THE INTENT OF THIS PLAN IS TO ALLOW McKEE HOMES TO DEVELOP LOTS
INDIVIDUALLY AND INDEPENDENTLY OF OTHER LOTS DESIGNATED FOR
CL
Z
HOME CONSTRUCTION. LOT CONSTRUCTION FOR ADJACENT LOTS MAY
BEG I N AND END AT DIFFERENT TIMES. THEREFORE, EACH LOT SHOULD
CDC p
-
— _ _
HAVE PERIMETER CONTROLS AND A CONSTRUCTION ENTRANCE. REFER TO
DETAIL SHEETS FOR DETAILS OF INDIVIDUAL LOT EROSION CONTROL
r5 Mp 2
_ I
MEASURES.
p
11Z f E.
GENERAL NOTES
1. PROPERTY, RIGHT-OF-WAY, EASEMENT, ETC. LINEWORK WAS TAKEN
= om p
WLLQQm
� $ �jy
FROM AN AUTO CAD FILE PROVIDED BY GROUNDED ENGINEERING, ON
NOVEMBER 9, 2020.
;wj
m m
�.�
I
2. THESE PLANS ARE ONLY FOR EROSION CONTROL FOR THE
TOWNHOME LOTS 1CTI REFER DRAWINGS
DEVELOPMENT SUBDIVISION
TRYON POINTE SUBDIVISION CONSTRUCTION DRAWINGS DESIGNED BY
GROUNDED ENGINEERING FOR ALL INFRASTRUCTURE DESIGN.
��Z
_ �go�
1 �- — —,
T777
3. THE SITE IS LOCATED IN THE WALNUT CREEK WATERSHED ANDTHE
I N.
.� I '
4. THE NEE UISE RVERVER
RIPARIAN AREA PROTECTION AND MAINTENANCE
RULE APPLILAKES, STOALLND ESTUALAN❑
,777-17
INTERM5TENT ST EAMS,
INTERMITTENT STREAMS, LAKES, PONDS AND ESTUARIES INTHE NEUSEIa
RIVER BASIN WITH FOREST VEGETATION ON THE ADJACENT LAND OR
Ip,
-- J I I I L" I I O I I I r— —,
L-- J I I I I I O I
L-- w I I
I I oN
"RIPARIAN AREA".
5. ALL SOIL EROSION AND SEDIMENT CONTROL PLANS AND MEASURES
N u
p F z
• __ I I
_f L— I I I
I I OI ' '
LO
I
MUST CONFORM TO THE MINIMUM APPLICABLE STANDARDS
SPECIFIED IN NORTH CAROUNA'S EROSION AND SEDIMENT CONTROL
w w J
I � L-- I III I I
L-
PLANS.
a
x
1
�•_
'
•
__
•I am_ I
1—••
WAKE COUNTY EROSION CONTROL SEQUENCE
1. FOR EACH LOT, SCHEDULE A PRECONSTRUCTION CONFERENCE WITH THE
WAKE COUNTY WATERSHED MANAGER ANDREW LAKE AT919-594-0895.
r _ _ _
r _ 1 I
r
I 1 — ••• I
I ,II
OBTAIN A LAND DISTURBING PERMIT.
S—
INSTALL GRAVEL CONSTRUCTION PAD, SILT FENCE, SILT FENCE OUTLET
AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO
11
I
I O
INSTALL THESE AREAS DISTURBED
DEVICES. DFORIONOII CONTROL MEASURES IMMEDIATELY AFTER CONSTRUCTION.
II II
I
I
J
3. CALL FOR AN ONSITE INSPECTION BY THE WATERSHED MANAGER
ANDREW LAKE AT 919-594-0895 TO OBTAIN A CERTIFICATE OF
—
L-- JI L—
COMPLIANCE.
4. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED.
_ _ I I- _J L_ I I I I ,
ROUGH GRADE SITE.
S. PROTECTANY EXISTING STORM INLETS INLETS WITH BLOCKAND GRAVEL
INLET CONTROLS OR OTHER APPROVED MEASURES. BEGIN
CONSTRUCTION, BUILDING ETC.
6. STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH
_
7AREAS
III I I ,
VEGETATION, PAVING, DITCH LININGS ETC. SEED AND MULCH DENUDED
PER GROUND STABILIZATION TIME FRAMES.
7. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED
^'III O I I Ir - -, _ _ N/F
ZHAN,JIE WANG
COMPLETELY, CALL FOR AN INSPECTION BY THE WATERSHED MANAGER
ANDREW LAKE AT919-594-0895.
-- ILIIoIIJIAN
II CpZ
III� I I PIN: 1712-62-831p0
L�I I f III
8. IF THE SITE IS APPROVED, REMOVE SILT FENCE, SILT FENCE OUTLETS,
ETC., AND SEED OUT OR STABILIZE AND RESULTING BARE AREAS.
III O I D.B. 17362, PG. 1182
I• ��__ L — — j L IIB.M. 1994, PG. 1929
_ J SINGLE FAMILY
9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE
INSPECTION BY THE WATERSHED MANAGERANDREW LAKE AT
919-594-0895. OBTAIN A CERTIFICATE OF COMPLETION.
—••� ZONED: R20
CONSTRUCTION SEQUENCE NOTES
z
_ �•
_•Ig,
—•• __
_ _� '
1. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT EROSION IS
MINIMIZED AND THAT COMPLIANCE WITH ALL APPLICABLE FEDERAL,
STATE, AND LOCAL LAWS, REGULATIONS, AND ORDINANCES IS
MAINTAINED THROUGHOUT EXECUTION OF THIS PROJECT.
J
d
J
LL O
z
J
�••— _ '
1 Ir _
_ —• __
I , '
2. THE CONTRACTOR SHALL INSPECT AND REPAIR ALL EROSION DEVICES AT
LEAST ONCE EVERY 7 CALENDAR DAYS AND WITHIN 24 HOURS OF EVERY
U
z Z
d
Q
_
r
1 N I I I , r_
1 O I I OI I I I I I ,77-1 I
C" I r--
I
0.5 INCH OR GREATER RAINFALL EVENT.
3. THE CONTRACTOR SHALL ENSURE THATTHE EROSION CONTROL DEVICES
z m --
O O_1 z
d 70
W
Q
■ I I I I I O I I I
* I I I v I I I N I I , '
I
J L-J L- I '
L-JI I I OI I/ OI I I
REMAIN UNDISTURBED UNTIL THE CONTRIBUTING UPSTREAM AREAS
HAVE BEEN STABILIZED AND APPROVED.
U
z w
o Oon
�
JI Q
s L—J L_ I I I
JJL_
>
HO
oc�
L
v~i
o
O
J
W
SEAL 2
r - - - - MkPROJECTNO:
// � � ♦ /^� / / \
`
� � AREA OF DISTURBANCE
6
DESIGN Y:
/ \
I
�� AREA OF DISTURBANCE = 5.88 AC
^A
DRAWN BY. 4N
J /
SCALE:
1"=50'
\ A \
ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CURRENT WAKE so o zs so ioo
COUNTY EROSION CONTROL SPECIFICATIONS AND DETAILS
SCALE: V-S0'
DATE: 2@1-oa-a3
SHEET NO:
C-1
PRELIMINARY DRAWING -NOT RELEASED FOR CONSTRUCrI ON