Loading...
HomeMy WebLinkAboutNCC213864_Site Plan or Location Map_20210715Ar DUKE ENERGY PROGRESS ENKA 230kV SUBSTATION EXPANSION 99 GREYMONT LANE, ASHEVILLE, BUNCOMBE COUNTY, NC 28806 PROJECT INFORMATION PROGRESS ENERGY OF THE CAROLINAS FKA CAROLINA POWER AND LIGHT LANDOWNER 555 BREVARD ROAD ASHEVILLE, NC 28806 PH: 919.210.2532 DEWBERRY ENGINEERS INC. ENGINEER 2610 WYCLIFF ROAD, SUITE 410 RALEIGH, NC 27607 PH: 919.881.9939 ESP ASSOCIATES, INC. SURVEYOR 7011 ALBERT PICK RD, SUITE E GREENSBORO, NC 27409 PH: 336.334.7724 PARCEL INFORMATION PARCEL ID 961781721200000 JURISDICTION CITY OF ASHEVILLE EXISTING USE VACANT PROPOSED USE WAREHOUSING AND STORAGE EXISTING BUILDING 0 SF PROPOSED BUILDING 0 SF MAP BOOK AND PAGE NUMBER P.R. 214, PG. 46-47 DEED BOOK AND PAGE NUMBER D.B. 6034, PG. 485-487 SITE ZONING ASHEVILLE: COMMERCIAL INDUSTRIAL TOTAL ACREAGE OF PARCEL AREA 10.103 AC LAND TO BE DISTURBED/EXPOSED 8.83 AC EXISTING IMPERVIOUS AREA 0 AC EXISTING IMPERVIOUS AREA % 0% PROPOSED IMPERVIOUS AREA 2.49 AC PROPOSED IMPERVIOUS AREA % 24.6% TOTAL NEW IMPERVIOUS AREA 2.49 AC TOTAL NEW IMPERVIOUS AREA % 24.6% RIVER BASIN FRENCH BROAD RIVER BASIN MIGRATORY BIRD HOTLINE PARCEL INFORMATION PARCEL ID 961780428500000 JURISDICTION BUNCOMBE COUNTY EXISTING USE SUBSTATION PROPOSED USE SUBSTATION EXISTING BUILDING 1,331 SF PROPOSED BUILDING 1,440 SF MAP BOOK AND PAGE NUMBER NA DEED BOOK AND PAGE NUMBER D.B. 1271, PG. 594, D.B. 1485, PG. 199 SITE ZONING BUMCOMBE: EMPLOYMENT DISTRICT TOTAL ACREAGE OF PARCEL AREA 28.742 AC LAND TO BE DISTURBED/EXPOSED 20.73 AC EXISTING IMPERVIOUS AREA 1.67 AC EXISTING IMPERVIOUS AREA % 5.8% PROPOSED IMPERVIOUS AREA 0.15 AC PROPOSED IMPERVIOUS AREA % 0.5% TOTAL NEW IMPERVIOUS AREA 1.82 AC TOTAL NEW IMPERVIOUS AREA % 6.3% RIVER BASIN FRENCH BROAD RIVER BASIN STATE AND FEDERAL LAWS PROTECT ALL SPECIES OF NATIVE BIRDS FOUND THROUGHOUT THE DUKE ENERGY SERVICE AREA. INTERACTIONS OF BIRDS WITH GENERATING FACILITIES, TRANSMISSION, AND DISTRIBUTIONS, SUBSTATIONS, OTHER STRUCTURES AND EQUIPMENT, AND OPERATIONS ARE POTENTIALLY HARMFUL OR FATAL TO BIRDS. DUKE ENERGY OPERATES THESE 24-HOUR MIGRATORY BIRD HOTLINES TO ASSIST EMPLOYEES AND CONTRACTORS WITH RELATED INCIDENTS THAT OCCUR DURING WORK ACTIVITIES. CARO LI NAS: 800.573.3853 SPILL REPORTING HOTLINE IN ORDER TO ENSURE THE PROTECTION OF HUMAN HEALTH AND THE ENVIRONMENT, FEDERAL AND STATE LAWS REQUIRE THAT CERTAIN TYPES OF SPILLS AND UNPERMITTED RELEASES BE REPORTED TO THE PROPER REGULATORY AGENCIES AS SOON AS POSSIBLE FOLLOWING IDENTIFICATION. IMMEDIATELY NOTIFY YOUR SUPERVISOR AND THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL WHEN A SPILL OR UNPERMITTED RELEASE IS DISCOVERED. IF YOU ARE UNABLE TO REACH THE FIELD ENVIRONMENTAL/EHS PROFESSIONAL, CONTACT ONE OF THE DUKE ENERGY SPILL REPORTING HOTLINES AT: CARO LI NAS: 800.527.3853 LATITUDE: N 350 32' 28.04" LONGITUDE: E 820 38' 1.20" (AT SARDIS ROAD) VICINITY MAP SHEET LIST: SCALE: 1 500' COVER SHEET El9003004 SHT 1 OF 42 BOUNDARY SURVEY (BY ESP) SHT 2 OF 42 BOUNDARY SURVEY (BY ESP) SHT 3 OF 42 TOPOGRAPHIC SURVEY (BY ESP) SHT 4 OF 42 TOPOGRAPHIC, SUE, & AS -BUILT SURVEY (BY ESP) SHT 5 OF 42 TOPOGRAPHIC, SUE, & AS -BUILT SURVEY (BY ESP) SHT 6 OF 42 TREE SURVEY (BY ESP) SHT 7 OF 42 TOPO, TREE, AND SUE SURVEY (BY ESP) SHT 8 OF 42 COMBINATION PLAT El9003004 SHT 9 OF 42 OVERALL SITE PLAN E19003004 SHT 10 OF 42 SITE PLAN - SHEET 1 OF 2 E19003004 SHT 11 OF 42 SITE PLAN - SHEET 2 OF 2 E19003004 SHT 12 OF 42 OVERALL DEMOLITION PLAN E19003004 SHT 13 OF 42 DEMOLITION PLAN - SHEET 1 OF 2 E19003004 SHT 14 OF 42 DEMOLITION PLAN - SHEET 2 OF 2 E19003004 SHT 15 OF 42 OVERALL EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 E19003004 SHT 16 OF 42 OVERALL EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 E19003004 SHT 17 OF 42 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 SHEET 1 OF 2 E19003004 SHT 18 OF 42 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 SHEET 2 OF 2 E19003004 SHT 19 OF 42 OVERALL EROSION AND SEDIMENT CONTROL PLAN - PHASE 3 E19003004 SHT 20 OF 42 EROSION AND SEDIMENT CONTROL PLAN - PHASE 3 SHEET 1 OF 2 E19003004 SHT 21 OF 42 EROSION AND SEDIMENT CONTROL PLAN - PHASE 3 SHEET 2 OF 2 E19003004 SHT 22 OF 42 OVERALL GRADING AND DRAINAGE PLAN E19003004 SHT 23 OF 42 GRADING AND DRAINAGE PLAN - SHEET 1 OF 2 E19003004 SHT 24 OF 42 GRADING AND DRAINAGE PLAN - SHEET 2 OF 2 E19003004 SHT 25 OF 42 ACCESS DRIVE PROFILE - SHEET 1 OF 2 E19003004 SHT 26 OF 42 ACCESS DRIVE PROFILE - SHEET 2 OF 2 E19003004 SHT 27 OF 42 230 kV ACCESS DRIVE PROFILE E19003004 SHT 28 OF 42 230 kV PAD PROFILES E19003004 SHT 29 OF 42 LANDSCAPING PLAN E19003004 SHT 30 OF 42 LANDSCAPING PLAN E19003004 SHT 31 OF 42 LANDSCAPING PLAN E19003004 SHT 32 OF 42 STORMWATER BASIN DETAILS E19003004 SHT 33 OF 42 EROSION CONTROL DETAILS E19003004 SHT 34 OF 42 EROSION CONTROL DETAILS E19003004 SHT 35 OF 42 EROSION CONTROL DETAILS E19003004 SHT 36 OF 42 NCG01 DETAILS E19003004 SHT 37 OF 42 NCG01 DETAILS E19003004 SHT 38 OF 42 STORM DRAIN DETAILS E19003004 SHT 39 OF 42 FENCE DETAILS E19003004 SHT 40 OF 42 SITE DETAILS E19003004 SHT 41 OF 42 ADDITIONAL TREE SURVEY E19003004 SHT 42 OF 42 GENERAL NOTES: 1. LOCATION AND TOPOGRAPHICAL INFORMATION WAS TAKEN FROM LIDAR DATA AND ACTUAL FIELD SURVEY PERFORMED BY ESP & ASSOCIATES, DATED DECEMBER 18, 2020. REFERENCE DATUM IS NAD 1983/ NSRS 2011 (US SURVEY FEET) / NAVD88. 2. ALL MATERIALS, CONSTRUCTION, WORKMANSHIP SHALL MEET DUKE ENERGY PROGRESS, LLC (DEP) SPECIFICATIONS, STANDARDS AND DESIGN. 3. CONTRACTOR SHALL COMPLY WITH ALL PERTINENT PROVISIONS OF THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" ISSUED BY AGC OF AMERICA, INC., AND THE SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION ISSUED BY THE U.S. DEPARTMENT OF LABOR. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY EXISTING PAVEMENT OR EXISTING UTILITIES THAT ARE DAMAGED DUE TO CONSTRUCTION ACTIVITY. 5. DO NOT POUR ANY CONCRETE BEFORE FORMS ARE INSPECTED AND APPROVED BY THE PROJECT ENGINEER. FAILURE TO DO SO MAY CONSTITUTE REMOVAL OF WORK PERFORMED AT CONTRACTOR'S COST UNTIL MADE SATISFACTORY BY THE ENGINEER. 6. CONTRACTOR IS REQUIRED TO REDLINE ANY FIELD CHANGES ON DRAWINGS UPON COMPLETION OF CONSTRUCTION. NOTE ANY DEVIATIONS FROM THE ORIGINAL PLANS. PLANS ARE TO REFLECT THE ACTUAL LOCATION AND MATERIALS. EARTHWORK/EROSION: 7. SITE DISTURBANCE IS MORE THAN 1 ACRE THEREFORE AN EROSION CONTROL PERMIT WILL BE OBTAINED. ALL ADDITIONAL EROSION CONTROL ITEMS THAT ARE INSTALLED THAT ARE NOT SHOWN ON THE PLANS, SHALL BE APPROVED BY THE LOCAL AGENCY OR DEP REPRESENTATIVE BEFORE INSTALLING IN ORDER TO APPROVE FOR PAYMENT. ITEMS NOT APPROVED WILL BE INSTALLED AT THE CONTRACTOR'S EXPENSE. 8. ALL DISTURBED AREAS SHALL BE STABILIZED IN ACCORDANCE WITH NCG01 GROUND STABILIZATION REQUIREMENTS. 9. THE LOCATION OF THE TOPSOIL STOCKPILE SHALL BE COORDINATED WITH DEP REPRESENTATIVE. 10. ALL CONSTRUCTION DEBRIS SHALL BE DISPOSED OF OFF -SITE IN A STATE PERMITTED LANDFILL. 11. UNLESS NOTED OTHERWISE, ALL TREES NOT MARKED TO BE REMOVED ARE NOT TO BE DISTURBED. THEY ARE TO BE PROTECTED FROM DAMAGE BY EQUIPMENT DURING CONSTRUCTION. ENVIRONMENTAL: 12. THIS PROPERTY IS NOT LOCATED IN A SPECIAL FLOOD HAZARD ZONE. THE SITE LIES WITHIN AN AREA OF MINIMAL FLOOD HAZARD (ZONE X) AS REFERENCED FROM DFIRM PANEL (PANEL 2805) 3720280500K, MAP REVISED APRIL 16, 2013. STREETS: 13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK ZONE TRAFFIC CONTROL MEASURES IN AND/OR ADJACENT TO NCDOT RIGHT-OF-WAY. ALL METHODS SHALL CONFORM TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND NCDOT STANDARDS. 14. WORK WITHIN THE RIGHT-OF-WAY SHALL CONFORM TO NCDOT STANDARDS AND SPECIFICATIONS. UTILITIES: 15. EXISTING UTILITY LOCATIONS SHOWN, IF ANY, ARE APPROXIMATE AND SHALL BE VERIFIED IN THE FIELD PRIOR TO BEGINNING WORK. CONTRACTOR SHALL CONTACT NC ONE CALL CENTER AT 1-800-632-4949 (OR 81 1) FOR LOCATIONS OF EXISTING UTILITIES PRIOR TO BEGINNING CONSTRUCTION. NO SUBSURFACE UTILITY INVESTIGATION HAS BEEN CONDUCTED AT THIS TIME. 16. CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING UNDER, AROUND, AND/OR ADJACENT TO EXISTING POWER LINES. 5 :42421 NI C A Rz/i�� o _sS' E r 030966 • o f II IBI . 100% FOR PERMITTING & REVIEW PURPOSES ONLY NOT RELEASED FOR CONSTRUCTION