Loading...
HomeMy WebLinkAboutNCC213819_ESC Approval Submitted_20210628i z7� ROY COOPER Governor JOHN NICHOLSON Interim Secretary �. BRIAN WRENN Director Envir'o7YrTYE'nfol i:,r,.1a'& June 11, 2021 LETTER OF APPROVAL WITH MODIFICATIONS Union County Attention: John Shutak, Engineering Division Director 500 North Main Street, Suite 600 Monroe, North Carolina 28112 RE: Project Name: Yadkin Regional Water Supply Project (Miles 5-30) Acres Approved: 180.97 Project ID: UNION-2021-050 County: Union, City: Norwood Address: Various Streets River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Eleanor Mierzejewski, PE, Hazen & Sawyer Date Received by LQS: May 28, 2021 Plan Type: Revised Dear Mr. Shutak: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: North Carolina Department of Environmental Quality ( Division of Energy, Mineral and Land Resources } Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 s 1/ 704-663-1699 -,. Letter of Approval with Modifications Union County June 11, 2021 Page 2 of 3 The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 1, Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Eleanor Mierzejewski, PE Letter of Approval with Modifications Union County June 11, 2021 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Yadkin Regional Water Supply Project (Miles 5-30) Project ID: UNION-2021-050 County: Union 1. On Sheet C105, adequate inlet protection shall be provided for the existing 30" culvert near STA 1048+50. In addition, adequate outlet protection and channel stabilization shall be provided below culvert outlet to receiving stream tributary. Silt fence and/or fiber filter tubes shall be provided along top of channel. 2. On Sheet C 117, adequate outlet protection and/or velocity control shall be provided below existing 36" culvert outlet near STA 1162+50. 3. On Sheet C135, fiber filter tubes shall be installed along the edge of the pond near STA 1340+50. The area between the silt fence and filter tubes shall be stabilized with matting. 4. Plan approval does not include the following areas: Sheet C30 from STA 291+00 to STA 296+00, Sheets C34 & C35 from STA 339+00 to STA 342+00, Sheet C38 from STA 372+50 to STA 374+00, Sheet C40 from STA 397+00 to STA 400+00, Sheet C57 from STA 559+00 to 561+00, Sheets C58 & C59 from STA 579+00 to STA 581+00, Sheets C77 & C78 from STA 767+50 to 771+00, Sheet C89 from STA 882+00 to 884+50, Sheet C 103 from STA 1023+50 to 1025+50, Sheet C 115 from STA 1143+00 to 1144+50, Sheet C139 from STA 1384+50 to 1387+00 and Sheet C153 from STA 1523+50 to 1526+50. Revised plans shall be submitted and approved prior to land disturbance activities in these locations. ct � g-, a) v ® Q;•M cn .,� CARpV .' d •� Q" a40red c y u 1b3y7 3 r--4 ;4 cn ct •> a� -0 � U �• N N IN —, CIS 42 ct