HomeMy WebLinkAboutSW8910506_Current Permit_19910710aw.
State of North Carolina
Department of Environment, Health, and Natural Resources
Wilmington Regional Office
James G. Martin, Governor Bob Jamieson
William W. Cobey, Jr., Secretary Regional Manager
July 10, 1991
DIVISION OF ENVIRONMENTAL MANAGEMENT
Mr. Paul D. Dennis
Sea Trail Corporation
651 Clubhouse Road
Sunset Beach, North Carolina 28459
Subject: Certification of Compliance
with Stormwater Regulations
Project No. 910506
Oyster Bay Phase 3 (at Sea Trail
Plantation)
Brunswick County
Dear Mr. Dennis:
The Wilmington Regional Office received the Stormwater
submittal for the subject project on June 4, 1991 and final
information on July 9, 1991. Based on our review of the project
plans and specifications which limit the built -upon area to 4,420
square feet on each of the 68 lots identified, we have determined
that the project complies with the Stormwater Regulations set
forth in Title 15A NCAC 2H. 1003(a)(2). This Certification shall
be effective from the date of issuance until rescinded and the
project shall be constructed in accordance with the plans and
specifications as filed with the Wilmington Regional Office.
Any modification of the plans submitted to this Office or
further development of this site will require an additional
Stormwater submittal/modification and approval prior to
initiation of construction Modifications include but are not
limited to; project name changes, transfer of ownership, redesign
of.built-upon surfaces, addition of built -upon surfaces, redesign
or further subdivision of project area.
127 Cardinal Drive Extension, Wilmington, N.C. 28405-3945 • Telephone 919-395-3900 • Fax 919-350-2004
An Equal Opportunity Affirmative Action FmploM
Stormwater Certification No. 910506
July 10, 1991
Page 2 of 2
If you have any questions concerning this matter, please
call Paul Rawls or me at (919) 256-4161.
Sincerely,
ve Adkins
Water Quality Regional Supervisor
PER:DSK4:910506.JUN
Attachment
cc: Alan Lewis, Houston and Associates, P.A.
Robert Tucker, P.E., Brunswick County Building Inspections
Bill Mills, DEM
Wilmington Regional Files
Central Files
gtosa(p
DIVISION OF ENVIRONMENTAL MANAGEMENT
Submittal Form for Projects Using Density Limits for Stormwater
Control
PROJECT DATA
Name of Project: Oyster Bay Phase 3 at Sea Trail Plantation
Location (County, Township/Municipality, Address):
Brunswick County, Shallotte Township near Sunset Beach
Applicant Name: Sea7Trail Corporation
Mailing Address: 651 Clubhouse Road
Sunset.Beach, NC 28459
Phone No.: (919) 579-2939
Submittal Date:
Brief Description (include map and appropriate drawings):
68 Lot Subdivision of Approximately 33 acres with 4 8 acres of
roadway rights -of -way, common areas
Water Body Receiving Stormwater Runoff:
Name of Water Body: Calabash Creek
Classification of Water Body: SA �I
Tot v al Area of Proposed Project (acres): 32.7
iIlt?
State/Federal Permits and Approvals Required:
(Check Appropriate Blanks) �fP,
9 P, -
CAMA Major Sedimendation and Erosion Control X
404 Permit DEM/DHS Sewage Disposal X
Other (specify) :
CALCULATION OF BUILT -UPON AREA
(Built -upon area means that portion of an individual development
that is covered by impervious or partially pervious cover
including buildings, pavement, recreation facilities, etc. but
not including decking.)
a) Built -upon area: 6.98 AC
b) Total project area: 27.9AC
% built -upon = built -upon / total project area * 100
% built -upon area = �s_n %
If the water body receiving stormwater runoff is classified as
SA, is the % built -upon area < 25%? Yes X No
If the water body receiving stormwater runoff is classified other
than SA, is the % built -upon area < 30$7Yes No
STORMWATER COLLECTION SYSTEM
Is the only kind of stormwater collection system grass swales?
Yes X No
(Grassed -line swales' should have a side slope of 3:1 (H:V) or
less.)
If ..no, .please - provide .a detailed description.
BUFFER AREA
Is the built -upon area at least 30 feet from mean high water of
all surface waters? Yes x No
If no, please provide a detailed description.
(Note: Only boat ramps, public roads, public bridges and
walkways to water related facilities are allowed within 30 feet
of mean high water if the project is intended to meet stormwater
control requirements through density limits.)
DEED RESTRICTIONS AND PROTECTIVE COVENANTS
Do the deed restrictions and protective covenants ensure that
subdivisions maintain the development consistent with the plans
and specifications approved by the division and include the State
as a beneficiary of the restrictions? Yes X No
(Include a copy of the restrictions and covenants with this
form.)
CERTIFICATION
I, Paul D. Dennis , certify that the information
included on this submittal form is correct, that the project will
be constructed in conformance with this information, and that to
the best of my knowledge, the proposed 'project complies with the
requriement of 15 %turd-oAer
1003 (b).
ign or Agent Date
651 Clubhouse Road, Sunset Beach, NC 28459
Address
If agent, please list owner's name and address below:
DIVISION OF
Regional Office
q,�A
`11
bat
k-11u_ I
_ U
j t !
ENVIRONMENTAL MANAGEMENT SIGN -OFF Q E M
"-,of �
Individual Evaluating Forms/Plant
CC: Applicant/Region/Mills/CF
al Water Quality Supervisor
COMPLIANCE WITH STORMWATER REGULATIONS
In accordance with Title 15 NCAC 2H.1003(a)(2), the following DEED
RESTRICTIONS AND PROTECTIVE COVENANTS shall be recorded in the
Brunswick County Registry prior to the conveyance of lots. Said Deed
Restrictions and Protective Covenants shall apply to the Oyster Bay Phase 3
Subdivision project in Sunset Beach, North Carolina as shown on design
plans titled "Erosion Control and Stormwater Plan - Oyster Bay Phase 3 - Sea
Trail Plantation" prepared by Houston and Associates, P.A. dated April 25,
1991:
'No more than 4,420 square feet of any lot shall be covered by
structures and/or paved surfaces, including walkways or patios of brick,
stone, slate, or similar materials. This covenant is intended to insure
continued compliance with stormwater runoff rules adopted by the State of
North Carolina and therefore benefits may be egforced by the State of North
Carolina. This covenant is to run with the land and shall be binding on all
parties and all persons claiming under them."
Paul D. Dennis, President1�
Sea Trail Corporation Tsignalure)
651 Clubhouse Road
Sunset Beach, North Carolina
Phone: (919) 579-2939
d te)
STATE OF NORTH CAROLINA
COUNTY OF BRUNSWICK.
I, �� , , i .e®�� , a Notary Public of the County of
Brunswick, State of North Carolina, hereby certify that Paul D. Dennis
personally appeared before me this day and executed the above certification.
Witness my hand and notarial seal, this .2 Z day of , 1991.
10.
(Notary Public)
My Commission expires /% ZG- 41� . L�
-JU)Q 1991
D.^yE M