Loading...
HomeMy WebLinkAboutNCG030503_MONITORING REPORT_20200727ENGINEERED ESC 250 Old Murdock Road SINTERED ATSUMI Troutman, NC 28166 COMPONENTS TECH, LLC www. ngsin.00 _ v✓ww.engsin.com July 23, 2020 RE: COC- NCG030503 CERTIFIED MAIL/RETURN RECEIPT NCDEQ Mooresville Regional Office Division of Water Quality Attn: Mr. James Moore 610 East Center Avenue - Suite 301 Mooresville, NC 28115 Dear Mr. Moore: RECEIVED JUL 2" 2020 DENR-DEMLR Land Quality Section Mooresville Regional Office Enclosed are the results of July 2020 Monthly Storm Water Discharge Outfall Monitoring Report. We have exceedances for Copper in Outfalls 1, 2 and 3, and an exceedance for Zinc at Outfall 2. We were granted relief from the Tiered responses for our Copper and Zinc exceedances in January of 2015. We would like to request relief from the monthly sampling tiered responses for pH as we feel the low pH readings were due to long hold times at the lab before sampling. Please advise if we can discontinue the monthly sampling. If you have questions or concerns, please feel free to contact me. Respectfully Submitted, Aubrey Meadows EHSF Manager Cc: Jan Comer. VP of Human Resources Stormwater Discharge Monitoring Report for North Carolina Division of Energy, Mineral and Land Resources General Permit No. NCG030000 Date submitted 7/23/2020 CERTIFICATE OF COVERAGE NO. NCG03 o 5 0 3 FACILITY NAME COUNTY Iredell Engineered Sintered Components PERSON COLLECTING SAMPLES Aubrey Meadows LABORATORY Pace Analytical Lab Cert. # 12 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2020 SAMPLE PERIOD ❑ Jan June ❑ July -Dec or Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply [:]SA Mother Class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 n No discharge this period?' Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Total Copper Total Lead Total Zinc Non -Polar OW Total Petroleum Hydrocarbons Total Toxic Organicss Benchmarks _ - 100 mg/L or 50 mg/V 6.0 — 9.0 0.010 mg/L 0.075 mg/L 0.126 mg/L 15 mg/L 1 mg/L Parameter Code - 46529 C0530 00400 01119 01051 01094 00552 78141 SDO-1 7/7/2020 0.03 0 8.74 / 5.9 0.0145 0 0.0211 0 SDO-2 7/7/2020 0.03 0 8.23 / 5.0 0.0240 0 0.181 0 SDO-3 7/7/2020 0.03 9.3 8.27 / 5.2 0.0175 0 0.0843 0 SDO-4 7/7/2020 0.03 0 8.50 / 5.4 0 0 0.0362 0 P001-1 7/7/2020 0.03 N/A 7.54 / 4.9 N/A N/A N/A N/A ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Section B, Table 1 to identify the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Aubrey Meadows Name (Print name) EHSF Manager Title (Print title) Signature Date Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement rer 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period ?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 New Motor Oil or Hydraulic Oil Usage Non -Polar O&G/ Total Petroleum Hydrocarbons Total Suspended Solids Benchmarks - - - 15 mg/L 100 mg/L or 50 mg/V Parameter Code - 46529 NCOIL 00552 C0530 Footnotes from Part A also apply to Part B Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 11/1/2018 Page 2 of 3 FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3- HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE? YES E] NO Q REGIONAL OFFICE CONTACT NAME: James Moore Mail an original copy of this DMR, includina al! "No Discharge" reports, within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Signature of Permittee Permit Date: 11/1/2018-05/31/2021 Date SWU-245, last revised 11/1/2018 Page 3 of 3