Loading...
HomeMy WebLinkAboutNCC215547_Site Plan or Location Map_20211007L ` t a p NA 83UJ2 fi) V-dg� P Ri - J Rid ion 160 :. r 1 � � `� `�� � X / � J. �3.9� � - �+• � lU Barnhill ` . r 169♦ 1 170 r� V - L,1�^ silt gr a e � � ��� 'wet 50' � WV / r,-- � p � L l ! P add i t� fy►,Bct'in ri, 1S I, �. 7Pg.413� Y v ( Q Q C ✓ ` r ��r�a{ • / � Silt Fence and �I�j w.. -71�V Clearin_q Limit 1' in Front of u ! K 1 i�naa<y yi �� 1759 ° ^- � 1 • �Y �a t fill Q �� v� r 4•ay ����� .Af a \ O ryJ U` \ J ' r-ytorls Sect"on r j ex. ,able �3`C width - 3s =� r, J j C � t• � ° C 1 �p`� C_ Note: Contractor shall insure that he and all his workers (contractors, subcontractors and other site personnel) do not damage construction stakes or other measures used in laying out the project whether by the Engineer or another entity including those under the employ of the contractor. Contractor shall cause his workers to observe and verify to the fullest extent practicable that stakes, other measures and grades are, or appear to be, accurate and correct, and immediately, but prior to any associated work, notify the staking entity of any potential conflict, error or question regarding the work. The Engineer shall not be responsible if all of the above measures are not strictly adhered to. The Engineer shall not be responsible where due to damage, his staking can not be verified. For critical or costly components of the work, where the contractor believes that staking may not be. preserved, the contractor shall request the staking entity to place staking in an area where its preservation can be insured. 4 r 373 L m w; 137 � r > ram, RJW a. - ` 250 r Skimmer Sediment Basin Chart Sediment Disturbed Q10 Required Volume Actual Volume Required Surface Actual Surface General Top Dimension (ft) Qd Skimmer Orifice Td Basin Area (Acres) (CFS) (Cubic Yards) (Cubic Yards) Area(sf) Area (sf) (Length x Width x Depth (cf/Day) Size (in) Dia. (in) (Days) #1 3.7 8.0 247 250 2,600 2,700 901L x 30'W x 2.5'D 2,250 4 1.7 3 #2 3.7 8.0 247 250 2,600 2,700 90'L x 301W x 2.5'D 2,250 4 1.7 3 #3 3.9 8.4 260 264 2,730 2,852 92'L x 31'W x 2.5'D 2,376 4 1.8 3 Q10=CiA Orifice Dia. (in)= Qd/{2310* H) C=0.25 Qd=dewatering rate=V/td (Cf/Day) tc=5 min V=Volume (Cf) i10=-7.2 in/hr. td-Draw Down Time (Days=3) H=0.333 ft For 4" Skimmer Design Notes: 1. Side slopes from top of bank down to inside bottom of basin are to be 2:1 2. Side slopes from top of bank to ex ground are to be no steeper than 3:1 3. Skimmers shall be Faircloth Skimmers or approved equal 4. 325 sf minimum surface area per cfs of Q10 peak inflow 5. 66.7 cy minimum volume per acre of disturbed area 6. Upon complete restabilization of all disturbed areas, and approval by Engineer and NCDENR-LQS, remove sediment basin and regrade swale, fertilize, seed and mulch. 7. Field install Diversion Ditches as needed to ensure positive drainage towards upper ends of sediment basin. Swale Calculations Chart Area Q10 Side- Channel V10 V10 �• Section (acres) (cfs) Slope Slope(%) (bare)(fps) (grassed)(fps) 1 - 1 2 - 2 3.7 7.6 8.0 3:1 0.1% 1.7 16.4 3:1 0.10 2.0 0.8 1.0 Q=ciA Friction Factors C=0.3 '10=7.2 in/hr. n=0.02 Bare Earth n=0.05 Grass v=1.49 R 2/3 s 1/2 o � �r Maintenance Plan: 1. All erosion and sedimentation control devices shall be checked for stability and operation following every runoff -producing rainfall event and in no case less than once every week Any needed repairs will be made immediately to maintain all devices in the operating conditions intended. ✓/ 2. Sediment shall be removed from behind silt fence when it accumulates to a depth of six inches. 3. Sediment shall be removed from the inlet protection devices when storage capacity has been / j approximately 50% filled. 4. Any sediment tracked onto adjacent pavement shall be removed immediately. / 5. A maintenance log of all erosion control inspections and maintenance performed shall be kept I J J onsite at all times. 6. Any sedimentation that occurs into the offsite stormwater drainage network shall be removed immediately to prevent the stormwater device from sediment accumulation. IQ i General Notes ` - 1. Topographic information was created from a combination of Lidar elevation data obtained from the N.C. flood mapping program, and ground topographic survey by "tidewater Associates, Inc. on, • \ NAVD'88 Datum. Lidar contour lines are not adjusted to match ground shots. 2. Boundary information taken from an actual survey by Tidewater Associates, Inc. on 9-24-2020. 3. Development area is wooded. } 4. All easements to be drainage and utility at dimensions shown, unless otherwise noted. 5. There are no Areas of Environmental Concern (AEC) as defined by Coastal Area Management Act (CAMA) on -'--�"_a--� this site. 6. No wetland delineation prepared for this site. n 7. Stormwater from this project drains to an unnamed tributary to Pasture &ranch which is classified as SA;HQW. 8. For additional information, see plan and profile and detail sheets. Q b I 9. This site is not affected by any special flood hazard per FEMA CPN #370340 5346 J, (Onslow County) effective November 3, 2005. 10. The purpose of this plan is to dear and clean debris for future development. Soil stockpiles shall be encompassed by silt fence and maintain a minimum slope of 3:1, if left for more than 14 days, temporary seeding to be added to stockpile. j I Legend: BG - Below Ground CMF - Concrete Monument Found CP - Control Point D.B. - Deed Book E - Easting Elev. - Elevation Ex. - Existing IPF - Iron Pipe Found ISF - Iron Stake Found M.B. - Map Book N - Northing Pg. - Page R/W - Right-of-way 558 - Skimmer Sediment Basin CL - Clearing Limits CL sf - Clearing Limits / Silt Fence --�- --41; - - Existing Contour - Existing Ditch/Swale ... ... ... --- - Proposed Swale - - - . • - • - - - - - - Wetlands Line - Woodsline Erosion and Sedimentation Control Notes: 1. Clearing or grading operations shall begin at low points of outfall release or other locations where sediment control measures are shown on the plan and the sediment control devices (sediment traps, silt fences, etc.) shall be installed before or simultaneously with the disturbance of any area draining to the device. 2. Sediment control devices and structures shall be installed, maintained and amended as needed to provide effective control of accelerated erosion and sedimentation until the contributing watersheds are stabilized. 3. Requirements for materials handling shall follow rules set forth in NCG01, Part II. Section F. 4. Self -Inspection, record keeping, and reporting, shall follow rules set forth in NC601, Part III, Sections A, B, and C. 5. Construction sequence: A. Notify Engineer, owner and Land Quality Section prior to beginning construction. B. Install stabilized construction entrance at all points of access. C, Limits of clearing will be as shown. Owner may lessen the amount to clear. Confirm prior to start of work. Silt fence shall be installed at the down slope edge of clearing immediately after a lot is cleared. Silt fence shall be maintained until the lot is stabilized completely. Silt fences are shown based on topographic information in the locations expected to be needed to trap sediment prior to entering down slope areas. Actual locations of installation shall be adjusted to the actual physical on site topography. That is, where silt fence is not shown on the plan but the actual topography reflects a downward slope, silt fence shall be installed. Where the actual topography reflects an upward slope silt fence is not required. D. Clear d grub entire area within the clearing limits as shown. E. Strip topsoil & stockpile for later use. F. Construct sediment traps and rock check dams where shown. Construct drainage swales. Install storm drainage piping. G. Immediately seed, mulch and install temporary liners to swales where shown. H. Maintain erosion control measures as needed to assure full functionability. I. Reseed and mulch shoulders and swales. Install liners on all swales. J. Provide ground stabilization (Temporary or Permanent) on perimeter areas and slopes greater than 3.1 within 7 days following the completion of any phase of grading or construction; and 14 days for all other areas internal to the project 6. Seeding Specifications: Apply lime and fertilizer and work into 4 - 6 inches of soil. Seed mixture shall be distributed uniformly and covered with a clean straw mulch. All mulch shall be crimped or asphalt tacked to hold in place, Material and application rates as follows, and are generally considered minimums. *Mulch rate to be doubled if crimped` Material Application Rate Lime 3000 lbs. ac. Fertilizer (10-10-10) 750 lbs./ac. Mulch 2 tons/ac. Asphalt Tack 435 gal./ac. (Max) Permanent Seeding Common Bermu a (Unhulled Sept. 1 - April 1) 100 lbs./ac. (Hulled April 1 - Sept. 1) 75 lbs./ac. "Rebel" Fescue 50 lbs./ac. Rye Grain (Sept. 1 - April 1 only) 50 lbs./ac. German Millet (April 1 - Sept. 1 only) 50 lbs./ac. Temporary Seeding Dec. 1 - April 1 Kobe Lespedeza 50 lbs./ac. Rye Grain 120 lbs./ac. April 15 - Aug. 15 German Millet 40 lbs./ac. Aug. 15 - Dec. 30 Rye Grain 120 lbs./ac. 7. Once all areas have been stabilized, contractor is to remove temporary erosion control measures, regrade, dr mulch to restabilize these areas. 8. For additional requirements, see the approved erosion and sedimentation permit. 9. All ditches are 3:1 ditches to be approximately 24 inches deep to provide surface drainage and connection to future stormwater ponds for sediment storage. CA . ••.iROZ4 O. ESs/ O+.� 'cam SEAL 9r; 34978 _= A EROSION AND SEDIMENTATION CONTROL PLAN PEYTONS RIDGE SECTION 9 White Oak / Swansboro Twp, Onslow Co, North Carolina Owner / Developer: South State Development, LLC 121 Garnet Lane Jacksonville, North Carolina 285" DATE: 09/07/2021 GRAPHIC SCALE: 1"=200' 0 100 200 400 600 SCALE:1"-200' FEET TIDEWATER ASSOCIATES, INC. Consulting Engineers - Land Surveyors - Land Planners Jacksonville, North Carolina P.O. Box 976 - 306 New Bridge Street - 28540 Phone (910) 4SS-2414 - www.TidewaterENC.com Firm License Number: F-0108 Field Boole NIA Dish Name: Aced #2967 Filename: Peyton 9 - ESC Plan dwg KNW Sheet 1 of 2 Job No.: S200108-n50 EsG 1961