Loading...
HomeMy WebLinkAboutNCC213951_ESC Approval Submitted_20210707Engineering and UW Environmental Services LETTER OF APPROVAL PROJECT NAME: Highland Park Lots 88-103 SUBMITTED BY: Pabst Design Group, PA NEW SUBMITTAL (X) REVISED () July 2, 2021 Eastwood Homes of Raleigh Attn: Andy Crawford 6601 Six Forks Rd. Raleigh, NC 27615 Dear Andy: JOB NUMBER: 6314-12 June 28, 2021 ACRES:.975 This office has reviewed the subject Sedimentation and Erosion Control Permit Application. We find the application to be acceptable and hereby issue this letter of approval. If any stipulations or recommendations are applicable, a list is attached and is incorporated as a part of this letter of approval. Pursuant to Section 3.8.5 of the Durham City -County Unified Development Ordinance, plans for which no permit has been issued shall expire one year from the approval date. Please be advised that a copy of the approved plan must be on file at the job site, and a land disturbing permit must be obtained and prominently displayed. Pursuant to G.S. 113A-61 (d) and Section 15.5.1 of the Durham City -County Unified Development Ordinance, you are hereby notified that the Sedimentation and Erosion Control Office has the right to inspect the site over the life of the project to insure compliance with the approved plan and ordinance. The Sedimentation and Erosion Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. if following the commencement of this project it is determined that the sedimentation and erosion control plan is inadequate to meet the requirements of the Durham City -County Unified Development Ordinance, this office may require revisions in the plan and its implementation to insure compliance with the Ordinance. Pursuant to Section 12.10. 6 of the Durham City -County Unified Development Ordinance, prior to initiating land -disturbing activity, the person conducting such activity must notify the sedimentation and erosion control office of the date that such activity will begin. It should also be noted that approval of an erosion control plan does not in any way indicate approval of, or authorization to begin installation of Storrnwater infrastructure without City/County approved Construction Drawings. We look forward to working with you on this project. Sincerely, Robert Sokolowski Erosion Control Technician CC: Pabst Design Group, PA mg/jm Rev.08110