Loading...
HomeMy WebLinkAboutSW6200102_Plan (SCM Detail)_20200608U.S. ARMY CORPS OF ENGINEERSHPTC_CG508.dgnANSI DCHECKED BY:DRAWN BY:ISSUE DATE:SHEET ID FILENAME:B C D E F G 2 3 4 5 6 7 8 9 10 DESIGNED BY:1 A MARKSIZE:SUBMITTED BY:DATECONTRACT NO.:®of Engineers US Army Corps CATEGORY CODEDESCRIPTIONP:\Projects\017001\03 CAD_BIM\_Sheets\05_Civil\HPTC_CG508.dgn04-JUN-202008:41 171-20-13R. BOSTONW912PM-19-C-000769 DARLINGTON AVENUEWILMINGTON DISTRICTWILMINGTON, NORTH CAROLINAFORT BRAGG, NORTH CAROLINASOF HUMAN PERFORMANCE TRAINING CENTER (HPTC)FY18 PN 79443W912PM-18-R-0003SOLICITATION NO.:CERTIFIED FINAL FAST-TRACK (ISSUED FOR CONSTRUCTION)DECEMBER 2019NOT TO SCALE DETAIL1 BIO RETENTION BASIN LOW IMPACT BMP TYP REFER TO PLANS FOR FINISH GRADES. POLLUTANTS ARE REMOVED ON THE SURFACE OF THE BIORETENTION CELL RATHER THAN WITHIN THE CELL. TSS OR PATHOGENS IS THE TARGET POLLUTANT, THE HIGHER PERMEABILITY CAN BE USED BECAUSE THESE TWO RATE FOR PERCENT FINES BETWEEN 8 AND 10 CAN BE APPROXIMATED DURING DESIGN BY LINEAR INTERPOLATION. IF IN/HR FOR 8% AND 10% FINES, RESPECTIVELY, DEPENDING ON THE TARGET POLLUTANT. AN ESTIMATED DRAINAGE THUMB, USING THE ABOVE-SPECIFIED MEDIA, THE INFILTRATION RATES SHOULD BE APPROXIMATELY 2 IN/HR AND 1 SHOULD FALL BETWEEN 1 AND 6 INCHES PER HOUR, WITH 1-2 INCHES PER HOUR BEING PREFERRED. AS A RULE OF THE MEDIA SHOULD BE TESTED TO DETERMINE AN ACTUAL DRAINAGE RATE AFTER PLACEMENT. THE PERMEABILITY SOIL FOR THE BIORENTENTION BASINS NOTE: CUT SOIL FROM THE PROJECT SITE OR SOIL FROM THE BORROW PIT MAY NOT BE USED FOR THE ENGINEERED PHOSPHORUS. EXTREMELY IMPORTANT DESIGN ELEMENT. CELLS THAT ARE CONSTRUCTED OF HIGH P-INDEX SOILS CAN EXPORT REGARDLESS OF THE TARGET POLLUTANT (HARDY ET. AL., 2003 AND HUNT ET. AL., 2006). THE P INDEX IS AN HAVE THE SOIL ANALYZED. THE P INDEX FOR BIORETENTION SOIL MEDIA SHOULD ALWAYS RANGE BETWEEN 10 AND 30, NC DEPARTMENT OF AGRICULTURE [NCDA] LABS TO BE ANALYZED. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO USED. ADDITIONALLY, THE PHOSPHORUS CONTENT OF THE SOIL MIX SHOULD BE LOW. SOIL MEDIA SHALL BE SENT TO POLLUTANT. IN AREAS WHERE PHOSPHORUS IS THE TARGET POLLUTANT, LOWER (8 PERCENT) FINES SHOULD BE BARK FINES). HIGHER (10 PERCENT) FINES CONTENT SHOULD BE RESERVED FOR AREAS WHERE TN IS THE TARGET CLASSIFICATION), 8 TO 10 PERCENT FINES (SILT AND CLAY), AND 5 TO 10 PERCENT ORGANIC MATTER (SUCH AS PINE SOIL MIX OF 75 TO 85 PERCENT BY VOLUME MEDIUM TO COARSE WASHED SAND (USDA SOIL TEXTURAL OF STONES, STUMPS, ROOTS OR OTHER SIMILAR MATERIAL GREATER THAN 2 INCHES. IT SHOULD BE A HOMOGENOUS *BIORETENTION “ENGINEERED SOIL” LAYER SHALL BE MINIMUM 30” DEEP. THE SOIL MIX SHOULD BE UNIFORM AND FREE REFER TO SPECIFICATIONS NON-WOVEN GEOTEXTILE DESIGN VOLUME PEAK ATTENUATION VOLUME LAYOUT TO PLAN SHEETS FOR PIPES INTO RISER. REFER TIE UNDERDRAIN SYSTEM SOD *SEE NOTE BELOW 30" MIN. ENGINEERED SOIL NCDOT #57 CRUSHED ROCK THE PLANTING SURFACE OF 18 INCHES BELOW IWS ZONE A MINIMUM SET THE TOP OF THE PERFORATIONS PVC PIPE WITH SDR 35 SMOOTH WALL 6" SCHEDULE 40 OR RISER SHEET CG508 REFER TO DETAIL 2, RISER STRUCTURE 18"IWS* * IWS=INTERNAL WATER STORAGE3:13:1 CONNECTION TO BE WRAPPED AROUND NON-WOVEN GEOTEXTILE ENCASEMENT CONCRETE CAST IN PLACE PIPE PERFORATED AS NECESSARY MATCH INVERTS PROVIDE SPACER TOCONCRETE COLLAR TO SUPPORT CLASS I BEDDINGVARIES NOT TO SCALE DETAIL2 RCP PIPE PERFORATED PIPE TO CONCRETE PIPE CONNECTION TYP FINISH GRADE POND BERM OUTLET PEAK ATTENUATION "O" RING JOINT WITH LOCKING RCP CLASS 3 ONE PER UNDERDRAIN CLEANOUT, MINIMUM 4" DIA ORIFICE EACH SIDE OF PIPE ROCK ABOVE AND ON PROVIDE 3" CRUSHED TOP ELEV PLANTING ELEV ELEV PEAK ATTENUATION STEPS MASTIC (TYP.) WATERPROOF BASE 8' x 6' x 1' ANTI-FLOTATION W/STAINLESS STEEL HARDWARE. AND SECTIONS SHALL BE STRAPPED TOGETHER PROVIDED AT ALL CONSTRUCTION JOINTS IN RISER CONTINUOUS RUBBER WATERSTOPS SHALL BE NOTE:15"OF RISER LOCATED ON 3 SIDES 6" HIGH X 36" LONG WEIR DIMENSION MIN WEIGHT - 23,587 LBS. w/6" THICK SOLID WALLS INSIDE DIMENSION 3' x 3' MIN CONCRETE RISER RISER NOT TO SCALE DETAIL2 TYP RISER STRUCTURE AWAY FROM DAM. PRE-CAST BOX. LID SHOULD OPEN CLASP WITHIN THE INSIDE LIP OF WITH HINGES AND HOLD DOWN HORIZONTAL OPENING, MOUNTED NO.6 REBAR W/ MAX. 12" DOMED TRASH RACK "O" RING JOINT WITH LOCKING RCP CLASS 3 3' MIN EACH WAY24"18"(SEE CG601) INV. ELEV BASIN 2: 260.50 BASIN 1: 258.50 TOP ELEV BASIN 2: 259.50 BASIN 1: 257.50 WEIR ELEV FOR ELEVATIONS REFER TO TABLE BELOW NOTE:9"CG508S.HAGGARDM.MEYERG.LYNNSTORM DRAINAGEBIO RETENTION BASIN DETAILS