Loading...
HomeMy WebLinkAboutSW8980808_Compliance Evaluation Inspection_20201110ROY COOPER Governor WCHAEL S. REGAN secretary BRIAN WRENN Acting Director NORTH CAROLINA QuaMy November 10, 2020 CERTIFIED MAIL. #7017 0190 0000 9526 9659 RETURN RECEIPT REQUESTED Ms. Billie M. Bell Howard 3153 Freedom Way Hubert, NC 28539 CERTIFIED MAIL #7017 0190 0000 9526 9666 RETURN RECEIPT REQUESTED ABJK, LLC Mr. A. Jeffrey Brown, Registered Agent 115 Atlas Brown Drive Jacksonville, NC 28540 CERTIFIED MAIL #7017 0190 0000 9526 9673 RETURN RECEIPT REQUESTED Robert and Debbie Fisher 112 Oyster Bay Road Swansboro, NC 28584 CERTIFIED MAIL #7017 0190 0000 9526 9680 RETURN RECEIPT REQUESTED Titan Carolina Concrete 5700 Lake Wright Drive STE 300 Norfolk, VA 23502 CERTIFIED MAIL #7017 0190 0000 9526 9697 RETURN RECEIPT REQUESTED Deep Creek Landing, LLC 124 Leslie Drive Hubert, NC 28539-3745 CERTIFIED MAIL #7017 0190 0000 9526 9703 RETURN RECEIPT REQUESTED Onslow County 234 NW Corridor Blvd Jacksonville, NC 28540-5309 Subject: NOTICE OF VIOLATION, NOV-2020-PC-0472 Onslow Asphalt Stormwater Permit No. SW8 980808 Onslow County Dear Sirs and Madams: On November 6, 2020, Wilmington Regional Office staff of the Division of Energy, Mineral and Land Resources (DEMLR) performed a Compliance Inspection of the subject project, located at Freedom Way, Onslow County, North Carolina. The inspection was performed to determine the status of compliance with Stormwater Permit Number SW8 980808 issued to you on November 2, 1998. North Carolina Department of Environmental Quality I Division of Energy. Wmeral and Land Resources igLD--W-7>Wilmirkgtan Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 9i0.796.7215 State Stormwater Permit No. SW8 980808 November 12, 2020 Page 2 of 3 The project has been found in violation of Stormwater Permit Number SW8 980808; issued pursuant to the requirements of the stormwater rules, I SA NCAC 2H.1000. The violations found are: 1. Failure to Mods the Permit. The SW8 980808 low density permit was issued based on a 111.16 acre project area, which Ms. Howard owned at the time the permit was issued. Per Design Condition I.12 of the permit, further subdivision of the project area requires that the permit be modified. Several parcels out of that 111.16 acre tract have been subdivided and conveyed to the various entities listed below, all without benefit of approval from the Division to modify the permit. The remaining acreage for low density is ±72.74 acres as reflected on the current Onslow County GIS record for this parcel. Four of the parcels have been re -permitted, without modification to this permit. a. Robert & Debbie Fisher — 1.00 acre on January 26, 1999; b. Onslow County — 0.92 acres on March 18, 2003; c. Robert & Deborah Fisher — 4.24 acres on July 20, 2004; SW8 041225 d. ABJK, LLC — 10 acres on February 2, 2006; e. Titan Carolina Concrete, LLC —10.05 acres on August 16, 2007; SW8 070210 (issued to Two -Ten Investors, Inc.) f. Deep Creek Landing, LLC — 2.37 acres on April 2, 2013; SW8 130806 g. Sharon Howard Quinn — 0.58 acres on April 18, 2016; h. Robert & Deborah Fisher — 7.65 acres on December 6, 2017; i. Robert & Deborah Fisher —1.40 acres on November 26, 2018; SW8 180302 A separate new permit application must be submitted under the 2017 rules if any "subject" development has occurred within their parcel after ownership of the parcel was conveyed. Parcels that have a permit already or do not have additional development, need to be transferred to the new property owner or simply update the mailing address. 2. Failure to Operate and Maintain the Stormwater System. Per Section H Schedule of Compliance #2, the Permittee shall provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The site is not utilizing sheet flow or vegetated conveyances in the location of the asphalt and rock stockpiles, as detailed in the current permit documents. Please note that the ability to utilize sheet flow and vegetated conveyances will not be sufficient to meet the minimum treatment requirement if the density within the 10 acre project area exceeds 12%. As also stated in the permit, the approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals, including, but not limited to: • Routine monthly inspections; • Sediment Removal; • Mowing and re -vegetation of side slopes; • Immediate repair of eroded areas; • Maintenance of side slopes in accordance with the approved plans and specifications; e Debris removal and unclogging of the outlet structure, orifice device and catch basins and piping; • Access to the outlet / bypass structure must be available at all times To correct these violations you must: 1. Submit applications for modification of the original permit area. 2. The areas that have sybsequent permits need to be removed from this permit. The Fisher tracts should be revised to include all development after 1998. The front metal buildings and the associated parking lots are phased development in conjunction with SW8 041225 Fisher Rentals. The Fisher Rentals permit must be brought into compliance with the permit including revising the plan to match field conditions and installation of stormwater control measures. State Stormwater Permit No. SW8 980808 November 12, 2020 Page 3 of 3 4. The asphalt plant area must revise the plan or submit a new permit application to accommodate the density of the area. Please provide a "Plan of Action" by January 1, 2021 to DEMLR that states how and when these violations will be corrected. If we do not receive your plan of action by this date you will be in violation of 15A NCAC 2H.1000, which could result in the initiation of enforcement action which may include recommendations for the assessment of civil penalties, pursuant to NCGS 143-215.6A. By copy of this letter to the Onslow County Building Inspector, this office is requesting that the Building Inspector consider withholding building permits and Certificates of Occupancy for this project until this matter is satisfactorily resolved. If you have any questions concerning this matter, please call Brian Lambe or me at (910)796-7215. Sincerely, Mr.-, "- -Uk Brian Wrenn, Director Division of Energy, Mineral and Land Resources Enclosures: Compliance Inspection Report DES\bpl: \\\Stormwater\Permits & Projects\ 1 998\980808 LD\2020 11 NOV 980808 cc: Sharon Howard Quinn; 3196 Freedom Way; Hubert, NC 28539-3802 Onslow County Building Inspections Annette Lucas, PE; DEMLR Wilmington Regional Office Stormwater File Compliance Inspection Report Permit: SW8980808 Effective:11/02/98 Expiration: Project: Onslow Asphalt Owner: Onslow Asphalt Inc County: Onslow Region: Wilmington Contact Person: Billie Howard Directions to Project Type of Project: State Stormwater - Low Density Drain Areas: 1 - (Queen Creek) (03-05-01) ( S&HQW) On -Site Representative(s): Related Permits: Title: Adress: 103 Waterfront Rd City/State/Zip: Hubert NC 28539 Inspection Date: 11/06/2020 Entry Time 01:OOPM Primary Inspector: Brian P Lambe Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: ❑ Compliant 0 Not Compliant Question Areas: State Stormwater (See attachment summary) Phone: Exit Time: 02:OOPM Phone: Inspection Type: Compliance Evaluation page 1 Permit: SWB980808 Owner -Project: Onslow Asphalt Inc Inspection Date: 11/06/2020 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Submit applications for modification of the original permit area to remove the areas that have subsequent permits. The modficiation must either address the revisions to the asphalt plant area or a new permit application must be submitted accommodate the density of the area. page 2 Permit: SW8980808 Owner -Project: Onslow Asphalt Inc Inspection Date: 11/06/2020 Inspection Type Compliance Evaluation Reason for Visit: Routine File Review Yes No NA NE Is the permit active? U ❑ ❑ ❑ Signed copy of the Engineer's certification is in the file? ❑ ❑ 0 ❑ Signed copy of the Operation & Maintenance Agreement is in the file? ❑ ❑ E ❑ Copy of the recorded deed restrictions is in the file? ❑ ❑ N❑ Comment: The permit does not allow for additional impervious area without modification of the permit per design standard 7. The permit requires revised plans anytime there is any revision to the approved plans transfer of ownership, redesign or addition to the approved amount of built upon area or further subdivision of the project area. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ❑ 0 ❑ ❑ Is the drainage area as per the permit and approved plans? ❑ N ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ❑ 0 ❑ ❑ Comment: The asphalt plant has four SCMs that are not on the original permit map The map details sheet flow a treatment. The site conditions of the plant do not allow for sheet flow. Other areas of the permitted area have been developed with other stormwater permits or without stormwater permits. Fisher properties have additional permits: SW8 180302 (not constructed post offic and SW8 041225 (not constructed according to plans). The two metal buildings on the Fisher Properti should have been included in thier SW8 041225 permit as phased development. Those properties will need to find a permitting solution. The Titan Carolina Concrete LLC Property is permitted under SW8070210, which will need to be transferred. Deep Creek Landing LLC obtained SW8130806. The SW8 980808 permit should have been modified exclude these areas. SW Measures Are the SW measures constructed as per the approved plans? Are the inlets located per the approved plans? Yes No NA NE ❑ E ❑ ❑ ❑ ❑E❑ Are the outlet structures located per the approved plans? ❑ ❑ E ❑ Comment: The permit documents sheet flow as the means of treatment. The asphalt plant utilizes four ponds for stormwater treatment. Operation and Maintenance Are the SW measures being maintained and operated as per the permit requirements? Yes No NA NE ❑ N ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ DWQ upon request? Comment: The permit documents sheet flow as the means of treatment. The asphalt plant utilizes four ponds for stormwater treatment. Other Permit Conditions Is the site compliant with other conditions of the permit? Yes No NA NE ❑ 1 ❑ ❑ page 3 Permit: SW8980808 Owner -Project: Onslow Asphalt Inc Inspection Date: 11/06/2020 Inspection Type Compliance Evaluation Reason for Visit: Routine Comment: The permit has not been modified or revised to accomodate additional impervious area and subdivisio the original 111 acres permitted as low density. Four permits have been issued for parcels but this permit was not revised to reflect those changes. Other WQ Issues Is the site compliant with other water quality issues as noted during the inspection? Comment: Yes No NA NE ❑ ❑ ❑ ❑ page 4 ROY COOPER Governor MIC14AEL S. REGAN Secretary S. DANIEL SMITH Interim Director April 12, 2019 Ms. Billie M. Bell Howard 3153 Freedom Way Hubert, NC 28539 NORTH CAROLINA Environmental Quality ABJK, LLC Mr. A. Jeffrey Brown, Registered Agent 115 Atlas Brown Drive Jacksonville, NC 28540 Subject: Notice of Inspection -Not Compliant Onslow Asphalt, Inc. State Stormwater Management Permit No. SW8 980808 Onslow County Dear Ms. Howard and Mr. Brown: On March 11, 2019, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) inspected the subject project, located at Waterfront Road in Onslow County to determine the status of compliance with State Stormwater Management Permit Number SW8 980808 issued to you on November 2, 1998. DEMLR file review and site inspection revealed that the site is not in compliance with the terms and conditions of this permit. A copy of the March 11, 2019 inspection report was mailed to you on March 12, 2019. This letter provides further clarification to the March 12, 2019 letter. Please note the following additions and revisions to the previous letter: The SW8 980808 low density permit was issued based on a 111.16 acre project area, which Ms. Howard owned at the time the permit was issued. Per Design Condition 1.12 of the permit, further subdivision of the project area requires that the permit be modified. Several parcels out of that 111.16 acre tract have been subdivided and conveyed to the various entities listed below, all without benefit of approval from the Division to modify the permit. The remaining acreage for low density is ±72.74 acres as reflected on the current Onslow County GIS record for this parcel. a. Robert & Debbie Fisher - 1.00 acre on January 26, 1999; b. Onslow County - 0.92 acres on March 18, 2003; c. Robert & Deborah Fisher - 4.24 acres on July 20, 2004; d. ABJK, LLC - 10 acres on February 2, 2006; e. Titan Carolina Concrete, LLC - 10.05 acres on August 16, 2007; f. Deep Creek Landing, LLC - 2.37 acres on April 2, 2013; g. Sharon Howard Quinn - 0.58 acres on April 18, 2016; h. Robert & Deborah Fisher - 7.65 acres on December 6, 2017; i. Robert & Deborah Fisher - 1.40 acres on November 26, 2018; The original 1998 stormwater permit application indicates that Ms. Howard is the legally responsible party for the facility, i.e., the proposed asphalt plant. However, it now appears that she was the owner of the 111.16 acre property and leased part of the property to Onslow Asphalt, Inc. for the asphalt plant. In 2006, Ms. Howard sold a 10 acre parcel containing the asphalt plant to ABJK, LLC. Please submit a modified application by May 12, 2019, for the current SW8 980808 permit, which reflects the loss of 38.42 acres of project area and which includes any development within the remaining 72.74 acre tract that has occurred and is not shown on the current approved plans. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources J 0F, Wilmington Regional Office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 NaRn� CAFO gnu 0 ;"� 910.796.7215 ♦t State Stormwater Permit � o. SW8 980808 . Page 2 of 3 The Division will contact each owner of the nine parcels that were subdivided and sold from the original 111.16 acre tract as noted above, about the requirement to submit a separate new stormwater permit application under the 2017 rules if any "subject" development has occurred within their parcel after ownership of the parcel was conveyed. For those projects that have a permit already, some may need to be transferred to the new property owner or simplyupdate the mailing address. ABJK, LLC will need to apply for a separate new permit. That site is not being maintained in accordance with the SW8 980808 approved plans. The site is not utilizing sheet flow or vegetated conveyances in the location of the asphalt and rock stockpiles, as detailed in the current permit documents. Please note that the ability to utilize sheet flow and vegetated conveyances will not be sufficient to meet the minimum treatment requirement if the density within the 10 acre project area exceeds 12%. The Division is requesting that ABJK, LLC submit a new permit application to the Division by May 12, 2019 for their 10 acre parcel. Please be advised that until a Permit Transfer Application Form is submitted to the Division and the Division approves the transfer of the permit, the permittee is required to comply with the terms, conditions and limitations of the Stormwater Management Permit SW8.980808 issued under Title 15A NCAC 02H.1000 and North Carolina General Statute 143-214.7, including the requirement to maintain overall low density, to modify the permit prior to the subdivision and sale of the property, and to notify the Division of any change of ownership or mailing address. Failure to provide the requested information, or to respond to this letter with a plan of action, including a timeline to resolve the identified deficiencies, by May 12, 2019, are considered violations of the permit. If the requested information is not submitted to this office by the due date, then DEMLR staff will re -inspect the site and may issue a Notice of Violation. Please also note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil penalties of up to $25,000 per day. If you have any questions, please contact me at the Wilmington Regional Office, telephone number (910)-796-7215 or via email at 1inda.1ewis@ncdenr.gov Sincerely, &V� Linda Lewis, E.I. Environmental Engineer III Enclosure: Compliance Inspection Report Permit Transfer Application Form 4�GDS\arl: G:\\\Stormwater\Permits & Projects\1998\980808 LD\2019 04 CEI. deficient 980808 cc: Dave Newsom, P.E. Crystal Coast Engineering WiRO Stormwater Permit File SW8 980808 WiRO Stormwater Permit File SW8 070210 WiRO Stormwater Permit File SW8 041225 WiRO Stormwater Permit File SW8 130806 State Stormwater Permit'No. SVv8 980808 Page 3 of 3 Additional cc:'s Fisher, Robert Jr., & Deborah 3100 Freedom Way Hubert, NC 28539 Two -Ten Investors, Inc. Harry M. Shaw, President PO Box 1108 Clinton, NC 28329 Titan Carolina Concrete, LLC (merged) S & W Ready Mix Concrete Company, LLC (surviving entity) Lawrence Wilt, Jr., Manager 5700 Lake Wright Drive, Suite 300 Norfolk, VA 23502 Sharon H. Quinn 3196 Freedom Way Hubert, NC 28539-3802 Onslow County David Cotton, County Manager 234 NW Corridor Boulevard Jacksonville, NC 28540-5309 ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH biterim Director March 12, 2019 Onslow Asphalt, Inc. Ms. Billie M. Bell Howard 3153 Freedom Way Hubert, NC 28539 Onslow Paving and Grading, LLC 115 Atlas Brown Drive Jacksonville, NC 28540 ABJK, LLC 115 Atlas Brown Drive Jacksonville, NC 28540 Robert L Fisher Jr and Debbie Fisher 112 Oyster Bay Road Swansboro, NC 28584 NORTH CAROLINA Environmental Quality Subject: Notice of Inspection Not Compliant Onslow Asphalt, Inc. Siaie Stormwater Management Permit No. SW8 SW8 980808 Onslow County Dear Ms. Howard: Effective August 1, 2013, the State Stormwater program was transferred from the Division of Water Quality (DWQ) to the Division of Energy, Mineral and Land Resources (DEMLR). All previous references to DWQ will remain in older stormwater permits issued prior to August 1, 2013 until they are modified. Please note that this letter references DEMLR as the Division responsible for compliance with the permit. On March 11, 2019, the Wilmington Regional Office of the Division of Energy, Mineral and Land Resources (DEMLR) inspected the subject project, located at Waterfront Road in Onslow County to determine the status of compliance with the State Stormwater Management Permit Number SW8 980808 issued on November 2, 1998. DEMLR file review and site inspection revealed that the site is not in compliance with the terms and conditions of this permit. Please find a copy of the completed form entitled "Compliance Inspection Report" attached to this letter, which summarizes the findings of the recent inspection. As indicated in the attached inspection report, the following deficiencies must be resolved: 1. Onslow Asphalt, Inc is dissolved. Please submit a permit transfer application form. 2. Additional development has occurred within the original limits of the permit. The original permit accounted for 110 acres. Development on parceled land must be submitted as a revised plan. 3. The asphalt plant has not maintained treatment for the stormwater. The permit application details sheet flow in the location of the asphalt and rock stockpiles and for vegetative conveyance. Submit revisions in best management practices. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources ,.E,� Wilmington Regional office 1 127 Cardinal Drive Extension I Wilmington, North Carolina 28405 jga wa 910.796.7215 State Stormwater Permit No. SW8 [insert permit number] Page 2 of.2 Please be reminded that it is your responsibility as the permittee of record to submit a completed and signed Permit. "Transfer Application Form to the Division of Energy, Mineral and Land Resources 30-60 calendar days prior to making any of the below listed changes. This form is available on our website at: Mips:/ d- q.»c�ev/about/divisions/energy-m,incral_-..land-resources/energy-mineral-land-rules/stormwater- program/post-construction. a. An ownership change including the sale or conveyance of the permitted project area in whole or in part. This does not include the conveyance of subdivided residential lots to individuals which are made subject to a recorded declaration of covenants and restrictions which contain the statements required by the stormwatcr permit; b. The sale or conveyance of the common areas to a Homeowner's or Property Owner's Association, subject to the requirements of Session Law 2011-256; c. Foreclosure proceedings; d. Filing for Bankruptcy; e. Dissolution of the partnership, corporate entity or LLC. Per NCGS 57D-6-07, a dissolved LLC shall wind up, which may include continuing the business of the LLC for a period of time. The person charged with winding up the LLC shall collect the LLC's assets [which include the stormwater management permit], and distribute the assets as provided in NCGS 57D-6-08(2). f. A name change of the owner / permittee; g. A name change of the project; h. A mailing address change of the permittee; Please be advised that until you submit the required Permit Transfer Application Form to the Division and receive approval from the Division to transfer the permit, you are required to comply with the terms, conditions and limitations of the Stormwater Management Permit under Title 15A North Carolina Administrative Code 2H .1003 and North Carolina General Statute 143-214.7, including the operation and maintenance of the permitted stormwater system. Failure to provide the requested information, or to respond to this letter with a plan of action, including a timeline to resolve the identified deficiencies, by March 31, 2019, are considered violations of the permit. If the requested information is not submitted to this office'by the due date, then DEMLR staff will re- inspect the site and may issue a :Notice of Violation. Please also note that any individual or entity found to be in noncompliance with the provisions of a stormwater management permit or the stormwater rules is subject to enforcement action as set forth in NCGS 143 Article 21, including the assessment of civil penalties of up to $25,000 per day. If you have any questions, please contact me at the Wilmington Regional Office, telephone number (910)- 796-7215 or via email at Brian.Lambe@ncdenr.gov Sincer , rian Lambe Environmental Specialist Enclosure: Compliance Inspection Report Permit Transfer Application Form GDS\bpl: \\\Stormwater\Permits & Projects\1998\980808 LD\2019 03 CEI_deficient 980808 cc: WiRO Stormwater Permit File } 7 J o i J m W o m CO } C? m W m l., Q U N M r2 S :n J O N `W w E m v to �ZCQ¢ 5 o wz '� w0 z u. IY W W 0 p v In m N -i i y Z 'n ^ Q o m W � ! O i Q LU �p 1 O M m I LL M m O .- W N l O 5 '- O�2 10 O O O 7 O 7 CN V) i m 0 i I c M � I y le a� � U 7JT', 3 . I J J ui 1 � � v a VA W y c N J m_ '0 O y aQ U°'a p� C N a cD °oo O- 3 Q`om Lcd3 7 Em o pN H> o ww N Ed m U yR h C m ccoa c C 7 1 J M iC}HyO C¢ O EL pO UOW0 J ( O U eyZ O r 1 m mLh m � H N O m I 0 m ELJ \\ \ Co cc__, 0/3/ a� \/ �7$! \i)§ \/_ _ ■ § cn \ ry \ ƒ 21 3: $ / � \\(\ U- a !kb(3 , 0 fn n« oo<z< \ ,!L? „ &!4§§\ 5$ _}\< _ . §/y m /mn / @gym § LU <Z U -- } \ -U) - � tv, j -.\2 \\() ) ) ! ( 0. 2 {_B `) k �\ja\)),f& \E 7»)y i \) =2 £J \ ��! j)/f {=3 ) () k. e §;„ )/ƒ/7)/3 ol g§§® !/a \o)22) ) ua)]/ /go2| f\k f2:_ zz ���<2=3) 2a2f\2 g§esz / L a d m CD a) a) CD U U d C Y 0- W 0 C❑ 0 > 0 m U mn w n o m 0 m .c d m O N C, m J 0 U U N `"�v mavvvvv g 3 J T N V L 10 (p v m�F7 rn' d'> ro o Q >>> o o� Z ii O m m co w U U to m y _10 m V) ¢ O O rn cn M O O O O O O 0 01 C Ct O O C O f O .I r CLOD N ij m N N C N - .-- N O O O O O O II N I co Q m I I O C C C 7 J J ❑ 7 C II MD a m m d m W d U> > >> o 4� c m 7 o, c n m M m aD � C U > 5 off a n o ii m c>> o c o> > E E'w :I w c� y v X p u w o m m m c .� >> 9 a o v cu m '9 W x W 11 tL m m y�mH m m>aU�N��❑JOm LL' Ij 1 a N d 0. d w w w '� O m m 'O m m m 'C En<<<000m S0 ZZ fnJJ ILL ILL mC'O d> it H C,4 p p wee N T O N W H R0Z O Cd m W c6 Xpof cc c Qc N � T � O T � � L W _ 06 2 O 11 m p W 2 LLI w m LL _N p U) ca 2 Cfl Z w w � u LU O °s p n W U Z o U) U)0 O C D v O In 30 a) } U U)O Z U C)xs M ~ T c c O Z o C) u D- ?> = O N U o No O O w L Z N U O O iu O�m pw m w m LO m O Z J [� J T m v� .p W a1 LU E �— ti 3�IMn Z QZ� U o mZ -j U7 Q cy LL .f0 E O L c- 00 M O Nr� Z U� J J O N O in Q W '' T ��-° mCD N co o �U � cr° °r� =cola m�C`')M N �oo UToMrn Y M QY LO U- T cy c000 O N oo V C M c- _ l() Z O O m Q coo �-U a o a M IQ T C N CD H a U) N L) a, I- m i� _0 CJ T Q O R U � C U) O a) L to a) 7 O 3 c 01 'Q v N N O � U o 0 a) aD w Q Q (0 a Q ?� O w p J 0 1 L >, W Co a) � C� Q C O) E a5 ~ v, c O Q O O E w O N O a) O to o m J r t 0 c o c Q' Q 'O cn -o o Q O o o N m E c rn 3 d N ` ' U X 0- a N L .� Z T c C r a�.�Q �I�dZ)DZC) JLLN�dF- -09 F, OOUOZQ \ L Cl) m (!1 `p ! N L) U) r o i CO T o U7 O d N Z U Z C) 0 ui � J o U Z QJ J 0 Y Y Q coLO Q Q � � i U) N U 0 N Q rn N o C C 00� ch CD Z Q 06 Z U J (� LL. �O O U J U c Z Q d 0 0 0 O m N CU 0 I m o oc0 0000 Q c0 N N y ti LL L.L tl LL LL N N N 0 o N N N E LL LL L N N N { c':O ❑ N W F }�L E ❑LU w Fyn € M 3 0 13} 2 j Y E[ 2 O w w LL m cn m c m u, f d w co IL w En 1 C � o 1II rn'` o T m m w m QE U rn p E� o ° J a m ❑ w U m m d 6 av 0 � m O E o a� o> �n a E m E N c"jm W cn O W aa) o m 3t ` m a� 0 m m m>>> m m N ry m IL J Q m N c7 N O N O a) o m N m :0 m m m-- 'O o o O m d J C U` V] U7 (n Cn VJ Q Q Q Z Z co C. 'a❑ os� Nwr L:U Z �❑o }ALL LL ❑ w N Z W �Qr C4 Q N � o 2 2 O w w U- LL ❑ mU °C Z y J J N C N Aco C ❑ W Q m O fy a J J_ Cn O W co O W J_ CO LL !LU U J LU Ov m H CO W T W J 00 .0 J O o m N ci ❑ I O < W T C C0 0 O O I w U U w ❑ o to i Z 3: O x cc x m d w a m m w Q I? W O w m J m _ N cC CA O (O ❑ N Q Q O 07 I 7 C � N i CL i � rJ 1 I a a O O m o ) m 1 O 1 i l i I I � C O In � C%ja O O E (rD N o E O co 1 Q r T CJ U m c a c V o 0� o w U W 1❑ Y E o p j c° E E — N N �' y (n O LL i m o o m cu d> >> u m CJQ (A o N a ❑mdJ Cis �(n(nCnCnU) QQZZ M