Loading...
HomeMy WebLinkAboutNCC214045_ESC Approval Submitted_20210712TOWN OF WEDDINGTON EROSION and SEDIMENTATION CONTROL COMPLIANCE FORM Tracts Less than One -Acre Disturbed Residential and Commercial This compliance form shall be prominently displayed at the primary entrance to the site of the land disturbing activity Before construction begins and remain until all construction is complete. PARCEL ID: PROPERTY ADDRESS: NAME OF SUBDIVISION: f d "—s fis C lrr'-e LOT #: NAME OF PROPERTY OWNER: dear NAME OF CONSTRUCTION COMPANY: NAME OF CONSTRUCTION MANAGER: r Cr Ex) _q e-- CONSTRUCTION MGR PHONE#: EMAIL: car2ft ij A 'Lb---f - PROPOSED START DATE OF CONSTRUCTION-_ 1_201 --- �p PLEASE READ THE BACK SIDE BEFORE COMPLETING. EROSION CONTROL PLAN Choose one of the following approaches: The most a propriate option from the back of this form 10er 00q is option or a combination of options and —Cssued —iu4.y 0,.20,-21 14r-e6L -to Le- disiai-Lec 0.acre The sediment control plan is as drawn in the space to the right or is attached. Notes. I THE UNDERSIGNED HEREBY CERTIFIES THAT HE/SHE HAS READ THE INFORMATION ON THE BACK OF THIS FORM AND IS AWARE OF THE STATED REQUIREMENTS OF THE EROSION AND SEDIMENTATION CONTROL ORDINANCE. THE OWNER MUST COMPLY WITH THE PROVISION OF THE ORDINANCE. THE UNDERSIGNED ACKNOWLEDGES FINANCIAL RESPONSIBILITY FOR PAYMENT OF ALL FEES ASSOCIATED WITH THIS PROJECT. PROPERTY OWN ER/AHORIZED AGENT SIGNATURE PRINT NAME 0 c-, PHONE EMAIL DATE APPLICANT CHECKLIST: OFFICE USE ONLY ❑ Exempt from installation of ESC measures. REASON: 11 vrl9 tin kiss ct-u. eEr- 0 An Erosion Control Plan Approval is required. REASON. cc6nn ed 6V d-'k6VL r U Attach approved NCGOI Certificate of Compliance (CoC) (available at www.deq.nc.gov) An Existing driveway will be used as the Temporary Construction Entrance. ❑ 0 Install Temporary Gravel Construction Entrance in accordance with NCDENR detail attached and as indicated above. (Atch A) i.P - -11 Install Silt Fencing with steel posts in accordance with NCDENR detail attached and as indicated above. (Atch B) DI Confine siltation within 25% of lake or water course buffer zone per ESC Ord. Section 58.606 (a). Call Gary Wright of LaBella Engineering (704) 351-5306 for inspection 48 hours prior to start of work for inspection of measures. D Groundcover on all slopes shall be established within 21 days of completion of any phase of construction (Sect. 59.606 (b)). Upon completion of any phase of construction permanent groundcover shall be established within 60 calendar days (Sect. 58.606 (d)) APPROVED DATE: OF Erosion and Sedimentation Control PLAN OPTIONS The Town of Weddington Erosion and Sedimentation Control Ordinance requires that the minimum erosion control measures be installed when the disturbed area on a tract of land is less than one -acre disturbed, unless otherwise exempt from installation of measuresldevices or ESC Plan Approval is required. Furthermore, no person shall initiate any land - disturbing activity on a tract if more than one -acre is to be uncovered unless thirty (30) days or more prior to initiating the activity, a Plan for such activity is filed with and approved by the Town. Failure to install andlor maintain erosion control measures/devices may result in penalties of up to $5,000.00 per day (Sect. 58.619 (a)). INSTRUCTIONS: Identify One or Any Combination of Letters for the Schematic That Best Describes the Erosion Control Measures That Will be Used at Your Site During Construction. SILT FENCE CONSTRUCTION ENTRANCE DIRECTION OF FLOW (POINT DOWNHILL) A. Flow to the Rear B. Flow to the Front C. Flow to the Left .. FLOW FLOW FLOW HOUSE HOUSE ' HOUSE r77777 FLOW * FLOW FLOW f, <= A�" ^j3CX�r'i" � aw t (jDow to the Right E. Flow to the Front & Rear ==> I FLOW , FLOW HOUSE HOUSE FLOW FLOW X rc r. 10082020