Loading...
HomeMy WebLinkAboutNCC215510_ESC Approval Submitted_20211004ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality December 18, 2019 LETTER OF APPROVAL WITH MODIFICATIONS Howard Jacobson c/o PEM Entities, LLC ATTN: Howard Jacobson, Attorney 3821 Falls River Avenue Raleigh, NC 27624 RE: Project Name: Sutherland Station Project ID: FRANK-2020-003 Acres Approved: 14.23 County: FRANKLIN, City: Youngsville, Address: River Basin: Tar -Pamlico, Stream Classification: Submitted By: The Nau Company Date Received by LQS: December 17, 2019 Plan Type: Revised Dear Mr. Jacobson: Sutherland Drive Other This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval with Modifications. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The N01 form may be accessed at deq.nc.gov/NCG01. Please direct questions about the N01 form to Annette Lucas at Antiette.litcas.@ncdenr.gov or Paul Clark at Paiil.cIark@nCdenr.gQv. After you submit a complete and correct N01 form, a CPOC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for the coverage under the NCGO1 permit. However, on or after June 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. 15fD EQ� o.r..o�wuwar�ww �.n, V North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Raleigh Regional office 1628 Mail Service Center 3800 Barrett Drive I Raleigh, North Carolina 27609 919 791.4200 Letter of Approval with Modifications Howard Jacobsen c/o PEM Entities, LLC December 18, 2019 Page 2 of 3 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspection made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, S -Q.� Sally CastleI Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGO1 Fact Sheet cc: James David Arnold, PE (darnold(@thenauco.com ) - Electronic Copy Bryson Stephens, PE (bste_phens@thenauco.com ) - Electronic Copy DEMLR - Raleigh Regional Office File Letter of Approval with Modifications Howard Jacobsen c/o PEM Entities, LLC December 18, 2019 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Sutherland Station Project ID: FRANK-2020-003 Project County: FRANKLIN 1. Provide two copies (one full-size and one-half size) of the plan set to include the inlet and outlet protection for the golf crossing culverts and the associated design calculations per the electronic submittal received on December 17, 2020. To facilitate DEMLR review, bubble, highlight, or otherwise identify the changes to your resubmittal. Provide a cover letter referencing the project name, project ID, and purpose for submittal. (G.S. 113A- 57(4))