FINAL APPROVAL 8/12/2021
PR03ECT NUMBER: SDRC-2020-00053
IARLOTTE_
P
NGINEERING
SO / DETENTION / DRAINAGE PLAN
�ROSION CONTROL
RBAN FORESTRY
T EE ORDINANCE
ODOT
NOTE:
AT
DISTURBING
FC
SCHEDULE PRE -CONSTRUCTION MEETING
LEAST 48 HRS. PRIOR TO ANY LAND
ACTIVITY USING THE ONLINE
RM FOUND AT http://charlottenc.gov/ld
Sheet List Table
Emily Chien
Peter Rodriguez
Jonathan Wilson
Kevin Parker
LAND DEVELOPMENT SUBMISSION
ARROWOOD BUSINESS DISTRICT
CHAPTER INDEX
C5.16 STORM DRAINAGE AREA MAP C12.01 STRIPING AND SIGNAGE PLAN
C5.17
STORM DRAINAGE AREA MAP
C12.02
GRADING AND EROSION CONTROL PLAN
Sheet
Number
Sheet Title
C5.18
STORM DRAINAGE AREA MAP
C12.03
PLAN AND PROFILE
C5.19
STORM DRAINAGE AREA MAP
C12.04
CROSS SECTIONS
CHAPTER 1-GENERAL
C5.20
STORM DRAINAGE AREA MAP
C12.05
CROSS SECTIONS
G1.00
COVER
C5.21
STORM DRAINAGE AREA MAP
C12.06
CROSS SECTIONS
G1.01
ONSITE SEALED SURVEY
C5.22
STORM DRAINAGE AREA MAP
C12.07
CROSS SECTIONS
G1.03
SEALED SURVEY INTERSECTION 2
C5.23
STORM TABLES AND DETAILS
C12.08
CROSS SECTIONS
G1.04
SEALED SURVEY INTERSECTION 3
C5.24
STORM DETAILS
C12.09
CROSS SECTIONS
G1.05
SEALED SURVEY INTERSECTIONS NEAR SITE
C5.25
STORM DETAILS
C12.10
CROSS SECTIONS
G1.06
SEALED SURVEY INTERSECTION 6
C5.26
SCM DRAINAGE AREA MAP
C12.11
TURNING MOVEMENTS
G1.08
SEALED SURVEY INTERSECTION 10
C5.27
WET POND SCM1 PLAN AND DETAILS
C12.12
PHASE 1 TRAFFIC CONTROL PLAN
EXISTING CONDITIONS AND BUFFER
G1.09
DELINEATION PLAN
C5.28
WET POND SCM 2B PLAN AND DETAILS
C12.13
PHASE 1 TRAFFIC CONTROL PLAN
G1.10
GENERAL NOTES
C5.29
WET POND SCM-413 PLAN & DETAILS
C12.14
PHASE 2 TRAFFIC CONTROL PLAN
RZ-1
REZONING
C5.30
SAND FILTER SCM4A
C12.15
PHASE 3 TRAFFIC CONTROL PLAN
RZ-2
REZONING
C5.31
SAND FILTER SCM2A PLAN AND DETAILS
C12.16
PHASE 4 TRAFFIC CONTROL PLAN
RZ-3
REZONING
C5.32
SAND FILTER SCM3 PLAN AND DETAILS
CHAPTER 13-INNER RAMP AT ARROWOOD RD
RZ-4
REZONING
C5.33
SCM DETAILS
C13.00
DEMOLITION PLAN
RZ-5
REZONING
C5.34
SCM DETAILS
C13.01
STRIPING AND SIGNAGE PLAN
RZ-6
REZONING
CHAPTER 6-EARLY GRADING PERMIT
C13.02
GRADING AND EROSION CONTROL PLAN
RZ-7
REZONING
C6.00
OVERALL EARLY GRADING PERMIT PH1
C13.03
PLAN AND PROFILE
CHAPTER 2-SITE
C6.04
EARLY GRADING PERMIT PH1
C13.04
PLAN AND PROFILE
L2.00
OVERALL SITE LAYOUT PLAN
C6.05
EARLY GRADING PERMIT PH1
C13.05
CROSS SECTIONS
L2.01
OVERALL MASTER PLAN
C6.06
EARLY GRADING PERMIT PH1
C13.06
CROSS SECTIONS
L2.02
ENLARGEMENT SITE LAYOUT PLAN
C6.07
EARLY GRADING PERMIT PH1
C13.07
CROSS SECTIONS
L2.03
ENLARGEMENT SITE LAYOUT PLAN
C6.08
EARLY GRADING PERMIT PH1
C13.08
CROSS SECTIONS
L2.04
ENLARGEMENT SITE LAYOUT PLAN
C6.09
EARLY GRADING PERMIT PH1
C13.09
CROSS SECTIONS
L2.05
ENLARGEMENT SITE LAYOUT PLAN
C6.10
EARLY GRADING PERMIT PH1
C13.10
CROSS SECTIONS
L2.06
ENLARGEMENT SITE LAYOUT PLAN
C6.11
OVERALL EARLY GRADING PERMIT PH1 B
C13.11
CROSS SECTIONS
L2.07
ENLARGEMENT SITE LAYOUT PLAN
C6.15
EARLY GRADING PERMIT PH1 B
C13.12
CROSS SECTIONS
L2.08
ENLARGEMENT SITE LAYOUT PLAN
C6.16
EARLY GRADING PERMIT PH1 B
C13.13
CROSS SECTIONS
L2.09
ENLARGEMENT SITE LAYOUT PLAN
C6.17
EARLY GRADING PERMIT PH1 B
C13.14
CROSS SECTIONS
L2.10
ENLARGEMENT SITE LAYOUT PLAN
C6.18
EARLY GRADING PERMIT PH1 B
C13.15
CROSS SECTIONS
L2.11
ENLARGEMENT SITE LAYOUT PLAN
C6.19
EARLY GRADING PERMIT PH1 B
C13.16
CROSS SECTIONS
CHAPTER 3-EROSION CONTROL
C6.20
EARLY GRADING PERMIT PH1 B
C13.17
TURNING MOVEMENTS
C3.00
OVERALL EROSION CONTROL PHASE 2+4
C6.21
EARLY GRADING PERMIT PH1 B
C13.18
PHASE 1 TRAFFIC CONTROL PLAN
C3.01
EROSION CONTROL PHASE 2
C6.22
EARLY GRADING DETAILS
C13.19
PHASE 2 TRAFFIC CONTROL PLAN
C3.02
EROSION CONTROL PHASE 2
C6.23
EARLY GRADING DETAILS
CHAPTER 14-ARROWOOD RD
C3.03
EROSION CONTROL PHASE 2
C6.24
EARLY GRADING DETAILS
C14.00
DEMOLITION PLAN
C3.04
EROSION CONTROL PHASE 2
C6.25
EARLY GRADING DETAILS
C14.01
STRIPING AND SIGNAGE PLAN
C3.05
EROSION CONTROL PHASE 2
C6.26
EARLY GRADING DETAILS
C14.02
GRADING AND EROSION CONTROL PLAN
C3.06
EROSION CONTROL PHASE 2
C6.30
OVERALL TREE SAVE PLAN
C14.03
PLAN AND PROFILE
C3.07
EROSION CONTROL PHASE 2
C6.31
OVERALL NAUTRAL AREA PLAN
C14.04
PLAN AND PROFILE
C3.08
OVERALL EROSION CONTROL PHASE 3
CHAPTER 7-ONSITE ROADWAY
C14.05
CROSS SECTIONS
C3.09
EROSION CONTROL PHASE 3
C7.00
OVERALL ROADWAY PLAN
C14.06
CROSS SECTIONS
C3.10
EROSION CONTROL PHASE 3
C7.01
ROADYWAY PLAN AND PROFILE
C14.07
CROSS SECTIONS
C3.11
EROSION CONTROL PHASE 3
C7.02
ROADYWAY PLAN AND PROFILE
C14.08
CROSS SECTIONS
C3.12
EROSION CONTROL PHASE 4
C7.03
ROADYWAY PLAN AND PROFILE
C14.09
CROSS SECTIONS
C3.13
EROSION CONTROL PHASE 4
C7.04
ROADYWAY PLAN AND PROFILE
C14.10
CROSS SECTIONS
C3.14
EROSION CONTROL PHASE 4
C7.05
ROADYWAY PLAN AND PROFILE
C14.11
CROSS SECTIONS
C3.15
EROSION CONTROL DETAILS
C7.06
ROADYWAY PLAN AND PROFILE
C14.12
CROSS SECTIONS
C3.16
EROSION CONTROL DETAILS
C7.07
ROADYWAY PLAN AND PROFILE
C14.13
CROSS SECTIONS
C3.17
EROSION CONTROL DETAILS
C7.08
ROADYWAY PLAN AND PROFILE
C14.14
CROSS SECTIONS
C3.18
EROSION CONTROL DETAILS
C7.09
ROADYWAY PLAN AND PROFILE
C14.15
CROSS SECTIONS
CHAPTER 4-GRADING
C7.10
ROADYWAY PLAN AND PROFILE
C14.16
CROSS SECTIONS
L4.00
OVERALL GRADING PLAN
C7.11
INTERSECTION SIGHT DISTANCE - ROAD A
C14.17
CROSS SECTIONS
L4.01
DETAILED GRADING PLAN
C7.12
INTERSECTION SIGHT DISTANCE - ROAD B
C14.18
CROSS SECTIONS
L4.02
DETAILED GRADING PLAN
CHAPTER 9-SITE DETAILS
C14.19
CROSS SECTIONS
L4.03
DETAILED GRADING PLAN
L9.00
SITE DETAILS - PAVEMENT
C14.20
CROSS SECTIONS
L4.04
DETAILED GRADING PLAN
L9.01
SITE DETAILS - OTHER
C14.21
CROSS SECTIONS
L4.05
DETAILED GRADING PLAN
L9.02
SITE DETAILS - SECTIONS
C14.22
TURNNING MOVEMENTS
L4.06
DETAILED GRADING PLAN
CHAPTER 10-PLANTING PLAN
C14.23
TURNNING MOVEMENTS
L4.07
DETAILED GRADING PLAN
L10.00
OVERALL PLANTING PLAN
C14.24
PHASE 1 TRAFFIC CONTROL PLAN
L4.08
DETAILED GRADING PLAN
L10.01
ENLARGEMENT PLANTING PLAN
C14.25
PHASE 1 TRAFFIC CONTROL PLAN
L4.09
DETAILED GRADING PLAN
L10.02
ENLARGEMENT PLANTING PLAN
C14.26
PHASE 2 TRAFFIC CONTROL PLAN
L4.10
DETAILED GRADING PLAN
L10.03
ENLARGEMENT PLANTING PLAN
C14.27
PHASE 2 TRAFFIC CONTROL PLAN
CHAPTER 5-STORM
L10.04
ENLARGEMENT PLANTING PLAN
C14.28
PHASE 3 TRAFFIC CONTROL PLAN
C5.00
OVERALL STORM DRAINAGE PLAN
L10.05
ENLARGEMENT PLANTING PLAN
CHAPTER 15-SANDY PORTER RD AT ROAD A
C5.01
STORM DRAINAGE PLAN
L10.06
ENLARGEMENT PLANTING PLAN
C15.00
DEMOLITION PLAN
C5.02
STORM DRAINAGE PLAN
L10.07
ENLARGEMENT PLANTING PLAN
C15.01
STRIPING AND SIGNAGE PLAN
C5.03
STORM DRAINAGE PLAN
L10.08
ENLARGEMENT PLANTING PLAN
C15.02
GRADING AND EROSION CONTROL PLAN
C5.04
STORM DRAINAGE PLAN
L10.09
ENLARGEMENT PLANTING PLAN
C15.03
PLAN AND PROFILE
C5.05
STORM DRAINAGE PLAN
L10.10
ENLARGEMENT PLANTING PLAN
C15.04
CROSS SECTIONS
C5.06
STORM DRAINAGE PLAN
L10.11
BUFFER DETAILS
C15.05
CROSS SECTIONS
C5.07
STORM DRAINAGE PLAN
L10.12
PLANTING DETAILS
C15.06
CROSS SECTIONS
C5.08
STORM DRAINAGE PLAN
L10.13
SCM1 WET POND PLANTING PLAN
C15.07
CROSS SECTIONS
C5.09
STORM DRAINAGE PLAN
L10.14
SCM213 WET POND PLANTING PLAN
C15.08
CROSS SECTIONS
C5.10
STORM DRAINAGE PLAN
L10.15
SCM413 WET POND PLANTING PLAN
C15.09
CROSS SECTIONS
C5.11
CULVERT PLAN & PROFILE
CHAPTER 11-SANDY PORTER RD AT ARROWOOD RD
C15.10
CROSS SECTIONS
C5.12
OVERALL STORM DRAINAGE AREA MAP
C11.00
STRIPING AND SIGNAGE PLAN
C15.11
CROSS SECTIONS
C5.13
STORM DRAINAGE AREA MAP
C11.01
TURNING MOVEMENTS
C15.12
CROSS SECTIONS
C5.14
STORM DRAINAGE AREA MAP
CHAPTER 12-OUTER RAMP AT ARROWOOD RD
C15.13
TURNING MOVEMENTS
C5.15
STORM DRAINAGE AREA MAP
C12.00
DEMOLITION PLAN
C15.14
PHASE 1 TRAFFIC CONTROL PLAN
6/2/2021 3:50 PM MICHAEL PHILLIPS NA 2019\1019251\CAD\DOCUMENTATION-ONSITE\1019251 PLN COVR.DWG
MAJOR INFRASTRUCTURE
E.T.J. CHARLOTTE, N.C.
VICINITY MA
C15.15 PHASE 2 TRAFFIC CONTROL PLAN
CHAPTER 16-TRYON RD AT ARROWOOD RD
C16.00
DEMOLITION PLAN
C16.01
STRIPING AND SIGNAGE PLAN
C16.02
GRADING AND EROSION CONTROL PLAN
C16.03
STORM DRAINAGE AREAS
C16.04
PLAN AND PROFILE
C16.05
CROSS SECTIONS
C16.06
CROSS SECTIONS
C16.07
TURNNING MOVEMENTS
C16.08
PHASE 1 TRAFFIC CONTROL PLAN
C16.09
PHASE 2 TRAFFIC CONTROL PLAN
C16.10
PHASE 2 TRAFFIC CONTROL PLAN
CHAPTER 19-TYPICAL SECTIONS AND NCDOT
DETAILS
C19.00
TYPICAL SECTIONS
C19.01
TYPICAL SECTIONS
C19.02
TYPICAL SECTIONS
C19.03
TYPICAL SECTIONS
C19.04
NCDOT DETAILS
C19.05
NCDOT DETAILS
C19.06
NCDOT DETAILS
C19.07
NCDOT DETAILS
C19.08
NCDOT DETAILS
C19.09
NCDOT RIGHT-OF-WAY PLAN
DATE: 06/01 /2021
SCALE:
(NOT TO SCALE)
PROJECT TEAM
OWNER/DEVELOPER
�d
KARMA REAL ESTATE, LLC
301 SOUTH COLLEGE ST.
SUITE 2800
CHARLOTTE, NC, 28202
704.342.6021
CONTACT NAME: STEVE HOOTS
LANDSCAPE ARCHITECT
LANDDESIGN
223 NORTH GRAHAM STREET
CHARLOTTE, NC 28202
c 704.333.0325
CONTACT NAME: SHAUN TOOLEY
APPROVED FOR
CONSTRUCTION
CHARLOTTE-MECKLENBURG PLANNING DEPARTMENT
Josh Weaver
07/26/2021 _j
CIVIL ENGINEER
LANDDESIGN
223 NORTH GRAHAM STREET
CHARLOTTE, NC 28202
704.333.0325
CONTACT NAME: DAVID WATSON
SURVEYOR
LDSI
201 WEST 29TH ST.
CHARLOTTE, NC, 28206
704.337.8329
CONTACT NAME: SETH MARTIN
www.ldsi-inc.com
, .... RO �®
�e 0 >aE ARCH%TF61®�
* 15 a *_
CA
-ram # 1 97
UN
6/01 /2021
Yi ARo''%,
L '-
�oFEssiN; j
EAL
1164 -
IN
06/01 /2021
CORPORATE
S EAL
NCDOT DRIVEWAY PERMIT NO.: 20-072-M
ACCELA NO.: SDRC-2020-00053
ARROWOOD BUSINESS DISTRICT
LD PN 1019251
COVER
andDesLm.