Loading...
HomeMy WebLinkAboutSW4190902_As-Built_20210225cM ti N w N O 0 M co M N co CM ARCHITECT: JAMES E. WILKERSON, A.I.A. WILKERSON ARCHITECTS, LLC 119 EAST TALLULAH DRIVE GREENVILLE, SC 29605 PH: (864) 370-2582 OFC PH: (864) 414-1499 CELL FX: (864) 240-5375 FAX WILKPOE@CHARTER.NET SITE PLAN SUMMARY PROJECT: CIRCLE K - R&R 2723188 OWNER: CIRCLE K STORES INC PROJECT ADDRESS: 1065 BETHANIA-RURAL HALL ROAD, RURAL HALL, NC PIN #: 6819-58-8592 DEED: DB 003339 PG 01359 ZONING: HB (HIGHWAY BUSINESS) EXISTING USE: CONVENIENCE STORE W/ GAS SALES PROPOSED USE: CONVENIENCE STORE W/ GAS SALES FLOOD ZONE: NOT LOCATED IN FLOOD HAZARDS AREA PER FEMA MAP #3710681900J (EFFECTIVE 01/02/2009) PROPOSED TRACT 1.25 ACRES (AFTER NCDOT R/W TAKING) AREA: DISTURBED AREA: 1.40 ACRES (AFTER NCDOT R/W TAKING) EXISTING IMPERVIOUS Q_79 ACRES (63.2%) AFTER NCDOT R/W TAKING SURFACE AREA: PROPOSED IMPERVIOUS SURFACE 0 20 ACRES (16.0% INCLUDING 0.10 AC IMPERVIOUS CONTINGENCY) AREA: AFTER NCDOT R/W TAKING TOTAL IMPERVIOUS 0.99 AC (79.2%) AFTER NCDOT R/W TAKING SURFACE AREA: TYPE OF BUILDING V-B (NOWSPRINKLERED) CONSTRUCTION: TYPE OF CANOPY CONSTRUCTION: II-B PROPOSED BUILDING SQUARE FOOTAGE: 3,819 SF 1 SPACE PER 225 SQUARE FEET OF GROSS FLOOR AREA = VEHICLE PARKING 3,819 SF / 225 SF = 17 SPACES REQUIRED SUMMARY: REQUIRED 1 SPACE PER 100 SQUARE FEET OF INTERIOR RESTAURANT SEATING AREA = 50 SF / 100 SF = 1 SPACE REQUIRED TOTAL = 18 SPACES (1 MUST BE ADA SPACES) VEHICLE PARKING 18 PARKING SPACES SUMMARY: PROVIDED 1 VAN ACCESSIBLE ADA SPACE TOTAL = 19 SPACES STORM DRAINAG AS UILT FOR: CIRCALE K R&R 2723188 RURAL HALL, NORTH CAROLINA 27045 OWNER: CIRCLE K STORES INC PO BOX 52085 PHOENIX, AZ 85072 FORSYTH COUNTY CIRCLE K STORES INC ANDY PRIOLO 1100 SITUS COURT SUITE 100 RALEIGH, NC 27606 PH: (919) 566-1714 FAX: (919) 777-5139 CIVIL ENGINEER: TIMMONS GROUP. 5410 TRI N ITY ROAD SUITE 102 RALEIGH, NC 27607 PROJECT MANAGER: BRIAN DOWNS BRIAN.DOWNS@TIMMONS.COM PH: (919) 866-4504 ENGINEER OF RECORD: RICK BAKER, P.E. RICK.BAKER@TIMMONS.COM PH: (919) 866-4939 M co 0 Q z VICINITY MAP NTS GENERAL NOTES: ALL CONTRACTORS SHALL VISIT THE PROJECT TO FAMILIARIZE THEMSELVES WITH SITE CONDITIONS PRIOR TO BIDDING OR CONSTRUCTION. BY SUBMITTING A BID, THE CONTRACTOR AND HIS SUBCONTRACTORS ARE CONFIRMING THAT THEY HAVE VISITED THE SITE AND HAVE INCLUDED IN THEIR BID ANY ADDITIONAL ITEMS OF CONSTRUCTION THAT MAY BE REQUIRED DUE TO EXISTING SITE CONDITIONS. NO JURISDICTIONAL WETLANDS ARE PRESENT ON -SITE. SURVEYOR: TIMMONS GROUP ANDY ZIEMNIAK, PLS 5410 TRINITY ROAD SUITE 102 RALEIGH, NC 27607 P H : (984) 255-2363 ANDY.ZIEMNIAK@TIMMONS.COM Sheet List Table Sheet Number Sheet Title AB0.0 ASBUILT COVER SHEET AB3.0 ASBUILT GRADING AND DRAINAGE PLAN AB7.8 ASBUILT NOTES AND DETAILS AB7.9 ASBUILT NOTES AND DETAILS I, Rick Baker, PE, AS A DULY REGISTERED PROFESSIONAL ENGINEER IN THE STATE OF NORTH CAROLINA, HAVING BEEN AUTHORIZED TO OBSERVE ( X PERIODICALLY, WEEKLY, FULL TIME) THE CONSTRUCTION OF THE PROJECT, CIRCLE K - R&R 2723188, HEREBY STATE THAT, TO THE BEST OF MY ABILITIES, DUE CARE AND DILIGENCE WAS USED IN THE OBSERVATION OF THE CONSTRUCTION SUCH THAT BY MY INSPECTION OF THE CONSTRUCTED IMPROVEMENTS AND MY REVIEW OF THE AS -BUILT SURVEY DATA, I HEREBY CERTIFY THAT THE (1) PUBLIC IMPROVEMENTS, (2) PRIVATE IMPROVEMENTS, AND (3) PUBLIC SAFETY OF THE ABOVE REFERENCED PROJECT AS CONSTRUCTED ARE IN COMPLIANCE WITH THE REQUIREMENTS OF THE IMPROVEMENTS AS PRESCRIBED IN THE APPROVED. CONSTRUCTION DRAWINGS, APPROVED DESIGN DOCUMENTS, AND/OR ANY APPROVED MODIFICATIONS, EXCEPT AS NOTED IN RED ON THE'AS-BUILT' DRAWINGS. FURTHERMORE, I CERTIFY THAT THE RED -NOTED EXCEPTIONS DO NOT ADVERSELY AFFECT THE REQUIRED PERFORMANCE OR PUBLIC SAFETY ASPECTS OF THEIMPROVEMENTS: NAME: _R;_s. k S'w e e- DATE: t�Z�o 1��2uzJ NCPE SEAL: ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF WINSTON-SALEM, FORSYTH COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS E 0 E on� i0 0 ^E N E H � 3 Q c 0 � Q LL 00 �- U. N �vj C o M J 1 < �� a 0 Ln E F- ro CD L oUj 0 0 0 w W U Q z 0 D 0 0 W z Uj z 0 a U En W z 0 W w DATE 0312812019 DRAWN BY A. MAY DESIGNED BY B. DOWNS CHECKED BY R. BAKER SCALE AS SHOWN 00 00 < Z M J i ce I" NUW = W I-- Not!) Z W 66 re 0 0 = U Ln J a w =� 0 � I co Uj-jun = Q r� J _ 1-1 � U JOB NO. 7630.02 SHEET NO. ABO.O 79 L auu. i v , - - - - UNU: 964.bU l } f GENERAL CONTRACTOR: I ` az ` \ , / OTHERWISE. ALL ELEVATIONS ARE BASED ON VERTICAL DATUM NAVD88. PRIOR TO BEGINNING AN Jt ` TC: 964.90'' ��" ,. 965 "®/' r s 9. A PRE -CONSTRUCTION MEETING MUST BE SCHEDULED PRIOR TO ANY r� SURVEY VERIFY EXISTING GRADING IN R/W / /� FC: 965.30 % r�� RESULTING FROM NCDOT TIP PROJECT. IN CASE OF f Qa� f ' � �� TC: 965.52' , �� 4" p � � � �' l / WORK, GRADING OR INSTALLATION OF EROSION CONTROL MEASURES. DISCREPANCY, NOTIFY ENGINEER. f G08 t VC / 10. ALL HANDICAP PARKING SPACES AND STRIPED ACCESSIBILITY AISLES ARE r f r z TO HAVE NO MORE THAN A 1:50 (2.0%) SLOPE IN ALL DIRECTIONS. ALL TC: 964.8' ± (ME) f f % I ° 964.50' CG01 , 965.49' CG05 ' r SIDEWALKS ARE TO HAVE NO MORE THAN A 1:20 (5.0%) SLOPE FOR THE G08 ® INV OUT 962.95 t t r FC: 965.30' / % LENGTH OF THE SIDEWALK AND NO MORE THAN A 1:50 (2.0%) SLOPE FOR f / / Vv' f f / i \ \ n /�``� % THE WIDTH OF THE SIDEWALK. PROVIDE 5' X 5' MINIMUM LANDINGS AT ALL 1� l �f /'I // ` r t `� , rr ' TURNING AREAS AND TOP AND BOTTOMS OF ALL RAMPS WITH SLOPE LESS 4 PVC O A/161V�' f �Y ` THAN 2.00°!° IN ANY DIRECTION. SIDEWALKS WITHIN 5 OF ALL DOORWAYS / SHALL NOT EXCEED 2.00% IN ANY DIRECTION. CG02 \ ����965.40' c9 �t 964 zt,,.s' �' i rg 11. IF CONTRACTOR NOTICES ANY DISCREPANCIES IN ANY OF THESE SLOPE r f %f r / f j %✓ ,1 f r �� .� % CG01 REQUIREMENTS, IT IS THE CONTRACTORS RESPONSIBILITY TO CONTACT ��~- i rr 96sr r' THE OWNER PRIOR TO POURING ANY CONCRETE SO THAT A SOLUTION CAN y ' t f' j tr 964.20 G@ r G17 \ r f BE FOUND. = �� J r r ® _ rr 12. SPOT ELEVATIONS ARE GIVEN AT THE MAJORITY OF THE MAJOR BREAK f/ j / Q ` 4" PVC '�� ' j 'f '`�o �` r f f r f �^'° - POINTS BUT IT SHOULD NOT BE ASSUMED THAT ALL NECESSARY SPOT 64 ELEVATIONS ARE SHOWN. DUE TO SPACE LIMITATIONS, THERE MAY BE I / �� I r f f ° FC: 965.32' r 83 t \ - -' r r t I'.`� OTHER CRITICAL SPOTS NOT LABELED THAT SHOULD BE TAKEN INTO / r CONSIDERATION. THE CONTRACTOR SHALL REVIEW THE GRADING PLAN IN r ! \ �✓ ' / r , ' f , % r / / a "� v:& ,3"'.-"-.< " �\ 'r ' ✓t 1 e/ TC: 964.00' f t CG15 r P DETAIL AND SHALL ENSURE THAT ALL CRITICAL GRADE POINTS ARE STAKED O at t INV OUT 963.45 �., rr � � r,, � 965.49' �, � CG02 r � s y ,; �\ #� ` �'�� AND FOLLOWED TO PROVIDE POSITIVE DRAINAGE. r� r j \ f / �f1 963.60 / 4 . v -® 13, EXISTING VEGETATION WITHIN TREE PROTECTIVE AREAS SHALL REMAIN pp '� `°Vs '° UNDISTURBED UNLESS NOTED OTHERWISE. ANY AND ALL LANDSCAPING ® r TW: 962.10 ' h . f G41 :fir 963.79 O FC: 965.32 t9 J BW: 9S1 10' v= .r AND EXISTING TREES & SHRUBS TO REMAIN WHICH ARE DAMAGED DURING j - ®4 PVC �" /� A j C 1 964.05 �� o / 1 t f �� h f s f / DEMOLITION OR CONSTRUCTION SHALL BE REPLACED BY THE CONTRACTOR r 4 PVC .� G01 c��r >' i .965 r t t \�� f j , r USING A LICENSED LANDSCAPE CONTRACTOR AT NO ADDITIONAL COST TO G08 14. THE GRADING CONTRACTOR SHALL COMPLY WITH ALL STATE CODES IN j THE OWNER. f TIN: 964.50 I 1 - r 965.02 - 4 F ( 1 , r BW: 961.00' _.., . _ OBSERVING EROSION CONTROL MEASURES BOTH ON AND OFF -SITE. THE r / r L FC: 965.32 46 964.05' C� ° o r GRADING CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL DEVICES r s f i G 16 \ r �! \ \ r f ! AFTER EACH RAINFALL EVENT OR AS DIRECTED BY THE EROSION CONTROL ,j 4 PVC / Lo�6 �r % r ! INSPECTOR OR THE ENGINEER. Erb \ 965.02 / / \/o SURVEY NOTES 15. THE GRADING CONTRACTOR SHALL BE RESPONSIBLE FOR OFF -SITE CG06 l2 DISPOSAL OF ALL CLEARING AND GRADING WASTE MATERIALS GENERATED j 1. ALL DISTANCES SHOWN ON SURVEY ARE HORIZONTAL GROUND DURING CONSTRUCTION AND FOR OBTAINING ALL APPLICABLE PERMITS FOR DISTANCES UNLESS OTHERWISE NOTED. OFF -SITE STOCKPILES AND/OR WASTE AREAS. 964.05' G r TW: 962.50' f 16. ALL CATCH BASINS MUST BE MARKED "DUMP NO WASTE DRAINS TO JI/ �s r , 2. THIS SURVEY DOES NOT REPRESENT A TITLE SEARCH BY THIS FIRM. r \ _ \ r r BW: 960.30' 3. BASIS OF BEARING SHOWN HEREON IS NC GRID NAD 83 (NSRS 2007). STREAM" OR EQUIVALENT. r r 3 _ ° r % \ \ 4" PVC ° CG05 t 14 ; r % 4. VERTICAL DATUM SHOWN HEREON IS NAVD88. 17. ALL FINISHED GRADED SURFACES SHALL SLOPE AWAY FROM BUILDING �' CB103 !t _ 5. AS -BUILT SURVEY PROVIDED BY J. DYLAN ATKINS, PLS WITH ATKINS TOWARDS DRAINAGE OUTLETS FOR POSITIVE DRAINAGE AND TO AVOID G40 9s� r FC: 965.32' t Jf{ / � �. r LAND SURVEYING, INC. ON 1217/2020. STANDING WATER. TC: 962.35 \ 962.44' \ 1 r c96' AL �65 r TW: 963.50' r e 964. , 962.69 - ME G18 r f j 962 4" PVC °CG01 rj j ' 35' TW: 963.5 965.r t j >9 961.94 r r` 0' O c� ` , BW: 960.10 -- ff r gro 964.05 D 4" PVC r f TW: 964.50' G36 CB102 ` \ r2 Q 964.20' r f r BW: 959.50' r f % t f \ G G08 r e fl r f ilA f 1 r7Q16 \ } \ \ � \ \ N t/ G08 11 rn e 964.05 4- t f s 41 _ TC: 963.00' 0\ �.. TC: 960.05' ti ti \ r A 963. M r r f r jy TC: 959.94' \ J6201 959 G42 f / f f fr ; . \ `\ TW: 961.00, . \ f ""� BW: 960 50 q, \ ti Q e , TW: 964.00 f 1' r rr ` \ ��, �� 95 \ 1 TC: 963.50 BW- 958.00' d 1 / ,� ��� v \ v� TW: 963.30 B ° r BW: 959.50'CD l STORM STRUCTURE TABLE STRUCTURE # TOP DESCRIPTION CB102 '96 spa NCDOT 840.02 CONCRETE CATCH BASIN CB10 -"J62Z8 NCDOT 840.02 CONCRETE CATCH BASIN JBI01 -965 5' DIA. - NCDOT 840.52 PRECAST MANHOLE JB201 60 5' DIA. - NCDOT 840.52 PRECAST MANHOLE w/ 2' SUMP N i 1 % r t ' EXISTING GRADES SHOWN IN ROAD A \ \ �� �� / 9g'(l �, rr iv ° J / f' NOTES: BASED ON AS -BUILT SURVEY s \ o r r INFORMATION RECEIVED FROM ` � TC: 963.30' 963.40' ' i `6tk ` r G44 / 1. TOP REFERS TO: N rf r THE CONTRACTOR ON 09/15/2020. ` \ °' \ 1.1. CATCH BASIN: TOP OF CURB %' r r \ �1/ \ 1 ° / t r7- /ow% r f r 1 2 YARD INLET: SILL 963.70' JB101 f GENERAL CONTRACTOR: \\� r r m lr r PRIOR TO BEGINNING ANY �� r o f r rjr SURVEY VERIFY EXISTING GRADING IN R/W `� TC: 963.50' 9y6 2 TC: 964.00' r . f RESULTING FROM NCDOT TIP PROJECT. IN CASE OF / ° r j BC: 963.50'sl'`� /r G44 ti v v r m� r DISCREPANCY, NOTIFY ENGINEER. 1 _V TW:963.00' e/ ` 60: % r r TC:964.10' f BW: 957.00' BC: 963.60' N `� TC: 964.30' BC:963.80' v tJ TW: 956.00' BW: 955.50' GRADING PLAN KEYNOTES NUMBER DESCRIPTION CG01 TAPER CURB AND GUTTER TO FULL HEIGHT OVER 10' (TYP.); SEE DETAIL CK-135. CG02 CONNECT ROOF DRAIN DOWN SPOUTS UNDERGROUND TO STORM PIPE; SEE PLAN FOR SIZE (TYP.). CG05 STORM CLEANOUT; SEE DETAIL. TO BE TRAFFIC RATED IF WITHIN PAVEMENT (TYP.). SEE DETAIL CK-210. CG06 ROOF DRAIN SYSTEM, SEE PLAN FOR SIZE AND MATERIAL. MIMIMUM COVER OF 2' AND MINIMUM SLOPE OF 1.00%. G01 EXISTING CURB INLET G08 24" CURB & GUTTER (TYP.) G16 ADA STALLS (MAX SLOPE 1:50) G17 SIDEWALK (ADA ACCESS ROUTE MAX CROSS SLOPE 1:50; MAX LONG. SLOPE 1:20). TURNING AREAS AND LANDINGS AT TOP AND BOTTOM OF RAMPS AND BUILDING ENTRANCES SHALL NOT EXCEED 2.00% IN ANY DIRECTION. G18 ADA RAMP (TYP.) G27 MATCH EXISTING PAVEMENT ELEVATION G36 LIMITS OF SAWCUT AND PAVEMENT REMOVAL G41 EXISTING PERMANENT UTILITY EASEMENT G42 UNDERGROUND STORMWATER SYSTEM; REFER TO DETAILS G43 CLASS'B' RIPRAP OVER FILTER FABRIC 15' L X 5' W X 18" TH G44 RETAINING WALL TO BE DESIGNED BY OTHERS STRUCTURAL ENGINEER. 42" HIGH PEDESTRIAN SAFETY FENCE REQUIRED ATOP WALL WHEREVER WALL HEIGHT EXCEEDS 30 INCHES. G45 TEMPORARY CONSTRUCTION EASEMENT FOR NCDOT TIP R-2247 NOREPIN • . 1 ,r. x z... 4sits r • • •� h 4_21) ONE. kill" 1 0 20 40' f EXTEND 5 LF OF EXISTING 15" RCP STORM r G43 the l,• fix,` ,z PIPE ON SAME LINE AND SLOPE �` TC: 952.0' - ME ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF WINSTON-SALEM, ti FORSYTH COUNTY NCDEQ AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS N 022530 J " .r . "''o/11Ii"iIyl�'�'o. v E 0 0 N E w z �! OW t0� W U OC N 14 U.co z o- LL w0oM O z ++ � 1�l M al X U) < W � O p ,r, z �rn F-cp oq ram, w Lrn J W F- M O c� O w w w H a a z O DATE 0312812019 O DRAWN BY } A. MAY DESIGNED BY . B. DOWNS CHECKED BY . R. BAKER . ! SCALE . AS SHOWN 01. .y U z> M W m 0 N ♦' 0 CL � m � to V�j Q Z W 0 o 2' C CL 1 M° °G a U Nuz '-' a O m z N one z 0 N z CSC Q Lu Uz U z � CL S < p .o a _ ( l D o L z z S 0 w U) ~ O 2 (9 O o v(j) a W m O a� U a �� TZ _ E a a� I.L � <cai m 0 O� z H°�m U N Z U) a CL X F- m m o� 0 Q. w � 3 n m c 2 :X 7 U � N O .L 2 d m t6 � �N. U Eo C u m � a m u - JOB NO. 0 � U 37630.025 SHEET NO. T a ao AB3.00-0 F- L T m Q a CD O CD a 0 0 a v 0 -30 a F- Z 0 to N O 0 c7 m r` Q' O PROJECT INFORMATION ENGINEERED KELLY HEFNER PRODUCT 704-215-0743 MANAGER: KELLY.HEFNER@ADS-PIPE.COM KEITH COEN ADS SALES REP: 704 466-0135 KEITH.COEN@ADS-PIPE.COM PROJECT NO: 5119442 ADVANCED DRAINAGE SYSTEMS, INC. SiteASS�ST D FOR STORMTECH INSTRUCTIONS, ■ DOWNLOAD THE Q INSTALLATION API • CIRCLE K RURAL HALL BAYFILTER STORMTECH TIMMONS RURAL HALL, NC SC-740 STORMTECH CHAMBER SPECIFICATIONS IMPORTANT - NOTES FOR THE BIDDING AND INSTALLATION OF THE SC-740 SYSTEM 1. STORMTECH SC-740 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A 1. CHAMBERS SHALL BE STORMTECH SC-740. PRE -CONSTRUCTION MEETING WITH THE INSTALLERS. 2. CHAMBERS SHALL BE ARCH -SHAPED AND SHALL BE MANUFACTURED FROM VIRGIN, IMPACT -MODIFIED POLYPROPYLENE 2. STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". COPOLYMERS. 3. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) 3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR AN EXCAVATOR SITUATED OVER THE CHAMBERS. CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". STORMTECH RECOMMENDS 3 BACKFILL METHODS: • STONESHOOTER LOCATED OFF THE CHAMBER BED. 4. CHAMBER ROWS SHALL PROVIDE CONTINUOUS, UNOBSTRUCTED INTERNAL SPACE WITH NO INTERNAL SUPPORTS THAT WOULD • BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. • BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. IMPEDE FLOW OR LIMIT ACCESS FOR INSPECTION. 5. THE STRUCTURAL DESIGN OF THE CHAMBERS, THE STRUCTURAL BACKFILL, AND THE INSTALLATION REQUIREMENTS SHALL ENSURE 4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. THAT THE LOAD FACTORS SPECIFIED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, SECTION 12.12, ARE MET FOR: 1) 5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. LONG -DURATION DEAD LOADS AND 2) SHORT -DURATION LIVE LOADS, BASED ON THE AASHTO DESIGN TRUCK WITH CONSIDERATION FOR IMPACT AND MULTIPLE VEHICLE PRESENCES. 6. MAINTAIN MINIMUM - 6" (150 mm) SPACING BETWEEN THE CHAMBER ROWS. 6. CHAMBERS SHALL BE DESIGNED, TESTED AND ALLOWABLE LOAD CONFIGURATIONS DETERMINED IN ACCORDANCE WITH ASTM F2787, 7 EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE 3/4-2" (20-50 mm). "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". LOAD CONFIGURATIONS SHALL INCLUDE: 1) INSTANTANEOUS (<1 MIN) AASHTO DESIGN TRUCK LIVE LOAD ON MINIMUM COVER 2) 8 THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIALS BEARING CAPACITIES TO THE SITE DESIGN MAXIMUM PERMANENT (75-YR) COVER LOAD AND 3) ALLOWABLE COVER WITH PARKED (1-WEEK) AASHTO DESIGN TRUCK. ENGINEER. 7. REQUIREMENTS FOR HANDLING AND INSTALLATION: 9• ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT" INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE • TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. STACKING LUGS. • TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS NOTES FOR CONSTRUCTION EQUIPMENT THAN 2". • TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/INAN. AND b) TO RESIST CHAMBER DEFORMATION 1. STORMTECH SC-740 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73- F / 23" C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. 2. THE USE OF CONSTRUCTION EQUIPMENT OVER SC-740 CHAMBERS IS LIMITED: • NO EQUIPMENT IS ALLOWED ON BARE CHAMBERS. 8. ONLY CHAMBERS THAT ARE APPROVED BY THE SITE DESIGN ENGINEER WILL BE ALLOWED. UPON REQUEST BY THE SITE DESIGN • NO RUBBER TIRED LOADERS, DUMP TRUCKS, OR EXCAVATORS ARE ALLOWED UNTIL PROPER FILL DEPTHS ARE REACHED IN ACCORDANCE ENGINEER OR OWNER, THE CHAMBER MANUFACTURER SHALL SUBMIT A STRUCTURAL EVALUATION FOR APPROVAL BEFORE WITH THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". DELIVERING CHAMBERS TO THE PROJECT SITE AS FOLLOWS: • WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT CAN BE FOUND IN THE "STORMTECH SC-310/SC-740/DC-780 CONSTRUCTION GUIDE". • THE STRUCTURAL EVALUATION SHALL BE SEALED BY A REGISTERED PROFESSIONAL ENGINEER. • THE STRUCTURAL EVALUATION SHALL DEMONSTRATE THAT THE SAFETY FACTORS ARE GREATER THAN OR EQUAL TO 1.95 FOR 3. FULL 36" (900 mm) OF STABILIZED COVER MATERIALS OVER THE CHAMBERS IS REQUIRED FOR DUMP TRUCK TRAVEL OR DUMPING. DEAD LOAD AND 1.75 FOR LIVE LOAD, THE MINIMUM REQUIRED BY ASTM F2787 AND BY SECTIONS 3 AND 12.12 OF THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS FOR THERMOPLASTIC PIPE. USE OF A DOZER TO PUSH EMBEDMENT STONE BETWEEN THE ROWS OF CHAMBERS MAY CAUSE DAMAGE TO THE CHAMBERS AND IS NOT AN • THE TEST DERIVED CREEP MODULUS AS SPECIFIED IN ASTM F2418 SHALL BE USED FOR PERMANENT DEAD LOAD DESIGN ACCEPTABLE BACKFILL METHOD. ANY CHAMBERS DAMAGED BY THE "DUMP AND PUSH" METHOD ARE NOT COVERED UNDER THE STORMTECH EXCEPT THAT IT SHALL BE THE 75-YEAR MODULUS USED FOR DESIGN. STANDARD WARRANTY. 9. CHAMBERS AND END CAPS SHALL BE PRODUCED AT AN ISO 9001 CERTIFIED MANUFACTURING FACILITY. CONTACT STORMTECH AT 1-888-892-2694 WITH ANY QUESTIONS ON INSTALLATION REQUIREMENTS OR WEIGHT LIMITS FOR CONSTRUCTION EQUIPMENT. BAYSAVER BAYFILTER SPECIFICATIONS BAYFILTER MAINTENANCE THE BAYFILTER SYSTEM REQUIRES PERIODIC MAINTENANCE TO CONTINUE OPERATING AT ITS PEAK EFFICIENCY DESIGN. THE MAINTENANCE PROCESS COMPRISES THE REMOVAL AND REPLACEMENT OF EACH BAYFILTER CARTRIDGE AND THE CLEANING OF THE VAULT OR MANHOLE WITH A PRODUCTS VACUUM TRUCK. FOR BEST RESULTS, BAYFILTER MAINTENANCE SHOULD BE PERFORMED BY A CERTIFIED MAINTENANCE CONTRACTOR. A QUICK A. INTERNAL COMPONENTS: ALL COMPONENTS INCLUDING CONCRETE STRUCTURE(S), PVC MANIFOLD PIPING AND FILTER CARTRIDGES, CALL TO AN ADS ENGINEER OR CUSTOMER SERVICE REPRESENTATIVE WILL PROVIDE YOU WITH A LIST OF RELIABLE CONTRACTORS IN YOUR AREA. SHALL BE PROVIDED BY BAYSAVER TECHNOLOGIES LLC, 1030 DEER HOLLOW DRIVE, MOUNT AIRY, MD (800.229.7283). WHEN BAYFILTER IS INITIALLY INSTALLED, WE RECOMMEND THAT AN INSPECTION BE PERFORMED ON THE SYSTEM IN THE FIRST SIX (6) MONTHS. B. PVC MANIFOLD PIPING: ALL INTERNAL PVC PIPE AND FITTINGS SHALL MEET ASTM D1785. MANIFOLD PIPING SHALL BE PROVIDED TO THE AFTER THAT, THE INSPECTION CYCLE TYPICALLY FALLS INTO A BIANNUAL PATTERN GIVEN NORMAL STORM OCCURRENCE AND ACTUAL SOLIDS CONTRACTOR PARTIALLY PRE-CUT AND PRE -ASSEMBLED. LOADS. C. FILTER CARTRIDGES: EXTERNAL SHELL OF THE FILTER CARTRIDGES SHALL BE SUBSTANTIALLY CONSTRUCTED OF POLYETHYLENE OR WHEN BAYFILTER EXHIBITS FLOWS BELOW DESIGN LEVELS, THE SYSTEM SHOULD BE INSPECTED AND MAINTAINED AS SOON AS PRACTICAL. EQUIVALENT MATERIAL ACCEPTABLE TO THE MANUFACTURER. FILTRATION MEDIA SHALL BE ARRANGED IN A SPIRAL LAYERED FASHION REPLACING A BAYFILTER CARTRIDGE SHOULD BE CONSIDERED AT OR ABOVE THE LEVEL OF THE MANIFOLD. TO MAXIMIZE AVAILABLE FILTRATION AREA. AN ORIFICE PLATE SHALL BE SUPPLIED WITH EACH CARTRIDGE TO RESTRICT THE FLOW RATE TO A MAXIMUM OF 45 GPM. MAINTENANCE PROCEDURES 1. REMOVE THE MANHOLE COVERS AND OPEN ALL ACCESS HATCHES. D. FILTER MEDIA: FILTER MEDIA SHALL BE BY BAYSAVER TECHNOLOGIES LLC AND SHALL CONSIST OF THE FOLLOWING MIX: A BLEND OF 2. BEFORE ENTERING THE SYSTEM MAKE SURE THE AIR IS SAFE PER OSHA STANDARDS OR USE A BREATHING APPARATUS. USE LOW 02, HIGH ZEOLITE, PERLITE AND ACTIVATED ALUMINA. CO, OR OTHER APPLICABLE WARNING DEVICES PER REGULATORY REQUIREMENTS. 3. USING A VACUUM TRUCK, REMOVE ANY LIQUID AND SEDIMENTS THAT CAN BE REMOVED PRIOR TO ENTRY. E. PRECAST CONCRETE VAULT: CONCRETE STRUCTURES SHALL BE PROVIDED ACCORDING TO ASTM C. THE MATERIALS AND STRUCTURAL 4. USING A SMALL LIFT OR THE BOOM OF THE VACUUM TRUCK, REMOVE THE USED CARTRIDGES BY LIFTING THEM OUT. DESIGN OF THE DEVICES SHALL BE PER ASTM C478, C857 AND C858. PRECAST CONCRETE SHALL BE PROVIDED BY BAYSAVER 5. ANY CARTRIDGES THAT CANNOT BE READILY LIFTED CAN BE EASILY SLID ALONG THE FLOOR TO A LOCATION THEY CAN BE LIFTED VIA A BOOM TECHNOLOGIES, LLC. LIFT. 6. WHEN ALL THE CARTRIDGES HAVE BEEN REMOVED, IT IS NOW PRACTICAL TO REMOVE THE BALANCE OF THE SOLIDS AND WATER. LOOSEN THE PERFORMANCE STAINLESS CLAMPS ON THE FERNCO COUPLINGS FOR THE MANIFOLD AND REMOVE THE DRAINPIPES AS WELL. CAREFULLY CAP THE MANIFOLD A. THE STORMWATER FILTER SYSTEM SHALL BE AN OFFLINE DESIGN CAPABLE OF TREATING 100% OF THE REQUIRED TREATMENT FLOW AT AND THE FERNCO'S AND RINSE THE FLOOR, WASHING AWAY THE BALANCE OF ANY REMAINING COLLECTED SOLIDS. FULL SEDIMENT LOAD CONDITIONS. 7. CLEAN THE MANIFOLD PIPES, INSPECT, AND REINSTALL. B. THE STORMWATER FILTER SYSTEM'S CARTRIDGES SHALL HAVE NO MOVING PARTS. 8. INSTALL THE EXCHANGE CARTRIDGES AND CLOSE ALL COVERS. C. THE STORMWATER TREATMENT UNIT SHALL BE DESIGNED TO REMOVE AT LEAST 85% OF SUSPENDED SOLIDS, 65% OF TOTAL 9. THE USED CARTRIDGES MUST BE SENT BACK TO ADS FOR EXCHANGE/RECYCLING AND CREDIT ON UNDAMAGED UNITS. PHOSPHORUS, 65% OF TURBIDITY, 40% OF TOTAL COPPER, AND 40% OF TOTAL ZINC BASED ON FIELD DATA COLLECTED IN COMPLIANCE WITH THE TECHNOLOGY ACCEPTANCE RECIPROCITY PARTNERSHIP TIER 11 TEST PROTOCOL. BAYFILTER INSTALLATION NOTES D. THE STORMWATER FILTRATION SYSTEM SHALL REDUCE INCOMING TURBIDITY (MEASURED AS NTUs) BY 50% OR MORE AND SHALL NOT 1. CONTACT UTILITY LOCATOR TO MARK ANY NEARBY UNDERGROUND UTILITIES AND MAKE SURE IT IS SAFE TO EXCAVATE. HAVE ANY COMPONENTS THAT LEACH NITRATES OR PHOSPHATES. 2. REFERENCE THE SITE PLAN AND STAKE OUT THE LOCATION OF THE BAYFILTER VAULT. E. THE STORMWATER FILTRATION CARTRIDGE SHALL BE EQUIPPED WITH A HYDRODYNAMIC BACKWASH MECHANISM TO EXTEND THE 3. EXCAVATE THE HOLE, PROVIDING ANY SHEETING AND SHORING NECESSARY TO COMPLY WITH ALL FEDERAL, STATE AND LOCAL SAFETY FILTER'S LIFE AND OPTIMIZE ITS PERFORMANCE. REGULATIONS. F. THE STORMWATER FILTRATION SYSTEM SHALL BE DESIGNED TO REMOVE A MINIMUM OF 65% OF THE INCOMING TOTAL PHOSPHORUS 4. LEVEL THE SUB -GRADE TO THE PROPER ELEVATION. VERIFY THE ELEVATION AGAINST THE MANHOLE DIMENSIONS, THE INVERT G. (TP) LOAD. THE STORMWATER FILTRATION SYSTEM'S CARTRIDGES SHALL HAVE A TREATED SEDIMENT CAPACITY FOR 80% TSS REMOVAL BETWEEN ELEVATIONS, AND THE SITE PLANS. ADJUST THE BASE AGGREGATE, IF NECESSARY. 5. HAVE THE SOIL BEARING CAPACITY VERIFIED BY A LICENSED/ENGINEER FOR THE REQUIRED LOAD BEARING CAPACITY. ON SOLID 150-350 LBS. SUB -GRADE, SET THE FIRST SECTION OF THE BAYFILTER PRE -CAST VAULT. 6. CHECK THE LEVEL AND ELEVATION OF THE FIRST SECTION TO ENSURE IT IS CORRECT BEFORE ADDING ANY RISER SECTIONS. 7. IF ADDITIONAL SECTION(S) ARE REQUIRED, ADD A WATERTIGHT SEAL TO THE FIRST SECTION OF THE BAYFILTER VAULT. SET ADDITIONAL SECTION(S) OF THE VAULT, ADDING A WATERTIGHT SEAL TO EACH JOINT. 8. INSTALL THE PVC OUTLET MANIFOLD. 9. INSTALL THE PVC OUTLET PIPE IN BAYFILTER VAULT. 10. INSTALL THE INLET PIPE TO THE BAYFILTER VAULT. 11. AFTER THE SITE IS STABILIZED, REMOVE ANY ACCUMULATED SEDIMENT OR DEBRIS FROM THE VAULT AND INSTALL THE FLOW DISKS, DRAINDOWN MODULES (IF APPLICABLE), AND THE BAYFILTER CARTRIDGES. 12. PLACE FULL SET OF HOLD DOWN BARS AND BRACKETS INTO PLACE. PLAN 6" p , / EXP. 1,' " 9" f- B b. 6 SEE NOTE DOWEL SECTION Y-Y L MANHOLE E C D tf �. D aco6 _0/ Tj f -j' cc LU I� i U- �CL �y / ; co ).54 CFOR MANHOLE COVER $ FRAME #4 BARS "A" OPTIONAL SPACED 6" C. TO C. BRICK MAY BE USED TO ADJUST FRAME 8 COVER TO SURFACE ELEVATION MAX. 1' PIPE Err E OR F 1 %2" SECTION C-C OR D-D GENERAL NOTES: CHAMFER ALL EXPOSED CORNERS 1". USE CLASS "B" CONCRETE THROUGHOUT. OPTIONAL CONSTRUCTION - MONOLITHIC POUR, 2" KEYWAY, OR #4 BAR DOWELS AT 12" CENTERS AS DIRECTED BY THE ENGINEER. USE FORMS TO CONSTRUCT THE BOTTOM SLAB. IF REINFORCED CONCRETE PIPE IS SET IN BASE SLAB OF BOX, ADD TO BASE AS SHOWN ON STANDARD NO. 840.00. PROVIDE ALL JUNCTION BOXES OVER 3'-6" IN DEPTH WITH STEPS 12 ON CENTERS IN ACCORDANCE WITH STD. NO. 840.66. ADJUST THE STEEL, CONCRETE AND BRICK MASONRY QUANTITIES TO INCLUDE THE ADDITION OF THE MANHOLE (I.E. DIAGONAL BARS SHORTENED AROUND OPENING IN TOP SLAB, ADDITIONAL VARIABLE HEIGHT BRICK MASONRY, OPENING IN TOP SLAB.) MAX. DEPTH OF THIS STRUCTURE FROM TOP OF BOTTOM SLAB TO TOP ELEVATION IS 12 FEET. #4 BAR r DOWEL DIMENSIONS AND QUANTITIES FOR CONCRETE JUNCTION BOXES DIMENSIONS OF BOX AND PIPE REINFORCEMENT BARS "A" TOP SLAB DIMENSIONS CUBIC YARDS IN BOX TOTAL QUANTITIES BOX AND SLABS DEDUCTIONS FOR ONE PIPE CU.YDS. PIPE SPAN WIDTH HEIGHT D A B H NO. LENGTH E F TOP SLAB BOTTOM SLAB WALL/ FT. OF HT. LBS. REINF CU. YDS. MIN. "H" C.S. R.C. 12" 2' 0" 2'-0" 2`-3" 12 2'-9" 3' 0" 3' 0" 0.167 0.167 0.185 22 0.750 0.015 0.024 15" 2'-3" 2'-3" 2'-6" 12 3'-0" 3'-3" 3'-3" 0.196 0.196 0.204 24 0.902 0.023 0.036 18" 2'-6" 2'-6" 2'-9" 14 3'-3" 3'-6" 3'-6" 0.227 0.227 0.222 30 1.065 0.033 0.049 24" 3'-0" 3'-0" 3'-3" 16 3'-9" 4'-0" 4'-0" 0.296 0.296 0.259 40 1.434 0.059 0.085 30" 3'-6" 3'-6" 3'-9" 18 4`-3" 4'-6" 4'-6" 0.375 0.375 0.296 51 1.860 0.092 0.127 36" 4'-0" 4'-0" 4'-3" 20 4'-9" 5'-0" 5' 0" 0.463 0.463 0.333 64 2.341 0.132 0.178 42' 4'-6" 4'-6" 4'-9" 22 5'-3" 5'-6" 1 5'-6" 0.560 0.560 0.370 77 2.878 0.180 0.243 48" 5' 4" 5'-4" 5' 3" 26 6'-3" 6'-4" 6'-4" 0.743 0.743 0.407 111 3.623 0.235 0.317 54" 5'-10" 5'-10" 5'-9" 28 6'-7" 6'-10" 6'-10" 0.865 0.865 0.444 126 4.283 0.297 0.401 60' 6'-6" 6'-6" 6'-3" 30 7'-3" 7'-6" 7'-6" 1.042 1.042 0.481 145 5.090 0.367 0.495 66" 7'-1" 7`-1" 6'-9" 32 7'-10" 8' 1" 8'-1" 1.210 1.210 0.518 169 5.917 0.444 0.589 z ocf) Q H [IC Ca U- .J a F-I Z 0 0 C15 _ cr_ z LU QC3�O Lu CO1--1OJ O O CA Q HH LU 0 O Lu CD Cc_! Q O z M Q CL O V J (O � Z 0 O � Lz 1- L O U) r W = cal Q Z :+ Q � O V 1840.31 6 STORMTECH SC-740 CHAMBERS 2 STORMTECH SC-740 END CAPS 6 STONE ABOVE (in) 6 STONE BELOW (in) 40 % STONE VOID 570 INSTALLED SYSTEM VOLUME (CF) (PERIMETER STONE INCLUDED) 289 SYSTEM AREA (W) 105 SYSTEM PERIMETER (ft) PROPOSED ELEVATIONS 967.67 MAXIMUM ALLOWABLE GRADE (TOP OF PAVEMENT/UNPAVED) 961.67 MINIMUM ALLOWABLE GRADE (UNPAVED WITH TRAFFIC) 961.17 MINIMUM ALLOWABLE GRADE (UNPAVED NO TRAFFIC) 961.17 MINIMUM ALLOWABLE GRADE (BASE OF FLEXIBLE PAVEMENT) 961.17 MINIMUM ALLOWABLE GRADE (TOP OF RIGID PAVEMENT) 960.17 TOP OF STONE 959.67 TOP OF SC-740 CHAMBER 957.18 24" ISOLATOR ROW CONNECTION INVERT 957.17 BOTTOM OF SC-740 CHAMBER 956.67 UNDERDRAIN INVERT 956.67 BOTTOM OF STONE 8.50' 7.00. [102.00' ] (84.001 5.09' 12" INLET PIPE [61.08"] 2.50' [30.00] 2.18' 1.67' (26.16"] [20.04"] i 6" INLET PIPE 6" FLAP VALVE 24" INLET PIPE 12" OUTLET PIPE 6" INLET ORIFICE (SEE DETAIL) NOTES • MANIFOLD SIZE TO BE DETERMINED BY SITE DESIGN ENGINEER. SEE TECH SHEET #7 FOR MANIFOLD SIZING GUIDANCE. • DUE TO THE ADAPTATION OF THIS CHAMBER SYSTEM TO SPECIFIC SITE AND DESIGN CONSTRAINTS, IT MAY BE NECESSARY TO CUT AND COUPLE ADDITIONAL PIPE TO STANDARD MANIFOLD COMPONENTS IN THE FIELD. • THE SITE DESIGN ENGINEER MUST REVIEW ELEVATIONS AND IF NECESSARY ADJUST GRADING TO ENSURE THE CHAMBER COVER REQUIREMENTS ARE MET. • THIS CHAMBER SYSTEM WAS DESIGNED WITHOUT SITE -SPECIFIC INFORMATION ON SOIL CONDITIONS OR BEARING CAPACITY. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR DETERMINING THE SUITABILITY OF THE SOIL AND PROVIDING THE HEARING CAPACITY OF THE INSITU SOILS. THE BASE STONE DEPTH MAY BE INCREASED OR DECREASED ONCE THIS INFORMATION IS PROVIDED. 24" SOLID LID 36" SOLID LID - ......... 96a-56 ± 963.6 STEPS (TYP) WEIR - - - ------ 958.26 ti 522 BAYFILTER CARTRIDGE 957. -` 956.63 955.27 [6.00"] 3" PVC TEE W/ FLOWDISK 3` PVC OUTLET MANIFOLD 3" FLEXIBLE COUPLER SECTION A -A SCALE: 1/4" = 1' 52 B7-6 PBAYFILTER BFV 11LTER ,eyk OUTLET PIPE WATER QUALITY VOLUME 557 CF AIR RELEASE VALVE O DRAINAGE AREA POLYMER SEAL CARTRIDGE DESIGN VOLUME 1250 CF # BAYFILTER CARTRIDGES 1 CAPTURED SEDIMENT -CAPACITY' 131 LBS INLET DRAINAGE OUTLET MATERIAL PATHWAY THE BAYFILTER STORMWATER MANAGEMENT SYSTEM IS A FLOW CONTROL STORMWATER FILTRATION DEVICE DESIGNED TO REMOVE FINE MEDIA SPIRAL ORIFICE SEDIMENTS, HEAVY METALS, AND PHOSPORUS. THE BAYFILTER SYSTEM RELIES ON A SPIRAL WOUND MEDIA FILTER CARTRIDGE OUTLET DRAINAGE WITH APPROXIMATELY 45 SQUARE FEET OF FILTRATION AREA. THE MATERIAL FILTER CARTRIDGES ARE HOUSED IN A CONCRETE STRUCTURE INLET PLATE THAT EVENLY DISTRIBUTES THE FLOW BETWEEN CARTRIDGES. THE SYSTEM IS INLINE WITH AN INTERNAL BYPASS WEIR THAT FILTER LEG ROUTES HIGH INTENSITY STORMS AROUND THE CARTRIDGES. THE AF FILTER CARTRIDGES REMOVE POLLUTANTS FROM RUNOFF BY OUTLET FILTRATION (INTERCEPTION.JATTACHMENT) AND ADSORPTION. <; COLLECTION 'SEDIMENT CAPTURE PER CURRENT NJDEP APPROVAL MANIFOLD (DESIGN BY ENGINEER / PROVIDED BY OTHERS) �a i �a 6" INLET PIPE INVERT - 956.67 [Pf'2APASE9} 956.63 �J �� U4 01 957.29 24" INLET PIPE INVERT 6" INLET ORIFICE HOLD DOWN BAR VERTICAL DRAIN DOWN MODULE ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF WINSTON-SALEM, FORSYTH COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS u 36" SOLID LID 6.00' PLAN VIEW SCALE: 1/4" = 1' 3AYFILTER PAGE 4) 12" INLET PIPE INVERT - 95�56 958.26 STEPS (TYP) 24" SOLID LID 12" OUTLET PIPE INVERT - 955-08 9955.27 WEIR 3" PVC OUTLET MANIFOLD W FLEXIBLE COUPLER (TYP) 3" PVC TEE W/FLOW DISK 3" PVC PLUG 522 BAYFILTER CARTRIDGE CA) Q � P '_ W M 0 V 0 C7 z Z Y 0 � J Q W Lu _ U 0 O an Q rn v 0 W CO rn a W c r � W o to 3 a � � o U w W w W 1- o w w zF 1z W w w it o wo a ow F K H ,Up t U Q W W FO wa ] O r z< zz 0 Wg O w w = U,6 U W „j z O� ag 0 Q j wm _ < < Oa � °a wJ 2 < ow ® o W2 m Q 0� o = o -w wW9 V O o 3 J w H o c O v, r 41.0 3 y w< o O U U ' o �O O m° o� zo w 0 Lo 011 9 ww K m o O m wi- Z 00 o 2 <o �00 a ow o' i N O a= J O Z F. m n Ow Z <_ wW W O o 0 0 z, tY O w Q 0z O J w c, (�O J < W v S oz io wo aW z w0 w w a� z w= m� 0 Q < ° O Z' a O 0 O �w SHEET 3 OF 7 cn a z � o w WLu U ° t- ~ U o 25 z Z Y 0 S LJ _ u Qa U 0 lL = U y 0 Co J rn v o � E :5 r r a 0 < � 0 Q: I- m Y U v v Q w 0 a J x w z� Zz zw ww o zon i ow o =0 �°c a z ' Q< Z z w O wg ww Y � � U U W "j Z a� w J W < oa °a Z < ® 5 w WWg [4 W� M 2 QNw< 0 vi . "a >r„ wo O m N ip! o J CO° Xo �p o< �_ �^ Wz a N � Z �0 o 0. W =� Ww F U ww < 00 O O D 0o <o 00 'a. W w o= o &Q o zi- m cM O w Z It a = Q 2:wz w p 20 z� 0 Ow 1,-Q °w OJ W w� m J I'� ¢ W V 2 O oZ ®ti z dw ? w0 �Ww w Z z y Q w= N m� WO 0 2 } aZ _, Ln K z 00 w a F w SHEET 4 of 7 RECORD DRAWING THIS PLAN DEPICTS THE ORIGINAL DESIGN REVISED TO INCLUDE ALL CONSTRUCTION PHASE REVISIONS AND AS -BUILT INFOR- MATION PROVIDED BY THE CONTRACTOR. f�ElAtit Nt��� o���ti E 0 u n � O O N E LLI Z +, 0 W i LLI U iw N 2 1-4 U- 00 z a- W N Lu p o M O o.='-'00 a t_ CU of ~ �j x U) <� L11 0 t� O z U) In � cn 0 _ L U] to o oR W .-I Lnrn J H U) O U O w 0 W W_ LU Q U Q z O DATE ce 0312812019 O } DRAWN BY A. MAY DESIGNED BY B. DOWNS CHECKED BY R. BAKER SCALE AS SHOWN I c to 0 L W 3 N 0 toI n Q Z ► /1 Vt o E P kD •--� :3 a T...I I J O r - / H Q c o U C� u v amo O a3i Q z N0 0 w zps z z c Q I.LI U z /A m a c J u W o N F 0 z O c -0 H z� � �o � O LL Q eZ W mO 0 U w = E C rco� to I..L. Q a t coi � � o= m z 0 U Z rn O m 2 m F" m O N L o .3 !Z c m .2 Y 3 N m o m c 0 U � o m m JOB NO. y = o 37630.02 � y C N �� a o SHEET NO. AB7.8 0w L ACCEPTABLE FILL MATERIALS: STORMTECH SC-740 CHAMBER SYSTEMS AASHTO MATERIAL MATERIAL LOCATION DESCRIPTION COMPACTION / DENSITY REQUIREMENT CLASSIFICATIONS FINAL FILL: FILL MATERIAL FOR LAYER'D' STARTS FROM THE PREPARE PER SITE DESIGN ENGINEER'S PLANS. PAVED D TOP OF THE 'C' LAYER TO THE BOTTOM OF FLEXIBLE ANY SOIL/ROCK MATERIALS, NATIVE SOILS, OR PER ENGINEER'S PLANS. N/A INSTALLATIONS MAY HAVE STRINGENT MATERIAL AND PAVEMENT OR UNPAVED FINISHED GRADE ABOVE. NOTE THAT CHECK PLANS FOR PAVEMENT SUBGRADE REQUIREMENTS. PREPARATION REQUIREMENTS. PAVEMENT SUBBASEMAY BE PART OF THE 'D' LAYER. AASHTO M145' BEGIN COMPACTIONS AFTER 12" (300 mm) OF MATERIAL OVER INITIAL FILL: FILL MATERIAL FOR LAYER'C' STARTS FROM THE GRANULAR WELL -GRADED SOIL/AGGREGATE MIXTURES, <35% FINES OR A-1, A-24, A-3 THE CHAMBERS IS REACHED. COMPACT ADDITIONAL LAYERS IN TOP OF THE EMBEDMENT STONE ('B' LAYER) TO 18" (450 mm) PROCESSED AGGREGATE. 6" (150 mm) MAX LIFTS TO A MIN. 95% PROCTOR DENSITY FOR C ABOVE THE TOP OF THE CHAMBER. NOTE THAT PAVEMENT OR WELL GRADED MATERIAL AND 95% RELATIVE DENSITY FOR SUBBASE MAY BE A PART OF THE 'C' LAYER. MOST PAVEMENT SUBBASE MATERIALS CAN BE USED IN LIEU OF THIS PROCESSED AGGREGATE MATERIALS. ROLLER GROSS LAYER. AASHTO M431 VEHICLE WEIGHT NOT TO EXCEED 12,000 lbs (53 kN). DYNAMIC 3, 357, 4, 467, 5, 56, 57, 6, 67, 68, 7, 78, 8, 89, 9, 10 FORCE NOT TO EXCEED 20,000 lbs (89 kN). EMBEDMENT STONE: FILL SURROUNDING THE CHAMBERS AASHTO M43' B FROM THE FOUNDATION STONE ('A' LAYER) TO THE 'C' LAYER CLEAN, CRUSHED, ANGULAR STONE 3, 357, 4, 467, 5, 56, 57 NO COMPACTION REQUIRED. ABOVE. A FOUNDATION STONE: FILL BELOW CHAMBERS FROM THE CLEAN, CRUSHED, ANGULAR STONE AASHTO M43' PLATE COMPACT OR ROLL TO ACHIEVE A FLAT SURFACE 2,3 SUBGRADE UP TO THE FOOT (BOTTOM) OF THE CHAMBER. 3, 357, 4, 467, 5, 56, 57 PLEASE NOTE: 1. THE LISTED AASHTO DESIGNATIONS ARE FOR GRADATIONS ONLY. THE STONE MUST ALSO BE CLEAN, CRUSHED, ANGULAR. FOR EXAMPLE, A SPECIFICATION FOR #4 STONE WOULD STATE: "CLEAN, CRUSHED, ANGULAR NO.4 (AASHTO M43) STONE". 2. STORMTECH COMPACTION REQUIREMENTS ARE MET FORA' LOCATION MATERIALS WHEN PLACED AND COMPACTED IN 6" (150 mm) (MAX) LIFTS USING TWO FULL COVERAGES WITH A VIBRATORY COMPACTOR. 3. WHERE INFILTRATION SURFACES MAY BE COMPROMISED BY COMPACTION, FOR STANDARD DESIGN LOAD CONDITIONS, A FLAT SURFACE MAY BE ACHIEVED BY RAKING OR DRAGGING WITHOUT COMPACTION EQUIPMENT. FOR SPECIAL LOAD DESIGNS, CONTACT STORMTECH FOR COMPACTION REQUIREMENTS. 4. ONCE LAYER'C' IS PLACED, ANY SOIUMATERIAL CAN BE PLACED IN LAYER'D' UP TO THE FINISHED GRADE. MOST PAVEMENT SUBBASE SOILS CAN BE USED TO REPLACE THE MATERIAL REQUIREMENTS OF LAYER 'C' OR'D' AT THE SITE DESIGN ENGINEER'S DISCRETION. ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE ALL AROUND CLEAN, CRUSHED, ANGULAR STONE IN A & B LAYERS PERIMETER STONE (SEE NOTE 4) EXCAVATION WALL (CAN BE SLOPED OR VERTICAL) 12" (3001 PAVEMENT LAYER (DESIGNED BY SITE DESIGN ENGINEER) I 'TO BOTTOM OF FLEXIBLE PAVEMENT FOR UNPAVED 1 8' INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, , 18" INCREASE COVER TO 24" (6W mm). (2:4 m) (450 mm) MIN` MAX 6" SUBGRADE SOILS (150 mm) MIN (SEE NOTE 3) LDEPTH OF STONE TO BE DETERMINED BY SITE DESIGN ENGINEER 6" (150 mm) MIN 12" (300 mm) MIN NOTES: 1. CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F2418-16a, "STANDARD SPECIFICATION FOR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 2. SC-740 CHAMBERS SHALL BE DESIGNED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER COLLECTION CHAMBERS". 3. THE SITE DESIGN ENGINEER IS RESPONSIBLE FOR ASSESSING THE BEARING RESISTANCE (ALLOWABLE BEARING CAPACITY) OF THE SUBGRADE SOILS AND THE DEPTH OF FOUNDATION STONE WITH CONSIDERATION FOR THE RANGE OF EXPECTED SOIL MOISTURE CONDITIONS. 4. PERIMETER STONE MUST BE EXTENDED HORIZONTALLY TO THE EXCAVATION WALL FOR BOTH VERTICAL AND SLOPED EXCAVATION WALLS. 5. REQUIREMENTS FOR HANDLING AND INSTALLATION: • TO MAINTAIN THE WIDTH OF CHAMBERS DURING SHIPPING AND HANDLING, CHAMBERS SHALL HAVE INTEGRAL, INTERLOCKING STACKING LUGS. • TO ENSURE A SECURE JOINT DURING INSTALLATION AND BACKFILL, THE HEIGHT OF THE CHAMBER JOINT SHALL NOT BE LESS THAN 2". • TO ENSURE THE INTEGRITY OF THE ARCH SHAPE DURING INSTALLATION, a) THE ARCH STIFFNESS CONSTANT AS DEFINED IN SECTION 6.2.8 OF ASTM F2418 SHALL BE GREATER THAN OR EQUAL TO 550 LBS/IN/IN. AND b) TO RESIST CHAMBER DEFORMATION DURING INSTALLATION AT ELEVATED TEMPERATURES (ABOVE 73° F / 23- C), CHAMBERS SHALL BE PRODUCED FROM REFLECTIVE GOLD OR YELLOW COLORS. STORMTECH UNDERDRAIN DETAIL NTS STORMTECH CHAMBER UTLET MANIFOLD FOUNDATION STONE BENEATH CHAMBERS ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE STORMTECH END CAP FOUNDATION BENEATH CHAMBERS ADS GEOSYNTHETICS 601T NON -WOVEN GEOTEXTILE - DESIGN ENGINEER 4" (100 mm) TYP FOR SC-310 & SC-160LP SYSTEMS 6" (150 mm) TYP FOR SC-740, DC-780, MC-3500 & MC-4500 SYSTEMS SECTION B-B DUAL WALL PERFORATED HDPE UNDERDRAIN SC-740 TECHNICAL SPECIFICATION NTS r— 90.7" (2304 mm) ACTUAL LENGTH —I 12.2" (310 mm) 29.3" , , (744 mm) 0 0 �-- 45.9" (1166 mm) --I 85.4" (2169 mm) INSTALLED LENGTH <BUILD ROW IN THIS DIRECTION (OVER SMALL CORRUGATION) 30.0" (762 mm) 51.0" (1295 mm) START END NOMINAL CHAMBER SPECIFICATIONS SIZE (W X H X INSTALLED LENGTH) 51.0" X 30.0" X 85.4" (1295 mm X 762 mm X 2169 mm) CHAMBER STORAGE 45.9 CUBIC FEET (1.30 m') MINIMUM INSTALLED STORAGE" 74.9 CUBIC FEET (2.12 m3) WEIGHT 75.0 lbs. (33.6 kg) ASSUMES 6" (152 mm) STONE ABOVE, BELOW, AND BETWEEN CHAMBERS A A B PRE-FAB STUBS AT BOTTOM OF END CAP FOR PART NUMBERS ENDING WITH "B" PRE-FAB STUBS AT TOP OF END CAP FOR PART NUMBERS ENDING WITH 'T' t C PRE -CORED END CAPS END WITH "PC" PART # STUB A B C SC740EPE06T / SC740EPE06TPC 6" (150 mm) 10.9" (277 mm) 18.5" (470 mm) -- SC740EPE06B / SC740EPE06BPC - 0.5" (13 mm) SC740EPE08T /SC740EPE08TPC 8" (200 mm) 12.2" (310 mm) 16.5" (419 mm) --- SC740EPE08B / SC740EPE08BPC - 0.6" (15 mm) SC740EPE10T / SC740EPElOTPC 10" (250 mm) 13.4" (340 mm) 14.5" (368 mm) SC740EPEIOB / SC740EPE10BPC - 0.7" (18 mm) SC740EPE12T / SC740EPE12TPC 12" (300 mm) 14.7" (373 mm) 12.5" (318 mm) SC740EPE12B / SC740EPE12BPC --- 1.2" (30 mm) SC740EPE15T / SC740EPE15TPC 15" (375 mm) 18.4" (467 mm) 9.0" (229 mm) --- SC740EPE15B / SC740EPE15BPC -- 1.3" (33 mm) SC740EPE18T / SC740EPE18TPC 18" (450 mm) 19.7" (500 mm) 5.0" (127 mm) --- SC740EPE18B / SC740EPE18BPC - 1.6" (41 mm) SC740EPE24B` 24" (600 mm) 18.5" (470 mm) -- 0.1" (3 mm) ALL STUBS, EXCEPT FOR THE SC740EPE24B ARE PLACED AT BOTTOM OF END CAP SUCH THAT THE OUTSIDE DIAMETER OF THE STUB IS FLUSH WITH THE BOTTOM OF THE END CAP. FOR ADDITIONAL INFORMATION CONTACT STORMTECH AT 1-888-892-2694. " FOR THE SC740EPE24B THE 24" (600 mm) STUB LIES BELOW THE BOTTOM OF THE END CAP APPROXIMATELY 1.75" (44 mm). BACKFILL MATERIAL SHOULD BE REMOVED FROM BELOW THE N-12 STUB SO THAT THE FITTING SITS LEVEL. NOTE: ALL DIMENSIONS ARE NOMINAL colil Z O � C-) U �2 ILLJ U o O Z C/3 cr-, _ LLj r m Q Z ¢ b Y U w U N o U 0 o z rn o � in � U Cie Lij w ® U o sW_=u — U U m U u F J o " y u c ` V � M Iw- N � u o, ° L N aQ u O ® ° ul O o ? z 0 Fn a 0 0 m o cy)to z� Q ¢_ w O o z w F- ¢ z 0 (0 J 7 = i a m 0 w a u. w y o z w w m 0 0 i o a a � 5 SHEET 7 OF cn O a w p � U m— U p O cn or: J li Q S Z - Q = Z) Z S U, o U w N U o U O d O �_ m a o U) 3 o O o � U J W � w a a it O u a C a W U o ; `u 0 ® m ' o_ Ica' u u U zi m u }o f Y 7 � g U u f M � W F cp " �op° u 0 h o -0 z ,ten u 0 o c r` a "S1N3W3i31n03N 133raw ONV'9NOI1Vlno3m'SMVI 319V31lddV 11V 133W STV130 031VIOOSSV llV ONV O31OId30 (S)1On0021d 3H11VHi aNnSN9 01 U33NION3 NOIS30 311S 3H1 d0 UIIIsISNOdS9N iVW11ln 3Hl Si 11 'N0113nNlSNO0 01210RId ONIMV210 SIHl M31A3N IIVHS 2333PODN3 NOIS30 311S 3H1 '3AIlVlN3S3Nd3N 103IrMfd 831410 210 833NI`JN3 NEJIS30 311S 3H1 30 14011032310 9H1213aNn SOV 010301AONd NOIlVMOJN1 NO 03SVO 03NVd32md N339 SVH EJNIMVNO SIHl Of0 :03NO3HO Zti1766LS 4103fO3d NOI1dIa3S3a mmH3 Nmtial 31Va W03'H031WNO1S'MMM I V69Z-Z69-MI 99L9-6Z9-M 19M 110 1 IIIH ANOON I E 3))ns `OV023 OOOMNI OL F— HMW :NMV80 61/8L/ZO :31V0 Arle"ajeim•ULU LL gmje&.wgUaiaa W O JN 'II V H i Y OI I j ®LlCPfLuJ03mR.,. "0NI'SW31SAS39VN"M0030NVA0 U) 9ZOEti HO `GHVIIIIH a(10 AWL H031NWiS 011JAd811aH lVtlM N 3100 CA -IS NVW3naL Ob94 w F- z� w W Z IY 00 m¢p2 0UJI U Z W - Q� _3 f- W Z J> U W g �O ZO F-UJ.J hF- F_U �1ZwF¢- zU ¢w 0 0- m�¢Z J U (n ¢a OZ" ,°n NXwx LU _j¢ JSaBUJ Of wca WUp0 U O p 0 m a F- z :EUw z-1¢Wrn U) x*Ow0 >_� wd E�r•Osov>N E U QF-000 OUF xz c� 0fij of O o pn-W J pp Up M> Fes -OF ^ Ww w Q z Q ZH oow �mawo io ton ~pO- W U MOB p 0 U m IY W w Z Z m d ti W LL - Q o 0 Zo? = o G. m zo 1- > O Z cn�z O d w 0 F- (9 z v Z t w0 `- r w U 1 O O W ,i _ o V� z a. O wW� i co gx _ E >j W 0 0 F- U' rh v , C ¢ Z 0) LL S}Q~Q F- F- OW O m Y ¢ N Z L L W' U ¢ U m w Z F d JV 2i7ka cc/)MZ L W~ W F-0 z_10wQ 0 LL 4tU Q U �� wdo E<mp W m z _j D U a � 0 o E LL =Z,wU U o0 F LLI Ul v F m O U w Z O U) LU U z Q Op J ryw O w o t1i n. w - iL Q O� N O O V¢m V w w QLLv U N 0- W W Z W W ¢^ w z (L (L zQ z O _}� UJIz of E0" zQ U- ai EFtUn ¢ari ri w ¢ W C,< zOa a a m w LL OUF z w JU JU > cn Ul W NpLL W>O woo W Uj w w O JF- d WSI- O Z F U U Z O Z Z UJI w a¢¢ W W F Z ¢ WwU wuLLi�U O U w o w --- Cp E z2o z ¢O5w—w� U awaWozoz WLL0 09zzpiz znz U F MOz F0 W Z vw O w w m U)Ww 0ZLL ¢OUP -LL LLJ F F_ = F_ ca ¢X� zW LL0a cor_)=p�a p`n > 0 Fz ~FZ UO oaW.w LL�0ZUJI LUW w w j0 O �W� F- MZ p(LZ0 OWOWio �¢ p = Q> Z �0 E _¢ wW F z�F- F s F- ZW O Q'wN FUG �p¢p �OwwW ZU 0 LL o OW U 00°D UO ZF-WW W W<jp W wo U)¢� OU 2 W UJ U Q OZQ�o �WWZO 0W 3Y W w¢ z JOpZ WF'-w0a. aw> ZM mw< p F- a= cnz ZW -E pF¢OE a-rcm u) �c7 w �� o LLwm- w�: 0 >a>�Z� Z can �o W W-- WO92s I-'S0 W ¢ w ¢Z W WU W Z F- J�p�c+3 F0�Zc+� ' JQO � 0 }Z O Ww mW W FOOFt¢-J pWU > 2NF W F z w_O J >= pZ2 �Z_5 00 Wa F-0 F-0wm J 2 �F a oz 0<w 0 m(90 pw)-Wptnm F-00 M 0z-'¢ E LLg z ¢ F-ZU W w(nZJz -¢ mz p¢ z0 p w uij zw 0 2W � U) W zIL¢� W 2-W U' X as W Z _2 ZQ w gw� z a�z Z 0 <m—Q mm0zo �QWU) m OU z 0 p(Lz 2 oink Q a �����¢cl) < O_1U)z O z-z,Q O W (n MW^ Z �mzoxwwn :wmzwxw WOn¢� ¢ �F- 0 �Z¢O= a- ch FW- Woo< ozwOLLWsz 0Waw'U w z upiw ¢ JZF- Im U)0 Z OZ W W¢¢2O W<W _3 �JF-� o J Fp p �1—(n-� 0 Q QOO>OOwoQ>OOwJb OpjU U U zw z =Wof z Q UOjUwwtnpm0wc��Om F-w�� Q z gLL 0 U U > w w W O J LL W == O x J p W ¢ O O Z F_ZC) _ 0w oLLaa < c~i Wz FF- 2 x= W Z uj 1]- Z N M d' �¢ N M ¢¢ ¢> J Q.. >UJI O W 0aF O U QQQQQ doom m J w U W Q F_ U) U) N ZQ in UdMd W Z v� W VW N WW z 0 W 4�. N M v Z m O 1 Z m F_ U U Z O N ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF WINSTON-SALEM, FORSYTH COUNTY, NCDEQ, AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS RECORD DRAWING THIS PLAN DEPICTS THE ORIGINAL DESIGN REVISED TO INCLUDE ALL CONSTRUCTION PHASE REVISIONS AND AS -BUILT INFOR- MATION PROVIDED BY THE CONTRACTOR. E O v n O }_ � O n E N w z 9 0 ui m ce M w N-m n LL N M cOoM ao N U N A H j (n X o c :n Ln �` rn o� �rn J W I— w Q DATE 0312812019 DRAWN BY A. MAY DESIGNED BY B. DOWNS CHECKED BY R. BAKER SCALE AS SHOWN am 00 N 00 � T--I Z J i e cgU Nuw z 0 w z 0 z F z _z � ran V l Irle O W _ F z O Z p o 6.L i < Lu J=� -I ) (I.) O z p---q U JOB NO. 37630.02 SHEET NO. AB7.9 0 c a ui U C 0 m 3 Q ca U a M o. T c m 0 a 0 N 3 a> >3 0 c fi s -a c m m a c a m 0 3 C •a 0 o O m to � Z 00 o2 c 2 m Y- E o -0 C C N a^ a NJ LL w O 3 U) Z N O m 2 CL 2 m I- a, ow 0 CL o -3 CL N C aY U � c axi o y N ClE C Y E3 b s3 0 U -0 6 v `a 0-0 _ o c to a, o � U a2 C to � C � o � U CL 0-0 - L