Storm Event: 1-yr, 24-hr Tailwater Elevation Convergence Error (ft) (ft) 356.50 0.00 (N/A) 0.00 357.00 0.00 (N/A) 0.00 357.40 0.00 (N/A) 0.00 357.50 1.52 (N/A) 0.00 358.00 13.15 (N/A) 0.00 Contributing Structures (no Q: Riser - 1,Culvert - 1) (no Q: Riser - 1,Culvert - 1) (no Q: Riser - 1,Culvert - 1) Riser - 1,Culvert - I Riser - 1,Culvert - 1 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR. 1030.ppc Center [08.11,01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 40 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Diverted Hydrograph Label: Outlet-1 Peak Discharge 0.18 ft3/s Time to Peak 12.150 hours Hydrograph Volume 0.004 ac-ft Return Event: 1 years Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/5) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/s) (ft3/s) (ft3/s) (ft3/s) (ft3/s) 12.050 0.00 0.04 0.18 0.15 0.12 12.300 0,10 0.09 0.08 0.07 0.05 12.550 0.04 0.03 0.03 0.02 0.02 12.800 0.02 0.01 0.01 0.01 0.00 13.050 0.00 0.00 (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR. 1030.ppc Center (08.11.01.56] 12/512019 27 Siemon Company Drive Suite 200 W Page 41 of 50 Watertown, CT 06795 USA t1-203-755-1666 Subsection: Elevation -Volume -Flow Table (Pond) Label: PO-1 Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 1.5000 in/h Initial Conditions Elevation (Water Surface, 356.50 ft Initial) Volume (Initial) 0.000 ac-ft Flow (Initial Outlet) 0.00 ft3/s Flow (Initial Infiltration) 0.00 ft3/S Flow (Initial, Total) 0.00 ft3/S Time Increment 0.050 hours Elevation Outflow Storage Area (ft) (ft3/S) (ac-ft) (ft2) Return Event: 1 years Storm Event: 1-yr, 24-hr Infiltration Flow (Total) 2S/t + O (ft3/5) (ft3/S) (ft3/S) 3S6.S0 0.00 0.000 1,426.000 0.00 0.00 0.00 357.00 0.00 0.019 1,831.000 0.06 0.06 9.09 357.40 0.00 0.036 2,001.696 0.07 0.07 17.61 357.50 1.52 0.041 2,045.558 0.07 1.59 21.38 358.00 13.15 0.066 2,272.000 0.08 13.23 45.01 Bentley Systems, Inc. Haestao Methods Solution Bentley PonoPack VBi BAR.1030.ppc Center 108, 11.01.561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 42 of 50 Watertown, CT 06795 USA ,1-203-755-1666 Subsection: Pond Infiltration Calculations Label: PO-1 (IN) Average Infiltration Rating Table Elevation (Water Area (Total) Flow (Infiltration) Surface) (ft2) MIN (ft) 356.50 1,426.0 0.00 357.00 1,831.0 0.06 357.40 2,001.7 0.07 357.50 2,045.6 0.07 358.00 2,272.0 0.08 Return Event: 1 years Storm Event: 1-yr, 24-hr Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BARA 030.ppc Center [08,11.01,56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 43 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Level Pool Pond Routing Summary Label: PO-1 (IN) Infiltration Infiltration Method Average (Computed) Infiltration Rate Infiltration Rate (Average) 1.5000 in/h Initial Conditions Elevation (Water Surface, 356.50 ft Initial) Volume (Initial) 0.000 ac-ft Flow (Initial Outlet) 0.00 ft3/S Flow (Initial Infiltration) 0.00 ft3/s Flow (Initial, Total) 0.00 ft3/S Time Increment 0.050 hours Inflow/Outflow Hydrograph Summary Return Event: 1 years Storm Event: 1-yr, 24-hr Flow (Peak In) 1.30 ft3/s Time to Peak (Flow, In) 11.900 hours Infiltration (Peak) 0.07 ft3/s Time to Peak (Infiltration) 12.150 hours Flow (Peak Outlet) 0.18 ft3/s Time to Peak (Flow, Outlet) 12.150 hours Elevation (Water Surface, 357.41 ft Peak) Volume (Peak) 0.037 ac-ft Mass Balance (ac-ft) Volume (Initial) 0.000 ac-ft Volume (Total Inflow) 0.073 ac-ft Volume (Total Infiltration) 0.061 ac-ft Volume (Total Outlet 0.004 ac- ft Outflow) Volume (Retained) 0.007 ac-ft Volume (Unrouted) -0.001 ac-ft Error (Mass Balance) 0.8 3/0 Bentley Systems, Inc. Haestad Methods Solution Bentley PondPack VBi BAR. 1030.ppc Center [08. 11.01.561 12/512019 27 Siemon Company Drive Suite 200 W Page 44 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Pond Infiltration Hydrograph Label: PO-1 (INF) Peak Discharge 0.07 ft3/s Time to Peak 12.150 hours Hydrograph Volume 0.061 ac-ft Return Event: 1 years Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/s) .Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/s) (ft3/s) (ft3/s) (ft3/s) (ft3/s) 6.650 0.00 0.00 0.00 0.00 0.00 6.900 0.00 0.00 0.00 0.00 0.00 7.150 0.00 0.00 0.00 0.00 0.00 7.400 0.00 0.00 0.00 0.00 0.00 7.650 0.00 0.00 0.00 0.00 0.00 7.900 0.00 0.00 0.00 0.00 0.00 8.150 0.00 0.00 0.00 0.00 0.00 8.400 0.00 0.00 0.00 0.00 0.00 8.650 0.00 0.00 0.00 0.00 0.00 8.900 0.00 0.00 0.01 0.01 0.01 9.150 0.01 0.01 0.01 0.01 0.01 9.400 0.01 0.01 0.01 0.01 0.01 9.650 0.01 0.01 0.01 0.01 0.01 9.900 0.01 0.01 0.01 0.01 0.01 10.150 0.01 0.01 0.01 0.01 0.01 10.400 0.01 0.01 0.01 0.01 0.01 10.650 0.01 0.01 0.01 0.01 0.01 10.900 0.01 0.01 0.02 0.02 0.02 11.150 0.02 0.02 0.02 0.02 0.02 11.400 0.02 0.02 0.02 0.02 0.03 11.650 0.03 0.03 0.04 0.05 0.06 11.900 0.06 0.07 0.07 0.07 0.07 12.150 0.07 0.07 0.07 0.07 0.07 12.400 0.07 0.07 0.07 0.07 0.07 12.650 0.07 0.07 0.07 0.07 0.07 12.900 0.07 0.07 0.07 0.07 0.07 13.150 0.07 0.07 0.07 0.07 0.07 13.400 0.07 0.07 0.07 0.07 0.07 13.650 0.07 0.07 0.07 0.07 0.07 13.900 0.07 0.07 0.07 0.07 0.07 14.150 0.07 0.07 0.07 0.07 0.07 14.400 0.07 0.07 0.07 0.07 0.07 14.650 0.07 0.07 0.07 0.07 0.07 14.900 0.07 0.07 0.07 0.07 0.07 15.150 0.07 0.07 0.07 0.07 0.07 15.400 0.07 0.07 0.07 0.07 0.07 15.650 0.07 0.07 0.07 0.07 0.07 15.900 0.07 0.07 0.07 0.07 0.07 16.150 0.07 0.07 0.07 0.07 0.07 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR. 1030.ppc Center [08.11.01,561 12/5/2019 27 Siemon Company Drive Suite 200 W Page 45 of 50 Watertown, CT 06795 USA +1-203-755-1666 Subsection: Pond Infiltration Hydrograph Return Event: 1 years Label: PO-1 (INF) Storm Event: 1-yr, 24-hr HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Time Flow Flow Flow Flow Flow (hours) (ft3/S) (ft3/5) (ft3/5) (ft3/5) (ft3/S) 16.400 0.07 0.07 0.07 0.07 0.07 16.650 0.07 0.07 0.07 0.07 0.07 16.900 0.07 0.07 0.07 0.07 0.07 17.150 0.07 0.07 0.07 0.07 0.07 17.400 0.07 0.07 0.07 0.07 0.07 17.650 0.07 0.07 0.07 0.07 0.07 17.900 0.06 0.06 0.06 0.06 0.06 18.150 0.06 0.06 0.06 0.06 0.06 18.400 0.06 0.06 0.06 0.06 0.06 18.650 0.06 0.06 0.06 0.06 0.06 18.900 0.06 0.06 0.06 0.06 0.06 19.150 0.06 0.06 0.06 0.06 0.06 19.400 0.06 0.06 0.06 0.06 0.06 19.650 0.06 0.06 0.06 0.05 0.05 19.900 0.05 0.05 0.05 0.05 0.05 20.150 0.05 0.05 0.05 0.05 0.05 20.400 0.05 0.05 0.05 0.05 0.05 20.650 0.05 0.05 0.05 0.04 0.04 20.900 0.04 0.04 0.04 0.04 0.04 21.150 0.04 0.04 0.04 0.04 0.04 21.400 11.04 0.04 0.04 0.04 0.04 21.650 0.04 0.04 0.04 0.04 0.04 21.900 0.04 0.04 0.04 0.04 0.04 22.150 0.04 0.03 0.03 0.03 0.03 22.400 0.03 0.03 0.03 0.03 0.03 22.650 0.03 .0.03 0.03 0.03 0.03 22.900 0.03 0.03 0.03 0.03 0.03 23.150 0.03 0.03 0.03 0.03 0.03 23.400 0.03 0.03 0.03 0.03 0.03 23.650 0.03 0.03 0.03 0.03 0.03 23.900 0.03 0.03 0.03 (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BARA 030.ppc Center [08.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 46 of 50 Watertown, CT 06795 USA «1-203-755-1666 Subsection: Pond Routed Hydrograph (total out) Label: PO-1 (OUT) Peak Discharge Time to Peak Hydrograph Volume 0.18 ft3/s 12.150 hours 0.004 ac-ft HYDROGRAPH ORDINATES (ft3/s) Output Time Increment = 0.050 hours Time on left represents time for first value in each row. Return Event: 1 years Storm Event: 1-yr, 24-hr Time Flow Flow Flow Flow Flow (hours) (ft3/5) (ft3/5) (ft3/s) (ft3/5) (ft3/5) 12.050 0.00 0.04 0.18 0.15 0.12 12.300 0.10 0.09 0.08 0.07 0.05 12.550 0.04 0.03 0.03 0.02 0.02 12.800 0.02 0.01 0.01 0.01 0.00 13.050 0.00 0.00 (N/A) (N/A) (N/A) Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack VBi BAR. 1030, ppc Center [08.11,01,56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 47 of 50 Watertown, CT 06795 USA , 1 -203-755-1666 Subsection: Pond Inflow Summary Return Event: 1 years Label: PO-1 (IN) Storm Event: 1-yr, 24-hr Summary for Hydrograph Addition at'PO-1' Upstream Link Upstream Node <Catchment to Outflow Node> CM-2 Node Inflows Inflow Type Element Volume Time to Peak Flow (Peak) (ac-ft) (hours) (ft3/s) Flow (From) CM-2 0.073 11.900 1.30 Flow (In) PO-1 0.073 11.900 1.30 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack Vei BAR.1030.ppc Center [06. 11.01,56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 46 of 50 Watertown, CT 06795 USA +1-203-755-1666 Index C CM-1 (Unit Hydrograph (Hydrograph Table), 1 years)... 14, 15 CM-1 (Unit Hydrograph Summary, 1 years) ... 12, 13 CM-2 (Unit Hydrograph (Hydrograph Table), I years) ... 18, 19 CM-2 (Unit Hydrograph Summary, 1 years) ... 16, 17 CM-3 (Unit Hydrograph (Hydrograph Table), I years) ... 22, 23 CM-3 (Unit Hydrograph Summary, 1 years) ... 20, 21 Composite Outlet Structure - 1 (Composite Rating Curve, I years) ... 40 Composite Outlet Structure - 1 (Individual Outlet Curves, 1 years) ... 38, 39 Composite Outlet Structure - 1 (Outlet Input Data, 1 years) ... 34, 35, 36, 37 M Master Network Summary ... 2, 3 0 0-1 (Addition Summary, 1 years)... 24, 25 Outlet-1 (Diverted Hydrograph, 1 years) ... 41 P PO-1 (Elevation -Area Volume Curve, I years) ... 32 PO-1 (Elevation -Volume -Flow Table (Pond), 1 years) ... 42 PO-1 (IN) (level Pool Pond Routing Summary, I years) ... 44 PO -I (IN) (Pond Infiltration Calculations, I years) ... 43 PO-1 (IN) (Pond Inflow Summary, 1 years) ... 48 PO-1 (IN) (Time vs. Elevation, 1 years) ... 26, 27, 28 PO-1 (INF) (Pond Infiltration Hydrograph, 1 years) ... 45, 46 PO-1 (OUT) (Pond Routed Hydrograph (total out), I years) ... 47 PO-1 (Time vs. Volume, I years) ... 29, 30, 31 PO -I (Volume Equations, I years) ... 33 T Time -Depth - 1 (Time -Depth Curve, 1 years) ... 8, 9 Time -Depth - 1 (Time -Depth Curve, 10 years) ... 6, 7 Time -Depth - 1 (Time -Depth Curve, 100 years) ... 4, S U Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR. 1030.ppc Center [08.11.01.56] 12/5/2019 27 Siemon Company Drive Suite 200 W Page 49 of 50 Watertown, CT 06795 USA t1-203-755-1666 Unit Hydrograph Equations...10, 11 Bentley Systems, Inc. Haestad Methods Solution Bentley Pond Pack V8i BAR.1030.ppc Center [08.11.01.561 12/5/2019 27 Siemon Company Onve Suite 200 W Page 50 of 50 Watertown, CT 06795 USA +1-203-755-1666 SEASONAL HIGH WATER TABLE DETERMINATION AND INFILTRATION TESTING REPORT Range 37 Training Annex FY 10, LI 74837 Fort Bragg, North Carolina 1. PURPOSE. This report has been prepared to provide information for the design of proposed stormwater detention structures at the Range 37 Training Annex project at Fort Bragg, North Carolina. The purpose of this report is to provide soil borings within the footprint of the stormwater structures to determine the seasonal high water table elevations and infiltration rates for the design of the structures. The proposed locations for the borings were provided by the AE firm, Cromwell Architects Engineers in Little Rock, Arkansas. 2. EXPLORATION PROCEDURES. a. Soil Survey Research. Prior to the field investigation, the U.S. Department of Agriculture (USDA) Web Soil Survey was used to access the Cumberland County Soil Survey to obtain an overview of possible soil series located in the project area. The project site is surrounded by the three mapped soil series listed below. Map Unit Symbol Soil Series CaB Candorsand I to 8 percent slopes VaB Vaucluse loamy sand 2 to 8 percent slopes VaD Vaucluse loamy sand 8 to 15 percent slopes b. Field Exploration. (1) Subsurface conditions at the locations of the stormwater structures were explored by two soil test borings drilled to depths of 20 and 25 feet. The borings were performed within the footprint of the proposed stormwater detention structures at the locations shown on the attached plan. (2) The boring locations were established in the field by an engineer using a hand held Global Positioning System (GPS) device having an accuracy oft10 feet. The ground surface elevations at the boring locations were determined by interpolation from the site topography survey. Since the measurements were not precise, the locations shown on the boring layout plan and the elevations on the drilling logs should be considered approximate. SHWT Determination and Infiltration Testing Report Range 37 Training Annex, Fort Bragg, NC, Li 74837, FY 10 October 2010 (3) The borings were drilled by Freehling & Robertson, Inc. of Raleigh, North Carolina under contract to the Savannah District. The borings were drilled with an ATV CME 550 drill rig; a 2 1/4-inch I.D. hollow stem auger was used to advance the boreholes. Split -barrel sampling with Standard Penetration Testing (SPT) was performed at intervals shown on the boring logs. All soil sampling and Standard Penetration Testing were in substantial accordance with ASTM D 1586. (4) Representative portions of the soil samples obtained from the borings were sealed in airtight containers and transported to the Savannah District office where they were examined by a geotechnical engineer. Classification of the soil samples was performed in general accordance with ASTM D 2488 (Visual -Manual Procedure for Description of Soils. Since the soil descriptions and classifications are based on visual examination, they should be considered approximate. (5) Logs of the soil borings graphically depicting soil descriptions, standard penetration resistances, and groundwater levels are attached to this report. 3. SUBSURFACE CONDITIONS. a. Site Description. The proposed sites for the stormwater structures at the Range 37 Training Annex are in the northwest portion of the site. This portion of the site is sparsely wooded having been timbered recently and slopes to the northwest and Longstreet Road. b. Subsurface Soil Conditions. The USDA lists the typical soil profile for the Vaucluse loamy sand group as loamy sand from the surface to a depth of 1.25 feet bgs. Below this a zone of sandy clay loam extends to a depth of 4.8 feet bgs. A sandy loam layer extends to a depth of 6.7 feet bgs. The soil boring logs for the stormwater structure borings correlate fairly well with the typical soil profile for the Vaucluse loamy sand group in Cumberland County, North Carolina. The two borings drilled at the site contain more sandy materials especially from 3.5 to 6.5 feet bgs in boring PB-I. This subsurface description is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The boring log should be reviewed for specific information at the boring location. The stratifications shown on the boring log represent the conditions only at the actual boring location. The stratification lines shown on the boring log represent approximate boundaries between the subsurface materials; the actual transitions are typically more gradual. c. Groundwater Conditions. Groundwater was not encountered in either boring during or after drilling. Many of the borings previously drilled on the site have been dry. However, groundwater was detected in three previous borings on the site; the depth to groundwater was measured as 17 feet, 19 feet, and 20 feet bgs. It should be noted that groundwater conditions, including perched water, vary during periods of prolonged drought and excessive rainfall as well as seasonally. Therefore, fluctuations in the elevation of the groundwater and the occurrence of perched water conditions should be anticipated with changing climatic and rainfall conditions. There were no indications of a seasonal high water table within the depths of these borings. It is recommended that the infiltration structures planned for this site be located in the sand layer at a SIIWT Determination and Intl ltration Testing Report Range 37 Training Annex, Fort Bragg, NC, LI 74837, FY 10 October 2010 depth of 3.5 to 6.5 feet bgs in boring PB-1 and below the clay layer extending from 13.5 to 18.5 feet bgs in boring P13-2. 4. IN -SITU INFILTRATION TESTING. Two in -situ infiltration tests were completed adjacent to boring locations P13-1 and P13-2. These tests were conducted to determine the infiltration rate of the in -situ soils at the locations and depths proposed for the storm water infiltration structures. The following test procedure was used. • Boreholes were advanced to the selected depths below ground surface (bgs), 8.3 feet for PB-I and 18.3 ft for 1`13-2, using a 6.25 inch inside diameter hollow stem auger. • Four inches of general purpose gravel were placed in the bottom of the hole. • A 4 foot length of 4 inch PVC slotted screen with 4 inch PVC casing was installed in the hole and the hole was backfilled with gravel to an elevation above the screen. • The temporary wells were filled with water to the ground surface. After waiting 10 minutes the wells were refilled with water. • The next day, infiltration tests were conducted by filling the temporary well with water to an elevation at least 2 feet above the elevation of the screen and recording the decline in water level over time. • Changes in water level and elapsed time were recorded until a stabilized rate of decline was obtained. The results of the infiltration tests are shown in the table below. Location Test depth Soil Classification Infiltration (bgs) Rate in/hr 1`13-1 4-8 3.5 — 6.5 very loose, fine to med. sand 21.6 6.5 — 8.0 medium dense, sand clay loam PB-2 14 - 18 14 — 18 stiff, sandy clay 2.4 Note: The infiltration rate of 21.6 in/hr for 1`13-1 is thought to be more representative of the sands in the 3.5 to 6.5 foot range. It is anticipated that the sandy clay loam would have an infiltration rate similar to the rate from P13-2. I iDPDP9NTSCRAPE ;" LEGEND NOTES: P'PO ,..OUR4LGROY vDD, oELEV. )59.H ®,MI MIX. Y E. -�' I IC, WL( OIXIDA ...4WR SId[yWL B[):I, OI[4 LOW OGRE MR. OP MME IXBW pVIpE W'p11N. BVRV -'!' 'T Cj {� 'J60-- °IKA�' WTM EXA ITMMOECOCHS PROVIDE 'f' `C; EREWRI ). D),IpGL11'p yyIL ZOIVM ICu1W Yl�xzY WIDELIXICPEiE 'f' 1�� W [RO4a/d mJD-Y ______ UAW vMES GRp Io [#AVIIXG dW'FN - ALL MpMD END ON NPE -r' I 1 .-�N K'>` IV LIIpMI) IREwGDN¢rcXaEiEwigLDsl 1 1 ` \/wL60YE CO110M E.I.Nina LwL a IaLsm u 011a,LIm3 _-f- `)� (s NE RULI �>— - \I g ' - nNm EOtt MIOIE ° xDAE.ciwL LPN.' IDPOL. s[[°,! G[xnuw ® _f'�L D'NrzwR) —)vl— a4lOPoSE).1R...IIE Q. GGGUNDdS OSMILM, UNU. 9PN DMP¢ _=� C Id d CW r 6W O.4' / / - }a li ;rO ula BNl (CA) W WSCIAB&aO O G Es / i ''' .. A Ila. dqB NOT IS 1) 2 NEIwrNAIi YiD / / `' '_ / Ixn IPx14[ GUL • 1 EDL-DREs. (2)xTDA R Es. r I I11 / - / I ;i / LI I ^„4 Irnl mm,c L ER i WARDMORE REBOTEaLARREc WBA41Cg1O11W15 .. •.0l'+IYMTz!7en MwOSR9 fA[L.. EI usrswLn rzsT ur. A UP1RA TIHEES i.- %� L„ fit!✓"s . i i // i j >" \ Q'' / Df / �� 1 U. ttiD liLvl RAT,",I i li pOpccU�AFCO �I�..d.��..e...ISEL 4 LJEs / to i / . ,v-o� W yr>• , yam- / . / / -s ^a. / / / IP / xRuvigN dRB�'- / c V®Ia N 11AS v I C�^�` I I•.IT,' o I '' n % % % •T ' �/ i / 4ti /i % i f ' _ - �_ I :1•\I IL IL L) 1 I a.. Mt I r r / / / / / / / / ' /' Y - __- - 1j •''. _ al I Il •i'-I L SI 1 1 ____- -' ��SY ___ / I I l I Ii. L.L.,I l I I II I 1 I :l • � _ � _ i-__ _____-______ // / i � I _- _ _ _ - __ I c IS, 15J i CONSTRUCT R4UOLiER NO WiP�L i Nore:N41DMlP PYMIN4bP.LLE NTR.WSITIdrIOURo V/ILq IE eIO WIgN VAtIS iMFH b ....E STRIP. ALEE59LANE CAM HEIGHT TO t� E NO MORE THAN S%CROSS DRIVE SLOPE WARY DIRECTION 3Y SITE GRADING & DRAINAGE PLAN FOR OFFICIAL USE ONLY BORING LOG Report No.: 66L 0454-0005 SINCE �p FROEHLING & ROBERTSON, INC. Oc ENGINEERING • ENVIRONMENTAL - GEOTECHNICAL ro I e e I Date: October 2010 Client: U.S. Army Corps of Engineers Project. SOF Range 37 Training Annex (PN 74837, FY-10), Ft. Bragg, North Carolina Boring No.: PB-1 (l of l) Dettlh 20.0' Elev: 340.0 m51 Location: Type of Boring: 2.25" ID HSA I Started: 10/14/10 Completed: 10/14/10 Driller: D. Tignor Elevation Depth ( ) DESCRIPTION OF MATERIALS (Classification) ' Sam le P Blows Sam le Depih feet ( blows/ft REMARKS 2.0 ' ' • SURFICIAL ORGANIC SOILS 4-5-5 0.0 1.5 2 .0 10 3 GROUNDWATER DATA: 0 His.: Dry inside HSA Boring bacldilled upon completion. NATIVE SOILS: Medium dense, moist, orange -brown, silty fine SAND (SM), with some clay. Very loose, moist, orange -brown, clayey tine SAND 2-1-2 (SC), with some silt. 3.5 3.5 3 Very loose, moist, tan -brown, fine to medium SAND 1-1-2 (SP), with trace silt. 5.0 6.5 6.5 18 • • Medium dense, moist, orange -brown, clayey fine to 8-7-I I medium SAND (SC), with area. 8.0 8.5 21 6-8- 33 10.0 13.5 13.5 11 Medium dense, moist, orange -gray, clayey fine SAND 44-7 ! (SC). 15.0 16.0 ' ' Medium dense, moist, orange -gray, silty clayey fine to medium SAND (SC). 18.5 17 3-5-12 20.0 Boring Terminated at 20.0 feet. 'Number of blows required fur a 140 lb automatic hammer dropping 30" to drive 2" O.D., 1.375" I.D. spht-spoon sampler in successive 6' increments. The sum of the second and third increments of penetration is termed the Standard Penetration Test value, "N". BORING LOG Report No.: 66L-0454-0005 SINCE �p FROEHLING & ROBERTSON, INC. Ot ENGINEERING • ENVIRONMENTAL • GEOTECHNICAL m tees Date: October 20 ] 0 Client: U.S. Army Corps of Engineers Project: SOF Range 37 Training Annex (PN 74837, FY-10), Ft. Bragg, North Carolina Boring No.: PR-2 (l of l) De th 2$A' El,,: 343 . 0 m51 Location: Type of Boring: 2.25"IDHSA Started: 10/14/10 Completed: 10/14/10 Driller: D.Tignor Elevation Depth (feet) DESCRIPTION OF MATERIALS (Classification) * Sample Blows Sample Depth N Value (blows/ft) REMARKS 2.0 ' ' • SURFICIAL ORGANIC SOILS 1-1-2 1.5 2.0 3 2 GROUNDWATER DATA: 0 Hrs.: Dry inside HSA Boring backfilled upon completion. NATIVE SOILS: Very loose, mist, orange -brown, silty fine to medium SAND (SM), with trace gravel. Very loose, moist, red -brown, clayey fine SAND (SC). 2-1-1 3.5 3 5 2 Very loose, moist, orange -brown, silty fine to medium 1-1-1 • SAND (SM). 5.0 6.5 6 5 I Very loose, mist, orange -brown, silty fine to rnedium OH-WOH-1 • SAND (SM), with trace clay. 8.0 8.5 8.5 4 • Loose to very loose, mist, orange -gray, clayey fine to 2-1-3 coarse SAND (SC). 10.0 13.5 13.5 1 I Stiff, mist, gray, fine sandy CLAY (CL). q_5{ 15.0 18.5 18.5 12 Medium dense, mist, orange -gray, silty fine SAND 4-" (SM), with trace clay. 20.0 23.5 23 5 31 Dense, mist, gray -orange -red, clayey fine SAND 7-9-22 (SC), with trace coarse sand. 25.0 Boring Temtinate(1 at 25.0 feet. _ . •Number of blows required fora 14U Ib automatic hammer dropping 30" W drive 2" O.D., 1.375" I.D. split -spoon sampler in successive 6" increments. The sum of the second and third increments of penetration is termed the Standard Penetration Test value, "N". SINE FROEHLING & ROBERTSON, INC. Engineering • Environmental • Geotechnical $( 310 Hubert Street Raleigh, North Carolina 27603-2302 1 USA 1 8 81 O T 919.828.34411 F 919.828.5751 Soil Infiltration Test Date: 10/15/2010 Number: 66 L-045 4-0005 Engineering Staff: D. Racey Client/Project: USACE-SOF Range 37 Training Annex (PN 74837, FY-10) Test Hole Did water remain in test hole overnight i(24hr)?: ' Yes - Measurement to T.O.W. per _Time Interval Nu r - Time began: 9:50 AM min hr min h r„ min hr- min hr mini hr min hr min hr min hr Final 81 X If yes, adjust to 4' and test in 30 min. 90 o.s 60 1.0 90 1 i zoz.os 1 15o z.s 180 3.0 zto 3.s zao q.o Infiltration If no, add _ &test every 30 min for 4 hrs s' 4.9' 4.9' 4.9' 4.9' 4.9' Rate PB-1 Depth to -. T.O.W. If no, and _ drains within 30 min, adjust to and test every 10 min. for 1 hr min r mini hr mini hr min hr min hr mini hr 0.9'/30 min. (21.6"/hr.) '10 0.17 20 633 'so oso qo 0.57 so 0.83 so 1 1.00 4' Water readjusted to 4'B.G.S, at all test intervals. * Tests were performed in general accordance with the Wastewater Treatment Manual TM 5-814-3. T.O.W. =Top of Water (measured from ground surface) B.G.S. = Below Ground Surface NOTES: 10 14 10: 1) Driller moved approx. 3' SE of SPT boring and test hole PB-1 was drilled to a depth of 8.3' using 6.25" ID H.S.A. 2) 4" of general purpose gravel was placed in the bottom of the hole. 3) A 4" slotted PVC pipe was installed to 8.0' B.G.S. and backfilled with gravel to a depth of 4.0' B.G.S. 10/14/10 Pre-soak: 1) Filled pipe with water to ground surface, water level dropped to approx. 5.0' B.G.S. after 10 min. 2) Re -filled pipe with water to ground surface, water level dropped to approx. 5.0' B.G.S. after 10 min. 10/15/10 Infiltration Test: 1) Water level was at 6.2' B.G.S. after overnight pre-soak 2) Filled pipe with water to 4.0' B.G.S., water level dropped to 5.0' B.G.S. after 30 min. SINCE FROEHLING & ROBERTS❑N, INC. Engineering • Environmental • Geotechnical �( 310 Hubert Street Raleigh, North Carolina 27603 2302 1 USA 1881 T 919.828.34411 F 919.828.5751 Soil Infiltration Test Date: 10/15/2010 Number: 66 L-04 54-0005 Engineering Staff: D. Racey Client/Project: USACE-SOF Range 37 Training Annex (PN 74837, FY-10) Test Hole__ Did water remain in -test hole overnight,(24hr)?: Yes : .. -:.Measurement to T.O.W.: per Time Interval,_- " m -Deoth" Time began: 10:01 AM min hr min hr minj hr minj hr min hr min hr- min hr min hr Final 18' X If yes, adjust to 14' and test in 30 min. so os so'.. 1.0, so :.1.5 1zo z.o 150 zs _iso 1:0 uo as zoo -a.o Infiltration If no, add _ & test every 30 min for 4 hrs 14.2' 14.2' 14.2' 14.2' 14.2' 141' Rate PB-2 Depth to T.O.W, If no, and _ drains within 30 min, adjust to _and test every 10 min. for 1 hr min hr: min : hr, :min hr min hr min hr min hr 0.2730 min. (2.4'/1hr.) I 10 o.v. zo - 0.33 ao oso ao 0.67 so 0.83 so 1 1.00 14' Water readjusted to 14' B.G.S. at all test intervals. . Tests were performed in general accordance with the Wastewater Treatment Manual TM 5-814-3. T.O.W. =Top of Water (measured from ground surface) B.G.S. = Below Ground Surface NOTES: 10/14/10: 1) Driller moved approx. 3' SE of SPT boring and test hole PB-2 was drilled to a depth of 18.3' using 6.25" ID H.S.A. 2) 4" of general purpose gravel was placed in the bottom of the hole. 3) A 4" slotted PVC pipe was installed to 18.0' B.G.S. and backfilled with gravel to a depth of 13.5' B.G.S. 10/14/10 Pre-soak: 1) Filled pipe with water to ground surface, water level dropped to approx. 15.0' B.G.S. after 10 min. 2) Re -filled pipe with water to ground surface, water level dropped to approx. 15.0' B.G.S. after 10 min. 10/15/10 Infiltration Test: 1) Water level was at 16.0' B.G.S. after overnight pre-soak 2) Filled pipe with water to 14.0' B.G.S., water level dropped to 14.2' B.G.S. after 30 min.