HomeMy WebLinkAboutNCC214272_ESC Approval Submitted_20210727ROYCOOPER W d�� Governor JOHN NICHOLSON Interim Secretary BRIAN WRENN NORTH CAROLINA Director Environmental Quality June 25, 2021 LETTER OF APPROVAL McIntyre Manufacturing Group ATTN: Jeffrey W. McIntyre, CEO / Manager 1266 Frye Bridge Rd. Clemmons, NC 27012 RE: Project Name: McIntyre Manufacturing - 3040 Junior Order Home Rd Acres Approved: 10.1 Project ID: DAVID-2021-037 County: Davidson City: Cotton Grove Address: 3040 Junior Order Home Rd. River Basin: Yadkin-PeeDee Stream Classification: C Submitted By: Allied Design, Inc. Date Received by LQS: June 23, 2021 Plan Type: Revised Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this letter of Approval. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. North Carolina Department of Environmental Quality I Division of Energy, Mineral and land Resources •/ Wlnston-SalemRegional 0lfice ( 450HanesMillRoad,Suite300I Winston-Salem, North Carolina27103 336.776.9800 Letter of Approval McIntyre Manufacturing Group June 25, 2021 Page 2 of 2 Title 1SA NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-S1 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sinc ely, Za ary Lentz, EI Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCG01 Fact Sheet cc: Allied Design, Inc. ATTN: Kevin Davie 4720 Kester Mill Rd. Winston-Salem, NC 27103 WSRO file CERTIFICATE OF PLAN APPROVAL The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 413.0107 (c). This certificate must be posted at the primary entrance of the job site before construction begins and until establishment of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 413.0127 (b). McIntyre Manufacturing - 3040Junior Order Home Rd - Davidson County - DAVID-2021-037 Project Name and Location June 25, 2021 Date of Plan Approval Certificate of Coverage Number Assistant ional Engineer Fact Sheet on the New NCG01 Permit April 2019 Organizational Updates The new permit: • Repeats state requirements for E&SC Plans and organizes them with federal construction activity requirements; • Is clearly organized by topic; and • Has less text and more tables. Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be included in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);' • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record -keeping and reporting in "calendar days" for clarity and consistency (p. 11-14);2 • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously 0.5 inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activities take place (p. 23). This list is based on website guidance by the DEMLR Sediment Program. The number of calendar days was selected to be as equivalent as possible with the previous permit. The intent is to provide predictability to the inspection schedule. Acronyms to Know GrD_EQ� COC: Certificate of Coverage, proof of coverage under an NCG01 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI: Notice of Intent, application form for the NCG01 permit e-NOT: Notice of Termination, form for closing out the NCG01 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 The NCG01 Process The new NCG01 applies to permits approved on or after April 1, 2019. Permittees will no longer receive a copy of the NCG01 permit in the mail with their E&SC Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an N01 on each construction project and issue each construction project its own COC. Under the new NCG01 process, construction sites will continue to receive approval for E&SC Plans from either DEMLR or the delegated local E&SC program just like before. After receiving E&SC Plan approval, permittees will officially obtain coverage under the NCG01 by completing an e-NOI (available at deq.nc.gov/NCG01). The e-NOI will only take about 20 minutes to fill out and submit on-line. Initially, there will be no charge associated with applying for an NCG01 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annual general permit fee as required per §143-215.3D. DEMLR is working on creating a single application form that will allow an applicant to simultaneously apply for an E&SC permit and an NCG01 COC. That effort is part of a larger Permit Transformation project at DEMLR. Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific COC to every construction site that disturbs one acre or more. DEMLR is working to create a form that combines the E&SC plan approval and e-NOI processes, but that will take more time. For now, DEMLR has created an efficient e-NOI process. If an E&SC Plan is approved before April 1, which permit applies? Projects with already approved E&SC Plans will automatically follow the new NCG01 permit, but will not need to fill out an e-NOI or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deg.nc.gov/NCG01 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. How will the new a-NOI submittal and COC process work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before. The E&SC approval letter will instruct the permittee to visit deq.nc.gov/NCG01 to submit an e-NOI form to DEMLR. The permittee may begin the construction activity after receipt of the COC (within three days*). The permittee must print and retain a copy of the permit and the COC on site, Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an a-NOI form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV.13.6 of the NCG01 permit. Additional signatory options are set forth in IV.13.6 of the permit. It is possible for consultant to prepare the e-NOI, save it as a draft, and email it to the responsible entity for signature & submittal. What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit deq.nc.gov/NCG01 to submit an e-NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&SC Plan approval letters and list servs. If a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an e-NOI after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. How does the new NCG01 affect the delegated local E&SC Programs? Local programs will continue to review and approve E&SC plans. However, they will no longer send copies of the NCG01 with E&SC Plan approvals. DEMLR will provide sample language to use in local E&SC Plan approvals to advise permittees that they must submit an e-NOI to DEMLR. Local programs are not required to check if permittees have submitted e- NOls to DEMLR, However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for them to view a list of construction projects that have submitted e-NOIs, When local programs close out an E&SC Plan, the close-out letter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&SC plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCG01 requirements. However, their permittees will be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCG01 permit. * Or 24 business hours for a project approved under the DEMLR Express review program.