Loading...
HomeMy WebLinkAboutSWA000098_Plan (Grading)_20210405STORM STRUCTURE TABLE STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION STORM PIPE TABLE PIPE # DIA FROM -TO UPSTREAM INVERT DOWNSTREAM INVERT SLOPE LENGTH DESCRIPTION 15 . . .............. 010, IN VARIABLE WIDTH MP EASEMENT TOP OF 15'STORM RETAINING WALL EASEMENT RETAINING REQUIRE SEPARATE H, BUILDING PER FROM LOCATION OF POWER POLE TIC FC TIC iOH 12. TIC TIC TIC J TIC 712.50' TIC TIC I PVIVIT MT 712.50' GND GND 71 2.7� 3 NJ GND EX 7112 12.50' TIC TIC GND GND "I 1.96 STORM STRUCTURE TABLE STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION \ � ` 'STORM PIPE TABLE STORM STRUCTURE TABLE STRUCTURE# TOP STRUCTURE HEIGHT DESCRIPTION STORM PIPE TABLE PIPE # DIA FROM -TO UPSTREAM INVERT DOWNSTREAM INVERT SLOPE LENGTH DESCRIPTION 4- 2. 6" FIRE WATER SHALL BE BROUGHT INTO BUILDING BY PLUMBING CONTRACTOR AND STUBBED UP 12" BY UTILITY CONTRACTOR. 3. ALL STORM DRAIN PIPES SHALL INCLUDE A TRACER INSTALLED WITH SE, I I'� Al 1, . ........ 4. EACH STORM GRATE AND FRAME CASTING SHALL BE PERMANENTLY IN �AID 83"H01 1 ?011� I F;6) I, IMPRINTED WITH THE IMAGE OF A FISH AND THE FOLLOWING . . . .... VAUI I STATEMENT: "DUMP NO WASTE! DRAINS TO RIVERS." 7,64 2 81 5. THE DESIGN OF STORMWATER MANAGEMENT FACILITIES SHALL BE �z, COMPUTED IN ACCORDANCE WITH THE TOWN OF WEDDINGTON 7" STORM WATER ORDINANCE AND DRAINAGE MANUAL. GENERAL NOTES ` �8 ALL NOTES APPLY To ALL DRAWINGS AND ALL TRADES. IT IS THE RESPONSIBILITY OF ALL CONTRACTORS AND TRADES �AID8)3 11"l)" 7 H, TO COORDINATE THE INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY ALL OTHER CONTRACTORS AND I'� 116, � 96,15 "91 TRADES. THE REQUIREMENTS OF THE DRAWINGS, GENERAL REQUIREMENTS AND ALL ITEMS OF THE CONTRACT DOCUMENTS ARE EQUALLY BINDING ON ALL CONTRACTORS AND TRADES. EACH CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS \,I 4 6'7­'6',l')'8 31 OF THE CONTRACT DOCUMENTS FOR HIS EMPLOYEES USE ON THE PROJECT TO ASSURE THAT ALL WORK IS PROPERLY COORDINATED AND INSTALLED WITH THE WORK OF OTHER CONTRACTORS AND TRADES. WHENEVER THERE ARE DISCREPANCIES BETWEEN DRAWINGS, OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR CONFLICTS WITHIN THE SPECIFICATIONS AND/OR DRAWINGS, AND SUCH DISCREPANCY IS NOT CALLED TO THE ARCHITECT'S ATTENTION IN TIME TO PERMIT CLARIFICATION BY ADDENDUM, THE CONTRACTOR SHALL BASE HIS BID UPON /Z PROVIDING THE BETTER QUALITY OR GREATER OF WORK OR MATERIAL CALLED FOR, SHALL SUBMIT A WRITTEN STATEMENT WITH HIS PROPOSAL NOTING SUCH DISCREPANCIES, AND SHALL SO FURNISH AND INSTALL SUCH BETTER QUALITY OR 7� GREATER QUANTITY UNLESS OTHERWISE ORDERED IN WRITING. Project No. 1619 Date: 11.12.2020 Drawn by: JH Checked by: BVC Revisions: 0 TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. ARCHITECTS, P.A. THIS DRAWING IS THE PROPERTY OF STEWART-COOPER-NEWELL ARCHITECTS, PA. AND IS SUBJECT TO FEDERAL COPYRIGHT LAWS. THIS DRAWING MAY NOT BE REPRODUCED, PUBLISHED OR USED IN ANY WAY WITHOUT THE WRITTEN PERMISSION OF STEWART-COOPER-NEWELL ARCHITECTS, PA. SEAL CID CO co 00 lE CD LLJ Cl- LLJ CD Sheet Number