Loading...
HomeMy WebLinkAboutSW6210204_Plan (Prop. DA)_20210422UGP UGP UGP TTTT T T UGP UGP UGP UGP UGP UGP GSANSANSANSANSAN SANSAN SAN UGTUGTUGTUGTUGT UGT UGP UGP UGP UGTUGTUGT UGT UGT G GG W W UGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTUGTTTTT S TTT TT GGGUGP UGPUGPUGPUGPUGPUGPUGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP UGP G G G G G G G G G G G G G GGGGGGUCATV UCATV UCATV UCATV UCATV UCATV UCAT V UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UCATV UC A T V UCATV UCATV UGT UGT UGT UGT UCATVUCATVUCATVUCATVUGPUGPT270 270265 270270 OHPOHPOHPOHPOHPOHPWWWWWWWWWWWWWWOHP OHP OH P OHPOHPOHPOHPOHPOHPOHPUGP UGP UGP XXXX XX2 6 5265270265265265 UCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVUCATVU C A T V UCATV UCATV UCATVUCATVUCATVUCATVCONSTRUCTION LIMITS CONSTRUCTION LIMITS CONSTRUCTION LIMITSCONSTRUCTION LIMITSCONSTRUCTIONLIMITSCONSTRUCTIONLIMITSCONSTRUCTIONLIMITSS1°14'17"W329.72'S1°47'43"E50.00'S9°41'43"E29.30'S86°02'17"W 496.13'N11°40'43"W411.20'N86°02'17"E 580.19'266267268269 272 272 270271272273273269 269 26526126 1 262 26 2 263264 2662 6 7 267 267267267 2 6 7 2682692 6 0 2612 6 2 26126226326226 3 2 6 5 264 269 267268 26 6 266267 2682 6 4 26 4 263262 2682672682 6 7 263 262 261 268267268266267263262 263 264266267268269 269 267 269 268268 269268267267268269 26926726626 4266 268 269 267 267 267 267268 267267 2 6 6 266 26 7 264262 261264 268269 2672682 6 7 268268 SHWT BORING 1 ELEV.: 260.20 SHWT BORING 2 ELEV.: 260.00 SHWT BORING 3 ELEV.: 259.50 SHWT BORING 4 ELEV.: 261.33 SHWT BORING 5 ELEV.: 261.50 SHWT BORING 6 ELEV.: 262.50 XXXXXX X X X X XXXXX XX24" RCP 24" HDPE 24" HDPE6" HDPE18" HDPE18" RCP 10" HDPE10" HDPERDRDRD RD RD 8" HDPE 18" RCP6" HDPE 8" HDPE 8" HDPE15" HDPE 2 6 8 26 8 2 6 7 267 267 26726726626626 7 26 8 26 9 2 7 0 269 268 267 270 269 26 7 267 267 268268 268267265 262 263265263267 268 268268267267 24" RCP18" RCP18" RCP24"RCP HP 268.00 10" HDPE12" HDPEHP 268.00 HP 268.50 RD RDRDRD15" HDPE 30" RCP 18" HDPE 18" HDPE24" RCP D D D D DD D 12" HDPE 6" HDPE10" HDPE 10" HDPE HP 268.00 8' X 11' FILTER UNIT (SEE SHEET C5.6) SUBSURFACE DETENTION ASSEMBLY (SEE SHEET C5.6) ANALYSIS POINT A ANALYSIS POINT B A2 A1 B B A2 SUBSURFACE DETENTION ASSEMBLY (SEE SHEET C5.6) JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICEN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E R 0 3 3 6 1 2N O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E R S E A LN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RN O R T H C A R O L I N AP R O F E S S I O N A LE N G I N E E RF R A N C I S S L I N S K Y, I I I2020-DEC-01 NCNG RAEFORD POV & MOV EXPANSION305 TEAL DRIVE RAEFORD, NORTH CAROLINA, 28376, NCNG# 3720140172 / SCO# 18-19694-01A43358 J. LEWIS F. SLINSKY F. SLINSKY PRELIMINARY PLANS FOR REVIEW ONLY DO NOT USE FOR CONSTRUCTION NAD 830 SCALE 1"=30' 60'30' C3.2 POST-DEVELOPMENT STORMWATER MANAGEMENT PLAN1" = 30' 1.THE NET INCREASE IN IMPERVIOUS AREA IS CAPTURED AND TREATED IN THE UNDERGROUND DETENTION WITH STORMFILTERS (DRAINAGE AREA A1). 2.FOR STORMWATER MANAGEMENT, THERE ARE TWO ANALYSIS POINTS, A AND B. ANALYSIS POINT A IS LOCATED JUST OFFSITE TO THE SOUTHWEST IN AN EXISTING DITCH. ANALYSIS POINT B IS LOCATED IN THE EXISTING ROADSIDE DITCH TO THE NORTHEAST OF THE SITE. A.THE DRAINAGE AREA TO ANALYSIS POINT A INCLUDES ONSITE DRAINAGE AS WELL AS SOME OFFSITE DRAINAGE FROM THE NORTH OF THE SITE THAT FLOWS THROUGH THE SITE AND IS ROUTED THROUGH THE PROPOSED STORM SYSTEM. DRAINAGE AREA 'A1' IS THE AREA THAT DRAINS TO THE UNDERGROUND DETENTION WITH STORMFILTERS AND THEN TO ANALYSIS POINT A. DRAINAGE AREA 'A2' INCLUDES ONSITE AS WELL AS OFFSITE RUNOFF THAT BYPASSES THE SCM AND DRAINS TO ANALYSIS POINT A. B. THE DRAINAGE AREA TO ANALYSIS POINT B CONSISTS OF ONSITE DRAINAGE ONLY AND IS SHOWN AS DRAINAGE AREA 'B'. POST DEVELOPMENT RUNOFF HAS BEEN DESIGNED TO BE LESS THAN PRE DEVELOPMENT RUNOFF FOR THE 1 YEAR, 24 HOUR STORM AT BOTH ANALYSIS POINTS. 3.THIS DRAWING IS FOR AGENCY REVIEW ONLY - NOT FOR CONSTRUCTION. 4.THERE ARE NO WETLANDS ON-SITE, AS DETERMINED BY TIMMONS GROUP. NOTES POST-DEVELOPMENT IMPERVIOUS AREA AND WATER QUALITY TREATMENT POST-DEVELOPMENT IMPERVIOUS (BYPASS) ANALYSIS POINT A DRAINAGE AREA (Acres) COMPOSITE C Q1 Q10 POST-DEVELOPMENT A2 (BYPASS) 3.10 0.66 3.21 3.82 POST-DEVELOPMENT A1 (SCM) POST-DEVELOPMENT A1+A2 (COMBINED) 1.78 0.77 4.88 POST-DEVELOPMENT IMPERVIOUS TREATED IN SCM POST-DEVELOPMENT STORMWATER QUANTITY CONTROL NOTE: POST-DEVELOPMENT FLOW IS LESS THAN PRE-DEVELOPMENT FLOW AT ALL ANALYSIS POINTS. REFER TO CALCULATION BOOKLET FOR ADDITIONAL INFORMATION. Q100 5.51 DRAINAGE AREA PRE DEVELOPMENT ONSITE IMPERVIOUS SURFACES (BUILT BEFORE 1997) = 2.16± ACRES POST DEVELOPMENT ONSITE IMPERVIOUS SURFACES = 3.75± ACRES IMPERVIOUS AREA REQUIRED TO BE TREATED = 1.59± ACRES IMPERVIOUS AREA TREATED WITH STORMWATER FILTERS = 1.59 ± ACRES STORMWATER QUALITY CALCULATIONS 0.70 5.64 6.79 9.20 2.55 2.97 3.69 TIME OF CONCENTRATION FLOW LINE TIME OF CONCENTRATION LINE AREA 'A1' TIME OF CONCENTRATION LINE AREA 'B' TIME OF CONCENTRATION LINE AREA 'A2' ANALYSIS POINT A DRAINAGE AREA (Acres) COMPOSITE CPRE-DEVELOPMENT 3.82 Q1 Q10 0.62 7.24 11.42 NOTE: POST-DEVELOPMENT FLOW IS LESS THAN PRE-DEVELOPMENT FLOW AT ALL ANALYSIS POINTS. REFER TO CALCULATION BOOKLET FOR ADDITIONAL INFORMATION. Q100 14.83 PRE-DEVELOPMENT STORMWATER QUANTITY CONTROL ANALYSIS POINT B 1.34 0.65 2.15 3.49 4.66 ANALYSIS POINT B DRAINAGE AREA (Acres) COMPOSITE C Q1 Q10 POST-DEVELOPMENT STORMWATER QUANTITY CONTROL Q100 POST-DEVELOPMENT B1 (BYPASS) 0.28 0.39 0.30 0.48 0.64