Loading...
HomeMy WebLinkAboutNCS000329_MONITORING REPORT_20210513May 10, 2021 P.O. Box 5030 2020 Ashcraft Avenue Monroe, NC 28111-5030 � Division of Energy Mineral and Land Resources ` Phone: (704) 289-4511 Attn: Central Files Fax: (�oa> z9o-5194 (Jr� 4f Email: mike.mcmanus@atimetals.com 1617 Mail Service Center`-«,,,fit,�y�l Raleigh, NC 27699-1617 _rJ � Central Files: Tier 2 Monthly Monitoring -April 2021 Attached, please find stormwater monitoring data for Permit No NCS000329. The originals and one copy are included. The monitoring data is for the following monitoring schedule: Analytical monitoring includes: ® Outfall #01 (B), commingled stormwater ® Outfall #02 (B), non -commingled stormwater ® Outfall #03 (B), non -commingled stormwater If you have any questions or need additional information, please contact me at 704-289-4511 x3800. Thank you. Sincerely, !7 Michael McMan EHS Coordinator ATI Specialty Materials ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: Sample Time: -'jr� o>pr-► Sample Location: Stormwater Discharge Outfall # 01 (Commih Drainage Area= 2,915,470 sq. ft. = 69 Acres..f. Ltd p Impervious= 34% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS 100 BOD 30 COD 4' 120 Cadmium 0.003 Chromium 0.905 Total Calcium 915 Total Copper 0.01 Total Nickel 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Total Residual Chlorine .017 Oil and Grease 15 Storm Date: Storm Duration: (Hrs.) Inches of Rainfall: Duration of time preceding rain event exceeding 0.1": (Hrs.) Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Rev. 01 Date of Rev.: 1/22/2020 �kA iatedals ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Tot., cfs) _ (A x inches rain/12 inches/ft. x 69 acres x .66) + (.9 x inches rain/12 inches/ft. x 69 x .34) Q (Total, cfs) = 1.15180 x (inches of rain) + 1.7595 x (inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 40-1ATI Specialty Materials ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: y Sample Time:,, Sample Location:of Stormwater Discharge Outfall # 02 (Non- ` Commingled)-' Drainage Area= 212,952 sq. ft. = 4.9 Acres Impervious= 12% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS 100 BOD 30 COD 6 . 120 Cadmium �, �. 0.003 Chromium 0.905 Total Calcium 915 Total Copper 0.01 Total Nickel 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Storm Date: Storm Duration: Duration of time preceding rain event exceeding 0.1": Estimated Flow Calculation: (Hrs.) Inches of Rainfall: (Hrs.) Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 4.9 acres x .88) + (.9 x inches rain/12 inches/ft. x 4.9 x .12) Rev. 01 Date of Rev.: 1/22/2020 I-tATI Specialty Materials ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Total, cfs) = 0.1437 x (Inches of rain) + 0.0441 x (Inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: r Sample Time: f Sample Location: �� Stormwater Discharge Outfall # 03 Commingled),p� Drainage Area= 336,580 sq. ft. = 7.8 Acres Impervious=15% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS 100 BOD 30 COD 120 Cadmium ./'► Sri 0.003 Chromium 0.905 Total Calcium 915 Total Copper 0.01 Total Nickel 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Storm Date: Storm Duration: Duration of time preceding rain event exceeding 0.1": Estimated Flow Calculation: (Hrs.) Inches of Rainfall: (Hrs.) Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 7.8 acres x .85) + (.9 x inches rain/12 inches/ft. x 7.8 x .15) Rev. 01 Date of Rev.: 1/22/2020 ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Total, cfs) = 0.2210 x (Inches of rain) + 0.0878 x (Inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 O ea CE "O O M ffi CC �a � O i. +•' � O O ,Q G .. d �q Q p W C7 u y O r A�� z 'v z z wd` ®° a � Va o 'O V S. W � O C O U) L W Y (0 LYl 0 G O E N co to 0 a i. � d O � z _o , 0 G•, � O 0 o"H o w zo �. c� a o O ' O U O U Q U C � � w �AAv1U u :e d a W w L � Q ®.z a E C