Loading...
HomeMy WebLinkAboutNCS000329_MONITORING REPORT_20210122January 15, 2021 Division of Energy Mineral and Land Resources c? Attn: Central Files `a 1617 Mail Service Center Raleigh, NC 27699-1617 Central Files: Tier 2 Monthly Monitoring -November, 2020-Resubmittal AFATI P.O. Box 5030 2020 Ashcraft Avenue Monroe, NC 28111-5030 Phone: (704) 289-4511 Fax: (704) 290-5194 Email: tyler.mercer0atimetals.com Attached, please find stormwater monitoring data for Permit No NCS000329. The originals and one copy are included. The monitoring data is for the following monitoring schedule: Analytical monitoring includes: • Outfall #01 (B), commingled stormwater • Outfall #02 (B), non -commingled stormwater • Outfall #03 (B), non -commingled stormwater If you have any questions or need additional information, please contact me at 704-289-4511 x3823. Thank you. Sincerely, Tyler Mercer EHS Manager AT AT[ (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date:17 �! oZd/If OYwv Sample Time: Sample Location: a7AQ6 Stormwater Discharge Outfall # 01 (Commingled) Drainage Area= 2,915,470 sq. ft. = 69 Acres % Impervious= 34% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) Tss No 100 BOD Fla w 30 COD 120 Cadmium 0.003 Chromium No 0.905 Total Calcium/ow 915 Total Copper 0.01 Total Nickel 0 0.335 Total Zinc o 0.126 pH (std units) 6-9 Temperature Deg. Celsius Total Residual Chlorine .017 Oil and Grease 15 Storm Date: Storm Duration: Duration of time preceding rain event exceeding 0.1": Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) (Hrs.) Inches of Rainfall: (Hrs.) Rev.01 Date of Rev.: 1/22/2020 ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Tot., cfs) _ (A x inches rain/12 inches/ft. x 69 acres x .66) + (.9 x inches rain/12 inches/ft. x 69 x .34) Q (Total, cfs) = 1.15180 x (Inches of rain) + 1.7595 x (Inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 AT ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: 1E.- -1404 Sample Time: Sample Location: apa p Stormwater Discharge Outfall # 02 (Non - Commingled) Drainage Area= 212,952 sq. ft. = 4.9 Acres % Impervious= 12% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS No 100 BOD d 30 COD 120 Cadmium 0 0.003 Chromium /O 0.905 Total Calcium 915 Total Copper 0.01 Total Nickel F�vw 0.335 Total Zinc 0.126 PH (std units) 6-9 Temperature Deg. Celsius Storm Date: Storm Duration: (Hrs.) Inches of Rainfall: Duration of time preceding rain event exceeding 0.1": (Hrs.) Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 4.9 acres x .88) + (.9 x inches rain/12 inches/ft. x 4.9 x .12) Rev. 01 Date of Rev.: 1/22/2020 00 sATI C,p;:; sally td;urn.:'N ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Total, cfs) = 0.1437 x (Inches of rain) + 0.0441 x (Inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 sATI Specialty Malenals ATI (Allvac) — Bakers Campus,(BNO) Stormwater Monitoring Report Form Sample Date: %-6r _M,. �!i DUe 0/�T/t/ Sample Time: Sample Location: apa Stormwater Discharge Outfall # 03 (Non - Commingled) Drainage Area= 336,580 sq. ft. = 7.8 Acres % Impervious= 15% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS 0 100 BOO OW 30 COD 120 Cadmium �� 0.003 Chromium O w 0.905 Total Calcium 915 Total Copper No 0.01 Total Nickel / /O� 0.335 Total Zinc 0.126 PH (std units) 6-9 Temperature Deg. Celsius Storm Date: Storm Duration: (Hrs.) Inches of Rainfall: Duration of time preceding rain event exceeding 0.1": (Hrs.) Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 7.8 acres x .85) + (.9 x inches rain/12 inches/ft. x 7.8 x .15) Rev. 01 Date of Rev.: 1/22/2020 ATI Specialty Materials ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Total, cfs) = 0.2210 x (Inches of rain) + 0.0878 x (Inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS (0003.21 FACILITYNAME AYT ee�:iEv /�lefu�:Jf, Brkc.� Sre PERSON COLLECTING SA PLE( ) CERTIFIED LABORATORY(S) Lab # Lab # Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) COUNTY Lltien PHONE NO. (70Y)aB9 �fJ// SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Outfall Date 50050 No. Sample Collected Total Flow if a Total Rainfall mo/dd/ r MG inches Iwo I /too A16 o suoa o ow No 51A(O3 NO Flaw Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Oyes *no (if yes, complete Part B) ♦.. M....:f...:.... Vnnn:vmm�nte rara n: r cwuc n.awac..n..ca. Outfall No. .-........ Date Sample Collected ............... -._ 50050 _____..__.__ 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Non -polar O&G/TPH (Method 1664 SGT-HEM), if appl. Total Suspended Solids pH New Motor Oil Usage mo/dd/ r MG inches m mgn unit gallmo Form SWU-247, last revised 611212015 Page 1 of STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Energy Mineral and Land Resources Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 0-,Q j -i.3 -ar (Signature of Permi a (Date) Form SWU-247, last revised 611212015 Page 2 of 2 ATI (AIIVac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: ;i er a? -/+to��lij ect�bc Sample Time: Sample Location: Stormwater Discharge Outfall # 01(Commingled) Drainage Area= 2,915,470 sq. ft. = 69 Acres Impervious= 34% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS D 100 BOD la w 30 COD 120 Cadmium 0.003 Chromium 0 0.905 Total Calcium 915 Total Copper o 0.01 Total Nickel IOW 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Total Residual Chlorine .017 Oil and Grease 15 Storm Date: Storm Duration: (Hrs.) Inches of Rainfall: Duration of time preceding rain event exceeding 0.1": (Hrs.) Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Rev. 01 Date of Rev.: 1/22/2020 AT'I (A61vac) — Bakers Campus (BNO) Stormwater MonitoriM Report Form Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 69 acres x .66) + (.9 x inches rain/12 inches/ft. x 69 x .34) Q (Total, cfs) = 1.15180 x (inches of rain) + 1.7595 x (Inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 A F I ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: era A1444y Sample Time: Sample Location: o?Dad Stormwater Discharge Outfall # 01 (Commingled) Drainage Area= 2,915,470 sq. ft. = 69 Acres % Impervious= 34% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS No 100 BOD t/d hr I 30 COD 120 Cadmium 0.003 Chromium No 0.905 Total Calcium Flow 915 Total Copper 0.01 Total Nickel 0 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Total Residual Chlorine .017 Oil and Grease 15 Storm Date: Storm Duration: Duration of time preceding rain event exceeding 0.1": Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) (Hrs.) Inches of Rainfall: (Hrs.) Rev. 01 Date of Rev.: 1/22/2020 4qr«n.aOY tfa, �irns:�:, Afl (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 69 acres x .66) + (.9 x inches rain/12 inches/ft. x 69 x .34) Q (Total, cfs) = 1.15180 x (Inches of rain) + 1.7595 x (Inches of rain) cfs Rev. 01 ®ate of Rev.: 1/22/2020 . #r AT I i:I,. , i.-11. 16 r.:r:- ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Sample Date: Wei -Xim Sample Time: Sample Location: qAQ p Stormwater Discharge Outfall # 02 (Non - Commingled) Drainage Area= 212,952 sq. ft. = 4.9 Acres % Impervious= 12% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS 100 BOD 0 30 COD 120 Cadmium 0 0.003 Chromium /0 0.905 Total Calcium 915 Total Copper 1416 0.01 Total Nickel `/cw 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Storm Date: Storm Duration: (Hrs.) Inches of Rainfall: Duration of time preceding rain event exceeding 0.1": (Hrs.) Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Q (Tot., cfs) - (A x inches rain/12 inches/ft. x 4.9 acres x .88) 1 (.9 x inches rain/12 inches/ft. x 4.9 x .12) Rev.01 Date of Rev.: 1/22/2020 ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form 4 (Total, cfs) = 0.1437 x (Inches of rain) + 0.0441 x (inches of rain) cfs Rev. 01 Date of Rev.: 1/22/2020 ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report form Sample Date: rer _AN0 Sample Time: Sample Location: o(Qa d Stormwater Discharge Outfall # 03 (Non - Commingled) Drainage Area= 336,580 sq. ft. = 7.8 Acres % Impervious= 15% Person Collecting Samples: Laboratory Performing Analysis: Analytical Techniques and Methods: 40 CFR Part 136 Results of Sample Analysis: Parameter Results (mg/1) Benchmark Values (mg/1) TSS 0 100 BOD /O W 30 COD 120 Cadmium A0 0.003 Chromium W 0.905 Total Calcium 915 Total Copper No 0.01 Total Nickel r/0w r ! 0.335 Total Zinc 0.126 pH (std units) 6-9 Temperature Deg. Celsius Storm Date: Storm Duration: (Hrs.) Inches of Rainfall: Duration of time preceding rain event exceeding 0.1": (Hrs.) Estimated Flow Calculation: Q=CIA Q (Total) = Q (Pervious Area) + Q (Impervious Area) Q (Tot., cfs) = (A x inches rain/12 inches/ft. x 7.8 acres x .85) + (.9 x inches rain/12 inches/ft. x 7.8 x .15) Rev. 01 Date of Rev.: 1/22/2020 %or AT ATI (Allvac) — Bakers Campus (BNO) Stormwater Monitoring Report Form Q (Total, cfs) = 0.2210 x (Inches of rain) + 0.0878 x (Inches of rain) = cfs Rev. 01 Date of Rev.: 1/22/2020 STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 40003471 FACILITY NAME A77 :sw; 4y /11i.%iria1.5, B.Xers tlA PERSON COLLECTING S PLE( ) CERTIFIED LABORATORY(S) Lab 0 Lab 4 Part A: Specific Monitoring Requirements SAMPLES COLLECTED DURING CALENDAR YEAR: (This monitoring report shall be received by the Division no later than 30 days frow the date the facility receives the sampling results from the laboratory.) COUNTY aAien PHONE NO. ( 70 Y) AB 9- 4ff-// SIGNATURE OF PERMITTEE OR DESIGNEE REQUIRED ON PAGE 2. Qutfall Date 50059 _ No. Sample Collected Total Flow if a Total Rainfall mo/dd/yr MG inches 5 0 / /Jo a ri B'qlp swoa o rjoW 81yo 5w03 NO Flaw I i Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? Dyes ®no (if yes, complete Part B) P rt B• Vehicle Maintenance Act" ity Monitoring Requirements a Outfall No. Date Sample Collected 50050 00556 00530 00400 Total Flow (if applicable) Total Rainfall Oil & Grease (if appl.) Noll -polar O&G/TPH (Method 1664 SGT-HEM), if appl, Total Suspended Solids pH New Motor Oil Usage mo/dd/ r MG inches mgn m /I ""it al/mo Form SWU-247, last revised 61121201.5 Page i of 2 "A6 STORM EVENT CHARACTERISTICS: Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) Mail Original and one copy to: Division of Energy Mineral and Land Resources Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Rased on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of j-i3-a� (Date) Form SW-247, last revised 611212015 Page 2 of 2