Loading...
HomeMy WebLinkAboutNCC215402_NOI Application_20210929Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/28/2021 8:40:40 AM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 9/28/2021 10:02:06 AM (Review- Construction NOI 66702) • The task was assigned to Broussard, Brooklyn C by round robin distribution 9/28/2021 8:41 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 30, 2021 5:00 PM. The priority is: High 9/28/2021 8:41 AM Submit by Evans, Shaundra M 9/29/2021 8:31:32 AM (Payment Verification for NCC215402) * Seth Mailman • Evans, Shaundra M assigned the task to Evans, Shaundra M 9/29/2021 8:30 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 9, 2021 5:00 PM. The priority is: High 9/28/2021 10:02 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * FB-Runway & Ta)away Rehabilitation - Laydown Area 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) Military Installation 2. County* Cumberland 3. Highway or Street Booster Drive Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Fort Bragg 5. State * NC 6. Zip Code* 28310 7. Latitude* Enter the latitude in decimal degrees 35.1800 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -79.0110 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/30/2021 Estirrated Construction Project Start Rate 10. Date to End * 09/30/2022 Estinated Construction Project End Date 11. SIC (Primary) * Other (9999) Standard Industrial C]assification for Development 12. Acres to be 6.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 6.00 (acres) * 14. Post- 0.00 construction (Estimated) impervious area (acres) * Project Tracking ID NCC-CUMBE-2021-FB-Runway & Taxiway Rehabilitation - Laydown Area Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Tank Creek Waterbody* Name of waterbody into which stormwater runoff will discharge 15b. Waterbody 18-23-27 Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual ......................................................................................................................................................... Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee * Legally Pesponsible Entity Fort Bragg Directorate of Public Works IF pernittee is an individual, enter first and last narre in this field. Otherwise, enter organization/business narre. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Monica If Corporation, enter Faegistered Agent First %rre 3. Last Name* Stephenson IF Corporation, enter F;bgistered Agent Last %rre 3b. Title Director 4. Permitee E-mail monica.a.stephenson.civ@mail.mil Address* 5. Permittee 910-396-4009 Telephone No.* 6. Permittee Mailing Street Address Address* 2175 Reilly Road Stop A Address Line 2 City Fort Bragg Fbstal / Zip Code 28310-5000 Check box if the street address the same as mailing address 7. Permittee Street Address* F Yes Street Address 4300 Butner Road Address Line 2 city Fort Bragg Fbstal / Zip Code 28310 State / Ffovince / Fbgion NC Country us State / Frovince / Region NC Country us 8. Type of Ojvnership is only individual if an individual is naned in B.1. above. Ownership* Government- Federal C. Site Contact Information Part C. Roject Site Contact Inforrration ...................................................................................................................................................................................................... 1. Primary Site Lee Contact - First Name * 2. Primary Site Ward Contact - Last Name * 3. Title Chief, DPW/Water Management Section 4. Site Contact E- lee.p.\&ard.civ@mail.mil mail Address* 5. Site Contact 910-908-5286 Telephone No. 6. Organization Fort Bragg Directorate of Public Works Name 7. Site Contact Street Address Mailing Address* 2175 Reilly Road Stop A Address Line 2 City Fort Bragg Postal / Zip Code 28310-5000 8. Consultant Name (Optional) Clay Greene, P.E. First and Last narre 9. Consultant E-mail clayg@adcengineering.com This person will be copied on all correspondence. 10. Consultant 864-751-9123 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) monica.a.stephenson.civ@mail.mil Default is legally responsible person a-rrail 12. Billing (For Annual Fee correspondence) Telephone 910-396-4009 Default is legally responsible person telephone State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/22/2021 Approved * 2. E&SC Plan Project CUMBE-2022-039 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Fayetteville (FRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan cumbe-2022-039exap.pdf 800.66KB Approval letter or Mist beRDFformat Grading Permit 6. Signed FRO Financial Pesponsibility/Ojvnership Form Signed FRO PAAF Runway & Taxiway Laydown 366.8KB Area.pdf Mast be RDFfon-rat 7. Site Location Map Mast be RDFfornat (lint 201VB) Vicinity Map Runway & Taxiway Rehabilitation 6.75MB LayDown Area.pdf Rease do not upload entire set of E&SC plans. 8. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies if necessary. 9. NOI Certification Signed NOI Runway & Taxiway Rehabilitation Form 469.21 KB Laydown Area.pdf Wst be RDFfornat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Legally Responsible Person named on this Notice of Intent r Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Lee Ward Title Chief, DPW/Water Management Section Organization Legally Responsible Entity Fort Bragg Directorate of Public Works Date * 09/28/2021 F. Tracking and COC Info NOI Tracking No. 66702 NC Reference No. NCG01-2021-5402 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC215402 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5402 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC215402-2021 Invoice Due Date 10/28/2021 Initial Fee $ 100.00 Invoice Status OPEN