HomeMy WebLinkAboutSWA000098_Plan (Grading)_20210405STORM STRUCTURE TABLE
STRUCTURE#
TOP
STRUCTURE HEIGHT
DESCRIPTION
STORM PIPE TABLE
PIPE #
DIA
FROM -TO
UPSTREAM
INVERT
DOWNSTREAM
INVERT
SLOPE
LENGTH
DESCRIPTION
15
. . ..............
010,
IN
VARIABLE WIDTH
MP EASEMENT
TOP OF
15'STORM RETAINING WALL
EASEMENT
RETAINING
REQUIRE SEPARATE
H, BUILDING PER FROM
LOCATION OF POWER POLE
TIC
FC
TIC
iOH
12. TIC TIC TIC
J TIC
712.50' TIC TIC I
PVIVIT
MT 712.50'
GND
GND
71 2.7� 3
NJ GND
EX 7112
12.50' TIC
TIC GND GND "I
1.96
STORM STRUCTURE TABLE
STRUCTURE#
TOP
STRUCTURE HEIGHT
DESCRIPTION
\
�
`
'STORM
PIPE TABLE
STORM STRUCTURE TABLE
STRUCTURE#
TOP
STRUCTURE HEIGHT
DESCRIPTION
STORM PIPE TABLE
PIPE #
DIA
FROM -TO
UPSTREAM
INVERT
DOWNSTREAM
INVERT
SLOPE
LENGTH
DESCRIPTION
4- 2. 6" FIRE WATER SHALL BE BROUGHT INTO BUILDING BY PLUMBING
CONTRACTOR AND STUBBED UP 12" BY UTILITY CONTRACTOR.
3. ALL STORM DRAIN PIPES SHALL INCLUDE A TRACER INSTALLED WITH
SE, I I'� Al 1, . ........ 4. EACH STORM GRATE AND FRAME CASTING SHALL BE PERMANENTLY
IN
�AID 83"H01 1 ?011� I F;6) I, IMPRINTED WITH THE IMAGE OF A FISH AND THE FOLLOWING
. . . .... VAUI I STATEMENT: "DUMP NO WASTE! DRAINS TO RIVERS."
7,64 2 81 5. THE DESIGN OF STORMWATER MANAGEMENT FACILITIES SHALL BE
�z, COMPUTED IN ACCORDANCE WITH THE TOWN OF WEDDINGTON
7" STORM WATER ORDINANCE AND DRAINAGE MANUAL.
GENERAL NOTES
` �8 ALL NOTES APPLY To ALL DRAWINGS AND ALL TRADES. IT IS THE RESPONSIBILITY OF ALL CONTRACTORS AND TRADES
�AID8)3 11"l)" 7 H, TO COORDINATE THE INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY ALL OTHER CONTRACTORS AND
I'� 116, � 96,15 "91 TRADES. THE REQUIREMENTS OF THE DRAWINGS, GENERAL REQUIREMENTS AND ALL ITEMS OF THE CONTRACT DOCUMENTS
ARE EQUALLY BINDING ON ALL CONTRACTORS AND TRADES. EACH CONTRACTOR IS REQUIRED TO MAINTAIN FULL SETS
\,I 4 6'7'6',l')'8 31 OF THE CONTRACT DOCUMENTS FOR HIS EMPLOYEES USE ON THE PROJECT TO ASSURE THAT ALL WORK IS PROPERLY
COORDINATED AND INSTALLED WITH THE WORK OF OTHER CONTRACTORS AND TRADES.
WHENEVER THERE ARE DISCREPANCIES BETWEEN DRAWINGS, OR BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR
CONFLICTS WITHIN THE SPECIFICATIONS AND/OR DRAWINGS, AND SUCH DISCREPANCY IS NOT CALLED TO THE
ARCHITECT'S ATTENTION IN TIME TO PERMIT CLARIFICATION BY ADDENDUM, THE CONTRACTOR SHALL BASE HIS BID UPON
/Z PROVIDING THE BETTER QUALITY OR GREATER OF WORK OR MATERIAL CALLED FOR, SHALL SUBMIT A WRITTEN STATEMENT
WITH HIS PROPOSAL NOTING SUCH DISCREPANCIES, AND SHALL SO FURNISH AND INSTALL SUCH BETTER QUALITY OR
7� GREATER QUANTITY UNLESS OTHERWISE ORDERED IN WRITING.
Project No.
1619
Date: 11.12.2020
Drawn by: JH
Checked by: BVC
Revisions: 0
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
ARCHITECTS, P.A.
THIS DRAWING IS THE PROPERTY OF
STEWART-COOPER-NEWELL ARCHITECTS, PA.
AND IS SUBJECT TO FEDERAL COPYRIGHT
LAWS. THIS DRAWING MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN ANY
WAY WITHOUT THE WRITTEN PERMISSION OF
STEWART-COOPER-NEWELL ARCHITECTS, PA.
SEAL
CID CO
co
00
lE
CD
LLJ
Cl-
LLJ
CD
Sheet Number