Loading...
HomeMy WebLinkAboutNCC214909_NOI Application_20210830Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 8/26/2021 3:06:33 PM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 8/27/2021 7:47:43 AM (Review- Construction NOI 63100) • The task was assigned to Broussard, Brooklyn C by round robin distribution 8/26/2021 3:07 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: August 30, 2021 5:00 PM. The priority is: High 8/26/2021 3:07 PM Submit by Miller, Ariyelle L 8/30/2021 11:07:04 AM (Payment Verification for NCC214909) * Immanuel Baucom • Miller, Ariyelle L assigned the task to Miller, Ariyelle L 8/30/2021 11:06 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 8, 2021 5:00 PM. The priority is: High 8/27/2021 7:48 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Duke Energy Carolinas, LLC - Marshall Gypsum Area Surface Ash Removal 1 b. Specific Lot This field may be used to list specifc lot numbers. Numbers NA 1 c. Parcel ID List all Rios associated w ith this project. Number(s) (PIN) 46180342650 2. County* Chatham 3. Highway or Street 8320 NC Hwy 150 Address* Street name only is acceptable if no address number assigned yet 4. City or Township* Sherrills Ford 5. State * NC 6. Zip Code* 28673 7. Latitude* Enter the latitude in decimal degrees 35.6009 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -80.9715 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/01/2021 Estimated Construction Project Start Rate 10. Date to End* 05/31/2022 Estimated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial Oassification for Development 12. Acres to be 5.20 disturbed* (including off -site borrow and waste areas) 13. Total site area 1,709.00 (acres) * 14. Post- 4.00 construction (Estimated) impervious area (acres) * Project Tracking ID NCC-CHATH-2021-Duke Energy Carolinas, LLC - Marshall Gypsum Area Surface Ash Removal Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Catawba River - Lake Norman Waterbody* Name of waterbody into which stormwater runoff will discharge 15b. Waterbody 11-(75) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ Fternittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Carolinas, LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. Note: The organization name must match the business entity name registered with the NC Secretary of State. You can verify the registration here. 2. First Name * David If Corporation, enter Faegistered Agent First %rre 3. Last Name* Dellario It Corporation, enter Pbegistered Agent Last %rre 3b. Title GM CCP Project Management 4. Permitee E-mail David.Dellario@duke-energy.com Address* 5. Permittee (980)242-1764 Telephone No.* 6. Permittee Mailing Street Address Address* 400 South Tryon Street Address Line 2 City Charlotte Fbstal / Zip Code 28202 Check box if the street address the same as mailing address 7. Permittee Street Address* V Yes Street Address 400 South Tryon Street Address Line 2 City Charlotte Fbstal / Zip Code 28202 State / Frovince / Pegion NC Country us State / Frovince / Faegion NC Country us 8. Type of Ownership is only individual if an individual is naned in B.1. above. Ownership* Non -Government C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Chris Contact - First Name * 2. Primary Site Randazzo Contact - Last Name * 3. Title CCP Environmental Field Support 4. Site Contact E- Chria.Randazzo@duke-energy.com mail Address* 5. Site Contact (704)999-7661 Telephone No. 6. Organization Duke Energy Carolinas, LLC Name 7. Site Contact Street Address Mailing Address* 8320 NC-150 Address Line 2 City Sherrills Ford Fbstal / Zip Code 28673 8. Consultant Name (Optional) Chad Brown First and Last narre 9. Consultant E-mail Chad.Brown@woodplc.com This person will be copied on all correspondence. 10. Consultant (704)357-5612 Telephone No. 11. Billing E-mail (For Annual Fee correspondence) David.Dellario@duke-energy.com Default is legally responsible person a-rrail 12. Billing (For Annual Fee correspondence) Telephone (980)242-1764 Default is legally responsible person telephone State / Rovince / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/25/2021 Approved * 2. E&SC Plan Project CATAW-2022-004 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Mooresville (MRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan Marshall Gypsum Area Surface Ash Removal and Approval letter or Utility Installation (CATAW-2022-004) approval w 227.4KB Grading Permit mods.pdf Mast be RFforrret 6. Site Location Map Mast be R7Fforrrat (linit 20IVB) MSS Gypsum Area CATAW-2022-004 Project 991.12KB Location Map.pdf Rease do not upload entire set of E&SC plans. 7. Notes (Optional) Provide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies if necessary. One area of the project drains into Marshall Ash Basin which is further treated by Evoqua treatment system and ultimately discharged through Outfall 002 of NPDES Permit NC0004987 to the Catawba River (Lake Norman). Another area of the project drains into Gypsum collection ponds and is pumped to the Lined Retention Basin (LRB) and is discharged through Outfall 005 of NPDES Permit NC0004987 to the Catawba River (Lake Norman). 8. NOI Certification Dellario_NCG01-eNO1-Certification-Form-20210514- Form DEMLR-SW MSS Gypsum Area CATAW-2022- 905.99KB 004DJD. pdf Mast be RDFforrral This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Atide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* IT The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person* (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Oe6,1 ZW1,1W Type Name * David Dellario Title GM CCP Project Management Organization Legally Responsible Entity Duke Energy Carolinas, LLC Date * 08/26/2021 F. Tracking and COC Info NOI Tracking No. 63100 NC Reference No. NCG01-2021-4909 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC214909 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 4909 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC214909-2021 Invoice Due Date 9/26/2021 Initial Fee $ 100.00 Invoice Status OPEN